Loading...
HomeMy WebLinkAboutMFP26003455.pdfDEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT Minor Franchise Permit: MFP26003455 IVR Number: 26003455 Permit Information Permit Name: Ziply Pacific LLC - 6024434/P-110987 Address/Location:06/30/2026Application Date:7227800450Parcel Number: 3000 NE 4TH ST Permit Type:08/03/2026Issue Date:Franchise Permit Work Class:08/03/2027Expiration Date:Minor Utility Job Number: 6024434Franchise Type:Cable Description: Ziply Pacific LLC Master Franchise Agreement, ORD 6182. Access MH 360 190 and splice then bore 10' north to private property and place new HH. Pothole all existing utilities. Restoration per City of Renton standards. Contacts Name Address PhoneTypeBilling Stephanie Perkins Ziply Fiber 426 E Casino Rd Everett, WA 98208 B: (951) 675-5019 H: (951) 675-5019 C: (951) 675-5019 ApplicantX Stephanie Perkins Ziply Fiber 426 E Casino Rd Everett, WA 98208 B: (951) 675-5019 H: (951) 675-5019 C: (951) 675-5019 Contact Luke Jones Pacific Cable Construction INC B: (425) 348-7966Contractor Business License Number: 57955Construction Contractor: PACIFCC954PJ RENTON TECHNICAL COLLEGE 3000 NE 4TH ST RENTON , WA 98056 Owner General Conditions & Signature Permission is hereby given for the work described on this permit according to the conditions hereon and according to the approved plans and specifications pertaining thereto, subject to compliance with the Ordinance of the City of Renton. Ÿ This permit and plans must be posted at the job site at all times.Ÿ I hereby certify that no work is to be done except as described above and in approved plans, and that work is to conform to Renton codes and ordinances. Renton Trench Restoration and Street Overlay Requirements. Ÿ Call 425.430.7203 or go to: https://permitting.rentonwa.gov one working day in advance to schedule an inspections and for ANY work in the Right of Way. Ÿ Call 8 1 1 to locate underground utilities at least two full business days prior to any excavation.Ÿ In accordance with RCW 19.122.033(4) the permit holder is required to contact (Williams Northwest Pipeline at 425.868.1010) (Olympic Pipeline at 425.235.7736) (Puget Sound Energy at 425.375.3397) to request a consultation with the transmission pipeline company prior to performing any construction or excavation activities. This requirement to consult with the transmission pipeline company is in addition to the requirement to Call before You Dig as required in RCW 19.122. Ÿ (Date)(Signature) Page 1 of 1THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document. PUBLIC WORKS DEPARTMENT Page 1 of 6 | Published: 3/12/2025 Transportation Systems Division | 1055 South Grady Way, 5th Floor | Renton, WA 98057 | 425-430-7380 Website: rentonwa.gov TRAFFIC CONTROL PLAN APPLICATION Published: 3/12/2025 TRAFFIC CONTROL PLAN (TCP) MUST BE SUBMITTED TO PUBLIC WORKS TRANSPORTATION DIVISION FOR REVIEW/APPROVAL AT LEAST FIVE (5) WORKING DAYS BEFORE THE DATE OF WORK AND FOR TRAFFIC SIGNAL WORK WITHIN 150 FEET OF THE INTERSECTION AT LEAST FIFTEEN (15) WORKING DAYS BEFORE THE DATE OF WORK. FOR PURPOSES OF THIS APPLICATION, WORKING DAYS ARE DEFINED AS MONDAY THRU FRIDAY, AND EXCLUDING CITY HOLIDAYS. The City of Renton requires any contractor, firm, corporation, or other public/private agency to prepare a Traffic Control Plan (TCP) and obtain City's approval of that plan when construction, repair, or maintenance work is to be conducted within the City's right-of-way. 1. Fill out the Traffic Control Plan (TCP) Application form and prepare required submittal documents. 2. All TCPs must conform to all attached requirements. Failure to do so may be subject to resubmittal. 3. Submit Application via email to TCP@rentonwa.gov with the subject line “TCP Application – [Project Name].” 4. Resubmittal may be required for TCPs that are incomplete and do not display proper requirements as described in the guidelines. Additional review time may be needed. By signing, I certify that the information on this application and within the submittal documents are accurate to the best of my knowledge and I acknowledge and have read all the requirements and guidelines on this application. Applicant’s Signature Date Applicant’s Name (Print) Project Name: Permit #: Site Address: Work Date: From _____________ To _____________ Work Time: Start ______________ End ______________ Construction Company: Contact Name: Phone/Cell: _________________________ Business Address: City/State: Zip: ___________ Description of Work: 24 Hour Emergency Contact Name & Phone: Approval By: ______________________________________________ Date:____________________ PW/Transportation or CED/Development Engineering Division 6/30/2026 Stephanie Perkins P-110987 / 6024434 K-20 EDUCATION NETWORK 3000 NE 4TH ST RENTON WA 98056 1600 Pacific Cable Construction Lucas Jones 206-399-1703 101 E Marine View Dr Everett WA 98201 Boring in Renton ROW to place new conduit and fiber Lucas Jones 206-399-1703 7/20/26 8/20/26 0800 Scott Warlick CED 8/3/2026 Monday Friday 8:00am 3:00pm MFP26003455 Page 2 of 6 | Published: 3/12/2025 This Page Intentionally Left Blank Page 3 of 6 | Published: 3/12/2025 APPLICANT AGREES TO ALL THE FOLLOWING REQUIREMENTS: GENERAL • Applicant is responsible for compliance with all traffic regulations of the City of Renton (City) and the State of Washington, including codes and regulations not described in this application. • Work Zone Traffic Control shall be in accordance with Manual on Uniform Traffic Control Devices (MUTCD) and shown by a traffic control plan layout or reference to Washington State Department of Transportation (WSDOT) traffic control plans. • Any lane or street closures not in conformance with the approved Traffic Control Plan (TCP) and/or without notification of emergency services may result in receiving a citation for violation of R.C.W. 47.36.200 Signs or Flaggers at thoroughfare work sites and R.C.W. 9A.36.050 Reckless Endangerment, and other applicable State and City codes. • Indemnify and hold harmless the City from any and all claims, actions, and judgments, including all costs of defense and attorney’s fees incurred in defending against same, arising from and related to implementation of the approved TCPs including claims arising from towing of private vehicles and the acts of Applicant’s agents and employees. • Applicant must comply with all conditions of the application. • The City shall be entitled, in its reasonable discretion, to settle claims prior to suit or judgment, and in such event shall indemnify and hold harmless the City for any such claims paid, including the City’s reasonable attorney’s fees and litigation costs incurred resulting from such claim. • In the event any claim or suit is brought against City within the scope of this application, Applicant is responsible to pay for legal counsel chosen by the City to defend against same. • No more than one TCP shall be in use at any given time for a single project. If multiple TCPs are submitted for review and approval at the same time, the TCPs shall be clearly labeled as separate plans and include construction phasing and sequencing. • Previously approved TCPs cannot be combined into a new TCP without review and approval by the City. • Expired TCP is not valid and shall not be used. Applicant shall resubmit the expired TCP for approval with the updated date and time and/or any changes to TCP. • Applicant must have the approved TCP prior to commencing the work. • Approved TCP must be at the work site during work hours. • Signage shall be used to warn motorcyclists/bicyclists of the potential hazards on any uneven surfaced or slippery road conditions during work and non-work hours. • Any vehicle, equipment, barricade, or portable tow-away sign used within the work area must display a company logo or any legally acceptable sign showing the company name, address, and telephone number at a conspicuous place on the vehicle or equipment. • At signalized intersections, vehicle detection shall always remain operational, unless approved in this TCP and notified Transportation Signal Maintenance prior to commencing work. If damage occurs to existing vehicle detection that is to remain, it is Applicant’s responsibility to replace with video vehicle detection equipment that meets current City’s standards at Applicant’s expense. • When not in use, temporary traffic control devices shall be removed or covered immediately. It is the Applicant’s responsible to cover any temporary traffic control devices when not applicable for the construction activities. Similarly, when work is suspended for short periods of time, traffic control devices that are no longer necessary shall be removed or covered. If deemed abandoned, City crews will remove and may store them at the City’s maintenance shop (3555 NE 2nd Street) for up to sixty (60) days. The City is not responsible for any private property from City assets and identifying the property owner. • Applicant is responsible to maintain existing pedestrian accessible routes during work and non-work hours. At intersections, the work on pedestrian facilities shall be limited to one (1) corner at a time, with the least possible inconvenience or delay to pedestrians. Pedestrian pushbuttons shall remain accessible at all times, unless approved pedestrian accessible detour(s) are provided. Accessibility to existing or temporary Page 4 of 6 | Published: 3/12/2025 pedestrian pushbuttons shall not be impaired. Deficiencies caused by Applicant’s operations shall be repaired at Applicant’s expense. • Applicant shall provide complete assistance and accommodation from a dedicated pedestrian escort to all kinds of pedestrian traffic when sidewalk or walkway is impeded to safely redirect pedestrians around a work zone. • Driveway and alley access shall be maintained at all times, also see RMC Chapters 9 and 10 for Street Closure and Street Excavation for details. Applicant is responsible for coordinating with the property owners and/or residents prior to commencement of the work. • Pavement excavation shall be limited to a maximum of one travel lane at a time unless otherwise approved. • Accessibility for emergency vehicles shall be maintained at all times. PUBLIC OUTREACH • Applicant must notify City Inspector (425-430-7203) at least twenty-four (24) hours before commencing work. • Applicant must notify Transportation Signal Maintenance (425-430-7423) at least twenty-four (24) hours before commencing work, if work affects traffic signal operations, including vehicle detection. • Applicant shall notify emergency services (253-852-2121) twenty-four (24) hours before any street closures or lane closures. • Applicant shall call Renton School District (425-204-4455) or any public/private agency, including public transit, to be affected by a temporary lane or road closure a minimum of five (5) working days (excluding weekends and holidays) prior to starting any work. • Applicant shall coordinate with King County Metro Transit Construction Information Center (206-477-1140 or construction.coord@kingcounty.gov) for any construction or installation activities affecting transit operations or facilities. Notification information and guidelines can be found at: https://kingcounty.gov/en/dept/metro/about/contractor-resources/transit-system-impacts. WORKING DAYS AND TIMES • Normal working days are Monday through Friday. Work on holidays, weekends or at night shall not occur without City’s approval. For work times between 10:00 p.m. and 7:00 a.m., see Night Work section below for details. • Work time begins when any street or travel lane is fully or partially closed. This includes set up and removal within the traveled way. • If the City determines the closure hours adversely affect traffic during the work, the City may require to adjust or reduce the working hours accordingly. Reduced work hours may be required by the City to minimize traffic impacts for any work located near a school during pick-up and drop-off times or on an arterial street. (See WSDOT Functional Classification Map: https://www.wsdot.wa.gov/data/tools/geoportal/?config=FunctionalClass) • Applicant may request the City for consideration of extended or modified working hours. Such request must be approved by the City before changing hours of work. CLOSURES • All closure hours and days are subject to local permit and ordinance conditions (such as noise ordinances). More information can be found on https://www.rentonwa.gov/City-Services/Permit-Center. Total street closure lasting more than twenty-four (24) hours is subject to City Council authorization per Section 9-9 of the Renton Municipal Code (RMC). • Road closure notice – Applicant must install Portable Changeable Message Sign (PCMS) boards no less than three (3) working days in advance of effective date and time, not including holidays, at location(s) as identified in the TCP. Other methods of displaying the messages shall be approved by the City. Page 5 of 6 | Published: 3/12/2025 • Road closure notice messages must include at least the following:  ROAD WILL BE CLOSED  MONTH/DAY – MONTH/DAY  _AM - _PM • Road and/or sidewalk closure must be evaluated by the City with respect to both the necessity as well as the impact of the closure to the public. Applicant shall submit detour plans for road closures to accommodate both motorized and non-motorized users, including accessible pedestrian route(s). Road closures shall require additional temporary traffic control including advance notification, approach and detour signage. • Applicant is responsible to temporarily remove the flags and install bags over the flag holders for any work requiring the temporary closure of a crosswalk equipped with pedestrian flags. Applicant shall ensure the bags remain intact and shall replace damaged bags as needed or determined necessary by the City of Renton inspector. For any misplaced or lost flags, Applicant is responsible to replace at Applicant’s own expense. Upon restoration of the crosswalk, Applicant shall remove the bags and return all flags to the holders. Inventory of pedestrian flags must be submitted to the City inspector and reported to City of Renton Transportation Signal Maintenance (425-430-7423) prior to removal. UNIFORMED POLICE OFFICERS (UPO) / FLAGGERS • Any construction activities within one hundred and fifty (150) feet of a signalized intersection shall require Uniformed Police Officer(s) (UPO) at the traffic signal, unless otherwise approved in this TCP and evaluated by City Transportation for the impacts of traffic signal operations and safety. • Flagger and sign placement are subject to revision by the City Inspector on site, if needed to address traffic or pedestrian safety or travel. • For TCPs that require the presence of UPO to manage vehicular traffic and pedestrians at signalized intersections, Applicant shall coordinate with Transportation Signal Maintenance (425-430-7423) at least twenty-four (24) hours in advance for any signal that will be placed in red flashing mode. Applicant shall notify Transportation Signal Maintenance when the intersection is back to the normal traffic signal operations. TEMPORARY TRAFFIC SIGNALS OR TRAFFIC SIGNAL MODIFICATION • Temporary traffic signal programming or modification requires a minimum fifteen (15) working days for each traffic signal controller to be programmed and tested by City Transportation staff before starting the work. The Start Date on this TCP shall reflect the time for temporary traffic signal programming or modification. TEMPORARY NO-PARKING • Applicant must post notice of date(s) and time(s) of Temporary No Parking Zone with signs at every hundred (100) feet at least seventy-two (72) hours in advance of effective date and time. • Applicant is responsible to show on the TCP the limits of Temporary No Parking Zone, identifying barricade locations for vacate parking or curb lane usage. The cover sheet of this approved TCP form must be attached to each Temporary No Parking Sign on the project site. • Two travel lanes (one for each approach) must be open at all times on arterial streets unless approved in this TCP. NIGHT WORK • Between the hours of 10 p.m. and 7 a.m., approved Noise Variance shall be required (See Section RMC 8-7- 8) for night work. Process may take up to twelve (12) weeks. More information can be found at https://www.rentonwa.gov/City-Services/Permit-Center/Land-Use-Development/Noise-Variance. • City may require night work for TCPs that have severe traffic impacts on arterial streets. Page 6 of 6 | Published: 3/12/2025 • Night work shall always be required if two lanes of traffic (One for each approach) cannot be maintained on an arterial street. • Night work shall be required if an evaluation of existing traffic volumes and patterns finds that any TCP will functionally reduce an arterial or high-volume collector street to only one lane of traffic. • The following configurations may require night work:  Work at traffic signals that requires shifting one direction of traffic into a left turn pocket where a high volume of left turns occur.  Work at traffic signals that requires shifting two directions of traffic into left turn pockets.  Work at traffic signals that requires shifting high-volume left-turn movement into a through lane on a single approach to the intersection.  Work at signals that requires shifting left-turning traffic into a through lane on multiple approaches to the intersection. • If City’s initial TCP review finds that night work is required, a pre-construction meeting is mandatory to confirm the extents of the work required, the duration of work, anticipated noise levels, and any potential alternatives to mitigate the impact of night work to adjacent residents prior to review and approval of the TCP. TRAFFIC CONTROL PLAN (TCP) FORMAT • TCP must be site and project specific. The TCP shall clearly indicate all existing transportation facilities impacted by work including roads, bike lanes, sidewalks, transit stops, and driveways. Typical drawings, taper tables and MUTCD illustrations, by themselves, are insufficient. • Each construction phase shall be provided with appropriate work zone traffic control. The impacts of utility relocation, traffic delays, detours and capacity restrictions must be considered and addressed. A suitable sequence of construction activities must be discussed with City Staff prior to fully developing TCPs based on the complexity of a project. • TCPs shall be clearly labeled as separate plans to identify the construction sequencing during each phase when more than one TCP layout is submitted. • TCP must be submitted with an electronic copy of TCP layout(s), on 11” X 17” paper size PDF format, which consist of:  Map(s) showing the location of the project and work area.  All fonts shall be legible and a minimum 10-point font size.  All symbols of viewing or printing shall be clear and contrasting.  All streets shall be labeled, and layout must include a north arrow and scale.  Must show channelizing devices, signing, flagger locations, barricades, PCMS boards, etc.  Show locations where the standard traffic control plans are applied. NOT TO SCALEComments: MERGING TAPER LENGTHTAPER ("L") LANE WIDTH L MPH 10' 11' 12'SHIFTING 20 70 75 80TAPER 25 105 115 1651/2 L 30 150 165 180 35 205 225 245SHOULDER 40 270 295 320TAPER 45 450 495 5401/3 L 50 500 550 600 ONE-LANE TWO-WAY TAPER -- 50-100'Date:6/24/2026 Author:Jeffrey Hubbard, Traffic Control Supervisor Project:________________CERTIFICATION:WA TCS # ES2000151 (Exp: 4/2027)LOCATION:RENTON, WAComments: General Requirements1. All signs and spacing to conform to the MUTCD and CITY / COUNTY / WSDOT Requirements.2. Channelizing devices are CONES / BARRELS with retro reflective material.3. All signs are 36"x36" or 48"x"48" unless otherwise specified.4. Alert affected local residents and businesses.5. Crew is required to leave a minimum 11' for lane width.6. Work hours will be determined by CITY / COUNTY / WSDOT. TC-01NE 4TH ST @ 3000 NE 4TH STWORK @ MH-360-190 / BORE / RESTORERIGHT-LANE CLOSURE N LEGENDARROW BOARDBUS STOP BUS STOPCONESHHHHMHMHSSPOTTERWORK AREAWORK TRUCK HOURS OF OPERATION _____ AM to _____ PM TRAFFIC CONTROL PLANJOB # P - 110987PERMIT # _____________ NOT TO SCALE TCP PROPOSAL: NOT VALID W/O R-O-WJURISDICTION APPROVAL STAMP XXX ROAD WORK AHEAD W20-1 W4-2 RIGHT LANE CLOSED AHEAD W20-5 Comments: WORK @ MH, BORE, & RESTORE ALL.RIGHT-LANE CLOSURE WEST-BUNDNE 4TH ST. ARROW BOARD WILL BE USED.DRIVEWAYS REMAIN OPEN/ACCESSIBLE.SIDEWALKS REMAIN OPEN/ACCESSIBLE.SPOTTER WILL ASSIST AT WORK AREA.COORDINATE WITH TRANSIT PRIOR.REFER CHART FOR SIGN/DEVICE SPACING. Drafted By: Jeffrey HubbardTraffic Control SupervisorWA TCS # ES2 000151Jeffrey.Hubbard@ziply.com____________________ DEVICES30 x CONES1 x SPOTTER1 x ARROW BOARD10 x W20-11 x W20-51 x W4-2BUS STOP DRIVEWAY DRIVEWAY HHMHSIDEWALK SIDEWALKNE 4TH ST NE 4TH ST 10 10 10 10 10 10 10 10 SIDEWALK SIDEWALK L = 10' X ~205'MERGING TAPERSPEEDLIMIT35 SPEEDLIMIT35XROAD WORK AHEAD W20-1 ROADWORKAHEADPLACE ATDRIVEWAYS RENTONTECHNICALCOLLEGE3000 NE 4TH STPH: 425.235.2352 WEB: RTC.EDU 3131 DRIVEWAY 3123 DRIVEWAY 3131 SPOTTERS WORK @ MH-360-190BORE & RESTOREWORK AREA10' X ~50' COORDINATE WITH BUSINESSFOR ANY / ALL WORK ON PRIVATE PROPERTY MONROEAVE NE www.invarion.com MFP26003455Work with King County Metro to ensure access to the bus stop is maintained. temporary bus stop location may be required WORK DETAILS: 60 2 4 4 3 4 - A T C O - S P . d w g 708 First Street Snohomish, WA 98290 DATE: 360.563.9000 PR O J E C T N U M B E R : PR O J E C T A D D R E S S : FI L E N A M E : DESIGNED BY: ATCO CONTACT: NE A R E S T I N T E R S E C T I O N SHEET:SCALE: LEGEND: EXISTING UTILITY POLE PROPOSED NEW POLE EXISTING HANDHOLE PROPOSED NEW HANDHOLE [2'x3'] EXISTING MANHOLE PROPOSED NEW MANHOLE EXISTING FLOWER POT PROPOSED NEW FLOWER POT EXISTING UNDERGROUND UTILITY PROPOSED UNDERGROUNDCONSTRUCTION [HAND DIG, BORE] DRINKING WATER SURFACE WATER ACCESS MH 360-190 AND SPLICE THEN BORE ~10' NORTH AND PLACE NEW HH. PULL FIBER THRU EXISTING CUSTOMER CONDUIT TO MPOE AND PLACE NEW 24-PORT SLIMBOX CENTER LINE PARCEL LIMITS [PROPERTY LINE] 60 2 4 4 3 4 MO N R O E A V E N E & N E 4 T H S T 30 0 0 N E 4 T H S T , R E N T O N W A EOP EDGE OF PAVEMENT ROW RIGHT OF WAY - BORE PIT TO BE BACKFILLED AND COMPACTED IN 12" LIFTS WITH MATERIAL REMOVED - FLOW OF ANY NEARBY DRAINAGE MUST BE MAINTAINED AT ALL TIMES - PROTECT ROOTS AT ALL TREE LOCATIONS, FIELD ADJUST AS NECESSARY MINIMUM STANDARDS FOR DIRECTIONAL BORING 48" MIN12" MIN FROM EX. UTILITIES EX. GRADE RECEIVE PITBORE PIT - PLACE END MARKER WITH UTILITY OWNER'S NAME DESCRIBING CONDUIT STREET CROSSINGS TYPICAL BORE DETAILS Everett, WA 98206 NEXISTING TERMINAL PROPOSED TERMINAL CITY OF RENTON EOP EOP EOP EOP EOP EOP EOP EOP EOP E O P EO P EO P EOP EOP EOP EOP EOP EOP EOP EOP EOP EOP EO P EO P EO P ROW ROW ROW ROW ROW ROW ROW ROW ROW RO W RO W ROW ROW ROW ROW ROW ROW ROW ROW ROW RO W RO W RO W WASTEWATER 32 ' 8' 46 ' MH360-190 PROPOSEDHH PROPOSEDSLIMBOX MFP26003455 Potholing of the city utility line will be required RESTORATION PER CITY OF RENTON STANDARDS POTHOLE ALL EXISTING UTILITIES UNITS / ACCT CODES REVISIONS ENGR:DRAWN DATE: SCALE:TAX DISTRICT: PROJECT NUMBER: C.O. AREA: DWG OF CNTY: TWNSHP:RNG:SEC: FILE: 3000 NE 4TH ST, RENTON WP-P-110987-6024434PHONE: EXCH. CODE: EMAIL: ATCO ENGINEER:CHANTTEL HILARIO CHANTTEL.HILARIO@ATCOTELECOM.COM ***ALL FACILITIES NOT PERTAINING TO THIS WORK ORDER HAVE BEEN DELETED FOR CLARITY*** 811 CALL BEFORE YOU DIG ** CAUTION ** MULTIPLE VOLTAGE POWER CIRCUITS OVERHEAD N 1 23N 5E 9 ---- JACOB LEWIS 208-690-0437 RENTON 51670 KING P-110987/6024434 RNTN-10G-K-20 EDUCATION NETWORK 5/1/2026 101 MATERIAL TYPE QTY 24F MMP HH 2'' CONDUIT SPLICE CASE 24-PORT SLIMBOX PROJECT NO: P-110987/6024434 CILLI CODE: RNTN PROJECT TYPE: METRO-E LOCATION: 3000 NE 4TH ST, RENTON, WA 98056. SCOPE OF WORK COMMERCIAL PLANNER: EDWIN ALECIA CONTACT: 602-301-7383 ENGINEERING COORDINATOR: NICHOLAS PREZIOSI CONTACT: 803-320-4479 OSP PROJECT MANAGER: CRAIG COLWELL CONTACT: 681-283-5414 CPA: SCOTT DIXION CONTACT: 208-240-0079 CONSTRUCTION LEAD: MICHEAL HALL CONTACT: 425-359-0752 CONSTRUCTION MANAGER: DEREK PREJEAN CONTACT: 425-551-0108 LOCAL INFO: NAME: BRIAN RUSSELL PHONE: 509-335-4874 EMAIL: B.RUSSELL@WSU.EDU ZIPLY CONTACTS: SPLICING/PLACING INSTRUCTIONS: - (PRINT 3) : 1. LOCATE MH 360-190(HAS AN EXISTING 60' LOOP) NEAR MH 360-190 SET A NEW MMP HH IN THE BACK OF THE SIDEWALK WITH NEW 2'' CONDUIT TO MH 360-190. 2. PLACE APPROX. 200' 24F FROM MH 360-190 TO MMP AND CONTINUE TO PULL FIBER THRU NEW CUSTOMER CONDUIT TO MPOE. SPLICE FT277,4 TO NEW 24F GOING TO MPOE. 3. AT MPOE PLACE A 24-PORT SLIMBOX LOCATION MAP: NOC NOTIFICATION REQ. NOC - 888-608-8029 NWF TIER 1 - 888-488-4427 NWF TIER 2 - 888-488-4435 *ATTENTION SPLICER: VERIFY TRAFFIC ON ASSIGNED FIBERS AND EXISTING JUMPERS, AT THE OFFICE, SPLICE LOCATION, AND THE X-CONN. IF TRAFFIC IS FOUND, PLEASE ESCALATE TO THE LOCAL INSPECTOR OR SPECIAL SERVICES TEAM. NOTATION OF CUSTOMER REQUIREMENTS: N/A SHEET 3 REV.1 PLACE A 24F IN MH 360-190.4/29/2026 MFP26003455 LEGENDS LINETYPES AREAS OF USE BF BF BF PROPOSED BURIED FIBER BF BF BF EXISTING BURIED FIBER AF AF AF PROPOSED AERIAL FIBER AF EXISTING AERIAL FIBER UGF UGF UGF PROPOSED UG FIBER UGF EXISTING UG FIBER UFT UFT UFT EXISTING UG FIBER TAIL EXISTING BURIED FIBER TAIL C EXISTING CONDUIT C PROPOSED CONDUIT RIGHT OF WAY EDGE OF PAVEMENT CENTERLINE RAILROAD TRACKS SECTION LINE BFT BFT BFT PROPOSED BURIED FIBER TAIL AFT AFT AFT PROPOSED AERIAL FIBER TAIL UFT UFT UFT PROPOSED UG FIBER TAIL UTILITY EASEMENT SIDEWALK FENCE DITCH CULVERT DROP AF AF UGF BFT BFT BFT DROP DROP DROP SYMBOL DESCRIPTION C/L CENTERLINE R/W RIGHT OF WAY EOP EDGE OF PAVEMENT ESMT UTILITY EASEMENT P/L PROPERTY LINE CO DIRECTION EXISTING HH PROPOSED HH NORTH ARROW CO/EXCHANGE SPLICE POINT PROPOSED SPLICE ARROW FOREIGN OWNED POLE ZIPLY POLE EXISTING SPLICE ARROW PROPOSED CONDUIT PROPOSED FLOWERPOT PROPOSED PEDESTAL EXISTING HUB PROPOSED TERMINAL EXISTING ANCHOR & GUY PROPOSED ZIPLY POLE HUB DIRECTION TREE TRIMMING ZIPLY POLE REMOVAL FOREIGN OWNED POLE REMOVAL LOCATE MARKER EXISTING COPPER PEDESTAL SIDEWALK ANCHOR & GUY PROPOSED MH EXISTING MH PROPOSED BORE PIT PEDESTAL REMOVAL BFI OPTICAL NETWORK TERMINAL PROPOSED SLIMBOX TERMINAL HH HH FP TRM HUB I MKR 6M MH MH TRM GRD BFI-ONT JOINT USE POLE UNITS / ACCT CODES REVISIONS ENGR:DRAWN DATE: SCALE:TAX DISTRICT: PROJECT NUMBER: C.O. AREA: DWG OF CNTY: TWNSHP:RNG:SEC: FILE: 3000 NE 4TH ST, RENTON WP-P-110987-6024434PHONE: EXCH. CODE: EMAIL: ATCO ENGINEER:CHANTTEL HILARIO CHANTTEL.HILARIO@ATCOTELECOM.COM ***ALL FACILITIES NOT PERTAINING TO THIS WORK ORDER HAVE BEEN DELETED FOR CLARITY*** 811 CALL BEFORE YOU DIG ** CAUTION ** MULTIPLE VOLTAGE POWER CIRCUITS OVERHEAD N 2 23N 5E 9 ---- JACOB LEWIS 208-690-0437 RENTON 51670 KING P-110987/6024434 RNTN-10G-K-20 EDUCATION NETWOEK 5/1/2026 102 MATERIAL TYPE QTY 24F MMP HH 2'' CONDUIT SPLICE CASE 24-PORT SLIMBOX 200' 1 30' 1 1 REV.1 PLACE A 24F IN MH 360-190.4/29/2026 MFP26003455 MH HH TREE TREE TREE PA R K I N G SI D E W A L K SIDEWALK SIDEWALK SID E W A L K SIDEWALK MH MH TREE TREE TREE MH TREE TREE MH SIDEWALK SIDEWALK MO N R O E A V E N E (A S P H A L T ) MO N R O E A V E N E (A S P H A L T ) NE 4TH ST (ASPHALT) NE 4TH ST (ASPHALT) *SOURCE FIBER* 7FW01AA 2422.201 23780' UG 144F 8349WANU FT251,1-72+ XD,73-96+ 8349WANU FT277,1-48 *PLACE NEW 24F 200' * 6024434 2422.201 (UG 200') XD,1-3+ 8349WANU FT277,4+ XD,5-24 *BORE & PLACE 2'' CONDUIT 30' * 6024434 2422.201 1-2'' MIN 36'' DEPTH SOFT SURFACE/CONCRETE 3000 BLDG. B BLDG. A START STA. 00+00 MH 360-190 EXIST. 60' LOOP 47.488659, -122.176813 MH 3 6 0 - 1 9 2 MH 3 6 0 - 1 9 3 5'MH 3 6 0 - 1 9 1 MH 360-194 PLACE NEW MMP HH LP 10' 20 ' SIDEWALKSIDEWALK SIDEWALK EN T R A N C E EN T R A N C E ENTRANCE PARKING PARKING LCON INFO: NAME: BRAIN RUSSEL CONTACT: 509-335-4874 EMAIL: BRUSSELL@WSU.EDU K-20 EDUCATION NETWORK ADDRESS: 3000 NE 4TH ST RENTON, WA 98056. *PLACE NEW 24-PORT SLIMBOX* 6024434 2422.201 FTP FT-1006948 XD,1-3+ 8349WANU FT277,4+ XD,5-24 STA. 00+30 UGF UGF UGF UGF UGF UGF UGF UGF UGF UGF C GRASS GRASS PARKING LOT SID E W A L K SI D E W A L K SID E W A L K SI D E W A L K EOP EO P ROW ROW C/L EOP EO P EO P EO P C/ LRO W RO W RO W RO W C/ L SI D E W A L K SID E W A L K SI D E W A L K UGF UGF UGF UG F TRM GRD UGF UGFUGF UGF UGF 116' 54 ' C C LCON INFO: NAME: JOHN HENERY WHATLEY CONTACT: 425-235-25156 EMAIL: JHWHATLEY@RTC.COM CONSTRUCTION NOTE: AS PER FIELD AT TIME OF VISIT NO ONE WITH PROPER INFO AVAILABLE, EXISTING CUSTOMER PROVIDED CONDUIT TO BE VERIFIED. AQM NOTE: THE ADDRESS 3000 NE 4TH ST RENTON, INCLUDES BUILDINGS A-N. END STA. 02+00 UNITS / ACCT CODES REVISIONS ENGR:DRAWN DATE: SCALE:TAX DISTRICT: PROJECT NUMBER: C.O. AREA: DWG OF CNTY: TWNSHP:RNG:SEC: FILE: 3000 NE 4TH ST, RENTON WP-P-110987-6024434PHONE: EXCH. CODE: EMAIL: ATCO ENGINEER:CHANTTEL HILARIO CHANTTEL.HILARIO@ATCOTELECOM.COM ***ALL FACILITIES NOT PERTAINING TO THIS WORK ORDER HAVE BEEN DELETED FOR CLARITY*** 811 CALL BEFORE YOU DIG ** CAUTION ** MULTIPLE VOLTAGE POWER CIRCUITS OVERHEAD N 3 23N 5E 9 ---- JACOB LEWIS 208-690-0437 RENTON 51670 KING P-110987/6024434 RNTN-10G-K-20 EDUCATION NETWORK 5/1/2026 103 MATERIAL TYPE QTY 200' 1 30' 1 1 24F MMP HH 2'' CONDUIT SPLICE CASE 24-PORT SLIMBOX GRASS REV.1 PLACE A 24F IN MH 360-190.4/29/2026 144F 1 2422.201 2 144F 1 2422.201 1 MFP26003455 POTHOLE ALL EXISTING UTILITIES RESTORATION PER CITY OF RENTON STANDARDS UNITS / ACCT CODES REVISIONS ENGR:DRAWN DATE: SCALE:TAX DISTRICT: PROJECT NUMBER: C.O. AREA: DWG OF CNTY: TWNSHP:RNG:SEC: FILE: 3000 NE 4TH ST, RENTON WP-P-110987-6024434PHONE: EXCH. CODE: EMAIL: ATCO ENGINEER:CHANTTEL HILARIO CHANTTEL.HILARIO@ATCOTELECOM.COM ***ALL FACILITIES NOT PERTAINING TO THIS WORK ORDER HAVE BEEN DELETED FOR CLARITY*** 811 CALL BEFORE YOU DIG ** CAUTION ** MULTIPLE VOLTAGE POWER CIRCUITS OVERHEAD N 4 23N 5E 9 ---- JACOB LEWIS 208-690-0437 RENTON 51670 KING P-110987/6024434 RNTN-10G-K-20 EDUCATION NETWORK 5/1/2026 104 MATERIAL TYPE QTY 200' 1 30' 1 1 24F MMP HH 2'' CONDUIT SPLICE CASE 24-PORT SLIMBOX MH UPDATE REQUIRED IN FIELD *NO MH DETAIL IN RECORDS. MH 360-190 REV.1 PLACE A 24F IN MH 360-190.4/29/2026 MFP26003455 UNITS / ACCT CODES REVISIONS ENGR:DRAWN DATE: SCALE:TAX DISTRICT: PROJECT NUMBER: C.O. AREA: DWG OF CNTY: TWNSHP:RNG:SEC: FILE: 3000 NE 4TH ST, RENTON WP-P-110987-6024434PHONE: EXCH. CODE: EMAIL: ATCO ENGINEER:CHANTTEL HILARIO CHANTTEL.HILARIO@ATCOTELECOM.COM ***ALL FACILITIES NOT PERTAINING TO THIS WORK ORDER HAVE BEEN DELETED FOR CLARITY*** 811 CALL BEFORE YOU DIG ** CAUTION ** MULTIPLE VOLTAGE POWER CIRCUITS OVERHEAD N 5 23N 5E 9 ---- JACOB LEWIS 208-690-0437 RENTON 51670 KING P-110987/6024434 RNTN-10G-K-20 EDUCATION NETWORK 5/1/2026 105 MATERIAL TYPE QTY 200' 1 30' 1 1 24F MMP HH 2'' CONDUIT SPLICE CASE 24-PORT SLIMBOX MH 360-190 PICTURE 1 MH 360-190 PICTURE 2 PROPOSED LOCATION FOR MMP REV.1 PLACE A 24F IN MH 360-190.4/29/2026 MFP26003455 UNITS / ACCT CODES REVISIONS ENGR:DRAWN DATE: SCALE:TAX DISTRICT: PROJECT NUMBER: C.O. AREA: DWG OF CNTY: TWNSHP:RNG:SEC: FILE: 3000 NE 4TH ST, RENTON WP-P-110987-6024434PHONE: EXCH. CODE: EMAIL: ATCO ENGINEER:CHANTTEL HILARIO CHANTTEL.HILARIO@ATCOTELECOM.COM ***ALL FACILITIES NOT PERTAINING TO THIS WORK ORDER HAVE BEEN DELETED FOR CLARITY*** 811 CALL BEFORE YOU DIG ** CAUTION ** MULTIPLE VOLTAGE POWER CIRCUITS OVERHEAD N 6 23N 5E 9 ---- JACOB LEWIS 208-690-0437 RENTON 51670 KING P-110987/6024434 RNTN-10G-K-20 EDUCATION NETWORK 5/1/2026 106 MATERIAL TYPE QTY 200' 1 30' 1 1 24F MMP HH 2'' CONDUIT SPLICE CASE 24-PORT SLIMBOX PICTURE 3-7 TO MPOE REV.1 PLACE A 24F IN MH 360-190.4/29/2026 MFP26003455 UNITS / ACCT CODES REVISIONS ENGR:DRAWN DATE: SCALE:TAX DISTRICT: PROJECT NUMBER: C.O. AREA: DWG OF CNTY: TWNSHP:RNG:SEC: FILE: 3000 NE 4TH ST, RENTON WP-P-110987-6024434PHONE: EXCH. CODE: EMAIL: ATCO ENGINEER:CHANTTEL HILARIO CHANTTEL.HILARIO@ATCOTELECOM.COM ***ALL FACILITIES NOT PERTAINING TO THIS WORK ORDER HAVE BEEN DELETED FOR CLARITY*** 811 CALL BEFORE YOU DIG ** CAUTION ** MULTIPLE VOLTAGE POWER CIRCUITS OVERHEAD N 7 23N 5E 9 ---- JACOB LEWIS 208-690-0437 RENTON 51670 KING P-110987/6024434 RNTN-10G-K-20 EDUCATION NETWORK 5/1/2026 107 MATERIAL TYPE QTY 200' 1 30' 1 1 24F MMP HH 2'' CONDUIT SPLICE CASE 24-PORT SLIMBOX PICTURE 8-12 REV.1 PLACE A 24F IN MH 360-190.4/29/2026 MFP26003455 UNITS / ACCT CODES REVISIONS ENGR:DRAWN DATE: SCALE:TAX DISTRICT: PROJECT NUMBER: C.O. AREA: DWG OF CNTY: TWNSHP:RNG:SEC: FILE: 3000 NE 4TH ST, RENTON WP-P-110987-6024434PHONE: EXCH. CODE: EMAIL: ATCO ENGINEER:CHANTTEL HILARIO CHANTTEL.HILARIO@ATCOTELECOM.COM ***ALL FACILITIES NOT PERTAINING TO THIS WORK ORDER HAVE BEEN DELETED FOR CLARITY*** 811 CALL BEFORE YOU DIG ** CAUTION ** MULTIPLE VOLTAGE POWER CIRCUITS OVERHEAD N 8 23N 5E 9 ---- JACOB LEWIS 208-690-0437 RENTON 51670 KING P-110987/6024434 RNTN-10G-K-20 EDUCATION NETWORK 5/1/2026 108 MATERIAL TYPE QTY 200' 1 30' 1 1 24F MMP HH 2'' CONDUIT SPLICE CASE 24-PORT SLIMBOX PICTURE 13 PICTURE 14 REV.1 PLACE A 24F IN MH 360-190.4/29/2026 MFP26003455 UNITS / ACCT CODES REVISIONS ENGR:DRAWN DATE: SCALE:TAX DISTRICT: PROJECT NUMBER: C.O. AREA: DWG OF CNTY: TWNSHP:RNG:SEC: FILE: 3000 NE 4TH ST, RENTON WP-P-110987-6024434PHONE: EXCH. CODE: EMAIL: ATCO ENGINEER:CHANTTEL HILARIO CHANTTEL.HILARIO@ATCOTELECOM.COM ***ALL FACILITIES NOT PERTAINING TO THIS WORK ORDER HAVE BEEN DELETED FOR CLARITY*** 811 CALL BEFORE YOU DIG ** CAUTION ** MULTIPLE VOLTAGE POWER CIRCUITS OVERHEAD N 9 23N 5E 9 ---- JACOB LEWIS 208-690-0437 RENTON 51670 KING P-110987/6024434 RNTN-10G-K-20 EDUCATION NETWORK 5/1/2026 109 MATERIAL TYPE QTY 200' 1 30' 1 1 24F MMP HH 2'' CONDUIT SPLICE CASE 24-PORT SLIMBOX PICTURE 15 PICTURE 16 REV.1 PLACE A 24F IN MH 360-190.4/29/2026 MFP26003455 UNITS / ACCT CODES REVISIONS ENGR:DRAWN DATE: SCALE:TAX DISTRICT: PROJECT NUMBER: C.O. AREA: DWG OF CNTY: TWNSHP:RNG:SEC: FILE: 3000 NE 4TH ST, RENTON WP-P-110987-6024434PHONE: EXCH. CODE: EMAIL: ATCO ENGINEER:CHANTTEL HILARIO CHANTTEL.HILARIO@ATCOTELECOM.COM ***ALL FACILITIES NOT PERTAINING TO THIS WORK ORDER HAVE BEEN DELETED FOR CLARITY*** 811 CALL BEFORE YOU DIG ** CAUTION ** MULTIPLE VOLTAGE POWER CIRCUITS OVERHEAD N 10 23N 5E 9 ---- JACOB LEWIS 208-690-0437 RENTON 51670 KING P-110987/6024434 RNTN-10G-K-20 EDUCATION NETWORK 5/1/2026 1010 MATERIAL TYPE QTY 200' 1 30' 1 1 24F MMP HH 2'' CONDUIT SPLICE CASE 24-PORT SLIMBOX K-20 EDUCATION NETWORK ADDRESS: 3000 NE 4TH ST RENTON, WA 98056 LOCAL INFO NAME: BRIAN RUSSELL PHONE: 509-335-4874 EMAIL: B.RUSSELL@WSU.EDU PICTURE 17 REV.1 PLACE A 24F IN MH 360-190.4/29/2026 MFP26003455