HomeMy WebLinkAboutCM_Construction_Mitigation_Description_180911_v1.pdfMaple Highlands Construction Mitigation Description The following narrative is provided to describe the proposed construction mitigation measures that Harbour Homes, LLC “Harbour Homes” and the to be named general contractor “Contractor” for The Pines will implement throughout the duration of the site development and infrastructure period as well as during building construction. Proposed Construction Dates (Site Work): February 2020-February 2021 Harbour Homes anticipates on beginning clearing and site development work in the early spring of 2020 depending on the timing of approvals. Harbour Homes anticipates roughly a 180 day schedule to finalize all grading, storm, sewer, water and first lift of asphalt on the site. The goal will be to have the site completely stabilized by August 1st, 2020 before the fall. Proposed Construction Dates (Building Construction): Harbour Homes plans on beginning construction of a model home in January of 2021 and anticipates starting two homes per month thereafter with an average construction timeline of seven months to complete. Hours & Days of Operation Normal site hours of operation will be in compliance with the allowable working hours in the City of Renton which are as follows: For new single-family residences and non-residential construction, the permitted work hours are 7:00am-8:00pm Monday through Friday, 9:00am-8:00pm Saturday, and no work shall be permitted on Sunday. Proposed Hauling/Transportation Routes Maple Highlands is located on the corner of 162nd Avenue SE and 134th St. The Contractor anticipates utilizing one haul route to and from SR-169 (See attached Exhibit “A” for location). Heading north on 154th PL, head north on 156th Ave SE, east on SE 2nd PL, then north on 162nd Ave SE to the site. Measures to Minimize Impacts Harbour Homes and the Contractor will make every effort to minimize the impacts from this project on the surrounding neighbors, the environment and traffic circulation for the immediate area. The Contractor and Harbour Homes’ contact information will be clearly posted at the site and the job trailer to ensure communication and immediate responses to any questions or inquiries from the community. Dust/Mud/Erosion Impacts- The Contractor will implement and maintain the TESC measures approved for The Pines project at all times. Measures such has water trucks, street sweepers and maintaining perimeter erosion fencing help to mitigate impacts. In addition, regular inspections by the City of Renton and the project’s certified erosion control and sediment lead (Earth Solutions Northwest), as well as regular meetings between Harbour Homes and the Contractor to ensure compliance. Traffic/Transportation Impacts- Harbour Homes and the Contractor will secure all necessary Right-of-Way use permits including providing traffic control measures to minimize the impact of the frontage improvements associated with the project. Haul routes and hours will be adhered o and Harbour Homes is attempting to minimize the amount of import/export needed on the project through careful design of the finishing grade within the site. Utilizing the on -site material and repurposing wood chips and top soil from the clearing activities minimize the need for ongoing truck and trailer loads. Noise- The Contractor will comply with the allowable working hours in the City of Renton (see above) to minimize the impact to neighbors during the site construction and building construction. Exhibit “A” Maple Highlands