Loading...
HomeMy WebLinkAboutR-3970070 CIO 6 i W Q n_ I— Ir 0 cn U) J Q W m z I— W W Cn "42-4 0 - C. --4 C m m PROJECT SITE Z \ ` CENTERLINE OF R0VY \. • ' : : • :: :: :. \' :: :: �:. .: • :. 1--� HASHED YELLOW UNE�:.. • _ :: :: �. • . RE 11 \��� \ / �.+ • ' •- ��- I i S.E--.-164.TH- .-ST.- N W E S W E UTILITY CONFLICT NOTE s THE CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFYING THE LOCATION, DIMENSION, AND DEPTH OF ALL EXISTING UTILITIES, WHETHER SHOWN ON THESE PLANS OR NOT, BY POTHOLING THE UTILITIES AND SURVEYING THE HORIZONTAL AND VERTICAL LOCATION PRIOR TO CONSTRUCTION. THIS SHALL INCLUDE CALLING UTILITY LOCATE @ 1-800424-5555 AND THEN POTHOLING ALL EXISTING UTILITIES AT LOCATIONS OF NEW UTILITY CROSSINGS TO PHYSICALLY VERIFY WHETHER OR NOT CONFLICTS EXIST. LOCATIONS OF SAID UTILITIES AS SHOWN ON THESE PLANS ARE NOT GUARANTEED AND ARE SUBJECT TO VARIATION, IF CONFLICTS SHOULD OCCUR, THE CONTRACTOR SHALL CONSULT AP CONSULTING ENGINEERS PLLC TO RESOLVE ALL PROBLEMS PRIOR TO PROCEEDING WITH CONSTRUCTION. I i < i SE 164TH ST — SCHOOL S SCALE: 1 =20' AFE WALKI (REF). SE 164TH ST —SCHOOL SAFE WALKING ROUTE SCALE: 1 °=26 NO. REVISION i , �. NG ROUTE (E) SURVEYED: DESIGNED: KL DRAWN: KL CHECKED: AEP BY DATE APPR APPROVED: SCALE ONE INCH AT FULL SCALE IF NOT ONE INCH SCALE ACCORDINGLY VERTICAL NAVD 1980 HORIZONTAL- NAD 1983/1991 DATUM TOPOGRAPHY NOTE: TOPOGRAPHY INFORMATION BASED ON RENTON ONLINE GIS. AP CONSULTING ENGINEERS PLLC MAKES NO GUARANTEE AS TO THE ACCURACY OF THIS INFORMATION. IF SITE CONDITIONS DIFFER FROM WHAT IS SHOWN, THE CONTRACTOR SHALL CONSULT AP CONSULTING ENGINEERS PLLC IMMEDIATELY TO RESOLVE ALL PROBLEMS PRIOR TO PROCEEDING WITH CONSTRUCTION. SURVEY NOTE: SURVEY INFORMATION INCLUDING PROPERTY LINES, ROADS, EDGE OF ASPHALT AND LOCATION OF DITCH IS BASED ON RENTON ONLINE GIS AND INFORMATION PROVIDED BY SOUND BUILDING AND CONSTRUCTION. AP CONSULTING ENGINEERS PLLC MAKES NO GUARANTEE AS TO THE ACCURACY OF THIS INFORMATION. IF SITE CONDITIONS DIFFER FROM WHAT IS SHOWN, THE CONTRACTOR SHALL CONSULT AP CONSULTING ENGINEERS PLLC IMMEDIATELY TO RESOLVE ALL PROBLEMS PRIOR TO PROCEEDING WITH CONSTRUCTION. COMPACTION NOTE: SHOULDER SHALL BE COMPACTED PER METHOD B OF SECTION 2-03.3(14)C OF WSDOT STD SPECS. L Vf1f1Y CL JIIVULUL(\ GRAVEL SHOULDER DETAIL C7 NTS 0 CITY OE RENTON Planning/Building/Public Works Dept. c� o �00 Q F� z m NWz WWW W 10, �z z M 1c- W v O�J M v UW� E 0 U N N 41 C C i 1 W ,r R-397007 IN COMPLIANCE WITH CITY OF RENTON STANDARDS DEVELOPMENT ENGINEERING Ann Fowler 08/01 /2018 LALLY'S SHORT PLAT SCHOOL SAFE WALKING ROUTE PLAN ,s 0 U CL L W U a DATE: 05/03/2018 FIELOBOOK: B 0 0 K PAGE., PAGE DRAWING NO: C7 SHEET: OF: 7 7 1v-- Cc) 0) 0 0 r AW C.c) LO 0 0 Cfl J C'7 (c) M O 0 0 cr- n_ F-- n_ rr 0 = /) rC V ! _..I R-397004