Loading...
HomeMy WebLinkAboutP_Refuse_2018.pdfGROUT FILLED METAL SUPPORT POST FINISH: PT-1 BRICK OVER CMU WALL FINISH: BR-3 HOLLOW METAL DOOR AND FRAME FINISH: PT-1 T.O. BM. 8' - 8" T.O. SLAB 0' - 0" BRICK OVER CMU WALL FINISH: BR-3 T.O. BM. 8' - 8" T.O. SLAB 0' - 0" BRICK OVER CMU WALL FINISH: BR-3 GROUT FILLED METAL SUPPORT POST FINISH: PT-1 METAL GATE FRAME FINISH: PT-1 GATE PANEL PRE- FINISHED PLASTIC LUMBER "WEATHERED WOOD" BRICK OVER CMU WALL FINISH: BR-3 T.O. BM. 8' - 8" T.O. SLAB 0' - 0" BRICK OVER CMU WALL FINISH: BR-3 GROUT FILLED METAL SUPPORT POST FINISH: PT-1 T.O. BM. 8' - 8" T.O. SLAB 0' - 0"2C2B 2A2D 9'-111/4"RE:CIVILRE: CIVIL 20' - 1 63/64"8' - 1 5/8" 28' - 3 39/64"SLOPE1/4:12MIN.SLOPE1/4:12MIN.SLOPE 1/4:12 MIN. SLOPE 1/4:12 MIN. GROUT FILLED METAL SUPPORT POST FINISH: PT-1SLOPE1/4:12MIN.RE:CIVIL15 1/4" = 1'-0" TE EXTERIOR ELEVATION SOUTH2C 1/4" = 1'-0" TE EXTERIOR ELEVATION (WEST)2D 1/4" = 1'-0" TE EXTERIOR ELEVATION (EAST)2B 1/4" = 1'-0" TE EXTERIOR ELEVATION (NORTH)2A 1/4" = 1'-0" TE FLOOR PLAN1A Information contained on this drawing and in all digital files produced for above named project may not be reproduced in any manner without express written or verbal consent from authorized project representatives. Chick-fil-A 5200 Buffington Road Atlanta, Georgia 30349-2998 NO.DATE DESCRIPTION REVISION SCHEDULE A FSR#CHICK-FIL-A1 B C D E A B C D E 234 1234 5 5 I:\Chick-fil-A\16-Jobs\16-144361RainierAve.South,Renton,WA\Graphics\20CustomDesign\20.2SchematicDesign\RefuseSheet\Sheet-A-110-REFUSEENCLOSURE.dwgSheetNo:LAYOUT1Savedby:tony-Tuesday,August21,201810:30AMPrintedby:TonyMorales-August21,201810:30AM1833 E. 17th. Street; Suite 301Santa Ana, CA. 92705Phone 714.832.1834