Loading...
HomeMy WebLinkAboutRS_Transportation_Impact_Analysis_2018.pdf Chick-fil-A Renton, WA PRE17-000838 Transportation Impact Analysis August 13, 2018 Prepared for: Chick-fil-A Inc. 15635 Alton Parkway, Suite 350 Irvine, CA 92618 Prepared by: TENW Transportation Engineering NorthWest 11400 SE 8th Street, Suite 200 Bellevue, WA 98004 Office: (425) 889-6747 Fax: (425) 889-8369 Transportation Impact Analysis Chick-fil-A – Renton, WA TENW August 13, 2018 Page i Table of Contents FINDINGS/CONCLUSIONS .................................................................................................. 1 INTRODUCTION ................................................................................................................. 3 Project Description ................................................................................................................ 3 Project Approach ................................................................................................................. 3 Primary Data and Information Sources ...................................................................................... 3 EXISTING CONDITIONS ....................................................................................................... 6 Roadway Network ............................................................................................................... 6 Existing Traffic Volumes .......................................................................................................... 6 Public Transportation Services ................................................................................................. 6 Level of Service .................................................................................................................... 9 Collision History ................................................................................................................. 10 FUTURE TRAFFIC CONDITIONS AND TRAFFIC IMPACTS ......................................................... 11 Planned Transportation Improvements ..................................................................................... 11 Project Trip Generation ........................................................................................................ 11 Project Trip Distribution and Assignment .................................................................................. 11 Future Traffic Volumes .......................................................................................................... 12 Future Level of Service ......................................................................................................... 12 Site Access Assessment ........................................................................................................ 13 Parking Analysis ................................................................................................................. 13 Traffic and Parking Management Plan .................................................................................... 14 MITIGATION .................................................................................................................... 15 Appendices Appendix A – Peak Hour Turning Movement Counts Appendix B – Level of Service (LOS) Calculations Appendix C – Trip Generation Calculations Appendix D – Site Access Level of Service (LOS) and Queue Calculations Transportation Impact Analysis Chick-fil-A – Renton, WA TENW August 13, 2018 Page ii List of Figures and Tables Figure 1 Project Site Vicinity ....................................................................................................... 4 Figure 2 Preliminary Site Plan ..................................................................................................... 5 Figure 3 AM Peak Hour Traffic Volumes ....................................................................................... 7 Figure 4 PM Peak Hour Traffic Volumes ........................................................................................ 8 Table 1 Existing Roadway Network Summary – Project Site Vicinity .................................................. 6 Table 2 LOS Criteria for Signalized and Stop-Controlled Intersections1 .............................................. 9 Table 3 2018 Existing Peak Hour Level of Service Summary ......................................................... 10 Table 4 Collision Data Summary, January 1, 2014 to December 31, 2016 .................................... 10 Table 5 Trip Generation Summary ............................................................................................ 11 Table 6 Project Trip Distribution................................................................................................ 11 Table 7 Year 2020 Peak Hour Level of Service Summary ............................................................. 12 Table 8 Site Access Peak Hour LOS & Queue Summary ............................................................... 13 Transportation Impact Analysis Chick-fil-A – Renton, WA TENW August 13, 2018 Page 1 FINDINGS/CONCLUSIONS This transportation impact analysis (TIA) has been prepared for the proposed Chick-fil-A Restaurant project located at 361 Rainier Avenue S in Renton. Project Proposal. The project proposal includes a 4,195 square foot (SF) Chick-fil-A fast-food restaurant with a drive-through window on a site that is currently vacant (formerly occupied by Diamond LilÊs Restaurant). Vehicular access to the site is proposed at two locations: one via the Rainier Avenue S / S 3rd Place signalized intersection and the other via a right-in/right-out driveway north of the signal. Full buildout of the project is estimated to occur in 2020. Trip Generation. The proposed project is estimated to generate 988 new weekday daily trips with 86 new trips occurring during the weekday AM peak hour (44 entering, 22 exiting) and 68 new trips occurring during the weekday PM peak hour (35 entering, 33 exiting). Future Year LOS. LOS analyses were conducted for future year 2020 AM and PM peak hour conditions at the Rainier Avenue S / S 3rd Place signalized intersection. Based on the analysis results, the signalized study intersection is expected to operate at LOS C or better in 2020 with the proposed Chick-fil-A Restaurant project. Site Access Analysis. The individual movements at the proposed right-in/right-out driveway on Rainier Avenue S are expected to operate at LOS B or better in 2019 with 95th percentile queues anticipated to be less than 25 feet during both the AM and PM peak hours. Parking Evaluation. The project proposes a total of 42 on-site surface parking stalls. Peak parking demand was estimated based on rates included in the ITE Parking Generation manual, which has an average peak period parking demand rate for a fast-food restaurant with drive-through window of 9.98 vehicles per 1,000 SF. Applying the peak parking demand rate to the proposed Chick-fil-A Restaurant results in a total estimated peak parking demand of 42 stalls (9.98 X 4,195 / 1000). The 42 proposed on-site parking stalls would accommodate this peak parking demand. Parking Modification. The project proposes 42 stalls which exceeds the City coded allowance of 1 stall per 75 SF of dining area. To ensure public safety and minimize impact to adjacent properties, it is imperative that adequate on-site parking is provided for customers and to accommodate traffic circulation. Having adequate on-site parking and drive-thru queuing will prevent parking spill-over onto adjacent businesses and neighborhoods. If delays in the drive-thru are too long, customers will intuitively park on-site and go inside the restaurant. Without adequate on-site parking and good circulation, dine-in customers will create parking spillover. This can be avoiding by allowing the site to provide the amount of proposed parking greater than code allows. Mitigation. Off-Site Improvements. Based on the results of the analysis, the existing transportation facilities are anticipated to accommodate the additional traffic generated by the proposed Chick-fil-A Restaurant project. No project-specific off-site transportation mitigation is proposed. Transportation Impact Analysis Chick-fil-A – Renton, WA TENW August 13, 2018 Page 2 Transportation Impact Fees. To mitigate long-term traffic impacts, the City of Renton requires payment of a traffic impact fee. The CityÊs currently adopted impact fee rates are $90.36 per square foot of fast-food restaurant with drive-through window use and $30.48 per square foot of sit-down restaurant use. Based on the current site plan, with credit for the former Diamond LilÊs Restaurant, the net impact fee for the proposed project would be $225,166.68. The CityÊs impact fee rate is subject to change. Traffic and Parking Management Plan. During the opening weeks of the Chick-fil-A Restaurant, it is expected that higher traffic levels and parking needs will be generated similar to other recent openings in the region. As a result, a Traffic and Parking Management Plan has been developed that will help direct entering and exiting vehicles for Chick-fil-A drive- through and walk-up patrons to areas within the site to help reduce impacts to the shared parking areas and drive aisles of the retail center, and to eliminate queue spill-back onto adjacent streets. Implementation of the Traffic and Parking Management Plan is proposed to mitigate short- term transportation impacts, and payment of the pro-rata transportation costs is proposed to mitigate long-term transportation impacts of the proposed Chick-fil-A development. Transportation Impact Analysis Chick-fil-A – Renton, WA TENW August 13, 2018 Page 3 INTRODUCTION This transportation impact analysis (TIA) has been prepared for the proposed Chick-fil-A Restaurant project located at 361 Rainier Avenue S in Renton as shown in the Figure 1 Vicinity Map. Project Description The project proposal includes a 4,195 square foot (SF) Chick-fil-A fast-food restaurant with a drive- through window and 42 parking stalls on a site that is currently vacant (formerly Diamond LilÊs Restaurant). Vehicular access to the site is proposed at two locations: one on S 3rd Place west of Rainier Avenue S signalized intersection, other via a right-in/right-out driveway north of the signal. Full buildout of the project is anticipated in 2020. A preliminary site plan is provided in Figure 2. Project Approach To analyze the traffic impacts from the project, the following tasks were undertaken: · Assessed existing conditions through field reconnaissance and reviewed existing planning documents; · Described and assessed existing transportation conditions in the area; · Documented collision histories at study intersections; · Documented planned transportation improvements in the site vicinity; · Documented existing traffic volumes and intersection levels of service (LOS) at the Rainier Avenue S / S 3rd Place study intersection during the weekday AM and PM peak hours; · Estimated trip generation and documented trip distribution and assignment of AM and PM peak hour project-generated traffic; · Documented traffic forecasts and assumptions for year 2020 conditions at the off- site study intersection without and with the proposed development; · Analyzed weekday AM and PM peak hour LOS for year 2020 conditions at the off- site study intersection without and with the proposed development; · Assessed operations at the proposed site access locations, including LOS and queuing during weekday AM and PM peak hour conditions; · Identified transportation mitigation to the City of Renton. Primary Data and Information Sources · City of Renton Comprehensive Plan Transportation Element, June 22, 2015. · City of Renton 2018 - 2023 Transportation Improvement Program. · ITE Trip Generation Manual, 10th Edition, 2017. · AM and PM Peak Hour traffic counts by All Traffic Data, June 2018. · Highway Capacity Manual (HCM 6th Edition), 2016. · Washington State Department of Transportation (WSDOT) Collision Data, 2015- 2017. Transportation Impact Analysis Chick-fil-A – Renton, WA TENW August 13, 2018 Page 4 Figure 1 Project Site Vicinity Transportation Impact Analysis Chick-fil-A – Renton, WA TENW August 13, 2018 Page 5 Figure 2 Preliminary Site Plan Transportation Impact Analysis Chick-fil-A – Renton, WA TENW August 13, 2018 Page 6 EXISTING CONDITIONS Roadway Network The primary anticipated travel route to and from the site in the City of Renton includes Rainier Avenue S. Descriptions of this roadway are included in Table 1 below. Table 1 Existing Roadway Network Summary – Project Site Vicinity Roadway Orientation Classification Speed Limit Number of Lanes Street Parking Sidewalks Rainier Avenue S N-S Principal Arterial 35 6 None Both Sides The intersection of Rainier Ave S and S 3rd Place is identified as a study intersection for the purpose of this traffic analysis. The intersection is signalized with crosswalks on all 4 legs. Existing Traffic Volumes Existing weekday AM and PM peak hour traffic volumes at the Rainier Avenue S / S 3rd Place off- site study intersection were based on counts conducted by All Traffic Data in June 2018. Figure 3 illustrates the 2018 existing AM and PM peak hour traffic volumes at the study intersection. The detailed peak hour turning movement count sheets are provided in Appendix A. Public Transportation Services Public transportation in the immediate project vicinity is served by King County Metro Transit. The closet transit stop is located on Rainier Avenue S, south of S 3rd Place. This stop provide access to King County Metro Transit routes 102, 167, 169, and RapidRide F Line. Route 102 offers weekday service between Fairwood and Downtown Seattle. Weekday service runs from approximately 4:45 a.m. to 7:00 p.m. with approximate 15-minute headways. Route 167 offers weekday service between South Renton Park & Ride and University District. Weekday service runs from approximately 6:00 a.m. to 6:30 p.m. with approximate 30-minute headways. Route 169 offers weekday service between Kent Station and the Renton Transit Center. Weekday service runs from approximately 4:30 a.m. to 1:00 a.m. with approximate 30-minute headways. RapidRide F Line offers weekday and weekend service between Burien, Tukwila International Blvd Link Station, the Renton Transit Center, and The Landing. Weekday service runs from approximately 4:45 a.m. to 1:00 a.m. with approximate 15-minute headways. Transportation Impact Analysis Chick-fil-A – Renton, WA TENW August 13, 2018 Page 7 Figure 3 AM Peak Hour Traffic Volumes Transportation Impact Analysis Chick-fil-A – Renton, WA TENW August 13, 2018 Page 8 Figure 4 PM Peak Hour Traffic Volumes Transportation Impact Analysis Chick-fil-A – Renton, WA TENW August 13, 2018 Page 9 Level of Service Level of service (LOS) analyses were conducted at the Rainier Avenue S / S 3rd Place off-site study intersection during the weekday AM and PM peak hours. LOS generally refers to the degree of congestion on a roadway or intersection. It is a measure of vehicle operating speed, travel time, travel delays, and driving comfort. A letter scale from A to F generally describes intersection LOS. At signalized intersections, LOS A represents free-flow conditions (motorists experience little or no delays), and LOS F represents forced-flow conditions where motorists experience an average delay in excess of 80 seconds per vehicle. The LOS reported for signalized intersections represents the average control delay (sec/veh) and can be reported for the overall intersection, for each approach, and for each lane group (additional v/c ratio criteria apply to lane group LOS only). The LOS reported at stop-controlled intersections is based on the average control delay and can be reported for each controlled minor approach, controlled minor lane group, and controlled major- street movement (and for the overall intersection at all-way stop controlled intersections. Additional v/c ratio criteria apply to lane group or movement LOS only). Table 2 outlines the current HCM 6th Edition LOS criteria for signalized and stop-controlled intersections based on these methodologies. Table 2 LOS Criteria for Signalized and Stop-Controlled Intersections1 SIGNALIZED INTERSECTIONS STOP-CONTROLLED INTERSECTIONS LOS by Volume-to Capacity (V/C) Ratio2 LOS by Volume-to Capacity (V/C) Ratio3 Control Delay (sec/veh) £ 1.0 > 1.0 Control Delay (sec/veh) £ 1.0 > 1.0 £ 10 A F £ 10 A F > 10 to £ 20 B F > 10 to £ 15 B F > 20 to £ 35 C F > 15 to £ 25 C F > 35 to £ 55 D F > 25 to £ 35 D F > 55 to £ 80 E F > 35 to £ 50 E F > 80 F F > 50 F F 1 Source: Highway Capacity Manual (6th Edition), Transportation Research Board, 2016. 2 For approach-based and intersection-wide assessments at signals, LOS is defined solely by control delay. 3 For two-way stop controlled intersections, the LOS criteria apply to each lane on a given approach and to each approach on the minor street. LOS is not calculated for major-street approaches or for the intersection as a whole at two-way stop controlled intersections. For approach-based and intersection-wide assessments at all-way stop controlled intersections, LOS is solely defined by control delay. Level of service calculations for intersections were based on methodology and procedures outlined in the latest Highway Capacity Manual (6th Edition) using Synchro 10.1 traffic analysis software. The 2018 existing AM and PM peak hour LOS analysis results for the Rainier Avenue S / S 3rd Place study intersection are summarized in Table 3. The 2018 existing LOS worksheets are included in Appendix B. Transportation Impact Analysis Chick-fil-A – Renton, WA TENW August 13, 2018 Page 10 Table 3 2018 Existing Peak Hour Level of Service Summary 2018 Existing Time Period / Study Intersection LOS Delay (sec) AM Peak Hour Rainier Avenue S / S 3rd Place B 12.8 PM Peak Hour Rainier Avenue S / S 3rd Place C 25.7 1. Results based on HCM Methodologies (6th Edition). As shown in Table 3, the existing Rainier Avenue S / S 3rd Place signalized intersection currently operates at LOS C or better during both the AM and PM peak hours. Collision History Historic collisions at the study intersections were analyzed for the three-year period from 2015 to 2017. Collision data was provided by WSDOT. Summaries of the total and yearly average collisions during this period are provided in Table 4. Table 4 Collision Data Summary, January 1, 2014 to December 31, 2016 Location 2015 2016 2017 Three-Year Total Collisions Average Annual Collisions Intersection Rainier Avenue S / S 3rd Place 7 2 7 16 5.33 Segment Rainier Avenue S between SW Sunset Blvd and S 3rd Pl 8 6 10 24 8.00 Source: WSDOT Collision Records. Transportation Impact Analysis Chick-fil-A – Renton, WA TENW August 13, 2018 Page 11 FUTURE TRAFFIC CONDITIONS AND TRAFFIC IMPACTS Planned Transportation Improvements This section documents the known planned transportation improvements included in the City of RentonÊs 2018-2023 Transportation Improvement Program (TIP). Based on the most recent TIP, there are no planned improvements in the project study area. Project Trip Generation The trip generation estimate for the proposed 4,195 SF Chick-fil-A Restaurant with drive-thru was based on methodology included in the Institute of Transportation Engineers (ITE) Trip Generation Manual, 10th edition for Land Use Code (LUC) 934 (Fast-Food Restaurant with Drive-Through Window). Adjustments to the trip generation estimates were made to account for pass-by trips which are made by vehicles that are already on adjacent streets and make intermediate stops at the site en-route to a primary destination (e.g. on the way home from work). The resulting net new weekday daily, AM, and PM peak hour trip generation associated with the proposed project is summarized in Table 5. Table 5 Trip Generation Summary Net New Trips Generated Weekday Time Period In Out Total Weekday Daily 494 494 988 Weekday AM Peak Hour 44 42 86 Weekday PM Peak Hour 35 33 68 As shown in Table 5, the proposed project is estimated to generate 988 net new weekday daily trips, with 86 net new trips occurring during the weekday AM peak hour (44 entering, 42 exiting), and 68 net new trips occurring during the weekday PM peak hour (35 entering, 33 exiting). Detailed trip generation calculations are included in Attachment C. Project Trip Distribution and Assignment The distribution and assignment of the net new AM and PM peak hour project trips were estimated based existing traffic counts in the area and anticipated travel patterns. The following Table 6 summarizes the general trip distribution patterns. The project trip distribution and assignment through the site driveways and the study intersection are shown in Figure 4. Table 6 Project Trip Distribution Route (Direction) Trip Distribution Rainier Avenue S (north) 50% Rainier Avenue S (south) 45% S 3rd Place (east) 5% TOTAL 100% Transportation Impact Analysis Chick-fil-A – Renton, WA TENW August 13, 2018 Page 12 Future Traffic Volumes Year 2020 No Action (without project) peak hour traffic volumes were estimated by applying a 3 percent annual background growth rate to the existing volumes (confirmed by City staff). The 2020 With-Project traffic volumes were determined by adding the trip assignment from the proposed development to the future 2020 No Action traffic volumes. The 2020 No Action and 2020 With-Project AM and PM peak hour traffic volumes were shown previously in Figures 3 and 4. Future Level of Service Future year 2020 Level of Service (LOS) analyses were conducted at the Rainier Avenue S / S 3rd Place off-site study intersection for year 2020 weekday AM and PM peak hour No Action (without project) conditions and for year 2020 With-Project conditions. Existing intersection geometry was assumed at the study intersection as there are no planned improvements at this intersection. The 2020 weekday AM and PM peak hour LOS results at the study intersection without and with the proposed project are summarized in Table 7. The LOS worksheets are included in Appendix C. Table 7 Year 2020 Peak Hour Level of Service Summary 2020 No Action 2020 With-Project Time Period / Study Intersection LOS Delay (sec) LOS Delay (sec) AM Peak Hour Rainier Avenue S / S 3rd Place B 13.3 B 18.2 PM Peak Hour Rainier Avenue S / S 3rd Place C 26.9 C 29.9 1. Results based on HCM Methodologies (6th Edition). As shown in Table 7, the Rainier Avenue / S 3rd Place signalized intersection is anticipated to operate at LOS C or better in 2020 during both the weekday AM and PM peak hours with or without the proposed Chick-fil-A project. Transportation Impact Analysis Chick-fil-A – Renton, WA TENW August 13, 2018 Page 13 Site Access Assessment Vehicular access to the site is proposed at two driveway locations: (1) on S 3rd Place just west of the Rainier Avenue S signalized intersection (2) a right-in/right-out driveway north of the signal. To evaluate operations of the proposed site access on Rainier Avenue S, level of service (LOS) and queuing were analyzed, which are described next. LOS and Queue Analysis The LOS and queue calculations were conducted using Synchro 10.1 software based on methodology outlined in the latest edition of the Highway Capacity Manual (6th Edition). The reported queues are estimated 95th percentile queues that are exceeded only 5 percent of the time. Table 8 summarizes the results of the 2020 with-project LOS and queue analyses. The LOS and queue calculation sheets are included in Appendix D. Table 8 Site Access Peak Hour LOS & Queue Summary AM Peak Hour PM Peak Hour Study Intersection (movement) LOS Delay (sec) 95th % Queue LOS Delay (sec) 95th % Queue Rainier Avenue S / RIRO Driveway Eastbound Right-Turn B 13.4 < 25’ C 22.0 < 25’ 1. Results based on HCM Methodologies (6th Edition). As shown in Table 8, the exiting right-turn movement at the proposed site access driveway on Rainier Avenue S is expected to operate at an acceptable level (LOS C or better) during the weekday AM and PM peak hours in 2020 with the proposed project. Vehicle queues are all estimated to be statistically 1 vehicle or less. Parking Analysis A parking analysis was completed for the proposed Chick-fil-A Restaurant project to evaluate the estimated peak parking demand as it compares proposed parking supply, and to propose a modification to allow more than the maximum allowed by code (1 stall per 75 SF of dining area). Parking Supply. The project proposes a total of 42 on-site surface parking stalls. Parking Demand. The peak parking demand for the proposed 4,195 SF fast-food restaurant was estimated based on rates included in the ITE Parking Generation manual, 4th edition for LUC 934 (Fast-Food Restaurant with Drive-Through Window). Per ITE, the average peak period parking demand rate for a fast-food restaurant with drive-through window is 9.98 vehicles per 1,000 SF. Applying the peak parking demand rate to the proposed Chick-fil-A Restaurant results in a total Transportation Impact Analysis Chick-fil-A – Renton, WA TENW August 13, 2018 Page 14 estimated peak parking demand of 42 stalls (9.98 X 4,195 / 1000). The 42 proposed on-site parking stalls would accommodate this peak parking demand. Code Required Parking Supply. Per City of Renton Municipal Code section 4-4-080 (Parking, Loading, and Driveway Regulations), a minimum and maximum of 1 stall per 75 SF of dining area is required. The proposed Chick-fil-A Restaurant consists of 1,473 SF of dining area, which results in a minimum and maximum required parking supply of 20 stalls (1,473 SF / 75). Code Required Drive-Through Stacking. City of Renton Municipal Code section 4-4-080 (Parking, Loading, and Driveway Regulations), the drive-through facility shall provide sufficient on-site vehicle stacking space (typically 5 spaces per window are required). The proposed Chick-fil-A Restaurant includes drive-through stacking space for 15 vehicles, which is intended to minimize drive-through impacts to on-site circulation and parking. Justification for Parking Modification. To ensure public safety and minimize impact to adjacent properties, it is imperative that adequate on-site parking is provided for customers and to accommodate traffic circulation. Having adequate on-site parking and drive-thru queuing will prevent parking spill-over onto adjacent businesses and neighborhoods. If delays in the drive-thru are too long, customers will intuitively park on-site and go inside the restaurant. Without adequate on-site parking and good circulation, dine-in customers will create parking spillover. This can be avoided by allowing the site to provide the amount of proposed parking greater than code allows. Traffic and Parking Management Plan During Opening Weeks, a combination of manual control and signage is proposed to be utilized. Manual control will include presence of a Chick-fil-A staff, certified flagger, and/or police officer that will be positioned strategically on the site to help direct entering Chick-fil-A vehicle traffic. Any traffic in the public ROW will be managed by a police officer. Signage will direct customers and used to restrict parking for Chick-fil-A customers in neighboring properties. The following measures are proposed: · Chick-fil-A drive-through traffic will be directed to access the drive-through from either access on Rainier and 3rd Place. A police officer will be positioned at the Rainier Ave S driveway to ensure drive-through queues do not extend back onto Rainier Ave S. · A Chick-fil-A staff member will be positioned at the exit of the drive-through to direct exiting traffic to use the southwest access to S 3rd Place. · Signage will be located at the southwest access indicating no Chick-fil-A parking on adjacent businesses. These traffic management plan measures are intended to help direct entering vehicles to the on-site drive-through queue area and eliminate queue spill-back onto adjacent streets. It is expected that the duration of the management plan will be reviewed and collaborated with City staff. Transportation Impact Analysis Chick-fil-A – Renton, WA TENW August 13, 2018 Page 15 MITIGATION The following measures are proposed to mitigation the transportation and parking impacts of the proposed 4,195 SF Chick-fil-A restaurant with drive-through. Off-Site Improvements. Based on the results of the analysis, the existing transportation facilities are anticipated to accommodate the additional traffic generated by the proposed project. No project- specific off-site transportation improvements are proposed. Transportation Impact Fees. To mitigate long-term traffic impacts, the City of Renton requires payment of a traffic impact fee. The CityÊs currently adopted impact fee rates are $90.36 per SF of fast-food restaurant with drive-through window use and $30.48 per SF of sit-down restaurant use. Based on the proposed 4,195 SF fast-food restaurant with drive-through window, the impact fee associated with the proposed use would be $379,060.20 (4,195 SF X $90.36/SF). Based on 5,049 SF of existing sit-down restaurant use, the impact fee credit associated with the existing use would be $153,893.52 (5,049 SF X $30.48/SF). The resulting net impact fee for the proposed project is $225,166.68. Traffic and Parking Management Plan. During the opening weeks of the Chick-fil-A Restaurant, it is expected that higher traffic levels and parking needs will be generated similar to other recent openings in the region. As a result, a Traffic and Parking Management Plan has been developed that will help direct entering and exiting vehicles for Chick-fil-A drive-through and walk-up patrons to areas within the site to help reduce impacts to the shared parking areas and drive aisles of the retail center, and to eliminate queue spill-back onto adjacent streets. Implementation of the Traffic and Parking Management Plan is proposed to mitigate short-term transportation impacts, and payment of the pro-rata transportation costs is proposed to mitigate long- term transportation impacts of the proposed Chick-fil-A development. Transportation Impact Analysis Chick-fil-A – Renton, WA Appendix A Peak Hour Turning Movement Counts Peak Hour:07:15 AM - 08:15 AM RAINER AVE S RAINER AVE SS 3RD PLACCESS RD (303) 216-2439 www.alltrafficdata.net Location:4 RAINER AVE S & S 3RD PL AM Thursday, June 28, 2018Date and Start Time: All Vehicles Pedestrians/Bicycles in Crosswalk Traffic Counts - All Vehicles Heavy Vehicles Peak Hour Traffic Counts - Heavy Vehicles and Pedestrians/Bicycles in Crosswalk412961 27 19 25 13 28 741 1,453 107 30 1,399737 66 93 N S EW 0 0 689251,36284ACCESS RD S 3RD PLRAINER AVE SRAINER AVE S2,313 2 4112N S EW 0410 1 1 102Interval Start Time RightLeftThru Total Eastbound Westbound Northbound Southbound U-Turn Rolling HourRightLeftThruU-Turn RightLeftThruU-Turn RightLeftThruU-Turn 7:00 AM 2,303071054012362049952521865 7:15 AM 2,313062059183430115255531627 7:30 AM 2,297064034163820017460541227 7:45 AM 2,271073048133472420661871718 8:00 AM 2,19809407618290041575351116319 8:15 AM 0 4 4 0 6 7 0 7 300 0 2 173 539817110 8:30 AM 0 6 3 0 3 9 0 9 319 0 6 178 5791112518 8:45 AM 0 6 9 0 2 6 0 16 272 4 10 182 545916112 Count Total 0 51 30 0 35 53 4 69 2,615 6 31 1,321 4,501551242186 Peak Hour 0 28 13 0 19 27 4 25 1,362 2 9 689 2,3132561841 HV%PHF 0.69 0.89 0.89 0.84 4.5% 3.7% 6.8% 5.5% 6.2%0.94 EB WB NB SB All 0003 0 1 0 0 3 41 99 4 2 9542 3 0 N S EW 0 0 4109320Heavy VehiclesInterval Start Time EB NB TotalWBSB 7:00 AM 0 26 0 8 34 7:15 AM 1 20 1 10 32 7:30 AM 0 26 3 9 38 7:45 AM 0 23 0 12 35 8:00 AM 2 26 0 10 38 8:15 AM 0 26 1 10 37 8:30 AM 0 23 0 10 33 8:45 AM 0 22 0 15 37 Count Total 3 192 5 84 284 Peak Hour 3 95 4 41 143 Pedestrians/Bicycles on CrosswalkInterval Start Time EB NB TotalWBSB 7:00 AM 1 0 0 0 1 7:15 AM 5 0 2 1 8 7:30 AM 2 0 2 1 5 7:45 AM 3 0 0 0 3 8:00 AM 2 1 0 0 3 8:15 AM 0 1 2 0 3 8:30 AM 3 0 1 1 5 8:45 AM 7 2 1 1 11 Count Total 23 4 8 4 39 Peak Hour 12 1 4 2 19 Peak Hour:04:15 PM - 05:15 PM RAINER AVE S RAINER AVE SS 3RD PLACCESS RD (303) 216-2439 www.alltrafficdata.net Location:4 RAINER AVE S & S 3RD PL PM Thursday, June 28, 2018Date and Start Time: All Vehicles Pedestrians/Bicycles in Crosswalk Traffic Counts - All Vehicles Heavy Vehicles Peak Hour Traffic Counts - Heavy Vehicles and Pedestrians/Bicycles in Crosswalk11397589 49 26 92 79 92 1,514 1,396 164 180 1,3141,446 263 233 N S EW 0 0 1,317711,2062611ACCESS RD S 3RD PLRAINER AVE SRAINER AVE S3,255 5 221611N S EW 913511 1 4 38Interval Start Time RightLeftThru Total Eastbound Westbound Northbound Southbound U-Turn Rolling HourRightLeftThruU-Turn RightLeftThruU-Turn RightLeftThruU-Turn 4:00 PM 3,2200231605141192671143597982818627 4:15 PM 3,2550202005143232960163258062819730 4:30 PM 3,248020160892223105303418331721428 4:45 PM 3,2510262507152122954143107832018629 5:00 PM 3,1770261806114143050153418332731926 5:15 PM 0 29 25 0 5 10 5 19 288 5 14 325 7992416628 5:30 PM 0 26 29 0 9 12 1 25 298 4 18 344 8362817619 5:45 PM 0 32 15 0 7 14 3 27 270 3 16 249 7092121625 Count Total 0 202 164 0 52 99 21 161 2,329 22 137 2,594 6,39719316150212 Peak Hour 0 92 79 0 26 49 11 71 1,206 9 75 1,317 3,255928926113 HV%PHF 0.93 0.85 0.97 0.94 0.0% 0.6% 2.8% 3.1% 2.6%0.98 EB WB NB SB All 2001 0 0 0 0 0 47 37 1 1 3745 0 2 N S EW 0 0 4503610Heavy VehiclesInterval Start Time EB NB TotalWBSB 4:00 PM 0 7 0 12 19 4:15 PM 0 12 0 16 28 4:30 PM 0 7 0 11 18 4:45 PM 0 10 1 10 21 5:00 PM 0 8 0 10 18 5:15 PM 2 3 0 14 19 5:30 PM 0 11 0 11 22 5:45 PM 0 7 1 11 19 Count Total 2 65 2 95 164 Peak Hour 0 37 1 47 85 Pedestrians/Bicycles on CrosswalkInterval Start Time EB NB TotalWBSB 4:00 PM 1 5 13 2 21 4:15 PM 8 4 3 0 15 4:30 PM 1 4 8 2 15 4:45 PM 0 6 5 1 12 5:00 PM 2 2 6 2 12 5:15 PM 8 5 3 1 17 5:30 PM 3 9 2 7 21 5:45 PM 3 6 6 0 15 Count Total 26 41 46 15 128 Peak Hour 11 16 22 5 54 Transportation Impact Analysis Chick-fil-A – Renton, WA Appendix B Level of Service (LOS) Calculations Transportation Impact Analysis Chick-fil-A – Renton, WA 2018 Existing Lanes, Volumes, Timings 1: Rainier Ave S & S 3rd Pl 07/18/2018 Chick-Fil-A Renton Synchro 10 Report 2018 Existing - AM Peak Hour Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (vph) 28 13 25 19 27 61 29 1362 8 11 689 41 Future Volume (vph) 28 13 25 19 27 61 29 1362 8 11 689 41 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Storage Length (ft) 100 0 0 0 225 0 150 0 Storage Lanes 1 0 1 0 1 1 1 1 Taper Length (ft) 25 25 25 25 Right Turn on Red Yes Yes Yes Yes Link Speed (mph) 25 25 35 35 Link Distance (ft) 578 783 719 265 Travel Time (s) 15.8 21.4 14.0 5.2 Confl. Peds. (#/hr) 2 1 1 2 4 12 Peak Hour Factor 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 Heavy Vehicles (%) 5% 5% 5% 4% 4% 4% 7% 7% 7% 6% 6% 6% Shared Lane Traffic (%) Turn Type Perm NA Perm NA Prot NA Perm Prot NA Perm Protected Phases 4 8 5 2 1 6 Permitted Phases 4 8 2 6 Detector Phase 4 4 8 8 522166 Switch Phase Minimum Initial (s) 6.0 6.0 6.0 6.0 4.0 6.0 6.0 4.0 6.0 6.0 Minimum Split (s) 42.0 42.0 43.0 43.0 9.0 28.0 28.0 9.0 26.0 26.0 Total Split (s) 55.0 55.0 55.0 55.0 19.0 83.0 83.0 18.0 82.0 82.0 Total Split (%) 35.3% 35.3% 35.3% 35.3% 12.2% 53.2% 53.2% 11.5% 52.6% 52.6% Yellow Time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 All-Red Time (s) 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 Lost Time Adjust (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Lost Time (s) 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 Lead/Lag Lead Lag Lag Lead Lag Lag Lead-Lag Optimize? Yes Yes Yes Yes Yes Yes Recall Mode None None None None None C-Max C-Max None C-Max C-Max Intersection Summary Area Type: Other Cycle Length: 156 Actuated Cycle Length: 156 Offset: 36 (23%), Referenced to phase 2:NBT and 6:SBT, Start of Green Natural Cycle: 90 Control Type: Actuated-Coordinated Splits and Phases: 1: Rainier Ave S & S 3rd Pl HCM 6th Signalized Intersection Summary 1: Rainier Ave S & S 3rd Pl 07/18/2018 Chick-Fil-A Renton Synchro 10 Report 2018 Existing - AM Peak Hour Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (veh/h) 28 13 25 19 27 61 29 1362 8 11 689 41 Future Volume (veh/h) 28 13 25 19 27 61 29 1362 8 11 689 41 Initial Q (Qb), veh 000000000000 Ped-Bike Adj(A_pbT) 1.00 0.99 1.00 0.99 1.00 1.00 1.00 0.99 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No Adj Sat Flow, veh/h/ln 1826 1826 1826 1841 1841 1841 1796 1796 1796 1811 1811 1811 Adj Flow Rate, veh/h 30 14 27 20 29 65 31 1449 9 12 733 44 Peak Hour Factor 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 Percent Heavy Veh, %555444777666 Cap, veh/h 111 59 113 157 53 119 39 2689 1196 18 2668 1181 Arrive On Green 0.11 0.11 0.11 0.11 0.11 0.11 0.02 0.79 0.79 0.01 0.78 0.78 Sat Flow, veh/h 1266 555 1071 1338 503 1127 1711 3413 1518 1725 3441 1523 Grp Volume(v), veh/h 30 0 41 20 0 94 31 1449 9 12 733 44 Grp Sat Flow(s),veh/h/ln 1266 0 1626 1338 0 1630 1711 1706 1518 1725 1721 1523 Q Serve(g_s), s 3.6 0.0 3.6 2.2 0.0 8.5 2.8 24.4 0.2 1.1 9.5 1.0 Cycle Q Clear(g_c), s 12.1 0.0 3.6 5.8 0.0 8.5 2.8 24.4 0.2 1.1 9.5 1.0 Prop In Lane 1.00 0.66 1.00 0.69 1.00 1.00 1.00 1.00 Lane Grp Cap(c), veh/h 111 0 172 157 0 172 39 2689 1196 18 2668 1181 V/C Ratio(X) 0.27 0.00 0.24 0.13 0.00 0.55 0.79 0.54 0.01 0.67 0.27 0.04 Avail Cap(c_a), veh/h 383 0 521 444 0 523 154 2689 1196 144 2668 1181 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 0.00 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 72.0 0.0 64.0 66.7 0.0 66.2 75.8 6.1 3.5 76.9 5.0 4.1 Incr Delay (d2), s/veh 1.9 0.0 1.0 0.5 0.0 3.8 28.8 0.8 0.0 35.4 0.3 0.1 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 1.2 0.0 1.6 0.8 0.0 3.8 1.6 8.0 0.1 0.7 3.2 0.3 Unsig. Movement Delay, s/veh LnGrp Delay(d),s/veh 73.8 0.0 65.0 67.2 0.0 70.0 104.6 6.9 3.5 112.4 5.3 4.1 LnGrp LOS EAEEAEFAAFAA Approach Vol, veh/h 71 114 1489 789 Approach Delay, s/veh 68.7 69.5 8.9 6.8 Approach LOS EEAA Timer - Assigned Phs 1 2 4 5 6 8 Phs Duration (G+Y+Rc), s 6.6 127.9 21.5 8.6 125.9 21.5 Change Period (Y+Rc), s 5.0 5.0 5.0 5.0 5.0 5.0 Max Green Setting (Gmax), s 13.0 78.0 50.0 14.0 77.0 50.0 Max Q Clear Time (g_c+I1), s 3.1 26.4 14.1 4.8 11.5 10.5 Green Ext Time (p_c), s 0.0 37.5 0.5 0.0 17.5 1.0 Intersection Summary HCM 6th Ctrl Delay 12.8 HCM 6th LOS B Lanes, Volumes, Timings 1: Rainier Ave S & S 3rd Pl 07/18/2018 Chick-Fil-A Renton Synchro 10 Report 2018 Existing - PM Peak Hour Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (vph) 92 79 92 26 49 89 82 1206 26 84 1317 113 Future Volume (vph) 92 79 92 26 49 89 82 1206 26 84 1317 113 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Storage Length (ft) 100 0 0 0 225 0 150 0 Storage Lanes 1 0 1 0 1 1 1 1 Taper Length (ft) 25 25 25 25 Right Turn on Red Yes Yes Yes Yes Link Speed (mph) 25 25 35 35 Link Distance (ft) 578 783 719 242 Travel Time (s) 15.8 21.4 14.0 4.7 Confl. Peds. (#/hr) 5 16 16 5 22 11 Peak Hour Factor 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 Heavy Vehicles (%) 0% 0% 0% 1% 1% 1% 3% 3% 3% 3% 3% 3% Shared Lane Traffic (%) Turn Type Perm NA Perm NA Prot NA Perm Prot NA Perm Protected Phases 4 8 5 2 1 6 Permitted Phases 4 8 2 6 Detector Phase 4 4 8 8 522166 Switch Phase Minimum Initial (s) 6.0 6.0 6.0 6.0 4.0 6.0 6.0 4.0 6.0 6.0 Minimum Split (s) 42.0 42.0 43.0 43.0 9.0 28.0 28.0 9.0 26.0 26.0 Total Split (s) 45.0 45.0 45.0 45.0 22.0 89.0 89.0 22.0 89.0 89.0 Total Split (%) 28.8% 28.8% 28.8% 28.8% 14.1% 57.1% 57.1% 14.1% 57.1% 57.1% Yellow Time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 All-Red Time (s) 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 Lost Time Adjust (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Lost Time (s) 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 Lead/Lag Lead Lag Lag Lead Lag Lag Lead-Lag Optimize? Yes Yes Yes Yes Yes Yes Recall Mode None None None None None C-Max C-Max None C-Max C-Max Intersection Summary Area Type: Other Cycle Length: 156 Actuated Cycle Length: 156 Offset: 40 (26%), Referenced to phase 2:NBT and 6:SBT, Start of Green Natural Cycle: 90 Control Type: Actuated-Coordinated Splits and Phases: 1: Rainier Ave S & S 3rd Pl HCM 6th Signalized Intersection Summary 1: Rainier Ave S & S 3rd Pl 07/18/2018 Chick-Fil-A Renton Synchro 10 Report 2018 Existing - PM Peak Hour Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (veh/h) 92 79 92 26 49 89 82 1206 26 84 1317 113 Future Volume (veh/h) 92 79 92 26 49 89 82 1206 26 84 1317 113 Initial Q (Qb), veh 000000000000 Ped-Bike Adj(A_pbT) 0.98 0.98 0.99 0.98 1.00 0.98 1.00 0.99 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No Adj Sat Flow, veh/h/ln 1900 1900 1900 1885 1885 1885 1856 1856 1856 1856 1856 1856 Adj Flow Rate, veh/h 94 81 94 27 50 91 84 1231 27 86 1344 115 Peak Hour Factor 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 Percent Heavy Veh, %000111333333 Cap, veh/h 208 161 187 181 120 218 104 2258 990 106 2262 1000 Arrive On Green 0.20 0.20 0.20 0.20 0.20 0.20 0.06 0.64 0.64 0.06 0.64 0.64 Sat Flow, veh/h 1247 791 918 1202 589 1072 1767 3526 1545 1767 3526 1559 Grp Volume(v), veh/h 94 0 175 27 0 141 84 1231 27 86 1344 115 Grp Sat Flow(s),veh/h/ln 1247 0 1709 1202 0 1662 1767 1763 1545 1767 1763 1559 Q Serve(g_s), s 11.1 0.0 14.2 3.2 0.0 11.5 7.3 30.1 1.0 7.5 34.4 4.5 Cycle Q Clear(g_c), s 22.6 0.0 14.2 17.4 0.0 11.5 7.3 30.1 1.0 7.5 34.4 4.5 Prop In Lane 1.00 0.54 1.00 0.65 1.00 1.00 1.00 1.00 Lane Grp Cap(c), veh/h 208 0 347 181 0 338 104 2258 990 106 2262 1000 V/C Ratio(X) 0.45 0.00 0.50 0.15 0.00 0.42 0.81 0.55 0.03 0.81 0.59 0.11 Avail Cap(c_a), veh/h 274 0 438 245 0 426 193 2258 990 193 2262 1000 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 0.00 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 63.9 0.0 55.2 62.9 0.0 54.1 72.5 15.5 10.3 72.4 16.2 10.8 Incr Delay (d2), s/veh 2.2 0.0 1.6 0.5 0.0 1.2 13.7 1.0 0.1 13.6 1.2 0.2 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 3.7 0.0 6.4 1.0 0.0 5.0 3.7 12.1 0.4 3.8 13.8 1.6 Unsig. Movement Delay, s/veh LnGrp Delay(d),s/veh 66.1 0.0 56.8 63.4 0.0 55.3 86.2 16.4 10.3 86.0 17.3 11.0 LnGrp LOS EAEEAEFBBFBB Approach Vol, veh/h 269 168 1342 1545 Approach Delay, s/veh 60.0 56.6 20.7 20.7 Approach LOS E E C C Timer - Assigned Phs 1 2 4 5 6 8 Phs Duration (G+Y+Rc), s 14.4 104.9 36.7 14.2 105.1 36.7 Change Period (Y+Rc), s 5.0 5.0 5.0 5.0 5.0 5.0 Max Green Setting (Gmax), s 17.0 84.0 40.0 17.0 84.0 40.0 Max Q Clear Time (g_c+I1), s 9.5 32.1 24.6 9.3 36.4 19.4 Green Ext Time (p_c), s 0.1 31.6 1.7 0.1 34.2 1.2 Intersection Summary HCM 6th Ctrl Delay 25.7 HCM 6th LOS C Transportation Impact Analysis Chick-fil-A – Renton, WA 2020 No Action Lanes, Volumes, Timings 1: Rainier Ave S & S 3rd Pl 07/18/2018 Chick-Fil-A Renton Synchro 10 Report 2020 Without Project - AM Peak Hour Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (vph) 30 14 27 20 29 65 31 1445 8 12 731 43 Future Volume (vph) 30 14 27 20 29 65 31 1445 8 12 731 43 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Storage Length (ft) 100 0 0 0 225 0 150 0 Storage Lanes 1 0 1 0 1 1 1 1 Taper Length (ft) 25 25 25 25 Right Turn on Red Yes Yes Yes Yes Link Speed (mph) 25 25 35 35 Link Distance (ft) 578 783 719 265 Travel Time (s) 15.8 21.4 14.0 5.2 Confl. Peds. (#/hr) 2 1 1 2 4 12 Peak Hour Factor 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 Heavy Vehicles (%) 5% 5% 5% 4% 4% 4% 7% 7% 7% 6% 6% 6% Shared Lane Traffic (%) Turn Type Perm NA Perm NA Prot NA Perm Prot NA Perm Protected Phases 4 8 5 2 1 6 Permitted Phases 4 8 2 6 Detector Phase 4 4 8 8 522166 Switch Phase Minimum Initial (s) 6.0 6.0 6.0 6.0 4.0 6.0 6.0 4.0 6.0 6.0 Minimum Split (s) 42.0 42.0 43.0 43.0 9.0 28.0 28.0 9.0 26.0 26.0 Total Split (s) 55.0 55.0 55.0 55.0 19.0 83.0 83.0 18.0 82.0 82.0 Total Split (%) 35.3% 35.3% 35.3% 35.3% 12.2% 53.2% 53.2% 11.5% 52.6% 52.6% Yellow Time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 All-Red Time (s) 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 Lost Time Adjust (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Lost Time (s) 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 Lead/Lag Lead Lag Lag Lead Lag Lag Lead-Lag Optimize? Yes Yes Yes Yes Yes Yes Recall Mode None None None None None C-Max C-Max None C-Max C-Max Intersection Summary Area Type: Other Cycle Length: 156 Actuated Cycle Length: 156 Offset: 36 (23%), Referenced to phase 2:NBT and 6:SBT, Start of Green Natural Cycle: 100 Control Type: Actuated-Coordinated Splits and Phases: 1: Rainier Ave S & S 3rd Pl HCM 6th Signalized Intersection Summary 1: Rainier Ave S & S 3rd Pl 07/18/2018 Chick-Fil-A Renton Synchro 10 Report 2020 Without Project - AM Peak Hour Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (veh/h) 30 14 27 20 29 65 31 1445 8 12 731 43 Future Volume (veh/h) 30 14 27 20 29 65 31 1445 8 12 731 43 Initial Q (Qb), veh 000000000000 Ped-Bike Adj(A_pbT) 1.00 0.99 1.00 0.99 1.00 1.00 1.00 0.99 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No Adj Sat Flow, veh/h/ln 1826 1826 1826 1841 1841 1841 1796 1796 1796 1811 1811 1811 Adj Flow Rate, veh/h 32 15 29 21 31 69 33 1537 9 13 778 46 Peak Hour Factor 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 Percent Heavy Veh, %555444777666 Cap, veh/h 112 61 118 161 56 124 42 2670 1188 19 2646 1171 Arrive On Green 0.11 0.11 0.11 0.11 0.11 0.11 0.02 0.78 0.78 0.01 0.77 0.77 Sat Flow, veh/h 1260 554 1072 1335 506 1125 1711 3413 1518 1725 3441 1523 Grp Volume(v), veh/h 32 0 44 21 0 100 33 1537 9 13 778 46 Grp Sat Flow(s),veh/h/ln 1260 0 1626 1335 0 1631 1711 1706 1518 1725 1721 1523 Q Serve(g_s), s 3.9 0.0 3.9 2.3 0.0 9.1 3.0 27.8 0.2 1.2 10.5 1.1 Cycle Q Clear(g_c), s 12.9 0.0 3.9 6.1 0.0 9.1 3.0 27.8 0.2 1.2 10.5 1.1 Prop In Lane 1.00 0.66 1.00 0.69 1.00 1.00 1.00 1.00 Lane Grp Cap(c), veh/h 112 0 180 161 0 180 42 2670 1188 19 2646 1171 V/C Ratio(X) 0.29 0.00 0.24 0.13 0.00 0.55 0.79 0.58 0.01 0.68 0.29 0.04 Avail Cap(c_a), veh/h 377 0 521 441 0 523 154 2670 1188 144 2646 1171 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 0.00 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 71.9 0.0 63.4 66.2 0.0 65.7 75.7 6.7 3.7 76.9 5.4 4.3 Incr Delay (d2), s/veh 2.0 0.0 1.0 0.5 0.0 3.8 27.0 0.9 0.0 35.2 0.3 0.1 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 1.3 0.0 1.7 0.8 0.0 4.0 1.6 9.2 0.1 0.7 3.6 0.3 Unsig. Movement Delay, s/veh LnGrp Delay(d),s/veh 73.8 0.0 64.4 66.8 0.0 69.5 102.7 7.6 3.7 112.1 5.7 4.4 LnGrp LOS EAEEAEFAAFAA Approach Vol, veh/h 76 121 1579 837 Approach Delay, s/veh 68.4 69.0 9.6 7.2 Approach LOS EEAA Timer - Assigned Phs 1 2 4 5 6 8 Phs Duration (G+Y+Rc), s 6.7 127.0 22.2 8.8 124.9 22.2 Change Period (Y+Rc), s 5.0 5.0 5.0 5.0 5.0 5.0 Max Green Setting (Gmax), s 13.0 78.0 50.0 14.0 77.0 50.0 Max Q Clear Time (g_c+I1), s 3.2 29.8 14.9 5.0 12.5 11.1 Green Ext Time (p_c), s 0.0 37.6 0.5 0.0 18.9 1.0 Intersection Summary HCM 6th Ctrl Delay 13.3 HCM 6th LOS B Lanes, Volumes, Timings 1: Rainier Ave S & S 3rd Pl 07/18/2018 Chick-Fil-A Renton Synchro 10 Report 2020 Without Project - PM Peak Hour Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (vph) 98 84 98 28 52 94 87 1279 28 90 1397 120 Future Volume (vph) 98 84 98 28 52 94 87 1279 28 90 1397 120 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Storage Length (ft) 100 0 0 0 225 0 150 0 Storage Lanes 1 0 1 0 1 1 1 1 Taper Length (ft) 25 25 25 25 Right Turn on Red Yes Yes Yes Yes Link Speed (mph) 25 25 35 35 Link Distance (ft) 578 783 719 242 Travel Time (s) 15.8 21.4 14.0 4.7 Confl. Peds. (#/hr) 5 16 16 5 22 11 Peak Hour Factor 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 Heavy Vehicles (%) 0% 0% 0% 1% 1% 1% 3% 3% 3% 3% 3% 3% Shared Lane Traffic (%) Turn Type Perm NA Perm NA Prot NA Perm Prot NA Perm Protected Phases 4 8 5 2 1 6 Permitted Phases 4 8 2 6 Detector Phase 4 4 8 8 522166 Switch Phase Minimum Initial (s) 6.0 6.0 6.0 6.0 4.0 6.0 6.0 4.0 6.0 6.0 Minimum Split (s) 42.0 42.0 43.0 43.0 9.0 28.0 28.0 9.0 26.0 26.0 Total Split (s) 45.0 45.0 45.0 45.0 22.0 89.0 89.0 22.0 89.0 89.0 Total Split (%) 28.8% 28.8% 28.8% 28.8% 14.1% 57.1% 57.1% 14.1% 57.1% 57.1% Yellow Time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 All-Red Time (s) 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 Lost Time Adjust (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Lost Time (s) 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 Lead/Lag Lead Lag Lag Lead Lag Lag Lead-Lag Optimize? Yes Yes Yes Yes Yes Yes Recall Mode None None None None None C-Max C-Max None C-Max C-Max Intersection Summary Area Type: Other Cycle Length: 156 Actuated Cycle Length: 156 Offset: 40 (26%), Referenced to phase 2:NBT and 6:SBT, Start of Green Natural Cycle: 90 Control Type: Actuated-Coordinated Splits and Phases: 1: Rainier Ave S & S 3rd Pl HCM 6th Signalized Intersection Summary 1: Rainier Ave S & S 3rd Pl 07/18/2018 Chick-Fil-A Renton Synchro 10 Report 2020 Without Project - PM Peak Hour Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (veh/h) 98 84 98 28 52 94 87 1279 28 90 1397 120 Future Volume (veh/h) 98 84 98 28 52 94 87 1279 28 90 1397 120 Initial Q (Qb), veh 000000000000 Ped-Bike Adj(A_pbT) 0.98 0.98 0.99 0.98 1.00 0.98 1.00 0.99 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No Adj Sat Flow, veh/h/ln 1900 1900 1900 1885 1885 1885 1856 1856 1856 1856 1856 1856 Adj Flow Rate, veh/h 100 86 100 29 53 96 89 1305 29 92 1426 122 Peak Hour Factor 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 Percent Heavy Veh, %000111333333 Cap, veh/h 207 164 191 179 123 223 109 2228 977 112 2235 988 Arrive On Green 0.21 0.21 0.21 0.21 0.21 0.21 0.06 0.63 0.63 0.06 0.63 0.63 Sat Flow, veh/h 1239 790 919 1191 591 1071 1767 3526 1545 1767 3526 1559 Grp Volume(v), veh/h 100 0 186 29 0 149 89 1305 29 92 1426 122 Grp Sat Flow(s),veh/h/ln 1239 0 1709 1191 0 1663 1767 1763 1545 1767 1763 1559 Q Serve(g_s), s 11.9 0.0 15.1 3.5 0.0 12.2 7.8 33.7 1.1 8.0 38.8 4.8 Cycle Q Clear(g_c), s 24.1 0.0 15.1 18.5 0.0 12.2 7.8 33.7 1.1 8.0 38.8 4.8 Prop In Lane 1.00 0.54 1.00 0.64 1.00 1.00 1.00 1.00 Lane Grp Cap(c), veh/h 207 0 356 179 0 346 109 2228 977 112 2235 988 V/C Ratio(X) 0.48 0.00 0.52 0.16 0.00 0.43 0.81 0.59 0.03 0.82 0.64 0.12 Avail Cap(c_a), veh/h 267 0 438 236 0 426 193 2228 977 193 2235 988 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 0.00 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 64.2 0.0 54.9 63.1 0.0 53.7 72.3 16.8 10.8 72.1 17.6 11.3 Incr Delay (d2), s/veh 2.5 0.0 1.7 0.6 0.0 1.2 13.4 1.1 0.1 13.3 1.4 0.3 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 4.0 0.0 6.8 1.1 0.0 5.3 3.9 13.6 0.4 4.1 15.7 1.8 Unsig. Movement Delay, s/veh LnGrp Delay(d),s/veh 66.7 0.0 56.6 63.7 0.0 54.9 85.7 17.9 10.8 85.5 19.0 11.6 LnGrp LOS EAEEADFBBFBB Approach Vol, veh/h 286 178 1423 1640 Approach Delay, s/veh 60.1 56.4 22.0 22.1 Approach LOS E E C C Timer - Assigned Phs 1 2 4 5 6 8 Phs Duration (G+Y+Rc), s 14.9 103.6 37.5 14.6 103.9 37.5 Change Period (Y+Rc), s 5.0 5.0 5.0 5.0 5.0 5.0 Max Green Setting (Gmax), s 17.0 84.0 40.0 17.0 84.0 40.0 Max Q Clear Time (g_c+I1), s 10.0 35.7 26.1 9.8 40.8 20.5 Green Ext Time (p_c), s 0.1 32.3 1.7 0.1 33.5 1.3 Intersection Summary HCM 6th Ctrl Delay 26.9 HCM 6th LOS C Transportation Impact Analysis Chick-fil-A – Renton, WA 2020 With-Project Lanes, Volumes, Timings 1: Rainier Ave S & S 3rd Pl 08/07/2018 Chick-Fil-A Renton Synchro 10 Report 2020 With Project - AM Peak Hour Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (vph) 76 16 44 20 32 64 78 1418 8 12 735 46 Future Volume (vph) 76 16 44 20 32 64 78 1418 8 12 735 46 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Storage Length (ft) 100 0 0 0 225 0 150 0 Storage Lanes 1 0 1 0 1 1 1 1 Taper Length (ft) 25 25 25 25 Right Turn on Red Yes Yes Yes Yes Link Speed (mph) 25 25 35 35 Link Distance (ft) 578 783 719 265 Travel Time (s) 15.8 21.4 14.0 5.2 Confl. Peds. (#/hr) 2 1 1 2 4 12 Peak Hour Factor 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 Heavy Vehicles (%) 5% 5% 5% 4% 4% 4% 7% 7% 7% 6% 6% 6% Shared Lane Traffic (%) Turn Type Perm NA Perm NA Prot NA Perm Prot NA Perm Protected Phases 4 8 5 2 1 6 Permitted Phases 4 8 2 6 Detector Phase 4 4 8 8 522166 Switch Phase Minimum Initial (s) 6.0 6.0 6.0 6.0 4.0 6.0 6.0 4.0 6.0 6.0 Minimum Split (s) 42.0 42.0 43.0 43.0 9.0 28.0 28.0 9.0 26.0 26.0 Total Split (s) 55.0 55.0 55.0 55.0 19.0 83.0 83.0 18.0 82.0 82.0 Total Split (%) 35.3% 35.3% 35.3% 35.3% 12.2% 53.2% 53.2% 11.5% 52.6% 52.6% Yellow Time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 All-Red Time (s) 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 Lost Time Adjust (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Lost Time (s) 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 Lead/Lag Lead Lag Lag Lead Lag Lag Lead-Lag Optimize? Yes Yes Yes Yes Yes Yes Recall Mode None None None None None C-Max C-Max None C-Max C-Max Intersection Summary Area Type: Other Cycle Length: 156 Actuated Cycle Length: 156 Offset: 36 (23%), Referenced to phase 2:NBT and 6:SBT, Start of Green Natural Cycle: 100 Control Type: Actuated-Coordinated Splits and Phases: 1: Rainier Ave S & S 3rd Pl HCM 6th Signalized Intersection Summary 1: Rainier Ave S & S 3rd Pl 08/07/2018 Chick-Fil-A Renton Synchro 10 Report 2020 With Project - AM Peak Hour Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (veh/h) 76 16 44 20 32 64 78 1418 8 12 735 46 Future Volume (veh/h) 76 16 44 20 32 64 78 1418 8 12 735 46 Initial Q (Qb), veh 000000000000 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.99 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No Adj Sat Flow, veh/h/ln 1826 1826 1826 1841 1841 1841 1796 1796 1796 1811 1811 1811 Adj Flow Rate, veh/h 81 17 47 21 34 68 83 1509 9 13 782 49 Peak Hour Factor 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 Percent Heavy Veh, %555444777666 Cap, veh/h 159 63 173 192 80 160 102 2547 1133 19 2401 1062 Arrive On Green 0.15 0.15 0.15 0.15 0.15 0.15 0.06 0.75 0.75 0.01 0.70 0.70 Sat Flow, veh/h 1258 427 1181 1312 546 1093 1711 3413 1518 1725 3441 1522 Grp Volume(v), veh/h 81 0 64 21 0 102 83 1509 9 13 782 49 Grp Sat Flow(s),veh/h/ln 1258 0 1608 1312 0 1639 1711 1706 1518 1725 1721 1522 Q Serve(g_s), s 9.8 0.0 5.5 2.3 0.0 8.8 7.5 31.4 0.2 1.2 13.9 1.6 Cycle Q Clear(g_c), s 18.6 0.0 5.5 7.8 0.0 8.8 7.5 31.4 0.2 1.2 13.9 1.6 Prop In Lane 1.00 0.73 1.00 0.67 1.00 1.00 1.00 1.00 Lane Grp Cap(c), veh/h 159 0 236 192 0 240 102 2547 1133 19 2401 1062 V/C Ratio(X) 0.51 0.00 0.27 0.11 0.00 0.42 0.82 0.59 0.01 0.68 0.33 0.05 Avail Cap(c_a), veh/h 378 0 515 420 0 525 154 2547 1133 144 2401 1062 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 0.00 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 69.0 0.0 59.2 62.6 0.0 60.6 72.5 9.0 5.1 76.9 9.2 7.4 Incr Delay (d2), s/veh 3.5 0.0 0.9 0.4 0.0 1.7 18.0 1.0 0.0 35.2 0.4 0.1 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 3.3 0.0 2.3 0.8 0.0 3.8 3.8 11.0 0.1 0.7 5.2 0.5 Unsig. Movement Delay, s/veh LnGrp Delay(d),s/veh 72.6 0.0 60.0 63.0 0.0 62.3 90.5 10.0 5.1 112.1 9.6 7.4 LnGrp LOS EAEEAEFBAFAA Approach Vol, veh/h 145 123 1601 844 Approach Delay, s/veh 67.0 62.4 14.2 11.0 Approach LOS EEBB Timer - Assigned Phs 1 2 4 5 6 8 Phs Duration (G+Y+Rc), s 6.7 121.4 27.9 14.3 113.9 27.9 Change Period (Y+Rc), s 5.0 5.0 5.0 5.0 5.0 5.0 Max Green Setting (Gmax), s 13.0 78.0 50.0 14.0 77.0 50.0 Max Q Clear Time (g_c+I1), s 3.2 33.4 20.6 9.5 15.9 10.8 Green Ext Time (p_c), s 0.0 34.8 1.0 0.1 18.9 1.0 Intersection Summary HCM 6th Ctrl Delay 18.2 HCM 6th LOS B Lanes, Volumes, Timings 1: Rainier Ave S & S 3rd Pl 08/07/2018 Chick-Fil-A Renton Synchro 10 Report 2020 Without Project - PM Peak Hour Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (vph) 130 87 114 28 56 92 119 1263 28 89 1395 124 Future Volume (vph) 130 87 114 28 56 92 119 1263 28 89 1395 124 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Storage Length (ft) 100 0 0 0 225 0 150 0 Storage Lanes 1 0 1 0 1 1 1 1 Taper Length (ft) 25 25 25 25 Right Turn on Red Yes Yes Yes Yes Link Speed (mph) 25 25 35 35 Link Distance (ft) 578 783 719 242 Travel Time (s) 15.8 21.4 14.0 4.7 Confl. Peds. (#/hr) 5 16 16 5 22 11 Peak Hour Factor 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 Heavy Vehicles (%) 0% 0% 0% 1% 1% 1% 3% 3% 3% 3% 3% 3% Shared Lane Traffic (%) Turn Type Perm NA Perm NA Prot NA Perm Prot NA Perm Protected Phases 4 8 5 2 1 6 Permitted Phases 4 8 2 6 Detector Phase 4 4 8 8 522166 Switch Phase Minimum Initial (s) 6.0 6.0 6.0 6.0 4.0 6.0 6.0 4.0 6.0 6.0 Minimum Split (s) 42.0 42.0 43.0 43.0 9.0 28.0 28.0 9.0 26.0 26.0 Total Split (s) 45.0 45.0 45.0 45.0 22.0 89.0 89.0 22.0 89.0 89.0 Total Split (%) 28.8% 28.8% 28.8% 28.8% 14.1% 57.1% 57.1% 14.1% 57.1% 57.1% Yellow Time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 All-Red Time (s) 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 Lost Time Adjust (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Lost Time (s) 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 Lead/Lag Lead Lag Lag Lead Lag Lag Lead-Lag Optimize? Yes Yes Yes Yes Yes Yes Recall Mode None None None None None C-Max C-Max None C-Max C-Max Intersection Summary Area Type: Other Cycle Length: 156 Actuated Cycle Length: 156 Offset: 40 (26%), Referenced to phase 2:NBT and 6:SBT, Start of Green Natural Cycle: 90 Control Type: Actuated-Coordinated Splits and Phases: 1: Rainier Ave S & S 3rd Pl HCM 6th Signalized Intersection Summary 1: Rainier Ave S & S 3rd Pl 08/07/2018 Chick-Fil-A Renton Synchro 10 Report 2020 Without Project - PM Peak Hour Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (veh/h) 130 87 114 28 56 92 119 1263 28 89 1395 124 Future Volume (veh/h) 130 87 114 28 56 92 119 1263 28 89 1395 124 Initial Q (Qb), veh 000000000000 Ped-Bike Adj(A_pbT) 0.99 0.98 0.99 0.98 1.00 0.98 1.00 0.99 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No Adj Sat Flow, veh/h/ln 1900 1900 1900 1885 1885 1885 1856 1856 1856 1856 1856 1856 Adj Flow Rate, veh/h 133 89 116 29 57 94 121 1289 29 91 1423 127 Peak Hour Factor 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 Percent Heavy Veh, %000111333333 Cap, veh/h 224 163 213 180 139 230 142 2185 957 111 2124 939 Arrive On Green 0.22 0.22 0.22 0.22 0.22 0.22 0.08 0.62 0.62 0.06 0.60 0.60 Sat Flow, veh/h 1238 739 963 1172 631 1040 1767 3526 1545 1767 3526 1558 Grp Volume(v), veh/h 133 0 205 29 0 151 121 1289 29 91 1423 127 Grp Sat Flow(s),veh/h/ln 1238 0 1701 1172 0 1671 1767 1763 1545 1767 1763 1558 Q Serve(g_s), s 16.1 0.0 16.6 3.5 0.0 12.1 10.5 34.2 1.1 7.9 42.0 5.5 Cycle Q Clear(g_c), s 28.2 0.0 16.6 20.2 0.0 12.1 10.5 34.2 1.1 7.9 42.0 5.5 Prop In Lane 1.00 0.57 1.00 0.62 1.00 1.00 1.00 1.00 Lane Grp Cap(c), veh/h 224 0 376 180 0 369 142 2185 957 111 2124 939 V/C Ratio(X) 0.59 0.00 0.55 0.16 0.00 0.41 0.85 0.59 0.03 0.82 0.67 0.14 Avail Cap(c_a), veh/h 268 0 436 222 0 428 193 2185 957 193 2124 939 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 0.00 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 64.1 0.0 53.8 62.8 0.0 52.0 70.8 17.8 11.5 72.2 20.7 13.4 Incr Delay (d2), s/veh 3.6 0.0 1.8 0.6 0.0 1.0 22.3 1.2 0.1 13.4 1.7 0.3 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 5.4 0.0 7.4 1.1 0.0 5.3 5.7 13.9 0.4 4.0 17.4 2.0 Unsig. Movement Delay, s/veh LnGrp Delay(d),s/veh 67.7 0.0 55.6 63.3 0.0 53.1 93.1 18.9 11.5 85.6 22.4 13.7 LnGrp LOS EAEEADFBBFCB Approach Vol, veh/h 338 180 1439 1641 Approach Delay, s/veh 60.3 54.7 25.0 25.2 Approach LOS E D C C Timer - Assigned Phs 1 2 4 5 6 8 Phs Duration (G+Y+Rc), s 14.8 101.7 39.5 17.6 99.0 39.5 Change Period (Y+Rc), s 5.0 5.0 5.0 5.0 5.0 5.0 Max Green Setting (Gmax), s 17.0 84.0 40.0 17.0 84.0 40.0 Max Q Clear Time (g_c+I1), s 9.9 36.2 30.2 12.5 44.0 22.2 Green Ext Time (p_c), s 0.1 31.7 1.7 0.1 31.5 1.2 Intersection Summary HCM 6th Ctrl Delay 29.9 HCM 6th LOS C Transportation Impact Analysis Chick-fil-A – Renton, WA Appendix C Trip Generation Calculations ITE Land Use Area Units 1 LUC 2 In Out Trip Rate In Out Total Weekday Daily Proposed Use: Fast-Food Rest. with Drive-Thru 4,195 GFA 934 50%50%470.95 988 988 1,976 Pass-By Trips 3 50%-494 -494 -988 Net Proposed Trips = 494 494 988 Net New Weekday Daily Trips = 494 494 988 Weekday AM Peak Hour Proposed Use: Fast-Food Rest. with Drive-Thru 4,195 GFA 934 51%49%40.19 86 83 169 Pass-By Trips 3 49%-42 -41 -83 Net Proposed Trips = 44 42 86 Net New Weekday AM Peak Hour Trips = 44 42 86 Weekday PM Peak Hour Proposed Use: Fast-Food Rest. with Drive-Thru 4,195 GFA 934 52%48%32.67 71 66 137 Pass-By Trips 3 50%-36 -33 -69 Net Proposed Trips = 35 33 68 Net New Weekday PM Peak Hour Trips = 35 33 68 Notes: 1 GFA = Gross Floor Area. 2 Institute of Transportation Engineers, Trip Generation Manual, 10th edition Land Use Code. 3 Pass-by percentage based on studies documents in the ITE Trip Generation Handbook, 3rd Edition, 2017. Chick-fil-A Renton Trip Generation Summary Directional Distribution Trips Generated 8/7/2018 Chick-fil-A Renton - Trip Generation Transportation Impact Analysis Chick-fil-A – Renton, WA Appendix D Site Access LOS and Queue Calculations Lanes, Volumes, Timings 2: Rainier Ave S & Site Access 08/07/2018 Chick-Fil-A Renton Synchro 10 Report 2020 With Project - AM Peak Hour Lane Group EBL EBR NBL NBT SBT SBR Lane Configurations Traffic Volume (vph) 0 18 0 1560 777 33 Future Volume (vph) 0 18 0 1560 777 33 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 Link Speed (mph) 25 35 35 Link Distance (ft) 296 265 341 Travel Time (s) 8.1 5.2 6.6 Confl. Peds. (#/hr) 14 14 14 14 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 Heavy Vehicles (%) 3% 3% 7% 7% 6% 6% Shared Lane Traffic (%) Sign Control Stop Free Free Intersection Summary Area Type: Other Control Type: Unsignalized HCM 6th TWSC 2: Rainier Ave S & Site Access 08/07/2018 Chick-Fil-A Renton Synchro 10 Report 2020 With Project - AM Peak Hour Intersection Int Delay, s/veh 0.1 Movement EBL EBR NBL NBT SBT SBR Lane Configurations Traffic Vol, veh/h 0 18 0 1560 777 33 Future Vol, veh/h 0 18 0 1560 777 33 Conflicting Peds, #/hr 14 14 14 0 0 14 Sign Control Stop Stop Free Free Free Free RT Channelized - None - None - None Storage Length - 0 ---- Veh in Median Storage, # 0 - - 0 0 - Grade, % 0 - - 0 0 - Peak Hour Factor 92 92 92 92 92 92 Heavy Vehicles, % 3 37766 Mvmt Flow 0 20 0 1696 845 36 Major/Minor Minor2 Major1 Major2 Conflicting Flow All - 469 - 0 - 0 Stage 1 ------ Stage 2 ------ Critical Hdwy - 7.16 ---- Critical Hdwy Stg 1 ------ Critical Hdwy Stg 2 ------ Follow-up Hdwy - 3.93 ---- Pot Cap-1 Maneuver 0 461 0 - - - Stage 1 0 - 0 - - - Stage 2 0 - 0 - - - Platoon blocked, % - - - Mov Cap-1 Maneuver - 449 ---- Mov Cap-2 Maneuver ------ Stage 1 ------ Stage 2 ------ Approach EB NB SB HCM Control Delay, s 13.4 0 0 HCM LOS B Minor Lane/Major Mvmt NBTEBLn1 SBT SBR Capacity (veh/h) - 449 - - HCM Lane V/C Ratio - 0.044 - - HCM Control Delay (s) - 13.4 - - HCM Lane LOS - B - - HCM 95th %tile Q(veh) - 0.1 - - Lanes, Volumes, Timings 2: Rainier Ave S & Site Access 08/07/2018 Chick-Fil-A Renton Synchro 10 Report 2020 Without Project - PM Peak Hour Lane Group EBL EBR NBL NBT SBT SBR Lane Configurations Traffic Volume (vph) 0 15 0 1495 1593 31 Future Volume (vph) 0 15 0 1495 1593 31 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 Link Speed (mph) 25 35 35 Link Distance (ft) 242 242 364 Travel Time (s) 6.6 4.7 7.1 Confl. Peds. (#/hr) 16 16 16 16 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 Heavy Vehicles (%) 3% 3% 3% 3% 3% 3% Shared Lane Traffic (%) Sign Control Stop Free Free Intersection Summary Area Type: Other Control Type: Unsignalized HCM 6th TWSC 2: Rainier Ave S & Site Access 08/07/2018 Chick-Fil-A Renton Synchro 10 Report 2020 Without Project - PM Peak Hour Intersection Int Delay, s/veh 0.1 Movement EBL EBR NBL NBT SBT SBR Lane Configurations Traffic Vol, veh/h 0 15 0 1495 1593 31 Future Vol, veh/h 0 15 0 1495 1593 31 Conflicting Peds, #/hr 16 16 16 0 0 16 Sign Control Stop Stop Free Free Free Free RT Channelized - None - None - None Storage Length - 0 ---- Veh in Median Storage, # 0 - - 0 0 - Grade, % 0 - - 0 0 - Peak Hour Factor 92 92 92 92 92 92 Heavy Vehicles, % 3 33333 Mvmt Flow 0 16 0 1625 1732 34 Major/Minor Minor2 Major1 Major2 Conflicting Flow All - 915 - 0 - 0 Stage 1 ------ Stage 2 ------ Critical Hdwy - 7.16 ---- Critical Hdwy Stg 1 ------ Critical Hdwy Stg 2 ------ Follow-up Hdwy - 3.93 ---- Pot Cap-1 Maneuver 0 235 0 - - - Stage 1 0 - 0 - - - Stage 2 0 - 0 - - - Platoon blocked, % - - - Mov Cap-1 Maneuver - 228 ---- Mov Cap-2 Maneuver ------ Stage 1 ------ Stage 2 ------ Approach EB NB SB HCM Control Delay, s 22 0 0 HCM LOS C Minor Lane/Major Mvmt NBTEBLn1 SBT SBR Capacity (veh/h) - 228 - - HCM Lane V/C Ratio - 0.072 - - HCM Control Delay (s) - 22 - - HCM Lane LOS - C - - HCM 95th %tile Q(veh) - 0.2 - -