Loading...
HomeMy WebLinkAboutPN_Project Narative_260708_v11. Project name: Northwest Region South Strategic Pavement PreservaƟon Project XL7030 2. The nature, source, intensity and locaƟon of the sound/project limits: Nature: Pavement PreservaƟon along specific highways within the City of Renton Source: Temporary ConstrucƟon Equipment Intensity: range between 61 – 93 dBA at 50 feet and 41 – 73 dBA at 500 Ō LocaƟons: SR 169 Milepost (MP) MP 24.84 to 25.23 SR 900 MP 12.58B to 13.00B Decreasing, 12.58B to 12.81 Increasing, and 12.50 to 12.58B 3. DescripƟon of work: This project will provide crack sealing and asphalt patching on highways within Area 4, Area 5, and ramps along I-90. NWR Materials has determined that numerous routes require strategic preservaƟon before a paving project can be programmed to address deterioraƟng roadway condiƟons. Specifically for the City of Renton, crack sealing work on this project will occur along SR 169 MP 24.84 to 25.23, SR 900 12.50 to 12.58B, 12.58B to 13.00B Decreasing, and 12.58B to 12.81 Increasing. 4. The equipment and vehicles used for the work: Item # Equipment Sound level (dBA) at 50Ō Sound level (dBA) at 100Ō Sound level (dBA) at 300Ō Sound level (dBA) at 500Ō Type of ConstrucƟon work 1 Backhoe / Excavator 76 70 60 56 Digging and scooping materials 2 Backup and Movement alarm 79 73 64 59 Safety warning for work site 3 Chip Spreader 77 74 69 67 Spreading asphalt and aggregate for the chip and seal process 4 Ground Compactor 75 72 67 65 CompacƟng and flaƩening surfaces 5 Air Compressor 66 60 50 46 GeneraƟng power 6 Flatbed Truck / Pickup Truck 74 71 66 64 TransporƟng people and materials 7 Generator 67 61 52 47 GeneraƟng power / Generator 8 Jackhammer 91 85 75 71 Breaking, Breaking asphalt, Breaking concrete 9 Joint Sealer 74 71 66 64 Seals joints 10 Light Tower 61 55 45 41 Generates light 11 Asphalt Paver 83 80 75 73 Paving asphalt 12 Dump Truck 82 76 66 62 TransporƟng materials (idle) 13 Material Transfer Vehicle 73 70 65 63 TransporƟng materials (moving) 14 Power Tool – Air Hose 93 87 77 73 Clearing debris 15 Roller 82 79 75 72 CompacƟng materials 16 Vacuum Street Sweeper 81 78 74 71 Sweeping up and vacuuming materials 17 Traffic Control Equipment 74 68 62 54 Support traffic control – truck mounted aƩenuators and portable changeable message signs. 5. Proposed Noise MiƟgaƟng Measures the applicant will implement to minimize the sound level violaƟons: • All trucks performing export haul shall have well maintained bed liners as inspected and accepted by the Engineer. • Truck tailgate banging is prohibited. All truck tailgates shall be secured to prevent excessive noise from banging. • A copy of the noise variance permit shall be kept on the project site at all Ɵmes. • WriƩen noƟficaƟons detailing the anƟcipated work schedule, project duraƟon, and a 24-hour noise complaint number will be sent to all residents located within 500 feet of the project boundary, at least 14 calendar days prior to any anƟcipated nighƫme construcƟon work. • Contractor and WSDOT personnel must refrain from parking and idling vehicles near residenƟal areas. 6. Any addiƟonal informaƟon or studies regarding any aspect of the requested variance that is deemed necessary to complete the review of the variance request: This project is exempt from WAC 197-11-800(26) state transportaƟon projects. This project is a repair project that occurs within the exisƟng right of way and in a manner that substanƟally conforms to the preexisƟng design, funcƟon, and locaƟon as the original except to meet current engineering standard and the acƟon does not result in addiƟon lanes, changing of capacity, or the funcƟonal use of the highway. 7. The hours during the day and/or night the noise will occur: Weekdays and weekend from 10:00 PM to 7:00 AM 8. The number of days and/or nights the noise will occur: 7 cumulaƟve nights 9. The ambient sound level during the Ɵme of day or night for which the variance is being sought: Level of highway traffic noise depends on volume, speed, and mix of trucks. Based off WSDOT’s Biological Assessment Chapter 7 Table 7-3 Typical noise levels for traffic volumes at a given speed and Washington State Pavement Management System the following informaƟon was calculated for the worst and quietest traffic hours to give a range for the operaƟonal noise levels of the highway: SR 169 AADT: 40,2011 Speed limit: 40 mph Daily noise range levels: 64 to 73 dBA at 50 feet SR 900 AADT: 25,859 Speed limit: 35 mph Daily noise range levels: 60 to 71 dBA at 50 feet 10. The Ɵme period (include start date and end date) for which the variance is requested: March 1, 2027 to December 31, 2027 11. The reason for which the noise violaƟon cannot be avoided, i.e. why work cannot be performed within allowed Ɵmes: WSDOT traffic recommends that lane closures be done at night when traffic volumes are low enough to handle closures. ConstrucƟon related lane closures during the dayƟme could cause delays to the traveling public, impact bus routes and business access, jeopardize workers’ and public safety. Performing work at night will minimize the danger to workers and the traveling public from road closures, detours and traffic delays. In addiƟon, dayƟme lane closures could backup and adversely impact traffic and city arterials. Therefore, lane closures during the nighƫme are necessary for this project. 12. MiƟgaƟng condiƟons the applicant will implement to minimize the sound level violaƟons: See #5