Loading...
HomeMy WebLinkAboutRES 4354CITY OF RENTON, WASHINGTON RESOLUTION NO. 4354 A RESOLUTION OF THE CITY OF RENTON, WASHINGTON, AUTHORIZING THE TEMPORARY TOTAL CLOSURE OF THE INTERSECTION OF EAST VALLEY ROAD AND SW 19TH STREET, BETWEEN 1701 EAST VALLEY ROAD AND 2501 EAST VALLEY ROAD TO THE NORTH AND SOUTH, AND 200 SW 19TH STREET AND 204 SW 19TH STREET TO THE EAST AND WEST. WHEREAS, the Washington State Department of Transportation ("WSDOT") plans to install a culvert that conveys Rolling Hills Creek under East Valley Road, at the approximate address of 1801 East Valley Road; and WHEREAS, this construction activity will require temporary street closure along East Valley Road, between 1701 East Valley Road to 2501 East Valley Road, as well as SW 19th Street between 200 SW 19th Street and 204 SW 19th Street; and WHEREAS, pursuant to City Code section 9-9-3 the City Council is to authorize such closures by means of a resolution; WHEREAS, the City wishes to provide full and adequate notice to the public of the extent and nature of such closure; NOW, THEREFORE, THE CITY OF RENTON, WASHINGTON, DO RESOLVE AS FOLLOWS: SECTION I. The City Council does hereby authorize the temporary total closure of the intersection of East Valley Road and SW 191h Street, between 1701 East Valley Road and 2501 East Valley Road to the north and south, and 200 SW 19th Street and 204 SW 19th 1 RESOLUTION N0. 4354 Street to the east and west, for a single weekend with a work time extending from 8:30 p.m. Friday to 5 a.m. Monday between September 11 and October 1, 2018, to allow WSDOT to install the culvert. PASSED BY THE CITY COUNCIL this 10th day of September , 2018. APPROVED BY THE MAYOR this 10th day of September , 2018. )elb,lo Denis Law, Mayor ``rrrrrr u u i i � �iii��i V Approved as to form: o� * SEAL Shane Moloney, City Attl5ney %, °.�m''��� 9/14/2018 (summary) ORA r�D SEp;'\���`�� Date of Publication: SUmmar Y RES:1780:8/28/18:clb