STORMWATER CONTROL PLAN
Chick-fil-A
Project Site No. 04249
361 Rainier Avenue South
Renton, Washington
Prepared for:
Chick-fil-A, Inc.
15635 Alton Parkway, Suite 350
Irvine, CA 92618
August 16, 2018
Our Job No. 18963
18215 72ND AVENUE SOUTH KENT, WA 98032 (425) 251-6222 (425) 251-8782 FAX
BRANCH OFFICES ¨ TUMWATER, WA ¨ KLAMATH FALLS, OR ¨ LONG BEACH, CA ¨ ROSEVILLE, CA ¨ SAN DIEGO, CA
www.barghausen.com
Stormwater Control Plan Chick-fil-A Project Site No. 04249 Renton, Washington Our Job No. 18963
18963.001.doc
TABLE OF CONTENTS
1.0 PROJECT OVERVIEW
2.0 CONDITIONS AND REQUIREMENTS SUMMARY
3.0 OFF-SITE ANALYSIS
4.0 FLOW CONTROL AND WATER QUALITY FACILITY ANALYSIS AND DESIGN
5.0 CONVEYANCE SYSTEM ANALYSIS AND DESIGN
6.0 SPECIAL REPORTS AND STUDIES
7.0 OTHER PERMITS
8.0 CONSTRUCTION STORMWATER POLLUTION PREVENTION PLAN (CSWPPP) ANALYSIS
AND DESIGN
9.0 BOND QUANTITIES, FACILITY SUMMARIES, AND DECLARATION OF COVENANT
10.0 OPERATIONS AND MAINTENANCE MANUAL
Tab 1.0
18963.001.doc
1.0 PROJECT OVERVIEW
The existing site is a partially developed 0.93-acre lot located in the northwest quarter of the
southeast quarter of Section 18, Township 23 North, Range 5 East, Willamette Meridian, City of
Renton, King County, Washington. Specifically, the site is at 361 Rainier Avenue South, Parcel
No. 000720-0209. See Figure 1.2, Vicinity Map, for a graphical depiction of the exact site
location.
The existing site has a restaurant building that sits at the northeast corner of the site. There is a
former building pad on the south half of the site that is currently a grass covered area.
Surrounding the existing building and grass pad is a paved parking area. There is storm sewer
on site that collects and conveys stormwater off site to the storm sewer in the right-of-way of
Rainier Avenue. See Figure 1.6 for the Existing Conditions Map.
The proposed Chick-fil-A quick serve restaurant project proposes a 4,195-square-foot building
and associated utilities with new on-site curb, sidewalk, and asphalt pavement for parking and
maneuvering and drive-thru facilities. A stormwater system is proposed that will collect, convey,
and detain stormwater on site. See Figure 1.7 for the Proposed Site Map.
Permits associated with this project include:
· Grading Permit
· Building Permit
· Health Department Permit
· Utility Permits for Water, Sewer and Storm
· Fire Permit
· Mechanical and Plumbing Permits
The proposed improvements will require the site to implement formal flow control and water
quality treatment per the 2017 Renton Surface Water Design Manual. A Full Drainage Review is
required. See Figure 1.5 (Figure 1.1.2.A Flow Chart For Determining Type of Drainage Review
Required). This is discussed further in Section 4.0 of this report.
A Geotechnical Report has been provided for the project site by Terracon and is provided in
Section 6.0 of this report. Full infiltration is not recommended on site due to high groundwater
elevation during the winter months. This is discussed further in Section 4.0 of this report.
CITY OF RENTON SURFACE WATER DESIGN MANUAL
2017 City of Renton Surface Water Design Manual 12/12/2016 8-A-1
REFERENCE 8-A
TECHNICAL INFORMATION REPORT (TIR)
WORKSHEET
Part 1 PROJECT OWNER AND
PROJECT ENGINEER Part 2 PROJECT LOCATION AND
DESCRIPTION
Project Owner _____________________________
Phone ___________________________________
Address __________________________________
_________________________________________
Project Engineer ___________________________
Company _________________________________
Phone ___________________________________
Project Name __________________________
CED Permit # ________________________
Location Township ________________
Range __________________
Section _________________
Site Address __________________________
_____________________________________
Part 3 TYPE OF PERMIT APPLICATION Part 4 OTHER REVIEWS AND PERMITS
Land Use (e.g., Subdivision / Short Subd.)
Building (e.g., M/F / Commercial / SFR)
Grading
Right-of-Way Use
Other _______________________
DFW HPA
COE 404
DOE Dam Safety
FEMA Floodplain
COE Wetlands
Other ________
Shoreline
Management
Structural
Rockery/Vault/_____
ESA Section 7
Part 5 PLAN AND REPORT INFORMATION
Technical Information Report Site Improvement Plan (Engr. Plans)
Type of Drainage Review
(check one):
Date (include revision
dates):
Date of Final:
Full
Targeted
Simplified
Large Project
Directed
__________________
__________________
__________________
Plan Type (check
one):
Date (include revision
dates):
Date of Final:
Full
Modified
Simplified
__________________
__________________
__________________
REFERENCE 8: PLAN REVIEW FORMS AND WORKSHEET
TECHNICAL INFORMATION REPORT (TIR) WORKSHEET
12/12/2016 2017 City of Renton Surface Water Design Manual 8-A-2
Part 6 SWDM ADJUSTMENT APPROVALS
Type (circle one): Standard / Blanket
Description: (include conditions in TIR Section 2)
____________________________________________________________________________________
____________________________________________________________________________________
____________________________________________________________________________________
Approved Adjustment No. ______________________ Date of Approval: _______________________
Part 7 MONITORING REQUIREMENTS
Monitoring Required: Yes / No
Start Date: _______________________
Completion Date: _______________________
Describe: _________________________________
_________________________________________
_________________________________________
Re: SWDM Adjustment No. ________________
Part 8 SITE COMMUNITY AND DRAINAGE BASIN
Community Plan: ____________________________________________________________________
Special District Overlays: ______________________________________________________________
Drainage Basin: _____________________________________________________________________
Stormwater Requirements: _____________________________________________________________
Part 9 ONSITE AND ADJACENT SENSITIVE AREAS
River/Stream ________________________
Lake ______________________________
Wetlands ____________________________
Closed Depression ____________________
Floodplain ___________________________
Other _______________________________
_______________________________
Steep Slope __________________________
Erosion Hazard _______________________
Landslide Hazard ______________________
Coal Mine Hazard ______________________
Seismic Hazard _______________________
Habitat Protection ______________________
_____________________________________
REFERENCE 8-A: TECHNICAL INFORMATION REPORT (TIR) WORKSHEET
TECHNICAL INFORMATION REPORT (TIR) WORKSHEET
2017 City of Renton Surface Water Design Manual 12/12/2016 Ref 8-A-3
Part 10 SOILS
Soil Type
______________________
______________________
______________________
______________________
Slopes
________________________
________________________
________________________
________________________
Erosion Potential
_________________________
_________________________
_________________________
_________________________
High Groundwater Table (within 5 feet)
Other ________________________________
Sole Source Aquifer
Seeps/Springs
Additional Sheets Attached
Part 11 DRAINAGE DESIGN LIMITATIONS
REFERENCE
Core 2 – Offsite Analysis_________________
Sensitive/Critical Areas__________________
SEPA________________________________
LID Infeasibility________________________
Other________________________________
_____________________________________
LIMITATION / SITE CONSTRAINT
_______________________________________
_______________________________________
_______________________________________
_______________________________________
_______________________________________
_______________________________________
Additional Sheets Attached
Part 12 TIR SUMMARY SHEET (provide one TIR Summary Sheet
per Threshold Discharge Area)
Threshold Discharge Area:
(name or description)
Core Requirements (all 8 apply):
Discharge at Natural Location Number of Natural Discharge Locations:
Offsite Analysis Level: 1 / 2 / 3 dated:__________________
Flow Control (include facility
summary sheet)
Standard: _______________________________
or Exemption Number: ____________
On-site BMPs: _______________________________
Conveyance System Spill containment located at: _____________________________
Erosion and Sediment Control /
Construction Stormwater Pollution
Prevention
CSWPP/CESCL/ESC Site Supervisor: _____________________
Contact Phone: _________________________
After Hours Phone: _________________________
REFERENCE 8: PLAN REVIEW FORMS AND WORKSHEET
TECHNICAL INFORMATION REPORT (TIR) WORKSHEET
12/12/2016 2017 City of Renton Surface Water Design Manual 8-A-4
Part 12 TIR SUMMARY SHEET (provide one TIR Summary Sheet
per Threshold Discharge Area)
Maintenance and Operation Responsibility (circle one): Private / Public
If Private, Maintenance Log Required: Yes / No
Financial Guarantees and Liability Provided: Yes / No
Water Quality (include facility
summary sheet)
Type (circle one): Basic / Sens. Lake / Enhanced Basic / Bog
or Exemption No. _______________________
Special Requirements (as applicable):
Area Specific Drainage
Requirements
Type: SDO / MDP / BP / Shared Fac. / None
Name: ________________________
Floodplain/Floodway Delineation Type (circle one): Major / Minor / Exemption / None
100-year Base Flood Elevation (or range): _______________
Datum:
Flood Protection Facilities Describe:
Source Control
(commercial / industrial land use)
Describe land use:
Describe any structural controls:
Oil Control High-Use Site: Yes / No
Treatment BMP: _________________________________
Maintenance Agreement: Yes / No
with whom? _____________________________________
Other Drainage Structures
Describe:
REFERENCE 8-A: TECHNICAL INFORMATION REPORT (TIR) WORKSHEET
TECHNICAL INFORMATION REPORT (TIR) WORKSHEET
2017 City of Renton Surface Water Design Manual 12/12/2016 Ref 8-A-5
Part 13 EROSION AND SEDIMENT CONTROL REQUIREMENTS
MINIMUM ESC REQUIREMENTS
DURING CONSTRUCTION
Clearing Limits
Cover Measures
Perimeter Protection
Traffic Area Stabilization
Sediment Retention
Surface Water Collection
Dewatering Control
Dust Control
Flow Control
Control Pollutants
Protect Existing and Proposed
BMPs/Facilities
Maintain Protective BMPs / Manage
Project
MINIMUM ESC REQUIREMENTS
AFTER CONSTRUCTION
Stabilize exposed surfaces
Remove and restore Temporary ESC Facilities
Clean and remove all silt and debris, ensure
operation of Permanent BMPs/Facilities, restore
operation of BMPs/Facilities as necessary
Flag limits of sensitive areas and open space
preservation areas
Other _______________________
Part 14 STORMWATER FACILITY DESCRIPTIONS (Note: Include Facility Summary and Sketch)
Flow Control Type/Description Water Quality Type/Description
Detention
Infiltration
Regional Facility
Shared Facility
On-site BMPs
Other
________________
________________
________________
________________
________________
________________
Vegetated Flowpath
Wetpool
Filtration
Oil Control
Spill Control
On-site BMPs
Other
________________
________________
________________
________________
________________
________________
________________
Part 15 EASEMENTS/TRACTS Part 16 STRUCTURAL ANALYSIS
Drainage Easement
Covenant
Native Growth Protection Covenant
Tract
Other ____________________________
Cast in Place Vault
Retaining Wall
Rockery > 4′ High
Structural on Steep Slope
Other _______________________________
REFERENCE 8: PLAN REVIEW FORMS AND WORKSHEET
TECHNICAL INFORMATION REPORT (TIR) WORKSHEET
12/12/2016 2017 City of Renton Surface Water Design Manual 8-A-6
Part 17 SIGNATURE OF PROFESSIONAL ENGINEER
I, or a civil engineer under my supervision, have visited the site. Actual site conditions as observed were
incorporated into this worksheet and the attached Technical Information Report. To the best of my
knowledge the information provided here is accurate.
____________________________________________________________________________________
Signed/Date
auhgs
ernabC.OCNNIS ,USL RTIENEGN IEGN
Horizontal:
Scale:
Vertical:
For:
Title:
VICINITY MAP
Job Number
18215 72ND AVENUE SOUTH
KENT, WA 98032
(425) 251-6222
(425) 251-8782
CIVIL ENGINEERING, LAND PLANNING,
SURVEYING, ENVIRONMENTAL SERVICES
N.T.S.N/A 18963
DATE: 08/15/18
Chick-fil-A
Renton, Washington
P:\18000s\18963\exhibit\graphics\18963 vmap.cdr
REFERENCE: Rand McNally (2018)
SITE
auhgs
ernabC.OCNNIS ,USL RTIENEGN IEGN
Horizontal:
Scale:
Vertical:
For:
Title:
SOIL SURVEY MAP
Job Number
18215 72ND AVENUE SOUTH
KENT, WA 98032
(425) 251-6222
(425) 251-8782
CIVIL ENGINEERING, LAND PLANNING,
SURVEYING, ENVIRONMENTAL SERVICES
1 : 24000 N/A 18963
DATE: 08/15/18
Chick-fil-A
Renton, Washington
P:\18000s\18963\exhibit\graphics\18963 topo.cdr
REFERENCE: usgs.gov
SITE
auhgs
ernabC.OCNNIS ,USL RTIENEGN IEGN
Horizontal:
Scale:
Vertical:
For:
Title:
SOIL SURVEY MAP
Job Number
18215 72ND AVENUE SOUTH
KENT, WA 98032
(425) 251-6222
(425) 251-8782
CIVIL ENGINEERING, LAND PLANNING,
SURVEYING, ENVIRONMENTAL SERVICES
N.T.S.N/A 18963
DATE: 08/15/18
Chick-fil-A
Renton, Washington
P:\18000s\18963\exhibit\graphics\18963 soil.cdr
REFERENCE: USDA, Natural Resources Conservation Service
LEGEND:
Ur = Urban land
SITE
SECTION 1.1 DRAINAGE REVIEW
12/12/2016 2017 City of Renton Surface Water Design Manual
1-14
FIGURE 1.1.2.A FLOW CHART FOR DETERMINING TYPE OF DRAINAGE REVIEW REQUIRED
Tab 2.0
18963.001zj.doc
2.0 CONDITIONS AND REQUIREMENTS SUMMARY
Core Requirement #1: Discharge at the Natural Location:
Response: The on-site stormwater conveyance in its existing condition is connected to the
abutting City storm sewer. Because of the urbanized nature of the surrounding area of the site,
underground storm conveyance is the only outlet for stormwater generated on the subject site.
Core Requirement #2: Offsite Analysis:
Response: A Level 1 Off-Site Analysis is provided in Section 3.0 of this report that assesses
potential off-site drainage and water quality impacts associated with the development of the
project site.
Core Requirement #3: Flow Control Facilities:
Response: The subject site lies within a Peak Rate Flow Control Standard area. This means
that the site stormwater discharge will match the existing discharge. The proposed redeveloped
site will have approximately a 7% increase in impervious area. Once BMPs are implemented, as
outlined in the discussion of Core Requirement #9 and modeled against the existing condition in
WWHM, flows will pass the required parameters of the stormwater model. Per Section 1.2.3.1.A
of the 2017 Renton SWDM, an increase of up to 0.15 cfs in flow for the 100-year peak flow from
the site will be allowed.
Core Requirement #4: Conveyance System:
Response: A pipe conveyance network has been proposed for on-site stormwater collection and
will be designed to convey a minimum 25-year peak flow.
Core Requirement #5: Construction Stormwater Pollution Prevention (SWPPS):
Response: A Construction Stormwater Pollution Prevention Plan can be found in Section 8.0 of
this report.
Core Requirement #6: Maintenance and Operations:
Response: An Operations and Maintenance Manual will be provided to the owner of the
property and can be found is Section 10.0 of this report.
Core Requirement #7: Financial Guarantees and Liability:
Response: The Construction Bond will be calculated and provided by the contractor once
selected to perform the proposed site improvements.
Core Requirement #8: Water Quality Facilities:
Response: The proposed project will be a high-use site and will meet the requirements of the
high-use water quality menu. Water quality will be provided, including oil control and Enhanced
Basic Water Quality using a coalescing plate oil/water separator in series with a Modular Wetland
Proprietary facility.
Core Requirement #9: On-Site BMPs:
Response: The building roof and plaza frontage along Renton Center Way S.W. will be
conveyed to a 390± square-foot bioretention pond with an underdrain. The tributary area to the
18963.001zj.doc
bio-retention facility will be approximately 14% of the subject site and off-site improvements.
Special Requirement #1: Other Adopted Area-Specific Requirements:
Response: There are no additional Area-Specific Requirements.
Special Requirement #2: Flood Hazard Area Delineation:
Response: The site lies outside the 500-year floodplain per FEMA FIRM Map Panel 977 of
1725, Map number 53033C0977F, Revised May 16, 1995.
Special Requirement #3: Flood Protection Facilities:
Response: The subject site does not rely on any Flood Protection Facilities.
Special Requirement #4: Source Control:
Response: The proposed developed site will implement roof covering over the trash enclosure.
Special Requirement #5: Oil Control:
Response: The proposed developed site will be of the high-use designation. Oil Control will be
required.
Special Requirement #6: Aquifer Protection Area:
Response: The site does not fall within an Aquifer Protection Area Zone as depicted by the City
of Renton Groundwater Protection Areas Map (Reference 15-B of the City of Renton Surface
Water Design Manual).
Tab 3.0
18963.001.doc
3.0 OFF-SITE ANALYSIS
Due to the built up urban environment around the site, the adjacent lots around the subject site
are all established with building, paving and landscaping. They have stormwater infrastructure in
place. There is no off-site stormwater expected to enter the proposed site.
A Level 1 Downstream Analysis has been performed for the subject site and is described as
follows: A site visit was conducted by a Barghausen Consulting Engineers, Inc. engineer on
August 13, 2018.
Task 1: The study area consists of the subject site, surrounding sites of Fred Meyer Fuel, a strip
mall to the west, and a Firestone automotive shop to the north. It also includes the site frontages
along Rainier Avenue South to the east and Renton Center Way to the south. Storm
infrastructure carries captured stormwater north in the Rainier Avenue right-of-way. See Figure
3.1 for a Downstream Analysis Map.
Task 2: Upon Review of the site survey, performed by Barghausen Consulting Engineers, Inc.,
dated February 7, 2018, and available City of Renton GIS information and as-built drawings, a
complete study of the current on-site and surrounding area was completed. See Figure 3.1 for a
Downstream Analysis Map that shows the downstream infrastructure a quarter of a mile
downstream of the site. The final outfall of the site is the Black River Drainage Basin
approximately 2 miles downstream.
Task 3: A site visit was conducted by a Barghausen Consulting Engineers, Inc. engineer on
August 13, 2018. The weather was clear and sunny, the temperature was 88 degrees. A
thorough investigation of the downstream infrastructure was conducted due to some incorrect
information regarding downstream flow direction on the GIS information. The flow direction of
adjacent infrastructure in the right-of-way was verified.
Task 4: Upon Review of all off-site stormwater conveyance, there are no anticipated concerns
regarding the proposed site stormwater runoff contributing to the existing stormwater
conveyance. The site lies within a built-up urban environment with well-established stormwater
infrastructure. The site lies within the Peak Rate Flow Control Standard (Existing Site Conditions)
area as depicted in Reference 15-A of the City of Renton Surface Water Design Manual (included
in this report as Figure 3.2).
The proposed site improvements will include some BMP implementation such as treatment with a
bio-retention facility for a portion of the impervious areas of the site. The proposed site will create
a net increase in overall impervious area; however, implementation of the required BMPs will help
to match the previous site discharge rate. For these reasons there are no foreseeable negative
effects on the existing off-site stormwater infrastructure.