Loading...
HomeMy WebLinkAbout237.20Frame and round solid cover marked "DRAIN" with locking bolts. 0 6" min. weir shape as needed for performance NOTES: 0 We and 0 0 El crown outlet pipe flow SECTION B -B NTS ISOMETRIC NTS 1' min. under DESIGN W.S. I.E. weir, inlet We and drain = crown outlet pipe flow c E shear gate with (V control rod for 'iE drain. See A Locate additional ladder rungs (in sets) to allow / access to tanks or vaults l when sump is filled with water Outlet Capacity: 100 -year developed peak flow. Metal Parts: corrosion resistant steel parts galvanized and asphalt coated. Catch Basin: type 2 Min. 72" diameter to be constructed in accordance with AASHTO M-199 unless otherwise specified. Baffle Wall: to be designed with concrete reinforcing as required. Spill Control Requirements SECTION A -A NTS tbk� B '"I B PLAN VIEW NTS frame elevation per plans outlet pipe handholds, steps or ladder (2 places) A shear gate Locate horizontal for clearance with ladder. Attach rod to support bracket on inside of access opening � + Y � + PUBLIC WORKS FLOW RESTRICTOR STD. PLAN — 237.20 DEPARTMENT OIL POLLUTION CONTROL WEIR MARCH 2008