HomeMy WebLinkAboutOwner Acceptance of the Precon Notes1
Heather Bray
From:Eric Koch <eric@padgi.com>
Sent:Thursday, July 23, 2026 9:43 PM
To:Heather Bray; Brown, Clayton
Cc:josea@pennonconstruction.com; kylek@pennonconstruction.com; ismaeljr2006
@icloud.com; Edward Ordemann Jr.; Pedro DeGuzman; ismeals@ismealsinc.com; Huy
Huynh; Joel McCann
Subject:RE: C26001238 Sherwin Williams - Preconstruction Meeting Summary
Hi Heather,
I have read and accepted the preconstruction notes dated 7/23/2026.
Thanks
Eric Koch
Partners Architectural Design Group, Inc.
12819 SE 38th ST, #89
Bellevue, WA 98006
425-636-8006 ext 205
From: Heather Bray <HBray@rentonwa.gov>
Sent: Thursday, July 23, 2026 3:08 PM
To: Brown, Clayton <clayton.brown@marcusmillichap.com>
Cc: josea@pennonconstruction.com; kylek@pennonconstruction.com; ismaeljr2006@icloud.com; Edward Ordemann Jr.
<edward@bpg-investments.com>; Eric Koch <eric@padgi.com>; Pedro DeGuzman
<pedro@terraformadesigngroup.com>; ismeals@ismealsinc.com; Huy Huynh <HHuynh@rentonwa.gov>; Joel McCann
<JMccann@Rentonwa.gov>
Subject: C26001238 Sherwin Williams - Preconstruction Meeting Summary
All,
Thank you for attending the pre-con meeting today, July 23rd, 2026. Below is a summary of the meeting with items
that had additional discussion listed. Please let me know if you have any questions or would like to make
additions.
• Huy read the pre-construction notes to the group
• Applicant directed to contact City Project Manager to discuss sidewalk closure on Wells Ave S
• Construction to begin in late August or early September
• Joel answered site specific construction questions
Attached are the revised precon notes that we discussed today as well as the permit.
After I have received confirmation from the applicant and contractor that the preconstruction meeting notes have
been read and accepted (via email confirmation is okay), I can issue the permit.
CAUTION: This email originated from outside the City of Renton. Do not click links, reply or open attachments unless
you know the content is safe.
2
HEATHER BRAY, Civil Engineer III
City of Renton // Development Engineering
Virtual Permit Center // Online Applications and Inspections
o6ice 425-430-7383
NOTICE OF PUBLIC DISCLOSURE: This message complies with Washington State’s Public Records Act – RCW 42.56