HomeMy WebLinkAboutRES 4351CITY OF RENTON, WASHINGTON
RESOLUTION NO. 4351
A RESOLUTION OF THE CITY OF RENTON, WASHINGTON, UPDATING AND
EXTENDING RENTON'S SIX -YEAR TRANSPORTATION IMPROVEMENT PROGRAM
FOR 2019 — 2024.
WHEREAS, the City of Renton has adopted a Six -Year Transportation Improvement
Program ("TIP") pursuant to RCW 35.77.010 (Perpetual advanced six -year plans for coordinated
transportation program expenditures), and the TIP has been updated, amended and modified
from time to time as authorized and required by law; and
WHEREAS, the City Council held a duly noticed public hearing on August 20, 2018, for the
purpose of considering updates to the TIP; and
WHEREAS, the City Council has reviewed the work accomplished under the TIP,
considered any public testimony given at the public hearing held on August 20, 2018, considered
proposed updates to the TIP, and determined current City transportation needs;
NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF RENTON, WASHINGTON, DO
RESOLVE AS FOLLOWS:
SECTION I. The City of Renton's 2019-2024 Six -Year Transportation Improvement
Program, attached as Exhibit A and fully incorporated herein by this reference, is adopted as the
City's updated and extended TIP.
SECTION II. The updated and extended TIP, as attached, shall be and constitute
Renton's 2019-2024 Six -Year Transportation Improvement Program for purposes of compliance
with RCW 35.77.010, and shall remain in full force and effect until further revised, amended, and
modified as provided by law.
1
RESOLUTION NO. 4351
SECTION III. The Administrator of the Public Works Department and the City Clerk are
authorized and directed to file this resolution, together with Exhibit A, with the Washington State
Secretary of Transportation within 30 days of its adoption.
PASSED BY THE CITY COUNCIL this 10th day of September, 2018.
Jasona. Seth,
APPROVED BY THE MAYOR this 10th day of September, 2018.
Approved as to form:
Shane Moloney, City ttorney
RES.1774:7/26/18:scr
2
Denis Law, Mayor
Clerk
RESOLUTION NO. 4351
EXHIBIT A
2019 - 2024
TRANSPORTATION IMPROVEMENT PROGRAM
ADOPTED
September 2018
171
�r.
IJ
® Bronson Wa t
a Main Ave S
lA�
ACKNOWLEDGEMENTS
MAVnR
Denis Law
CITY COUNCIL
Ed Prince, Council President
Don Persson, Council President Pro-tem
Randy Corman
Ryan Mclrvin
Armondo Pavone
Ruth Perez
Don Persson
Carol Ann Witschi
CHIEF ADMINISTRATIVE OFFICER
Robert Harrison
PUBLIC WORKS
Gregg Zimmerman, Public Works Administrator
Jim Seitz, Transportation Systems Director
Vangie Garcia, Transportation Planning & Programming Manager
Bob Hanson, Transportation Design Manager
Chris Barnes, Transportation Operations Manager
Eric Cutshall, Transportation Maintenance Manager
Heather Gregersen, Program Development Coordinator
CITY OF i
Renton 0.%
Public Works
2019 — 2024 TRANSPORTATION IMPROVEMENT PROGRAM
2019 - 2024 TRANSPORTATION IMPROVEMENT PROGRAM
TABLE OF CONTENTS
SECTION A — INTRODUCTION
Purpose of the Transportation Improvement Program
4
Renton Business Plan
5
SECTION B — MAP AND LOCATION
Transportation Improvement Program Map
8
Map Index
9
SECTION C — DEVELOPMENT AND PRIORITIZATION
TIP Development Activities
11
General Programming Criteria
13
Summary of Projects and Prioritization
15
SECTION D — EXPENDITURES AND REVENUES
Funding Sources - Itemized
19
SECTION E — PROJECT DESCRIPTIONS
Detailed Project Descriptions
26
SECTION F —APPENDIX
Abbreviations and Acronyms
Resolution to Adopt Six -Year 2019-2024 TIP
2
N<otikl
SECTION A
INTRODUCTION
2019 - 2024 TRANSPORTATION IMPROVEMENT PROGRAM
City of Renton 1 2019 - 2024 TRANSPORTATION IMPROVEMENT PROGRAM ` +
PURPOSE OF THE TRANSPORTATION IMPROVEMENT PROGRAM
The purpose of this document is to update the City of Renton's future plans for transportation improvement
programs and projects. This document is Renton's comprehensive transportation program for the ensuing
six calendar years and is mandated by the Revised Code of Washington and Washington Administrative Code.
The Transportation Improvement Program (TIP) is a multi -year planning tool for the development of
transportation facilities within the City that:
• support the Mission and Vision of the City of Renton
• help achieve the goals of the Renton Business Plan
• reflect the involvement of City Citizens and Elected Officials.
The Transportation Improvement Program is a vital part of planning under the Growth Management Act and
city projects must be included in the TIP to be eligible for state and federal grant programs. The
Transportation Systems Division uses the TIP to coordinate projects and programs with other jurisdictions
and agencies.
rd
Provide a safe,
healthy, vibrant
community
Promote safety, health,
and security through
effective communication
and service delivery
Facilitate successful
neighborhoods through
community involvement
■ Encourage and partner
in the development of
quality housing choices
for people of all ages and
income levels
Promote a walkable,
pedestrian and bicycle -
friendly city with complete
streets, trails, and
connections between
neighborhoods and
community focal points
Provide opportunities
for communities to be
better prepared for
emergencies
Promote economic
vitality and strategically
position Renton for
the future
Promote Renton as the
progressive, opportunity -
rich city in the Puget
Sound region
Capitalize on
opportunities through
bold and creative
economic development
strategies
Recruit and retain
businesses to ensure
a dynamic, diversified
employment base
■ Nurture
entrepreneurship
and foster successful
partnerships with
businesses and
community leaders
Leverage public/
private resources to
focus development
on economic centers
Support planned
growth and influence
decisions that impact
the city
Foster development
of vibrant, sustainable,
attractive, mixed -use
neighborhoods in urban
centers
Uphold a high standard
of design and property
maintenance
Advocate Renton's
interests through state and
federal lobbying efforts,
regional partnerships and
other organizations
Pursue transportation
and other regional
improvements and services
that improve quality of life
■ Balance development
with environmental
protection
Building an inclusive
informed city with
opportunities for all
Improve access to city
services, programs and
employment, and make
residents and businesses
aware of opportunities
to be involved with their
community
Build connections with
ALL communities that
reflect the breadth and
richness of the diversity
in our city
Promote understanding
and appreciation of
our diversity through
celebrations and festivals
Provide critical and
relevant information on a
timely basis and facilitate
two-way dialogue between
city government and the
community
Meet service demands
and provide high
quality customer
service
Plan, develop, and
maintain quality services,
infrastructure, and
amenities
Prioritize services at
levels that can be sustained
by revenue
Retain a skilled
workforce by making
Renton the municipal
employer of choice
Develop and maintain
collaborative partnerships
and investment strategies
that improve services
Respond to growing
service demands through
partnerships, innovation,
and outcome management
GXT
CD
5
RENTON. AHEAD OF THE CURVE
N<otikl
SECTION B
MAP AND LOCATION
2019 - 2024 TRANSPORTATION IMPROVEMENT PROGRAM
City of Renton 12019 - 2024 TRANSPORTATION IMPROVEMENT PROGRAM
MAP AND LOCATION
This section contains a list of all the projects listed in the 2019 - 2024 Transportation Improvement Program
(TIP), listed by TIP number. The TIP project numbering system starts with programmatic activities that
typically have annual financial allocations. With this in mind, the TIP numbers for these programs will remain
the same for future TIPs.
The next grouping of projects in alphabetical order are projects with full or partial funding secured, such as
with federal or state grants or developer contributions, or where the City has a financial commitment to
implementing within the six -year period.
The last group of projects, where the projects start over in alphabetical order, are unfunded local projects or
outside agency -led projects, that have been identified in other long-range plans for the City.
INTERACTIVE ONLINE MAP
In addition to having a map index to the map of 2019-2024 TIP projects, there is an interactive online map
where a user can click on a specific project and a dialog box opens with information about that project with a
link to the individual TIP sheet. The web address is: http://www.rentonwa.gov/TIPMap
7
0 City of Renton 1 2019 - 2024 TRANSPORTATION IMPROVEMENT PROGRAM
f r ! Maintenance and Preservation
Corridor Projects
Traffic Operations and Safety
G Non -Motorized Projects
N EWCAS O TIP Number
� Q
If i City-wide projects are not identified
on this map.
m
i17 fl il, 1y�* ----
ti
Kennydal,
i 1 +
Lake i ` i _ I v�
Washington x —•� l�qG
31
—) — 44
z9 :Hi I.4nds
West Hill ,_,i 38 + !
•
�T �/
r \ J 18 25 15
2.1
j�•�.�. 21 24 28
41 17 34
kip 35 30 City C
X .
+ 22 REN TON
r@
•� 26
4z
y 't 43
S �l
5
i
S
e•=
i
Ilia 'F�:ti -y _ ti i SE Ren
Valley �
�• i � r m
u3
E1 i Bensoi
i a
32 7
�R7 i 23
j H 47 27
i
r �
4
Fairwood
.P., _._._, _._._._1-1 SE 192nd St
�& Talbot
.M I
TRANSPORTATION IMPROVEMENT PROGRAM MAP
w
CD
w
co
Lake
Yo un g�
N
Ell
City of Renton 1 2019 - 2024 TRANSPORTATION IMPROVEMENT PROGRAM +
MAP INDEX
TIP No.
1
Project Title
Street Overlay
2
Arterial Rehabilitation Program
2.1
2.2
Renton Avenue 5 Resurfacing, S 130th St to Taylor Ave NW
SW 43rd St Resurfacing, SR 167 to west City Limits
3
Walkway Program
4
Roadway Safety and Guardrail Program
5
Intersection Safety & Mobility Program
6
Traffic Safety Program
7
Traffic Operation Devices Program
8
Intelligent Transportation Systems (ITS) Program
9
Sidewalk Rehabilitation and Replacement Program
10
Bridge Inspection & Repair Program
11
Barrier -Free Transition Plan Implementation
12
Project Development & Pre -Design Program
13
Arterial Circulation Program
14
1% for the Arts Program
15
Bronson Way Bridge - Seismic Retrofit and Painting, across Cedar River
16
Duvall Ave NE Roadway Improvements, NE 7th St to Sunset Blvd NE
17
Houser Way Bridge - Seismic Retrofit and Painting
18
Lake Washington Loop Trail, perimeter of the Renton Airport
19
NE Sunset Boulevard (SR 900) Corridor Improvements, 1-405 to east City Limits
20
Park Ave North Extension, Logan Ave N to Southport
21
Rainier Ave 5/N Corridor Improvements Phase 4, S 3rd St to NW 3rd PI
22
Renton Connector, S 2nd St to S 5th St
23
116th Ave SE Improvements, Puget Drive SE to the south City Limits
24
South 2nd Street Conversion Project, Rainier Ave S to Main Ave S
25
Williams Ave Bridge - Seismic Retrofit and Painting
26
Williams Ave S and Wells Ave S Conversion Project, S Grady Way to N 1st St
27
Carr Road improvements, Lind Ave SW to 116th Ave SE
28
Houser Way 5/N Non -Motorized Improvements, Mill Ave S to Bronson Way S
29
Houser Way North Widening and Realignment, N 8th St to Lake Washington Blvd
30
Lake to Sound (L2S) Trail, East-West Trail connecting Lake Washington to Puget Sound
31
Lake Washington Blvd N/ Southport Access Improvements, Park Ave N to Gene Coulon Park
32
Lind Ave SW Roadway Widening, SW 16th St to SW 43rd St
33
Logan Ave North Improvements, S 2nd St to Park Ave N
34
Maple Valley Highway Barriers, vicinity of western edge of Riverview Park
35
Monster Road SW/68th Ave S Roadway Improvements, Monster Rd Bridge to City Limits
36
NE 3rd Street / NE 4th Street Corridor Improvements, Sunset Blvd N to the east City Limits
37
Nile Ave NE Bridge Replacement, across May Creek
38
Rainier Ave N Corridor Improvements Phase 5, NW 3rd PI to City Limits
39
Renton Bus Rapid Transit (BRT) Improvements, S Renton Village PI extension to S Grady Way
40
Transit Master Plan
41
South 3rd Street Conversion Project, Rainier Ave S to Main Ave S
42
South/Southwest 7th Street Corridor Improvements
43
South Grady Way Multi -Modal Improvements, Talbot Rd South to Rainier Ave South
44
South Lake Washington Transit Stop, vicinity of Southport Dr N and Garden Ave N
45
Sunset Area Green Connections, vicinity of Sunset Area Revitalization Area
46
SW 27th Street/Strander Boulevard Connection
47
Talbot Road S / S 177th St Signalization and Roadway Improvements, adjacent to Valley Medical Center
m
0
Ni�toi� J-7f�
Mir
Laq
SECTION C
DEVELOPMENT AND PRIORITIZATION
2019 - 2024 TRANSPORTATION IMPROVEMENT PROGRAM
10
City of Renton 12019 - 2024 TRANSPORTATION IMPROVEMENT PROGRAM
VANOF
TIP DEVELOPMENT ACTIVITIES
TIP project and financial development activities are intricately intertwined and involve interactions with
many groups and agencies at the local, regional, state and federal levels. Within the Transportation Systems
Division of the City of Renton, project development involves year-round coordination between the
Transportation Operations and Transportation Maintenance Section, the Transportation Planning and
Programming Section and the Transportation Design Section.
The Transportation Operations and Maintenance Section compiles accident and traffic count data, performs
level -of -service calculations needed to identify operational/congestion problems and tracks all transportation
-related complaints, suggestions and requests that come into the City.
The Transportation Design Section, through the TIP's Overlay Program and Bridge Inspection and Repair
Program, work closely with the Maintenance Services Division to establish structural ratings for the City's
roads and bridges.
These and other data are being used by the Planning and Programming Section to develop transportation
improvement projects, prepare grant applications, interface with ongoing state and federal transportation
programs and develop a TIP that supports the goals of the City's long-range Comprehensive Plan and current
business plan.
The Transportation Planning and Programming Section works with Washington Department of Transporta-
tion, King County Metro Transit, Puget Sound Regional Council, Sound Transit and other groups and agencies
to assure consistency between Renton's transportation policies and programs and those of the region. Such
consistency is required by the Growth Management Act and related legislation and by federal and state grant
programs.
With on -going changes to 1-405 and SR 167 as well as the expansion of the Sound Transit network, especially
the 1-405 Bellevue to Renton Bus Rapid Transit, the City of Renton must look to creating and maintaining an
infrastructure system to support these changes to the transportation system to promote economic vitality as
well as providing a safe and healthy community.
Ongoing transportation planning activities, such as updating the Transportation Element in the
Comprehensive Plan and the development of sub -area plans, play an important part in identifying and
prioritizing transportation improvement projects. In recent years, long-range planning efforts have played a
key role in the development of transportation projects for the City: Downtown Civic Core Vision & Action
Plan, City Center Community Plan, Sunset Area Transformation Plan, a nd the Renton Trails and Bicycle Master
Plan.
All City of Renton departments and City Council are solicited each year to provide input, discuss and
comment on the Six -Year TIP. Additional input is also gathered through interactions with other public and
private organizations and through public meetings held in the community concerning specific transportation
projects and programs.
11
AdftL
City of Renton 1 2019 - 2024 TRANSPORTATION IMPROVEMENT PROGRAM
At all levels of government - City, State and Federal - there are new laws and regulations that create the need
for new or different kinds of transportation projects and programs that have tremendous impacts on the de-
velopment and costs of transportation projects. Examples include the Moving Ahead for Progress in the 215t
Century Act (MAP-21), the Growth Management Act, the Clean Air Act, the Commute Trip Reduction law, the
Endangered Species Act and the Surface Water Management Ordinance.
Within the City of Renton, there are actions and interactions involving other departments and divisions, the
private sector, the City Council and Administration, which strongly influence the direction of the
transportation program. For example, the transportation system is significantly impacted by land use
decisions, private development proposals and by public water and sewer extensions which increase
transportation demand by making possible higher density and/or intensity of land uses. Such proposals need
to be monitored and analyzed in regard to how they individually and collectively create the need for
transportation improvements.
In summary, with its heavy dependence on many different and unpredictable sources of external funding and
with the significant impacts created by ongoing local and regional land use decisions, transportation project
development is a continuous activity comprised of a multitude of diverse elements.
12
City of Renton 1 2019 - 2024 TRANSPORTATION IMPROVEMENT PROGRAM +
GENERAL PROGRAMMING CRITERIA
The yearly update of the Six -Year Transportation Improvement Program (TIP) is part of an ongoing process
intrinsically linked with the development of the City's Capital Improvement Program. The Six -Year TIP is also
linked with various state and federal funding programs, regional/inter-jurisdictional planning and coordina-
tion processes and the City's Growth Management Act Comprehensive Land Use Plan.
Projects are developed and prioritized based on community needs, specific goals to be achieved and on gen-
eral programming considerations. The general programming considerations include the following:
PRIORITY — As shown on pages 15-17 the projects and programs are prioritized by type prepared by City
staff with final approval by the City Council during the annual update of the TIP. The prioritization as-
sists staff in assigning the limited resources to projects and programs and reducing resources during
funding shortfalls. In general, staff expends more resources on higher priority projects in the first
three years of the TIP, and when applying for grants staff will consider these projects first unless oth-
er lower priority projects better meet the particular criteria of a grant program.
PLANNING — How, at a local and regional level, a project fits with or addresses identified future trans-
portation goals, demands and planning processes must be evaluated. This is strongly influenced by
ongoing land use decisions and by regional highway and transit system plans.
FINANCING — Many projects are dependent upon external grants, formation of LID's or the receipt of im-
pact fees. Prioritization has to take into account the peculiarities of each of the various fund sources
and the probabilities of when and how much money will be available.
SCHEDULING — If a project is interconnected with, or interdependent on, other projects taking place,
this is reflected in their relative priorities.
PAST COMMITMENT —The level of previous commitment made by the City in terms of resources, legis-
lative actions or inter -local agreements must be taken into consideration in prioritizing TIP projects.
In addition to the general considerations discussed above, there are five specific project categories through
which the TIP is evaluated and analyzed. The categories include the following:
• Maintenance and Preservation of Existing Infrastructure
• Corridor Projects
• Operations and Safety
• Non -Motorized Projects
• Other Programs
These categories provide a useful analysis tool and represent goals developed through an evaluation of the
City's transportation program in response to input from citizens and local officials and to state and federal
legislation.
13
} City of Renton 1 2019 - 2024 TRANSPORTATION IMPROVEMENT PROGRAM
Taken as a whole, the five categories provide a framework for evaluating projects both individually and as
part of a strategy that seeks to meet and balance the transportation needs of Renton during a time of in-
creasing transportation demand, decreasing revenues, and growing environmental concerns.
Although each project can be identified with an important concern that allows it to be classified into one of
the five categories, most projects are intended to address and are developed to be compatible with multiple
goals.
MAINTENANCE AND PRESERVATION OF THE EXISTING INFRASTRUCTURE is a basic need that must be met by the
program. The Mayor and City Council have emphasized the importance of sustaining strong programs in this
project category and maintaining our current infrastructure. Therefore, more than half of the Transporta-
tion's City Funds have historically been allocated under this category. The State Growth Management Act
also requires jurisdictions to assess and address the funding required to maintain their existing transporta-
tion systems. The City of Renton owns and maintains 250 centerline miles of streets.
CORRIDOR PROJECTS are oriented toward moving people through a balanced transportation system that in-
volves multiple modes of transportation. Included are facilities that facilitate the movement of transit and
carpools. The Moving Ahead for Progress in the 215t Century Act (MAP-21), the State and Federal Clean Air
legislation and the State Commute Trip Reduction Act (CTR) have added momentum to regional efforts and
placed requirements on local jurisdictions such as Renton to promote these transportation elements.
OPERATIONS AND SAFETY projects and programs are developed through ongoing analyses of the transporta-
tion system and are directed mainly toward traffic engineering concerns such as safety and congestion. Pro-
jects are identified not only by analysis of traffic counts, accident records and geometric data, but also
through review and investigation of citizen complaints and requests.
NON -MOTORIZED PROJECTS have been developed with major emphasis on addressing community quality of
life issues by improving and/or protecting residential livability while providing necessary transportation sys-
tem improvements. Bicycle and pedestrian projects are included in this category.
OTHER PROGRAMS involve planning of transportation improvements necessitated by new development and
new transportation capital improvements.
14
City of Renton 12019 - 2024 TRANSPORTATION IMPROVEMENT PROGRAM
SUMMARY OF PROJECTS AND PRIORITIZATION
The prioritization of the TIP is influenced by the interconnection and/or interdependence among TIP projects
and with projects by other City departments and by other jurisdictions as well as the timing of those
transportation projects. Equally important to the prioritization below is the likelihood, the time frame, and
the amount of outside funding that will be obtainable to finance transportation projects.
The prioritization lists below are sorted by the category type of the projects.
Priority TIP No. Project Title Community Planning Area
Maintenance and Preservation of the Existing Infrastructure
1
1
Street Overlay
Citywide
2
2
Arterial Rehabilitation Program
Citywide
3
2.1
Renton Avenue S Resurfacing,
City Center
S 130th St to Taylor Ave NW
4
2.2
SW 43rd St Resurfacing,
Valley
SR 167 to west City Limits
5
15
Bronson Way Bridge - Seismic Retrofit and Painting,
City Center
across Cedar River
Houser Way Bridge - Seismic Retrofit and Painting,
6
17
across Cedar River
City Center
7
25
Williams Ave Bridge - Seismic Retrofit and Painting,
City Center
across Cedar River
8
9
Sidewalk Rehabilitation and Replacement Program
Citywide
9
37
Nile Ave NE Bridge Replacement,
East Plateau
across May Creek
10
10
Bridge Inspection & Repair Program
Citywide
15
` }U City of Renton 1 2019 - 2024 TRANSPORTATION IMPROVEMENT PROGRAM
Priority TIP No. Project Title Community Planning Area
Corridor
Projects
1
16
Duvall Ave NE Roadway Improvements,
Highlands & E. Plateau
NE 7th St to Sunset Blvd NE
2
26
Williams Ave S and Wells Ave S Conversion Project,
City Center
S Grady Way to N 1st St
Park Ave North Extension,
3
20
Logan Ave N to Southport
City Center
Rainier Ave S/N Corridor Improvements Phase 4,
4
21
S 3rd St to NW 3rd PI
City Center
5
24
South 2nd Street Conversion Project,
City Center
Rainier Ave S to Main St
6
19
NE Sunset Boulevard (SR 900) Corridor Improvements
Highlands
1-405 to east City Limits
7
23
116th Ave SE Improvements,
Benson
Puget Drive SE to the south City Limits
8
41
South 3rd Street Conversion Project,
City Center
Rainier Ave S to Main St
9
22
Renton Connector,
City Center
S 2nd St to S 5th St
10
44
South Lake Washington Transit Stop,
City Center
vicinity of Southport Dr N and Garden Ave N
11
27
Carr Road improvements,
Talbot & Benson
Lind Ave SW to 116th Ave SE
12
39
Renton Bus Rapid Transit (BRT) Improvements,
City Center
S Renton Village PI extension to S Grady Way
13
42
South 7th Street Corridor Improvements,
City Center
Rainier Ave South to Talbot Road South
Lake Washington Blvd N/ Southport Access Improvements,
14
31
Park Ave N to Gene Coulon Park
City Center
15
43
South Grady Way Multi -Modal Improvements,
City Center
Talbot Rd South to Rainier Ave South
16
38
Rainier Ave N Corridor Improvements Phase 5,
City Center
NW 3rd PI to City Limits
17
29
Houser Way North Widening and Realignment,
City Center
N Sth St to Lake Washington Blvd
18
33
Logan Ave North Improvements,
City Center
S 2nd St to Park Ave N
19
36
NE 3rd Street / NE 4th Street Corridor Improvements,
Highlands & E. Plateau
Sunset Blvd N to the east City Limits
20
32
Lind Ave SW Roadway Widening,
Valley
SW 16th St to SW 43rd St
21
35
Monster Road SW/68th Ave S Roadway Improvements,
Valle y
Monster Rd Bridge and City Limits
22
46
SW 27th Street/Strander Boulevard Connection
Valley
16
City of Renton 12019 - 2024 TRANSPORTATION IMPROVEMENT PROGRAM
Priority TIP No. Project Title Community Planning Area
Operations and Safety
1
4
Roadway Safety and Guardrail Program
Citywide
2
5
Intersection Safety & Mobility Program
Citywide
3
6
Traffic Safety Program
Citywide
4
8
Intelligent Transportation Systems (ITS) Program
Citywide
5
7
Traffic Operation Devices Program
Citywide
6
34
Maple Valley Highway Barriers,
west edge of Riverview Park
Cedar River
7
47
Talbot Road S / S 177th St Signalization and Roadway Improvements,
adjacent to Valley Medical Center
Talbot
Non -Motorized Projects
1
18
Lake Washington Loop Trail,
City Center
south perimeter of the Renton Airport
2
30
Lake to Sound (L2S) Trail,
Valley & City Center
East-West Trail connecting Lake Washington to Puget Sound
Houser Way S/N Non -Motorized Improvements,
3
28
Mill Ave S to Bronson Way S
City Center
4
11
Barrier -Free Transition Plan Implementation
Citywide
5
3
Walkway Program
Citywide
6
45
Sunset Area Green Connections,
Highlands
vicinity of Sunset Area Revitalization Area
Other Programs
1
13
Arterial Circulation Program
Citywide
2
12
Project Development & Pre -Design Program
Citywide
3
40
Transit Master Plan
Citywide
4
14
1% for the Arts Program
N/A
17
m
N&Itotiki
Mir
Laq
SECTION D
EXPENDITURES AND REVENUES
2019 — 2024 TRANSPORTATION IMPROVEMENT PROGRAM
18
SUMMARY OF PROJECT EXPENDITURES
TIP No.
Project Title
2019 2020 2021 2022
2023
2024
Six -Year PeriodTotal
1
Street Overlay
$1,090,000
$1,170,000
$2,070,000
$2,170,000
$2,260,000
$2,360,000
$11,120,000
2
Arterial Rehabilitation Program
$1,540,000
$1,610,000
$1,680,000
$4,830,000
2.1
Renton Avenue S Resurfacing
$550,000
$550,000
2.2
SW 43rd St Resurfacing
$220,000
$1,820,000
$2,040,000
3
Walkway Program
$200,000
$250,000
$250,000
$250,000
$250,000
$250,000
$1,450,000
4
Roadway Safety and Guardrail Program
$25,000
$25,000
$30,000
$30,000
$35,000
$35,000
$180,000
5
Intersection Safety & Mobility Program
$250,000
$200,000
$350,000
$350,000
$350,000
$350,000
$1,850,000
6
Traffic Safety Program
$150,000
$150,000
$150,000
$150,000
$150,000
$150,000
$900,000
7
Traffic Operation Devices Program
$120,000
$120,000
$120,000
$120,000
$120,000
$120,000
$720,000
8
Intelligent Transportation Systems (ITS) Program
$60,000
$60,000
$60,000
$60,000
$60,000
$60,000
$360,000
9
Sidewalk Rehabilitation and Replacement Program
$100,000
$110,000
$110,000
$110,000
$110,000
$110,000
$650,000
10
Bridge Inspection & Repair Program
$90,000
$50,000
$100,000
$100,000
$100,000
$100,000
$540,000
11
Barrier -Free Transition Plan Implementation
$60,000
$80,000
$80,000
$80,000
$80,000
$80,000
$460,000
12
Project Development & Pre -Design Program
$150,000
$150,000
$150,000
$150,000
$150,000
$150,000
$900,000
13
Arterial Circulation Program
$145,000
$150,000
$150,000
$150,000
$150,000
$150,000
$895,000
14
1% for the Arts Program
$15,000
$15,000
$15,000
$15,000
$15,000
$15,000
$90,000
15
Bronson Way Bridge - Seismic Retrofit and Painting
$420,000
$2,510,000
$2,930,000
16
Duvall Ave NE Roadway Improvements
$1,512,139
$1,512,139
17
Houser Way Bridge - Seismic Retrofit and Painting
$470,000
$2,531,900
$222,550
$3,224,450
18
Lake Washington Loop Trail
$340,000
$1,425,000
$1,200,000
$950,000
$3,250,000
$7,165,000
19
NE Sunset Blvd (SR 900) Corridor Improvements
$459,000
$2,750,000
$7,550,000
$6,850,000
$6,450,000
$6,250,000
$30,309,000
20
Park Ave North Extension
$6,125,000
$625,000
$6,750,000
21
Rainier Ave S/N Corridor Improvements (Phase 4)
$1,500,000
$1,951,323
$8,800,000
$5,850,000
$150,000
$18,251,323
22
Renton Connector
$278,700
$621,300
$3,963,000
$8,850,000
$13,713,000
23
116th Ave SE Improvements
$1,600,000
$3,700,000
$2,600,000
$2,200,000
$10,100,000
24
South 2nd Street Conversion Project
$100,000
$1,350,000
$7,800,000
$7,800,000
$17,050,000
25
Williams Ave Bridge - Seismic Retrofit and Painting
$470,000
$2,740,450
$3,210,450
26
Williams Ave S and Wells Ave S Conversion Project
$1,933,800
$6,348,269
$8,282,069
27
Carr Road improvements
$50,000
$50,000
28
Houser Way Non -Motorized Improvements
$385,000
$836,000
$966,000
$2,187,000
29
Houser Way North Widening and Realignment
$1,065,000
$1,560,000
$2,340,000
$4,965,000
30
Lake to Sound (L2S) Trail
$2,800,000
$2,800,000
31
Lake Wash. Blvd N/Southport Access Improvements
$2,000,000
$2,000,000
32
Lind Ave SW Roadway Widening
$400,000
$1,650,000
$2,350,000
$4,400,000
33
Logan Ave North Improvements
$1,240,000
$10,000,000
$11,240,000
34
Maple Valley Highway Barriers
$299,035
$2,838,865
$3,137,900
35
Monster Road SW/68th Ave S Improvements
$50,000
$8,000,000
$8,050,000
36
NE 3rd Street / NE 4th Street Corridor Improvements
$20,000
$20,000
$750,000
$4,190,000
$5,180,000
$3,200,000
$13,360,000
37
Nile Ave NE Bridge Repair
$50,000
$200,000
$250,000
38
Rainier Ave N Corridor Improvements (Phase 5)
$100,000
$2,000,000
$2,100,000
39
Renton Bus Rapid Transit (BRT) Improvements
$3,195,000
$9,052,500
$9,052,500
$21,300,000
40
Renton Transit Master Plan
$300,000
$200,000
$500,000
41
South 3rd Street Conversion Project
$4,000,000
$6,500,000
$10,700,000
$21,200,000
42
S/SW 7th Street Corridor Improvements
$200,000
$1,600,000
$10,364,000
$3,608,9281
$15,772,928
43
South Grady Way Multi -Modal Improvements
$550,000
$1,760,000
$1,690,000
$4,000,000
44
South Lake Washington Transit Stop
$4,350,000
$4,350,000
45
Sunset Area Green Connections
$3,600,000
$10,700,000
$7,900,000
$22,200,000
46
SW 27th Street/Strander Boulevard Connection
47
Talbot Road S / S 177th St Improvements
TOTAL EXPENDITURES
$21,104,939
$23,801,942
$35,905,2851
$57,030,165
$80,475,500 $75,577,4281
$293,895,259
19
RESOURCE: VEHICLE FUEL TAX
TIP No.
Project Title
2019
2020
2021
2022
2023
2024
Six -Year Period
Total
1
Street Overlay
$700,000
$710,000
$720,000
$730,000
$740,000
$750,000
$4,350,000
2
Arterial Rehabilitation Program
2.1
Renton Avenue S Resurfacing
2.2
SW 43rd St Resurfacing
3
Walkway Program
q
Roadway Safety and Guardrail Program
5
Intersection Safety & Mobility Program
6
Traffic Safety Program
7
Traffic Operation Devices Program
8
Intelligent Transportation Systems (ITS) Program
9
Sidewalk Rehabilitation and Replacement Program
10
Bridge Inspection & Repair Program
11
Barrier -Free Transition Plan Implementation
12
Project Development & Pre -Design Program
13
Arterial Circulation Program
14
1% for the Arts Program
15
Bronson Way Bridge - Seismic Retrofit and Painting
16
Duvall Ave NE Roadway Improvements
17
Houser Way Bridge - Seismic Retrofit and Painting
18
Lake Washington Loop Trail
19
NE Sunset Boulevard (SR 900) Corridor Improvements
20
Park Ave North Extension
21
Rainier Ave S/N Corridor Improvements (Phase 4)
22
Renton Connector
23
116th Ave SE Improvements
24
South 2nd Street Conversion Project
25
Williams Ave Bridge - Seismic Retrofit and Painting
26
Williams Ave S and Wells Ave S Conversion Project
27
Carr Road improvements
28
Houser Way Non -Motorized Improvements
29
Houser Way North Widening and Realignment
30
Lake to Sound (L2S) Trail
31
Lake Washington Blvd N/ Southport Access Improvements
32
Lind Ave SW Roadway Widening
33
Logan Ave North Improvements
34
Maple Valley Highway Barriers
35
Monster Road SW/68th Ave S Roadway Improvements
36
NE 3rd Street / NE 4th Street Corridor Improvements
37
Nile Ave NE Bridge Repair
38
Rainier Ave N Corridor Improvements (Phase 5)
39
Renton Bus Rapid Transit (BRT) Improvements
40
Renton Transit Master Plan
41
South 3rd Street Conversion Project
42
S/SW 7th Street Corridor Improvements
43
South Grady Way Multi -Modal Improvements
44
South Lake Washington Transit Stop
45
Sunset Area Green Connections
46
SW 27th Street/Strander Boulevard Connection
47
Talbot Road S / S 177th St Improvements
TOTAL VEHICLE FUEL TAX
$700,000
$710,000
$720,000
$730,000
$740,000
$750,000
$4,350,000
RESOURCE: BUSINESS LICENSE AND BUSINESS & OCCUPATION
TIP No.
Project Title
2019
2020
2021
2022
2023
2024
Six -Year Period
Total
1
Street Overlay
$390,000
$460,000
$490,000
$530,000
$560,000
$600,000
$3,030,000
2
Arterial Rehabilitation Program
$510,000
$530,000
$550,000
$1,590,000
2.1
Renton Avenue S Resurfacing
$275,000
$275,000
2.2
SW 43rd St Resurfacing
$220,000
$820,000
$1,040,000
3
Walkway Program
$200,000
$250,000
$100,000
$100,000
$100,000
$100,000
$850,000
4
Roadway Safety and Guardrail Program
$25,000
$25,000
$30,000
$30,000
$35,000
$35,000
$180,000
5
Intersection Safety & Mobility Program
6
Traffic Safety Program
$130,000
$70,000
$200,000
7
Traffic Operation Devices Program
$120,000
$120,000
$120,000
$120,000
$120,000
$120,000
$720,000
8
Intelligent Transportation Systems (ITS) Program
9
Sidewalk Rehabilitation and Replacement Program
$100,000
$110,000
$110,000
$110,000
$110,000
$110,000
$650,000
10
Bridge Inspection & Repair Program
$90,000
$50,000
$50,000
$50,000
$50,000
$50,000
$340,000
11
Barrier -Free Transition Plan Implementation
$60,000
$80,000
$140,000
12
Project Development & Pre -Design Program
$150,000
$150,000
$150,000
$150,000
$150,000
$150,000
$900,000
13
Arterial Circulation Program
$145,000
$150,000
$150,000
$150,000
$150,000
$150,000
$895,000
14
1%for the Arts Program
$15,000
$15,000
$15,000
$15,000
$15,000
$15,000
$90,000
15
Bronson Way Bridge - Seismic Retrofit and Painting
16
Duvall Ave NE Roadway Improvements
$30,000
$30,000
17
Houser Way Bridge - Seismic Retrofit and Painting
18
Lake Washington Loop Trail
$75,000
$75,000
19
NE Sunset Boulevard (SR 900) Corridor Improvements
$32,975
$32,975
20
Park Ave North Extension
21
Rainier Ave S/N Corridor Improvements (Phase 4)
$100,000
$450,000
$550,000
22
Renton Connector
23
116th Ave SE Improvements
24
South 2nd Street Conversion Project
$100,000
$100,000
25
Williams Ave Bridge- Seismic Retrofit and Painting
$122,550
$122,550
26
Williams Ave S and Wells Ave S Conversion Project
$30,000
$180,000
$210,000
27
Carr Road improvements
28
Houser Way Non -Motorized Improvements
29
Houser Way North Widening and Realignment
30
Lake to Sound (L25) Trail
31
Lake Washington Blvd N/Southport Access Improvements
32
Lind Ave SW Roadway Widening
33
Logan Ave North Improvements
34
Maple Valley Highway Barriers
35
Monster Road SW/68th Ave S Roadway Improvements
36
NE 3rd Street / NE 4th Street Corridor Improvements
$20,000
$20,000
$40,000
37
Nile Ave NE Bridge Repair
$50,000
$50,000
38
Rainier Ave N Corridor Improvements (Phase 5)
39
Renton Bus Rapid Transit (BRT) Improvements
40
Renton Transit Master Plan
41
South 3rd Street Conversion Project
42
S/SW 7th Street Corridor Improvements
43
South Grady Way Multi -Modal Improvements
44
South Lake Washington Transit Stop
45
Sunset Area Green Connections
46
SW 27th Street/Strander Boulevard Connection
47
Talbot Road S / S 177th St Improvements
TOTAL B & 0 Share
$1,812,975
$2,247,550
$2,135,000
$2,215,000
$1,820,000
$1,880,000
$12,110,525
21
RESOURCE: GRANTS AWARDED
TIP No.
Project Title
2019
2020
2021
2022
2023
2024
Six -Year Period
Total
1
Street Overlay
2
Arterial Rehabilitation Program
2.1
Renton Avenue S Resurfacing
2.2
SW 43rd St Resurfacing
$1,000,000
$1,000,000
3
Walkway Program
4
Roadway Safety and Guardrail Program
5
Intersection Safety & Mobility Program
6
Traffic Safety Program
7
Traffic Operation Devices Program
8
Intelligent Transportation Systems (ITS) Program
9
Sidewalk Rehabilitation and Replacement Program
10
Bridge Inspection & Repair Program
11
Barrier -Free Transition Plan Implementation
12
Project Development & Pre -Design Program
13
Arterial Circulation Program
14
1% for the Arts Program
15
Bronson Way Bridge - Seismic Retrofit and Painting
$420,000
$2,510,000
$2,930,000
16
Duvall Ave NE Roadway Improvements
$1,049,039
$1,049,039
17
Houser Way Bridge - Seismic Retrofit and Painting
$406,550
$2,531,900
$2,938,450
18
Lake Washington Loop Trail
$340,000
$1,042,961
$1,382,961
19
NE Sunset Boulevard (SR 900) Corridor Improvements
$426,025
$426,025
20
Park Ave North Extension
21
Rainier Ave S/N Corridor Improvements (Phase 4)
$1,192,475
$1,358,000
$5,800,000
$8,350,475
22
Renton Connector
23
116th Ave SE Improvements
24
South 2nd Street Conversion Project
$1,200,000
$1,200,000
25
Williams Ave Bridge- Seismic Retrofit and Painting
$406,550
$2,517,900
$2,924,450
26
Williams Ave 5 and Wells Ave S Conversion Project
$1,453,800
$2,396,200
$3,850,000
27
Carr Road improvements
28
Houser Way Non -Motorized Improvements
29
Houser Way North Widening and Realignment
30
Lake to Sound (L25) Trail
31
Lake Washington Blvd N/ Southport Access Improvements
32
Lind Ave SW Roadway Widening
33
Logan Ave North Improvements
34
Maple Valley Highway Barriers
35
Monster Road SW/68th Ave S Roadway Improvements
36
NE 3rd Street / NE 4th Street Corridor Improvements
37
Nile Ave NE Bridge Repair
38
Rainier Ave N Corridor Improvements (Phase 5)
39
Renton Bus Rapid Transit (BRT) Improvements
40
Renton Transit Master Plan
41
South 3rd Street Conversion Project
42
S/SW 7th Street Corridor Improvements
43
South Grady Way Multi -Modal Improvements
44
South Lake Washington Transit Stop
45
Sunset Area Green Connections
46
SW 27th Street/Strander Boulevard Connection
47
Talbot Road S / S 177th St Improvements
TOTAL GRANTS AWARDED
1 $5,694,439
$12,356,961
$8,000,000
$26,051,400
22
RESOURCE: MITIGATION (IMPACT FEES)
TIP No.
Project Title
2019
2020
2021
2022
2023
2024
Six -Year Period
Total
1
Street Overlay
2
Arterial Rehabilitation Program
2.1
Renton Avenue S Resurfacing
2.2
SW 43rd St Resurfacing
3
Walkway Program
4
Roadway Safety and Guardrail Program
5
Intersection Safety & Mobility Program
$250,000
$200,000
$450,000
6
Traffic Safety Program
$10,000
$80,000
$90,000
7
Traffic Operation Devices Program
8
Intelligent Transportation Systems (ITS) Program
$60,000
$60,000
$120,000
9
Sidewalk Rehabilitation and Replacement Program
10
Bridge Inspection & Repair Program
11
Barrier -Free Transition Plan Implementation
12
Project Development & Pre -Design Program
13
Arterial Circulation Program
14
1% for the Arts Program
15
Bronson Way Bridge - Seismic Retrofit and Painting
16
Duvall Ave NE Roadway Improvements
$322,475
$322,475
17
Houser Way Bridge - Seismic Retrofit and Painting
18
Lake Washington Loop Trail
$307,039
$307,039
19
NE Sunset Boulevard (SR 900) Corridor Improvements
20
Park Ave North Extension
-$600,000
-$600,000
21
Rainier Ave S/N Corridor Improvements (Phase 4)
$307,525
$593,323
$700,000
$945,000
$150,000
$2,695,848
22
Renton Connector
23
116th Ave SE Improvements
24
South 2nd Street Conversion Project
25
Williams Ave Bridge - Seismic Retrofit and Painting
26
Williams Ave S and Wells Ave S Conversion Project
$450,000
$300,000
$750,000
27
Carr Road improvements
$50,000
$50,000
28
Houser Way Non -Motorized Improvements
29
Houser Way North Widening and Realignment
30
Lake to Sound (L2S) Trail
31
Lake Washington Blvd N/ Southport Access Improvements
32
Lind Ave SW Roadway Widening
33
Logan Ave North Improvements
34
Maple Valley Highway Barriers
35
Monster Road SW/68th Ave S Roadway Improvements
36
NE 3rd Street / NE 4th Street Corridor Improvements
37
Nile Ave NE Bridge Repair
38
Rainier Ave N Corridor Improvements (Phase 5)
39
Renton Bus Rapid Transit (BRT) Improvements
40
Renton Transit Master Plan
41
South 3rd Street Conversion Project
42
S/SW 7th Street Corridor Improvements
43
South Grady Way Multi -Modal Improvements
44
South Lake Washington Transit Stop
45
Sunset Area Green Connections
46
SW 27th Street/Strander Boulevard Connection
47
ITalbot Road S / S 177th St Improvements
TOTAL MITIGATION
$850,000
$1,540,362
$700,000
$945,000
$150,000
$4,185,362
RESOURCE: OTHER (Developer Contributions, Other Aqencies, etc)
TIP No.
Project Title
2019
2020
2021
2022
2023
2024
Six -Year Period
Total
1
Street Overlay
2
Arterial Rehabilitation Program
2.1
Renton Avenue S Resurfacing
2.2
SW 43rd St Resurfacing
3
Walkway Program
4
Roadway Safety and Guardrail Program
5
Intersection Safety & Mobility Program
6
Traffic Safety Program
7
Traffic Operation Devices Program
8
Intelligent Transportation Systems (ITS) Program
9
Sidewalk Rehabilitation and Replacement Program
10
Bridge Inspection & Repair Program
11
Barrier -Free Transition Plan Implementation
12
Project Development & Pre -Design Program
13
Arterial Circulation Program
14
1% for the Arts Program
15
Bronson Way Bridge - Seismic Retrofit and Painting
16
Duvall Ave NE Roadway Improvements
17
Houser Way Bridge - Seismic Retrofit and Painting
18
Lake Washington Loop Trail
19
NE Sunset Boulevard (SR 900) Corridor Improvements
20
Park Ave North Extension
$6,875,000
$625,000
$7,500,000
21
Rainier Ave S/N Corridor Improvements (Phase 4)
$2,100,000
$4,455,000
$6,555,000
22
Renton Connector
23
116th Ave SE Improvements
24
South 2nd Street Conversion Project
$150,000
$214,931
$364,931
25
Williams Ave Bridge - Seismic Retrofit and Painting
26
Williams Ave S and Wells Ave S Conversion Project
27
Carr Road improvements
28
Houser Way Non -Motorized Improvements
29
Houser Way North Widening and Realignment
30
Lake to Sound (L2S) Trail
$2,800,000
$2,800,000
31
Lake Washington Blvd N/ Southport Access Improvements
$2,000,000
$2,000,000
32
Lind Ave SW Roadway Widening
33
Logan Ave North Improvements
34
Maple Valley Highway Barriers
35
Monster Road SW/68th Ave S Roadway Improvements
36
NE 3rd Street / NE 4th Street Corridor Improvements
37
Nile Ave NE Bridge Repair
38
Rainier Ave N Corridor Improvements (Phase 5)
39
Renton Bus Rapid Transit (BRT) Improvements
40
Renton Transit Master Plan
41
South 3rd Street Conversion Project
42
S/SW 7th Street Corridor Improvements
43
South Grady Way Multi -Modal Improvements
44
South Lake Washington Transit Stop
45
Sunset Area Green Connections
46
SW 27th Street/Strander Boulevard Connection
47
ITalbot Road S / S 177th St Improvements
TOTAL OTHER SOURCES
$11,675,000
$625,000
$2,250,000
$4,669,931
$19,219,931
N<otlki
Mir
r-aq
SECTION E
PROJECT DESCRIPTIONS
2019 - 2024 TRANSPORTATION IMPROVEMENT PROGRAM
25
TRANSPORTATION IMPROVEMENT PROGRAM
Project Title: Street Overlay
Community Planning Area: Citywide
Functional Classification: Local and Collector
Project Length: various
Fund: 317
Project: 122108
Contact: Michelle Faltaous
Street Overlay
TIP No. 1
425-430-7301
oject Description:
inual program for repairing and resurfacing existing roadways. Installation of ADA compliant curb ramps has been incorporated into the Street Overlay Program in accordance
th federal requirements. This program funds overlays on neighborhood streets and collector streets while the Arterial Rehabilitation Program (TIP No. 2) funds principal and
inor arterials. This program allocates $100K/yr for the overlay of alleyways.
concrete pavement (ACP) overlay and slurry seal of streets provide for improved driving surface and are highly cost-effective ways of avoiding expensive repairs and
-uction. The Pavement Management System and biennial survey of roadway conditions greatly improve the efficiency of the Overlay Program.
2016 "Pavement Management Program State of the Streets Report" rated the average Pavement Condition Index (PCI) as 68. According to the report, $78M will need to be
sted in pavement rehabilitation in the next 10 years to bring the PCI to 70 and maintain it at that level. The City will be conducting an updated street survey through the
mer of 2018.
Due to increasing ADA regulations starting in 2019, the annual design and contract award will be prepared by a Consultant. The ADA required curb ramps may be split out into its
own contract.
Funded: 1 10,905,173 Unfunded: 1 3,740,000
Project Expenditures &Resources
Programmed
Programmed
Pre-2019
Six
-Year Program
Spent2017
2018 2019
2020
2021
2022
2023
2024
Expenditures:
Planning
-
- -
-
-
-
-
-
Preliminary Engineering
28,000
4,000 see 4,000
4,000
4,000
4,000
4,000
4,000
R-O-W (includes Admin)
-
-
- -
-
-
-
-
-
Construction
14,161,226
1,671,226
1,730,000 0 •1 see 1,030,000
1,110,000
2,010,000
2,110,000
2,200,000
2,300,000
Construction Services
455,947
63,947
56,000 r r r 56,000
56,000
56,000
56,000
56,000
56,000
Post Construction Services
-
-
- -
-
-
-
-
-
Other
-
-
- -
-
-
-
-
-
Total Expenses
14,645,173
1,735,173
1,790,000 1,090,000
1,170,000
2,070,000
2,170,000
2,260,000
2,360,000
Source of Fund:
Vehicle Fuel Tax
5,680,000
660,000
670:000 � r � 700,000
710,000
720,000
730,000
740,000
750,000
Business & Occupation Share
3,395,173
75,173
290000 1 1 off 390,000
460,000
490,000
530,000
560,000
600,000
Fund Balance
30,000
-
30,000 -
-
-
-
-
-
Grants Awarded (1)
-
-
Grants Awarded (2)
-
-
Mitigation
800,000
800,000
Bonds / LID's Formed
-
-
Other (Gen Fund Transfer)
1,000,000
1,000,000
Other (2)
-
-
Undetermined
1 3,740,000
- I off
860,000
1 910,000
1 960,000
1,0101000
Total Sources
1 14,645,173
1 1,735,173
1 1,790,000 1 1 1 1 1,090,000
1 1,170,000
1 2,070,000
1 2,170,000
1 2,260,000
2,360,000
26
TRANSPORTATION IMPROVEMENT PROGRAM
Project Title: Arterial Rehabilitation Program
Community Planning Area: Citywide
Functional Classification: Principal and Minor Arterial
Project Length: various
Arterial Rehabilitation Program
TIP No. 2
Fund: 317
Project: 122186
Contact: Michelle Faltaous 425-430-7301
Project Description:
This program provides for the rehabilitation of principal and minor arterial streets. Installation of ADA-compliant curb ramps has been incorporated into the annual Arterial
Rehabilitation and Overlay programs according to new federal requirements. This program will provide funding for the City match for larger federally funded projects.
Overlay Program (TIP #1) concentrates to a great degree on maintaining residential streets, where relatively small traffic volumes and less truck and bus traffic make
dard asphalt overlays a long term means of maintenance. Arterial streets can often deteriorate rather quickly and often require more costly rehabilitation measures
for costly temporary repairs to avoid more extensive deterioration.
The 2016 "Pavement Management Program State of the Streets Report" rated the average Pavement Condition Index (PCI) as 68. According to the report, $78M will need to
ne invested in pavement rehabilitation in the next 10 years to bring the PCI to 70 and maintain it at that level. The City was awarded a $1,020,700 STP grant for the Renton
Ave Extension and $1,000,000 was awarded to SW 43rd St.
Expenditures and Funds for years 2019, 2020, & 2021 are reflected in individual TIP project sheets for Renton Ave Resurfacing (TIP #2.1) and SW 43rd Preservation (TIP
Funded: 1 1,590,000 Unfunded: 1 3,240,000
Programmed Pre-2019 Six -year Program
Project Expenditures &Resources
Programmed
Spent2017
2018 2019
2020
2021
2022
2023
2024
Expenditures:
Planning
-
- -
-
-
-
-
Preliminary Engineering
R-O-W (includes Admin)
-
-
-
-
Construction
3,240,000
a all1,030,000
1,080,000
1,130,000
Construction Services
-
-
-
-
Post Construction Services
-
-
-
-
Other (City Match)
1,590,000
510,000
530,000
550,000
Total Expenses
4,830,000
1,540,000
1,610,000
1,680,000
Resources:
Vehicle Fuel Tax
-
-
-
-
Business & Occupation Share
1,590,000
510,000
530,000
550,000
Fund Balance
-
-
-
Grants Awarded (1)
-
-
- -
-
-
-
-
-
Grants Awarded (2)
Mitigation
Bonds / LID's Formed
Other (1)
Other (2)
Undetermined
1 3,240,0001
1
1,030,000
1 1,080,000
1 1,130,000
Total Sources
1 4,830,0001
1:1
1
1 1,540,000
1 1,610,000
1 1,680,000
27
TRANSPORTATION IMPROVEMENT PROGRAM
Project Title: Arterial Rehabilitation - Renton Ave 5 Resurfacing
Community Planning Area: West Hill
Functional Classification: Minor Arterial
Project Length: 0.60 mi
Arterial Rehabilitation - Renton Ave S Resurfacing
TIP No. 2.1
Fund: 317
Project: 122185
Contact: Hebe Bernardo 425-430-7232
Project Description:
This project will resurface 0.60 miles of Renton Ave 5 from S 130th St (west City Limits) to Hardie Ave SW and upgrade ADA ramps to current standards.
roadway is classified as a T-2 truck route carrying 5.8 million tones of freight annually. The overall condition of the pavement will be improved and the project will extend the
ament life (12-15 years). Renton Ave S is also an alternate route to SR-900, connecting Renton to the Skyway area and South Seattle.
City was awarded a $1,020,700 STP grant for Pavement Preservation in 2016. Design is underway and will be completed in the Fall of 2018. Construction to be completed in
construction of this project is being coordinated with development construction along Renton Ave S to minimize construction impacts and cost.
Funded: 1 1,953,700 Unfunded:
Programmed Pre-2019
Six -Year Program
Project Expenditures &Resources
Programmed
pre-2018
2018
2019
2020
2021
2022
2023
2024
Expenditures:
Planning
-
-
-
-
-
-
Preliminary Engineering
78,310
78,310
R-O-W(includesAdmin)
-
-
-
-
Construction
1,875,390
1,325,390
rrr 550,000
Construction Services
-
-
-
Post Construction Services
Other
-
-
Total Expenses
1,953,700
78,310
1,325,390
1 oil 550,000
Resources:
Vehicle Fuel Tax
-
-
-
-
Business & Occupation Share
505,655
78,310
152,345
off 275,000
Fund Balance
427,345
-
152,345
off 275,000
Grants Awarded (STP)
1,020,700
1,020,700
-
Grants Awarded (2)
-
-
Mitigation
Bonds / LID's Formed
Other(l)
Other (2)
Undetermined
Total Sources
1,953,7001
78,310
1 1,325,390
1 1 550,000
28
TRANSPORTATION IMPROVEMENT PROGRAM
Arterial Rehabilitation - SW 43rd St Pavement Preservation
TIP No. 2.2
Project Title: Arterial Rehabilitation - SW 43rd St Pavement Preservation
Community Planning Area: Valley Fund: 317
Functional Classification: Principal Arterial Project: NEW
Project Length: 1.17 mi Contact: Michelle Faltaous 425-430-7301
3ject Description:
is project will resurface the roadway from the western city limits to the SR 167 Ramps, except where there are existing concrete panels. This project will also upgrade all
ersection ramps to current ADA standards as well as install and replace all delineation to City of Renton standards. Also included in this project are the adjustment or evaluation
replacement of existing features affected by resurfacing such as monuments, catch basins, or drainage grates.
lustification:
This principal arterial and T-1 truck route is a major east -west corridor that serves and directly connects to the Sounder Station. SW 43rd St connects directly to SR 167 and is used
as a main access to Valley Medical Center, IKEA, and other major employment centers. Resurfacing this roadway will improve the overall condition of the pavement and the
project will extend the pavement life (12-15 years) of this key east -west South County corridor.
project. The City was awarded a $1,000,000 STP grant for Pavement Preservation in 2018.
Funded: 1 2,040,000 Unfunded:
Programmed
Pre-2019
Six
-Year Program
Project Expenditures &Resources
Programmed
Pre-2018
2018 2019
2020
2021
2022
2023
2024
Expenditures:
Planning
-
-
-
-
-
Preliminary Engineering
220,000
r off
220,000
R-O-W (includes Admin)
-
-
-
Construction
1,820,000
1 off
1,820,000
Construction Services
-
-
Post Construction Services
Other
-
-
Total Expenses
2,040,000
0, 1 oil
220,000
1,820,000
Resources:
Vehicle Fuel Tax
-
-
-
Business & Occupation Share
1,040,000
r r off
220,000
820,000
Fund Balance
-
-
-
Grants Awarded (STP Preservation)
1,000,000
oil off
1,000,000
Grants Awarded (2)
-
-
Mitigation
Bonds / LID's Formed
Other (1)
Other (2)
Undetermined
Total Sources
2,040,000
220,000
1,820,000
29
TRANSPORTATION IMPROVEMENT PROGRAM
Project Title: Walkway Program
Community Planning Area: Citywide
Functional Classification: various
Project Length: various
Fund: 317
Project: 120009
Contact: Hebe Bernardo
Walkway Program
TIP No. 3
425-430-7232
oject Description:
is program provides for the design and construction of non -motorized transportation facilities for pedestrians as well as provide City match funding for larger federal and state
nded projects. Projects are identified and prioritized using criteria from the Comprehensive Citywide Walkway Study, Council direction, and through coordination with the City's
�ighborhood Program.
Justification:
Providing safe and convenient non -motorized facilities is an integral part of a complete transportation network. Specific improvements will respond to the needs of school children,
the aged and persons with disabilities, and support increased use of transit.
Comprehensive Citywide Walkway Study was completed in 2009 and is being used to select projects that move into the design and construction phases.
the cost of design and construction of sidewalk projects exceeding the annual funding for this program, this program was used as match funding for grant applications in 2018.
Funded: 1 933,088 Unfunded: 1 600,000
Programmed Pre-2019 Six -Year Program
Project Expenditures &Resources
Programmed
Spent2017
2018 2019
2020
2021
2022
2023
2024
Expenditures:
Planning
32,000
2,000 r r r 5,000
5,000
5,000
5,000
5,000
5,000
Preliminary Engineering
150,000
- r r r 25,000
25,000
25,000
25,000
25,000
25,000
R-O-W (includes Admin)
-
-
- -
-
-
-
-
-
Construction
1,231,088
73,088
8,000 r r r 150,000
200,000
200,000
200,000
200,000
200,000
Construction Services
120,000
-
- I oil 20,000
20,000
20,000
20,000
20,000
20,000
Post Construction Services
-
-
-
-
-
-
-
Other
-
-
- -
-
-
-
-
-
Total Expenses
1,533,088
73,088
10,000 1 off 200,000
250,000
250,000
250,000
250,000
250,000
Resources:
Vehicle Fuel Tax
-
-
- -
-
-
-
-
-
Business & Occupation Share
933,088
73,088
10,000 r r r 200,000
250,000
100,000
100,000
100,000
100,000
Fund Balance
-
-
- -
-
-
-
-
-
Grants Awarded (1)
Grants Awarded (2)
Mitigation
Bonds/LID's Formed
Other (1)
Other (2)
Undetermined
1 600,000
- r r r
150,000
1 150,000
150,000
1 150,000
Total Sources
11,533,0881
73,088
1 10,000 1 off 200,000
1 250,000
1 250,000
1 250,000
250,000
1 250,000
30
TRANSPORTATION IMPROVEMENT PROGRAM
Project Title: Roadway Safety and Guardrail Program
Community Planning Area: Citywide
Functional Classification: various
Project Length: various
Roadway Safety and Guardrail Program
TIP No. 4
Fund: 317
Project: 120110
Contact: Chris Barnes 425-430-7220
act Description:
program will provide guardrail improvements each year and improve the safety of the roadside environment.
Justification:
This program will implement roadside safety improvements including barrier systems and hazardous object removal.
program will develop a policy and standardized criteria for barriers and selection of projects.
Funded: 1 210,000 Unfunded: I -
Programmed
Pre-2019
Six
-Year Program
Project Expenditures &Resources
Programmed
Spent2017
2018 2019
2020
2021
2022
2023
2024
Expenditures:
Planning
-
- -
-
-
-
-
-
Preliminary Engineering
21,000
3,000 3,000
3,000
3,000
3,000
3,000
3,000
R-O-W (includes Admin)
-
-
- -
-
-
-
-
-
Construction
175,000
714
24,286 20,000
20,000
25,000
25,000
30,000
30,000
Construction Services
14,000
-
2,000 2,000
2,000
2,000
2,000
2,000
2,000
Post Construction Services
-
- -
-
-
-
-
-
Other
-
-
- -
-
-
-
-
-
Total Expenses
210,000
714
29,286 :1 off 25,000
25,000
30,000
30,000
35,000
35,000
Resources:
Vehicle Fuel Tax
-
-
- -
-
-
-
-
-
Business & Occupation Share
210,000
714
29,286 25,000
25,000
30,000
30,000
35,000
35,000
Fund Balance
-
-
- -
-
-
-
-
-
Grants Awarded (1)
Grants Awarded (2)
Mitigation
Bonds/LIDs Formed
Other (1)
Other (2)
Undetermined
Total Sources
210,000
714
29,286 :11111M 25,000
1 25,000
30,000
30,000
35,000
35,000
31
TRANSPORTATION IMPROVEMENT PROGRAM
Project Title: Intersection Safety & Mobility Program
Community Planning Area: Citywide
Functional Classification: various
Project Length: N/A
Intersection Safety & Mobility Program
TIP No. 5
Fund: 317
Project: 122601
Contact: Chris Barnes 425-430-7220
act Description:
program will install new traffic signals, software systems to improve traffic signal timing operations, central signal system upgrades or make improvements to existing signals
tified by the Transportation Systems' Traffic Signal Priority List. The Priority List is determined by citizen concerns, intersection safety, mobility needs, and intersections that
t MUTCD traffic signal warrants.
Justification:
orically, one traffic signal is designed and constructed every two -three years to meet safety and mobility needs. This program budgets for projects needed to meet increasing
land, and the need for signalized traffic control. Elements used to prioritize project intersections may include vehicular approach volumes, accident analysis, signal -warrant
lysis, and pedestrian volume.
liminary engineering and design will begin for SW 41st St. and Oakesdale Ave SW in 2018 and construction completed in 2020.
Funded: 1 650,000 1 Unfunded: 1 1,400,000
Programmed
Pre-2019
Six
-Year Program
Project Expenditures &Resources
Programmed
Spent2017
2018 2019
2020
2021
2022
2023
2024
Expenditures:
Planning
-
- -
-
-
-
-
-
Preliminary Engineering
314,000
44,000 r r r 45,000
45,000
45,000
45,000
45,000
45,000
R-O-W (includes Admin)
-
- -
-
-
-
-
-
Construction
1,380,000
99,652
30,348 150,000
100,000
250,000
250,000
250,000
250,000
Construction Services
356,000
-
26,000 0 oil 55,000
55,000
55,000
55,000
55,000
55,000
Post Construction Services
-
- -
-
-
-
-
-
Other
-
- -
-
-
-
-
-
Total Expenses
2,050,000
99,652
100,348 1 off 250,000
200,000
350,000
350,000
350,000
350,000
Resources:
Vehicle Fuel Tax
-
-
- -
-
-
-
-
-
Business & Occupation Share
200,000
99,652
100,348
Fund Balance
-
-
-
Grants Awarded (1)
Grants Awarded (2)
-
-
-
Mitigation
450,000
1 oil 250,000
200,000
Bonds/LID'sFormed
-
-
-
Other (1)
Other (2)
Undetermined
1 1,400,000
- of rrr
350,000
1 350,000
350,000
1 350,000
Total Sources
I2,050,000
1 99,652
1 100,348 1 off 250,000
1 200,000
1 350,000
1 350,000
350,000
1 350,000
32
TRANSPORTATION IMPROVEMENT PROGRAM
Project Title: Traffic Safety Program
Community Planning Area: Citywide
Functional Classification: various
Project Length: various
Fund: 317
Project: 122115
Contact: Chris Barnes
Traffic Safety Program
TIP No. 6
425-430-7220
act Description:
ongoing yearly program provides funding for special small-scale traffic safety improvements that are identified and require materials, labor or equipment. This program
des converting school zone signs to electronic operation, installation of pedestrian safety traffic signals including Rectangular Rapid Flashing Beacons (RRFB), and Hawk hybrid
:on signals, bulbouts and radar speed signs for traffic calming.
Justification:
Historically, this level of traffic safety improvements are required on an annual basis. This program budgets for safety projects to address these needs. Projects are typically
dentified through citizen concerns, analysis of accident records or observation by City Traffic Operations personnel.
speed zone flashing beacons and speed radar signs will be installed for traffic calming.
Funded: 1 596,809 Unfunded: 1 600,000
Programmed
Pre-2019
Six
-Year Program
Project Expenditures &Resources
Programmed
Spent2017
2018 2019
2020
2021
2022
2023
2024
Expenditures:
Planning
34,905
34,905
- -
-
-
-
-
-
Preliminary Engineering
139,000
-
19,000 r r r 20,000
20,000
20,000
20,000
20,000
20,000
R-O-W (includes Admin)
-
-
- -
-
-
-
-
-
Construction
948,904
160,904
68,000 r r r 120,000
120,000
120,000
120,000
120,000
120,000
Construction Services
63,000
-
3,000 r r r 10,000
10,000
10,000
10,000
10,000
10,000
Post Construction Services
-
-
- -
-
-
-
-
-
Other (Trans to 503)
11,000
11,000
- -
-
-
-
-
-
Total Expenses
1,196,809
206,809
90,000 - 1 1 off 150,000
150,000
150,000
150,000
150,000
150,000
Resources:
Vehicle Fuel Tax
-
-
- -
-
-
-
-
-
Business & Occupation Share
345,000
55,000
90,000 of r r r 130,000
70,000
Fund Balance
113,259
103,259
- 1 r r r 10,000
-
Grants Awarded (1)
-
-
-
Grants Awarded (2)
-
-
-
-
Mitigation
95,000
5,000
•0 r r r 10,000
80,000
Bonds/LID'sFormed
-
-
-
-
Other (Landing Reimb)
43,550
43,550
Other (2)
-
-
Undetermined
1 600,000
- .11 r r r
150,000
1 150,000
150,000
1 150,000
Total Sources
11,196,8091
206,809
1 90,000 - 1 1 off 150,000
1 150,000
1 150,000
1 150,000
150,000
1 150,000
33
TRANSPORTATION IMPROVEMENT PROGRAM
Project Title: Traffic Operation Devices Program
Community Planning Area: Citywide
Functional Classification: N/A
Project Length: N/A
Traffic Operation Devices Program
TIP No. 7
Fund: 317
Project: 122904
Contact: Eric Cutshall 425-430-7423
oject Description:
e City of Renton owns and operates 135 traffic signals, 4800+ street lights, 700+ lane miles and 12,000+ signs. This program replaces failed video detection cameras, signal heads,
;nal cabinets, UPS batteries and LED indications as needed based on the findings from yearly maintenance programs. This program also provides for new/replacement of signs
at are obsolete, faded or that do not meet retro reflectivity requirements, replacement of damaged luminaire and signal poles. This program also replaces pavement markings
d failed C-curbing with a more maintenance friendly composite curbing.
Justification:
Most of Renton's traffic signals and UPS systems require extensive maintenance and replacement programs to keep traffic signals operating as efficiently as possible. Signage
requires a maintenance program to maintain retro reflectivity requirements. Pavement deterioration has increased the number of failed loops throughout the City and as loops fail
they are replaced with video detection cameras and associated equipment.
ng based on findings of yearly maintenance programs and engineering work orders.
Funded: 1 999,000 1 Unfunded: I -
Programmed
Pre-2019
Six
-Year Program
Project Expenditures &Resources
Programmed
Spent2017
2018 2019
2020
2021
2022
2023
2024
Expenditures:
Planning
-
Preliminary Engineering
R-O-W (includes Admin)
-
- -
-
-
-
-
-
Construction
999,000
135,763
143,237 120,000
120,000
120,000
120,000
120,000
120,000
Construction Services
-
- -
-
-
-
-
-
Post Construction Services
Other
-
-
- -
-
-
-
-
-
Total Expenses
999,000
135,763
143,237 1 off 120,000
120,000
120,000
120,000
120,000
120,000
Resources:
Vehicle Fuel Tax
-
-
- -
-
-
-
-
-
Business & Occupation Share
902,000
62,000
120,000 1 120,000
120,000
120,000
120,000
120,000
120,000
Fund Balance
97,000
73,763
23,237 -
-
-
-
-
-
Grants Awarded (1)
-
-
-
Grants Awarded (2)
Mitigation
Bonds/LIDs Formed
Other (1)
Other (2)
Undetermined
Total Sources
999,000
135,763
143,237 11111M 120,000
1 120,000
120,000
120,000
120,000
120,000
34
TRANSPORTATION IMPROVEMENT PROGRAM
Project Title: Intelligent Transportation Systems (ITS) Program
Community Planning Area: Citywide
Functional Classification: N/A
Project Length: N/A
Intelligent Transportation Systems (ITS) Program
TIP No. 8
Fund: 317
Project: 122162
Contact: Eric Cutshall 425-430-7423
Description:
s for improvements to the operational efficiency of the roadway system, including development and implementation of signal coordination programs, Adaptive Signal
installation of fiber communication, PTZ cameras, Radar signs, LED signs, transit signal priority, Intelligent Traffic Systems (ITS) Master Plan and signal improvements such as
ve/permissive phasing.
proving the capacity and efficiency of the existing roadway system is a cost effective element of the transportation program. Installing fiber communication creates higher
ndwidths so PTZ cameras can be installed. Fiber optic communication provides the Traffic Management Center with real time traffic conditions, adaptive signal control and ability
view video detection systems. The goal is to have fiber installed to all 135 traffic signals.
program is currently in the process of installing fiber communications and expanding adaptive signal control which affects 70% of the City's traffic signals.
additional $30,000/yr has been allocated to this program.
Funded: 1 190,000 Unfunded: 1 240,000
Programmed
Pre-2019
Six
-Year Program
Project Expenditures &Resources
Programmed
Spent2017
2018 2019
2020
2021
2022
2023
2024
Expenditures:
Planning
-
- -
-
-
-
-
-
Preliminary Engineering
65,000
5,000 •1 oil 10,000
10,000
10,000
10,000
10,000
10,000
R-O-W (includes Admin)
-
-
- -
-
-
-
-
-
Construction
300,000
38,015
21,985 1 off 40,000
40,000
40,000
40,000
40,000
40,000
Construction Services
65,000
-
5,000 .1 oil 10,000
10,000
10,000
10,000
10,000
10,000
Post Construction Services
-
- -
-
-
-
-
-
Other
-
-
- -
-
-
-
-
-
Total Expenses
430,000
38,015
31,985 • 1 off 60,000
60,000
60,000
60,000
60,000
60,000
Resources:
Vehicle Fuel Tax
-
-
- -
-
-
-
-
-
Business & Occupation Share
60,000
30,000
30,000
Fund Balance
10,000
8,015
1,985
Grants Awarded (1)
-
-
-
Grants Awarded (2)
-
-
-
Mitigation
120,000
1 off 60,000
60,000
Bonds/ LID's Formed
-
-
-
Other (1)
Other (2)
Undetermined
1 240,000
-
Ir r r
60,000
1 60,000
1 60,000
1 60,000
Total Sources
430,0001
38,015
1 31,985 • 1 off 60,000
60,000
60,000
60,000
60,000
60,000
35
TRANSPORTATION IMPROVEMENT PROGRAM
Project Title: Sidewalk Rehabilitation and Replacement Program
Community Planning Area: Citywide
Functional Classification: various
Project Length: N/A
Sidewalk Rehabilitation and Replacement Program
TIP No. 9
Fund: 317
Project: 122801
Contact: Michelle Faltaous 425-430-2270
act Description:
program provides for the replacement of existing curb and gutter, sidewalks, and curb ramps where such facilities have deteriorated or have been damaged.
Justification:
In order to address deficiencies and provide safe and convenient non -motorized facilities for pedestrians in neighborhoods, the City must have a program to analyze, repair or
replace damaged or deteriorated curb and gutter, sidewalks, and curb ramps. There are some places where curb ramps do not exist or are not to current ADA standards and they
will be upgraded through this program.
continue to receive location requests from the public and other staff for review and prioritization.
2019 program funding will be used to repair the sidewalk along Rainier Ave between S 2nd St and Tobin.
Funded: 1 1,572,030 Unfunded: I -
Programmed
Pre-2019
Six
-Year Program
Project Expenditures &Resources
Programmed
Spent2017
2018 2019
2020
2021
2022
2023
2024
Expenditures:
Planning
204
204
-
Preliminary Engineering
61,822
61,822
R-O-W (includes Admin)
-
-
- -
-
-
-
-
-
Construction
1,498,537
361,679
486,858 100,000
110,000
110,000
110,000
110,000
110,000
Construction Services
11,467
11,467
- -
-
-
-
-
-
Post Construction Services
-
-
Other
-
-
- -
-
-
-
-
-
Total Expenses
1,572,030
435,172
486,858 1 off 100,000
110,000
110,000
110,000
110,000
110,000
Resources:
Vehicle Fuel Tax
-
-
- -
-
-
-
-
-
Business & Occupation Share
850,000
100,000
100,000 r r r 100,000
110,000
110,000
110,000
110,000
110,000
Fund Balance
722,030
335,172
386,858 -
-
-
-
-
-
Grants Awarded (1)
-
-
-
Grants Awarded (2)
Mitigation
Bonds/LIDs Formed
Other (1)
Other (2)
Undetermined
Total Sources
1,572,030
435,172
486,858 11111M 100,000
110,000
110,000
110,000
110,000
110,0 00
36
TRANSPORTATION IMPROVEMENT PROGRAM
Project Title: Bridge Inspection & Repair Program
Community Planning Area: Citywide
Functional Classification: N/A
Project Length: N/A
Bridge Inspection & Repair Program
TIP No. 10
Fund: 317
Project: 120106
Contact: Derek Akesson 425-430-7337
'oject Description:
ie Transportation Division inspects 27 bridge structures owned by the City of Renton, every two years. The purpose of these inspections is to monitor the condition of bridge
ements in order to identify structural deficiencies in need of repair. The goals of the program are to keep the bridges open and safe for public use, preserve bridge infrastructure
t maximizing the useful lie through active maintenance, retrofitting and rehabilitation, and replace bridges with reliable new structures when repair or rehabilitation is not
asible.
Justification:
Per Federal Regulations, the City is required to perform a bridge condition inspection for all bridges, located in the public right-of-way and open for public use, that span 20-ft or
more. WSDOT recommends condition inspections be performed on all short span and pedestrian bridges, located with the public right-of-way and open for public use. In order to
qualify for Federal Highway Administration (FHWA) bridge funding, the City must stay in compliance with the Federal Regulations.
nds shown under construction are for minor repairs to bridge structures.
Funded: 1 565,056 Unfunded: 1 200,000
Programmed
Pre-2019
Six
-Year Program
Project Expenditures &Resources
Programmed
Spent2017
2018 2019
2020
2021
2022
2023
2024
Expenditures:
Planning
-
-
- -
-
-
-
-
-
Preliminary Engineering
385,056
88,056
87,000 r r r 30,000
20,000
40,000
40,000
40,000
40,000
R-O-W (includes Admin)
-
-
- -
-
-
-
-
-
Construction
162,000
15,000 r r r 20,000
17,000
20,000
35,000
20,000
35,000
Construction Services
-
- -
-
-
-
-
-
Post Construction Services
218,000
35,000 r r r 40,000
13,000
40,000
25,000
40,000
25,000
Other
-
- -
-
-
-
-
-
Total Expenses
765,056
88,056
137,000 M off 90,000
50,000
100,000
100,000
100,000
100,000
Resources:
Vehicle Fuel Tax
-
-
- -
-
-
-
-
-
Business & Occupation Share
450,000
50,000
60,000 1 r r r 90,000
50,000
50,000
50,000
50,000
50,000
Fund Balance
115,056
38,056
77,000 -
-
-
-
-
-
Grants Awarded (FEMA)
-
-
-
Grants Awarded (State Share)
Mitigation
Bonds / LID's Formed
Other (1)
Other (2)
Undetermined
1 200,000
- of rrr -
1
150,000
1 50,000
50,000
50,000
Total Sources
1 765,0561
88,056
1 137,000 , I off 90,000
1 50,000
1 100,000
1 100,000
100,000
100,000
37
TRANSPORTATION IMPROVEMENT PROGRAM
Barrier Free Transition Plan Implementation
TIP No. 11
Project Title: Barrier Free Transition Plan Implementation
Community Planning Area: Citywide Fund: 317
Functional Classification: N/A Project: 122705
Project Length: N/A Contact: Dan Hasty 425-430-7217
act Description:
program provides funding for designing and building features on an "as needed" basis in response to individual requests to improve access for individuals with special needs. A
act list has been developed based upon sites identified in the Transition Plan section of the City of Renton Comprehensive Citywide Sidewalk Study.
Justification:
program implements projects that support the City's effort to transition pedestrian facilities within the right-of-way into conformity with provisions contained in the Americans
Disabilities Act (ADA) Guidelines. The ADA Transition Plan has been adopted on May 18 2015. A programmatic approach is required to ensure compliance with federal law.
ice of the GIS database to continue Self Evaluation of existing curb ramps, newly constructed curb ramps, annexations, capital improvement projects, and/or physical
changes is ongoing.
additional $30,000 for 2019 and $40,000/yr for years 2020-2024 have been allocated to this program.
Funded: 1 200,000 1 Unfunded: 1 320,000
Programmed
Pre-2019
Six
-Year Program
Project Expenditures &Resources
Programmed
Spent2017
2018 2019
2020
2021
2022
2023
2024
Expenditures:
Planning
65,000
5,000 10,000
10,000
10,000
10,000
10,000
10,000
Preliminary Engineering
-
-
-
-
-
-
-
R-O-W(includes Admin)
-
-
- -
-
-
-
-
-
Construction
416,000
5,171
46,829 off44,000
64,000
64,000
64,000
64,000
64,000
Construction Services
39,000
-
3,000 .rrr 6,000
6,000
6,000
6,000
6,000
6,000
Post Construction Services
-
- -
-
-
-
-
-
Other
-
-
- -
-
-
-
-
-
Total Expenses
520,000
5,171
54,829 • 1 off 60,000
80,000
80,000
80,000
80,000
80,000
Resources:
Vehicle Fuel Tax
-
-
- -
-
-
-
-
-
Business & Occupation Share
175,171
5,171
30,000 1 r r r 60,000
80,000
Fund Balance
24,829
-
24,829 -
-
Grants Awarded (1)
-
-
Grants Awarded (2)
Mitigation
Bonds/LIDs Formed
Other (1)
Other (2)
Undetermined
1 320,000
- r r r
80,000
1 80,000
1 80,000
1 80,000
Total Sources
1 520,0001
5,171
1 54,829 -1 off 60,000
1 80,000
1 80,000
1 80,000
1 80,000
1 80,000
38
TRANSPORTATION IMPROVEMENT PROGRAM
Project Development & Pre -Design Program
TIP No. 12
Project Title: Project Development & Pre -Design Program
Community Planning Area: Citywide Fund: 317
Functional Classification: N/A Project: 122150
Project Length: N/A Contact: Vangie Garcia 425-430-7319
oject Description:
rform critical activities needed for the development of transportation projects that will best serve the needs of Renton and be eligible for grant applications. Also provides for
e monitoring of active grant projects for compliance with State and Federal laws, regulations and specifications.
Justification:
Other critical activities to develop future capital improvement projects consist of but are not limited to project scoping, cost estimates, pre -design, interlocal agreements, analyses
of existing and projected transportation problems, local and regional mobility goals and deficiency analysis.
program includes small studies funding. Transportation, in partnership with Parks Division is updating the Trail and Bicycle Master Plan.
Trails and Bicycle Master Plan Update is anticipated to be completed in the end of 2018. Once the Trails and Bicycle Master Plan is complete, staff will work on updating the
iprehensive Citywide Walkway Study (last updated in 2009).
Funded: 1 1,110,000 Unfunded: I -
Programmed Pre-2019 Six -Year Program
Project Expenditures &Resources
Programmed
Spent2017
2018 2019
2020
2021
2022
2023
2024
Expenditures:
Planning
766,795
77,233
89,562 .11 rrr 100,000
100,000
100,000
100,000
100,000
100,000
Preliminary Engineering
343,204
13,204
30,000 rrr 50,000
50,000
50,000
50,000
50,000
50,000
R-O-W (includes Admin)
-
-
- -
-
-
-
-
Construction
Construction Services
Post Construction Services
Other
-
-
- -
-
-
Total Expenses
1,110,000
90,438
119,562 • 1 1 off 150,000
150,000
150,000
150,000
150,000
150,000
Resources:
Vehicle Fuel Tax
-
-
- -
-
-
-
-
-
Business & Occupation Share
1,110,000
90,438
119,562 •1 1 rrr 150,000
150,000
150,000
150,000
150,000
150,000
Fund Balance
-
-
- -
-
-
-
-
-
Grants Awarded (1)
Grants Awarded (2)
Mitigation
Bonds/LIDs Formed
Other (1)
Other (2)
Undetermined
Total Sources
1,110,000
90,438
119,562 11111M 150,000
150,000
150,000
150,000
150,000
150,000
39
TRANSPORTATION IMPROVEMENT PROGRAM
Project Title: Arterial Circulation Program
Community Planning Area: Citywide
Functional Classification: N/A
Project Length: N/A
Arterial Circulation Program
TIP No. 13
Fund: 317
Project: 120029
Contact: Vangie Garcia 425-430-7319
act Description:
program provides for the short and long-range planning and traffic analyses required to evaluate and update proposed transportation improvements projects, to assess the
icts of new development proposals, and to recommend local and regional transportation system improvements for all modes of travel. This program also covers programmatic
ities to maintain eligibility for grant funding, such as assuring that project specifications and management comply with current State and Federal standards and regulations,
VI reporting and ADA Transition Plan implementation. This program will also provide coordination with the 1-405 project team, to assure it provides the maximum benefits and
mum problems for Renton's transportation system.
Justification:
State and Federal government regulations and legislation, the Growth Management Act (GMA), and the Puget Sound Regional Council Vision 2040 highlight the increasing
mportance of making sure that local and regional transportation plans are coordinated to the benefit of Renton make ongoing multi -modal planning a high priority need. In order
to meet the City's Business Plan Goals, transportation will play a key role with public and private partnerships to promote economic vitality.
project will fund the ongoing planning work which will lead to refinement and/or adjustment of the of improvement projects on the arterial network identified in the
sportation Element of the City's 2015 Comprehensive Plan and other long-range planning documents.
will develop a work plan to create a Transit Master Plan.
Funded: 1 1,095,000 1 Unfunded: I -
Programmed Pre-2019 Six -Year Program
Project Expenditures &Resources
Programmed
Spent2017
2018 2019
2020
2021
2022
2023
2024
Expenditures:
Planning
1,095,000
53,454
146,546 r r r 145,000
150,000
150,000
150,000
150,000
150,000
Preliminary Engineering
-
-
-
-
-
-
-
-
R-O-W (includes Admin)
Construction
Construction Services
Post Construction Services
Other
-
-
- -
-
-
Total Expenses
1,095,000
53,454
146,546 W off 145,000
150,000
150,000
150,000
150,000
150,000
Resources:
Vehicle Fuel Tax
-
-
- -
-
-
-
-
-
Business & Occupation Share
1,093,454
53,454
145,000 r r r 145,000
150,000
150,000
150,000
150,000
150,000
Fund Balance
1,546
1,546 -
-
-
-
-
-
Grants Awarded (1)
-
-
Grants Awarded (2)
Mitigation
Bonds/LIDs Formed
Other (1)
Other (2)
Undetermined
Total Sources
1,095,000
53,454
146,546 11111M 145,000
150,000
150,000
150,000
150,000
150,000
40
TRANSPORTATION IMPROVEMENT PROGRAM
Project Title: 1% For The Arts Program
Community Planning Area: N/A
Functional Classification: N/A
Project Length: N/A
1% For The Arts Program
TIP No. 14
Fund: 317
Project: 122112
Contact: Heather Gregersen 425-430-7393
eject Description:
nding is tied to the calculated share of eligible types of transportation projects and transportation funding subject to the City's 1% for the Arts Program. All gateway project
Dposals under this program are subject to approval of the Arts Commission.
Justification:
program transfers funds to Fund 125, which is being managed by the Department of Community and Economic Development.
;ram is now based on actual design and construction costs.
151 was transferred in 2013 for 2012 capital expenditures.
454 was transferred in 2014 for 2013 capital expenditures.
44 was transferred in 2015 for 2014 capital expenditures.
767 was transferred in 2016 for 2015 expenditures.
823 was transferred in 2017 for 2016 expenditures.
Funded: 1 133,823 Unfunded: I -
Programmed Pre-2019 Six -Year Program
Project Expenditures &Resources
Programmed
Spent2017
2018 2019
2020
2021
2022
2023
2024
Expenditures:
Planning
133,823
28,823
15,000 r r r 15,000
15,000
15,000
15,000
15,000
15,000
Preliminary Engineering
-
-
- -
-
-
-
-
-
R-O-W (includes Admin)
Construction
Construction Services
Post Construction Services
Other
-
-
- -
-
-
Total Expenses
133,823
28,823
15,000 .1 off 15,000
15,000
15,000
15,000
15,000
15,000
Resources:
Vehicle Fuel Tax
-
-
- -
-
-
-
-
-
Business & Occupation Share
133,823
28,823
15,000 •1 r r r 15,000
15,000
15,000
15,000
15,000
15,000
Fund Balance
-
-
- -
-
-
-
-
Grants Awarded (1)
Grants Awarded (2)
Mitigation
Bonds/LIDs Formed
Other (1)
Other (2)
Undetermined
Total Sources
133,823
28,823
15,000 11111M 15,000
15,000
15,000
15,000
15,000
15,000
41
TRANSPORTATION IMPROVEMENT PROGRAM
Project Title: Bronson Way Bridge - Seismic Retrofit and Painting
Community Planning Area: City Center
Functional Classification: N/A
Project Length: N/A
Bronson Way Bridge - Seismic Retrofit and Painting
TIP No. 15
Fund: 317
Project: NEW
Contact: Derek Akesson 425-430-7337
oject Description:
e Bronson Way Bridge was built by WSDOT in 1939. Ownership was transferred to the City in January 2018 as part of the SR-900 turnback agreement. It is a three span bridge
at crosses over the Cedar River. The project will remove the existing paint from the steel girders, repair corrosion damage and apply a new protective paint system. The project
II also perform a seismic analysis and retrofit along with other improvements.
Justification:
The main span is carried by steel girders. The girders are coated with paint to protect the steel from corrosion. Corrosion causes section loss which results in a reduced load carrying
capacity of the girders. The existing paint is failing. The bridge is located in a zone of moderate to high liquefication susceptibility during seismic events.
w project. In April 2018, the project was awarded $3,000,000 of Washington State funding (2018 Supplemental Transportation Budget) to perform a seismic retrofit and painting
the bridge. No local match is required.
Funded: 1 3,000,000 1 Unfunded: I -
Programmed
Pre-2019
Six
-Year Program
Project Expenditures &Resources
Programmed
Pre-2018
2018 2019
2020
2021
2022
2023
2024
Expenditures:
Planning
-
- -
-
-
Preliminary Engineering
620,000
70,000 r r r 420,000
130,000
R-O-W (includes Admin)
-
- -
-
Construction
1,950,000
r r r
1,950,000
Construction Services
430,000
1 oil
430,000
Post Construction Services
-
-
Other
-
-
-
Total Expenses
3,000,000
70,000 1 off 420,000
2,510,000
Resources:
Vehicle Fuel Tax
-
- -
-
Business & Occupation Share
Fund Balance
-
- -
-
Grants Awarded (FHWA Bridg
3,000,000
70,000 r r r 420,000
2,510,000
Grants Awarded (2)
-
- -
-
Mitigation
Bonds / LID's Formed
Other (1)
Other (2)
Undetermined
Total Sources
3,000,000
70,000 11111M 420,000
2,510,000
42
TRANSPORTATION IMPROVEMENT PROGRAM
Project Title: Duvall Ave NE - NE 7th St to Sunset Blvd NE
Community Planning Area: Highlands & East Plateau
Functional Classification: Minor Arterial
Project Length: 0.67 mi
Duvall Ave NE - NE 7th St to Sunset Blvd NE
TIP No. 16
Fund: 317
Project: 122702
Contact: Flora Lee 425-430-7303
Project Description:
Reconstruction/resurfacing of roadway, including new pavement, curb, gutter, sidewalk, street lights, storm drainage, channelization and bike lanes from NE 7th St to Sunset Blvd
NE.
Complete roadway improvements, bicycle lanes and sidewalks on Duvall Ave NE, from NE 7th St to Sunset Blvd NE. Condition of the existing roadway pavement requires road
reconstruction in segments of the roadway. Project will enhance safety for pedestrians, bicyclists and vehicular along this corridor.
City was awarded a TIB grant in the amount of $3,468,289 (2015) for the roadway reconstruction between NE 10th St and NE 12th St, curb, gutter, sidewalk and streetlights on
west side and channelization from NE 12th St to south of the intersection with NE Sunset Blvd. The City was also awarded a Department of Ecology (DOE) grant (2018) in the
)unt of $1,223,939 for water quality improvements via the installation of water quality treatment facilities. A future phase will install non -motorized improvements along the
side of Duvall Ave NE, from NE 7th St to NE 12th St.
project is anticipated to be ready for construction in early 2019.
Funded: 1 6,503,824 Unfunded: I -
Programmed Pre-2019 Six -Year Program
Project Expenditures &Resources
Programmed
Pre-2018
2018 2019
2020
2021
2022
2023
2024
Expenditures:
Planning
-
-
- -
-
Preliminary Engineering
1,044,136
353,250
335,435 355,451
R-O-W (includes Admin)
-
-
- -
Construction
4,559,488
3,576,000 983,488
Construction Services
900,200
727,000 173,200
Post Construction Services
-
- -
Other
-
- -
TotalExpenses
6,503,824
353,250
4,638,435 1,512,139
Resources:
Vehicle Fuel Tax
-
-
- -
Business & Occupation Share
90,000
-
60,000 r off 30,000
Fund Balance & Held Reserve
649,121
90,838
447,658 r 110,625
Grants Awarded (TIB 74.285%
3,468,289
262,412
3,205,877 -
Grants Awarded (DOE 75%)
1,223,939
-
174,900 r 1,049,039
Mitigation
1,072,475
750,000 322,475
Bonds / LID's Formed
-
- -
Other (Water Dept)
Other (2)
Undetermined
Total Sources
6,503,824
353,250
4,638,435 9 VM 1,512,139
43
TRANSPORTATION IMPROVEMENT PROGRAM
Project Title: Houser Way Bridge - Seismic Retrofit and Painting
Community Planning Area: City Center
Functional Classification: N/A
Project Length: N/A
Houser Way Bridge - Seismic Retrofit and Painting
TIP No. 17
Fund: 317
Project: NEW
Contact: Derek Akesson 425-430-7337
ect Description:
Houser Way Bridge was built by the City of Renton in 1960. It is a three span bridge that crosses over the Cedar River. The project will remove the existing paint from the steel
ars, repair corrosion damage and apply a new protective paint system. The project will also perform a seismic analysis and retrofit and replace/upgrade the bridge rails along
other improvements.
main span is carried by steel girders. The girders are coated with paint to protect the steel from corrosion. Corrosion causes section loss which results in a reduced load carrying
icity of the girders. The existing paint is failing. The bridge is located in a zone of moderate to high liquification susceptibility during seismic events. The bridge rail has been
F project. In late 2017, the project was awarded a Federal Highway Administration (FHWA) grant of $2,999,000 to perform a seismic retrofit and painting of the bridge. A 13.5%
1 match is required for Preliminary Engineering and ROW. If construction is authorized by December 2020, the project is eligible for 100% FHWA funding for the eligible costs.
Funded: 1 3,071,900 Unfunded: 1 222,550
Programmed Pre-2019 Six -Year Program
Project Expenditures &Resources
Programmed
pre-2018
2018 2019
2020
2021
2022
2023
2024
Expenditures:
Planning
-
- -
-
Preliminary Engineering
620,000
70,000 1 off 420,000
130,000
R-O-W (includes Admin)
50,000
- I off 50,000
-
Construction
2,189,450
r -
2,189,450
-
Construction Services
435,000
low
212,450
222,550
Post Construction Services
-
-
-
Other
-
-
-
-
Total Expenses
3,294,450
70,000 470,000
2,531,900
222,550
Resources:
Vehicle Fuel Tax
-
- -
-
-
Business & Occupation Share
-
- -
Fund Balance
72,900
9,450 r 63,450
-
Grants Awarded (FHWA Bridg
2,999,000
60,550 r 406,550
2,531,900
Grants Awarded (2)
- -
-
Mitigation
Bonds / LID's Formed
Other (1)
Other (2)
Undetermined
1 222,550
-
222,550
Total Sources
13,294,4501
1 70,000 470,000
1 2,531,900
1 222,550
44
TRANSPORTATION IMPROVEMENT PROGRAM
Project Title: Lake Washington Loop Trail
Community Planning Area: City Center
Functional Classification: varies
Project Length: N/A
Lake Washington Loop Trail
TIP No. 18
Fund: 317
Project: 122802
Contact: Michelle Faltaous 425-430-7301
eject Description:
e project will construct approximately 1.3 miles of pedestrian and bicycle facilities to complete a gap in the Lake Washington trail system. Improvements include a 12-foot wide
mbined pedestrian/bicycle path, a landscaped buffer separating the path from the travelled roadway, pedestrian level lighting. For the segment located along Airport Way, the
:ilities will include a bike track and sidewalk, which will involve removing one westbound lane of traffic on Airport Way.
Justification:
The project will separate pedestrians and bicyclists from the vehicular traffic, enhancing safety and encouraging residents to use active transportation modes.
City was awarded the following grants: TAP = $346,000 (2013); STP Non -Motorized = $575,000 (2015); Ped & Bike = $426,000 (2015); STP = $1,694,278; Ped & Bike Safety = $
000 (under recommendation for 2017). Construction has been implemented in phases, with Phases 1 and 2 completed. Phase 3 (Logan Ave N/Cedar River to Rainier Ave N)
gn is underway.Phase 4 is from Airport Way/Rainier Ave N intersection to north City limits (programmed in 2020-2022).
se 3 construction is expected to start in the fall or winter of 2019.
Funded: 1 3,903,301 Unfunded: 1 5,400,000
Programmed Pre-2019 Six -Year Program
Project Expenditures &Resources
Programmed
pre-2018
2018 2019
2020
2021
2022
2023
2024
Expenditures:
Planning
-
-
-
-
-
Preliminary Engineering
2,261,301
597,219
314,082 r r r
1,200,000
150,000
R-O-W(includesAdmin)
670,000
-
670,000 -
-
-
-
-
Construction
4,880,000
530,000 r r r 300,000
1,350,000
200,000
2,500,000
Construction Services
1,492,000
27,000 r r r 40,000
75,000
600,000
750,000
Post Construction Services
-
- -
-
-
Other
-
- -
-
-
-
Total Expenses
9,303,301
597,219
1,541,082 340,000
1,425,000
1,200,000
950,000
3,250,000
Resources:
Vehicle Fuel Tax
-
-
- -
-
-
-
-
Business & Occupation Share
124,984
49,984
r r r
75,000
Fund Balance + Held Reserve
-
-
-
-
Grants Awarded (TAP)
346,000
329,855
16,145
Grants Awarded (STP ROW)
575,000
-
575,000
Grants Awarded (Ped/Bike
Program - PE Phase 3)
426,000
217,380
208,620
Grants Awarded (Ped/Bike
Program - CN)
430,000
370,659 59,341
-
-
-
-
Grants Awarded (STP - CN
Phase 3
1,694,278
370,658 r 280,659
1,042,961
Mitigation
307,039
- r -
307,039
Bonds / LID's Formed
-
-
Other (1)
Other (2)
Undetermined
1 5,400,000
- of rrr
-
1,200,000
1 950,000
1 3,250,000
Total Sources
19,303,3011
597,219
1 1,541,082 340,000
1 1,425,000
1,200,000
1 950,000
1 3,250,000
45
TRANSPORTATION IMPROVEMENT PROGRAM
NE Sunset Boulevard (SR 900) Corridor Improvements
TIP No. 19
Project Title: NE Sunset Boulevard (SR 900) Corridor Improvements
Community Planning Area: Highlands Fund: 317
Functional Classification: Principal Project: 122902
Project Length: 3.0 mi Contact: Keith Woolley 425-430-7318
act Description:
project will seek to address pedestrian, transit and bicycle needs. This corridor needs a series of key improvements to improve traffic operations such as channelization, traffic
31 modifications, signal treatments, possible queue jumps, access management through installation of medians. The corridor limits are from 1-405 on the west and to the east
limits.
Justification:
This corridor has strong potential for non -motorized and transit usage. The Sunset area is experiencing residential and retail growth.
The Sunset Area Planned Action EIS prepared in 2011 delineated transportation needs along Sunset Blvd from N Park Dr to Monroe Ave NE (estimated at $33M).
project has received a STP/CMAQ grant in the amount of $1,313,935 for design and is on the PSRC contingency list for ROW funding. Transportation will continue to look into
er funding sources, such as TIB, for the ROW and construction phases.
Design of the corridor improvements is completed. WSDOT is currently reviewing the channelization plan. Project will be on hold until ROW funding can be identified.
Funded: 1 2,150,833 Unfunded: 1 29,850,000
Programmed Pre-2019 Six -Year Program
Project Expenditures &Resources
Programmed
pre-2018
2018 2019
2020
2021
2022
2023
2024
Expenditures:
Planning
200,000
200,000
- -
-
-
-
Preliminary Engineering
3,500,833
501,831
990,002 209,000
-
1,000,000
600,000
200,000
R-O-W (includes Admin)
3,300,000
-
- 250,000
2,750,000
300,000
-
-
-
Construction
20,000,000
1 off III -
-
5,000,000
5,000,000
5,000,000
5,000,000
Construction Services
5,000,000
off 1 1 1
1,250,000
1,250,000
1,250,000
1,250,000
Post Construction Services
-
-
-
-
-
Other
-
-
-
-
-
Total Expenses
32,000,833
701,831
990,002 0 W off 459,000
2,750,000
7,550,000
6,850,000
6,450,000
6,250,000
Resources:
Vehicle Fuel Tax
-
-
- -
-
-
-
-
-
Business & Occupation Share
312,866
2,364
277,527 32,975
Fund Balance + Held Reserve
324,032
74,032
250,000 -
Grants Awarded (STP/CMAQ)
1,313,935
425,435
462,475 426,025
Grants Awarded (2)
-
-
- -
Mitigation
Bonds /LID'sFormed
-
-
Other (BEET)
200,000
200,000
Other (2)
-
-
Undetermined
29,850,000
2,750,000
1 7,550,000
6,850,000
1 6,450,000
1 6,250,000
Total Sources
32,000,833
701,831
990,002 0 1 off 459,000
2,750,000
1 7,550,000
6,850,000
1 6,450,000
1 6,250,000
46
TRANSPORTATION IMPROVEMENT PROGRAM
Project Title: Park Avenue North Extension
Community Planning Area: City Center
Functional Classification: N/A
Project Length: 0.23 mi
Park Avenue North Extension
TIP No. 20
Fund: 317
Project: 122190
Contact: Hebe Bernardo 425-430-7232
Project Description:
The project will extend Park Ave N to the north of Logan Ave N, to provide access to Southport, PSE property and The Boeing Company. Improvements include bicycle and
pedestrian facilities, illumination, landscaping.
With the additional development growth in the North Renton area, which includes The Landing and the Southport residential/hotel/office development, this project will construct
improvements to improve accessibility.
design work will be completed in 2019 and the project is scheduled to go to bid in June of 2019.
Funded: 1 7,500,000 Unfunded: I -
Programmed
Pre-2019
Six
-Year Program
Project Expenditures &Resources
Programmed
pre-2018
2018 2019
2020
2021
2022
2023
2024
Expenditures:
Planning
-
-
- -
Preliminary Engineering
1,000,000
100,091
349,909 r off 550,000
R-O-W (includes Admin)
1,500,000
-
300,000 11 off 1,200,000
-
Construction
4,000,000
- III off 3,500,000
500,000
Construction Services
1,000,000
r r r off 875,000
125,000
Post Construction Services
-
-
-
Other (BNSF/Gate)
-
-
-
Total Expenses
7,500,000
100,091
649,909 1 oil 6,125,000
625,000
Resources:
Vehicle Fuel Tax
-
-
- -
-
Business & Occupation Share
-
Fund Balance
150,000 r off (150,000)
Grants In -Hand (1)
-
Grants In -Hand (2)
-
Mitigation In -Hand
100,091
499,909 .11 off (600,000)
Bonds/ LID's Formed
-
- -
-
Other In -Hand (LRF)
7,500,000
rr off 6,875,000
625,000
Other In -Hand (Developer)
-
-
-
Undetermined
Total Sources
7,500,000
100,091
649,909 1 oil 6,125,000
625,000
47
TRANSPORTATION IMPROVEMENT PROGRAM
Project Title: Rainier Ave S/N Phase 4 - S 3rd Street to NW 3rd PI
Community Planning Area: City Center
Functional Classification: Principal
Project Length: 0.51 mi
Rainier Ave S/N Phase 4 - S 3rd Street to NW 3rd PI
TIP No. 21
Fund: 317
Project: 122195
Contact: Michelle Faltaous 425-430-7301
eject Description:
is is Phase 4 of the Rainier Ave Corridor Improvements, and will extend the improvements from S 3rd St to NW 3rd Pl. Project elements include sidewalk widening with
eetscaping, adding pedestrian -scale illumination, adding a pedestrian actuated traffic signal, upgrading existing traffic signals, transit facility improvements, planted buffer
ips and landscaped medians. Also includes a ped/bike path on the east side of Rainier Ave N, between Airport Way and NW 3rd Pl.
nier Ave is a critical corridor in central Renton with existing operational problems and in need of infrastructure enhancements to provide greater ease of non -motorized and
isit-based travel. It also provides improved access to the Renton Airport and Boeing's Renton Plant. Improvements will enhance traffic flow and reduce accidents.
STP grant in the amount of $2,600,000 was awarded (2014) for design of Phase 4 and design is currently underway. Additional STP grants were awarded for Right -of -Way for
I,000,000 and for construction of Phase 4A for $4,500,000.
e 4 of the Rainier Ave S Corridor Improvements has been separated into two phases due to cost and feasibility. Currently, there is a Renton Airport Master Plan process that
affect the alignment of Airport Way, which is at the northern end of Phase 4. This grant request is to fund the construction of Phase 4A from S 3rd St to S Tobin St. The City of
on will construct Phase 4B after the Airport Master Plan is final and approved. *Transportation plans to also apply for a TIB grant for the construction of Phase 4A. Previous
es of Rainier were constructed with TIB funds but if this phase does not receive TIB funding, the City will use local funds to construct the project.
Funded: 1 20,300,000 Unfunded:
Programmed Pre-2019
Six -Year Program
Project Expenditures &Resources
Programmed
pre-2018
2018
2019
2020
2021
2022
2023
2024
Expenditures:
Planning
-
-
-
-
-
Preliminary Engineering
3,000,000
543,395
1,505,282
500,000
451,323
-
R-O-W (includes Admin)
3,500,000
-
-
1,000,000
1,500,000
1,000,000
-
Construction
10,500,000
1 of see -
-
6,000,000
4,500,000
-
Construction Services
3,300,000
1,800,000
1,350,000
150,000
Post Construction Services
-
-
-
-
Other
-
-
-
-
Total Expenses
20,300,000
543,395
1,505,282
1,500,000
1,951,323
8,800,000
5,850,000
150,000
Resources:
Vehicle Fuel Tax
-
-
-
-
-
-
-
-
Business & Occupation Share
709,600
56,387
103,213
0 see
100,000
450,000
Fund Balance
239,552
39,552
100,000
of oil
100,000
-
Grants Awarded (STP PE)
2,600,000
447,456
1,302,069
1 750,475
100,000
-
Grants Awarded (STP ROW)
3,000,000
-
-
off see 442,000
1,258,000
1,300,000
Grants Awarded (STP CN)
4,500,000
of oil -
-
4,500,000
-
-
Mitigation
2,695,848
307,525
593,323
700,000
945,000
150,000
Bonds /LID'sFormed
-
-
-
-
-
-
Other (TIB Grant)*
6,555,000
2,100,000
4,455,000
Undetermined
Total Sources
20,300,500
1 543,395
1 1,505,282
1,500,500
1,951,323
1 8,800,000
5,850,500
150,500
48
TRANSPORTATION IMPROVEMENT PROGRAM
Project Title: Renton Connector
Community Planning Area: City Center
Functional Classification: Urban Collector
Project Length: 0.5 mi
Fund: 317
Project: NEW
Contact: Vangie Garcia
Renton Connector
TIP No. 22
425-430-7319
eject Description:
e Renton Connector project will install a continuous non -motorized facility along Burnett Ave S. between S. 2nd St and S. 5th St via separated walkways, protected bicycle lanes
,cle track), and a multi -use path. This project will also include reduced travel lanes, landscaped medians, and reconfigured public parking areas in order to provide opportunities
incorporate art, play spaces, and resting areas along the connector. Intersection improvements will include traffic signalization improvements and curb ramp upgrades to ADA
a key element of the Downtown Civic Core Vision and Action Plan, The Renton Connector is anew urban trail, or "greenway", that creates a signature Civic Core and Downtown
!en spine and regional trail connection between the Cedar River Trail, Lake to Sound Trail, Lake Washington Loop Trail, and the Eastside Rail Corridor for pedestrians and cyclists
tween the Cedar River, City Hall and the South Renton Transit Center to the South.
Project. Project is pending funding availability. Transportation has applied for grants to begin design and will continue to look into other funding sources.
Funded: Unfunded: 1 13,713,000
Programmed
Pre-2019
Six
-Year Program
Project Expenditures & Resources
Programmed
pre-2018
2018 2019
2020
2021
2022
2023
2024
Expenditures:
Planning
-
-
-
-
Preliminary Engineering
1,500,000
of r r r
278,700
621,300
600,000
R-O-W (includes Admin)
-
-
-
-
-
Construction
12,213,000
off
3,363,000
8,850,000
Construction Services
-
-
Post Construction Services
Other
-
-
-
Total Expenses
13,713,000
278,700
621,300
3,963,000
8,850,000
Resources:
Vehicle Fuel Tax
-
-
-
-
-
Business & Occupation Share
Fund Balance
Grants Awarded (1)
Grants Awarded (2)
Mitigation
Bonds / LID's Formed
Other (1)
Other (2)
Undetermined
1 13,713,000
11
1 2787001
621,300
1 31963,000
8,850,000
Total Sources
13,713,000
oil
278,700
621,300
3,963,000
8,850,000
49
TRANSPORTATION IMPROVEMENT PROGRAM
Project Title: 116th Ave SE Improvements
Community Planning Area: Benson
Functional Classification: Minor Arterial
Project Length: 2.5 mi
116th Ave SE Improvements
TIP No. 23
Fund: 317
Project: 122117
Contact: Flora Lee 425-430-7303
Project Description:
Widen roadway to provide a 3-lane roadway with bike lanes along 116th Ave SE and Edmonds Way SE, including new pavement, curb, gutter, sidewalk, street lights, traffic signals,
storm drainage, channelization and landscaping from Puget Drive SE to the southern City limits. Benson Hill Community Plan recommended improvements for a first phase, based
on the neighborhood needs. The priority, cost and schedule for the phased improvements will be determined based on available funding.
116th Ave SE is classified as a minor arterial. Non -continuous segments of sidewalk exist along the roadway. Improvements will enhance vehicular, bicycle and pedestrian safety
along this important north -south transportation corridor.
corridor improvements are estimated at $33M. Phase 1 Improvements (SE Petrovitsky Rd to SE 168th St) are shown as programmed for 2020-2024. Staff will be developing
pe, cost and schedule for future phases.
Transportation applied for a FY 2020 WSDOT Pedestrian -Bicycle grant for the design of a walkway and a bike lane on the west side of 116th Ave SE, between SE 168th St and SE
160th St.
Funded: 1 875,309 Unfunded: 1 10,100,000
Programmed
Pre-2019
Six
-Year Program
Project Expenditures &Resources
Programmed
pre-2018
2018 2019
2020
2021
2022
2023
2024
Expenditures:
Planning
-
-
-
-
Preliminary Engineering
1,313,179
113,179
rr off
600,000
600,000
R-O-W (includes Admin)
2,800,000
-
: r r off
1,000,000
1,800,000
-
-
Construction
5,315,028
615,028
rr off
-
1,000,000
2,000,000
1,700,000
Construction Services
1,547,102
147,102
rr off
300,000
600,000
500,000
Post Construction Services
-
-
-
-
-
Other
-
-
-
-
Total Expenses
10,975,309
875,309
1 of oil
1,600,000
3,700,000
2,600,000
2,200,000
Resources:
Vehicle Fuel Tax
-
-
-
-
-
Business & Occupation Share
221,638
221,638
Fund Balance
-
-
Grants Awarded (CMAQ+SRTS
653,671
653,671
Grants Awarded (2)
-
-
Mitigation
Bonds / LID's Formed
Other (1 )
Other(2)
Undetermined
10,100,000
1 rr off
1 1,600,000
1 3,700,000
1 21600,000
2,200,000
Total Sources
10,975,309
875,309
1,600,000
3,700,000
2,600,000
2,200,000
50
TRANSPORTATION IMPROVEMENT PROGRAM
Project Title: South 2nd Street Conversion Project
Community Planning Area: City Center
Functional Classification: Principal
Project Length: 0.5 mi
Fund:
Project:
Contact:
South 2nd Street Conversion Project
TIP No. 24
317
Vangie Garcia 425-430-7319
Project Description:
The South 2nd Street Conversion Project will be improving multimodal mobility in around the downtown core by converting an existing 4—lane one-way roadway to a roadway
with one through -lane in each direction between Main Ave South and Rainier Ave South. This project also includes pedestrian and bicycle facilities, traffic operations
improvements, and transit upgrades that will provide better traffic operation and circulation for all modes of transportation. The improvements include a westbound bypass
transit lane from just west of Logan Ave S to just east of Lake Avenue. Transit facility upgrades include new RapiclRide stops and a transit queue jump at the new traffic signal at
the Shattuck intersection.
s project is one of the strategies identified in the City Center Community Plan as well as the Downtown Civic Core Action Plan. The project enhances downtown Renton as a
stination area, while improving circulation and enhancing pedestrian safety and environment. The intersection of S 2nd St and Burnett is key connection to The Renton
nnector Project (TIP No. 22)
grant funding for design is for FY 2021, we hope to request advance construction funds to get started on design in order to apply for more grant opportunities.
The City was awarded $1.2M STP funds for preliminary engineering in the PSRC Countywide competition. There is $300,000 for this project that is third in line on the Regional
project contingency list.
Funded: 1 1,664,931 Unfunded: 15,385,069
Programmed Pre-2019 Six -Year Program
Project Expenditures &Resources
Programmed
pre-2018
2018 2019
2020
2021
2022
2023
2024
Expenditures:
Planning
-
-
-
Preliminary Engineering
1,450,000
100,000
1,350,000
R-O-W (includes Admin)
-
-
-
-
-
Construction
12,000,000
I M off
6,000,000
6,000,000
Construction Services
3,600,000
.11 off
1,800,000
1,800,000
Post Construction Services
-
-
-
Other
-
-
-
Total Expenses
17,050,000
1 1 oil
100,000
1,350,000
7,800,000
7,800,000
Resources:
Vehicle Fuel Tax
-
-
-
-
-
Business & Occupation Share
100,000
is off
100,000
Fund Balance
-
-
-
Grants Awarded (STP)
1,200,000
is off
1,200,000
Grants Awarded (2)
-
-
Mitigation
Bonds/ LID's Formed
-
-
-
Other (WSDOTTurnback)
364,931
150,000
214,931
Other (2)
-
-
-
Undetermined
15,385,069
1 7,585,069
1 7,800,000
Total Sources
17,050,000
1 1 oil
100,000
1,350,000
1 7,800,000
1 7,800,000
51
TRANSPORTATION IMPROVEMENT PROGRAM
Project Title: Williams Ave Bridge - Seismic Retrofit and Painting
Community Planning Area: City Center
Functional Classification: N/A
Project Length: N/A
Williams Ave Bridge - Seismic Retrofit and Painting
TIP No. 25
Fund: 317
Project: NEW
Contact: Derek Akesson 425-430-7337
ect Description:
Williams Ave Bridge was built by the City of Renton in 1954. It is a three span bridge that crosses over the Cedar River. The project will remove the existing paint from the steel
ars, repair corrosion damage and apply a new protective paint system. The project will also perform a seismic analysis and retrofit along with other improvements.
main span is carried by steel girders. The girders are coated with paint to protect the steel from corrosion. Corrosion causes section loss which results in a reduced load
ying capacity of the girders. The existing paint is failing. The bridge is located in a zone of moderate to high liquefication susceptibility during seismic events.
F project. In late 2017, the project was awarded a Federal Highway Administration (FHWA) grant of $2,985,000 to perform a seismic retrofit and painting of the bridge. A 13.5%
1 match is required for Preliminary Engineering and ROW. If construction is authorized by December 2020, the project is eligible for 100% FHWA funding for eligible costs.
Funded: 1 3,280,450 Unfunded: I -
Programmed Pre-2019 Six -Year Program
Project Expenditures &Resources
Programmed
pre-2018
2018 2019
2020
2021
2022
2023
2024
Expenditures:
Planning
-
- -
-
Preliminary Engineering
620,000
70,000 1 off 420,000
130,000
R-O-W (includes Admin)
50,000
- I off 50,000
-
Construction
2,175,450
r -
2,175,450
Construction Services
435,000
off
435,000
Post Construction Services
-
-
Other
-
-
-
Total Expenses
3,280,450
70,000 470,000
2,740,450
Resources:
Vehicle Fuel Tax
-
- -
-
Business & Occupation Share
132,000
9,450 r -
122,550
Fund Balance
163,450
- r 63,450
100,000
Grants Awarded (FHWA Bridg
2,985,000
60,550 r 406,550
2,517,900
Grants Awarded (2)
- -
-
Mitigation
Bonds / LID's Formed
Other (1)
Other (2)
Undetermined
Total Sources
3,280,450
70,000 470,000
2,740,450
52
TRANSPORTATION IMPROVEMENT PROGRAM
Williams Ave S and Wells Ave S Conversion Project
TIP No. 26
Project Title: Williams Ave 5 and Wells Ave 5 Conversion Project
Community Planning Area: City Center Fund: 317
Functional Classification: Principal Project: 122908
Project Length: N/A Contact: Keith Woolley 425-430-7318
Project Description:
The project provides pedestrian and bicyclists facilities and enhancements, traffic operation and circulation improvements in Downtown. The improvements include adding
signalized raised intersections with bulb outs, lighting, street furniture, streetscape, bike racks, signage and converting Williams Ave S and Wells Ave S to two-way traffic
operations.
This project is one of the strategies identified in the City Center Community Plan. The project enhances downtown Renton as a destination area, while improving circulation,
reducing traffic speeds and enhancing pedestrian safety. A feasibility study, including a Downtown Circulation Traffic Analysis for the conversion to two-way operations was
completed.
City was awarded a STP grant in the amount of $3,850,000 in 2016. Design starting in 2017 and construction is anticipated to start in 2019.
Funded: 1 8,452,231 Unfunded: 1 3,472,069
Programmed
Pre-2019
Six
-Year Program
Project Expenditures &Resources
Programmed
pre-2018
2018 2019
2020
2021
2022
2023
2024
Expenditures:
Planning
-
-
-
Preliminary Engineering
1,147,300
128,030
1,019,270
R-O-W (includes Admin)
130,000
-
130,000 -
-
Construction
7,547,000
2,364,931 1,233,800
3,948,269
Construction Services
2,100,000
- 500,000
1,600,000
Post Construction Services
-
-
-
Other (BNSF CM Agreement)
1,000,000
r r r off 200,000
800,000
Total Expenses
11,924,300
128,030
3,514,201 •' 1,933,800
6,348,269
Resources:
Vehicle Fuel Tax
-
-
-
-
Business & Occupation Share
220,000
-
10,000 r off 30,000
180,000
Fund Balance
540,000
128,030
411,970 -
-
Grants Awarded (1)
-
-
- -
-
Grants Awarded (STP)
3,850,000
- 1,453,800
2,396,200
Mitigation
1,157,965
407,965 450,000
300,000
Bonds /LID's Formed
-
- -
-
Other (WSDOT Mitigation)
319,335
319,335
Other (WSDOT Turnback)
2,364,931
2,364,931
Other (Utilties Reimb)
-
-
Undetermined
3,472,069
-
�••
3,472,069
Total Sources
11,924,300
128,030
3,514,201 • ' 1,933,800
6,348,269
53
TRANSPORTATION IMPROVEMENT PROGRAM
Project Title: Carr Road Improvements
Community Planning Area: Talbot & Benson
Functional Classification: Major Arterial
Project Length: N/A
Carr Road Improvements
TIP No. 27
Fund: 317
Project: 122920
Contact: Vangie Garcia 425-430-7319
Project Description:
A corridor study prepared by King County in 2003 identified the need for roadway improvements from Lind Ave SW and SW 43rd St intersection and extend east crossing SR 167
and ending at 116th Ave SE. Potential improvements vary from roadway realignment/widening at several locations to address geometric deficiencies, widening to 5-lane roadway
(2 lanes westbound, 3 lanes eastbound), including bicycle lanes on new alignment. The total project cost is estimated as $80M.
Road is classified as a principal arterial. It has four lanes of traffic with left -turn lanes at intersections. Improvements are necessary to enhance vehicle traffic capacity and
y for vehicles, bicycles, and pedestrians on this major east -west transportation corridor.
Future roadway improvement options include spot safety improvements, bicycle and pedestrian improvements, roadway widening and roadway on new alignment. Staff will be
developing scope, cost and schedule for the intersection of Talbot Rd near Valley Medical Center.
Funded: 1 834,421 Unfunded: I -
Programmed
Pre-2019
Six
-Year Program
Project Expenditures &Resources
Programmed
pre-2018
2018 2019
2020
2021
2022
2023
2024
Expenditures:
Planning
50,000
-
- r off 50,000
Preliminary Engineering
784,421
666,866
117,555 -
R-O-W (includes Admin)
-
-
-
Construction
Construction Services
Post Construction Services
Other
-
-
- -
Total Expenses
834,421
666,866
117,555 1 oil 50,000
Resources:
Vehicle Fuel Tax
-
-
- -
Business & Occupation Share
-
-
Fund Balance
78,424
78,424
-
Grants Awarded (Fed Safety)
660,000
542,445
117,555
Grants Awarded (2)
-
-
- -
Mitigation
95,997
45,997
r off 50,000
Bonds/ LID's Formed
-
-
-
Other (1)
Other (2)
Undetermined
Total Sources
834,421
666,866
1 117,555 11111M 50,000
54
TRANSPORTATION IMPROVEMENT PROGRAM
Houser Way S/N Non -Motorized Improvements
TIP No. 28
Project Title: Houser Way 5/N Non -Motorized Improvements
Community Planning Area: City Center Fund: 317
Functional Classification: Principal Arterial Project: NEW
Project Length: 0.36 mi Contact: Vangie Garcia 425-430-7319
act Description:
project would install a separated bike facility on the north side of Houser Way S/N, between Mill Ave S. and Bronson Way N. Intersection crossings would be improved at
it River Park Drive and Mill Ave S. The project will include planing and pavement overlay, channelization, and intersection crossing improvements. For feasibility and
tructibility issues, the roadway and pedestrian bridge sections would not be part of this project.
Justification:
The feedback during the public engagement process for the Trails and Bicycle Master Plan update identified Houser Way as the route for the Eastside Rail Corridor alignment. With
the development of the Civic Core Plan, development of this section of the bicycle network creates an important connection point for bicycle traffic between the north and south
portions of the City's urban growth center. Creating a bike facility down to Mill Ave S creates a connection to the Cedar River Trail. The crossing at Cedar River Park Drive is a
connection point for people connecting from Liberty Park to the Renton Community Center.
Project.
Funded: Unfunded: 1 2,187,000
Programmed Pre-2019 Six -Year Program
Project Expenditures &Resources
Programmed
pre-2018
2018 2019
2020
2021
2022
2023
2024
Expenditures:
Planning
-
-
Preliminary Engineering
220,000
r r r
220,000
R-O-W (includes Admin)
165,000
r r r
165,000
-
-
Construction
750,000
r r r
400,000
350,000
Construction Services
900,000
r r r
360,000
540,000
Post Construction Services
15Z000
r r r
76,000
76,000
Other
-
-
-
Total Expenses
2,187,000
off
385,000
836,000
96200
Resources:
Vehicle Fuel Tax
-
-
Business & Occupation Share
Fund Balance
Grants Awarded (1)
Grants Awarded (2)
Mitigation
Bonds/LIDs Formed
Other (1)
Other (2)
Undetermined
1 2,187,0001
1r r r1
1
1 385,000
1 836,000
1 966,000
Total Sources
I2,187,000
I
I - : off
I
1
1 385,000
1 836,000
1 966,000
55
TRANSPORTATION IMPROVEMENT PROGRAM
Houser Way North -North 8th Street to Lake Washington Blvd
TIP No. 29
Project Title: Houser Way North - North 8th Street to Lake Washington Blvd
Community Planning Area: City Center Fund: 317
Functional Classification: N/A Project:
Project Length: N/A Contact: Bob Mahn 425-430-7322
act Description:
project will widen and realign the existing one lane roadway to a two-lane roadway and includes intersection improvements to convert Houser Way N to a two-way operation.
des new roadway, curbs, pedestrian -bicycle path, drainage, signals, lighting, signing and channelization.
Justification:
The City of Renton travel demand model predicts traffic volumes increasing significantly in the North Renton Area in the near future. One of the recommendations to improve
northbound access to Lake Washington Blvd is to convert Houser Way N to a two-way operations, between N 8th St and Lake Washington Blvd.
conceptual layout of the two-way approach to the intersection of Houser Way and Lake WA Blvd has been completed. This project will coordinate with the Southport
=_velopment improvements to the Southport entrance at the Lake WA Blvd/Coulon Park intersection.
Funded: Unfunded: 1 4,965,000
Programmed Pre-2019 Six -Year Program
Project Expenditures &Resources
Programmed
pre-2018
2018 2019
2020
2021
2022
2023
2024
Expenditures:
Planning
-
-
Preliminary Engineering
900,000
rrr
900,000
R-O-W (includes Admin)
165,000
rrr
165,000
-
-
Construction
3,000,000
off III
-
1,200,000
1,800,000
Construction Services
900,000
rrr
360,000
540,000
Post Construction Services
-
-
-
Other
-
-
-
Total Expenses
4,965,000
off
1,065,000
1,560,000
2,340,000
Resources:
Vehicle Fuel Tax
-
-
-
-
Business & Occupation Share
Fund Balance
Grants Awarded (1)
Grants Awarded (2)
Mitigation
Bonds/LIDs Formed
Other (1)
Other (2)
Undetermined
1 4,965,0001
1rrr1
1
1 1,065,000
1 1,560,000
1 2,340,000
Total Sources
14,965,0001
1off
I
1
1 1,065,000
1 1,560,000
1 2,340,000
56
TRANSPORTATION IMPROVEMENT PROGRAM
Project Title: Lake to Sound (L2S) Trail
Community Planning Area: Valley & City Center
Functional Classification: Minor and Principal Arterial, and Other
Project Length: 1.6 mi
Fund: 317
Project: 122903
Contact: Vangie Garcia
Lake to Sound (L2S) Trail
TIP No. 30
425-430-7319
Project Description:
The Lake to Sound (L2S) Trail is a joint partnership between the cities of Renton, SeaTac, Tukwila, Burien and Des Moines, in coordination with King County. The 17-mile US Trail
will provide an east -west connection between the shoreline of Lake Washington (Renton) and the shoreline of Puget Sound (Des Moines). Phase A goes from Naches Ave SW
(Renton) to Fort Dent Park (Tukwila). The length between Naches Ave SW and Mill Ave S are future phases.
Phase A will connect Fort Dent (Tukwila) to the larger system of regional trails in South King County, including the Green River Trail, the Interurban Trail and the Cedar River Trail.
Phase A will provide a 12-foot wide asphalt paved multi -use trail, with 2-foot gravel shoulders. In the Downtown Civic Core Plan, the US Trail connects to the Eastside Rail Corridor
(ERC) and the Renton Connector (TIP #22).
s project received a $950,000 CMA4grant for construction of Phase A (Naches Ave SW to Fort Dent Park inTukwila), in 2014. No City match is required. King County is leading the
;ign for construction of Phase A, Fort Dent Park Connection. Construction of Phase A is anticipated to be completed in 2019. City staff will be developing scope, cost and schedule
future phases.
US uses BNSF ROW for central section, the alignment would likely be on the south side, lower bank. Downtown Civic Core team prefers alignment with city -owned Houser Way
!ction along the south side of ROW. Alignment within BNSF would require King County to purchase ROW and new bridges to cross roadways. An alignment on 7th Street can be
weloped as a reasonable alternative or parallel route as a trail within railroad ROW is developed (TIP #42).
Funded: 1 3,710,000 Unfunded:
Programmed Pre-2019 Six -Year Program
Project Expenditures &Resources
Programmed
pre-2018
2018 2019
2020
2021
2022
2023
2024
Expenditures:
Planning
-
-
Preliminary Engineering
800,000
800,000
R-O-W(includesAdmin)
110,000
110,000
-
Construction
2,240,000
-
' 11 Sol 2,240,000
Construction Services
560,000
.1 off 560,000
Post Construction Services
-
-
Other
-
-
-
Total Expenses
3,710,000
910,000
2,800,000
Resources:
Vehicle Fuel Tax
-
-
-
Business & Occupation Share
Fund Balance
Grants Awarded (1)
Grants Awarded (2)
Mitigation
Bonds/ LID's Formed
-
-
-
Other (KC+CMAQ Grant)
3,710,000
910,000
off 2,800,000
Other (2)
-
-
-
Undetermined
Total Sources
1 3,710,000
910,000
: H off 2,800,000
57
TRANSPORTATION IMPROVEMENT PROGRAM I Lake Washington Blvd N - Park Ave N to Gene Coulon Memorial
Park
TIP No. 31
Project Title: Lake Washington Blvd N - Park Ave N to Gene Coulon Memorial Park
Community Planning Area: City Center Fund: 317
Functional Classification: Collector Project: 122121
Project Length: N/A Contact: Bob Hanson 425-430-7319
act Description:
project includes road widening, traffic signals, railroad crossings, drainage, curb, gutter, sidewalks and bicycle lanes. Developer to design and construct improvements, and get
it toward mitigation contribution. The developer is completing the project in 3 phases.
Justification:
This project will serve the development and access needs to Coulon Park and the Southport Development. Agreement with developer to credit traffic mitigation towards the costs
Df certain improvements.
hotel tower was complete in 2018. The office towers are under construction. This project will be funded by the development of Southport. The costs shown below are for the
nated mitigation credit, per agreement with the developer.
Phase underway. Design for Lake Washington Blvd is complete. Construction to start in the summer of 2018 and be completed by the end of 2019.
Funded: 1 2,443,476 Unfunded: I -
Programmed Pre-2019 Six -Year Program
Project Expenditures &Resources
Programmed
pre-2018
2018 2019
2020
2021
2022
2023
2024
Expenditures:
Planning
14,899
14,899
Preliminary Engineering
28,460
28,460
R-O-W (includes Admin)
-
-
-
Construction
1,973,821
373,821
1,600,000
Construction Services
410,363
10,363
of 1 1 1 400,000
Post Construction Services
15,934
15,934
-
Other
-
-
-
Total Expenses
2,443,477
443,477
oil off 2,000,000
Resources:
Vehicle Fuel Tax
2,807
2,807
-
Business & Occupation Share
2,734
2,734
Fund Balance
8,828
8,828
Grants Awarded (1)
149,501
149,501
Grants Awarded (2)
-
-
Mitigation
258,353
258,353
Bonds/LID'sFormed
-
-
-
Other (Dev. Expend)
2,000,000
-
off r'r'r' 2,000,000
Other (Dev. Reimb)
21,253
21,253
-
Undetermined
Total Sources
2,443,476
443,476
oil off 2,000,000
58
TRANSPORTATION IMPROVEMENT PROGRAM
Project Title: Lind Ave SW - SW 16th St to SW 43rd St
Community Planning Area: Valley
Functional Classification: Minor Arterial
Project Length: 1.69 mi
Lind Ave SW - SW 16th St to SW 43rd St
TIP No. 32
Fund: 317
Project: 120024
Contact: Bob Mahn 425-430-7322
Description:
existing roadway to five lanes where required. Includes new roadway, curbs, sidewalks, drainage, signals, lighting, signing and channelization.
Justification:
3sing traffic demands in the Valley due in part to development will create the need to increase the capacity of this major north/south arterial. A potential project is a signal
lation at the intersection at Lind Ave SW and SW 34th St (currently unsignalized). Additionally, improvements may result from future WSDOT 1-405 plans which include an
:hange at Lind Ave SW (currently unfunded).
needs, priorities and schedules for improvements on Lind Ave SW will be determined through Arterial Circulation studies.
Funded: Unfunded: 1 4,400,000
Programmed Pre-2019 Six -Year Program
Project Expenditures &Resources
Programmed
pre-2018
2018 2019
2020
2021
2022
2023
2024
Expenditures:
Planning
-
-
-
Preliminary Engineering
650,000
400,000
250,000
R-O-W (includes Admin)
-
-
-
-
Construction
3,200,000
1,200,000
2,000,000
Construction Services
550,000
200,000
350,000
Post Construction Services
-
-
-
Other
-
-
-
Total Expenses
4,400,000
H off
400,000
1,650,000
2,350,000
Resources:
Vehicle Fuel Tax
-
-
-
-
Business & Occupation Share
Fund Balance
Grants Awarded (1)
Grants Awarded (2)
Mitigation
Bonds/LIDs Formed
Other (1)
Other (2)
Undetermined
1 4,400,0001
1 of M
I
1
1 400,000
1 1,650,000
1 2,350,000
Total Sources
14,400,0001
1H off
I
1
1 400,000
1 1,650,000
1 2,350,000
59
TRANSPORTATION IMPROVEMENT PROGRAM
Project Title: Logan Ave North Improvements
Community Planning Area: City Center
Functional Classification: Principal Arterial
Project Length: 0.76 mi
Logan Ave North Improvements
TIP No. 33
Fund: 317
Project: 122303
Contact: Vangie Garcia 425-430-7319
Project Description:
Phase 1 (Cedar River Bridge to N 6th St) is complete. Phase 2 (N 6th St to Park Ave N) will add a NB lane, new curb, gutter, sidewalks (on the east side), landscaped buffer, and a
pedestrian/bicycle trail (west side), streetlights, pedestrian scale illumination, crosswalks, channelization.
The increase in traffic and the new Rapid Ride transit have warranted widening to add a northbound lane. Included with the improvements are urban roadway amenities to
implement "Complete Streets" practice per City code.
Project is on hold until the Boeing Company is in a position to dedicate property to the project.
Project has been closed out for Phase 1.
Funded: 1 7,354,042 Unfunded: 1 11,240,000
Programmed
Pre-2019
Six
-Year Program
Project Expenditures &Resources
Programmed
pre-2018
2018 2019
2020
2021
2022
2023
2024
Expenditures:
Planning
39,760
39,760
-
-
Preliminary Engineering
3,245,616
1,005,616
1 off
1,240,000
1,000,000
R-O-W (includes Admin)
9,033,266
33,266
- III off
-
9,000,000
Construction
5,108,330
4,908,330
200,000
-
Construction Services
1,167,070
1,081,070
86,000
Post Construction Services
-
-
-
Other
-
-
-
-
-
Total Expenses
18,594,042
7,068,042
286,000
11240,000
10,000,000
Resources:
Vehicle Fuel Tax
-
-
-
-
-
Business & Occupation Share
27,065
27,065
-
Fund Balance
59,090
20,111
38,979
Grants Awarded (STP)
3,074,943
2,988,943
86,000
Grants Awarded (TIB)
3,912,242
3,751,221
161,021
Mitigation
200,000
200,000
-
Bonds/ LID'sFormed
-
-
Other (Integra Phone)
53,702
53,702
Other (Boeing Lot)
27,000
27,000
Undetermined
11,240,000
- r off
1,240,000
10,000,000
Total Sources
18,594,042
7,068,2
04
286,500
1,240,000
10,000,000
TRANSPORTATION IMPROVEMENT PROGRAM
Maple Valley Highway Barriers
TIP No. 34
Project Title: Maple Valley Highway Barriers
Community Planning Area: Cedar River Fund: 317
Functional Classification: Principal Arterial Project:
Project Length: N/A Contact: Chris Barnes 425-430-7220
oject Description:
is project includes two barriers: One is to install a concrete median barrier between east and westbound travel lanes of the SR 169 S-Curve between the Riviera Apartments and
5th Street including associated roadway widening to add the barrier. The second barrier improvement will remove the existing concrete barrier end treatment located eastbound
ast of the Riviera Apartments) and replace with 2 new concrete barriers extending west.
Justification:
Maple Valley Highway (SR 169) is a principal arterial carrying 44,000 vehicles per day. This project will improve safety for traffic on Maple Valley Highway (SR 169) at this location,
which has been the site to numerous collision impacts.
design report for the Cedar River half bridge is complete and was funded by the Roadway Safety and Guardrail Program (TIP # 4). Final design and construction pending funding
lability.
Funded: Unfunded: 1 3,137,900
Programmed Pre-2019 Six -Year Program
Project Expenditures &Resources
Programmed
pre-2018
2018 2019
2020
2021
2022
2023
2024
Expenditures:
Planning
-
-
-
Preliminary Engineering
522,970
r
274,035
248,935
R-O-W (includes Admin)
156,300
25,000
131,300
Construction
1,804,160
-
1,804,160
Construction Services
654,470
654,470
Post Construction Services
-
-
Other
-
-
Total Expenses
3,137,900
299,035
2,838,865
Resources:
Vehicle Fuel Tax
-
-
-
Business & Occupation Share
Fund Balance
Grants Awarded (1)
Grants Awarded (2)
Mitigation
Bonds/LIDs Formed
Other (1)
Other (2)
Undetermined
1 3,137,900
• r r
1
1 299,035
1 2,838,865
Total Sources
13,137,900
. 0 0
1
1 299,035
1 2,838,865
61
TRANSPORTATION IMPROVEMENT PROGRAM
Monster Road SW/68th Ave S Roadway Improvements
TIP No. 35
Project Title: Monster Road SW/68th Ave S Roadway Improvements
Community Planning Area: Valley Fund: 317
Functional Classification: N/A Project:
Project Length: 0.92 mi Contact: Vangie Garcia 425-430-7319
ect Description:
en existing roadway to four lanes plus two -way -left -turn -lane where needed and bike lanes. Realign Beacon Coal Mine Road approach to intersection with the Monster Road
roadway. Includes new roadway, curbs, sidewalk, drainage, street lighting, traffic signals, channelization, retaining walls and widening the existing bridge.
Justification:
Will serve growing north -south traffic demand. A preliminary design study was completed in 1999. The project cost is estimated at $32M, with the City's share estimated at $13M
and King Co. at $19M.
se 1 of improvements will address drainage problems between the Monster Rd Bridge and the City limits. Scope, cost and implementation schedule to be determined. Project is
ding future grant funding availability. Cost beyond 2024 not shown.
Funded: Unfunded: 1 8,050,000
Programmed Pre-2019 Six -Year Program
Project Expenditures &Resources
Programmed
pre-2018
2018 2019
2020
2021
2022
2023
2024
Expenditures:
Planning
50,000
50,000
-
Preliminary Engineering
5,000,000
off III
-
5,000,000
R-O-W (includes Admin)
3,000,000
off 1 1 1
3,000,000
Construction
-
-
Construction Services
Post Construction Services
Other
-
-
Total Expenses
8,050,000
: 1 1 off
50,000
8,000,000
Resources:
Vehicle Fuel Tax
-
-
-
Business & Occupation Share
Fund Balance
Grants Awarded (1)
Grants Awarded (2)
Mitigation
Bonds/LIDs Formed
Other (1)
Other (2)
Undetermined
1 8,050,0001
1
1
1
1
1 50,000
1 8,000,000
Total Sources
18,050,0001
1: 1 1 off
I
I
I
1 50,000
1 8,000,000
M.
TRANSPORTATION IMPROVEMENT PROGRAM
NE 3rd Street/NE 4th Street Corridor Improvements
TIP No. 36
Project Title: NE 3rd Street/NE 4th Street Corridor Improvements
Community Planning Area: Highlands & East Plateau Fund: 317
Functional Classification: Principal Project: 122176
Project Length: 2.2 mi Contact: Keith Woolley 425-430-7318
act Description:
project involves a series of improvements in this corridor to improve traffic operations such as rechannelization and traffic signal modifications, possible transit priority signal
ments and queue jumps. This project will seek to meet pedestrian, transit and bicycle needs. Phase 1 constructed a new signal and other improvements at NE 4th St and
:man Ave NE.
: corridor has a strong potential for transit usage and is experiencing rapid residential and retail growth. The NE 3rd/4th Corridor Study was adopted in May 2005. The study
ned the corridor transportation needs and costs, including pedestrian, transit, bicycle improvements, as well as streetscape enhancement.
estimated cost for all corridor improvements (Sunset Blvd N to the east City limits) is $46M. Programmed expenses (2021-2024) are placeholders for future phases. Programmed
roses in 2019-2020 are for developing scope, cost and schedule for next phases. Future phases are pending future grant funding availability.
estimated costs from previous TIP for inflation.
Funded: 1 3,759,085 Unfunded: 1 13,320,000
Programmed Pre-2019 Six -Year Program
Project Expenditures & Resources
Programmed
Pre-2018
2018 2019
2020
2021
2022
2023
2024
Expenditures:
Planning
258,420
218,420
- I off 20,000
20,000
-
-
-
Preliminary Engineering
2,276,917
776,917
1 M -
-
750,000
750,000
R-O-W (includes Admin)
684,024
84,024
.88 off
-
600,000
-
-
Construction
10,816,803
2,316803
11 M
2,500,000
4,500,000
1,500,000
Construction Services
3,042,921
322:921
r off
340,000
680,000
1,700,000
Post Construction Services
-
-
-
-
-
other
-
-
-
-
Total Expenses
17,079,085
3,719,085
20,000
20,000
750,000
4,190,000
5,180,000
3,200,000
Resources:
Vehicle Fuel Tax
-
-
-
-
-
-
-
-
Business & Occupation Share
462,831
422,831
r off 20,000
20,000
Fund Balance
1,024,433
1,024,433
-
-
Grants Awarded (TIB)
1,495,542
1,495,542
Grants Awarded (2)
-
-
Mitigation
373,700
373,700
Bonds/ LID's Formed
-
-
Other (KC WD#90)
352,541
352,541
Other (Franchise Reimb)
50,038
50,038
Undetermined
13,320,000
-
I rrr -
750,000
4,190,000
5,180,000
3,200,000
Total Sources
17,079,085
3,719,085
.1 off 20,000
20,000
750,000
4,190,000
5,180,000
3,200,000
63
TRANSPORTATION IMPROVEMENT PROGRAM
Project Title: Nile Ave NE Bridge Replacement
Community Planning Area: East Plateau
Functional Classification: N/A
Project Length: N/A
Nile Ave NE Bridge Replacement
TIP No. 37
Fund: 317
Project: NEW
Contact: Derek Akesson 425-430-7337
ect Description:
Nile Ave NE Bridge was built by King County in 1951. Ownership was transferred to the City in 2009 as part of the MacKay Annexation (Ord #5456). It is a single span bridge that
ses over May Creek. The initial phase of this project will evaluate replacement options with a type, size and location (TS&L) study.
bridge is 17 years beyond its original design life of 50 years. It will very likely need to be replaced or significantly retrofitted within the next 10 years. The main span is
prised of precast concrete girders. The girders are supported on treated timber piles with a timber caps. Some of the timber piles are showing signs of deterioration.
w project. To date the project has not received grant funding for replacement. However, with a TS&L study, the City will be in a very good position to apply for Federal Highway
ministration (FHWA) funding when the bridge condition qualifies for replacement funding.
Funded: 1 50,000 Unfunded: 1 200,000
Programmed Pre-2019
Six -Year Program
Project Expenditures &Resources
Programmed
pre-2018
2018
2019
2020
2021
2022
2023
2024
Expenditures:
Planning
-
-
-
Preliminary Engineering
250,000
50,000
200,000
R-O-W (includes Admin)
-
-
-
Construction
Construction Services
Post Construction Services
Other
-
-
-
Total Expenses
250,000
1 off
50,000
200,000
Resources:
Vehicle Fuel Tax
-
-
-
Business & Occupation Share
50,000
r r r
50,000
Fund Balance
-
Grants Awarded (1)
Grants Awarded (2)
Mitigation
Bonds / LID's Formed
Other (1)
Other (2)
Undetermined
200,000
r r r
200,000
Total Sources
250,0001
1
1 50,000
1 200,000
64
TRANSPORTATION IMPROVEMENT PROGRAM
Rainier Ave N Corridor Improvements (Phase 5)
TIP No. 38
Project Title: Rainier Ave N Corridor Improvements (Phase 5)
Community Planning Area: City Center Fund: 317
Functional Classification: N/A Project:
Project Length: 0.76 mi Contact: Vangie Garcia 425-430-7319
act Description:
is Phase 5 of the Rainier Ave Corridor Improvements, and will extend the improvements from NW 3rd PI to north City limits. Project elements include widening of sidewalks
streetscaping, adding pedestrian -scale illumination and planted buffer strips. The street may be narrowed from 5 to 3 lanes where feasible. On the east side of Rainier Ave the
multi -use trail will be installed (Lake Washington Loop Trail), (as shown on TIP #18).
Justification:
Rainier Ave is a critical corridor in Renton with existing operational problems and in need of infrastructure enhancements to provide greater ease for non -motorized and transit -
based travel.
nds shown in 2023 are for planning to determine the roadway cross section. Project cost estimated at $31.5M and is unfunded. Costs beyond 2024 not shown.
Funded: Unfunded: 1 2,100,000
Programmed Pre-2019 Six -Year Program
Project Expenditures &Resources
Programmed
pre-2018
2018 2019
2020
2021
2022
2023
2024
Expenditures:
Planning
100,000
r r r
100,000
-
Preliminary Engineering
2,000,000
off III
-
2,000,000
R-O-W (includes Admin)
-
-
Construction
Construction Services
Post Construction Services
Other
-
-
Total Expenses
2,100,000
H off
100,000
2,000,000
Resources:
Vehicle Fuel Tax
-
-
Business & Occupation Share
Fund Balance
Grants Awarded (1)
Grants Awarded (2)
Mitigation
Bonds/LIDs Formed
Other (1)
Other (2)
Undetermined
1 2,100,0001
1 of rrr
I
I
I
1 100,000
1 2,000,000
Total Sources
I2,100,000
I
1H off
I
I
I
1 100,000
1 2,000,000
65
TRANSPORTATION IMPROVEMENT PROGRAM
Renton Bus Rapid Transit (BRT) Improvements
TIP No. 39
Project Title: Renton Bus Rapid Transit (BRT) Improvements
Community Planning Area: City Center Fund: 317
Functional Classification: TBD Project: NEW
Project Length: TBD Contact: Vangie Garcia 425-430-7319
ct Description:
transit access road improvements from 1-405 exit 3 (Talbot Rd) to South Renton Transit Center. Includes reconfiguration of Grady Way, Lake Ave S and S Renton Village Place to
nmodate transit.
Justification:
i current traffic conditions and configurations, improvements will be needed to ensure speed and reliability of the BRT system into and out of the South Renton Transit Center.
transit hub is currently and will remain a key connection point for transit users for both Metro and Sound Transit. Proximity to the Sounder Station and future increase of
ing availability also plays a key role in improvement accessibility needs.
Project. Estimated cost in Regional Transportation Plan is $21,300,000. Design and Construction should be implemented and coordinated with South Renton Transit Center,
opment of Renton Village, and implementation of 1-405 Bus Rapid Transit.
Funded: Unfunded: 1 21,300,000
Programmed Pre-2019 Six -Year Program
Project Expenditures &Resources
Programmed
pre-2018
2018 2019
2020
2021
2022
2023
2024
Expenditures:
Planning
Preliminary Engineering
R-O-W (includes Admin)
Construction
Construction Services
Post Construction Services
-
-
-
-
Other
21,300,000
rrr
3,195,000
9,052,500
9,052,500
Total Expenses
21,300,000
H off
3,195,000
9,052,500
9,052,500
Resources:
Vehicle Fuel Tax
-
-
-
-
Business & Occupation Share
Fund Balance
Grants Awarded (1)
Grants Awarded(2)
Mitigation
Bonds/LIDs Formed
Other (1)
Other (2)
Undetermined
21,300,000
of rrr
3,195,000
1 9,052,500
1 9,D52,500
Total Sources
21,300,000
H off
3,195,000
1 9,052,500
1 9,052,500
TRANSPORTATION IMPROVEMENT PROGRAM
Project Title: Transit Master Plan
Community Planning Area: Citywide
Functional Classification: N/A
Project Length: N/A
Fund: 317
Project: NEW
Contact: Vangie Garcia
Transit Master Plan
TIP No. 40
425-430-7319
ect Description:
Transit Master Plan provides the city with a means to influence decisions made by regional transit authorities. It also provides a basis on which to begin advancing proposed
tal projects for further study, design and prioritization, and position them to be strong competitors for grant funding. The plan establishes scalable short- and long-term
:egies, and identifies projects that will foster a high -quality transit system to meet Renton's needs.
Justification:
Although the City does not operate its own transit service, the role of transit in Renton is evolving and becoming more of a priority in the region. The current regional vision allows
cities and other urban service providers prioritized maximizing the use of existing infrastructure, making more efficient and less costly investments in new infrastructure, and
minimizing the environmental impact of urban growth. This prioritization made transportation a key role in the region by creating improved accessibility and mobility for walking,
biking, and transit. Regional growth centers are envisioned as major focal points of higher density population and employment, served with efficient multimodal transportation
nfrastructure and services. Linking these centers with a highly efficient transportation system allows the region to take actions to reduce the rate of growth in vehicle miles
traveled, especially by providing and expanding transportation choices.
project.
Funded: Unfunded: 1 500,000
Programmed Pre-2019 Six -Year Program
Project Expenditures &Resources
Programmed
pre-2018
2018 2019
2020
2021
2022
2023
2024
Expenditures:
Planning
500,000
r r r
300,000
200,000
Preliminary Engineering
-
-
-
R-O-W (includes Admin)
Construction
Construction Services
Post Construction Services
Other
-
-
Total Expenses
500,000
H off
300,000
200,000
Resources:
Vehicle Fuel Tax
-
-
-
Business & Occupation Share
Fund Balance
Grants Awarded (1)
Grants Awarded (2)
Mitigation
Bonds/LIDs Formed
Other (1)
Other (2)
Undetermined
1 500,0001
1 r r r
1
1 300,000
1 200,000
Total Sources
1 500,0001
1 H off
1
1 300,000
1 200,000
67
TRANSPORTATION IMPROVEMENT PROGRAM
Project Title: South 3rd Street Conversion Project
Community Planning Area: City Center
Functional Classification: Principal
Project Length: N/A
Fund:
Project:
Contact:
South 3rd Street Conversion Project
TIP No. 41
317
Vangie Garcia 425-430-7319
Project Description:
The project provides pedestrian and bicyclists facilities and enhancements, traffic operation and circulation improvements in Downtown. The improvements include adding raised
intersections with bulb outs, parklets, pedestrian plaza, lighting, street furniture, streetscape, bicycle blvd, bike racks, signage, wayfinding and converting S 3rd St to two-way
operations.
This project is one of the strategies identified in the City Center Community Plan. The project enhances downtown Renton as a destination area, while improving circulation,
reducing traffic speeds and enhancing pedestrian safety. A feasibility study, including a Downtown Circulation Traffic Analysis for the conversion to two-way operations was
completed.
is the last project of the Downtown Conversion to a two-way operations. It will continue the downtown improvements, further enhancing the pedestrian and bicyclists
ronment. Project is pending future grant funding availability.
Funded: Unfunded: 1 21,200,000
Programmed
Pre-2019
Six
-Year Program
Project Expenditures &Resources
Programmed
pre-2018
2018 2019
2020
2021
2022
2023
2024
Expenditures:
Planning
-
-
Preliminary Engineering
4,000,000
r r r off
4,000,000
R-O-W (includes Admin)
-
-
-
-
Construction
13,200,000
rr off
5,000,000
8,200,000
Construction Services
4,000,000
r r r off
1,500,000
2,500,000
Post Construction Services
-
-
-
Other
-
-
-
Total Expenses
21,200,000
of oil
4,000,000
6,500,000
10,700,000
Resources:
Vehicle Fuel Tax
-
-
-
-
Business & Occupation Share
Fund Balance
Grants Awarded (1)
Grants Awarded(2)
Mitigation
Bonds / LID's Formed
Other (1 )
Other(2)
Undetermined
21,200,000
rr off
1 4,000,000
1 6,500,000
1 10,700,000
Total Sources
21,200,000
of oil
1 4,000,000
1 6,500,000
1 10,700,000
•i
TRANSPORTATION IMPROVEMENT PROGRAM
Project Title: SAW 7th Street Corridor Improvements
Community Planning Area: City Center
Functional Classification: Minor Arterial
Project Length: 1.16 mi
S/SW 7th Street Corridor Improvements - Naches Ave S to
Talbot Road S
TIP No. 42
Naches Ave S to Talbot Road S
Fund: 317
Project: 122151
Contact: Vangie Garcia 425-430-7319
Project Description:
Widening the existing S 7th St from Talbot Road S to Rainier Ave S roadway to 3 lanes (2 lanes EB and 1 lane WB) and a separated multi -use trail. Includes new curb, gutter, wider
sidewalks, street lighting, landscaping, channelization and upgrades to traffic signals. The S 7th St Project - Traffic Analysis Report provided alternatives for corridor improvement
options. This project also includes a sidepath on SW 7th St between Rainier Ave S and Naches Ave S.
The segment of the S 7th St corridor connects Talbot Rd S (SR 515) with Rainier Ave S (SR 167). The segment of S 7th St is part of a designated east -west ped/bike route through
the City's commercial core and an important link between regional trails. The South Renton Neighborhood Study has identified South 7th St as needing streetscape
improvements. The Trails and Bicycle Master Plan Update identified SW 7th St/S 7th St as a good alternate/parallel route as the L2S Trail (TIP #30) is developed. With the
expansion of the South Renton Transit Center and Bus Rapid Transit (BRT) implementation, S 7th St is important non -motorized link to downtown core.
incurred are for Phase 1, which added a traffic signal and an eastbound right -turn lane at the intersection of S 7th St and Shattuck Ave S. Project is pending future grant
ig availability.
costs for the SW 7th St Sidepath. It is assumed that no ROW would be required.
Funded: 1 1,658,858 Unfunded: 1 15,772,928
Project Expenditures &Resources
Programmed
Programmed Pre-2019
Six -Year Program
pre-2018
2018
2019
2020
2021
2022
2023
2024
Expenditures:
Planning
32,270
32,270
-
-
-
Preliminary Engineering
2,311,842
311,842
o f f 111
200,000
800,000
1,000,000
-
R-O-W (includes Admin)
1,725,124
25,124
1 1 s r r
-
800,000
900,000
Construction
11,362,668
975,141
14,599
r
-
7,264,000
3,108,928
Construction Services
1,999,882
299,882
-
r r r
1,200,000
500,000
Post Construction Services
-
-
-
-
Other
-
-
-
-
Total Expenses
17,431,786
1,644,259
14,599
200,000
1,600,000
10,364,000
3,608,928
Resources:
Vehicle Fuel Tax
-
-
-
-
-
-
-
Business & Occupation Share
52,115
52,115
-
Fund Balance +Reserve
72,164
60,401
11,763
Grants Awarded (STP)
497,241
494,405
2,836
Grants Awarded (TIB)
613,338
613,338
-
Mitigation
424,000
424,000
-
Bonds/ LID's Formed
-
-
Other (1)
Other (2)
Undetermined
15,772,928
200,000
1 1,600,000
10,364,000
3,608,928
Total Sources
17,431,786
1,644,259
14,599
200,000
1 1,600,000
10,364,000
3,608,928
•e
TRANSPORTATION IMPROVEMENT PROGRAM
South Grady Way - Talbot Rd South to Rainier Ave South
TIP No. 43
Project Title: South Grady Way - Talbot Rd South to Rainier Ave South
Community Planning Area: City Center Fund: 317
Functional Classification: N/A Project:
Project Length: N/A Contact: Vangie Garcia 425-430-7319
act Description:
project will perform a comprehensive analysis of multi -modal transportation improvements, including review of potential transit improvements along Grady Way, such as
less Access and Transit (BAT) lanes and Traffic Signal Priority (TSP).
Justification:
The project will remove the islands at the intersections of S Grady Way with Lake Ave Sand Shattuck Ave S, to allow fora continuous eastbound lane from Rainier Ave S to Talbot
Rd S. Included are modifications to the traffic signal, new pedestrian crossings and channelization. The improvements will add much needed capacity to the S Grady Way corridor.
is pending future grant funding availability.
Funded: Unfunded: 1 4,000,000
Programmed Pre-2019 Six -Year Program
Project Expenditures &Resources
Programmed
pre-2018
2018 2019
2020
2021
2022
2023
2024
Expenditures:
Planning
-
-
-
Preliminary Engineering
750,000
550,000
200,000
R-O-W (includes Admin)
-
-
-
-
Construction
2,500,000
1,200,000
1,300,000
Construction Services
750,000
360,000
390,000
Post Construction Services
-
-
-
Other
-
-
-
Total Expenses
4,000,000
oil off
550,000
1,760,000
1,690,000
Resources:
Vehicle Fuel Tax
-
-
-
-
Business & Occupation Share
Fund Balance
Grants Awarded (1)
Grants Awarded (2)
Mitigation
Bonds/LIDs Formed
Other (1)
Other (2)
Undetermined
1 4,000,0001
1 off M
1
1 550,000
1 1,760,000
1 11690,000
Total Sources
14,000,0001
1 oil off
I
1 550,000
1 1,760,000
1 1,690,000
70
TRANSPORTATION IMPROVEMENT PROGRAM
Project Title: South Lake Washington Transit Stop
Community Planning Area: City Center
Functional Classification: N/A
Project Length: N/A
Fund:
Project:
Contact:
South Lake Washington Transit Stop
TIP No. 44
317
Vangie Garcia 425-430-7319
act Description:
project will implement a Bus Transit Station at Park Ave. N and Garden Ave N. The project includes a new transit stop, with passenger amenities such as shelters, lighting,
hes, litter receptacles, bicycle racks and lockers.
Justification:
The project is proposed to meet recent travel demand growth in the area and as apart of the connectivity of the regional transit system. This transit hub will provide service to a
17.5 acre mixed use site consisting of 730,000 sq.ft. of office space, 43,000 sq.ft. of meeting space, 30,000 sq.ft. of retail, 383 apartment units and a 347 unit hotel. Other new
development in the area includes two hotels. In addition, a large manufacturing company's employees will benefit from the transit hub's location as well as visitors to The Landing
and the 57 acre Gene Coulon Park.
preliminary planning for this transit project will be incorporated into the N Park Ave Extension Project (TIP #20).
Funded: Unfunded: 1 4,350,000
Programmed Pre-2019 Six -Year Program
Project Expenditures &Resources
Programmed
pre-2018
2018 2019
2020
2021
2022
2023
2024
Expenditures:
Planning
-
-
Preliminary Engineering
600,000
I M
600,000
R-O-W (includes Admin)
-
-
Construction
3,000,000
off M
3,000,000
Construction Services
750,000
1 M
750,000
Post Construction Services
-
-
Other
-
-
Total Expenses
4,350,000
1 off
4,350,000
Resources:
Vehicle Fuel Tax
-
-
Business & Occupation Share
Fund Balance
Grants Awarded (1)
Grants Awarded (2)
Mitigation
Bonds/ LID's Formed
Other (1)
Other (2)
Undetermined
1 4,350,0001
1
1
1 4,350,000
Total Sources
1 4,350,0001
1 off
1
1 4,350,000
71
TRANSPORTATION IMPROVEMENT PROGRAM
Sunset Area Green Connections
TIP No. 45
Project Title: Sunset Area Green Connections
Community Planning Area: Highlands Fund: 317
Functional Classification: N/A Project:
Project Length: N/A Contact: Vangie Garcia 425-430-7319
2ct Description:
project will construct multi -modal improvements identified in the Sunset Area Community Planned Action Study. Roadways will be widened/extended/realigned to provide for
-e traffic flows. Several residential streets will be developed as "green connections" improving pedestrian mobility and enhance the neighborhood. Roadways included are NE
St, NE Sunset Lane, Harrington Ave NE, NE 12th St, Edmonds Ave NE, Jefferson Ave NE, Kirkland Ave NE and Glennwood Ave NE.
)rovements to these streets are key to support the redevelopment of the Sunset Area Community in the Highlands area, bounded by NE 21st St on the north, Edmonds Ave NE
the west, NE 7th St on the south, and Monroe Ave NE on the east. The City in partnership with the Renton Housing Authority aspires to redevelop the Sunset Terrace public
ising community and encourage private delopment in the Planned Action Study area over a 20-year period.
total cost of the project is estimated at $22.2M. Schedule, cost and selection of streets to be improved to be determined. Significant cost participation will be required from
alopment. Surface Water is leading this project and has completed two projects along Harrington Ave NE.
Funded: Unfunded: 1 22,200,000
Programmed Pre-2019 Six -Year Program
Project Expenditures &Resources
Programmed
pre-2018
2018 2019
2020
2021
2022
2023
2024
Expenditures:
Planning
-
Preliminary Engineering
2,600,000
r r r
2,600,000
R-O-W (includes Admin)
1,000,000
off r r r
1,000,000
-
-
Construction
16,000,000
off oil
-
9,200,000
6,800,000
Construction Services
2,600,000
r r r
1,500,000
1,100,000
Post Construction Services
-
-
Other
-
-
-
Total Expenses
22,200,000
H off
3,600,000
10,700,000
7,900,000
Resources:
Vehicle Fuel Tax
-
-
-
-
Business & Occupation Share
Fund Balance
Grants Awarded (1)
Grants Awarded (2)
Mitigation
Bonds / LID's Formed
Other(CED)
Other (2)
Undetermined
22,200,000
r r r
3,600,000
10,700,000
17,900,000
Total Sources
22,200,000
H off
3,600,000
10,700,000
1 7,900,000
72
TRANSPORTATION IMPROVEMENT PROGRAM
SW 27th Street/Strander Boulevard Connection
TIP No. 46
Project Title: SW 27th Street/Strander Boulevard Connection
Community Planning Area: Valley Fund: 317
Functional Classification: Minor Arterial Project: 122239, 122240
Project Length: 1.27 mi Contact: Keith Woolley 425-430-7318
Project Description:
The project will provide a grade -separated crossing at the Union Pacific Railroad (UPRR) and Burlington Northern Santa Fe (BNSF) railroad tracks. Bicycle and pedestrian
connections will be provided to the Tukwila Station and the Interurban Trail. Phase 1 - Seg 2a - 2 lane roadway from Naches Ave SW to the Sounder Station, including a BNSF
bridge is completed.
This project provides a critical four/five-lane arterial that will serve as a connector to West Valley Highway (SR 181) and East Valley Road, as well as an arterial connector to SR 167
from the south. A new east -west arterial roadway will connect the cities of Renton and Tukwila and provide significant congestion relief to existing arterials. The new road will
provide access to the Tukwila Train/Sound Transit Station. The new grade separated arterial (UPRR and BNSF railroads) will provide significant benefits to both freight mobility
and general motorists.
City of Tukwila has taken the lead for future phases.
Funded: 1 29,691,837 Unfunded: I -
Programmed Pre-2019 Six -Year Program
Project Expenditures &Resources
Programmed
pre-2018
2018 2019
2020
2021
2022
2023
2024
Expenditures:
Planning
-
-
Preliminary Engineering
5,030,912
5,030,912
R-O-W (includes Admin)
3,842,563
3,842,563
-
Construction
16, 798,111
16, 748,111
50,000
Construction Services
2,435,829
2,435,829
-
Post Construction Services
3,009,442
3,009,442
Other
-
-
-
Total Expenses
31,116,857
31,066,857
50,000
Resources:
Vehicle Fuel Tax
-
-
-
Interfund Loan
700,000
700,000
-
Gen & Prop Fund Balances
2,638,698
2,588,698
50,000
Grants Awarded (State & Fea
2,408,422
2,408,422
-
Grants Awarded (FMSIB)
7,697,425
7,697,425
Mitigation
1,413,835
1,413,835
Bonds/ LID's Formed
2,799,500
2,799,500
Other (Sound Transit & FRB)
4,687,421
4,687,421
Other (STP & TIB)
7,346,536
7,346,536
City of Tukwila Reimburse
1,000,000
1,000,000
PW Utilities (Water/Surf Wat
425,020
425,020
Undetermined
-
Total Sources
31,116,857
1 31,066,857
1 50,000
73
TRANSPORTATION IMPROVEMENT PROGRAM I Talbot Road S / S 177th Street Signalization & Roadway
Improvements
TIP No. 47
Project Title: Talbot Road s / s 177th Street Signalization & Roadway Improvements
Community Planning Area: Talbot Fund: 317
Functional Classification: Major Collector Project:
Project Length: N/A Contact: Vangie Garcia 425-430-7319
act Description:
project involves installing a traffic signal and various roadway improvements including meeting pedestrian transit and bicycle needs.
Justification:
This project is proposed to meet recent traffic demand through this intersection and surrounding area as a result of the expansion of Valley Medical Center.
project is currently in design and will be starting construction in 2018 once they receive an approved permit.
Funded: 1 1,025,000 Unfunded: I -
Programmed Pre-2019 Six -Year Program
Project Expenditures &Resources
Programmed
pre-2018
2018 2019
2020
2021
2022
2023
2024
Expenditures:
Planning
Preliminary Engineering
R-O-W (includes Admin)
-
-
Construction
1,000,000
1,000,000
Construction Services
25,000
25,000
Post Construction Services
-
-
Other
-
-
Total Expenses
1,025,000
1,025,000
Resources:
Vehicle Fuel Tax
-
-
Business & Occupation Share
Fund Balance
Grants Awarded (1)
Grants Awarded (2)
Mitigation
Bonds/ LID's Formed
-
-
Other (Dev. Expenditure)
1,025,000
1,025,000
Other (Dev. Reimb)
-
-
Undetermined
Total Sources
1,025,000
1,025,000
74
N<otikl
SECTION F
APPENDIX
2019 - 2024 TRANSPORTATION IMPROVEMENT PROGRAM
75
City of Renton 1 2019 - 2024 TRANSPORTATION IMPROVEMENT PROGRAM ` +
ABBREVIATIONS AND ACRONYMS
The following list defines the abbreviated words and/or acronyms used in the City of Renton's Six -Year
Transportation Improvement Program.
ACP Asphalt Concrete Pavement
ADA American Disability Act
BAT ■I Business Access Transit
BNSF Burlington Northern Santa Fe
BRAC �I Bridge Replacement Advisory Committee
CBD Central Business District
CIP Capital Improvement Program
CMAQ Congestion Mitigation and Air Quality
CTR __Mrcommute Trip Reduction (State Act)
DOE Department of Ecology
EB 'LEastboundA
ECL East City Limits
EIS[Environmental Impact Study
ER Emergency Relief
FHWA _I Federal Highway Administration
FMSIB Freight Mobility Strategic Investment Board
GIs Geographic Information System
GMA Growth Management Act
HOV High Occupancy Vehicles
ITS Intelligent Transportation System
LF Linear Fee
LID Local Improvement District
LOS Level of Service
MAP-21 Moving Ahead for Progress in the 21" Century Act
METRO 'Municipality of Metropolitan Seattle
MOU Memorandum of Understanding
MUTCD illlllllllllllllllllllllllWanual on Uniform Traffic Control Devices W
NCL North City Limits
NB �ForthbouAF
PMS Pavement Management System
Precon '1Preconstruction Engineering/Administration (design phase of project)
PS&E Plans, Specifications, and Estimates
ROW-MRight-of-way
RTA Regional Transit Authority
SB �[Southbound
SCATBd South County Area Transportation Board
SCL _I South City Limit
SOV Single Occupant Vehicle
ST-Wsound Transit
STP Surface Transportation Program
TDM �FTransportation Demand Management Program
TIB Transportation Improvement Board
ransportation Improvement Plan
UPRR Union Pacific Railroad
UPS IJninterruptibleliver supple A
WB Westbound
WCL' Vest City Limits
WSBIS Washington State Bridge Inventory System
WSDOT _' Washington State Department of Transportation