HomeMy WebLinkAboutNOA_Notice_of_Application_DNS_CornwallBoatLift_180924.pdfDEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT
Planning Division
1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200, ext. 2
www.rentonwa.gov
OF APPLICATION AND PROPOSED DETERMINATION OF
NON-SIGNIFICANCE (DNS)
A Master Application has been filed and accepted with the Department of Community & Economic Development
(CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary
Public Approvals.
DATE OF NOTICE OF APPLICATION: September 24, 2018
PROJECT NAME/NUMBER: PR18-000465 Cornwall Boat Lift / LUA18-000617
PROJECT LOCATION: 4151 Williams Ave N (0518500350)
APPLICANT/PROJECT CONTACT
PERSON:
Evan Wehr, Ecco Design Inc. / evan@eccodesigninc.com
203 N 36th St, Seattle, WA 98103
LOCATION WHERE APPLICATION
MAY BE REVIEWED:
Applicant documents are available online through the City of Renton Document
Center website. See also https://bit.ly/2QTUU82
PROJECT DESCRIPTION: The applicant is requesting Environmental (SEPA) Review and Shoreline Substantial
Development Permit proposing to install a new boat lift on the Barbee Mill Community Organization dock located at
4151 Williams Ave N (Parcel # 0518500350) for future use by a resident of the Barbee Mill development. The dock was
constructed in 2010 under a separate Shoreline Substantial Development Permit (LUA10 -006). The original permit
allowed for the construction of one boat lift on the single finger pier. The upland portion of the site is zoned Residential
10 du/ac (R-10) and is designated Residential High Density in the Comprehensive Plan. The waterward portion of the site
is located in the Lake Washington Reach C and is designated Shoreline High Intensity. The proposed boat lift would be
located on DNR-owned parcel # 051850HYDR approximately 144 feet waterward of the ordinary high water mark
(OHWM) on the west site of the existing finger pier. The subject parcel is located in the Aquatic Shoreline Overlay District.
The lift would be approximately 11 feet wide by 13 feet long. The bunk of the boat lift would extend 18" above the
OHWM and would sit on 12-inch by 12-inch foot pads on the lake bed. The applicant submitted a Biological Assessment
and Habitat Data Report with the application.
DATE OF APPLICATION: September 12, 2018
NOTICE OF COMPLETE
APPLICATION:
September 24, 2018
OPTIONAL DETERMINATION OF NON-SIGNIFICANCE (DNS): As the Lead Agency, the City of Renton has determined that
significant environmental impacts are unlikely to result from the proposed project. Therefore, as permitted under the
RCW 43.21C.110, the City of Renton is using the Optional DNS process to give notice that a DNS is likely to be issued.
Comment periods for the project and the proposed DNS are integrated into a single comment period. There will be no
comment period following the issuance of the Threshold Determination of Non-Significance (DNS). This may be the only
opportunity to comment on the environmental impacts of the proposal. A 14-day appeal period will follow the issuance
of the DNS.
PERMITS/REVIEW REQUESTED: Shoreline Substantial Development Permit, Environmental (SEPA) Review
OTHER PERMITS WHICH MAY BE
REQUIRED:
Building Permit
REQUESTED STUDIES: Biological Assessment, Habitat Report
CONSISTENCY OVERVIEW:
Zoning/Land Use: The subject site is designated Residential High Density (RHD) on the City of Renton
Comprehensive Land Use Map and Residential-10 (R-10) on the City’s Zoning Map.
Environmental Documents
that Evaluate the Proposed
Project:
Environmental (SEPA) Checklist
NOTICE
PLEASE FOLLOW THE DOCUMENT CENTER LINK TO SEE ASSOCIATED PROJECT DOCUMENTS.
IF YOU NEED ADDITIONAL ASSISTANCE YOU MAY CONTACT THE CITY OF RENTON,
DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT AT (425) 430-7200, EXT. 2.
DO NOT REMOVE THIS NOTICE WITHOUT PROPER AUTHORIZATION
PLEASE INCLUDE THE PROJECT NUMBER WHEN CALLING FOR PROPER FILE IDENTIFICATION.
Development Regulations
Used For Project Mitigation:
The project will be subject to the City’s SEPA ordinance, RMC 4-3-090, and other
applicable codes and regulations as appropriate.
Proposed Mitigation
Measures:
No mitigation measures are proposed at the time of this posting.
Comments on the above application must be submitted in writing to Alex Morganroth, Associate Planner, CED –
Planning Division, 1055 South Grady Way, Renton, WA 98057, by 5:00 PM on October 8, 2018. If you have questions
about this proposal, or wish to be made a party of record and receive additional notification by mail, contact the Project
Manager. Anyone who submits written comments will automatically become a party of record and will be notified of any
decision on this project. A copy of the subsequent threshold determination is available upon request.
CONTACT PERSON: Alex Morganroth, Associate Planner; Tel: (425) 430-7219; Email: AMorganroth@Rentonwa.gov