HomeMy WebLinkAboutCM_Cascade Crest_Construction Mitigation_260713_v1Cascade Crest Apartments
3401 NE 12th Street, Renton
Combination of two Lots -Construction of two Apartment Buildings
CONSTRUCTION MITIGATION
Proposed Construction Dates (begin and end dates): Start of construction is proposed for the Spring of 2027 with installation of utilities including storm drainage facilities and frontage
improvements. There is minimal on-site grading proposed for this project. Completion of construction improvements is proposed for Spring of 2028. Hours and days of operation: 8:00 am to 5:30 pm, Monday through Friday or as otherwise allowed by City of Renton. Proposed Hauling/ Transportation routes: Materials and labor to the site are proposed from
NE Sunset Blvd and NE 12th Street. Transportation access will be from NE 12th St with on-site parking and material storage within the existing and proposed driveway and the proposed parking lot footprint area. Measures to minimize construction activities: The minimal construction activity will be necessary to provide the required public and private improvements for this project. City required
frontage improvements, will constructed on both NE 12th St and Olympia Ave NE. It is planned to minimize public disturbance and as much as is feasible, provide adequate pedestrian access during the new construction. Special hours: No special hours are necessary to complete construction. Weekend work may be necessary to complete the project on schedule; this will be determined by owner, contractor, and
City of Renton. Preliminary Traffic Control Plan: Coordination with the City of Renton staff will be necessary to minimize disruption to vehicle and pedestrian traffic on Hoquiam Ave NE. Once a contractor is selected, a traffic control plan will be submitted and approved prior to the pre-construction meeting with the City of Renton. This plan will be implemented prior to any
construction activities.