HomeMy WebLinkAboutCM_Construction_Mitigation_180907_v1.pdfConstruction Mitigation Description
Cornwall Boat Lift
Construction Dates : The date of construction will depend on when the necessary
government approvals for the lift are issued. Installation of the lift will only take one day
to complete. The in-water work window at the site is open from July 16th through
December 31st. The lift will be installed during the work window opening of 2018.
Hours and Days of Operation: The work will take place during the City of Renton’s
typical hours of construction which are 7:00 am through 10:00 pm Monday through
Friday and 9:00 am through 10:00 pm Saturday and Sunday.
Proposed Hauling/Transportation Routes: The lift will be brought to the site by barge.
Measures to be implemented to minimize dust, traffic and transportation impacts,
erosion, mud, noise, and other noxious characteristics: Work will take place only
during allowed hours of operation. Only one vehicular trip is required to install the lift.
Erosion will not be caused by the installation of the lift. Noise levels from installation
are very low.
Special Hours Proposed for Construction: No special hours are proposed for
construction.
Preliminary Traffic Control Plan: Traffic control is not necessary for the project.