Loading...
HomeMy WebLinkAbout237.00removable watertight coupling or flange 2" min. I' 'I max. plate welded to elbow with orifice as specified ELBOW RESTRICTOR elevation per plans / 1' min. under pavement 16" max. 6" min. desiqn W.S. elbow restrictor, see detail pipe supports see Note 6 1.5 x D TT T min. dutlet pipe D � 1 see notes 1 & invert and elevation per plans welded restrictor plate with orifice diameter as specified (not needed if for spill control only) 2' min. c E v 12„ 12" o c E v 12„ SECTION A -A 2' min. clearance to any portion of frop-T including elbows NOTES: A 1. Use a mimimum of a 54" diameter type 2 catch basin. 2. Outlet Capacity: 100 -Year developed peak flow. 3. Metal Parts: Corrosion resistant. elbow restrictor Non -Galvanized parts perferred. see detail Galvanized pipe parts to have asphalt treatment 1. 4. Frame and ladder or steps offset so: A. Cleanout gate is visible from top. B. Climb -down space is clear of riser and cleanout gate. C. Frame is clear of curb. 5. If metal outlet pipe connects to cement concrete pipe: outlet pipe to have smooth O.D. equal to concrete pipe I.D. less 41'- 6. Provide at least one 3" X .090 gage support bracket anchored to concrete wall. (maximum T-0" vertical spacing) 7. Locate elbow restrictor(s) as necessary to provide minimum clearance as shown. S. Locate additional ladder rungs in structures used as access to tanks and vaults to allow access when catch basin is filled with water. angle as necessary see note 7 2' min. PLAN VIEW frame & solid cover marked "DRAIN" with locking bolts see note 3 vertical bar grate for secondary inlet handholds, steps or ladder inlet dipe shear gate with control rod for cleanout/drain (rod bent as required for vertical alignment with cover) additional ladder rungs (in sets) to allow access to tanks or vaults when catch is filled with water � +'Y Y + PUBLIC WORKS FLOW RESTRICTOR STD. PLAN - 237.00 DEPARTMENT OIL POLLUTION CONTROL TEE MARCH 2008