HomeMy WebLinkAboutCM_Construction_Mitigation_Description_2018.pdf1
Construction Mitigation Description
New Chick-fil-A Restaurant
361 Rainier Ave S
Renton WA 98055
8/22/18
Planning Division
City of Renton
1055 South Grady Way, Renton, WA 98057
Proposed Construction Start Date:
• Fourth Quarter, 2019
Hours of Operation:
• Per City Restrictions
“Commercial, multi-family, new single family and other non-residential construction activities shall be
restricted to the hours between 7:00 a.m. and 8:00 p.m., Monday through Friday. Work on Saturdays
shall be restricted to the hours between 9:00 a.m. and 8:00 p.m. No work shall be permitted on
Sundays”.
• Majority of the work will be performed Monday through Friday from 7am to 5pm.
Proposed Hauling/Transportation Routes:
• Access from Rainier Ave and Renton.
Measures to be implemented to minimize dust/traffic/erosion/mud/noise:
• Temporary fencing will be provided around the perimeter of the subject site
• Erosion control measures will be provided as required by the City.
• Construction noise will be limited to the allowed hours of construction established in the City code. No special
hours of operation are anticipated.
Carlos Arias
4G Development & Consulting, Inc.
Phone: 951-970-9138
Email: carias@4gdev.com
Address: PO BOX 270571, San Diego, CA 92198