Loading...
HomeMy WebLinkAboutS-392401N M N i i a rr O U) Z D O m L0 T N OD 0 0 N co a 0 a 0 W c 0 m co 0 N I W d w rn c m W m c c W 0 i a 0 c 0 m' `o c r Y m Y to 0 N I 0 0 0 1 to d o_ i X W A PORTION OF SECTION 10, TOWNSHIP 23 N., RANGE 05 E., W.M. SANITARY SEWER NOTES AND SPECIFICATIONS 1. ALL WORK AND WORK MATERIAL SHALL BE IN 10. BACKFILL SHALL BE PLACED EQUALLY ON BOTH SIDES OF CONFORMANCE WITH THE STANDARDS AND THE PIPE IN LAYERS WITH A LOOSE AVERAGE DEPTH OF 6 APPROX. SPECIFICATIONS OF THE CITY OF RENTON FG ELEV: INCHES, MAXIMUM DEPTH OF 8 INCHES, THOROUGHLY BOTTOM OF PLANNING/BUILDING/PUBLIC WORKS DEPARTMENT AND TOP OF TAMPING EACH LAYER TO 95 PERCENT OF MAXIMUM CROSSING # THE LATEST EDITION OF THE WSDOT/APWA STANDARDS NETWORK DENSITY, THESE COMPACTED LAYERS MUST EXTEND FOR NETWORK AND SPECIFICATIONS, AS APPROVED AND MODIFIED BY SEPARATION ONE PIPE DIAMETER ON EACH SIDE OF THE PIPE OR TO THE • • • •• • THE CITY OF RENTON IN THE RENTON STANDARD PLANS & 430.6 SIDE OF THE TRENCH. MATERIALS TO COMPLETE THE FILL 429.5 SPECIFICATIONS. A SET OF APPROVED PLANS SHALL BE 8 OVER PIPE SHALL BE THE SAME AS DESCRIBED. • SEWER/8" KEPT ON SITE AT ALL TIMES DURING CONSTRUCTION. 11. OPEN CUT ROAD CROSSINGS FOR UTILITY TRENCHES ON 2. THE HOURS OF WORK IN THE STREET RIGHT OF WAY SHALL • • • •• • • EXISTING TRAVELED ROADWAY SHALL BE BACKFILLED WITH 431.1 BE PER CITY SPECIFICATIONS ON WEEKDAYS UNLESS 430.6 CRUSHED ROCK AND MECHANICALLY COMPACTED UNLESS * ETHAFOAM PAD REQUIRED OTHERWISE APPROVED IN WRITING BY THE K: 69.68 OTHERWISE APPROVED BY PLANNING/BUILDING/PUBLIC WORKS DEPARTMENT. AN 12. DATUM FOR VERTICAL CONTROL SHALL BE NORTH APPROVED TRAFFIC CONTROL PLAN MUST BE OBTAINED io AMERICAN VERTICAL DATUM 1988 METERS, AND FOR (SEE SHEET C12 FOR DETAILS) PRIOR TO BEGINNING ANY WORK WITHIN PUBLIC RIGHT OF 6 LF - 8" PVC SDR -35 HORIZONTAL CONTROL SHALL BE NORTH AMERICAN DATUM 28 LF - 6" PVC SDR -35 WAY 1983/1991 METERS UNLESS OTHERWISE APPROVED BY THE 3. ALL LOCATIONS OF EXISTING UTILITIES SHOWN ARE @ 2% (MIN.) CITY OF RENTON PUBLIC WORKS DEPARTMENT. REFERENCE 24 LF - 6" PVC SDR -35 _ _ 24 LF - 6" PVC SDR -35 HMARKAAFD EEEVAFI ARE N FED ON THE PLANS. LOW POINT STA: 51 +73.47 RESPONSIBILITY TO VERIFY THE TRUE AND CORRECT 13. ALL DISTURBED AREAS SHALL BE SEEDED AND MULCHED SSCO #4 LOCATION SO AS TO AVOID DAMAGE OR DISTURBANCE. OR OTHERWISE STABILIZED TO THE SATISFACTION OF THE 4. A PRE -CONSTRUCTION CONFERENCE AND A 24 HOUR DEPARTMENT FOR THE PREVENTION OF ON-SITE EROSION RIM 437.4 NOTICE SHALL BE REQUIRED PRIOR TO STARTING NEW AFTER THE COMPLETION OF CONSTRUCTION. SSCO #2 CONSTRUCTION. IT SHALL BE THE CONTRACTOR'S 14. ALL PIPE AND APPURTENANCES SHALL BE LAID ON A RESPONSIBILITY TO SECURE ALL NECESSARY PERMITS • - 52+16.11, 18'R - PROPERLY PREPARED FOUNDATION IN ACCORDANCE WITH PRIOR TO STARTING CONSTRUCTION. (INSPECTION WILL THE STANDARDS AND SPECIFICATIONS OF THE CITY OF BE ACCOMPLISHED BY A REPRESENTATIVE OF THE CITY OF RENTON PLANNING/BUILDING/PUBLIC WORKS DEPARTMENT RENTON.) IT SHALL BE THE CONTRACTOR'S AND THE LATEST EDITION OF THE WSDOT/APWA RESPONSIBILITY TO NOTIFY THE PUBLIC WORKS STANDARDS AND SPECIFICATIONS, AS APPROVED AND INSPECTOR 24 HOURS IN ADVANCE OF BACKFILLING ALL MODIFIED BY THE CITY OF RENTON IN THE RENTON CONSTRUCTION. STANDARD PLANS & SPECIFICATIONS. THIS SHALL INCLUDE 5. CONTRACTOR IS SOLELY RESPONSIBLE FOR THE MEANS, NECESSARY LEVELING OF THE TRENCH BOTTOM OR THE METHODS AND SEQUENCES OF CONSTRUCTION AND FOR TOP OF THE FOUNDATION MATERIAL, AS WELL AS THE SAFETY OF WORKERS AND OTHERS ON THE PLACEMENT AND COMPACTION OF REQUIRED BEDDING CONSTRUCTION SITE. + MATERIAL, TO UNIFORM GRADE SO THAT THE ENTIRE 6. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO LENGTH OF THE PIPE WILL BE SUPPORTED ON A UNIFORMLY I I Q � OBTAIN STREET USE AND ANY OTHER RELATED PERMITS DENSE, UNYIELDING BASE. PIPE BEDDING SHALL BE PEA PRIOR TO ANY CONSTRUCTION. GRAVEL 6 INCHES ABOVE AND BELOW THE PIPE. 7. PLANS APPROVED BY THE CITY OF RENTON, PUBLIC WORKS 15. SANITARY SEWER PIPE SHALL BE POLYVINYL CHLORIDE DEPARTMENT SHALL TAKE PRECEDENCE OVER ALL OTHER (PVC) RUBBER GASKETED ASTM D 3034, SDR 35, OR PLANS. DUCTILE IRON CLASS 50, UNLESS OTHERWISE APPROVED BY THE WASTEWATER UTILITY S. A COPY OF THESE APPROVED PLANS MUST BE ON THE JOB SITE WHENEVER CONSTRUCTION IS IN PROGRESS. 16. IN UNIMPROVED AREAS, MANHOLE TO EXTEND Y MINIMUM 6 INCHES AND MAXIMUM 12 INCHES ABOVE 9. THE CONTRACTOR SHALL PROVIDE THE CITY OF RENTON ... .. . .. .. . . . ... . .. . .... .. ... .. .. . . ..... .. . .... . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . WITH AN AS -BUILT DRAWING OF THE SANITARY SEWER CONCRETE RING POURED AT GRADE. IN PAVED AREA, SYSTEM, WHICH HAS BEEN STAMPED AND SIGNED BY A COVER MUST SLOPE IN ALL DIRECTIONS TO MATCH PAVING. LICENSED PROFESSIONAL ENGINEER OR LICENSED WM PROFESSIONAL SURVEYOR. THE PIPE DIMENSIONS SHOWN ARE MEASURED FROM CENTER OF STRUCTURE TO CENTER OF STRUCTURE 4130118 SURVEY DATUM VERTICAL DATUM: HORIZONTAL BASIS OF BEARING: NAVD88 THE MONUMENTED CENTERLINE OF NE 10TH STREET BETWEEN CHELAN AVENUE NE AND DUVALL AVE NE PER BENCHMARK: CITY OF RENTON SHORT PLAT RECORDED UNDER CITY OF RENTON BENCHMARK #RENT159 RECORDING NUMBER 20120110900001 BRASS DISK IN CONCRETE RECESSED 0.6' BELOW THE TOP OF MONUMENT CASE AND COVER IN THE CENTER OF • •• • • • • •• • • •• THE INTERSECTION AT NE 12TH STAND UNION AVE NE ELEVATION=415.961 EQUIPMENT USED: TOPCON PS 103A TOTAL STATION. STANDARD FIELD TRAVERSE METHODS FOR CONTROL AND STAKING. 72 LF - 8' PVC SDR -35 455 45 :' 43. 43 42. 42 UTILITY NOTE: THE LOCATIONS OF EXISTING UNDERGROUND UTILITIES ARE APPROXIMATE ONLY AND HAVE NOT BEEN INDEPENDENTLY VERIFIED BY THE OWNER OR ITS REPRESENTATIVE. THE CONTRACTOR SHALL DETERMINE THE EXACT LOCATION OF ALL EXISTING UTILITIES BEFORE COMMENCING WORK AND AGREES TO BE FULLY RESPONSIBLE FOR ANY AND ALL DAMAGES THAT HAPPEN DUE TO THE CONTRACTOR'S FAILURE TO LOCATE EXACTLY AND PRESERVE ANY AND ALL UNDERGROUND UTILITIES. BEYLER CONSULTING ASSUMES NO LIABILITY FOR THE LOCATION OF UNDERGROUND UTILITIES. W NW LOT 7 I ^ I I FFE 437.50 V)I SSCO #7 - r `V I RIM 437.1 51+42.71, 18'L V 6" IE 431.38 (IN -OUT) Q 12 LF - 6" PVC SDR -35 @ 2% (MIN.) ... PROPOSED STORM MAIN (TYP) (SEE SHEET C4 FOR DETAILS) SSMH #1, TYPE 1-54" STA 51+14.18, 7.66' L\ 20 10 0 20 40 SCALE: 1 " = 20' J� LOT 6 LOT 5 FFE 437.00 FFE 437.50 SSCO #6 RIM 436.8 51+78.47, 18'L 6" IE 431.56 (IN -OUT) SSCO RIM - L .RIM 4377.. 2 52+17.71, 18'L 6" IE 431.76 (IN -OUT) - 12 LF - 6" PVC SDR -35 - 12 LF - 6" PVC SDR -357 SSMH #2, TYPE 1-54" pCg @ 2% (MIN.) @ 2% (MIN.) STA 52+48.56, 6.00' L RIM 437.00 I- APPROX. PIPE FG ELEV: TOP PIPE SIZE/ BOTTOM OF BOTTOM PIPE SIZE/ TOP OF VERTICAL CROSSING # NETWORK TOP PIPE NETWORK BOTTOM PIPE SEPARATION 7 • • • •• • • SEWER/8" 430.6 STORM/12" 429.5 1.1' 8 • • • •• • • SEWER/8" 430.7 STORM/12" 430.1 0.6' 9* • • • •• • • • SEWER/8" 431.1 STORM/6" 430.6 0.5' * ETHAFOAM PAD REQUIRED SURVEY DATUM VERTICAL DATUM: HORIZONTAL BASIS OF BEARING: NAVD88 THE MONUMENTED CENTERLINE OF NE 10TH STREET BETWEEN CHELAN AVENUE NE AND DUVALL AVE NE PER BENCHMARK: CITY OF RENTON SHORT PLAT RECORDED UNDER CITY OF RENTON BENCHMARK #RENT159 RECORDING NUMBER 20120110900001 BRASS DISK IN CONCRETE RECESSED 0.6' BELOW THE TOP OF MONUMENT CASE AND COVER IN THE CENTER OF • •• • • • • •• • • •• THE INTERSECTION AT NE 12TH STAND UNION AVE NE ELEVATION=415.961 EQUIPMENT USED: TOPCON PS 103A TOTAL STATION. STANDARD FIELD TRAVERSE METHODS FOR CONTROL AND STAKING. 72 LF - 8' PVC SDR -35 455 45 :' 43. 43 42. 42 UTILITY NOTE: THE LOCATIONS OF EXISTING UNDERGROUND UTILITIES ARE APPROXIMATE ONLY AND HAVE NOT BEEN INDEPENDENTLY VERIFIED BY THE OWNER OR ITS REPRESENTATIVE. THE CONTRACTOR SHALL DETERMINE THE EXACT LOCATION OF ALL EXISTING UTILITIES BEFORE COMMENCING WORK AND AGREES TO BE FULLY RESPONSIBLE FOR ANY AND ALL DAMAGES THAT HAPPEN DUE TO THE CONTRACTOR'S FAILURE TO LOCATE EXACTLY AND PRESERVE ANY AND ALL UNDERGROUND UTILITIES. BEYLER CONSULTING ASSUMES NO LIABILITY FOR THE LOCATION OF UNDERGROUND UTILITIES. W NW LOT 7 I ^ I I FFE 437.50 V)I SSCO #7 - r `V I RIM 437.1 51+42.71, 18'L V 6" IE 431.38 (IN -OUT) Q 12 LF - 6" PVC SDR -35 @ 2% (MIN.) ... PROPOSED STORM MAIN (TYP) (SEE SHEET C4 FOR DETAILS) SSMH #1, TYPE 1-54" STA 51+14.18, 7.66' L\ 20 10 0 20 40 SCALE: 1 " = 20' J� LOT 6 LOT 5 FFE 437.00 FFE 437.50 SSCO #6 RIM 436.8 51+78.47, 18'L 6" IE 431.56 (IN -OUT) SSCO RIM - L .RIM 4377.. 2 52+17.71, 18'L 6" IE 431.76 (IN -OUT) - 12 LF - 6" PVC SDR -35 - 12 LF - 6" PVC SDR -357 SSMH #2, TYPE 1-54" pCg @ 2% (MIN.) @ 2% (MIN.) STA 52+48.56, 6.00' L RIM 437.00 SSCO #1 RIM 437.4 @ 2% (MIN.) I 6 IE 431.91 (IN -OUT) RIM 437.6 51+46.09, 18' R SSCO #3 50+77.48, 20'R i 6" IE 431.56 (IN -OUT) I I RIM 437.7 I 6" IE 431.24 (IN-OUT)51 +96.66, 18'R .......... 438 I I I6" IE 431.81 (IN OUT) LOT 1 I LOT 2N41 LOT 3 LOT 4 FFE 438.50 FFE 438. 00 FFE 438.50 / I - i I I I I I FFE 438.00 I I CHELAN PLACE NE SEWER PLAN SCALE: HORIZONTAL:1 "=20' I- ' - - - = - - 136 LF - 8" PVC SDR -35 - - - 8" PVC CAP PC8 PVI STA: 51+68.15 M PC7 M L2+00 - PVI ELEV: 436.077 CHELAN PLACE NE 51k K: 69.68 PROPOSED WATER MAIN io (SEE SHEET C12 FOR DETAILS) 6 LF - 8" PVC SDR -35 LENGTH: 150.00 28 LF - 6" PVC SDR -35 BREAK STA = 52+54.19 I / @ 2% (MIN.) N 24 LF - 6" PVC SDR -35 _ _ 24 LF - 6" PVC SDR -35 LOW POINT STA: 51 +73.47 . ELEV = ..... . @ 2% (MIN.) ... SSCO #4 @ 2% (MIN.) d RIM 437.4 LOW POINT ELEV: 436.48 •p SSCO #2 24 LF - 6" PVC SDR -35 - • - 52+16.11, 18'R - SSCO #1 RIM 437.4 @ 2% (MIN.) I 6 IE 431.91 (IN -OUT) RIM 437.6 51+46.09, 18' R SSCO #3 50+77.48, 20'R i 6" IE 431.56 (IN -OUT) I I RIM 437.7 I 6" IE 431.24 (IN-OUT)51 +96.66, 18'R .......... 438 I I I6" IE 431.81 (IN OUT) LOT 1 I LOT 2N41 LOT 3 LOT 4 FFE 438.50 FFE 438. 00 FFE 438.50 / I - i I I I I I FFE 438.00 I I CHELAN PLACE NE SEWER PLAN SCALE: HORIZONTAL:1 "=20' Know what's below. 0111 before you dig. 51+00 52+00 CHELAN PLACE NE SEWER PROFILE SCALE: HORIZONTAL:1 "=20' VERYTICAL: 1"=5' BEYLER CONTACT phone: 253-301-4157 OFFICE fax: 253-336-3950 5920 100TH ST SW, STE 25 beylerconsulting.com Lakewood, WA 98499 SURVEYED: SCALE BEYLER CONSULT. VERTICAL: NAW 1988 1 .i=20' HORIZONTAL NAD 1983/1991 DESIGNED: DTY/KRD DRAWN: DTY/KRD ONE INCH DATUM CHECKED: AT FULL SCALE DRB IF NOT ONE INCH NO. REVISION BY DATE AP P R APPROVED: SCALE ACCORDINGLY DRB CITY OF R RENTON Planning/Building/Public Works Dept. F55 f50 45 40 F35 CAP f30 R-35 JB W1 CAP) i0a f20 52+70 S-392401 IN COMPLIANCE WITH CITY OF RENTON STANDARDS DEVELOPMENT ENGINEERINGWASTEWATER UTILITY 0 Elk Z4 S N T 0 0 a J m ►�1 H (Fitz -James 04/30/2018 '� dchristen 04/30/2018 ' Q BOUN SHORT PLAT CONSTRUCTION PLANS LUA16-000124, SH PL -A, U 16-006297 SEWER PLAN & PROFILE I- O DATE: 12/14/2017 = FIELDBOOK: NA v PAGE: NA Z DRAWING NO: C15 PVI STA: 51+68.15 M PVI ELEV: 436.077 K: 69.68 io LENGTH: 150.00 GRADE BREAK STA = 52+54.19 N LOW POINT STA: 51 +73.47 ELEV = 436.94 d LOW POINT ELEV: 436.48 n + I I Q � N � I I � Y � Q WM PROPOSED WATER m m d ' rn MAIN (TYP) ' Q W11 0) (SEE SHEET C12.0 FOR DETAILS) Q W o d NU) m LLJ 11 WW W Q LLJ Ln d EXISTING GRADE @ m d W U PROPOSED STORM RIGHT OF WAY U j m MAIN (TYP) CENTERLINE (TYP) W m (SEE SHEET C4.0 W FOR DETAILS) PROPOSED GRADE @ RIGHT OF WAY CENTERLINE (TYP) -- -- 1.1�% - - -- --------- - - - - --------- _� - - 1.00% , PIPE CROSSING #9 PIPE CROSSING #7 & 8 SEE TABLE THIS SHEET LOT 4 STUB MAIN IE 431.43 SEE TABLE THIS SHEET 314 8" PVC 136 LF - 8" PVC SDR -35 72 LF - 8" PVC SDR -35 O @ S=0.50% LOT 5 STUBTr @ S=0.50% MAIN IE 431.44 11 D LOT 1 STU LOT 3 STUB SSMH #2, TYPE 1-54" 6 LF - 8" PVC SD MAIN IE 430.6 O LOT 7 STUB LOT 2 STUB MAIN IE 431.33 STA 52+48.56, 6.00' L @ 5=0.65 ° /o (ST MAIN IE 431.06 MAIN IE 431.08 LOT 6 STUB RIM 437.00 MAIN IE 431.24 8" IE 431.73 (IN -N) EX. SSMH #5552, TYPE 1-48" 8" IE 431.63 (OUT -S) STA 50+41.83, 1.41'L RIM 437.54 SSMH #1, TYPE 1-54" STA 51+14.18, 7.66'L EXISTING GRADE RIGHT OF WAY @ (PER CITY OF RENTON STD 400.2 - SHALLOW MANHOLES) 6" IE 430.33 (IN -N) (TO BE REMOVED) RIM 437.35 CENTERLINE (TYP) 8" IE 430.49 (IN -NW) (NEW) 8" IE 430.95 (IN -N) CORE DRILL & RECHANNEL MANHOLE 8" IE 430.85 (OUT -SE) PROPOSED GRADE @ 8" IE 430.39 (OUT -S) (PER CITY OF RENTON STD 400.2 - RIGHT OF WAY LADDER NORTHEAST SHALLOW MANHOLES) CENTERLINE (TYP) (FIELD VERIFIED) 1p CI c� j M Qp M00 I ^I Ln 0) 111 Co 00 I� to rn 0) op C M M M M M M M M M M M M M M M M M M M M M Know what's below. 0111 before you dig. 51+00 52+00 CHELAN PLACE NE SEWER PROFILE SCALE: HORIZONTAL:1 "=20' VERYTICAL: 1"=5' BEYLER CONTACT phone: 253-301-4157 OFFICE fax: 253-336-3950 5920 100TH ST SW, STE 25 beylerconsulting.com Lakewood, WA 98499 SURVEYED: SCALE BEYLER CONSULT. VERTICAL: NAW 1988 1 .i=20' HORIZONTAL NAD 1983/1991 DESIGNED: DTY/KRD DRAWN: DTY/KRD ONE INCH DATUM CHECKED: AT FULL SCALE DRB IF NOT ONE INCH NO. REVISION BY DATE AP P R APPROVED: SCALE ACCORDINGLY DRB CITY OF R RENTON Planning/Building/Public Works Dept. F55 f50 45 40 F35 CAP f30 R-35 JB W1 CAP) i0a f20 52+70 S-392401 IN COMPLIANCE WITH CITY OF RENTON STANDARDS DEVELOPMENT ENGINEERINGWASTEWATER UTILITY 0 Elk Z4 S N T 0 0 a J m ►�1 H (Fitz -James 04/30/2018 '� dchristen 04/30/2018 ' Q BOUN SHORT PLAT CONSTRUCTION PLANS LUA16-000124, SH PL -A, U 16-006297 SEWER PLAN & PROFILE I- O DATE: 12/14/2017 = FIELDBOOK: NA v PAGE: NA Z DRAWING NO: C15 SHEET: 15 OF., 19 M