Loading...
HomeMy WebLinkAbout216.50PLAN VIEW NOTES: 1. PLACE CURB TYPE SEDIMENT BARRIERS ON GENTLY SLOPING STREET SEGMENTS, WHERE WATER CAN POND AND ALLOW SEDIMNENT TO SEPARATE FROM RUNOFF. 2 SANDBAGS OF EITHER BURLAP OR WOVEN GEOTEXTILE FABRIC, ARE FILLED WITH GRAVEL, LAYERED AND PACKED TIGHTLY. LEAVE A ONE SANDBAG GAP IN THE TOP ROW TO PROVIDE A SPILLWAY 3. FOR OVERFLOW. INSPECT BARRIERS AND REMOVE SEDIMENT AFTER EACH STORM EVENT. 4 SEDIMENT AND GRAVEL MUST BE REMOVED FROM THE TRAVELED WAY IMMEDIATELY. ti�Y STD. PLAN - 216.50 A & PUBLIC WORKS CURB AND GUTTER DEPARTMENT BARRIER PROTECTION MARCH 2008