HomeMy WebLinkAboutR-386803EROSION CONTROL NOTES CO 1. THESE NOTES SHALL APPEAR FOR PROJECTS - SITE IMPROVEMENTS, SURFACE (0 WATER UTILITY, WASTEWATER UTILITY, WATER UTILITY, AND TRANSPORTATION PLANS: C0 2. BEFORE ANY CONSTRUCTION OR DEVELOPMENT ACTIVITY OCCURS, A O PRE -CONSTRUCTION MEETING MUST BE HELD WITH THE CITY OF RENTON, qqt PUBLIC WORKS DESIGN ENGINEER. Q 3. THE BOUNDARIES OF THE CLEARING LIMITS AND AREAS OF VEGETATION PRESERVATION AS PRESCRIBED ON THE PLAN(S) SHALL BE CLEARLY FLAGGED BY SURVEY TAPE OR FENCING Ll.l Lu IN THE FIELD PRIOR TO CONSTRUCTION IN ACCORDANCE WITH APPENDIX "D" OF THE SURFACE WATER DESIGN MANUAL AND OBSERVED DURING CONSTRUCTION. DURING THE CONSTRUCTION PERIOD, NO DISTURBANCE BEYOND THE CLEARING LIMITS SHALL BE PERMITTED. THE CLEARING LIMITS SHALL BE MAINTAINED BY THE APPLICANT/ESC SUPERVISOR FOR THE DURATION OF CONSTRUCTION. 4. STABILIZED CONSTRUCTION ENTRANCES SHALL BE INSTALLED AT THE BEGINING OF CONSTRUCTION AND MAINTAINED FOR THE DURATION OF THE PROJECT. ADDITIONAL MEASURES, SUCH AS Q CONSTRUCTED WHEEL WASH SYSTEMS OR WASH PADS, MAY BE REQUIRED TO ENSURE THAT ALL PAVED AREAS ARE KEPT CLEAN AND TRACK OUT TO ROAD RIGHT OF WAY DOES NOT OCCUR J FOR THE DURATION OF THE PROJECT. 5. ALL REQUIRED SEDIMENTATION/EROSION CONTROL FACILITIES MUST BE CONSTRUCTED AND IN OPERATION PRIOR TO LAND CLEARING AND/OR CONSTRUCTION TO PREVENT TRANSPORTATION OF SEDIMENT TO SURFACE WATER, DRAINAGE SYSTEMS AND ADJACENT PROPERTIES. ALL EROSION O AND SEDIMENT FACILITIES SHALL BE MAINTAINED IN A SATISFACTORY CONDITION UNTIL SUCH TIME = THAT CLEARING AND/OR CONSTRUCTION IS COMPLETE AND POTENTIAL FOR ON -SITE EROSION HAS PASSED. THE IMPLEMENTATION, MAINTENANCE, REPLACEMENT AND ADDITIONS TO EROSION/ SEDIMENTATION CONTROL SYSTEMS SHALL BE THE RESPONSIBILITY OF THE PERMITTEE. 6. THE EROSION AND SEDIMENTATION CONTROL SYSTEMS DEPICTED ON THIS DRAWING ARE Q INTENDED TO BE MINIMUM REQUIREMENTS TO MEET ANTICIPATED SITE CONDITIONS. AS CONSTRUCTION PROGRESSES AND UNEXPECTED OR SEASONAL CONITIONS DICTATE, THE PERMITEE SHALL ANTICIPATE THAT MORE EROSION AND SEDIMENTATION CONTROL FACILITIES WILL BE NECESSARY TO INSURE COMPLETE SILTATION CONTROL ON THE PROPSED SITE. DURING THE COURSE OF CONSTRUCTION, IT SHALL BE THE OBLIGATION AND RESPONSIBILITY OF THE PERMITEE TO ADDRESS ANY NEW CONDITIONS THAT MAY BE CREATED BY THE ACTIVITIES AND TO PROVIDE ADDITIONAL FACILITIES, OVER AND ABOVE MINIMUM REQUIREMENTS, AS MAY BE NEEDED, TO PROTECT ADJACENT PROPERTIES AND WATER QUALITY OF THE RECIEVING DRAINAGE SYSTEM. 7. APPROVAL OF THIS PLAN IS FOR EROSION/SEDIMENTATION CONTROL ONLY. IT DOES NOT CONSTITUTE AN APPROVAL OF STORM DRAINAGE DESIGN, SIZE NOR LOCATION OF PIPES, RESTRICTORS, CHANNELS, OR RETENTION FACILITIES. 8. ANY AREAS OF EXPOSED SOILS, INCLUDING ROADWAY EMBANKMENTS, THAT WILL NOT BE DISTURBED FOR TWO DAYS DURING THE WET SEASON (OCTOBER 1ST - MARCH 30TH) OR SEVEN DAYS DURING THE DRY SEASON (APRIL 1ST - SEPTEMBER 30TH) SHALL BE Co IMMEDIATELY STABILIZED WITH THE APPROVED ERC COVER METHODS (e.g. SEEDING, MULCHING, PLASTIC COVERING, ETC.). 9. WET SEASON SEASONAL EROSION AND SEDIMENT CONTROL REQUIREMENTS APPLY TO ALL W CONSTRUCTION SITES CLEARING BEWTEEN OCTOBER 1 AND MARCH 30 INCLUSIVE, UNLESS W OTHERWISE APPROVED BY THE CITY THROUGH AN ADJUSTMENT PROCESS. = 10. COVER MEASURES WILL BE APPLIED IN CONFORMANCE WITH APPENDIX "D" OF THE SURFACE (/) WATER DESIGN MANUAL. 11. ANY AREA NEEDING ERC MEASURES, NOT REQUIRING IMMEDIATE ATTENTION, SHALL BE ADDRESSED WITHIN SEVEN (7) DAYS. 12. THE ERC FACILITIES ON INACTIVE SITES SHALL BE INSPECTED AND MAINTAINED A MINIMUM OF ONCE A MONTH OR WITHIN 24 HOURS FOLLOWING A STORM EVENT. 13. AT NO TIME SHALL MORE THAN ONE (1) FOOT OF SEDIMENT BE ALLOWED TO ACCUMULATE WITHIN A CATCH BASIN. ALL CATCH BASINS AND CONVEYANCE LINES SHALL BE CLEANED PRIOR TO PAVING. THE CLEANING OPERATION SHALL NOT FLUSH SEDIMENT -LADEN WATER INTO THE DOWNSTREAM SYSTEM. 14. DURING THE TIME PERIOD OF OCTOBER 1ST - MARCH 30TH, ALL PROJECT DISTURBED SOIL AREAS, THAT ARE TO BE LEFT UN -WORKED FOR MORE THAN 12 HOURS, SHALL BE COVERED BY MULCH, SODDING, OR PLASTIC COVERING. 15. ANY PERMANENT RETENTION/DETENTION FACILITY USED AS A TEMPORARY SETTLING BASIN SHALL BE MODIFIED WITH THE NECESSARY EROSION CONTROL MEASURES AND SHALL PROVIDE ADEQUATE STORAGE CAPACITY. IF THE PERMANENT FACILITY IS TO FUNCTION ULTIMATELY AS AN INFILTRATION SYSTEM, THE TEMPORARY FACILITY MUST BE ROUGH GRADED SO THAT THE BOTTOM AND SIDES ARE AT LEAST THREE FEET ABOVE THE FINAL GRADE OF THE PERMANENT FACILITY. 16. PRIOR TO THE BEGINNING OF THE WET SEASON (OCT. 1), ALL DISTURBED AREAS SHALL BE REVIEWED TO IDENTIFY WHICH ONES CAN BE SEEDED IN PREPARATION FOR THE WINTER RAINS. DISTURBED AREAS SHALL BE SEEDED WITHIN ONE WEEK OF THE BEGINNING OF THE WET SEASON. A SKETCH MAP OF THOSE AREAS TO BE SEEDED AND THOSE AREAS TO REMAIN UNCOVERED SHALL BE SUBMITTED TO THE CITY OF RENTON FOR REVIEW. STURCTURAL NOTES 1. THESE PLANS APPROVED FOR STANDARD ROAD AND DRAINAGE IMPROVEMENTS ONLY. PLANS FOR STRUCTURES SUCH AS BRIDGES, VAULTS, WALLS, OR RETAINING WALLS REQUIRE A SEPERATE REVIEW AND APPROVAL BY THE CITY OF RENTON PRIOR TO CONSTRUCTION. 2. ROCKERIES ARE CONSIDERED TO BE A MEHTOD OF BANK STABILIZATION AND EROSION CONTROL. ROCKERIES SHALL NOT BE CONSTRUCTED TO SERVE AS RETAINING WALLS. ALL ROCKERIES IN THE CITY ROAD RIGHT-OF-WAY SHALL BE CONSTRUCTED IN ACCORDANCE WITH CITY STANDARDS. ROCKERIES OUTSIDE OF ROAD RIGHT-OF-WAY SHALL BE CONSTRUCTED IN ACCORDANCE WITH THE INTERNATIONAL BUILDING CODE (IBC). EROSION CONTROL NOTES: (A) THE SOIL MOISTURE HOLDING CAPACITY OF ALL NEW PREVIOUS SURFACE THAT AT PROJECT COMPLETION WILL NOT BE COVERED BY IMPERVIOUS SURFACE OR INCORPORATED INTO A DRAINAGE FACILITY MUST BE PROTECTED. THE DUFF LAYER AND NATIVE TOPSOIL SHALL BE RETAINED IN AN UNDISTURBED STATE TO THE MAXIMUM STENT FEASIBLE. (B) ANY DUFF LAYER OR TOPSOIL REMOVED DURING GRADING SHALL BE STOCKPILED ONSITE IN A DESIGNATED, CONTROLLED AREA NOT ADJACENT TO PUBLIC RESOURCES AND CRITICAL AREAS. THE MATERIAL SHALL BE REAPPLIED TO OTHER PORTIONS OF THE SITE WHERE FEASIBLE. (C) THE SOIL IN ANY AREA THAT HAS BEEN COMPACTED OR THAT HAS SOME OR ALL OF THE DUFF LAYER OR UNDERLYING TOPSOIL REMOVED SHALL BE AMENDED TO MITIGATE FOR LOSS OF MOISTURE -CAPACITY. THE AMENDMENT SHALL TAKE PLACE BETWEEN MAY 1 AND OCTOBER 1. REPLACED TOPSOIL SHALL BE A MINIMUM 8 INCHES THICK. REPLACED TOPSOIL SHALL HAVE AN ORGANIC MATTER CONTENT BETWEEN 8 AND 13 PERCENT DRY WEIGHT AND A pH SUITABLE FOR THE PROPOSED LANDSCAPE PLANTS. OFFE ENGINEERS 13932 SOUTHEAST 159TH PLACE RENTON, WASHINGTON 98058 PHONE: 425-260-3412 CONTACT: DARRELL OFFE, P.E. CONSTRUCTION SEQUENCE 1. PRE -CONSTRUCTION MEETING. 2. POST SIGN WITH NAME AND PHONE NUMBER OF ESC SUPERVISOR (MAY BE CONSOLIDATED W/THE REQUIRED NOTICE OF CONSTRUCTION SIGN). 3. FLAG OR FENCE CLEARING LIMITS. 4. INSTALL CATCH BASIN PROTECTION WHERE REQUIRED. 5. GRADE AND INSTALL CONSTRUCTION ENTRANCE(S). 6. INSTALL TREE PROTECTION FENCING 7. INSTALL PERIMETER PROTECTION (SILT FENCE, BRUSH BARRIER, ETC.) 8. CONSTRUCT SEDIMENT PONDS AND TRAPS, IF REQUIRED 9. GRADE AND STABILIZE CONSTRUCTION ROADS. 10. CONSTRUCT SURFACE WATER CONTROLS (INTERCEPTOR DIKES, PIPE SLOPE DRAINS, ETC.) SIMULTANEOUSLY WITH CLEARING AND GRADING FOR PORJECT DEVELOPMENT. 11. MAINTAIN EROSION CONTROL MEASURES IN ACCORDANCE WITH APPENDIX D OF THE SURFACE WATER DESIGN MANUAL AND MANUFACTURE'S RECOMMENDATIONS. 12. RELOCATE EROSION CONTROL MEASURES OR INSTALL NEW MEASURES SO THAT AS SITE CONDITIONS CHANGE THE EROSION AND SEDIMENT CONTROL IS ALWAYS IN ACCORDANCE WITH THE CITY'S EROSION AND SEDIMENT CONTROL STANDARDS. 13. COVER ALL AREAS THAT WILL BE UNWORKED FOR MORE THAN SEVEN DAYS DURING THE DRY SEASON OR TWO DAYS DURING THE WET SEASON WITH STRAW, WOOD FIBER MULCH, COMPOST, PLASTIC SHEETING OR EQUIVALENT. 14. STABILIZE ALL AREAS THAT REACH FINAL GRADE WITHIN SEVEN DAYS. 15. SEED OR SOD ANY AREAS TO REMAIN UNWORKED FOR MORE THAN 30 DAYS. 16. UPON COMPLETION OF THE PROJECT, ALL DISTURBED AREAS MUST BE STABILIZED AND BMP'S REMOVED IF APPROPRIATE. SILT FENCING TO BE INSTALLED ON ALL DOWNSLOPES DUST CONTROL MEASURES WILL BE APPLICABLE. NOTE: 1. REFER TO LANDSCAPE DWGS FOR SPECIFIC TREES TO BE FENCED. II ( INSTALL TREE 1-7/8" STRUCTURAL PRESERVATION WEIGHT STEEL POST FENCE 5' FROM SET 2' BELOW GRADE DRIP LINE WITH 11 GAUGE GALVANIZED CHAINLINK uJ MESH. SET POSTS 10' / ? I O,C, MAX. G_ D_ 0 SIGNIFICANT EXISTING TREE 5' 6'-0" TYP. TO BE SAVED MARK TREES TO BE SAVED WITH FLAGGING TYPICAL EXISTING TREE PROTECTION - N.T.& WASyo61. �'�',Cn a > - 4 2-: 2 p 27460 0 o�FSS 0NAL��'��\ FN10' 02/21/2018 2'-0" TYP. AS -BUILT REVISED PER CITY COMMENTS REVISED PER CLIENT REVISED PER CITY COMMENTS GNI sLVA6N MII SDMH RIM=473.32 (UNABLE TO OPEN) SDMH RIM=470.70 AyQ INV=466.45(12"N) INV=461.82 12"S) SDMH RIM=470.42 (UNABLE TO OPEN) L, 47� \ CALCULATED CENTER SECTION y� PER REC. NO. 20040723900002 & PLAT 229/034-042 SSMH RIM=470.84 INV=461.62(E,SW) (CENTER CHANNEL) SD C/O RIM=469.47 CB RIM=468.85 INV=467.04(12"NE) Tr6, e APPROXIMATE LOCATION OF STORM VAULT SDMH VAULT ACCESS RIM=464.16 A� A SDMH VAULT ACCESS RIM=462.97 APPROXIMATE LOCATION OF STORM VAULT Irk,, BOTTOM VAULT=452.6+/- LL oLd 0 '- SDMH w VAULT ACCESS RIM=459.93 A6, 0 EXISTING DRIVEWAY TO BE USED AS TEMP. CONSTRUCTION ENTRY SDMH RIM=459.06 INV=455.1 1(12"N)* INV=455.1 1 12"SE)* INV=455.1 1 12"S)* O CBSLL RIM=457.37 A INV=455.23 12"E) INV=455.23�12"N) Q c� N JOINTS IN FILTER FABRIC SHALL BE SPLICED AT POSTS. USE STAPLES, WIRE RINGS, OR EQUIVALENT TO ATTACH FABRIC TO POSTS. POST SPACING MAY BE INCREASER TO W IF WIRE BACKING 15 USED CB RIM=472.75 INV=468.31(12"N) SDMH INV=468.21 12"S) VAULT ACCESS RIM=469.55 CB SD C/O RIM=470.51 CBSLL RIM=469.53 INV=468.72(4"N) RIM=470.56 CB INV=467.85(12"SE) 479.21 INV=466.99 12"SW� NIM V=476.30(12"N) INV=466.9112"W) INV=476.27 12 E G �_ ✓i BOW 0 • CB SSMH RIM=483.30 RIM=479.20 INV=471.9(E,S,W) INV=476.54(12"S) (CENTER CHANNEL) REMOVE EXISTING STRUCTURES Y,�/�197J ;I KEYSTONE RET. WALL __,iSTING HOUSE °N° - 0 :ET. WALL 475.0+ - ' 13E 0 o SH \ o z Is 12"CPEP j �KEYSTON REMOVE EXISTING RET. WAL STRUCTURES 4 H GAZEBO ONLINE REMOVE S7 5' CHAIN x LINK FENCE REMOVE AC DRIVEWAY EXISTI GARAGE A I A FF=468.7+/- 4' WOOD PVC I AQ' m E� FENCE 7 12" CPEP 1 I I As8--- --- - -- - --- --- ® 88°00'38" E 199.0 - (S 88`19'30" E-BLA) m - AC DRIVEWAY TO BE REMOVED INSTALL FILTER SOCK \7 O 016, �01 5' BARBED 2S2' BY 14 Ga. WIRE OR EQUIVALENT, IF STANDARD STRENGTH FABRIC USED FILTER FABRIC BACKFILL TRENCH WITH NATIVE SOIL 2'X4" WOOD POSTS. STEEL FENCE POSTS, REBAR, OR EQUIVALENT NOTES 1. CONDITION OF USE 1.1. SILT FENCE MAY BE USED DOWNSLOPE OF ALL DISTURBED AREAS. 1.2. SILT FENCE IS NOT INTENDED TO TREAT CONCENTRATED FLOWS, NOR IS INTENDED TO TREAT SUBSTANTIAL AMOUNTS OF OVERLAND FLOW. ANY CONCENTRATED FLOW MOST BE CONVEYED THROUGH THE DRAINAGE SYSTEM TO A SEDIMENT TRAP OR POND. 2. DESIGN AND INSTALLATION SPECIFICATIONS 2.1. THE GEOTEXTILE USED MOST MET THE AVAILABLE ON SITE. STANDARD LISTED BELLOW. A COPY OF THE MANUFACTURER'S FABRIC SPECIFICATIONS MOST BE 3010051EVE SIZE (0.60.015MM)FOR SILT FILM A05 (ASTM D4751) SO10051EVE SIZE 030Q15NT4 FOR OTHER FABRICS WATER PERMITTIVITY ASTM D491 0.025EC^1 MINIMUM 180USS.MIN. FOR EMRASTRENGHFABRIC GRAB TENSILE STRENCHT(ASTM D4632) IW W5. MIN. FOR STANDARD 5TRENGHT FABRIC GRAB TENSILE ELONGATION ASTM D4632'30%MAX. ULTRAVIOLATE RESISTANCE ASTM D4355 70%MIN. 2.2. STANDARD STRENGTH FABRIC REQUIRES WIRE BACKING TO INCREASE THE STRENGTH OF THE FENCE. WIRE BACKING OR CLOSER POST SPACING MAY BE REQUIRED FOR EXTRA STRENGTH FABRIC IF FIELD PERFORMANCE WARRANTS A STRONGER FENCE. 2.3. WHERE THE FENCE IS INSTALLED, THE SLOPE SHALL NOT BE STEEPER THAN 211V 2.4. IF A TYPICAL SILT FENCE IS USED, THE STANDARD 4X4 TRENCH MAY NOT BE REDUCED AS LONG AS THE BOTTOM 8 INCHES OF THE SILT FENCE IS WELL BURIED AND SECURE IN A TRENCH THAT STABILIZES THE FENCE AND DOES NOT ALLOW WATER TO BYPASS OR UNDERMINE THE SILT FENCE. 3. MAINTENANCE STANDARDS 3.1. ANY DAMAGE SHALL BE REPAIR IMMEDIATELY. 3.2. IF CONCENTRATED FLOES ARE EVIDENT UPHILL OD THE FENCE, THEY MUST BE INTERCEPTED AND CONVEYED TO A SEDIMENT TRAP OR POND. 3.3. IT IS IMPORTANT TO CHECK THE UPHILL SIDE OF THE FENCE FOR SIGNS OF THE FENCE CLOGGING AND ACTING AS A BARRIER TO FLOW AND THEN CAUSING CHANNELIZATION OF FLOWS PARALLELTO THE FENCE. IF THIS OCCURS, REPLACE THE FENCE OR REMOVED THE TRAP SEDIMENT. 3.4. SEDIMENT MOST BE REMOVED WHEN SEDIMENT IS 6 INCHES HIGH. 3.5. IF THE FILTER FABRIC (GEOTEXTILE) HAS DETERIORATED DUE TO ULTRAVIOLET BREAKDOWN, IT SHALL BE REPLACED. PUBLIC WORKS SILT FENCE STD. PLAN - 214.00 DEPARTMENT p MARCH 2O08 SURVEYED: HANSEN SURVEYING SCALE: DLO 02/21/18 DESIGNED: D.L. OFFE, P.E. DLO 6/28/17 DLO 8/16/16 DR4WN` ONE INCH DLO 8/ 1 8/ 1 5 CHECKED: AT FULL SCALE IF NOT ONE INCH SCALE ACCORDINGLY BY DATE i APPR APPROVED: VERTICAL: NAVD 1988 HORIZONTAL: NAD 1983/1991 DATU M }(9 1 �� ra CBS INSTALL TREE PROTECTION FENCING (TYPICAL) CB RIM=481.35 INV=479.27 4" 5) INV=478.32 12"E) CROSS SECTIONS SEE SHEET 2 TYPICAL "`e0 \--",-6' WOOD FENCE FND IRC #38408 0.56' N & 0.38' E WET SEASON EROSION CONTROL MEASURES ARE APPLICABLE IN WET SEASON (OCT. 1st - APRIL 30th). SEE NOTES ON SHEET 3 NO SITE RUNOFF SHOULD GO TO ADJACENT PROPERTIES DURING CONSTRUCTION AND AFTER CONSTRUCTION DIRT QUANTITIES CUT EXCAVATION) 260 CU. YDS. FILL BACKFILL) 260 CU. YDS. CONSTRUCTION RECORD DRAWING THIS CONSTRUCTION REORD DRAWING IS A COPY OF A CAD FILE PREPARED BY OFFE ENGINEERS, PLLC AND HAS BEEN EDITED TO REFLECT FIELD VERIFIED INVERT AND RIM ELEVATIONS OF THE STORM, SANITARY AND WATER SYSTEM. FIELD VERIFIED INVERT AND RIM ELEVATIONS WERE PROVIDED BY 4 SITE SURVEYING, LLC ON JANUARY 25, 2018. THE ON -SITE PRIVATE STORM DRAINAGE AND PUBLIC/PRIVATE WATER AND SEWER SYSTEMS WERE INSTALLED IN ACCORDANCE WITH THE APPROVED PLANS AND THE DOCUMENTED FIELD REVISIONS AND FUNCTION AS INTENDED. CITY OF RENTON Planning/Building/Public Works Dept. GRAPHIC SCALE 0 15 30 60 inch = 30 feet RECORD DRAWINGS R-386803 IN COMPLIANCE WITH CITY OF RENTON STANDARDS MAIR SHORT PLAT ANDREW MICHAEL CONSTRUCTION, LLC EROSION CONTROL/TREE RETENTION PLAN 13606 156th AVENUE SE Ln 0 O L0 DATE: O 02/21/2018 T FIELDBOOK: '+^ PAGE: V J DRAWING NO: SHEET: OF: 3 8