HomeMy WebLinkAboutRS_Drainage_180712_v1.pdf.
Solera Subdivision
Drainage Report
July 2018
Solera Subdivision
i
Drainage Report
2018
Prepared for:
Quadrant Homes
15900 SE. Eastgate Way, Suite 300
Bellevue, WA 98008
Prepared by:
Jeremy Febus, PE, LEED AP
KPFF Consulting Engineers
1601 Fifth Avenue, Suite 1600
Seattle, WA 98101
(206) 622-5822
KPFF Project No. 117659
July
KPFF Consulting Engineers
ii
This Page Intentionally Left Blank
Solera Subdivision
iii
Table of Contents
1. 1. Project Overview ....................................................................................................... 1
2. 2. Existing Conditions ................................................................................................... 2
3. 3. Conditions and Requirements Summary...................................................................... 3
Core Requirement No. 1: Discharge at The natural Location ...................................................... 3
Core Requirement No. 2: Offsite Analysis .................................................................................. 3
Core Requirement No. 3: Flow Control ....................................................................................... 3
Core Requirement No. 4: Conveyance System ........................................................................... 3
Core Requirement No. 5: Construction Stormwater Pollution prevention .................................. 3
Core Requirement No. 6: Maintenance and Operations ............................................................. 3
Core Requirement No. 7: Financial Guarantees and Liability ....................................................... 3
Core Requirement No. 8: water quality ...................................................................................... 3
Core Requirement No. 9: On-Site BMPS .................................................................................... 4
special requirement No. 1: Other Adopted Area-Specific Requirements ..................................... 4
special requirement No. 2: Flood Hazard Area Delineation ......................................................... 4
special requirement No. 3: Flood Protection Facilities ................................................................. 4
special requirement No. 4: Source Control .................................................................................. 4
special requirement No. 5: oil control .......................................................................................... 4
special requirement No. 6: aquifer protection areas .................................................................... 4
4. 4. Off-Site Analysis ....................................................................................................... 4
3.1 upstream analysis .................................................................................................................. 4
3.2 Downstream analysis ............................................................................................................ 4
5. 5. Flow Control Analysis and Design ............................................................................... 7
6. 6. Water Quality Analysis and Design ............................................................................. 8
6.1 Water Quality Requirement .................................................................................................. 9
6.2 On-site BMP Requirement .................................................................................................... 9
7. 7. Conveyance System Analysis and Design .................................................................. 10
8. 8. Esc Analysis and Design ........................................................................................... 10
9. 9. Special Reports and Studies ..................................................................................... 10
10. 10. Bond Quantities and Declaration of Covenant .......................................................... 10
KPFF Consulting Engineers
iv
List of Figures
Figure 1-1: Site Map .................................................................................................................................. 1
Figure 1-2: Site Topography ...................................................................................................................... 2
Figure 4-1: Predeveloped Areas ................................................................................................................ 7
Figure 4-2: Developed Areas ..................................................................................................................... 8
Figure 5-1: Surface Runoff Basins .............................................................................................................. 9
List of Tables
Table 4-1: MGS Flood Peak Flow Rate Results ........................................................................................... 8
Appendices
Appendix A
Existing Conditions Site Map
Proposed Conditions Site Plan
Appendix B
Flow Control Applications Map
MGS Flood Peak Flow Report
MGS Flood Bioretention Report
Appendix C
Geotechnical Report
Infiltration Test Report
Drainage Report – Solera Unit Lot Subdivision
Appendix A
1. Project Overview
The Solera Subdivision is a proposed residential and mixed use development at the northern corner of NE 10th
Ave and Sunset Blvd in Renton, Washington. The project consists of 151 for-sale town home units,
approximately 521 apartment units and roughly 39,000 sq ft of non-residential or commercial space. The
project consists of 6 existing parcels which will be subdivided into 7 parcels including realignment and
dedication of a portion of Jefferson Avenue NE ROW totaling 11.8 acres (Figure 1-1). The realigned and
expanded public right-of-ways will bisect the site connecting NE 12th Street to NE 10th Street and Harrington
Place to NE Sunset Boulevard. Additional frontage ROW dedications will be provides as well.
Figure 1-1: Site Map
SITE
KPFF Consulting Engineers
2
2. Existing Conditions
The site is substantially developed and paved in its existing condition. The current use, the Greater Hi-Lands
Shopping Center and its accompanying surface parking lot occupy the majority of the site. A 1.1 acre parcel, in
the southwest corner of the site, is undeveloped - consisting of lawn and gravel. The majority of the site slopes
to the southwest at grades of 2-5%. The northern extent of the project site, near the existing US Bank building,
slopes toward NE 12th St at grades of 2-5%. See Figure 2-1 for an overview of site topography.
Figure 1-2: Site Topography
Drainage Report – Solera Unit Lot Subdivision
Appendix A
3. Conditions and Requirements Summary
In compliance to the City of Renton city code, proposed development shall be in accordance with a city
amended version of the 2016 King County Surface Water Manual City titled The Renton Surface Water Manual
(RSWM).
CORE REQUIREMENT NO. 1: DISCHARGE AT THE NATURAL L OCATION
The project proposes to connect to existing public stormwater conveyance systems in NE 10th St and NE 12th
St. These storm drains converge within ¼ mile downstream.
CORE REQUIREMENT NO. 2: OFFSITE ANALYSIS
An offsite analysis has been conducted, see Section 3.
CORE REQUIREMENT NO. 3: FLOW CONTROL
According to the Flow Control Application Map, from the RSWM the development is required to meet the Peak
Rate Flow Control Standard – Match Existing. Developed flows must match 2, 10 and 100-yr peak flows which
existed on site prior to May 1979. Existing improvements on the site were built in phases over a range of
years from 1958 to 1977, and so for the purposes of this analysis, “existing conditions” are defined as the
current land use.
CORE REQUIREMENT NO. 4: CONVEYANCE SYSTEM
Proposed conveyance system elements, both onsite and offsite, shall be analyzed, designed and constructed
according to RSWM requirements. Conveyance system calculations will be provided during construction
document permitting following entitlement.
CORE REQUIREMENT NO. 5: CONSTRUCTION STORMWATER PO LLUTION
PREVENTION
Erosion and Sediment Control measures and Stormwater Pollution Prevention and Spill Control measures will
be applied through a Construction Stormwater Pollution Prevention (CSWPP) plan to be prepared during
construction permitting.
CORE REQUIREMENT NO. 6: MAINTENANCE AND OPERATIONS
Operation and Maintenance measures for stormwater infrastructure will be provided prior to Final Plat
Submittal.
CORE REQUIREMENT NO. 7: FINANCIAL GUARANTEES AND LI ABILITY
Bond quantities for the City of Renton will be provided prior to construction permitting.
CORE REQUIREMENT NO. 8: WATER QUALITY
The project is required to apply Enhanced Basic WQ treatment due to the Commercial and multifamily land
uses. To achieve this bioretention facilities have been proposed throughout the site, See Section 5 for a more
detailed analysis.
KPFF Consulting Engineers
4
CORE REQUIREMENT NO. 9: ON-SITE BMPS
The project is satisfying the on-site BMP requirement by demonstrating compliance with the LID Performance
Standard as described in Section 1.2.9.1.B in the RSWM. The LID Performance standard is being achieved
through the use of bioretention facilities dispersed throughout the development. See Section 6 for a more
detailed analysis.
SPECIAL REQUIREMENT NO. 1: OTHER ADOPTED AREA-SPECI FIC
REQUIREMENTS
This project is within the Sunset Area Surface Water Master Plan (CH2M HILL, 2011) which requires the
developer to install an 8 ft wide bioretention facility along the south side of NE 12th St.
SPECIAL REQUIREMENT NO. 2: FLOOD HAZARD AREA DELINE ATION
This project is not located in a flood hazard area.
SPECIAL REQUIREMENT NO. 3: FLOOD PROTECTION FACILIT IES
This project does not modify or use a flood protection facility.
SPECIAL REQUIREMENT NO. 4: SOURCE CONTROL
Source control requirements apply to projects proposing a commercial building or which require a Commercial
Site Development permit. The commercial development will apply the appropriate BMP’s required during
building permits.
SPECIAL REQUIREMENT NO. 5: OIL CONTROL
The project does not classify as a high use site and is thus exempt from the Special Requirement #5.
SPECIAL REQUIREMENT NO. 6: AQUIFER PROTECTION AREAS
The project is within wellhead protection zone 2. However, the project is not proposing any of the drainage
facilities mentioned in Section 1.3.6 of the RSWM and thus special requirement No. 6 is not applicable.
4. Off-Site Analysis
3.1 UPSTREAM ANALYSIS
The site is on a ridgeline. There are no upstream basins that drain onto the project site.
3.2 DOWNSTREAM ANALYSIS
Approximately 90% of the existing development drains to the southwest, where it is collected in the public
conveyance systems within NE 10th St. The Sunset Neighborhood park, directly across NE 10th St, has sized
their bioretention cells to accommodate 0.77 acres of the flow from our site, while the rest of this runoff is
conveyed west along 10th St toward Sunset Blvd. The remaining approximately 10% of existing runoff flows, to
the north, where it discharges to the public stormwater conveyance system within NE 12th St. Flow from all of
three of these discharge locations converge within ¼ mile downstream.
The downstream path for this site’s runoff is contained within a piped public conveyance system.
Approximately 1 mile downstream, the piped system crosses under Interstate 405 and outfalls into a series of
Drainage Report – Solera Unit Lot Subdivision
Appendix A
wetlands. Runoff flows through the wetlands until it reaches a creek which flows to Lake Washington. The
Sunset Area Storm Water Master Plan notes that there are no known capacity issues in the drainage system
downstream of our site.
KPFF Consulting Engineers
6
Figure 3-1: 1-Mile Downstream Flow Path
Drainage Report – Solera Unit Lot Subdivision
Appendix A
5. Flow Control Analysis and Design
According to the Flow Control Application Map the project falls within the Peak Flow Control Standard (Existing
Site conditions) Region (see Appendix B). This standard states that the 2, 10 and 100 yr peak flows for
developed conditions must be less than peak flows that existed on site prior to May 1979.
The King County Assessor’s Reports indicate that the latest improvements to the developed parcels were
made in 1977. Street frontages being improved (Sunset Blvd, Harrington Pl, Kirkland Avenue NE, and NE 12th
St) were all assumed to their current condition prior to the on-site parcels. See Figures 4-1 and 4-2 for a
comparison of impervious and pervious surfaces in the existing and developed conditions. For this reason
existing surveyed conditions were modeled as existing conditions in this analysis.
Figure 5-1: Predeveloped Areas
KPFF Consulting Engineers
8
Figure 5-2: Developed Areas
Table 5-1: MGS Flood Peak Flow Rate Results
The proposed improvements to the site will create more pervious surface than existed in May 1979. As a
result, without the implementation of any flow control measures, te developed peak flows are less than
predeveloped peak flows in the 2, 10 and 100yr condition – complying with Core Requirement #3.
6. Water Quality Analysis and LID Performance Standard
Design
The project is proposing to construct infiltrating bioretention cells to satisfy both Core Requirement No. 8
Water Quality and Core Requirement No. 9 On-site BMPs.
Predeveloped Peak Flows Developed Peak Flows
2 yr 4.35 cfs 3.92 cfs
10 yr 6.42 cfs 5.90 cfs
100 yr 11.34 cfs 10.64 cfs
Drainage Report – Solera Unit Lot Subdivision
Appendix A
6.1 WATER QUALITY REQUIREMENT
Over 50% of the developed site will be commercial and multifamily land use. According to the RSWM this
triggers the need for Enhanced Basic Water Quality treatment. The treatment goal of Enhanced Basic Water
Requirement can be achieved by treating targeted surface runoff with bioretention (Enhanced Basic Option 4,
6.1.2 RSWM).
The project site has been subdivided into 56 sub-basins (Figure 5-1)
Figure 5-1: Surface Runoff Basins
The grading approach in each of these sub-basins is such that runoff will sheet flow from new PGIS and drain
through a curb cut into a bioretention facility. Runoff will be treated in the bioretention cells and infiltrate into
native soils. Additionally, the surface runoff from street frontage improvements will be treated using
bioretention cells (basins 47-56). Bioretention facilities have been sized using MGS Flood methodology to treat
91% of runoff entering the cell. An infiltration rate of 6 in/hr was used for the amended soil and an infiltration
rate of 0.7 in/hr was used for the underlying native soils consistent with infiltration test results completed by
Earth Solutions Northwest LLC (report in Appendix C). It should be noted that the 0.7 in/hr is a conservative
infiltration rate. Rates ranging from 2 in/hr – 20 in/hr were tested on site, but the lowest rate was used along
with a correction factor to. The MGS Flood Report demonstrating compliance is located in Appendix B.
6.2 ON-SITE BMP REQUIREMENT
According to section 1.2.9 of the RWSM, Core Requirement #9 can be satisfied by,
1) application of BMPs to the maximum extent feasible
2) or by using a continuous runoff model to demonstrate compliance with the Low Impact Development
(LID) Performance Standard.
KPFF Consulting Engineers
10
This development has opted to use the LID performance Standard. In order to comply with this standard,
“Stormwater discharges shall match developed discharge durations to pre-developed durations for the range
of pre-developed discharge rates from 8% of the 2-year peak flow to 50% of the 2-yr peak flows.” These
durations must be matched through the modeling of on-site BMPs —bioretention has been chosen for this
development. Using the same basins and infiltration rates as in section 6.1, each individual basin was modeled
to LID duration standards using MGS Flood Methodology. It was found that the LID performance standard
generated bioretention facilities smaller in size than what is needed to meet water quality standards. For this
reason, all bioretention facilities were sized to water quality standards, i.e. 91% of runoff treated. MGS Flood
Reports in Appendix B show results for both water quality and LID performance standard.
6.2 ON-SITE BMP MIXED USE LOTS
Mixed-use lots will use a combination of green-roof and ground level bio-retention planters to achieve 100% of
the LID performance standard. Meeting this requirement strictly through the use of bio-retention planters
would require approximately 2800 square feet of planter area on each mixed use parcel. The preliminary
drainage plan demonstrates that area in excess of this amount is available adjacent to the building structures.
The actual BMP sizing and placement will be refined and fully documented through individual site plan
entitlements for each mixed-use parcel.
7. Conveyance System Analysis and Design
No existing capacity issues are known within the downstream conveyance system. A detailed analysis will be
performed for the projects receiving conveyance system during construction document permitting. Proposed
conveyance system elements, both onsite and offsite, shall be analyzed, designed and constructed according
to RSWM requirements. Conveyance system calculations will be provided during construction document
permitting following entitlement.
8. Esc Analysis and Design
Erosion and Sediment Control measures and Stormwater Pollution Prevention and Spill Control measures will
be applied through a Construction Stormwater Pollution Prevention (CSWPP) plan.
9. Special Reports and Studies
The Sunset Area Surface water Master Plan (CH2M HILL, 2011) discusses the City of Renton’s surface water
management program within the Sunset Area. The Master Plan requires this project to install an 8’ bioretention
facility along the south side of NE 12th St.
10. Bond Quantities and Declaration of Covenant
Bond quantities for the City of Renton will be provided prior to construction permitting.
Drainage Report – Solera Unit Lot Subdivision
Appendix A
KPFF Consulting Engineers
12
Appendix A
1. Existing Conditions Site Map
2. Proposed Conditions Site Plan
NE
1
2
TH
S
T
R
E
E
T
(A
D
ED
I
CA
T
ED
PUB
L
I
C
R
IGH
T
O
F
WA
Y
)
HARRINGTON PLACE NE
(A DEDICATED PUBLIC RIGHT OF
W
A
Y
)KIRKLAND AVENUE NE(A DEDICATED PUBLIC RIGHT OF WAY)NE SUNSET BOULEVARD
(A DEDICATED PUBLIC RIGHT OF WAY)
SUNSET LANE NE
(A DEDICATED PUBLIC RIGHT OF WAY)NE 10TH STREET(A DEDICATED PUBLIC RIGHT OF WAY)SUNSET LANE NE
(A DEDICATED PUBLIC RIGHT OF WAY)
NE SUNSET BOULEVARD
(A DEDICATED PUBLIC RIGHT OF WAY)
PERVIOUS: 1.8 ACRES
IMPERVIOUS = 10.8 ACRES
SUNSET BLVD KIRKLAND AVE NENE 12TH
ST
HARRINGTON PL NE
NE 10TH STEXISTING CONDITIONS
1601 5th Avenue, Suite 1600
Seattle, WA 98101
206.622.5822
www.kpff.com
PERVIOUS: 3.17 ACRES
IMPERVIOUS = 9.43 ACRES
SUNSET BLVD KIRKLAND AVE NENE 12TH
ST
HARRINGTON PL NE
NE 10TH STDEVELOPED CONDITIONS
Drainage Report - Rose Hill Subdivision
Appendix B
Appendix B
1. Flow Control Applications Map
2. MGS Flood Peak Flow Report
3. MGS Flood Bioretention Report
LakeDesire
ShadyLake (MudLake)
PantherLake LakeYoungs
LakeWashington
Bl a c kRi ver
Gr eenRiv
e
r
C
edarRi verUV900
UV167
UV515
UV169
UV900
UV169
UV167BN IncBN IncBBNNIInnccSSEERReennttoonn II ssss aa qquuaahh RR dd
RReennttoonnMMaappllee VVaalllleeyyRRdd
MMaapplleeVVaalllleeyyHHwwyy
110088tthhAAvveeSSEESSWW SSuunnsseettBBllvvdd RRaaiinnii
eerrAAvveeNNNE 3rd StNE 3rd St
SW 43rd StSW 43rd St SS EE CCaarrrrRR dd
NE 4th StNE 4th St
SSEE RReennttoonn MMaappllee VVaalllleeyy RRddLLooggaannAAvveeNN
SR 515SR 515PPaarrkkAAvveeNNOOaakkeessddaalleeAAvveeSSWWSSuunnsseettBBllvvddNN EE
DDuuvvaallllAAvveeNNEEI-405 FWYI-405 FWY II--440055FFWWYYSR 167SR 167114400tthh
WWaayySS
EENNEE 2277tthh SStt
115566tthhAAvveeSSEEUUnniioonnAAvveeNNEE111166tthhAAvveeSSEESW 7th StSW 7th St
N 8th StN 8th St
PP uuggeettDDrrSSEE
RR
ee
nnttoonnAAvvee SS
SSWW 2277tthh SStt BBeennssoonnRRddSSWWiilllliiaammssAAvveeSSMMoonnrrooeeAAvveeNNEESE 128th StSE 128th St
II
nntt
eerr
uurr
bbaannAAvveeSS HHooqquuiiaammAAvveeNNEE8844tthhAAvveeSSSSEEPPeett
rr
oovvii
tt
sskkyyRRddEEVVaalllleeyyHHwwyySE 192nd StSE 192nd St
SE 60th StSE 60th St
TTaallbboottRRddSSRRee
nn
tt
oo
nn
AAvveeSS116644tthhAAvveeSSEESE 208th StSE 208th St
SE 72nd StSE 72nd St
RRaaiinniieerr
AAvvee
SS 111166tthhAAvveeSSEES 128th StS 128th St
NNeewwccaassttllee WWaayy
SS 221122tthh SStt
SS 118800tthh SStt CCooaall
CCrreeeekkPPkkwwyySSEESW 41st StSW 41st St
114400tthhAAvveeSSEE112288tthhAAvveeSSEE6688tthhAAvveeSSSSEE 116688tthh SStt
NE 12th StNE 12th St
BBee
aa
ccoonn
AA
vv
ee
SS
FFoorreesstt DDrr SSEE
SSEE 116644tthh SStt 114488tthhAAvveeSSEESSEE MMaayy VVaalllleeyy RRdd
SS EE JJ oo nn ee ss RR dd
SSEE 22 00 44 tthh WW aayySW 34th StSW 34th St
SE 144th StSE 144th St
114488tthhAAvveeSSEE115544tthhPPllSSEELL
aa
kk
ee
WWaa
sshhii
nnggtt
oonnBBll
vvddNNEEddmmoonnddssAAvveeNNEEAAbbeerrddeeeennAAvveeNNEEEEMM eerrcceerrWWaayyWWeessttVVaalllleeyyHHwwyyEast Valley RdEast Valley Rd,§-405
,§-405
,§-405
µ0 1 2Miles
Flow Control Application Map
Reference 15-A
Date: 01/09/2014
Flow Control Standards
Peak Rate Flow Control Standard (Existing Site Conditions)
Flow Control Duration Standard (Existing Site Conditions)
Flow Control Duration Standard (Forested Conditions)
Flood Problem Flow
Unincorporated King County Flow Control Standards
Renton City Limits
Potential Annexation Area
PROJECT SITE
—————————————————————————————————
MGS FLOOD
PROJECT REPORT
Program Version: MGSFlood 4.43
Program License Number: 200410007
Project Simulation Performed on: 03/08/2018 7:02 PM
Report Generation Date: 03/08/2018 7:04 PM
—————————————————————————————————
Input File Name: Biroetnetion WQ V BMP.fld
Project Name: Solera Subdivision
Analysis Title: Bioretention WQvBMP
Comments:
———————————————— PRECIPITATION INPUT ————————————————
Computational Time Step (Minutes): 15
Extended Precipitation Time Series Selected
Climatic Region Number: 0
Full Period of Record Available used for Routing
Precipitation Station : 95004005 Puget West 40 in_5min 10/01/1939-10/01/2097
Evaporation Station : 951040 Puget West 40 in MAP
Evaporation Scale Factor : 0.750
HSPF Parameter Region Number: 1
HSPF Parameter Region Name : USGS Default
********** Default HSPF Parameters Used (Not Modified by User) ***************
********************** WATERSHED DEFINITION ***********************
Predevelopment/Post Development Tributary Area Summary
Predeveloped Post Developed
Total Subbasin Area (acres) 0.100 0.100
Area of Links that Include Precip/Evap (acres) 0.000 0.001
Total (acres) 0.100 0.101
----------------------SCENARIO: PREDEVELOPED
Number of Subbasins: 1
---------- Subbasin : Subbasin 1 ----------
-------Area (Acres) --------
Impervious 0.100
----------------------------------------------
Subbasin Total 0.100
----------------------SCENARIO: POSTDEVELOPED
Number of Subbasins: 1
---------- Subbasin : Subbasin 1 ----------
-------Area (Acres) --------
Impervious 0.100
----------------------------------------------
Subbasin Total 0.100
************************* LINK DATA *******************************
----------------------SCENARIO: PREDEVELOPED
Number of Links: 0
FLOW CONTROL
************************* LINK DATA *******************************
----------------------SCENARIO: POSTDEVELOPED
Number of Links: 1
------------------------------------------
Link Name: New Bio Lnk1
Link Type: Bioretention Facility
Downstream Link: None
Base Elevation (ft) : 100.00
Riser Crest Elevation (ft) : 103.00
Storage Depth (ft) : 3.00
Bottom Length (ft) : 5.0
Bottom Width (ft) : 6.0
Side Slopes (ft/ft) : L1= 3.00 L2= 3.00 W1= 3.00 W2= 3.00
Bottom Area (sq-ft) : 30.
Area at Riser Crest El (sq-ft) : 552.
(acres) : 0.013
Volume at Riser Crest (cu-ft) : 717.
(ac-ft) : 0.016
Infiltration on Bottom only Selected
Soil Properties
Biosoil Thickness (ft) : 1.00
Biosoil Saturated Hydraulic Conductivity (in/hr) : 2.00
Biosoil Porosity (Percent) : 20.00
Maximum Elevation of Bioretention Soil : 101.00
Native Soil Hydraulic Conductivity (in/hr) : 0.50
Underdrain Present
Orifice NOT Present in Under Drain
Riser Geometry
Riser Structure Type : Circular
Riser Diameter (in) : 6.00
Common Length (ft) : 0.000
Riser Crest Elevation : 103.00 ft
Hydraulic Structure Geometry
Number of Devices: 0
**********************FLOOD FREQUENCY AND DURATION STATISTICS*******************
----------------------SCENARIO: PREDEVELOPED
Number of Subbasins: 1
Number of Links: 0
----------------------SCENARIO: POSTDEVELOPED
Number of Subbasins: 1
Number of Links: 1
********** Link: New Bio Lnk1 ********** Link WSEL Stats
WSEL Frequency Data(ft)
(Recurrence Interval Computed Using Gringorten Plotting Position)
Tr (yrs) WSEL Peak (ft)
======================================
1.05-Year 102.564
1.11-Year 102.778
1.25-Year 103.003
2.00-Year 103.023
3.33-Year 103.029
5-Year 103.034
10-Year 103.038
25-Year 103.046
50-Year 103.048
100-Year 103.049
***********Groundwater Recharge Summary *************
Recharge is computed as input to Perlnd Groundwater Plus Infiltration in Structures
Total Predeveloped Recharge During Simulation
Model Element Recharge Amount (ac-ft)
-----------------------------------------------------------------------------------------------
Subbasin: Subbasin 1 0.000
_____________________________________
Total: 0.000
Total Post Developed Recharge During Simulation
Model Element Recharge Amount (ac-ft)
-----------------------------------------------------------------------------------------------
Subbasin: Subbasin 1 0.000
Link: New Bio Lnk1 0.000
_____________________________________
Total: 0.000
Total Predevelopment Recharge Equals Post Developed
Average Recharge Per Year, (Number of Years= 158)
Predeveloped: 0.000 ac-ft/year, Post Developed: 0.000 ac-ft/year
***********Water Quality Facility Data *************
----------------------SCENARIO: PREDEVELOPED
Number of Links: 0
----------------------SCENARIO: POSTDEVELOPED
Number of Links: 1
********** Link: New Bio Lnk1 **********
Infiltration/Filtration Statistics--------------------
Inflow Volume (ac-ft): 45.20
Inflow Volume Including PPT-Evap (ac-ft): 47.23
Total Runoff Infiltrated (ac-ft): 0.00, 0.00%
Total Runoff Filtered (ac-ft): 43.78, 92.69%
Primary Outflow To Downstream System (ac-ft): 47.18
Secondary Outflow To Downstream System (ac-ft): 0.00
Percent Treated (Infiltrated+Filtered)/Total Volume: 92.69%
***********Compliance Point Results *************
Scenario Predeveloped Compliance Subbasin: Subbasin 1
Scenario Postdeveloped Compliance Link: New Bio Lnk1
*** Point of Compliance Flow Frequency Data ***
Recurrence Interval Computed Using Gringorten Plotting Position
Predevelopment Runoff Postdevelopment Runoff
Tr (Years) Discharge (cfs) Tr (Years) Discharge (cfs)
----------------------------------------------------------------------------------------------------------------------
2-Year 3.814E-02 2-Year 1.928E-02
5-Year 4.963E-02 5-Year 3.534E-02
10-Year 5.581E-02 10-Year 4.216E-02
25-Year 6.500E-02 25-Year 5.376E-02
50-Year 8.392E-02 50-Year 5.666E-02
100-Year 9.771E-02 100-Year 5.929E-02
200-Year 0.101 200-Year 5.938E-02
** Record too Short to Compute Peak Discharge for These Recurrence Intervals
**** Flow Duration Performance ****
Excursion at Predeveloped 50%Q2 (Must be Less Than or Equal to 0%): -71.9% PASS
Maximum Excursion from 50%Q2 to Q2 (Must be Less Than or Equal to 0%): -58.0% PASS
Maximum Excursion from Q2 to Q50 (Must be less than 10%): -57.2% PASS
Percent Excursion from Q2 to Q50 (Must be less than 50%): 0.0% PASS
-------------------------------------------------------------------------------------------------
MEETS ALL FLOW DURATION DESIGN CRITERIA: PASS
-------------------------------------------------------------------------------------------------
**** LID Duration Performance ****
Excursion at Predeveloped 8%Q2 (Must be Less Than 0%): -91.4% PASS
Maximum Excursion from 8%Q2 to 50%Q2 (Must be Less Than 0%): -71.9% PASS
-------------------------------------------------------------------------------------------------
MEETS ALL LID DURATION DESIGN CRITERIA: PASS
-------------------------------------------------------------------------------------------------
—————————————————————————————————
MGS FLOOD
PROJECT REPORT
Program Version: MGSFlood 4.43
Program License Number: 200410007
Project Simulation Performed on: 07/04/2018 2:10 PM
Report Generation Date: 07/04/2018 2:10 PM
—————————————————————————————————
Input File Name: Basin 1.fld
Project Name: Solera
Analysis Title: BMP Performance Standard
Comments:
———————————————— PRECIPITATION INPUT ————————————————
Computational Time Step (Minutes): 15
Extended Precipitation Time Series Selected
Climatic Region Number: 0
Full Period of Record Available used for Routing
Precipitation Station : 96004005 Puget East 40 in_5min 10/01/1939-10/01/2097
Evaporation Station : 961040 Puget East 40 in MAP
Evaporation Scale Factor : 0.750
HSPF Parameter Region Number: 1
HSPF Parameter Region Name : USGS Default
********** Default HSPF Parameters Used (Not Modified by User) ***************
********************** WATERSHED DEFINITION ***********************
Predevelopment/Post Development Tributary Area Summary
Predeveloped Post Developed
Total Subbasin Area (acres) 1.000 0.295
Area of Links that Include Precip/Evap (acres) 0.000 0.008
Total (acres) 1.000 0.303
----------------------SCENARIO: PREDEVELOPED
Number of Subbasins: 1
---------- Subbasin : Subbasin 1 ----------
-------Area (Acres) --------
Till Forest 1.000
----------------------------------------------
Subbasin Total 1.000
----------------------SCENARIO: POSTDEVELOPED
Number of Subbasins: 1
---------- Subbasin : Impervious ----------
-------Area (Acres) --------
Till Grass 0.107
Impervious 0.188
----------------------------------------------
Subbasin Total 0.295
************************* LINK DATA *******************************
----------------------SCENARIO: PREDEVELOPED
Number of Links: 0
BIORETENTION SIZING. MODELING
RESULTS FOR BASINS 1-10 ARE
PROVIDED. ALL BIORETENTION BASINS
WILL BE PROVIDED UPON CITY REQUEST.
BASIN 1
************************* LINK DATA *******************************
----------------------SCENARIO: POSTDEVELOPED
Number of Links: 1
------------------------------------------
Link Name: iMPERVIOUS BIO
Link Type: Bioretention Facility
Downstream Link: None
Base Elevation (ft) : 100.00
Riser Crest Elevation (ft) : 100.50
Storage Depth (ft) : 0.50
Bottom Length (ft) : 25.0
Bottom Width (ft) : 14.0
Side Slopes (ft/ft) : L1= 0.00 L2= 0.00 W1= 0.00 W2= 0.00
Bottom Area (sq-ft) : 350.
Area at Riser Crest El (sq-ft) : 350.
(acres) : 0.008
Volume at Riser Crest (cu-ft): 333.
(ac-ft) : 0.008
Infiltration on Bottom only Selected
Soil Properties
Biosoil Thickness (ft) : 1.50
Biosoil Saturated Hydraulic Conductivity (in/hr) : 6.00
Biosoil Porosity (Percent) : 30.00
Maximum Elevation of Bioretention Soil : 101.00
Native Soil Hydraulic Conductivity (in/hr) : 0.70
Riser Geometry
Riser Structure Type : Circular
Riser Diameter (in) : 6.00
Common Length (ft) : 0.000
Riser Crest Elevation : 100.50 ft
Hydraulic Structure Geometry
Number of Devices: 0
**********************FLOOD FREQUENCY AND DURATION STATISTICS*******************
----------------------SCENARIO: PREDEVELOPED
Number of Subbasins: 1
Number of Links: 0
----------------------SCENARIO: POSTDEVELOPED
Number of Subbasins: 1
Number of Links: 1
***********Groundwater Recharge Summary *************
Recharge is computed as input to Perlnd Groundwater Plus Infiltration in Structures
Total Predeveloped Recharge During Simulation
Model Element Recharge Amount (ac-ft)
-----------------------------------------------------------------------------------------------
Subbasin: Subbasin 1 172.429
_____________________________________
Total: 172.429
Total Post Developed Recharge During Simulation
Model Element Recharge Amount (ac-ft)
-----------------------------------------------------------------------------------------------
Subbasin: Impervious 13.077
Link: iMPERVIOUS BIO 99.700
_____________________________________
Total: 112.776
Total Predevelopment Recharge is Greater than Post Developed
Average Recharge Per Year, (Number of Years= 158)
Predeveloped: 1.091 ac-ft/year, Post Developed: 0.714 ac-ft/year
***********Water Quality Facility Data *************
----------------------SCENARIO: PREDEVELOPED
Number of Links: 0
----------------------SCENARIO: POSTDEVELOPED
Number of Links: 1
********** Link: iMPERVIOUS BIO **********
Infiltration/Filtration Statistics--------------------
Inflow Volume (ac-ft): 105.81
Inflow Volume Including PPT-Evap (ac-ft): 109.04
Total Runoff Infiltrated (ac-ft): 99.70, 91.43%
Total Runoff Filtered (ac-ft): 0.00, 0.00%
Primary Outflow To Downstream System (ac-ft): 9.24
Secondary Outflow To Downstream System (ac-ft): 0.00
Percent Treated (Infiltrated+Filtered)/Total Volume: 91.43%
***********Compliance Point Results *************
Scenario Predeveloped Compliance Subbasin: Subbasin 1
Scenario Postdeveloped Compliance Link: iMPERVIOUS BIO
*** Point of Compliance Flow Frequency Data ***
Recurrence Interval Computed Using Gringorten Plotting Position
Predevelopment Runoff Postdevelopment Runoff
Tr (Years) Discharge (cfs) Tr (Years) Discharge (cfs)
----------------------------------------------------------------------------------------------------------------------
2-Year 2.131E-02 2-Year 5.415E-02
5-Year 3.473E-02 5-Year 8.402E-02
10-Year 4.680E-02 10-Year 9.703E-02
25-Year 5.933E-02 25-Year 0.123
50-Year 7.572E-02 50-Year 0.157
100-Year 8.205E-02 100-Year 0.172
200-Year 0.128 200-Year 0.184
** Record too Short to Compute Peak Discharge for These Recurrence Intervals
**** LID Duration Performance ****
Excursion at Predeveloped 8%Q2 (Must be Less Than 0%): -94.6% PASS
Maximum Excursion from 8%Q2 to 50%Q2 (Must be Less Than 0%): -77.0% PASS
-------------------------------------------------------------------------------------------------
MEETS ALL LID DURATION DESIGN CRITERIA: PASS
-------------------------------------------------------------------------------------------------
—————————————————————————————————
MGS FLOOD
PROJECT REPORT
Program Version: MGSFlood 4.43
Program License Number: 200410007
Project Simulation Performed on: 07/04/2018 2:14 PM
Report Generation Date: 07/04/2018 2:14 PM
—————————————————————————————————
Input File Name: Basin 1.fld
Project Name: Solera
Analysis Title: BMP Performance Standard
Comments:
———————————————— PRECIPITATION INPUT ————————————————
Computational Time Step (Minutes): 15
Extended Precipitation Time Series Selected
Climatic Region Number: 0
Full Period of Record Available used for Routing
Precipitation Station : 96004005 Puget East 40 in_5min 10/01/1939-10/01/2097
Evaporation Station : 961040 Puget East 40 in MAP
Evaporation Scale Factor : 0.750
HSPF Parameter Region Number: 1
HSPF Parameter Region Name : USGS Default
********** Default HSPF Parameters Used (Not Modified by User) ***************
********************** WATERSHED DEFINITION ***********************
Predevelopment/Post Development Tributary Area Summary
Predeveloped Post Developed
Total Subbasin Area (acres) 1.000 0.128
Area of Links that Include Precip/Evap (acres) 0.000 0.004
Total (acres) 1.000 0.132
----------------------SCENARIO: PREDEVELOPED
Number of Subbasins: 1
---------- Subbasin : Subbasin 1 ----------
-------Area (Acres) --------
Till Forest 1.000
----------------------------------------------
Subbasin Total 1.000
----------------------SCENARIO: POSTDEVELOPED
Number of Subbasins: 1
---------- Subbasin : Basin2 ----------
-------Area (Acres) --------
Till Grass 0.022
Impervious 0.106
----------------------------------------------
Subbasin Total 0.128
************************* LINK DATA *******************************
----------------------SCENARIO: PREDEVELOPED
Number of Links: 0
BASIN 2
************************* LINK DATA *******************************
----------------------SCENARIO: POSTDEVELOPED
Number of Links: 1
------------------------------------------
Link Name: iMPERVIOUS BIO
Link Type: Bioretention Facility
Downstream Link: None
Base Elevation (ft) : 100.00
Riser Crest Elevation (ft) : 100.50
Storage Depth (ft) : 0.50
Bottom Length (ft) : 21.0
Bottom Width (ft) : 9.0
Side Slopes (ft/ft) : L1= 0.00 L2= 0.00 W1= 0.00 W2= 0.00
Bottom Area (sq-ft) : 189.
Area at Riser Crest El (sq-ft) : 189.
(acres) : 0.004
Volume at Riser Crest (cu-ft): 180.
(ac-ft) : 0.004
Infiltration on Bottom only Selected
Soil Properties
Biosoil Thickness (ft) : 1.50
Biosoil Saturated Hydraulic Conductivity (in/hr) : 6.00
Biosoil Porosity (Percent) : 30.00
Maximum Elevation of Bioretention Soil : 101.00
Native Soil Hydraulic Conductivity (in/hr) : 0.70
Riser Geometry
Riser Structure Type : Circular
Riser Diameter (in) : 6.00
Common Length (ft) : 0.000
Riser Crest Elevation : 100.50 ft
Hydraulic Structure Geometry
Number of Devices: 0
**********************FLOOD FREQUENCY AND DURATION STATISTICS*******************
----------------------SCENARIO: PREDEVELOPED
Number of Subbasins: 1
Number of Links: 0
----------------------SCENARIO: POSTDEVELOPED
Number of Subbasins: 1
Number of Links: 1
***********Groundwater Recharge Summary *************
Recharge is computed as input to Perlnd Groundwater Plus Infiltration in Structures
Total Predeveloped Recharge During Simulation
Model Element Recharge Amount (ac-ft)
-----------------------------------------------------------------------------------------------
Subbasin: Subbasin 1 172.429
_____________________________________
Total: 172.429
Total Post Developed Recharge During Simulation
Model Element Recharge Amount (ac-ft)
-----------------------------------------------------------------------------------------------
Subbasin: Basin2 2.628
Link: iMPERVIOUS BIO 49.181
_____________________________________
Total: 51.808
Total Predevelopment Recharge is Greater than Post Developed
Average Recharge Per Year, (Number of Years= 158)
Predeveloped: 1.091 ac-ft/year, Post Developed: 0.328 ac-ft/year
***********Water Quality Facility Data *************
----------------------SCENARIO: PREDEVELOPED
Number of Links: 0
----------------------SCENARIO: POSTDEVELOPED
Number of Links: 1
********** Link: iMPERVIOUS BIO **********
Infiltration/Filtration Statistics--------------------
Inflow Volume (ac-ft): 51.85
Inflow Volume Including PPT-Evap (ac-ft): 53.64
Total Runoff Infiltrated (ac-ft): 49.18, 91.68%
Total Runoff Filtered (ac-ft): 0.00, 0.00%
Primary Outflow To Downstream System (ac-ft): 4.40
Secondary Outflow To Downstream System (ac-ft): 0.00
Percent Treated (Infiltrated+Filtered)/Total Volume: 91.68%
***********Compliance Point Results *************
Scenario Predeveloped Compliance Subbasin: Subbasin 1
Scenario Postdeveloped Compliance Link: iMPERVIOUS BIO
*** Point of Compliance Flow Frequency Data ***
Recurrence Interval Computed Using Gringorten Plotting Position
Predevelopment Runoff Postdevelopment Runoff
Tr (Years) Discharge (cfs) Tr (Years) Discharge (cfs)
----------------------------------------------------------------------------------------------------------------------
2-Year 2.131E-02 2-Year 2.853E-02
5-Year 3.473E-02 5-Year 4.420E-02
10-Year 4.680E-02 10-Year 4.976E-02
25-Year 5.933E-02 25-Year 6.145E-02
50-Year 7.572E-02 50-Year 6.910E-02
100-Year 8.205E-02 100-Year 8.113E-02
200-Year 0.128 200-Year 8.887E-02
** Record too Short to Compute Peak Discharge for These Recurrence Intervals
**** LID Duration Performance ****
Excursion at Predeveloped 8%Q2 (Must be Less Than 0%): -96.1% PASS
Maximum Excursion from 8%Q2 to 50%Q2 (Must be Less Than 0%): -91.1% PASS
-------------------------------------------------------------------------------------------------
MEETS ALL LID DURATION DESIGN CRITERIA: PASS
-------------------------------------------------------------------------------------------------
—————————————————————————————————
MGS FLOOD
PROJECT REPORT
Program Version: MGSFlood 4.43
Program License Number: 200410007
Project Simulation Performed on: 07/04/2018 2:17 PM
Report Generation Date: 07/04/2018 2:18 PM
—————————————————————————————————
Input File Name: Basin 1.fld
Project Name: Solera
Analysis Title: BMP Performance Standard
Comments:
———————————————— PRECIPITATION INPUT ————————————————
Computational Time Step (Minutes): 15
Extended Precipitation Time Series Selected
Climatic Region Number: 0
Full Period of Record Available used for Routing
Precipitation Station : 96004005 Puget East 40 in_5min 10/01/1939-10/01/2097
Evaporation Station : 961040 Puget East 40 in MAP
Evaporation Scale Factor : 0.750
HSPF Parameter Region Number: 1
HSPF Parameter Region Name : USGS Default
********** Default HSPF Parameters Used (Not Modified by User) ***************
********************** WATERSHED DEFINITION ***********************
Predevelopment/Post Development Tributary Area Summary
Predeveloped Post Developed
Total Subbasin Area (acres) 1.000 0.137
Area of Links that Include Precip/Evap (acres) 0.000 0.004
Total (acres) 1.000 0.141
----------------------SCENARIO: PREDEVELOPED
Number of Subbasins: 1
---------- Subbasin : Subbasin 1 ----------
-------Area (Acres) --------
Till Forest 1.000
----------------------------------------------
Subbasin Total 1.000
----------------------SCENARIO: POSTDEVELOPED
Number of Subbasins: 1
---------- Subbasin : Basin 3 ----------
-------Area (Acres) --------
Till Grass 0.046
Impervious 0.091
----------------------------------------------
Subbasin Total 0.137
************************* LINK DATA *******************************
----------------------SCENARIO: PREDEVELOPED
Number of Links: 0
BASIN 3
************************* LINK DATA *******************************
----------------------SCENARIO: POSTDEVELOPED
Number of Links: 1
------------------------------------------
Link Name: iMPERVIOUS BIO
Link Type: Bioretention Facility
Downstream Link: None
Base Elevation (ft) : 100.00
Riser Crest Elevation (ft) : 100.50
Storage Depth (ft) : 0.50
Bottom Length (ft) : 21.0
Bottom Width (ft) : 8.0
Side Slopes (ft/ft) : L1= 0.00 L2= 0.00 W1= 0.00 W2= 0.00
Bottom Area (sq-ft) : 168.
Area at Riser Crest El (sq-ft) : 168.
(acres) : 0.004
Volume at Riser Crest (cu-ft): 160.
(ac-ft) : 0.004
Infiltration on Bottom only Selected
Soil Properties
Biosoil Thickness (ft) : 1.50
Biosoil Saturated Hydraulic Conductivity (in/hr) : 6.00
Biosoil Porosity (Percent) : 30.00
Maximum Elevation of Bioretention Soil : 101.00
Native Soil Hydraulic Conductivity (in/hr) : 0.70
Riser Geometry
Riser Structure Type : Circular
Riser Diameter (in) : 6.00
Common Length (ft) : 0.000
Riser Crest Elevation : 100.50 ft
Hydraulic Structure Geometry
Number of Devices: 0
**********************FLOOD FREQUENCY AND DURATION STATISTICS*******************
----------------------SCENARIO: PREDEVELOPED
Number of Subbasins: 1
Number of Links: 0
----------------------SCENARIO: POSTDEVELOPED
Number of Subbasins: 1
Number of Links: 1
***********Groundwater Recharge Summary *************
Recharge is computed as input to Perlnd Groundwater Plus Infiltration in Structures
Total Predeveloped Recharge During Simulation
Model Element Recharge Amount (ac-ft)
-----------------------------------------------------------------------------------------------
Subbasin: Subbasin 1 172.429
_____________________________________
Total: 172.429
Total Post Developed Recharge During Simulation
Model Element Recharge Amount (ac-ft)
-----------------------------------------------------------------------------------------------
Subbasin: Basin 3 5.622
Link: iMPERVIOUS BIO 47.325
_____________________________________
Total: 52.946
Total Predevelopment Recharge is Greater than Post Developed
Average Recharge Per Year, (Number of Years= 158)
Predeveloped: 1.091 ac-ft/year, Post Developed: 0.335 ac-ft/year
***********Water Quality Facility Data *************
----------------------SCENARIO: PREDEVELOPED
Number of Links: 0
----------------------SCENARIO: POSTDEVELOPED
Number of Links: 1
********** Link: iMPERVIOUS BIO **********
Infiltration/Filtration Statistics--------------------
Inflow Volume (ac-ft): 50.23
Inflow Volume Including PPT-Evap (ac-ft): 51.79
Total Runoff Infiltrated (ac-ft): 47.32, 91.38%
Total Runoff Filtered (ac-ft): 0.00, 0.00%
Primary Outflow To Downstream System (ac-ft): 4.41
Secondary Outflow To Downstream System (ac-ft): 0.00
Percent Treated (Infiltrated+Filtered)/Total Volume: 91.38%
***********Compliance Point Results *************
Scenario Predeveloped Compliance Subbasin: Subbasin 1
Scenario Postdeveloped Compliance Link: iMPERVIOUS BIO
*** Point of Compliance Flow Frequency Data ***
Recurrence Interval Computed Using Gringorten Plotting Position
Predevelopment Runoff Postdevelopment Runoff
Tr (Years) Discharge (cfs) Tr (Years) Discharge (cfs)
----------------------------------------------------------------------------------------------------------------------
2-Year 2.131E-02 2-Year 2.721E-02
5-Year 3.473E-02 5-Year 4.074E-02
10-Year 4.680E-02 10-Year 4.692E-02
25-Year 5.933E-02 25-Year 5.807E-02
50-Year 7.572E-02 50-Year 7.312E-02
100-Year 8.205E-02 100-Year 8.714E-02
200-Year 0.128 200-Year 8.779E-02
** Record too Short to Compute Peak Discharge for These Recurrence Intervals
**** LID Duration Performance ****
Excursion at Predeveloped 8%Q2 (Must be Less Than 0%): -95.7% PASS
Maximum Excursion from 8%Q2 to 50%Q2 (Must be Less Than 0%): -92.3% PASS
-------------------------------------------------------------------------------------------------
MEETS ALL LID DURATION DESIGN CRITERIA: PASS
-------------------------------------------------------------------------------------------------
—————————————————————————————————
MGS FLOOD
PROJECT REPORT
Program Version: MGSFlood 4.43
Program License Number: 200410007
Project Simulation Performed on: 07/04/2018 2:19 PM
Report Generation Date: 07/04/2018 2:19 PM
—————————————————————————————————
Input File Name: Basin 1.fld
Project Name: Solera
Analysis Title: BMP Performance Standard
Comments:
———————————————— PRECIPITATION INPUT ————————————————
Computational Time Step (Minutes): 15
Extended Precipitation Time Series Selected
Climatic Region Number: 0
Full Period of Record Available used for Routing
Precipitation Station : 96004005 Puget East 40 in_5min 10/01/1939-10/01/2097
Evaporation Station : 961040 Puget East 40 in MAP
Evaporation Scale Factor : 0.750
HSPF Parameter Region Number: 1
HSPF Parameter Region Name : USGS Default
********** Default HSPF Parameters Used (Not Modified by User) ***************
********************** WATERSHED DEFINITION ***********************
Predevelopment/Post Development Tributary Area Summary
Predeveloped Post Developed
Total Subbasin Area (acres) 1.000 0.088
Area of Links that Include Precip/Evap (acres) 0.000 0.003
Total (acres) 1.000 0.091
----------------------SCENARIO: PREDEVELOPED
Number of Subbasins: 1
---------- Subbasin : Subbasin 1 ----------
-------Area (Acres) --------
Till Forest 1.000
----------------------------------------------
Subbasin Total 1.000
----------------------SCENARIO: POSTDEVELOPED
Number of Subbasins: 1
---------- Subbasin : Basin 4 ----------
-------Area (Acres) --------
Till Grass 0.016
Impervious 0.072
----------------------------------------------
Subbasin Total 0.088
************************* LINK DATA *******************************
----------------------SCENARIO: PREDEVELOPED
Number of Links: 0
BASIN 4
************************* LINK DATA *******************************
----------------------SCENARIO: POSTDEVELOPED
Number of Links: 1
------------------------------------------
Link Name: iMPERVIOUS BIO
Link Type: Bioretention Facility
Downstream Link: None
Base Elevation (ft) : 100.00
Riser Crest Elevation (ft) : 100.50
Storage Depth (ft) : 0.50
Bottom Length (ft) : 21.0
Bottom Width (ft) : 6.0
Side Slopes (ft/ft) : L1= 0.00 L2= 0.00 W1= 0.00 W2= 0.00
Bottom Area (sq-ft) : 126.
Area at Riser Crest El (sq-ft) : 126.
(acres) : 0.003
Volume at Riser Crest (cu-ft): 120.
(ac-ft) : 0.003
Infiltration on Bottom only Selected
Soil Properties
Biosoil Thickness (ft) : 1.50
Biosoil Saturated Hydraulic Conductivity (in/hr) : 6.00
Biosoil Porosity (Percent) : 30.00
Maximum Elevation of Bioretention Soil : 101.00
Native Soil Hydraulic Conductivity (in/hr) : 0.70
Riser Geometry
Riser Structure Type : Circular
Riser Diameter (in) : 6.00
Common Length (ft) : 0.000
Riser Crest Elevation : 100.50 ft
Hydraulic Structure Geometry
Number of Devices: 0
**********************FLOOD FREQUENCY AND DURATION STATISTICS*******************
----------------------SCENARIO: PREDEVELOPED
Number of Subbasins: 1
Number of Links: 0
----------------------SCENARIO: POSTDEVELOPED
Number of Subbasins: 1
Number of Links: 1
***********Groundwater Recharge Summary *************
Recharge is computed as input to Perlnd Groundwater Plus Infiltration in Structures
Total Predeveloped Recharge During Simulation
Model Element Recharge Amount (ac-ft)
-----------------------------------------------------------------------------------------------
Subbasin: Subbasin 1 172.429
_____________________________________
Total: 172.429
Total Post Developed Recharge During Simulation
Model Element Recharge Amount (ac-ft)
-----------------------------------------------------------------------------------------------
Subbasin: Basin 4 1.955
Link: iMPERVIOUS BIO 33.472
_____________________________________
Total: 35.427
Total Predevelopment Recharge is Greater than Post Developed
Average Recharge Per Year, (Number of Years= 158)
Predeveloped: 1.091 ac-ft/year, Post Developed: 0.224 ac-ft/year
***********Water Quality Facility Data *************
----------------------SCENARIO: PREDEVELOPED
Number of Links: 0
----------------------SCENARIO: POSTDEVELOPED
Number of Links: 1
********** Link: iMPERVIOUS BIO **********
Infiltration/Filtration Statistics--------------------
Inflow Volume (ac-ft): 35.50
Inflow Volume Including PPT-Evap (ac-ft): 36.69
Total Runoff Infiltrated (ac-ft): 33.47, 91.23%
Total Runoff Filtered (ac-ft): 0.00, 0.00%
Primary Outflow To Downstream System (ac-ft): 3.18
Secondary Outflow To Downstream System (ac-ft): 0.00
Percent Treated (Infiltrated+Filtered)/Total Volume: 91.23%
***********Compliance Point Results *************
Scenario Predeveloped Compliance Subbasin: Subbasin 1
Scenario Postdeveloped Compliance Link: iMPERVIOUS BIO
*** Point of Compliance Flow Frequency Data ***
Recurrence Interval Computed Using Gringorten Plotting Position
Predevelopment Runoff Postdevelopment Runoff
Tr (Years) Discharge (cfs) Tr (Years) Discharge (cfs)
----------------------------------------------------------------------------------------------------------------------
2-Year 2.131E-02 2-Year 2.083E-02
5-Year 3.473E-02 5-Year 3.055E-02
10-Year 4.680E-02 10-Year 3.582E-02
25-Year 5.933E-02 25-Year 4.278E-02
50-Year 7.572E-02 50-Year 5.197E-02
100-Year 8.205E-02 100-Year 5.864E-02
200-Year 0.128 200-Year 6.138E-02
** Record too Short to Compute Peak Discharge for These Recurrence Intervals
**** LID Duration Performance ****
Excursion at Predeveloped 8%Q2 (Must be Less Than 0%): -96.4% PASS
Maximum Excursion from 8%Q2 to 50%Q2 (Must be Less Than 0%): -95.8% PASS
-------------------------------------------------------------------------------------------------
MEETS ALL LID DURATION DESIGN CRITERIA: PASS
-------------------------------------------------------------------------------------------------
—————————————————————————————————
MGS FLOOD
PROJECT REPORT
Program Version: MGSFlood 4.43
Program License Number: 200410007
Project Simulation Performed on: 07/04/2018 2:21 PM
Report Generation Date: 07/04/2018 2:21 PM
—————————————————————————————————
Input File Name: Basin 1.fld
Project Name: Solera
Analysis Title: BMP Performance Standard
Comments:
———————————————— PRECIPITATION INPUT ————————————————
Computational Time Step (Minutes): 15
Extended Precipitation Time Series Selected
Climatic Region Number: 0
Full Period of Record Available used for Routing
Precipitation Station : 96004005 Puget East 40 in_5min 10/01/1939-10/01/2097
Evaporation Station : 961040 Puget East 40 in MAP
Evaporation Scale Factor : 0.750
HSPF Parameter Region Number: 1
HSPF Parameter Region Name : USGS Default
********** Default HSPF Parameters Used (Not Modified by User) ***************
********************** WATERSHED DEFINITION ***********************
Predevelopment/Post Development Tributary Area Summary
Predeveloped Post Developed
Total Subbasin Area (acres) 1.000 0.176
Area of Links that Include Precip/Evap (acres) 0.000 0.006
Total (acres) 1.000 0.181
----------------------SCENARIO: PREDEVELOPED
Number of Subbasins: 1
---------- Subbasin : Subbasin 1 ----------
-------Area (Acres) --------
Till Forest 1.000
----------------------------------------------
Subbasin Total 1.000
----------------------SCENARIO: POSTDEVELOPED
Number of Subbasins: 1
---------- Subbasin : Basin 5 ----------
-------Area (Acres) --------
Till Grass 0.034
Impervious 0.142
----------------------------------------------
Subbasin Total 0.176
************************* LINK DATA *******************************
----------------------SCENARIO: PREDEVELOPED
Number of Links: 0
BASIN 5
************************* LINK DATA *******************************
----------------------SCENARIO: POSTDEVELOPED
Number of Links: 1
------------------------------------------
Link Name: iMPERVIOUS BIO
Link Type: Bioretention Facility
Downstream Link: None
Base Elevation (ft) : 100.00
Riser Crest Elevation (ft) : 100.50
Storage Depth (ft) : 0.50
Bottom Length (ft) : 23.0
Bottom Width (ft) : 11.0
Side Slopes (ft/ft) : L1= 0.00 L2= 0.00 W1= 0.00 W2= 0.00
Bottom Area (sq-ft) : 253.
Area at Riser Crest El (sq-ft) : 253.
(acres) : 0.006
Volume at Riser Crest (cu-ft): 240.
(ac-ft) : 0.006
Infiltration on Bottom only Selected
Soil Properties
Biosoil Thickness (ft) : 1.50
Biosoil Saturated Hydraulic Conductivity (in/hr) : 6.00
Biosoil Porosity (Percent) : 30.00
Maximum Elevation of Bioretention Soil : 101.00
Native Soil Hydraulic Conductivity (in/hr) : 0.70
Riser Geometry
Riser Structure Type : Circular
Riser Diameter (in) : 6.00
Common Length (ft) : 0.000
Riser Crest Elevation : 100.50 ft
Hydraulic Structure Geometry
Number of Devices: 0
**********************FLOOD FREQUENCY AND DURATION STATISTICS*******************
----------------------SCENARIO: PREDEVELOPED
Number of Subbasins: 1
Number of Links: 0
----------------------SCENARIO: POSTDEVELOPED
Number of Subbasins: 1
Number of Links: 1
***********Groundwater Recharge Summary *************
Recharge is computed as input to Perlnd Groundwater Plus Infiltration in Structures
Total Predeveloped Recharge During Simulation
Model Element Recharge Amount (ac-ft)
-----------------------------------------------------------------------------------------------
Subbasin: Subbasin 1 172.429
_____________________________________
Total: 172.429
Total Post Developed Recharge During Simulation
Model Element Recharge Amount (ac-ft)
-----------------------------------------------------------------------------------------------
Subbasin: Basin 5 4.094
Link: iMPERVIOUS BIO 66.660
_____________________________________
Total: 70.754
Total Predevelopment Recharge is Greater than Post Developed
Average Recharge Per Year, (Number of Years= 158)
Predeveloped: 1.091 ac-ft/year, Post Developed: 0.448 ac-ft/year
***********Water Quality Facility Data *************
----------------------SCENARIO: PREDEVELOPED
Number of Links: 0
----------------------SCENARIO: POSTDEVELOPED
Number of Links: 1
********** Link: iMPERVIOUS BIO **********
Infiltration/Filtration Statistics--------------------
Inflow Volume (ac-ft): 70.40
Inflow Volume Including PPT-Evap (ac-ft): 72.79
Total Runoff Infiltrated (ac-ft): 66.66, 91.57%
Total Runoff Filtered (ac-ft): 0.00, 0.00%
Primary Outflow To Downstream System (ac-ft): 6.06
Secondary Outflow To Downstream System (ac-ft): 0.00
Percent Treated (Infiltrated+Filtered)/Total Volume: 91.57%
***********Compliance Point Results *************
Scenario Predeveloped Compliance Subbasin: Subbasin 1
Scenario Postdeveloped Compliance Link: iMPERVIOUS BIO
*** Point of Compliance Flow Frequency Data ***
Recurrence Interval Computed Using Gringorten Plotting Position
Predevelopment Runoff Postdevelopment Runoff
Tr (Years) Discharge (cfs) Tr (Years) Discharge (cfs)
----------------------------------------------------------------------------------------------------------------------
2-Year 2.131E-02 2-Year 3.842E-02
5-Year 3.473E-02 5-Year 5.963E-02
10-Year 4.680E-02 10-Year 6.619E-02
25-Year 5.933E-02 25-Year 8.314E-02
50-Year 7.572E-02 50-Year 9.421E-02
100-Year 8.205E-02 100-Year 0.110
200-Year 0.128 200-Year 0.121
** Record too Short to Compute Peak Discharge for These Recurrence Intervals
**** LID Duration Performance ****
Excursion at Predeveloped 8%Q2 (Must be Less Than 0%): -95.6% PASS
Maximum Excursion from 8%Q2 to 50%Q2 (Must be Less Than 0%): -85.6% PASS
-------------------------------------------------------------------------------------------------
MEETS ALL LID DURATION DESIGN CRITERIA: PASS
-------------------------------------------------------------------------------------------------
—————————————————————————————————
MGS FLOOD
PROJECT REPORT
Program Version: MGSFlood 4.43
Program License Number: 200410007
Project Simulation Performed on: 07/04/2018 2:25 PM
Report Generation Date: 07/04/2018 2:25 PM
—————————————————————————————————
Input File Name: Basin 1.fld
Project Name: Solera
Analysis Title: BMP Performance Standard
Comments:
———————————————— PRECIPITATION INPUT ————————————————
Computational Time Step (Minutes): 15
Extended Precipitation Time Series Selected
Climatic Region Number: 0
Full Period of Record Available used for Routing
Precipitation Station : 96004005 Puget East 40 in_5min 10/01/1939-10/01/2097
Evaporation Station : 961040 Puget East 40 in MAP
Evaporation Scale Factor : 0.750
HSPF Parameter Region Number: 1
HSPF Parameter Region Name : USGS Default
********** Default HSPF Parameters Used (Not Modified by User) ***************
********************** WATERSHED DEFINITION ***********************
Predevelopment/Post Development Tributary Area Summary
Predeveloped Post Developed
Total Subbasin Area (acres) 1.000 0.111
Area of Links that Include Precip/Evap (acres) 0.000 0.003
Total (acres) 1.000 0.114
----------------------SCENARIO: PREDEVELOPED
Number of Subbasins: 1
---------- Subbasin : Subbasin 1 ----------
-------Area (Acres) --------
Till Forest 1.000
----------------------------------------------
Subbasin Total 1.000
----------------------SCENARIO: POSTDEVELOPED
Number of Subbasins: 1
---------- Subbasin : Basin 6 ----------
-------Area (Acres) --------
Till Grass 0.038
Impervious 0.073
----------------------------------------------
Subbasin Total 0.111
************************* LINK DATA *******************************
----------------------SCENARIO: PREDEVELOPED
Number of Links: 0
BASIN 6
************************* LINK DATA *******************************
----------------------SCENARIO: POSTDEVELOPED
Number of Links: 1
------------------------------------------
Link Name: iMPERVIOUS BIO
Link Type: Bioretention Facility
Downstream Link: None
Base Elevation (ft) : 100.00
Riser Crest Elevation (ft) : 100.50
Storage Depth (ft) : 0.50
Bottom Length (ft) : 19.0
Bottom Width (ft) : 7.0
Side Slopes (ft/ft) : L1= 0.00 L2= 0.00 W1= 0.00 W2= 0.00
Bottom Area (sq-ft) : 133.
Area at Riser Crest El (sq-ft) : 133.
(acres) : 0.003
Volume at Riser Crest (cu-ft): 126.
(ac-ft) : 0.003
Infiltration on Bottom only Selected
Soil Properties
Biosoil Thickness (ft) : 1.50
Biosoil Saturated Hydraulic Conductivity (in/hr) : 6.00
Biosoil Porosity (Percent) : 30.00
Maximum Elevation of Bioretention Soil : 101.00
Native Soil Hydraulic Conductivity (in/hr) : 0.70
Riser Geometry
Riser Structure Type : Circular
Riser Diameter (in) : 6.00
Common Length (ft) : 0.000
Riser Crest Elevation : 100.50 ft
Hydraulic Structure Geometry
Number of Devices: 0
**********************FLOOD FREQUENCY AND DURATION STATISTICS*******************
----------------------SCENARIO: PREDEVELOPED
Number of Subbasins: 1
Number of Links: 0
----------------------SCENARIO: POSTDEVELOPED
Number of Subbasins: 1
Number of Links: 1
***********Groundwater Recharge Summary *************
Recharge is computed as input to Perlnd Groundwater Plus Infiltration in Structures
Total Predeveloped Recharge During Simulation
Model Element Recharge Amount (ac-ft)
-----------------------------------------------------------------------------------------------
Subbasin: Subbasin 1 172.429
_____________________________________
Total: 172.429
Total Post Developed Recharge During Simulation
Model Element Recharge Amount (ac-ft)
-----------------------------------------------------------------------------------------------
Subbasin: Basin 6 4.607
Link: iMPERVIOUS BIO 37.957
_____________________________________
Total: 42.564
Total Predevelopment Recharge is Greater than Post Developed
Average Recharge Per Year, (Number of Years= 158)
Predeveloped: 1.091 ac-ft/year, Post Developed: 0.269 ac-ft/year
***********Water Quality Facility Data *************
----------------------SCENARIO: PREDEVELOPED
Number of Links: 0
----------------------SCENARIO: POSTDEVELOPED
Number of Links: 1
********** Link: iMPERVIOUS BIO **********
Infiltration/Filtration Statistics--------------------
Inflow Volume (ac-ft): 40.45
Inflow Volume Including PPT-Evap (ac-ft): 41.68
Total Runoff Infiltrated (ac-ft): 37.96, 91.08%
Total Runoff Filtered (ac-ft): 0.00, 0.00%
Primary Outflow To Downstream System (ac-ft): 3.68
Secondary Outflow To Downstream System (ac-ft): 0.00
Percent Treated (Infiltrated+Filtered)/Total Volume: 91.08%
***********Compliance Point Results *************
Scenario Predeveloped Compliance Subbasin: Subbasin 1
Scenario Postdeveloped Compliance Link: iMPERVIOUS BIO
*** Point of Compliance Flow Frequency Data ***
Recurrence Interval Computed Using Gringorten Plotting Position
Predevelopment Runoff Postdevelopment Runoff
Tr (Years) Discharge (cfs) Tr (Years) Discharge (cfs)
----------------------------------------------------------------------------------------------------------------------
2-Year 2.131E-02 2-Year 2.210E-02
5-Year 3.473E-02 5-Year 3.293E-02
10-Year 4.680E-02 10-Year 3.756E-02
25-Year 5.933E-02 25-Year 4.822E-02
50-Year 7.572E-02 50-Year 5.876E-02
100-Year 8.205E-02 100-Year 7.242E-02
200-Year 0.128 200-Year 7.814E-02
** Record too Short to Compute Peak Discharge for These Recurrence Intervals
**** LID Duration Performance ****
Excursion at Predeveloped 8%Q2 (Must be Less Than 0%): -95.9% PASS
Maximum Excursion from 8%Q2 to 50%Q2 (Must be Less Than 0%): -95.0% PASS
-------------------------------------------------------------------------------------------------
MEETS ALL LID DURATION DESIGN CRITERIA: PASS
-------------------------------------------------------------------------------------------------
—————————————————————————————————
MGS FLOOD
PROJECT REPORT
Program Version: MGSFlood 4.43
Program License Number: 200410007
Project Simulation Performed on: 07/04/2018 2:27 PM
Report Generation Date: 07/04/2018 2:27 PM
—————————————————————————————————
Input File Name: Basin 1.fld
Project Name: Solera
Analysis Title: BMP Performance Standard
Comments:
———————————————— PRECIPITATION INPUT ————————————————
Computational Time Step (Minutes): 15
Extended Precipitation Time Series Selected
Climatic Region Number: 0
Full Period of Record Available used for Routing
Precipitation Station : 96004005 Puget East 40 in_5min 10/01/1939-10/01/2097
Evaporation Station : 961040 Puget East 40 in MAP
Evaporation Scale Factor : 0.750
HSPF Parameter Region Number: 1
HSPF Parameter Region Name : USGS Default
********** Default HSPF Parameters Used (Not Modified by User) ***************
********************** WATERSHED DEFINITION ***********************
Predevelopment/Post Development Tributary Area Summary
Predeveloped Post Developed
Total Subbasin Area (acres) 1.000 0.109
Area of Links that Include Precip/Evap (acres) 0.000 0.004
Total (acres) 1.000 0.113
----------------------SCENARIO: PREDEVELOPED
Number of Subbasins: 1
---------- Subbasin : Subbasin 1 ----------
-------Area (Acres) --------
Till Forest 1.000
----------------------------------------------
Subbasin Total 1.000
----------------------SCENARIO: POSTDEVELOPED
Number of Subbasins: 1
---------- Subbasin : Basin 7 ----------
-------Area (Acres) --------
Till Grass 0.014
Impervious 0.095
----------------------------------------------
Subbasin Total 0.109
************************* LINK DATA *******************************
----------------------SCENARIO: PREDEVELOPED
Number of Links: 0
BASIN 7
************************* LINK DATA *******************************
----------------------SCENARIO: POSTDEVELOPED
Number of Links: 1
------------------------------------------
Link Name: iMPERVIOUS BIO
Link Type: Bioretention Facility
Downstream Link: None
Base Elevation (ft) : 100.00
Riser Crest Elevation (ft) : 100.50
Storage Depth (ft) : 0.50
Bottom Length (ft) : 19.0
Bottom Width (ft) : 9.0
Side Slopes (ft/ft) : L1= 0.00 L2= 0.00 W1= 0.00 W2= 0.00
Bottom Area (sq-ft) : 171.
Area at Riser Crest El (sq-ft) : 171.
(acres) : 0.004
Volume at Riser Crest (cu-ft): 162.
(ac-ft) : 0.004
Infiltration on Bottom only Selected
Soil Properties
Biosoil Thickness (ft) : 1.50
Biosoil Saturated Hydraulic Conductivity (in/hr) : 6.00
Biosoil Porosity (Percent) : 30.00
Maximum Elevation of Bioretention Soil : 101.00
Native Soil Hydraulic Conductivity (in/hr) : 0.70
Riser Geometry
Riser Structure Type : Circular
Riser Diameter (in) : 6.00
Common Length (ft) : 0.000
Riser Crest Elevation : 100.50 ft
Hydraulic Structure Geometry
Number of Devices: 0
**********************FLOOD FREQUENCY AND DURATION STATISTICS*******************
----------------------SCENARIO: PREDEVELOPED
Number of Subbasins: 1
Number of Links: 0
----------------------SCENARIO: POSTDEVELOPED
Number of Subbasins: 1
Number of Links: 1
***********Groundwater Recharge Summary *************
Recharge is computed as input to Perlnd Groundwater Plus Infiltration in Structures
Total Predeveloped Recharge During Simulation
Model Element Recharge Amount (ac-ft)
-----------------------------------------------------------------------------------------------
Subbasin: Subbasin 1 172.429
_____________________________________
Total: 172.429
Total Post Developed Recharge During Simulation
Model Element Recharge Amount (ac-ft)
-----------------------------------------------------------------------------------------------
Subbasin: Basin 7 1.711
Link: iMPERVIOUS BIO 43.292
_____________________________________
Total: 45.003
Total Predevelopment Recharge is Greater than Post Developed
Average Recharge Per Year, (Number of Years= 158)
Predeveloped: 1.091 ac-ft/year, Post Developed: 0.285 ac-ft/year
***********Water Quality Facility Data *************
----------------------SCENARIO: PREDEVELOPED
Number of Links: 0
----------------------SCENARIO: POSTDEVELOPED
Number of Links: 1
********** Link: iMPERVIOUS BIO **********
Infiltration/Filtration Statistics--------------------
Inflow Volume (ac-ft): 45.41
Inflow Volume Including PPT-Evap (ac-ft): 47.04
Total Runoff Infiltrated (ac-ft): 43.29, 92.02%
Total Runoff Filtered (ac-ft): 0.00, 0.00%
Primary Outflow To Downstream System (ac-ft): 3.70
Secondary Outflow To Downstream System (ac-ft): 0.00
Percent Treated (Infiltrated+Filtered)/Total Volume: 92.02%
***********Compliance Point Results *************
Scenario Predeveloped Compliance Subbasin: Subbasin 1
Scenario Postdeveloped Compliance Link: iMPERVIOUS BIO
*** Point of Compliance Flow Frequency Data ***
Recurrence Interval Computed Using Gringorten Plotting Position
Predevelopment Runoff Postdevelopment Runoff
Tr (Years) Discharge (cfs) Tr (Years) Discharge (cfs)
----------------------------------------------------------------------------------------------------------------------
2-Year 2.131E-02 2-Year 2.521E-02
5-Year 3.473E-02 5-Year 3.831E-02
10-Year 4.680E-02 10-Year 4.363E-02
25-Year 5.933E-02 25-Year 5.179E-02
50-Year 7.572E-02 50-Year 6.019E-02
100-Year 8.205E-02 100-Year 7.058E-02
200-Year 0.128 200-Year 7.770E-02
** Record too Short to Compute Peak Discharge for These Recurrence Intervals
**** LID Duration Performance ****
Excursion at Predeveloped 8%Q2 (Must be Less Than 0%): -96.5% PASS
Maximum Excursion from 8%Q2 to 50%Q2 (Must be Less Than 0%): -93.2% PASS
-------------------------------------------------------------------------------------------------
MEETS ALL LID DURATION DESIGN CRITERIA: PASS
-------------------------------------------------------------------------------------------------
—————————————————————————————————
MGS FLOOD
PROJECT REPORT
Program Version: MGSFlood 4.43
Program License Number: 200410007
Project Simulation Performed on: 07/04/2018 2:29 PM
Report Generation Date: 07/04/2018 2:29 PM
—————————————————————————————————
Input File Name: Basin 1.fld
Project Name: Solera
Analysis Title: BMP Performance Standard
Comments:
———————————————— PRECIPITATION INPUT ————————————————
Computational Time Step (Minutes): 15
Extended Precipitation Time Series Selected
Climatic Region Number: 0
Full Period of Record Available used for Routing
Precipitation Station : 96004005 Puget East 40 in_5min 10/01/1939-10/01/2097
Evaporation Station : 961040 Puget East 40 in MAP
Evaporation Scale Factor : 0.750
HSPF Parameter Region Number: 1
HSPF Parameter Region Name : USGS Default
********** Default HSPF Parameters Used (Not Modified by User) ***************
********************** WATERSHED DEFINITION ***********************
Predevelopment/Post Development Tributary Area Summary
Predeveloped Post Developed
Total Subbasin Area (acres) 1.000 0.218
Area of Links that Include Precip/Evap (acres) 0.000 0.007
Total (acres) 1.000 0.225
----------------------SCENARIO: PREDEVELOPED
Number of Subbasins: 1
---------- Subbasin : Subbasin 1 ----------
-------Area (Acres) --------
Till Forest 1.000
----------------------------------------------
Subbasin Total 1.000
----------------------SCENARIO: POSTDEVELOPED
Number of Subbasins: 1
---------- Subbasin : Basin 8 ----------
-------Area (Acres) --------
Till Grass 0.032
Impervious 0.186
----------------------------------------------
Subbasin Total 0.218
************************* LINK DATA *******************************
----------------------SCENARIO: PREDEVELOPED
Number of Links: 0
BASIN 8
************************* LINK DATA *******************************
----------------------SCENARIO: POSTDEVELOPED
Number of Links: 1
------------------------------------------
Link Name: iMPERVIOUS BIO
Link Type: Bioretention Facility
Downstream Link: None
Base Elevation (ft) : 100.00
Riser Crest Elevation (ft) : 100.50
Storage Depth (ft) : 0.50
Bottom Length (ft) : 25.0
Bottom Width (ft) : 13.0
Side Slopes (ft/ft) : L1= 0.00 L2= 0.00 W1= 0.00 W2= 0.00
Bottom Area (sq-ft) : 325.
Area at Riser Crest El (sq-ft) : 325.
(acres) : 0.007
Volume at Riser Crest (cu-ft): 309.
(ac-ft) : 0.007
Infiltration on Bottom only Selected
Soil Properties
Biosoil Thickness (ft) : 1.50
Biosoil Saturated Hydraulic Conductivity (in/hr) : 6.00
Biosoil Porosity (Percent) : 30.00
Maximum Elevation of Bioretention Soil : 101.00
Native Soil Hydraulic Conductivity (in/hr) : 0.70
Riser Geometry
Riser Structure Type : Circular
Riser Diameter (in) : 6.00
Common Length (ft) : 0.000
Riser Crest Elevation : 100.50 ft
Hydraulic Structure Geometry
Number of Devices: 0
**********************FLOOD FREQUENCY AND DURATION STATISTICS*******************
----------------------SCENARIO: PREDEVELOPED
Number of Subbasins: 1
Number of Links: 0
----------------------SCENARIO: POSTDEVELOPED
Number of Subbasins: 1
Number of Links: 1
***********Groundwater Recharge Summary *************
Recharge is computed as input to Perlnd Groundwater Plus Infiltration in Structures
Total Predeveloped Recharge During Simulation
Model Element Recharge Amount (ac-ft)
-----------------------------------------------------------------------------------------------
Subbasin: Subbasin 1 172.429
_____________________________________
Total: 172.429
Total Post Developed Recharge During Simulation
Model Element Recharge Amount (ac-ft)
-----------------------------------------------------------------------------------------------
Subbasin: Basin 8 3.911
Link: iMPERVIOUS BIO 84.886
_____________________________________
Total: 88.797
Total Predevelopment Recharge is Greater than Post Developed
Average Recharge Per Year, (Number of Years= 158)
Predeveloped: 1.091 ac-ft/year, Post Developed: 0.562 ac-ft/year
***********Water Quality Facility Data *************
----------------------SCENARIO: PREDEVELOPED
Number of Links: 0
----------------------SCENARIO: POSTDEVELOPED
Number of Links: 1
********** Link: iMPERVIOUS BIO **********
Infiltration/Filtration Statistics--------------------
Inflow Volume (ac-ft): 89.83
Inflow Volume Including PPT-Evap (ac-ft): 92.92
Total Runoff Infiltrated (ac-ft): 84.89, 91.35%
Total Runoff Filtered (ac-ft): 0.00, 0.00%
Primary Outflow To Downstream System (ac-ft): 7.92
Secondary Outflow To Downstream System (ac-ft): 0.00
Percent Treated (Infiltrated+Filtered)/Total Volume: 91.35%
***********Compliance Point Results *************
Scenario Predeveloped Compliance Subbasin: Subbasin 1
Scenario Postdeveloped Compliance Link: iMPERVIOUS BIO
*** Point of Compliance Flow Frequency Data ***
Recurrence Interval Computed Using Gringorten Plotting Position
Predevelopment Runoff Postdevelopment Runoff
Tr (Years) Discharge (cfs) Tr (Years) Discharge (cfs)
----------------------------------------------------------------------------------------------------------------------
2-Year 2.131E-02 2-Year 5.000E-02
5-Year 3.473E-02 5-Year 7.600E-02
10-Year 4.680E-02 10-Year 8.869E-02
25-Year 5.933E-02 25-Year 0.104
50-Year 7.572E-02 50-Year 0.120
100-Year 8.205E-02 100-Year 0.139
200-Year 0.128 200-Year 0.156
** Record too Short to Compute Peak Discharge for These Recurrence Intervals
**** LID Duration Performance ****
Excursion at Predeveloped 8%Q2 (Must be Less Than 0%): -95.3% PASS
Maximum Excursion from 8%Q2 to 50%Q2 (Must be Less Than 0%): -80.1% PASS
-------------------------------------------------------------------------------------------------
MEETS ALL LID DURATION DESIGN CRITERIA: PASS
-------------------------------------------------------------------------------------------------
—————————————————————————————————
MGS FLOOD
PROJECT REPORT
Program Version: MGSFlood 4.43
Program License Number: 200410007
Project Simulation Performed on: 07/04/2018 2:31 PM
Report Generation Date: 07/04/2018 2:31 PM
—————————————————————————————————
Input File Name: Basin 1.fld
Project Name: Solera
Analysis Title: BMP Performance Standard
Comments:
———————————————— PRECIPITATION INPUT ————————————————
Computational Time Step (Minutes): 15
Extended Precipitation Time Series Selected
Climatic Region Number: 0
Full Period of Record Available used for Routing
Precipitation Station : 96004005 Puget East 40 in_5min 10/01/1939-10/01/2097
Evaporation Station : 961040 Puget East 40 in MAP
Evaporation Scale Factor : 0.750
HSPF Parameter Region Number: 1
HSPF Parameter Region Name : USGS Default
********** Default HSPF Parameters Used (Not Modified by User) ***************
********************** WATERSHED DEFINITION ***********************
Predevelopment/Post Development Tributary Area Summary
Predeveloped Post Developed
Total Subbasin Area (acres) 1.000 0.132
Area of Links that Include Precip/Evap (acres) 0.000 0.003
Total (acres) 1.000 0.135
----------------------SCENARIO: PREDEVELOPED
Number of Subbasins: 1
---------- Subbasin : Subbasin 1 ----------
-------Area (Acres) --------
Till Forest 1.000
----------------------------------------------
Subbasin Total 1.000
----------------------SCENARIO: POSTDEVELOPED
Number of Subbasins: 1
---------- Subbasin : Basin 9 ----------
-------Area (Acres) --------
Till Grass 0.055
Impervious 0.077
----------------------------------------------
Subbasin Total 0.132
************************* LINK DATA *******************************
----------------------SCENARIO: PREDEVELOPED
Number of Links: 0
BASIN 9
************************* LINK DATA *******************************
----------------------SCENARIO: POSTDEVELOPED
Number of Links: 1
------------------------------------------
Link Name: iMPERVIOUS BIO
Link Type: Bioretention Facility
Downstream Link: None
Base Elevation (ft) : 100.00
Riser Crest Elevation (ft) : 100.50
Storage Depth (ft) : 0.50
Bottom Length (ft) : 25.0
Bottom Width (ft) : 6.0
Side Slopes (ft/ft) : L1= 0.00 L2= 0.00 W1= 0.00 W2= 0.00
Bottom Area (sq-ft) : 150.
Area at Riser Crest El (sq-ft) : 150.
(acres) : 0.003
Volume at Riser Crest (cu-ft): 143.
(ac-ft) : 0.003
Infiltration on Bottom only Selected
Soil Properties
Biosoil Thickness (ft) : 1.50
Biosoil Saturated Hydraulic Conductivity (in/hr) : 6.00
Biosoil Porosity (Percent) : 30.00
Maximum Elevation of Bioretention Soil : 101.00
Native Soil Hydraulic Conductivity (in/hr) : 0.70
Riser Geometry
Riser Structure Type : Circular
Riser Diameter (in) : 6.00
Common Length (ft) : 0.000
Riser Crest Elevation : 100.50 ft
Hydraulic Structure Geometry
Number of Devices: 0
**********************FLOOD FREQUENCY AND DURATION STATISTICS*******************
----------------------SCENARIO: PREDEVELOPED
Number of Subbasins: 1
Number of Links: 0
----------------------SCENARIO: POSTDEVELOPED
Number of Subbasins: 1
Number of Links: 1
***********Groundwater Recharge Summary *************
Recharge is computed as input to Perlnd Groundwater Plus Infiltration in Structures
Total Predeveloped Recharge During Simulation
Model Element Recharge Amount (ac-ft)
-----------------------------------------------------------------------------------------------
Subbasin: Subbasin 1 172.429
_____________________________________
Total: 172.429
Total Post Developed Recharge During Simulation
Model Element Recharge Amount (ac-ft)
-----------------------------------------------------------------------------------------------
Subbasin: Basin 9 6.722
Link: iMPERVIOUS BIO 43.061
_____________________________________
Total: 49.783
Total Predevelopment Recharge is Greater than Post Developed
Average Recharge Per Year, (Number of Years= 158)
Predeveloped: 1.091 ac-ft/year, Post Developed: 0.315 ac-ft/year
***********Water Quality Facility Data *************
----------------------SCENARIO: PREDEVELOPED
Number of Links: 0
----------------------SCENARIO: POSTDEVELOPED
Number of Links: 1
********** Link: iMPERVIOUS BIO **********
Infiltration/Filtration Statistics--------------------
Inflow Volume (ac-ft): 45.49
Inflow Volume Including PPT-Evap (ac-ft): 46.87
Total Runoff Infiltrated (ac-ft): 43.06, 91.87%
Total Runoff Filtered (ac-ft): 0.00, 0.00%
Primary Outflow To Downstream System (ac-ft): 3.78
Secondary Outflow To Downstream System (ac-ft): 0.00
Percent Treated (Infiltrated+Filtered)/Total Volume: 91.87%
***********Compliance Point Results *************
Scenario Predeveloped Compliance Subbasin: Subbasin 1
Scenario Postdeveloped Compliance Link: iMPERVIOUS BIO
*** Point of Compliance Flow Frequency Data ***
Recurrence Interval Computed Using Gringorten Plotting Position
Predevelopment Runoff Postdevelopment Runoff
Tr (Years) Discharge (cfs) Tr (Years) Discharge (cfs)
----------------------------------------------------------------------------------------------------------------------
2-Year 2.131E-02 2-Year 2.273E-02
5-Year 3.473E-02 5-Year 3.588E-02
10-Year 4.680E-02 10-Year 4.265E-02
25-Year 5.933E-02 25-Year 5.312E-02
50-Year 7.572E-02 50-Year 6.709E-02
100-Year 8.205E-02 100-Year 8.041E-02
200-Year 0.128 200-Year 8.373E-02
** Record too Short to Compute Peak Discharge for These Recurrence Intervals
**** LID Duration Performance ****
Excursion at Predeveloped 8%Q2 (Must be Less Than 0%): -96.0% PASS
Maximum Excursion from 8%Q2 to 50%Q2 (Must be Less Than 0%): -94.5% PASS
-------------------------------------------------------------------------------------------------
MEETS ALL LID DURATION DESIGN CRITERIA: PASS
-------------------------------------------------------------------------------------------------
—————————————————————————————————
MGS FLOOD
PROJECT REPORT
Program Version: MGSFlood 4.43
Program License Number: 200410007
Project Simulation Performed on: 07/04/2018 2:32 PM
Report Generation Date: 07/04/2018 2:32 PM
—————————————————————————————————
Input File Name: Basin 1.fld
Project Name: Solera
Analysis Title: BMP Performance Standard
Comments:
———————————————— PRECIPITATION INPUT ————————————————
Computational Time Step (Minutes): 15
Extended Precipitation Time Series Selected
Climatic Region Number: 0
Full Period of Record Available used for Routing
Precipitation Station : 96004005 Puget East 40 in_5min 10/01/1939-10/01/2097
Evaporation Station : 961040 Puget East 40 in MAP
Evaporation Scale Factor : 0.750
HSPF Parameter Region Number: 1
HSPF Parameter Region Name : USGS Default
********** Default HSPF Parameters Used (Not Modified by User) ***************
********************** WATERSHED DEFINITION ***********************
Predevelopment/Post Development Tributary Area Summary
Predeveloped Post Developed
Total Subbasin Area (acres) 1.000 0.110
Area of Links that Include Precip/Evap (acres) 0.000 0.004
Total (acres) 1.000 0.114
----------------------SCENARIO: PREDEVELOPED
Number of Subbasins: 1
---------- Subbasin : Subbasin 1 ----------
-------Area (Acres) --------
Till Forest 1.000
----------------------------------------------
Subbasin Total 1.000
----------------------SCENARIO: POSTDEVELOPED
Number of Subbasins: 1
---------- Subbasin : Basin 10 ----------
-------Area (Acres) --------
Till Grass 0.014
Impervious 0.096
----------------------------------------------
Subbasin Total 0.110
************************* LINK DATA *******************************
----------------------SCENARIO: PREDEVELOPED
Number of Links: 0
BASIN 10
************************* LINK DATA *******************************
----------------------SCENARIO: POSTDEVELOPED
Number of Links: 1
------------------------------------------
Link Name: iMPERVIOUS BIO
Link Type: Bioretention Facility
Downstream Link: None
Base Elevation (ft) : 100.00
Riser Crest Elevation (ft) : 100.50
Storage Depth (ft) : 0.50
Bottom Length (ft) : 20.0
Bottom Width (ft) : 9.0
Side Slopes (ft/ft) : L1= 0.00 L2= 0.00 W1= 0.00 W2= 0.00
Bottom Area (sq-ft) : 180.
Area at Riser Crest El (sq-ft) : 180.
(acres) : 0.004
Volume at Riser Crest (cu-ft): 171.
(ac-ft) : 0.004
Infiltration on Bottom only Selected
Soil Properties
Biosoil Thickness (ft) : 1.50
Biosoil Saturated Hydraulic Conductivity (in/hr) : 6.00
Biosoil Porosity (Percent) : 30.00
Maximum Elevation of Bioretention Soil : 101.00
Native Soil Hydraulic Conductivity (in/hr) : 0.70
Riser Geometry
Riser Structure Type : Circular
Riser Diameter (in) : 6.00
Common Length (ft) : 0.000
Riser Crest Elevation : 100.50 ft
Hydraulic Structure Geometry
Number of Devices: 0
**********************FLOOD FREQUENCY AND DURATION STATISTICS*******************
----------------------SCENARIO: PREDEVELOPED
Number of Subbasins: 1
Number of Links: 0
----------------------SCENARIO: POSTDEVELOPED
Number of Subbasins: 1
Number of Links: 1
***********Groundwater Recharge Summary *************
Recharge is computed as input to Perlnd Groundwater Plus Infiltration in Structures
Total Predeveloped Recharge During Simulation
Model Element Recharge Amount (ac-ft)
-----------------------------------------------------------------------------------------------
Subbasin: Subbasin 1 172.429
_____________________________________
Total: 172.429
Total Post Developed Recharge During Simulation
Model Element Recharge Amount (ac-ft)
-----------------------------------------------------------------------------------------------
Subbasin: Basin 10 1.711
Link: iMPERVIOUS BIO 44.165
_____________________________________
Total: 45.876
Total Predevelopment Recharge is Greater than Post Developed
Average Recharge Per Year, (Number of Years= 158)
Predeveloped: 1.091 ac-ft/year, Post Developed: 0.290 ac-ft/year
***********Water Quality Facility Data *************
----------------------SCENARIO: PREDEVELOPED
Number of Links: 0
----------------------SCENARIO: POSTDEVELOPED
Number of Links: 1
********** Link: iMPERVIOUS BIO **********
Infiltration/Filtration Statistics--------------------
Inflow Volume (ac-ft): 45.86
Inflow Volume Including PPT-Evap (ac-ft): 47.58
Total Runoff Infiltrated (ac-ft): 44.17, 92.82%
Total Runoff Filtered (ac-ft): 0.00, 0.00%
Primary Outflow To Downstream System (ac-ft): 3.39
Secondary Outflow To Downstream System (ac-ft): 0.00
Percent Treated (Infiltrated+Filtered)/Total Volume: 92.82%
***********Compliance Point Results *************
Scenario Predeveloped Compliance Subbasin: Subbasin 1
Scenario Postdeveloped Compliance Link: iMPERVIOUS BIO
*** Point of Compliance Flow Frequency Data ***
Recurrence Interval Computed Using Gringorten Plotting Position
Predevelopment Runoff Postdevelopment Runoff
Tr (Years) Discharge (cfs) Tr (Years) Discharge (cfs)
----------------------------------------------------------------------------------------------------------------------
2-Year 2.131E-02 2-Year 2.492E-02
5-Year 3.473E-02 5-Year 3.728E-02
10-Year 4.680E-02 10-Year 4.252E-02
25-Year 5.933E-02 25-Year 5.175E-02
50-Year 7.572E-02 50-Year 6.059E-02
100-Year 8.205E-02 100-Year 7.122E-02
200-Year 0.128 200-Year 7.853E-02
** Record too Short to Compute Peak Discharge for These Recurrence Intervals
**** LID Duration Performance ****
Excursion at Predeveloped 8%Q2 (Must be Less Than 0%): -96.8% PASS
Maximum Excursion from 8%Q2 to 50%Q2 (Must be Less Than 0%): -93.6% PASS
-------------------------------------------------------------------------------------------------
MEETS ALL LID DURATION DESIGN CRITERIA: PASS
-------------------------------------------------------------------------------------------------
Drainage Report - Rose Hill Subdivision
Appendix C
Appendix C
Geotechnical Report
INFILTRATION TEST MEMO
Drainage Report - Rose Hill Subdivision
Appendix D
.
EarthSolutionsNWLLC
EarthSolutions
NW LLC
Geotechnical Engineering
Geology
Environmental Scientists
Construction Monitoring
1805 -136th Place N.E.,Suite 201 Bellevue,WA 98005
(425)449-4704 Fax (425)449-4711
www.earthsolutionsnw.com
GEOTECHNICAL ENGINEERING STUDY
RENTON HIGHLANDS TOWNHOMES
NORTHEAST SUNSET BOULEVARD
RENTON,WASHINGTON
ES-5719
Drwn.
Checked Date
Date Proj.No.
Plate
Earth Solutions NWLLC
Geotechnical Engineering,Construction Monitoring
EarthSolutionsNWLLC
EarthSolutions
NW LLC and Environmental Sciences
Vicinity Map
Renton Highlands Townhomes
Renton,Washington
MRS
CGH
01/29/2018
Jan.2018
5719
1
NORTH
NOTE:This plate may contain areas of color.ESNW cannot be
responsible for any subsequent misinterpretation of the information
resulting from black &white reproductions of this plate.
Reference:
King County,Washington
Map 626
By The Thomas Guide
Rand McNally
32nd Edition
SITE
Plate
Proj.No.
Date
Checked By
Drwn.ByEarthSolutionsNWLLCGeotechnicalEngineering,ConstructionMonitoringandEnvironmentalSciencesEarthSolutionsNWLLCEarthSolutionsNWLLCBoringLocationPlanRentonHighlandsTownhomesRenton,WashingtonMRS
CGH
01/29/2018
5719
2
NORTH
NOT -TO -SCALE
NOTE:This plate may contain areas of color.ESNW cannot be
responsible for any subsequent misinterpretation of the information
resulting from black &white reproductions of this plate.
NOTE:The graphics shown on this plate are not intended for design
purposes or precise scale measurements,but only to illustrate the
approximate test locations relative to the approximate locations of
existing and /or proposed site features.The information illustrated
is largely based on data provided by the client at the time of our
study.ESNW cannot be responsible for subsequent design changes
or interpretation of the data by others.
LEGEND
Approximate Location of
ESNW Boring,Proj.No.
ES-5719,Dec.2017
Subject Site
Existing Building
KIRKLAND AVENUE N.E. N.E. SUNSET BOULEVARDN.E. 12TH STREET
HARRINGTON AVENUE N.E.N.E.10T
H
ST
R
EETApartments SUNSET LANE N.E.B-1
B-2
B-3
B-4
B-5B-6
B-7
B-8
B-9
B-10
B-11
B-12
B-13
B-1
HARRINGTON PL. N.E.
Drwn.
Checked Date
Date Proj.No.
Plate
Earth Solutions NWLLC
Geotechnical Engineering,Construction Monitoring
EarthSolutionsNWLLC
EarthSolutions
NW LLC and Environmental Sciences
CANTILEVER &SINGLE TIEBACK WALL
D =Pile Embedment
(per Structural Eng.)
2'
H
(Wall Height)
Active
Earth
Pressure
Passive
Earth
Pressure
EFP=350pcf
EFP=35pcf
Surcharge
(W here Applicable)
Traffic Surcharge or Building Surcharge
(W here Applicable)
Excavation Level
SCHEMATIC ONLY -NOT TO SCALE
NOT A CONSTRUCTION DRAW ING
NOTES:
Diagram for pressure distribution illustration
only,not a design drawing.
Passive Pressure includes a factor of
safety of 1.5.
For adjacent building or traffic surcharge
see text.
NOTE:
See text for recommended
Slope Backfill and At-Rest
Pressures.
Neglect Upper 2 feet
of Passive Pressure
Renton Highlands Townhomes
Renton,Washington
MRS
CGH
01/29/2018
Jan.2018
5719
3
Drwn.
Checked Date
Date Proj.No.
Plate
Earth Solutions NWLLC
Geotechnical Engineering,Construction Monitoring
EarthSolutionsNWLLC
EarthSolutions
NW LLC and Environmental Sciences
NO LOAD ZONE
D =Pile Embedment
(per Structural Eng.)
H
(Wall Height)
Traffic Surcharge or Building Surcharge
(W here Applicable)
Excavation Level
SCHEMATIC ONLY -NOT TO SCALE
NOT A CONSTRUCTION DRAW ING
H/4 60
Tieback No Load
Zone
Renton Highlands Townhomes
Renton,Washington
MRS
CGH
01/29/2018
Jan.2018
5719
4
Drwn.
Checked Date
Date Proj.No.
Plate
Earth Solutions NWLLC
Geotechnical Engineering,Construction Monitoring
EarthSolutionsNWLLC
EarthSolutions
NW LLC and Environmental Sciences
SHORING WALL DRAINAGE
W ood Lagging
Native
Soil
Excavation
PVC Tightline
Structural Fill
Foundation
(per Plan)
Drain Grate
Waterproofing and Insulation
per Architectural Plan
Continuous Sheet Drain
(Placed with Filter Fabric
Facing Shoring)
Concrete Facing
Slab-On-Grade Floor
(per Plan)
NOTE:Drain through wall should be installed at middle of lagging.
SCHEMATIC ONLY -NOT TO SCALE
NOT A CONSTRUCTION DRAW ING
Renton Highlands Townhomes
Renton,Washington
MRS
CGH
01/29/2018
Jan.2018
5719
5
Drwn.
Checked Date
Date Proj.No.
Plate
Earth Solutions NWLLC
Geotechnical Engineering,Construction Monitoring
and Environmental Sciences
EarthSolutionsNWLLC
EarthSolutions
NW LLC
RETAINING WALL DRAINAGE DETAIL
NOTES:
Free-draining Backfill should consist
of soil having less than 5 percent fines.
Percent passing No.4 sieve should be
25 to 75 percent.
Sheet Drain may be feasible in lieu
of Free-draining Backfill,per ESNW
recommendations.
Drain Pipe should consist of perforated,
rigid PVC Pipe surrounded with 1-inch
Drain Rock.
LEGEND:
Free-draining Structural Backfill
1-inch Drain Rock
18"Min.
Structural
Fill
Perforated Rigid Drain Pipe
(Surround in Drain Rock)
SCHEMATIC ONLY -NOT TO SCALE
NOT A CONSTRUCTION DRAWING
Renton Highlands Townhomes
Renton,Washington
MRS
CGH
01/29/2018
Jan.2018
5719
6
Drwn.
Checked Date
Date Proj.No.
Plate
Earth Solutions NWLLC
Geotechnical Engineering,Construction Monitoring
and Environmental Sciences
EarthSolutionsNWLLC
EarthSolutions
NW LLC
FOOTING DRAIN DETAIL
Slope
Perforated Rigid Drain Pipe
(Surround in Drain Rock)
18"Min.
NOTES:
Do NOT tie roof downspouts
to Footing Drain.
Surface Seal to consist of
12"of less permeable,suitable
soil.Slope away from building.
LEGEND:
Surface Seal:native soil or
other low-permeability material.
1-inch Drain Rock
SCHEMATIC ONLY -NOT TO SCALE
NOT A CONSTRUCTION DRAW ING
Renton Highlands Townhomes
Renton,Washington
MRS
CGH
01/29/2018
Jan.2018
5719
7
Drainage Report - Rose Hill Subdivision
Appendix E
.
Geotechnical Engineering,Construction
Obser vation/Testing and Environmental Services
Drwn.CAM
Checked CGH Date July 2018
Date 07/10/2018 Proj.No.5719.02
Plate 1
Earth Solutions NWLLCEarthSolutionsNWLLC
EarthSolutions
NW LLC
Vicinity Map
Solera
Renton,Washington
NORTH
NOTE:This plate may contain areas of color.ESNW cannot be
responsible for any subsequent misinterpretation of the information
resulting from black &white reproductions of this plate.
Reference:
King County,Washington
Map 626
By The Thomas Guide
Rand McNally
32nd Edition
SITE
GeotechnicalEngineering,ConstructionObservation/TestingandEnvironmentalServicesPlate
Proj.No.
Date
Checked By
Drwn.ByEarthSolutionsNWLLCEarthSolutionsNWLLCEarthSolutionsNWLLCSubsurfaceExplorationPlanSolera Renton,WashingtonCAM
CGH
07/10/2018
5719.02
2
NORTH
NOT -TO -SCALE
NOTE:This plate may contain areas of color.ESNW cannot be
responsible for any subsequent misinterpretation of the information
resulting from black &white reproductions of this plate.
NOTE:The graphics shown on this plate are not intended for design
purposes or precise scale measurements,but only to illustrate the
approximate test locations relative to the approximate locations of
existing and /or proposed site features.The information illustrated
is largely based on data provided by the client at the time of our
study.ESNW cannot be responsible for subsequent design changes
or interpretation of the data by others.
LEGEND
Approximate Location of
ESNW Test Pit,Proj.No.
ES-5719.02,June 2018
Approximate Location of
ESNW Boring,Proj.No.
ES-5719,Dec.2017
Subject Site
Existing Building
B-1
TP-1
KIRKLAND AVENUE N.E. N.E. SUNSET BOULEVARDN.E. 12TH STREET
HARRINGTON AVENUE N.E.N.E.10T
H
ST
R
EETApartments SUNSET LANE N.E.B-1
B-2
B-3
B-4
B-5B-6
B-7
B-8
B-9
B-10
B-11
B-12
B-13 HARRINGTON PL. N.E.TP-1
TP-4
TP-2
TP-3
Drainage Report - Rose Hill Subdivision
Appendix F
Appendix F
Operation and Maintenance
Drainage Report - Rose Hill Subdivision
Appendix G
Appendix G
Bond Quantities & Draft Declaration of Covenant