Loading...
HomeMy WebLinkAboutCM_Construction_Mitigation_180907_v1.pdfConstruction Mitigation Description Cornwall Boat Lift Construction Dates : The date of construction will depend on when the necessary government approvals for the lift are issued. Installation of the lift will only take one day to complete. The in-water work window at the site is open from July 16th through December 31st. The lift will be installed during the work window opening of 2018. Hours and Days of Operation: The work will take place during the City of Renton’s typical hours of construction which are 7:00 am through 10:00 pm Monday through Friday and 9:00 am through 10:00 pm Saturday and Sunday. Proposed Hauling/Transportation Routes: The lift will be brought to the site by barge. Measures to be implemented to minimize dust, traffic and transportation impacts, erosion, mud, noise, and other noxious characteristics: Work will take place only during allowed hours of operation. Only one vehicular trip is required to install the lift. Erosion will not be caused by the installation of the lift. Noise levels from installation are very low. Special Hours Proposed for Construction: No special hours are proposed for construction. Preliminary Traffic Control Plan: Traffic control is not necessary for the project.