HomeMy WebLinkAbout216.50PLAN VIEW
NOTES:
1. PLACE CURB TYPE SEDIMENT BARRIERS ON GENTLY SLOPING STREET
SEGMENTS, WHERE WATER CAN POND AND ALLOW SEDIMNENT TO
SEPARATE FROM RUNOFF.
2 SANDBAGS OF EITHER BURLAP OR WOVEN GEOTEXTILE FABRIC, ARE
FILLED WITH GRAVEL, LAYERED AND PACKED TIGHTLY.
LEAVE A ONE SANDBAG GAP IN THE TOP ROW TO PROVIDE A SPILLWAY
3. FOR OVERFLOW.
INSPECT BARRIERS AND REMOVE SEDIMENT AFTER EACH STORM EVENT.
4 SEDIMENT AND GRAVEL MUST BE REMOVED FROM THE TRAVELED WAY
IMMEDIATELY.
ti�Y STD. PLAN - 216.50
A & PUBLIC WORKS CURB AND GUTTER
DEPARTMENT BARRIER PROTECTION
MARCH 2008