HomeMy WebLinkAbout080326 Admin Report
DATE: July 30, 2026
TO: Ruth Pérez, Council President
Members of the Renton City Council
FROM: Armondo Pavone, Mayor
Ed VanValey, Chief Administrative Officer
SUBJECT: Administrative Report
• There’s still plenty of time this summer to visit the Farmers Market at Piazza Park held Tuesdays
between 3-7 p.m. now through September 29. Shop for locally grown, farm fresh produce,
flowers, snacks, and more. For a complete list of weekly vendors and entertainment visit
www.rentonwa.gov/farmersmarket.
• If it’s August, it must be time for Summer Concerts at Coulon Park. Enjoy the sounds of
summer in the sunshine from 6:30-8 p.m. on the Kidd Valley Stage every Thursday in August.
Concerts are free and suitable for all ages.
• Be sure to visit www.rentonwa.gov/events for a full list of events at Legacy Square. This week
includes a movie and music.
• Information about preventative street maintenance, traffic impact projects, and road closures
happening this week can be found at http://rentonwa.gov/traffic. All projects are weather
permitting and unless otherwise noted, streets will always remain open.
On-going construction work through Winter 2026. Intermittent lane closures on SW 43 St
for resurfacing and drainage improvements. Approved traffic control plans were issued for
all work and will be followed. Questions may be directed to 425-286-8217.
Monday, August 3 through Friday, August 7, 8:00am-3:00pm. Intermittent lane closure on
NE 4th St between Nile Ave NE and Duvall Ave NE for construction work. Approved traffic
control plans were issued for all work and will be followed. Questions may be directed to Joe
Nerlfi, 425-757-9657.
Monday, August 3 through Friday, August 7, 8:00am-3:00pm. Intermittent lane closure on
NE 12th St between Edmonds Ave NE to Pierce Pl NE for construction work. Approved traffic
control plans were issued for all work and will be followed. Questions may be directed to
Casey Grant, 206-532-4380.
Ruth Pérez, Council President
Members of the Renton City Council
Page 2 of 3
July 30, 2026
Monday, August 3 through Friday, August 7, 8:00am-3:00pm. Intermittent lane closure on
Union Ave NE at NE 2nd Pl for construction work. Approved traffic control plans were issued
for all work and will be followed. Questions may be directed to Casey Grant, 206-532-4380.
Monday, August 3 through Thursday, August 6, 7:00am-5:00pm. Intermittent lane closure
on 116th Ave SE between SE 160th St and SE 162nd St for construction work. Approved traffic
control plans were issued for all work and will be followed. Questions may be directed to
Piero D’Amore, 206-999-1833.
Monday, August 3 through Friday, August 7, 8:00am-3:00pm. Intermittent lane closure on
Rainier Ave S at S Grady Way for construction work. Approved traffic control plans were
issued for all work and will be followed. Questions may be directed to Brad Stocco, 425-282-
2373.
Monday, August 3 through Friday, August 7, 8:00am-3:00pm. Intermittent lane closure on
Benson Dr S at S Puget Dr for construction work. Approved traffic control plans were issued
for all work and will be followed. Questions may be directed to Brad Stocco, 425-282-2373.
Monday, August 3 through Friday, August 7, 8:00am-3:00pm. Intermittent lane closure on
SE Carr Rd between 103rd Ave SE and 105th Pl SE for construction work. Approved traffic
control plans were issued for all work and will be followed. Questions may be directed to
Brad Stocco, 425-282-2373.
Monday, August 3 through Friday, August 7, 8:00am-3:00pm. Intermittent lane closure on
SE 180th St between 105th Pl SE and 108th Ave SE for construction work. Approved traffic
control plans were issued for all work and will be followed. Questions may be directed to
Brad Stocco, 425-282-2373.
Monday, August 3 through Friday, August 7, 8:00am-3:00pm. Intermittent lane closure on
108th Ave SE at SE 192nd St for construction work. Approved traffic control plans were issued
for all work and will be followed. Questions may be directed to Brad Stocco, 425-282-2373.
Monday, August 3 through Friday, August 7, 8:00am-3:00pm. Intermittent lane closure on
Talbot Rd S at S 23rd St, S 32nd St and SE Carr Rd for construction work. Approved traffic
control plans were issued for all work and will be followed. Questions may be directed to
Brad Stocco, 425-282-2373.
Tuesday, August 4 through Thursday, August 6, 7:00am-4:00pm. Intermittent lane closure
on Stevens Ave SW between SW Sunset Blvd and Maple Ave SW for asphalt repair. Flaggers
will be on-site as needed to manage traffic. Questions may be directed to Public Works
Shops, 425-430-7400.
Ruth Pérez, Council President
Members of the Renton City Council
Page 3 of 3
July 30, 2026
On-going Street Closure through October 2, 2026 (City of Renton Resolution No. 4582)
FULL STREET CLOSURE on Logan Ave S between Transit Access Road and S Third St for the
purpose of hosting multiple events throughout the summer related to the World Cup watch
parties and community events.