Loading...
HomeMy WebLinkAboutOwner Acceptance of the Precon Notes1 Heather Bray From:Eric Koch <eric@padgi.com> Sent:Thursday, July 23, 2026 9:43 PM To:Heather Bray; Brown, Clayton Cc:josea@pennonconstruction.com; kylek@pennonconstruction.com; ismaeljr2006 @icloud.com; Edward Ordemann Jr.; Pedro DeGuzman; ismeals@ismealsinc.com; Huy Huynh; Joel McCann Subject:RE: C26001238 Sherwin Williams - Preconstruction Meeting Summary Hi Heather, I have read and accepted the preconstruction notes dated 7/23/2026. Thanks Eric Koch Partners Architectural Design Group, Inc. 12819 SE 38th ST, #89 Bellevue, WA 98006 425-636-8006 ext 205 From: Heather Bray <HBray@rentonwa.gov> Sent: Thursday, July 23, 2026 3:08 PM To: Brown, Clayton <clayton.brown@marcusmillichap.com> Cc: josea@pennonconstruction.com; kylek@pennonconstruction.com; ismaeljr2006@icloud.com; Edward Ordemann Jr. <edward@bpg-investments.com>; Eric Koch <eric@padgi.com>; Pedro DeGuzman <pedro@terraformadesigngroup.com>; ismeals@ismealsinc.com; Huy Huynh <HHuynh@rentonwa.gov>; Joel McCann <JMccann@Rentonwa.gov> Subject: C26001238 Sherwin Williams - Preconstruction Meeting Summary All, Thank you for attending the pre-con meeting today, July 23rd, 2026. Below is a summary of the meeting with items that had additional discussion listed. Please let me know if you have any questions or would like to make additions. • Huy read the pre-construction notes to the group • Applicant directed to contact City Project Manager to discuss sidewalk closure on Wells Ave S • Construction to begin in late August or early September • Joel answered site specific construction questions Attached are the revised precon notes that we discussed today as well as the permit. After I have received confirmation from the applicant and contractor that the preconstruction meeting notes have been read and accepted (via email confirmation is okay), I can issue the permit. CAUTION: This email originated from outside the City of Renton. Do not click links, reply or open attachments unless you know the content is safe. 2 HEATHER BRAY, Civil Engineer III City of Renton // Development Engineering Virtual Permit Center // Online Applications and Inspections o6ice 425-430-7383 NOTICE OF PUBLIC DISCLOSURE: This message complies with Washington State’s Public Records Act – RCW 42.56