HomeMy WebLinkAboutR-38180100
T
00
CY)
i
C)
W
I-
rr
W
I-
Z
W
U
CD
Z
Z
Q
rr
W
O
O
a
Vicinity Map
NTS
i
2
4
P
NE 31, d Si
`tea N
dar River Park
.._.i n m2..
r
NFIoy f�T�
��Lnr
9
y
NE th Lry
NI: 7th Pf
�
s
NE I Oth 5f y
y
NE%t St
!E 31h
-a
Nc BIn ST
a
NF8%
x
w
w
NF'.t45t
NE 7th PI
m
CHE
6th PI
Site
NF61h S:
c
NL 5Ih
P
x
Fer�hP IEr�l;:r lPrh�ic•.I C.:II�
dtti�St
t1f
��3�dSt
NE xr,d st
c r3.
Horizontal Control Diagram
Datum
Renton Technical College
Site Information
Building K
Owner
Sheet Index
HORIZONTAL DATUM: NAD '83 '03, WASHINGTON COORDINATE SYSTEM NORTH
SITE ADDRESS: 3000 NE FOURTH STREET
RENTON TECHNICAL COLLEGE
CHO
COVER SHEET
ZONE. BASED ON RTK GPS MEASUREMENTS CONSTRAINED TO THE WASHINGTON
RENTON, WASHINGTON 98056
3000 NE FOURTH STREET
CO.01
CIVIL NOTES
STATE REFERENCE NETWORK.
RENTON, WA 98056
CO.02
CIVIL NOTES
BASIS OF BEARING: CENTERLINE KIRKLAND AVE. NE
ZONING: IL
C1.00
DEMOLITION PLAN
C2.00
T.E.S.C. PLAN
VERTICAL DATUM: NAVD 88 BASED ON RTK GPS MEASUREMENTS
TAX ACCOUNT NOS.: 727800475
C2.10
T.E.S.C. DETAILS
CONSTRAINED TO THE WASHINGTON STATE REFERENCE NETWORK AND GEOID
Architect
C3.00
GRADING AND STORM DRAINAGE PLAN
2003 MODEL.
AREA: 4.48 ACRES
C3.10
PAVING AND DRAINAGE DETAILS
DISTURBED AREA: 0.8 ACRES
C4.00
UTILITY PLAN
ALL DISTANCES SHOWN ARE GROUND DISTANCES UNLESS OTHERWISE NOTED.
McGRANAHAN ARCHITECTS
C4.10
UTILITY DETAILS
EXISTING IMPERVIOUS AREA PRIOR TO PROJECT 103,500 SQFT
2111 PACIFIC AVE, SUITE 100
C5.00
PAVING PLAN
THE LOCATION AND DESCRIPTION OF ALL SURVEY MARKERS SHOWN HEREON
PROPOSED IMPERVIOUS AREA AFTER PROJECT 104,900 SQFT
TACOMA, WA 98402
C5.10
PAVING DETAILS
ARE BASED ON FIELD OBSERVATIONS TAKEN ON DECEMBER 26, 2013,
C5.20
PAVING DETAILS
UNLESS OTHERWISE INDICATED.
Scale: 1 "=80'-O"
GG
4) CP# 28
460A-25.28 MIC
er50'(� N=183052.33
E=1308175.05
ELEV.=341.67
/ 0 1 80 160
IILi o0
F SCALE 1=80'
O N
00
C-4 C14
0
z
OVA
I
I
CP# 22
460A-25.22 MIC
N=182224.13
Jefferson Ave NE E=1308181.57
- - - - _�$ ELEV.=336.61
OF WA �� 0
�1 �.1� COUGHLIN PORTERLUNDEEN
ti A CONSULTING STRUCTURAL AND CIVIL ENGINEERING CORPORATION
PVC 801 SECOND AVENUE - SUITE 900 P: 206/343-0460
<L43667 SEATTLE, WA 98104 F: 206/343-5691
Earthwork Quantities
EXCAVATION 50 CY
FILL 50 CY
NOTE:
THE QUANTITIES SHOWN ARE PRELIMINARY ESTIMATES ONLY AND INTENDED FOR MUNICIPAL PERMITTING
AND REVIEW FEES. THE CONTRACTOR SHALL IGNORE THESE QUANTITIES, THEY ARE EXCLUDED FROM THE
BID DOCUMENT INFORMATION. THESE VOLUMES SHALL NOT BE USED BY THE CONTRACTOR AS A BASIS FOR
ANY CONTRACTUAL INFORMATION. THE CONTRACTOR SHALL PREPARE THEIR OWN EARTHWORK QUANTITIES
BASED ON THE INFORMATION PROVIDED IN THE CONTRACT DOCUMENTS, INCLUDING BUT NOT LIMITED TO
DRAWINGS, SPECIFICATIONS, AND THE GEOTECHNICAL REPORT.
List of Civil Abbreviations
GENERAL
ASP
ASPHALT
ATB
ASPHALT TREATED BASE
BM
BENCHMARK
B
BOLLARD
BC
BOTTOM OF CURB
BMP
BEST MANAGEMENT PRACTICES
BOE
BOTTOM OF EXCAVATION
BR
BOTTOM OF ROCKERY
BW
BOTTOM OF WALL
CHAN
CHANNEL
CB
CATCH BASIN
CO
CLEAN OUT
CONIC
CONCRETE
CD
CURB DROP
DI
DUCTILE IRON
DIA
DIAMETER
E
EAST
EL
ELEVATION
ELEV
ELEVATION
EX
EXISTING
EB
EXPLORATORY BORING
"If
GENERAL
FF
FINISH FLOOR
FDC
FIRE DEPARTMENT
CONNECTION
FH
FIRE HYDRANT
GM
GAS METER
GV
GAS VALVE
HA
HAND AUGER BORING
IE
INVERT ELEVATION
IP
IRON PIPE
LF
LINEAR FEET
MH
MANHOLE
MAX
MAXIMUM
MJ
MECHANICAL JOINT
MIN
MINIMUM
N
NORTH
NIC
NOT IN CONTRACT
OD
OUTSIDE DIAMETER
OHP
OVERHEAD POWER LINE
(REC)
PER RECORD
REC
PER RECORD
RJ
RESTRAINED JOINT
RIM
RIM ELEVATION
REVISION
GENERAL
ROW
RIGHT-OF-WAY
S
SOUTH
SS
SANITARY SEWER
SD
STORM DRAIN
SOFT
SQUARE FEET
STD
STANDARD
TEMP
TEMPORARY
TIC
TOP OF CURB
TR
TOP OF ROCKERY
TW
TOP OF WALL
TYP
TYPICAL
W/
WITH
W
WEST
W
WATER
WGT
WEIGHT
WM
WATER METER
WMH
WATER MAN HOLE
WV
WATER VALVE
YD
YARD DRAIN
SURVEYED:
DESIGNED:
KAW
DRAWN:
LBJ
CHECKED:
JAJ
BY DATE APPR APPROVED:
Civil Engineer
COUGHLIN PORTER LUNDEEN
801 SECOND AVENUE, SUITE 900
SEATTLE, WA 98104
(206) 343-0460 CONTACT: KEN WIERSEMA
Landscape Architect
THE BERGER PARTNERSHIP
1721 8TH AVENUE N
SEATTLE, WA 98109
(206)325-6877 CONTACT: JASON HENRY
Contractor
Survevor
PACE
11255 KIRKLAND WAY #300
KIRKLAND, WA 98033
(425) 827-2014 CONTACT: BILL HAWKINS
SCALE:
AS NOTED
ONE INCH
AT FULL SCALE
IF NOT ONE INCH
SCALE ACCORDINGLY
Construction Seauence
1. ARRANGE AND ATTEND PRE -CONSTRUCTION CONFERENCE WITH THE CITY OF RENTON PUBLIC WORKS DEPARTMENT.
2. VERIFY VERTICAL AND HORIZONTAL LOCATIONS OF ALL EXISTING UNDERGROUND UTILITIES. CONTACT ALL UTILITY COMPANIES THAT MAY BE
AFFECTED BY THE PROPOSED CONSTRUCTION. CALL 1-800-424-5555.
3. FLAG CLEARING LIMITS AS INDICATED ON THE DRAWINGS.
4. PROVIDE CATCH BASIN PROTECTION.
5. INSTALL FILTER FABRIC AND BARRIER FENCE.
6. INSTALL TEMPORARY SEDIMENT TRAPS. (BAKER TANKS OR APPROVED EQUAL)
7. PERIODICALLY (DURING CONSTRUCTION) REMOVE EXCESS EXCAVATED MATERIALS, TRASH, DEBRIS AND WASTE MATERIALS AND DISPOSE IN AN
AUTHORIZED LOCATION AT NO COST TO THE OWNER. MONITOR TESC EFFECTIVENESS.
8. REMOVE UNSUITABLE BEARING MATERIAL AS REQUIRED.
9. BEGIN SITE EARTHWORK. GRADE AND PLACE ACCEPTABLE FILL AS REQUIRED AND COMPACT SLAB SUBGRADE AS REQUIRED.
10. REMOVE ALL ESC FACILITIES ONLY WHEN THE ENTIRE SITE IS STABILIZED AND APPROVED BY THE CITY INSPECTOR.
Hearing Examiner's Conditions of ADDroval
1. THE APPLICANT IS SUBJECT TO THE MITIGATION MEASURES AS DETERMINED BY THE ENVIRONMENTAL REVIEW COMMITTEE'S DECISION AUGUST 25, 2014.
2. THE APPLICANT SHALL BE REQUIRED TO PROVIDE A LIGHTING PLAN THAT ADEQUATELY PROVIDES FOR PUBLIC SAFETY WITHOUT CASTING EXCESSIVE GLARE ON ADJACENT
PROPERTIES AT THE TIME OF BUILDING PERMIT REVIEW. DOWN -LIGHTING SHALL BE USED IN ALL CASES TO ASSURE SAFE VEHICULAR MOVEMENT IN AN AREA WHERE
PEDESTRIANS COULD BE WALKING. THE LIGHTING PLAN SHALL BE SUBMITTED TO, AND APPROVED BY, THE CURRENT PLANNING PROJECT MANAGER PRIOR TO BUILDING
PERMIT APPROVAL.
3. THE APPLICANT SHALL PROVIDE A BICYCLE AND VEHICLE PARKING STALL ANALYSIS BASED ON THE CRITERIA USED FOR QUANTIFYING THE NUMBER OF VEHICLE AND
PARKING SPACES REQUIRED IN THE CITY CODE, AND PROVIDE AN UPDATED PARKING PLAN THAT SHOWS THE NUMBER OF BICYCLE PARKING SPACES REQUIRED AND
VEHICLE PARKING STALLS, THAT WILL BE REVIEWED AND APPROVED BY THE CURRENT PLANNING PROJECT MANAGER, PRIOR TO CONSTRUCTION PERMIT ISSUANCE.
4. THE APPLICANT SHALL PROVIDE A LOT COVERAGE ANALYSIS FOR THE OVERALL TECHNICAL COLLEGE CAMPUS.
5. THE APPLICANT SHALL PROVIDE PLAN SETS SHOWING ANY ROOFTOP EQUIPMENT OR STRUCTURES THAT MAY REQUIRE SCREENING PER CITY CODE, WHERE THE
SUBMITTED ELEVATIONS DO NOT SHOW ROOFTOP EQUIPMENT, AND SUCH EQUIPMENT SHALL BE SUBMITTED TO THE CURRENT PLANNING PROJECT MANAGER, FOR REVIEW
AND APPROVAL PRIOR TO CONSTRUCTION PERMIT ISSUANCE.
Environmental Review Committee Mitigation Measures August 25, 2014
1. PROJECT CONSTRUCTION SHALL BE REQUIRED TO COMPLY WITH THE RECOMMENDATIONS OUTLINED IN THE SUBMITTED GEOTECHNICAL ENGINEERING REPORT FOR RENTON
TECHNICAL COLLEGE PROPOSED BUILDING K3 IMPROVEMENTS, PREPARED BY GEOENGINEERS, INC, DATED JULY 17, 2014 (EXHIBIT 3).
2. PROJECT TESC (TEMPORARY EROSION AND SEDIMENT CONTROL) PLAN SHALL BE REQUIRED TO COMPLY WITH THE RECOMMENDATIONS OUTLINED IN THE TECHNICAL
INFORMATION REPORT, PREPARED BY COUGHLIN PORTER LUNDEEN, DATED JULY 2, 2014 (EXHIBIT 5).
3. PROJECT CONSTRUCTION SHALL BE REQUIRED TO COMPLY WITH THE OUTLINED RECOMMENDATIONS IN THE SUBMITTED LIMITED HAZARDOUS MATERIALS SURVEY REPORT
FOR AUTOMOTIVE TRADES COMPLEX AT RENTON TECHNICAL COLLEGE, PREPARED BY PBS ENGINEERING AND ENVIRONMENTAL, DATED MARCH 31, 2014 (EXHIBIT 4).
UPERMIT# U15000494
VERTICAL: NAVD 1988
HORIZONTAL- NAD 1983/1991
DATU M
CITY OF
RENTON
Planning/Building/Public Works Dept.
Approved By: Date:
Approved By: Date:
Approved By: Date:
Approved By: Date:
AUTOMOTIVE TRAINING CENTER 04/30/2015
RENTON TECHNICAL COLLEGE FIELDBOOK:
PAGE:
RENTON WASHINGTON
DRAWING NO:
CIVIL COVER SHEET
C0.00
SHEET: OF:
1 13
R-381801