Loading...
HomeMy WebLinkAboutD_Black_River_High_Use_Engine_Replacement_FinalDEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT D_Black River High Use Engine Replacement_Final PLANNING DIVISION CERTIFICATE OF EXEMPTION FROM SHORELINE SUBSTANTIAL DEVELOPMENT EVALUATION FORM & DECISION DATE OF DECISION: July 10, 2026 PROJECT NUMBER: LUA26-000228, SME PROJECT NAME: Black River Pump Station High Use Engine Replacement PROJECT MANAGER: Mariah Kerrihard, Associate Planner APPLICANT: John Dan Brubaker, King County Department of Natural Resources and Parks 201 S Jackson St, Suite 6300, Seattle WA 98104 OWNER: King County Department of Natural Resources and Parks 201 S Jackson St, Suite 6300, Seattle, WA 98104 CONTACT: Alexia Dorsch, Jacobs Engineering 1100 112th Ave NE, Bellevue, WA 98004 PROJECT LOCATION: 550 Monster Road SW, Renton, WA 98057 (APNs: 3779200090 and 7229500281) PROJECT DESCRIPTION: The applicant, King County Department of Natural Resources and Parks, Water and Land Resources Division, in coordination with the King County Flood Control District, is requesting a shoreline exemption to replace the existing engine associated with Pump P3 and an associated equipment cooling water pump at the Black River Pump Station (BRPS). The Black River Pump Station is located at 550 Monster Rd SW (APNs 3779200090 and 7229500281). The project is located in the Resource Conservation zone and is within the Black River/Springbrook Creek Shoreline Jurisdiction, Reach A (BRSC-A). The Black River is a Shoreline of the State and a Type S stream. The BRPS is located on a concrete dam that spans the Black River channel, conveys all Springbrook Creek flow to the Green River, and is a critical component of the Green River flood control system protecting developed lands in Renton, Kent, and Tukwila from backwater flooding. The pump station has operated continually since its construction in 1972 and includes eight (8) flood control pumps (P1–P8), with one (1) electric motor‑driven pump and seven (7) diesel engine‑driven pumps that pump river water from the Black River to the Green River under normal and flood conditions. The scope of work includes demolishing the existing Pump P3 engine, concrete pedestal, and associated equipment within the pump station structure and installing a new modern, automated engine and a dedicated equipment cooling water (ECW) pumping system (replacement of existing pump P12 with new pump P16) to support future construction and long‑term operational needs while preserving the existing pump station flood discharge capacity. Docusign Envelope ID: 0EBC0573-6C84-8AB6-8032-1F4E6DF449A7 City of Renton Department of Community & Economic Development Certificate of Exemption From Shoreline Substantial Black River Pump Station High Use Engine Replacement, LUA26-000228, SME Development Permit and Critical Areas Regulations Permit Date: July 10, 2026 Page 2 of 5 D_Black River High Use Engine Replacement_Final The new diesel engine requires a larger 12-inch (12”) exhaust manifold and silencer; the existing exhaust will be replaced and the structural frame supporting the silencer will be reused with minor support modifications, with all engine and exhaust work occurring above the normal forebay water level and all ECW pump replacement work confined to the existing pump house footprint and fenced station yard. All construction work would be contained within the existing fenced areas north and south of the pump house, with most work taking place within the existing structures at the pump station and within the established pump station footprint. Project construction for the BRPS high‑use engines improvements began in 2021, and replacement of the Pump P3 engine and installation of the P16 equipment cooling water system are scheduled to occur in 2026 as part of the ongoing pump station upgrade program. King County issued a SEPA Determination of Non‑Significance (DNS) for the BRPS high‑use engines project under WAC 197‑11‑340(2) on March 26, 2020 and revised DNS determinations on April 13, 2020 and June 1, 2026 to address refinements in the engine replacement scope, including the P3 engine and P16 equipment cooling water system. RMC 4-3-090F.5.a, establishes review criteria for permitted flood control projects; the applicable criteria is addressed below: Permitted Flood Control Projects: Flood control works shall be permitted when it is demonstrated by engineering and scientific evaluations that: i. They are necessary to protect health, safety, and/or existing development; Staff Comment: The applicant contends that the proposed replacement of the Pump P3 engine and associated equipment cooling water pump (P16) at the Black River Pump Station is necessary to protect public health, safety, and existing development served by the Green River flood control system. The applicant explicates that the P3 engine must be automated and made more reliable because it will drive the only large pump available during a future phase of construction and that the new equipment cooling water system (P16) is required to support the new engine and existing right‑angle gear drive, thereby maintaining the station’s flood discharge capacity during and after construction. Staff concurs that the proposed improvements are necessary to protect health, safety, and existing development. ii. Nonstructural flood hazard reduction measures are infeasible; and Staff Comment: The applicant contends that nonstructural flood hazard reduction measures are infeasible because the BRPS is a lawfully established flood control facility that relies on mechanical pumping to move flows from the Black River to the Green River and prevent backwater flooding during high-flow events. The applicant notes that operational adjustments or upstream storage alone would not provide the physical pumping capacity required at this location to protect existing development in the Green River basin. These actions are described as normal maintenance and repair of existing structures and equipment within the established flood control facility rather than an alternative, nonstructural approach to flood hazard reduction. Staff concurs that nonstructural flood hazard reduction measures are infeasible in this context. iii. Measures are consistent with an adopted comprehensive flood hazard management plan that evaluates cumulative impacts to the watershed system. Docusign Envelope ID: 0EBC0573-6C84-8AB6-8032-1F4E6DF449A7 City of Renton Department of Community & Economic Development Certificate of Exemption From Shoreline Substantial Black River Pump Station High Use Engine Replacement, LUA26-000228, SME Development Permit and Critical Areas Regulations Permit Date: July 10, 2026 Page 3 of 5 D_Black River High Use Engine Replacement_Final Staff Comment: The applicant contends that the proposed Pump P3 engine replacement and installation of the P16 equipment cooling water system are consistent with the adopted comprehensive flood hazard management planning for the Green River basin. The measures are presented as consistent with watershed‑scale flood hazard management and as not resulting in probable significant adverse cumulative impacts to the Black River/Green River system. Staff concurs that the proposed measures are consistent with an adopted comprehensive flood hazard management plan that evaluates cumulative impacts to the watershed system. SEC-TWN-R: SW ¼ of Section 13, Township 23N, and Range 4E W.M. LEGAL DESCRIPTION: (King County Assessor) JUNCTION ADD POR TRS 21-22-23-24 & 25A & POR TRS 26 & 29 RENTON SHORELANDS 2ND SUPL ADD BEG SW COR SEC 13-23-04 TH E 1271.74 FT TH N TAP ON BDRY LN BET TRS 28 & 29 OF SD RENTON SHORELANDS 2ND SUPL ADD & TPOB TH CONTG N 275 FT TH W 280.69 FT TH S 59-53-47 W 377.52 FT TH S 74- 13-19 W TO ELY MGN OF CO RD TH SELY ALG SD ELY MGN TO SLY BDRY OF SD TR 29 TH ELY ALG SD SLY BDRY TO TPOB ALSO BEG TPOB ABOVE DESC TH N 250 FT TH ON TANGENT CURVE TO RGT RAD OF 627.46 FT TAP ON BDRY LN BEG TRS 26 & 27 OF SD RENTON SH LDS 2ND SUPL ADD TH SWLY ALG SD BDRY LN TO BEG LESS PORTION FOR CO ROAD LESS POR FOR RD PERREC#9704291916 RENTON SHORELANDS 2ND SUPL POR OF TR 28 ALL 30 & POR GL 6 IN SEC 13- 23-04 DAF BEG S 87-26-48 E 1271.74 FT E OF SW COR TH N TO NLY MGN CO RD & TPOB TH N TO NLY LN TR 28 TH SWLY ALG NLY LN OF TRS 28 & 30-31 TO ELY MGN CO RD TH SELY & ELY ALG SD RD TO TPOB LESS PORTION FOR TRACT 31 LESS PORTION FOR CO ROAD LESS POR FOR RD PERREC#9704291916 WATER BODY/REACH: Black River/Springbrook Creek Reach A SHORELINE EXEMPTION FINDINGS: The proposed development is consistent with the following findings: YES i. Consistent with the policies of the Shoreline Management Act. Staff Comments: The proposed replacement of the Pump P3 engine and associated equipment cooling water pump (P16) at the Black River Pump Station qualifies as normal maintenance and repair of an existing flood control facility and is exempt from a Shoreline Substantial Development Permit under the Shoreline Management Act and RMC 4‑9‑190.C.1.c. The work is limited to replacement of existing engine and cooling equipment within the established pump station structure and fenced yard, does not expand the footprint or increase the discharge capacity of the station, and preserves the facility’s existing role in protecting developed lands in Renton, Kent, and Tukwila from backwater flooding. The June 1, 2026 Revised Determination of Non‑Significance for the Black River Pump Station High Use Engines Replacement Project confirms that the addition of the Pump P3 engine replacement and P16 equipment cooling water system to the approved scope would not result in probable significant adverse environmental impacts. YES ii. Not Applicable to the guidelines of the Department of Ecology where no Master Program has been finally approved or adopted by the Department. Staff Comments: Not applicable. Docusign Envelope ID: 0EBC0573-6C84-8AB6-8032-1F4E6DF449A7 City of Renton Department of Community & Economic Development Certificate of Exemption From Shoreline Substantial Black River Pump Station High Use Engine Replacement, LUA26-000228, SME Development Permit and Critical Areas Regulations Permit Date: July 10, 2026 Page 4 of 5 D_Black River High Use Engine Replacement_Final YES iii. Consistent with the City of Renton Shoreline Master Program. Staff Comments: Within the City’s Shoreline Master Program, maintenance and repair of a legally established flood control facility within the Natural Environment shoreline designation for the Black River/Springbrook Creek Reach A is allowed when the work does not change the character, scope, or size of the existing facility. The Pump P3 engine replacement and installation of the P16 equipment cooling water system would occur entirely within the existing pump station footprint and fenced yard as shown on the civil plans and neighborhood detail map, with in‑water work limited to replacement of the equipment cooling water pump within the pump station bays. As described in the June 1, 2026 Revised DNS, this work is a minor addition to the previously approved high‑use engines scope of work and would not result in probable significant adverse environmental impacts and therefore is consistent with the City of Renton Shoreline Master Program. SHORELINE EXEMPTION JUSTIFICATION/DECISION: An exemption from a Shoreline Management Substantial Development Permit is hereby APPROVED on the proposed project in accordance with RMC.4.9190C “Exemption from Permit System’ and for the following reasons: Normal maintenance or repair of existing structures or developments, including damage by accident, fire or elements. "Normal maintenance" includes those usual acts to prevent a decline, lapse, or cessation from a lawfully established condition. "Normal repair" means to restore a development to a state comparable to its original condition, including but not limited to its size, shape, configuration, location and external appearance, within a reasonable period after decay or partial destruction, except where repair causes substantial adverse effects to shoreline resource or environment. Replacement of a structure or development may be authorized as repair where such replacement is the common method of repair for the type of structure or development and the replacement structure or development is comparable to the original structure or development including but not limited to its size, shape, configuration, location and external appearance and the replacement does not cause substantial adverse effects to shoreline resources or environment. SIGNATURE & DATE OF DECISION: _________________________________________ __________________________________ Matthew Herrera, Planning Director Date RECONSIDERATION: Within 14 days of the decision date, any party may request that the decision be reopened by the approval body. The approval body may modify his decision if material evidence not readily discoverable prior to the original decision is found or if he finds there was misrepresentation of fact. After review of the reconsideration request, if the approval body finds sufficient evidence to amend the original decision, there will be no further extension of the appeal period. Any person wishing to take further action must file a formal appeal within the 14-day appeal time frame. APPEALS: This administrative land use decision will become final if not appealed in writing to the Hearing Examiner on or before 5:00 PM on July 24, 2026. An appeal of the decision must be filed within the 14-day appeal period (RCW 43.21.C.075(3); WAC 197-11-680). Appeals must be submitted electronically to the City Clerk at cityclerk@rentonwa.gov or delivered to City Hall 1st floor Lobby Hub Docusign Envelope ID: 0EBC0573-6C84-8AB6-8032-1F4E6DF449A7 Clark H. Close for 7/10/2026 | 9:38 AM PDT City of Renton Department of Community & Economic Development Certificate of Exemption From Shoreline Substantial Black River Pump Station High Use Engine Replacement, LUA26-000228, SME Development Permit and Critical Areas Regulations Permit Date: July 10, 2026 Page 5 of 5 D_Black River High Use Engine Replacement_Final Monday through Friday. The appeal fee, normally due at the time an appeal is submitted, will be collected at a future date if your appeal is submitted electronically. The appeal submitted in person may be paid on the first floor in our Finance Department. Appeals to the Hearing Examiner are governed by RMC 4-8-110 and additional information regarding the appeal process may be obtained from the City Clerk’s Office, cityclerk@rentonwa.gov. EXPIRATION: Two (2) years from the date of decision (date signed). ATTACHMENTS: Attachment A: Project Narrative Attachment B: Neighborhood Detail Map Attachment C: Environmental (SEPA) Determination of Non-Significance and Revised SEPA DNS Determinations, dated March 26, 2020, April 13, 2026, and June 1, 2026 Attachment D: Black River Pump Station Improvements (High-Use Engines) Plan Set cc: Erik Brodahl, Jacobs Engineering Docusign Envelope ID: 0EBC0573-6C84-8AB6-8032-1F4E6DF449A7