Loading...
HomeMy WebLinkAboutC_ERC DNS-M Agency_Letter_180803.pdf Enclosure cc: King County Wastewater Treatment Division Ramin Pazooki, WSDOT, NW Region Boyd Powers, Department of Natural Resources Larry Fisher, WDFW Karen Walter, Fisheries, Muckleshoot Indian Tribe Duwamish Tribal Office Melissa Calvert, Muckleshoot Cultural Resources Program US Army Corp. of Engineers Gretchen Kaehler, Office of Archaeology & Historic Preservation Washington State Department of Ecology August 3, 2018 Washington State Department of Ecology Environmental Review Section PO Box 47703 Olympia, WA 98504-7703 Subject: ENVIRONMENTAL (SEPA) THRESHOLD DETERMINATION Transmitted herewith is a copy of the Environmental Determination for the following project reviewed by the Environmental Review Committee (ERC) on July 30, 2018: SEPA DETERMINATION: Determination of Non-Significance - Mitigated (DNS-M) PROJECT NAME: Walker Auto Dealership PROJECT NUMBER: LUA18-000305 Appeals of the environmental determination must be filed in writing on or before 5:00 p.m. on August 17, 2018, together with the required fee with: Hearing Examiner, City of Renton, 1055 South Grady Way, Renton, WA 98057. Appeals to the Examiner are governed by RMC 4-8-110 and information regarding the appeal process may be obtained from the City Clerk’s Office, (425) 430-6510. Please refer to the enclosed Notice of Environmental Determination for complete details. If you have questions, please call me at (425) 430-7219. For the Environmental Review Committee, Alex Morganroth Associate Planner DEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT SIGNATURES: Gregg Zimmerman, Administrator Public Works Department Date Rick M. Marshall, Administrator Renton Regional Fire Authority Date Kelly Beymer, Administrator Community Services Department Date C.E. Vincent, Administrator Date Department Of Community & Economic Development ENVIRONMENTAL (SEPA) DETERMINATION OF NON-SIGNIFICANCE (DNS) PROJECT NUMBER: LUA18-000305, ECF, SPR-A APPLICANT: Matt Weber, AHBL, 2215 N 30th St Suite 300, Tacoma, WA 98407 PROJECT NAME: Walker Auto Dealership PROJECT DESCRIPTION: The applicant is requesting Site Plan and Environmental (SEPA) Review to construct a 64,935 square foot auto dealership on a site previously occupied by auto junk yard. The subject property is located at 3400 East Valley Road (APN 3023059067) near the intersection of East Valley Road and SW 34th St. The project site totals 5.65 acres in area and is zoned Commercial Arterial (CA). The site is located in the Automall Area C Overlay District. Two existing buildings are presently located on the site and are proposed for demolition as part of the project. The previous use located on the property resulted in a significant amount of contamination due to the decomposition of the junk vehicles. The applicant has proposed to remediate the site under Department of Ecology’s Voluntary Clean-up program authorized by the Washington Model Toxics Control Act. The proposed new structure would include a showroom/sales area, parts sale and storage area, service and shop, and various other support areas. Access to the site is proposed via three new driveways off of East Valley Road. The site is mapped with a high seismic hazard. According to the applicant, a Category III wetlands is located within the SR 167 ROW directly east of the site. The applicant submitted a Geotechnical Report, a Drainage Report, a Wetland Report, and a Traffic Study with the application. PROJECT LOCATION: 3400 East Valley Rd, Renton, WA 98057 LEAD AGENCY: City of Renton Environmental Review Committee Department of Community & Economic Development The City of Renton Environmental Review Committee has determined that it does not have a probable significant adverse impact on the environment. An Environmental Impact Statement (EIS) is not required under RCW 43.21C.030(2)(c). This Determination of Non-Significance is issued under WAC 197-11-340. Because other agencies of jurisdiction may be involved, the lead agency will not act on this proposal for fourteen (14) days. Appeals of the environmental determination must be filed in writing on or before 5:00 p.m. on August 17, 2018. Appeals must be filed in writing together with the required fee with: Hearing Examiner, City of Renton, 1055 South Grady Way, Renton, WA 98057. Appeals to the Examiner are governed by RMC 4-8-110 and more information may be obtained from the Renton City Clerk’s Office, (425) 430-6510. PUBLICATION DATE: August 3, 2018 DATE OF DECISION: July 30, 2018 DocuSign Envelope ID: B8605310-FF6F-47AA-8455-409D73EA164E 7/30/2018 | 3:55 PM PDT 7/30/2018 | 4:07 PM PDT 8/1/2018 | 3:38 PM PDT 7/30/2018 | 3:22 PM PDT DETERMINATION OF NON-SIGNIFICANCE – MITIGATED (DNS-M) MITIGATION MEASURES AND ADVISORY NOTES PROJECT NUMBER: LUA18-000305 ECF, SPR-A, MOD APPLICANT: Matt Weber PROJECT NAME: Walker Auto Dealership PROJECT DESCRIPTION: The applicant is requesting Site Plan and Environmental (SEPA) Review to construct a 64,935 square foot auto dealership on a site previously occupied by auto junk yard. The subject property is located at 3400 East Valley Road (APN 3023059067) near the intersection of East Valley Road and SW 34th St. The project site totals 5.65 acres in area and is zoned Commercial Arterial (CA). The site is located in the Automall Area C Overlay District. Two existing buildings are presently located on the site and are proposed for demolition as part of the project. The previous use located on the property resulted in a significant amount of contaminated due to the decomposition of the junk vehicles. The applicant would be required to obtain a Voluntary Clean -up Approval from the Department of Ecology (DOE) as part of the Model Toxics Control Act. The restoration plan submitted DOE would also be evaluated under the SEPA process. The proposed new structure would include a showroom/sales area, parts sale and storage area, service and shop, and various other support areas. Access to the site is proposed via three new driveways off of East Valley Road. The site is mapped with a high seismic hazard. According to the applicant, a Category III wetlands is located within the SR 167 ROW directly east of the site. PROJECT LOCATION: 3400 East Valley Rd LEAD AGENCY: The City of Renton Department of Community & Economic Development Planning Division MITIGATION MEASURES: 1. The applicant shall provide a revised site plan demonstrating compliance with the impervious surface requirements. This site plan shall be provided to the Current Planning Project Manager for review and approval prior to construction permit issuance. 2. The applicant shall provide a revised site plan that eliminates one of the three driveways in order to comply with the driveway standards in RMC 4-4-080. The new site plan shall be provided at the time of construction permit review and compliance shall be demonstrated prior to construction permit issuance. 3. The applicant shall submit a revised landscape plan demonstrating compliance with the landscape berm requirement for the Automall Area C Overlay District. The landscape plan shall be reviewed and approved by the Current Planning Project Manager prior to construction and building permit issuance. 4. The applicant shall submit a revised wetlands mitigation planting plan that includes a higher density of trees and shrubs near the center of the buffer. The revised mitigation plan shall be submitted at the time of construction permit application for review and approved by the Current Planning Project Manager prior to construction permit issuance. ERC Mitigation Measures and Advisory Notes Page 2 of 2 5. A lighting plan including fixture details and foot candles shall be submitted at the time of Construction Permit review forreview and approval by the Current Planning Project Manager prior to construction permit issuance. 6. The applicant shall submit a revised landscape plan that adds additional trees along the east façade near the proposed blank wall. The revised landscaping plan shall be, subject to review and approval by the Current Planning Project Manager prior to construction permit and building permit issuance. ADIVISORY NOTES: The following notes are supplemental information provided in conjunction with the administrative land use action. Because these notes are provided as information only, they are not subject to the appeal process for the land use actions. DEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT Page 1 of 9 LUA**-000*** ADVISORY NOTES TO APPLICANT The following notes are supplemental information provided in conjunction with the administrative land use action. Because these notes are provided as information only, they are not subject to the appeal process for the land use action. Planning: (Contact: Name, 425-430-7219, amorganroth@rentonwa.gov) 1. RMC section 4-4-030.C.2 limits haul hours between 8:30 am to 3:30 pm, Monday through Friday unless otherwise approved by the Development Services Division. 2. Commercial, multi-family, new single family and other nonresidential construction activities shall be restricted to the hours between seven o’clock (7:00) a.m. and eight o’clock (8:00) p.m., Monday through Friday. Work on Saturdays shall be restricted to the hours between nine o’clock (9:00) a.m. and eight o’clock (8:00) p.m. No work shall be permitted on Sundays. 3. Within thirty (30) days of completion of grading work, the applicant shall hydroseed or plant an appropriate ground cover over any portion of the site that is graded or cleared of vegetation and where no further construction work will occur within ninety (90) days. Alternative measures such as mulch, sodding, or plastic covering as specified in the current King County Surface Water Management Design Manual as adopted by the City of Renton may be proposed bet ween the dates of November 1st and March 31st of each year. The Development Services Division’s approval of this work is required prior to final inspection and approval of the permit. 4. A National Permit Discharge Elimination System (NPDES) permit is required when more than one acre is being cleared. 5. The applicant will be required to submit a Final Stream Mitigation Report and Maintenance and Monitoring proposal. In addition, the applicant will be required to comply with all the code requirements of RMC 4-3-050 Critical Areas. This includes, but is not limited to, placing the critical area within a Native Growth Protection Easement, providing fencing and signage, and providing the City with a site restoration surety device and, later, a maintenance and moni toring surety device. 6. The applicant may not fill, excavate, stack or store any equipment, dispose of any materials, supplies or fluids, operate any equipment, install impervious surfaces, or compact the earth in any way within the area defined by the drip line of any tree to be retained. 7. The applicant shall erect and maintain six foot (6') high chain link temporary construction fencing around the drip lines of all retained trees, or along the perimeter of a stand of retained trees. Placards shall be placed on fencing every fifty feet (50') indicating the words, “NO TRESPASSING – Protected Trees” or on each side of the fencing if less than fifty feet (50'). Site access to individually protected trees or groups of trees shall be fenced and signed. Individual trees shall be fenced on four (4) sides. In addition, the applicant shall provide supervision whenever equipment or trucks are moving near trees. 8. This permit is shall comply with the Bald and Golden Eagle Protection Act. The permitted is responsible for adhering to the U.S. Fish and Wildlife Service National Bald Eagle Management Guidelines (2007) and /or your U.S. Fish and Wildlife Service permit. Development Engineering: (Contact: Name, 425-430-7382, afowler@rentonwa.gov) 1. See Attached Development Engineering Memo dated June 2, 2018 DocuSign Envelope ID: B8605310-FF6F-47AA-8455-409D73EA164E ADVISORY NOTES TO APPLICANT Page 2 of 9 LUA18-000305 Fire Authority: (Contact: Corey Thomas, 425-430-7024, cthomas@rentonwa.gov) Environmental Impact Comments: 1. Fire impact fees are applicable at the rate of $ 1.25 per square foot. Credit is given for the demolished building. This fee is paid at time of building permit issuance. Code Related Comments: 1. The preliminary fire flow is 4,000 gpm. A minimum of Four (4) fire hydrants are required. One within 150-feet and others within 300-feet of the building. Hydrants are required within 50-feet of all fire department connections for standpipes and sprinkler systems. A looped water main is required for all buildings with fire flows exceeding 2,500 gpm Hydrant spacing on looped mains is required to be 300 feet on center maximum. 2. Approved fire sprinkler and fire alarm systems are required throughout the building. Direct outside access is required to the fire sprinkler riser rooms. The PIV, FDC and the water main piping cannot be run under the building. Fire alarm systems are required to be fully addressable and full detection is required. Separate plans and permits required by the fire department. 3. Fire department apparatus access roadways are required. Roadways shall be modified to meet or exceed the fire code minimum in and around the proposed new building. Fire lanes are required to meet 20-feet width with 25-foot inside and 45-feet outside turning radius. Roadways shall support a minimum of a 30-ton vehicle and 75-psi point loading. Fire Lane signage required for onsite roadways. Proposed front canopy shall be raised to a minimum of 13 -feet 6-inches of vehicle clearance for fire apparatus. 5. Emergency Responder Radio Coverage requirement per IFC Section 510 and local amended ordinance. 6. A parking structure on the second floor will require the installation of a standpipe. 7. Permits are required for above ground tanks. Separate plans and permits required by the fire department for all above and below ground tank installation. 8. HMIS information is required before the building permit is issued Technical Services: (Contact: Amanda Askren, 425-430-7369, aaskren@rentonwa.gov) 1. Community Services: (Contact: Leslie Betlach, 425-430-6619, lbetlach@rentonwa.gov) 1. Parks Impact fee per Ordinance 5670 applies. Police: (Contact: Cyndie Parks, 425-430-7521, cparks@rentonwa.gov) CONSTRUCTION PHASE Theft from construction sites is one of the most commonly reported crimes in the City. To protect materials and equipment it is recommended that all materials and tools be locked up when not in use. The site should have security lighting, and any construction trailer or storage area should be completely fenced-in with portable chain-link fencing. The fence will provide both a physical and psychological barrier to any prospective criminal and will demonstrate that the area is private property. Construction trailers should be kept locked when not in use, and should be fitted with heavy-duty deadbolts with a minimum 1-1/2” throw when bolted. Any construction material that contains cop per should be removed from the construction site at the end of each DocuSign Envelope ID: B8605310-FF6F-47AA-8455-409D73EA164E ADVISORY NOTES TO APPLICANT Page 3 of 9 LUA18-000305 working day. Glass windows in construction trailers should be shatter-resistant. Toolboxes and storage containers should be secured with heavy-duty padlocks and kept locked when not in use. “No Trespassing” signs should be posted on the property during the construction phase. These signs will allow officers, upon contact, to provide a verbal warning to trespassers that should they be contacted on the property again, they could be cited and/or arrested. COMPLETED FACILITY All exterior doors should be made of solid metal or metal over wood, with heavy -duty deadbolt locks, latch guards or pry-resistant cylinders around the locks, and peepholes. All strikeplates should have 2-1/2 to 3” wood screws. If glass doors are used, they should be fitted with the hardware described above and additionally be fitted with a layer of security film. Security film can increase the strength of the glass by up to 300%, greatly reducing the likelihood of breaking glass to gain entry. Access to the back of the buildings should be limited, preferably with security fencing or gates, as these areas could be vulnerable to crime due to the lack of natural surveillance by vehicle and/or pedestrian traffic. It is important to direct all foot traffic into the main entrance of the building. Any alternative employee entrances should have coded access to prevent trespassing. All areas of this project need to have adequate lighting. This will assist in the deterrent of theft of and from motor vehicle as well as provide safe pedestrian travel for customers utilizing the business. The structure should have a building number clearly posted with numbers at least 6” in height and of a color contrasting with the building. This will assist emergency personnel in locating the correct location for response. Landscaping should be installed with the objective of allowing visibility – not too dense and not too high. Too much landscaping will make customers and employees feel isolated and will provide criminals with conceal ment to commit crimes such as burglary and malicious mischief (property destruction). It is important for safety and security reasons to have appropriate lighting and signage. Use plenty of lights throughout your property, not just in the areas you thin k are most vulnerable. “No Trespassing” signs should be posted in conspicuous locations throughout the property, including entrances to the property and parking areas. Garbage and recycling dumpsters, according to plans, are placed in the farthest corne rs behind the property, bordering greenbelt area. Due to limited visibility of this area it is recommended dumpster areas be gated and locked during and after business hours to prevent loitering, illegal dumping and/or tampering. Additional lighting should also be placed around these areas for extra visibility. Most theft of vehicles from dealerships is the result of keys and key fob’s not properly secured. To prevent theft of automobiles and inventory at car dealerships, it is recommended to put in pla ce a high level of security around key management. Electronic key cabinets are one recommendation that come with audit tracking systems to secure keys and allow inventory control as well as require specific check-in/check-out monitoring. Key management is to include the service department when customer vehicles left on-site for overnight service have keys readily available to “grab & go”. DocuSign Envelope ID: B8605310-FF6F-47AA-8455-409D73EA164E ADVISORY NOTES TO APPLICANT Page 4 of 9 LUA18-000305 It is recommended that the dealership lot have proper barriers and fencing in place to prevent theft. Fencing with barbed wire is recommended to store surplus inventory. Gates are recommended at all entrances/exits and secured after hours to make it more difficult to drive vehicles off the lot due to theft. Bollards are recommended throughout the property to prevent theft of vehicle. In review of the plans it looks like there will be some bollards placed around the main building. When considering bollards as a deterrent to vehicle theft, note that bollards can be placed throughout several areas of the property as permanent, decorative, and/or moveable. Due to the high-dollar inventory at auto dealerships, hired security guards and video monitored surveillance is recommended. Guards can patrol major access points and minimized the threat of loss. The presence of guards patrolling a property can discourage criminals from targeting your dealership. An auxiliary security service could be used to patrol the property, preferably between the hours of 10:00 p.m. and 6:00 a.m. Video monitored surveillance for this type of inventory should be in “real time”. If an alarm is tripped and is being monitored, police can be dispatched immediately, increasing the chance of preventing the theft before it happens and possibly arrest of a suspect. If you choose to use security guards and/or surveillance, post signs throughout the property announcing that you do so. Let would-be criminals know you are watching. I highly recommend that the developer have a Renton Police Crime Prevention Representative conduct a security survey of the premises once construction is complete. Building: (Contact: Craig Burnell, 425-430-7290, cburnell@rentonwa.gov) 1. Recommendations of the geotechnical report must be followed. DocuSign Envelope ID: B8605310-FF6F-47AA-8455-409D73EA164E ADVISORY NOTES TO APPLICANT Page 5 of 9 LUA18-000305 DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT M E M O R A N D U M DATE: June 2, 2018 TO: Alex Morganroth, Planner FROM: Ann Fowler, Civil Engineer III, Plan Reviewer SUBJECT: Utility and Transportation Comments for Walker Subaru 3400 East Valley Road LUA 18-000305 I have reviewed the application for the Walker Subaru at 3400 East Valley Road (APN(‘s) 3023059067) and have the following comments: EXISTING CONDITIONS The site is approximately 5.65 acres in size and is square in shape. The existing site is mostly impervious gravel area which has been used as a vehicle storage lot. Site soils are generally contaminated with oils from the continued use of vehicular storage. Water Water service is provided by City of Renton. The site is in the Valley service area in the 196 hydraulic pressure zone. There is an existing 12-inch City water main located in East Valley Road (see Water plan no. W-0304) that can deliver a maximum total flow capacity of 5,000 gallons per minute (gpm). The approximate static water pressure is 75 psi at the elevation of 20 feet. The site is located outside of an Aquifer Protection Area. There is an existing 3/4-inch water meter serving the existing building on the property. Sewer Wastewater service is provided by the City of Renton. There is an existing 8-inch PVC wastewater main located in East Valley Road (see City plan no. S-0200). Storm There is an existing storm drainage system in East Valley Road (see City plan no. R-1999). There no existing on- site conveyance system or stormwater features. Surface run-off from the site appears to drain to the abutting wetlands as well as to the public drainage system in East Valley Road. Streets East Valley Road is a Collector Arterial Street with an existing right of way (ROW) width of 85 as measured using the King County Assessor’s Map. Current street frontage improvements include curb and gutter and a 6-ft sidewalk on both sides of the street. The site borders State Route 167 (SR 167) on the east property line. WSDOT has identified, in their long-range planning programs for I-405 and SR-167, a direct access connection to and from the south at SW 27th Street, which the City supports. Applicant should further coordinate with WSDOT at 425-456-8538 for further coordination and to verify any future impacts related to widening of the highway. CODE REQUIREMENTS WATER DocuSign Envelope ID: B8605310-FF6F-47AA-8455-409D73EA164E ADVISORY NOTES TO APPLICANT Page 6 of 9 LUA18-000305 1. Based on the information submitted with the land use application, Renton Regional Fire Authority has determined that the preliminary fire flow demand for the development is 4,000 gpm. 2. The proposed water main improvements as shown on the composite utility civil plan submitted with the Land Use Application provides the required looped 10-inch water main around the building and connecting to the existing 12-inch water main in East Valley Road since the fire flow demand is above 2,500 gpm. a. A 15-ft water easement is required for the looped water main. b. No buildings, structures or vaults shall be placed within the easement area or within 5 feet of the water main. c. A minimum of 10 feet horizontal separation shall be provided from the water main to the wetlands and buffer area. 3. Installation of fire hydrants shall be as required by Renton Fire Prevention will be required. The number and location of the hydrants shall be determined based on the City’s review of the final building and site plans. 4. Installation of a fire sprinkler stub with a detector double check valve assembly (DDCVA) for backflow prevention to the building. The DDVCA shall be installed in an outside underground vault per City standard plan no. 360.1 (or 360.2 depending on the size of the system). The DDVCA may be installed inside the building if it meets the conditions as shown on the City’s standard plan 360.5 for the installation of a DDCVA inside a building. 5. A reduced-pressure principle backflow prevention assembly (RPBA) is required for water meters for retail, commercial, industrial water use. The RPBA shall be installed inside an above-ground heated enclosure per City standard plan no. 350.2. The RPBA may be located inside the building if a drainage outlet for the relief valve is provided and the location is pre-approved by the City Plan Reviewer and City Water Utility Department. 6. Meter sizing shall be based on Uniform Plumbing Code meter sizing criteria. Sizing calculations shall be provided to the City. Meters 3” or larger, shall be installed in a concrete vault located outside of the building per COR Standard Plan 320.4. By-pass piping, valves, and associated piping shall be purchased and installed by the developer / contractor under City observation for meters 3” or larger. 7. A separate meter is required for landscape irrigation per COR Standard Plan 320.1. A double check valve assembly (DCVA) is required behind the meter per COR Standard Plan 340.8. 8. Please refer to City of Renton General Design and Construction Standards for Water Main Extensions as shown in Appendix J of the City’s 2012 Water System Plan. 9. Adequate horizontal and vertical separation between the new water main and other utilities (storm sewer pipes and vaults, sanitary sewer, power, gas, electrical) shall be provided for the operation and maintenance of the water main. 10. Retaining walls, rockeries or similar structures cannot be installed over the water main unless the water main is inside a steel casing. 11. The development is subject to a water system development charge (SDC) fee. This is payable at construction permit issuance. Proposed water meter sizes have not been noted on the preliminary utility plans. Typical water meter sizes and associated fees are noted as follows: a. The SDC fee for water is based on the size of the new domestic water to serve the project. The current water fee for a single 1-inch meter is $3,727.00 per meter, 1-1/2 inch meter is $18,635.00 and a 2-inch meter is $29,816.00. b. A water system redevelopment credit will apply for the existing domestic water meters if they are abandoned. c. The SDC fee for fire service is based on the size of the fire service line to serve the project. The current SDC fee for a 6-inch fire service line is $23,843.00. d. SDC fees are assessed and payable at construction permit issuance. 12. Water service installation charges for each proposed domestic water service is applicable. Water Service installation for a 1-inch water service line is $2,850.00* per service line, a 1-1/2 inch water service is $4,580.00* per service line and for $4,710.00* for each 2-inch water service line. This is payable at construction permit issuance. 13. Drop-in meter fee is $460.00* per meter for a 1-inch meter, $750.00* for a 1-1/2 inch meter, and $950.00* for a 2-inch meter. This is payable at issuance of the building. 14. Final determination of applicable fees will be made after the water meter size has been determined. DocuSign Envelope ID: B8605310-FF6F-47AA-8455-409D73EA164E ADVISORY NOTES TO APPLICANT Page 7 of 9 LUA18-000305 15. Additional water system development charges and water meter charges will apply if a landscape irrigation meter is required and is based on the size of the meter. SEWER 1. All existing side sewers will be required to be cut and capped during demolition of the properties. New side sewers shall be installed to serve each building. 2. Any covered parking areas, if proposed, will need to direct parking drainage to the sanitary sewer system through an oil/water interceptor. If any parking is not covered, it will need to be directed away from the sanitary sewer and into the storm sewer system. 3. If floor drains are required by the building department, drains are required to be connected to the sanitary sewer system. Flows shall be directed through the floor drains that are installed in accordance with the Uniform Plumbing Code to an interior or exterior oil/water separator. 4. The development is subject to applicable wastewater system development charges based on the size of the new domestic water to serve the project. a. SDC fee for sewer is based on the size of the new domestic water to serve the project. The current sewer fee for a 1-inch meter is $2,837.00 per meter, 1-1/2 inch meter is $14,185.00 and a 2-inch meter is $22,696.00. b. A redevelopment credit of the wastewater system development charges in the amount equal to the SDC fee for the size of the existing domestic water meter(s) will be applied to each of the existing meters if they are abandoned and capped at the main line. c. SDC fees are payable at construction permit issuance. SURFACE WATER 1. A geotechnical report, dated April 27, 2018, completed by Migizi Group, Inc., for the site has been provided. Erosion control measures will need to be in place prior to starting grading activities on the site. The report discounts the use of infiltration due to the high groundwater table present on the project site. Geotechnical recommendations presented need to be addressed within the project plans. 2. A Preliminary Drainage Plan and Technical Information Report (TIR), dated May 2018, was submitted by AHBL with the Land Use Application. Based on the City of Renton’s flow control map, the site falls within the Peak Rate Flow Control Standard area matching Existing Site Conditions and is within the Black River Drainage Basin. The development is subject to Full Drainage Review in accordance with the 2017 Renton Surface Water Design Manual (RSWDM). All nine core requirements and the six special requirements have been discussed in the Technical Information Report. 3. As discussed in the TIR, the applicant has determined that the redevelopment project is exempt from Core Requirement #3, Flow Control, since the proposed development will result in less than a 0.15 cfs increase in surface water run-off from the existing site conditions 100-year peak flow rate when modeled using the latest version of the Western Washington Hydrology Model (WWHM 2012), as outlined in Core Requirement #3. a. The redevelopment project is proposing to upgrade existing gravel and/or hard compacted dirt to asphalt. The existing ground surface is not currently serviced by an existing piped or channeled conveyance system. As such, while the existing ground surface is defined as an existing impervious area, it is classified as an existing non-effective impervious area for the purposes of continuous modeling land cover types per Section 3.2.2. b. As defined in Section 3.2.2, non-effective impervious area is assumed to have the same hydrologic response as the immediately surrounding pervious area. Therefore, the existing gravel/hard compacted dirt land cover shall be modeled as grass rather than impervious surface. c. The applicant will need to provide an updated WWHM model demonstrating compliance with the exception criteria outlined in Section 1.2.3.1.A as part of the civil construction permit application. If the exception criteria outlined in the RSWDM cannot be achieved, the applicant will be required to comply with all requirements of Core Requirement #3, which may include installation of a detention facility DocuSign Envelope ID: B8605310-FF6F-47AA-8455-409D73EA164E ADVISORY NOTES TO APPLICANT Page 8 of 9 LUA18-000305 which shall be designed in accordance with the RSWDM that is current at th e time of civil construction permit application. 4. The development is required to provide enhanced basic water quality treatment prior to discharge. Project water quality treatment will consist of two separate systems in order to maintain the two natural discharge locations. The east natural discharge basin will consist of conveyance to a bioretention cell prior to discharging into the existing wetland to the east. The west natural discharge basin will consist of conveyance to a proprietary water quality filter system prior to connection to the existing 12-inch concrete stormwater main located along East Valley Road. a. The applicant shall provide the GULD approval for the proposed water quality treatment filter system verifying that the system has been accepted by the Department of Ecology. b. The conveyance and water quality systems shall be designed in accordance with the RSWDM that is current at the time of civil construction permit application. 5. There are no potential downstream flooding or erosion issues identified in the drainage report. 6. Appropriate on-site BMPs will be required to help mitigate the new runoff created by this development. A preliminary drainage plan, including the application of on-site BMPs, has been included with the land use application, which identifies the use of basic dispersion to mitigate the impervious roof area. The final drainage plan and drainage report must be submitted with the civil construction permit application. a. Final evaluation of the application of on-site BMPs to the maximum extent feasible will be completed during civil construction permit review. The applicant may be required to apply additional on-site BMPs in order to meet the minimum requirements outlined in Core Requirement #9. 7. All work proposed outside of the applicant’s property will require a permanent drainage easement to be provided to the City and a temporary construction easement prior to any permits being issued. 8. A Construction Stormwater General Permit from Department of Ecology will be required since grading and clearing of the site exceeds one acre. A Stormwater Pollution Prevention Plan (SWPPP) is required for this site. 9. Surface water system development fee is $0.687 per square foot of new impervious surface, but not less than $1,718.00. This is payable prior to issuance of the construction permit. TRANSPORTATION 1. The proposed development fronts East Valley Road along the west property lines. East Valley Road is classified as a Collector Arterial Road. Existing right-of-way (ROW) width is approximately 85 feet. To meet the City’s complete street standards for collector arterial streets, minimum right of way width is 94 feet. Dedication of 4.5 feet of right of way would be required. The proposed development is subject to half-street frontage improvements which includes installation of paved travel width of 41 feet, with 8-ft wide parking on both sides, 0.5-ft wide curbs, 8-ft wide landscaped planters, 8-ft wide sidewalk, and 2 feet of clear width at back of sidewalk. a. The existing pavement width along East Valley Road is approximately 36 feet with a 0.5-foot curb/gutter and a 6-foot sidewalk on the east and west sides of roadway along the project frontage. The City’s Transportation section and Economic Development section reviewed East Valley Road and the surrounding area and have determined that a modified collector arterial street section along the east side of East Valley Road is more suitable for this location of East Valley Road. b. The modified collector arterial street section along the east side of East Valley Road will maintain the existing pavement width and curb-line. Applicant shall install a new 8-ft planter strip behind the existing curb-line and a new 6-ft sidewalk behind the new planter strip. No right-of-way dedication will be required to install the required frontage improvements. 2. The applicant has requested a street modification in order to match the modified the ROW width and street cross section to match the existing roadway section and street frontage improvements noted above. a. City staff is recommending approval of the applicant’s street modification request. Please see the Street Modification Criteria and Analysis for a complete summary of the request, staff analysis, and staff recommendation. 3. ADA access ramps shall be installed at all street crossings. Ramps shall be shown at each intersection. Ramps shall be oriented to provide direct pedestrian crossings. 4. Parking lot construction shall be in accordance with City code 4-4-80G. DocuSign Envelope ID: B8605310-FF6F-47AA-8455-409D73EA164E ADVISORY NOTES TO APPLICANT Page 9 of 9 LUA18-000305 5. Street lighting and street trees are required to meet current city standards. Lighting plans are required to be submitted with the land use application and will be reviewed during the construction utility permit review. 6. A traffic analysis dated April 30, 2018, was provided by Transportation Engineering Northwest (TENW). The site generated traffic volumes were calculated using data from the Institute of Transportation Engineers (ITE) Trip Generation Manual, 10th Edition, (2017). Based on the calculations provided, the proposed development would average 974 new daily vehicle trips. Weekday peak hour AM trips would generate 66 new vehicle trips, with 18 vehicles leaving and 48 vehicles entering the site. Weekday peak hour PM trips would generate 85 new vehicle trips, with 34 vehicles entering and 51 vehicles exiting the site. As detailed in the report the proposed project is not expected to lower the levels of service of the surrounding intersections included in the traffic study. Increased traffic created by the development will be mitigated by payment of transportation impact fees. 7. Refer to City code 4-4-080 regarding driveway regulations. Driveways shall be designed in accordance with City standard plans 104.1 and 104.2. a. The maximum width of any driveway shall not exceed 30-feet. b. Driveways shall be located a minimum of 5-feet from property lines. c. Maximum driveway slope is 8%. d. Site accesses must be a minimum of 125-ft from the intersection. e. The maximum number of driveway cuts is two (2) driveways per 330-ft of street frontage. 8. Paving and trench restoration shall comply with the City’s Trench Restoration and Overlay Requirements. 9. Payment of the transportation impact fee is applicable on the construction of the development at the time of application for the building permit. The transportation impact fee that is current at the time of building permit application will be levied. 10. Concurrency under separate cover, if applicable. GENERAL COMMENTS 1. All existing and proposed utility lines (i.e. electrical, phone, and cable services, etc.) along property frontage or within the site must be underground. The construction of these franchise utilities must be inspected and approved by a City of Renton inspector. 2. Maximum exposed retaining wall height is 6-ft and shall be setback a minimum of 3-ft from the right-of-way as outlined in RMC 4-4-040 – Fences, Hedges and Retaining Walls. 3. Adequate separation between utilities as well as other features shall be provided in accordance with code requirements. a. 7-ft minimum horizontal and 1-ft vertical separation between storm and other utilities is required with the exception of water lines which require 10-ft horizontal and 1.5-ft vertical. b. The stormwater line should be minimum 5 feet away from any other structure or wall or building. c. Trench of any utility should not be in the zone of influence of the retaining wall or of the building. 4. All civil construction permits for utility and street improvements will require separate plan submittals. All utility plans shall confirm to the Renton Drafting Standards. A licensed Civil Engineer shall prepare the civil plans. Please visit the Development Engineering Forms page for the most up-to-date plan submittal requirements: http://rentonwa.gov/business/default.aspx?id=42473 5. A landscaping plan shall be included with the civil plan submittal. Each plan shall be on separate sheets. 6. Fees quoted in this document reflect the fees applicable in the year 2017 only and will be assessed based on the fee that is current at the time of the permit application or issuance, as applicable to the permit type. Please visit www.rentonwa.gov for the current development fee schedule. 7. * An additional 3% technology fee will be added to each fee marked with an asterisk (*). 8. A demo permit is required for the demolition of the existing building. The demo permit shall be acquired through the building department. DocuSign Envelope ID: B8605310-FF6F-47AA-8455-409D73EA164E DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200, ext. 2 www.rentonwa.gov OF ENVIRONMENTAL DETERMINATION ISSUANCE OF A DETERMINATION OF NON-SIGNIFICANCE - MITIGATED (DNS-M) POSTED TO NOTIFY INTERESTED PERSONS OF AN ENVIRONMENTAL ACTION DNSM: THE CITY OF RENTON ENVIRONMENTAL REVIEW COMMITTEE (ERC) HAS DETERMINED THAT THE PROPOSED ACTION HAS PROBABLE SIGNIFICANT IMPACTS THAT CAN BE MITIGATED THROUGH MITIGATION MEASURES. DATE OF NOTICE OF ENVIRONMENTAL DETERMINATION: August 3, 2018 PROJECT NAME/NUMBER: Walker Auto Dealership /LUA18-000305 PROJECT LOCATION: 3400 East Valley Rd LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://bit.ly/2Ka4q2N PROJECT DESCRIPTION: The applicant is requesting Site Plan and Environmental (SEPA) Review to construct a 64,935 square foot auto dealership on a site previously occupied by auto junk yard. The subject property is located at 3400 East Valley Road (APN 3023059067) near the intersection of East Valley Road and SW 34th St. The project site totals 5.65 acres in area and is zoned Commercial Arterial (CA). The site is located in the Automall Area C Overlay District. Two existing buildings are presently located on the site and are proposed for demolition as part of the project. The previous use located on the property resulted in a significant amount of contaminated due to the decomposition of the junk vehicles. The applicant would be required to obtain a Voluntary Clean-up Approval from the Department of Ecology (DOE) as part of the Model Toxics Control Act. The restoration plan submitted DOE would also be evaluated under the SEPA process. The proposed new structure would include a showroom/sales area, parts sale and storage area, service and shop, and various other support areas. Access to the site is proposed via three new driveways off of East Valley Road. The site is mapped with a high seismic hazard. According to the applicant, a Category III wetlands is located within the SR 167 ROW directly east of the site. Appeals of the environmental determination must be filed in writing on or before 5:00 p.m. on August 17, 2018, together with the required fee with: Hearing Examiner, City of Renton, 1055 South Grady Way, Renton, WA 98057. Appeals to the Examiner are governed by City of RMC 4-8-110 and information regarding the appeal process may be obtained from the Renton City Clerk’s Office, (425) 430-6510. PUBLIC HEARING: If the Environmental Determination is appealed, a public hearing will be set and all parties notified. NOTICE SW 34th St East Valley Rd Lind Ave SW Route 167 DEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT ENV ENVIRONMENTAL CHECKLIST Planning Division 1055 South Grady Way-Renton, WA 98057 Phone: 425-430-7200 | www.rentonwa.gov PURPOSE OF CHECKLIST: Governmental agencies use this checklist to help determine whether the environmental impacts of your proposal are significant. This information is also helpful to determine if available avoidance, minimization or compensatory mitigation measures will address the probable significant impacts or if an environmental impact statement will be prepared to further analyze the proposal. INSTRUCTIONS FOR APPLICANTS: This environmental checklist asks you to describe some basic information about your proposal. Please answer each question accurately and carefully, to the best of your knowledge. You may need to consult with an agency specialist or private consultant for some questions. You may use “not applicable” or "does not apply" only when you can explain why it does not apply and not when the answer is unknown. You may also attach or incorporate by reference additional studies reports. Complete and accurate answers to these questions often avoid delays with the SEPA process as well as later in the decision -making process. The checklist questions apply to all parts of your proposal, even if you plan to do them over a period of time or on different parcels of land. Attach any additional information that will help describe your proposal or its environmental effects. The agency to which you submit this checklist may ask you to explain your answers or provide additional information reasonably related to determining if there may be significant adverse impact. INSTRUCTIONS FOR LEAD AGENCIES: Additional information may be necessary to evaluate the existing environment, all interrelated aspects of the proposal and an analysis of adverse impacts. The checklist is considered the first but not necessarily the only source of information needed to make an adequate threshold RECEIVED 05/02/2018 amorganroth PLANNING DIVISION determination. Once a threshold determination is made, the lead agency is responsible for the completeness and accuracy of the checklist and other supporting documents. USE OF CHECKLIST FOR NONPROJECT PROPOSALS: For nonproject proposals (such as ordinances, regulations, plans and programs), complete the applicable parts of sections A and B plus the (part D). Please completely answer all questions that apply and note that the words "project," "applicant," and "property or site" should be read as "proposal," "proponent," and "affected geographic a," respectively. The lead agency may exclude (for non-projects) questions in Part B - Environmental Elements –that do not contribute meaningfully to the analysis of the proposal. SEPA Checklist - Walker Auto Dealership April, 2018 City of Renton, WA BACKGROUND 1. Name of proposed project, if applicable: Walker Auto Dealership 2. Name of applicant: AHBL Engineers for Dale Walker, D&C Investments, LLC 3. Address and phone number of applicant and contact person: Applicant: AHBL Engineers D&C Investments, LLC 2215 N. 30th Street #300 PO Box 1657 Tacoma, WA 98403 Tacoma, WA 98401 253-383-2422 206-391-0311 Contact Persons: HHJ Architects, PLLC 601 Saint Helens Tacoma, WA 98402 Chee Tung 253.380.3800 chee@hhandj.com Roger Hansen: 253.606.9525 roger@hhandj.com 4. Date checklist prepared: 4/20/18 5. Agency requesting checklist: City of Renton - Community Planning and Development 6. Proposed timing or schedule (including phasing, if applicable): Phase 1. Site clean-up Spring 2018 – Fall 2018 Phase 2. Site grading and utilities Fall 2018 Phase 3. BuildingConstruction Spring 2019 – Fall 2019 7. Do you have any plans for future additions, expansion, or further activity related to or connected with this proposal? If yes, explain. The project includes restoration of wetlands inadvertently cleared within the WSDOT right- of-way along edge of the property. 8. List any environmental information you know about that has been prepared, or will be prepared, directly related to this proposal. SEPA Checklist - Walker Auto Dealership April, 2018 City of Renton, WA  Critical Areas Report and Restoration Plan  Geotechnical Report  Traffic Study  A brief summary letter describing recent limited preliminary investigations of the shallow on-site soils and groundwater including laboratory analyses results, boring logs and sample locations maps.  The presence of selected contaminates of concern, at levels exceeding applicable MTCA clean up levels, in the on-site shallow soils and groundwater have been properly reported to Ecology (ERTS 674280). 9. Do you know whether applications are pending for governmental approvals of other proposals directly affecting the property covered by your proposal? If yes, explain. WSDOT approval of restoration plan in wetlands See attached agreement between owner and WSDOT 10. List any government approvals or permits that will be needed for your proposal, if known.  City of Renton Grading Permit  City of Renton Building Permit  City of Renton Critical Areas Review  WA Dept of Ecology Voluntary Clean-up Approval  WSDOT Restoration Plan approval 11. Give brief, complete description of your proposal, including the proposed uses and the size of the project and site. There are several questions later in this checklist that ask you to describe certain aspects of your proposal. You do not need to repeat those answers on this page. The project site is 5.65 acres. The proposed project covers the entire site. An additional 0.37 acres of WSDOT right-of-way will also be restored. The proposed project includes the excavation, removal, loading, transport, and off -site disposal of approximately 7,500+ cubic yards of petroleum/metals/VOC's contaminated soils. Soils will be transported to a properly licensed off-site disposal facility. Excavated areas will be backfilled with recycled concrete except in the wetland buffer where clean soil will be used. Groundwater monitoring wells will be installed at selected locations on the property. Once the clean-up is complete, the site will be developed as an auto dealership with a 47,535 sq ft showroom and approximately 3 acres of parking. A 75-foot wide wetland buffer (0.84 acres) at the east edge of the property will be restored through planting of native trees, shrubs and ferns. The adjacent wetland in the WSDOT right-of-way will also be restored under an agreement with WSDOT (0.45 acres). 12. Location of the proposal. Give sufficient information for a person to understand the precise location of your proposed project, including a street address, if any, and section, township, and range, if known. If a proposal would occur over a range of area, provide SEPA Checklist - Walker Auto Dealership April, 2018 City of Renton, WA the range or boundaries of the site(s). Provide a legal description, site plan, vicinity map, and topographic map, if reasonably available. While you should submit any plans required by the agency, you are not required to duplicate maps or detailed plans submitted with any permit applications related to this checklist. The project is located at 3400 East Valley Road, Renton, WA. It is in the south 1/2 of Section 30, Township 23 North, Range 5 East. The approximate coordinates at the center of the site are 47.449531 Latitude, -122.217082 Longitude. Figure 1 is a site vicinity map and Figure 2 is the site survey. B. ENVIRONMENTAL ELEMENTS 1. EARTH a. General description of the site (check or circle one): Flat, rolling, hilly, steep slopes, mountainous, other ___________ b. What is the steepest slope on the site (approximate percent slope)? 2-3% c. What general types of soils are found on the site (for example, clay, sand, gravel, peat, muck)? If you know the classification of agricultural soils, specify them and note any agricultural land of long-term commercial significance and whether the proposal results in removing any of these soils. Soils are mapped as Urban Land over the entire parcel with Tukwila muck mapped to the west and Seattle muck mapped to the east. The entire property is covered with several feet of fill material consisting primarily of gravelly sand. d. Are there surface indications or history of unstable soils in the immediate vicinity? If so, describe. No e. Describe the purpose, type, total area, and approximate quantities and total affected area of any filling, excavation, and grading proposed. Indicate source of fill. The site clean-up will cover approximately 5.00 acres to varying depths depending on the extent of contamination. It is anticipated that approximately 10,000 cubic yards of contaminated soil material will be removed. Proposed Grading and Filling will consist of import of approximately 10,000 cubic yards of clean structural fill. Fill material will be obtained from an approved source. Final development of the site will result in additional 600 cubic yards of excavation and 14,200 cubic yards of fill for a net 13,600 cubic yards of fill. Fill will be imported from a clean site with similar soils. SEPA Checklist - Walker Auto Dealership April, 2018 City of Renton, WA f. Could erosion occur as a result of clearing, construction, or use? If so, generally describe. The site is relatively flat and most excavations will be shallow. Erosion is not expected to be a problem. g. About what percent of the site will be covered with impervious surfaces after project construction (for example, asphalt or buildings)? Approximately 70 percent of the site will be impervious surface. h. Proposed measures to reduce or control erosion, or other impacts to the earth, if any: Silt fence will be installed at the east edge of the property to preclude runoff to the wetland on WSDOT property. Other BMPs will be installed as needed to prevent runoff from other areas of the project. Stockpiles will be covered as required under the Construction Stormwater General Permit for western Washington. 2. AIR a. What types of emissions to the air would result from the proposal during construction , operation, and maintenance when the project is completed? If any, generally describe and give approximate quantities if known. Exhaust from diesel fuel engine powered excavation and grading equipment. b. Are there any off-site sources of emissions or odor that may affect your proposal? If so, generally describe. No c. Proposed measures to reduce or control emissions or other impacts to air, if any: None 3. WATER a. Surface Water: 1) Is there any surface water body on or in the immediate vicinity of the site (including year-round and seasonal streams, saltwater, lakes, ponds, wetlands)? If yes, describe type and provide names. If appropriate, state what stream or river i t flows into. There is a wetland immediately adjacent to the property along the east edge. This wetland flows into Panther Creek, which in turn flows into Springbrook Creek. Springbrook Creek joins the Black River which flows into the Duwamish River and then Elliott Bay. SEPA Checklist - Walker Auto Dealership April, 2018 City of Renton, WA 2) Will the project require any work over, in, or adjacent to (within 200 feet) the described waters? If yes, please describe and attach available plans. Yes, some excavation will occur in the wetland buffer to remove contaminated soils. The excavations will be backfilled with clean soil, topped with compost and planted to native plants. Please refer to the Critical Areas Report and Restoration Plan. 3) Estimate the amount of fill and dredge material that would be placed in or removed from surface water or wetlands and indicate the area of the site that would be affected. Indicate the source of fill material. Some soil sampling will occur in the wetland to characterize contamination levels, primarily for safety of planting crews. No excavation or filling is anticipated in the wetland. 4) Will the proposal require surface water withdrawals or diversions? Give general description, purpose, and approximate quantities if known. If surface is ponded on the site, it may be diverted around open excavation areas. 5) Does the proposal lie within a 100-year floodplain? If so, note location on the site plan. The recently revised FEMA flood maps have the site outside the 100-year floodplain. 6) Does the proposal involve any discharges of waste materials to surface waters? If so, describe the type of waste and anticipated volume of discharge. There will be no discharge of waste materials to surface waters. Any dewatering will be collected in baker tanks and discharged after settling and testing to the City sanitary sewer. b. Ground Water: 1) Will groundwater be withdrawn from a well for drinking water or other purposes? If so, give a general description of the well, proposed uses and approximate quantities withdrawn from the well. Will water be discharged to groundwater? Give general description, purpose, and approximate quantities if known. No 2) Describe waste material that will be discharged into the ground from septic tanks or other sources, if any (for example: Domestic sewage; industrial, containing the following chemicals. . . ; agricultural; etc.). Describe the general size of the system, the number of such systems, the number of houses to be served (if applicable), or the number of animals or humans the system(s) are expected to serve. The site will connect to City storm and sanitary sewers. c. Water runoff (including stormwater): SEPA Checklist - Walker Auto Dealership April, 2018 City of Renton, WA 1) Describe the source of runoff (including storm water) and method of collection and disposal, if any (include quantities, if known). Where will this water flow? Will this water flow into other waters? If so, describ e. During the clean-up portion of this project, storm water will be discharged via the currently operational on-site storm water discharge system. The completed project will incorporate stormwater collection and treatment as required by the City of Renton. Discharge will be to the City stormwater system for most of the site. The eastern end of the site will discharge to the wetland buffer after treatment in a bioretention pond. The outfall will match the existing condition site drainage pattern. The storm system will be designed to City of Renton requirements. 2) Could waste materials enter ground or surface waters? If so, generally describe. Contaminates of concern on this site has impacted the surface waters and /or groundwater on selected portions of this site for an extended period time. The purpose of this project is to remove the contaminates of concern and substantially reduce the adverse impacts on the surface and groundwaters. 3) Does the proposal alter or otherwise affect drainage patterns in the vicinity of the site? If so, describe. No d. Proposed measures to reduce or control surface, ground, and runoff water, and drainage pattern impacts, if any: Silt fences and/or straw waddles will be placed around the perimeter of the site. Dewatering of excavations during the clean-up will be pumped into Baker tanks, allowed to settle, and tested prior to discharge to the City stormw ater system. 4. PLANTS a. Check the types of vegetation found on the site: ____deciduous tree: alder, maple, aspen, other ____evergreen tree: fir, cedar, pine, other __X_shrubs __X_grass ____pasture ____crop or grain ____orchards, vineyards or other permanent crops. ____wet soil plants: cattail, buttercup, bullrush, skunk cabbage, other ____water plants: water lily, eelgrass, milfoil, other ____other types of vegetation SEPA Checklist - Walker Auto Dealership April, 2018 City of Renton, WA The majority of the site is virtually devoid of vegetation. There are some grassy areas on the east side near East Valley Highway and a few blackberries along the edges of the property. b. What kind and amount of vegetation will be removed or altered? As part of the site development any existing weedy vegetation will be removed prior to landscaping and restoration of the buffer. c. List threatened and endangered species known to be on or near the site. None identified. d. Proposed landscaping, use of native plants, or other measures to preserve or enhance vegetation on the site, if any: The east 75 feet of the property will be planted to native plants as part of a buffer restoration plan. Native plantings will also occur on the adjacent WSDOT right-of-way. Landscaping will occur as part of the site development. e. List all noxious weeds and invasive species known to be on or near the s ite. There are small amounts of Himalayan blackberry, reed canary grass and other weedy species on-site. 5. ANIMALS a. List any birds and other animals which have been observed on or near the site or are known to be on or near the site. Wildlife use of the site would be minimal given the level of site disturbance. Small mammals such as coyotes, raccoons, opossums, squirrels, etc. would have used the WSDOT right-of- way as a travel corridor. Songbirds would have also used the WSDOT right-of-way prior to clearing. Hawks and eagles are in the vicinity. Examples include: Birds: hawk, heron, eagle, songbirds , other: Mammals: deer, bear, elk, beaver, other: racoon, coyote Fish: bass, salmon, trout, herring, shellfish, other b. List any threatened and endangered species known to be on or near the site. None c. Is the site part of a migration route? If so, explain. SEPA Checklist - Walker Auto Dealership April, 2018 City of Renton, WA The site is part of the Pacific Flyway for migratory birds. d. Proposed measures to preserve or enhance wildlife, if any: The project will plant a total of 0.85 acres of buffer to native trees, shrubs and understory plants. Since this area was previously unvegetated, the buffer plantings will greatly improve habitat conditions. The cleared wetland on WSDOT property will be restored per an agreement with WSDOT. e. List any invasive animal species known to be on or near the site. Bullfrogs may be present in the wetland 6. ENERGY AND NATURAL RESOURCES a. What kinds of energy (electric, natural gas, oil, wood stove, solar) will be used to meet the completed project's energy needs? Describe whether it will be used for heating, manufacturing, etc. The project will use electricity as a primary energy source which will provide heating, cooling and illumination. b. Would your project affect the potential use of solar energy by adjacent properties? If so, generally describe. No c. What kinds of energy conservation features are included in the plans of this proposal? List other proposed measures to reduce or control energy impacts, if any: The project will meet the 2015 Washington State Energy Code (WSEC). Other conservation features such as LED lighting and low-flow plumbing fixtures will be determined at time of building design. 7. ENVIRONMENTAL HEALTH a. Are there any environmental health hazards, including exposure to toxic chemicals, risk of fire and explosion, spill, or hazardous waste that could occur as a result of this proposal? If so, describe. The site has known contamination. During the clean-up phase, entrance to the site will be limited to excavation project personnel and project managers. All on-site personnel will be 40-hour Haz Mat certified workers. The workers will likely be exposed to the contaminates of concern on the site and will be provided with appropriate safety equipment and apparel. The dealership will provide vehicle maintenance which may include the use of fuels, solvents, oils, greases and other potentially hazardous or flammable materials. 1) Describe any known or possible contamination at the site from present or past uses. SEPA Checklist - Walker Auto Dealership April, 2018 City of Renton, WA The presence of gasoline range TPH (total petroleum hydrocarbons), lube oil range TPH , MTCA 5 metals, and / or volatile organic compounds, at levels exceeding applicable MTCA Method A Clean Up Levels have been confirmed in the shallow soils and groundwater on this site. An asbestos survey will be completed on the existing 4,000 sq ft metal building prior to demolition. Any asbestos found during the survey will be abated prior to removal. 2) Describe existing hazardous chemicals/conditions that might affect project development and design. This includes underground hazardous liquid and gas transmission pipelines located within the project area and in the vicinity. None identified 3) Describe any toxic or hazardous chemicals that might be stored, used, or produced during the project's development or construction, or at any time during the operating life of the project. The dealership will provide vehicle maintenance which may include the use of fuels, solvents, oils, greases and other potentially hazardous or flammable materials. 4) Describe special emergency services that might be required. None required 5) Proposed measures to reduce or control environmental health hazards, if a ny: During the clean-up phase, silt fences and waddles will be placed to prevent the off-site migration of contaminates via stormwater or erosion. Any potentially contaminated dewatering liquid will be stored in Baker tanks and discharged after settling to the sanitary sewer. All chemicals and fuels will be stored in proper containment and employees will be trained in the handling of these materials. b. Noise 1) What types of noise exist in the area which may affect your project (for example: traffic, equipment, operation, other)? None 2) What types and levels of noise would be created by or associated with the project on a short-term or a long-term basis (for example: traffic, construction, operation, other)? Indicate what hours noise would come from the site. During clean-up and construction there will be noise from excavation equipment and transport trucks. During operation of the dealership, there will be minor traffic noise. 3) Proposed measures to reduce or control noise impacts, if any: Construction work will be performed from 7am - 5pm SEPA Checklist - Walker Auto Dealership April, 2018 City of Renton, WA 8. LAND AND SHORELINE USE a. What is the current use of the site and adjacent properties? Will the proposal affect current land uses on nearby or adjacent properties? If so, describe. No b. Has the project site been used as working farmlands or working forest lands? If so, describe. How much agricultural or forest land of long-term commercial significance will be converted to other uses as a result of the proposal, if any? If resource lands have not been designated, how many acres in farmland or forest land tax status will be converted to nonfarm or non-forest use? The property was used as farmland until sometime between 1940 and 1960 when it became a junkyard. There will be no conversion of use. 1) Will the proposal affect or be affected by surrounding working farm or forest land normal business operations, such as oversize equipment access, the application of pesticides, tilling, and harvesting? If so, how: No c. Describe any structures on the site. There is currently one buildings on site: a 4,000 sq ft metal warehouse building on a concrete slab d. Will any structures be demolished? If so, what? The building will be demolished and removed from the site. e. What is the current zoning classification of the site? CA – Commercial Arterial f. What is the current comprehensive plan designation of the site? EA – Employment Area g. If applicable, what is the current shoreline master program designation of the site? Not Applicable h. Has any part of the site been classified as a critical area by the city or county? If so, specify. The WSDOT right-of-way is mapped as a wetland on King County iMap, City of Renton Critical Areas maps, and the National Wetland Inventory. Much of the site was previously SEPA Checklist - Walker Auto Dealership April, 2018 City of Renton, WA mapped as with-in the 100yr floodplain, but the newest revision by FEMA lists the site as in the 500-year floodplain. i. Approximately how many people would reside or work in the completed project? It is anticipated approximately 50 to 100 people will work at the site. j. Approximately how many people would the completed project displace? None, the site has sat vacant for several years. k. Proposed measures to avoid or reduce displacement impacts, if any: N/A l. Proposed measures to ensure the proposal is compatible with existing and projected land uses and plans, if any: The project is compatible with existing and projected land uses. m. Proposed measures to reduce or control impacts to agricultural and forest lands of long-term commercial significance, if any: N/A 9. HOUSING a. Approximately how many units would be provided, if any? Indicate whether high, middle, or low-income housing. The proposal does not include housing. b. Approximately how many units, if any, would be eliminated? Indicate whether high, middle, or low-income housing. No housing will be eliminated c. Proposed measures to reduce or control housing impacts, if any: N/A 10. AESTHETICS a. What is the tallest height of any proposed structure(s), not including antennas; what is the principal exterior building material(s) proposed? The building is in preliminary design but it will not exceed the maximum height allowed in the current zoning. b. What views in the immediate vicinity would be altered or obstructed? SEPA Checklist - Walker Auto Dealership April, 2018 City of Renton, WA The building should not alter or obstruct any views c. Proposed measures to reduce or control aesthetic impacts, if any: N/A 11. LIGHT AND GLARE a. What type of light or glare will the proposal produce? What time of day would it mainly occur? The project will produce perimeter and interior lighting, typical of an automobile dealership and consistent with the other uses in the area. b. Could light or glare from the finished project be a safety hazard or interfere with views? The project is in a commercial development area and lights are not expected to interfere with views. Lights may be visible from State Route 167. c. What existing off-site sources of light or glare may affect your proposal? N/A d. Proposed measures to reduce or control light and glare impacts, if any: Outdoor lighting will be designed so that it does not cause a safety hazard for traffic on SR 167. 12. RECREATION a. What designated and informal recreational opportunities are in the immedi ate vicinity? There are currently no recreation opportunities in the immediate vicinity. East Valley Road does not currently have a bike lane. b. Would the proposed project displace any existing recreational uses? If so, describe. No c. Proposed measures to reduce or control impacts on recreation, including recreation opportunities to be provided by the project or applicant, if any: No special measures are proposed. 13. HISTORIC AND CULTURAL PRESERVATION SEPA Checklist - Walker Auto Dealership April, 2018 City of Renton, WA a. Are there any buildings, structures, or sites, located on or near the site that are over 45 years old listed in or eligible for listing in national, state, o r local preservation registers ? If so, specifically describe. An old metal building on the adjacent property to the south is identified on the Washington Information System for Architectural & Archeological Records Data (WISSARD) map site as having been surveyed but with no determination made. No eligible properties are shown in the vicinity. b. Are there any landmarks, features, or other evidence of Indian or historic use or occupation? This may include human burials or old cemeteries. Are there any material evidence, artifacts, or areas of cultural importance on or near the site? Please list any professional studies conducted at the site to identify such resources. The project site is identified on WISSARD as being located in an area with Very High Risk for archeological resources. A survey is highly advised. Historic maps show a stream flowing through the middle of the property from east to west. c. Describe the methods used to assess the potential impacts to cultural and historic resources on or near the project site. Examples include consultation with tribes and the department of archeology and historic preservation, archaeological surveys, historic maps, GIS data, etc. WISSARD website d. Proposed measures to avoid, minimize, or compensate for loss, changes to, and disturbance to resources. Please include plans for the above and any permits that may be required. Because there is fill material over nearly all of the site, and most of the contamination is contained within the fill layer, it is unlikely that the project will disturb any artifacts or remains. The Department of Archeology and Historic Preservation will be notified immediately if any human remains or artifacts are discovered during clean-up or site grading. 14. TRANSPORTATION a. Identify public streets and highways serving the site or affected geographic area and describe proposed access to the existing street system. Show on site plans, if any. The property fronts on East Valley Road. The project is proposing three driveways off of East Valley Road for access to the dealership. b. Is the site or affected geographic area currently served by public transit ? If so, generally describe. If not, what is the approximate distance to the nearest transit stop? The King County Metro F-Line comes within 1 mile of the site, serving Burien, SeaTac, Tukwila and Renton. Route 153 connects downtown Renton to Kent and has stops on Lind Ave SW, ½ mile from the project site. SEPA Checklist - Walker Auto Dealership April, 2018 City of Renton, WA c. How many additional parking spaces would the completed project or non - project proposal have? How many would the project or proposal eliminate? The project will have a total of 338 parking spaces, including 56 rooftop spaces. Many of these spaces will be used for displaying new and used cars. The existing site has approximately 30 parking spaces. d. Will the proposal require any new or improvements to existing roads, streets, pedestrian, bicycle or state transportation facilities, not including driveways? If so, generally describe (indicate whether public or private). Not to our knowledge. e. Will the project or proposal use (or occur in the immediate vicinity of) water, rail, or air transportation? If so, generally describe. No – The project is located approximately 375 feet east of a rail spur line, 2.8 miles from the Boeing airstrip in Renton, and 4 miles from SeaTac Airport. f. How many vehicular trips per day would be generated by the completed project or proposal? If known, indicate when peak volumes would occur and what percentage of the volume would be trucks (such as commercial and non-passenger vehicles). What data or transportation models were used to make these estimates? According to a Traffic Analysis Study prepared by Heath and Associates , the completed project is anticipated to generate approximately 974 vehicular trips per day. Approximately 66 trips would be associated with the AM peak hour and 85 trips with the PM peak hour. The highest volumes are likely to occur on the weekend. g. Will the proposal interfere with, affect or be affected by the movement of agricultural and forest products on roads or streets in the area? If so, generally describe. No h. Proposed measures to reduce or control transportation impacts, if any: Traffic impacts will be mitigated by payment of Traffic Impact Fees to the City of Ren ton. 15. PUBLIC SERVICES a. Would the project result in an increased need for public services (for example: fire protection, police protection, public transit, health care, schools, other)? If so, generally describe. No b. Proposed measures to reduce or control direct impacts on public services, if any. None needed SEPA Checklist - Walker Auto Dealership April, 2018 City of Renton, WA 16. UTILITIES a. Circle utilities currently available at the site: Electricity, natural gas, water, refuse service, telephone, sanitary sewer septic system other b. Describe the utilities that are proposed for the project, the utility providing the service, and the general construction activities on the site or in the immediate vicinity which might be needed. The project will use electrical, water, sewer, refuse, and telephone service. Sewer and Water is provided by the City of Renton. Gas and Power are provided by PSE. Construction will include excavation and trenching associated with undergrounding utilities along the project frontage and extending service to the building. C. SIGNATURE The above answers are true and complete to the best of my knowledge. I understand that the lead agency is relying on them to make its decision. Proponent Signature: Name of Signee (printed): Position and Agency/Organization: Date Submitted: PROJECT VICINITY MAP Dale Walker Auto Dealership Renton, WA FIGURE 1 PROJECT # 41482 DATE APRIL 2018 PROJECT SITE SITE SURVEY Dale Walker Auto Dealership Renton, WA FIGURE 2 PROJECT # 41482 DATE APRIL 2018 CONCEPTUAL SITE PLAN Dale Walker Auto Dealership Renton, WA FIGURE 3 PROJECT # 41482 DATE APRIL 2018 Restored 75’ Buffer Restored Wetland Dale Walker Auto Dealership Renton, WA FIGURE 4 PROJECT # 41482 DATE APRIL 2018