HomeMy WebLinkAbout071326 Admin Report
DATE: July 9, 2026
TO: Ruth Pérez, Council President
Members of the Renton City Council
FROM: Armondo Pavone, Mayor
Ed VanValey, Chief Administrative Officer
SUBJECT: Administrative Report
• Free watch parties will be hosted at Legacy Square for the FIFA World Cup Third Place and Final
matches July 18 and 19. For game times and more information visit www.rentonwa.gov/events.
• Get ready to celebrate 40 years of Renton River Days, Friday, July 24 – Sunday, July 26. For a list
of hours, events, and activities visit www.rentonwa.gov/riverdays.
• Information about preventative street maintenance, traffic impact projects, and road closures
happening this week can be found at http://rentonwa.gov/traffic. All projects are weather
permitting and unless otherwise noted, streets will always remain open.
On-going construction work through Winter 2026. Intermittent lane closures on SW 43 St
for resurfacing and drainage improvements. Approved traffic control plans were issued for
all work and will be followed. Questions may be directed to 425-286-8217.
Monday, July 13 through Friday, July 17, 8:00am-3:00pm. Intermittent lane closure on NE
4th St from 156th Ave SE to Nile Ave for construction work. Approved traffic control plans were
issued for all work and will be followed. Questions may be directed to Casey Grant, 206-532-
4380.
Monday, July 13 through Friday, July 17, 8:00am-3:00pm. Intermittent lane closures on NE
12th St at Edmonds Ave NE for construction work. Approved traffic control plans were issued
for all work and will be followed. Questions may be directed to Casey Grant, 206-532-4380.
Thursday, July 16, 7:00am-4:00pm. Intermittent lane closure on at 1616 NE 30th St for
asphalt repair. Flaggers will be on-site as needed to manage traffic. Questions may be
directed to Public Works Shops, 425-430-7400.
Monday, July 13 through Friday, July 17, 7:00am-5:00pm. Intermittent lane closure on 116th
Ave SE between SE 160th St and SE 162nd St for construction work. Approved traffic control
plans were issued for all work and will be followed. Questions may be directed to Piero
D’Amore, 206-999-1833.
Monday, July 13 through Friday, July 17, 8:00am-3:00pm. Road closure on 158th Ave SE at
NE 4th St and intermittent lane closure on NE 4th St/SE 128th St for utility work. Approved traffic
control plans were issued for all work and will be followed. Questions may be directed to Pat
Ruth Pérez, Council President
Members of the Renton City Council
Page 2 of 2
July 9, 2026
Decaro, 425-207-6013.
Monday, July 13 through Friday, July 17, 8:00am-3:00pm. Intermittent lane closure on SE
Carr Rd at 106th Pl SE for construction work. Approved traffic control plans were issued for
all work and will be followed. Questions may be directed to Brad Stocco, 425-282-2373.
Monday, July 13 through Friday, July 17, 8:00am-3:00pm. Intermittent lane closures on
Edmonds Ave NE at NE 12th St for construction work. Approved traffic control plans were
issued for all work and will be followed. Questions may be directed to Casey Grant, 206-532-
4380.
Monday, July 13 through Friday, July 17, 8:00am-3:00pm. Intermittent lane closure on
Maple Valley Hwy (SR 169) at SE 154th Pl SE for construction work. Approved traffic control
plans were issued for all work and will be followed. Questions may be directed to Casey
Grant, 206-532-4380.
Tuesday, July 14 through Wednesday, July 15, 7:00am-4:00pm. Intermittent lane closure
on Lake Washington Blvd at N 36th St for asphalt repair. Flaggers will be on-site as needed to
manage traffic. Questions may be directed to Public Works Shops, 425-430-7400.
Monday, July 13 through Friday, July 17, 8:00am-3:00pm. Intermittent lane closure on
Puget Dr SE from Rolling Hills Ave SE to SE 19th St for construction work. Approved traffic
control plans were issued for all work and will be followed. Questions may be directed to Kip
Braaten, 206-503-1746.
On-going Street Closure through October 2, 2026 (City of Renton Resolution No. 4582)
FULL STREET CLOSURE on Logan Ave S between Transit Access Road and S Third St for the
purpose of hosting multiple events throughout the summer related to the World Cup watch
parties and community events.
King County Metros RapidRide I-Line Project – beginning the week of July 20 and July 27:
Beginning stages of construction will start later this month on King County Metros RapidRide
I-Line project in Renton. This service will provide residents with quick and reliable bus
service, along with being a key connector to the Sounder.
• Work at the Valley Medical Center station area is set to begin the week of July 20 on the
west side of Talbot Road
• Night work at Grady & Talbot area is set to begin the week of July 27.
• For the latest information visit kingcounty.gov/rapidride/i