HomeMy WebLinkAbout03/20/2013 - Minutes Renton Library Ad�isory Board
,�*,,:..�--.
c�ty or,
����}������ '?=��
Meeting Minu#es
Ci#y Hall, Council Conference Room
March 20, 2013 � 5:3� p.m.
I. CALL TO ORDER
Chair Lynne King called the meeting to order at 5:35 p.m.
In Attendance
Members: Laurie Beden, Lynne King, Catherine Ploue-5mith, Suzi LJre
City of Renton Staff: Peter Renner, Diane Wagner
KCLS Staff: Angelina Benedetti
Excused
Members: Erica Richey
Staff: 1'erry Higashiyama
li. APPROVAL OF AGENDA
A motian was made by Laurie Beden, seconded by Suzi Ure,to appro�e the agenda. All were
in fa�or, mation carried, agenda appra�ed.
III. APPR�VAE.OF MINUTES
Laurie Beden made a motion, seconded by Catherine Ploue-Smith, to appro�e the January 16,
2013 meeting minutes and February 3, ZQ12 Retreat minutes as written. All were in fa�or,
motion carried, minutes approved.
tV. ORAL COMMUNICATIONSIRUBLIC COMM�NTS
None.
V. BOARD COMMUNICA710N5
Nane.
VI. CITY REPORT/ Peter Renner
Peter talked abaut#he design meeting for the liberty Park Lihrary, which Catherine and Lynne
attended. They talked about t�e three main issues: door,foatprint, and budge#. They
discussed the different seismic s�aring, maintenance of the building at different square
faotage, and the bridge deck/pedestrian bridge. The Council presen#ation is scheduled for
April 15, but that date may change. The presentation will incfude design and budget.
Peter reminded #he graup about the Open House/Meeting scheduled for March 26 at the
Liberty Park Library.
Peter talked about the progress af the Higi�lands redevel�pment in particular the Library
portion and said there are m�etings e�ery-other week. The meetings invol�e the lawyers and
City oF Renton
Library Board Minutes
March�0,2013
Page 2 of 3
sol�ing the issues#hat stitl need to be addressed. The �fraf� Purchase and Sale Agreement
should be complete in a�proximately one month, E�en with the change in rig�t-of-way, the
balance of Sunset Lane is sufficient far two lanes of traffic and some parallel parking. Existing
ut�lities are sufFicient far building needs if KCLS starts prior to the mixed use development.
i'he design is not any different than the last public update.
VIE. KCLS REPORT/ANGELINA BENEDE771
Angelina talked about the Summer Outreach Pragram and provided information abaut the
5ummer Reading Partnerships with the City of Renton shawing such events as the KCLS Oay�t
the Henry Mases Aquatic Center,the Summer Cancert at#he Rentan Farmer's Mar[cet, and
the 5ummer Ex#ravaganza at Heritage Park,to name just a #ew. This will also bring the
Library2G0! �ehicle to many events througk,out Renton during the summer mon#hs and
pro�ide an opportuni�y ta have Library cards available to those w#�o currently do not ha�e a
Library Card. The Board discussed how they can be in�ol�ed in assisting with the distriloution
af infarmat+an about the library ant� cards. Angelina will email the information to the Board
so#hey can distribute#he information #a friends, family, co-worlcers, �TA members, e#c. and
mentioned that KC�S can provide materials as requested.
Angexina talked about the recent author visit with Laurie King. She said there were
approximately 40 people at the Library for h�r�isit, whicF� was held on Thursday, March 14,
at 2:Oa pm. Laurie King wrate on her blog t�at she had a great#ime at the Renton Library.
Angelina talked about a program titled,A Place at the Table. This themed pragram is a year-
long series full af inspiring,thought-provolcing and interesting authars, presenters, and
programs. She distribu#ed the first quarter acti�ity guide illustrating a number of authors and
programs, some which are comjng to the Renton Libraries. As part af A Place at the Table,
KCLS is accepting non-perishabhe food that will be distributed to 45 4oc�l food banks from
March through December of 2013. BEns are located at each Library, New bags are a�ailable
to put fnod in and wil� be distr�buted at the 5pring Festival and#he Fa�mers Market along with
other events.
Angelina shared the new library bags �and advised the L�brary will no longer be giving out
plastic bags. The news �ags are a�aiiable far purchase at$1.�5 each or they can be checked-
out for up to a year. The new bags are available a#the Renton �ibrary.
VIII. DISCU$$ION/ACTION ITEMS
The Soard talked about the retreat gaals and how they can get involved around the
community such as possible ha�ing tables at different events that i�clud� information ahou�
the library and applications for cards, etc. The summer e�er�ts and different ideas were
discussed.
; � �
kC-��Bodrds and Cammissions��,ibrary Board�2012�2d13 Minutes�l�+larch 2013
City of Renton
Library Board Minutes
March 20.2013
Page 3 of 3
IX. OLD BUSINESS
Peter ga�e a progress report on the Day Center/5helter. The remodel design is camplete.
7here are a few ehanges required due to a recent inspectian and ac�ditional funding is being
actively pursued ta accommadate the changes. T�e handout Peter distributed included
information on the REACH website and how volunteers can sign up on the website at:
�ttp://www.reachren#on.or�/reach-center-of-hope.html -
X. NEW BUSINESS
None.
XI. INFORMA710N
The Li#erary Lions Gala is scheduled for Saturday, March 23, 2013, at the Belle�ue Nyatt.
Informa#ion on the event is included in the packet.
X�I. ADJOURNMENT
A motion was made by 5uzi Ure, seconded by Laurie 8eden, to a�journ the March meeting.
Alf were in favor, motion carri�d, the meeting adjournec� at 6:50 p.m.
Signature
NEXT REGULAR MEETINGS
-�
APRIL MEETING
Wednesday,April 7.7,2012, 530 p.m.
Rentan City Hall,Council Conference Room,7`h Flaor
Telephone 425.430.6574
MAY MEETfNG
Wednesday, May 15, 2013, 5:30�.m.
Renton City Mall,Counci) Conference Roorn,7`"Floor
Telaphone 425.430.6574
� , . �.
H:��Boards and tommissians�Library Board�2012�2013 MinuteslMarch 2013 �, ��— --