Loading...
HomeMy WebLinkAbout238.10outlet pipe A filter fabric top only riser for infiltration only for detention/infiltration see Standard Detail 235.00 optional parallel tank (\�\� access risers \ (max spacing 100-8) 1 outlet/overflow structure access risers PLAN VIEW NTS 50'50' max 100' max 50' maxmax 50' max T 1 I./—.O 0 oead0 st(oraoe 0 0 0 0 0 0 2' in. detention tank 1" holes as size as required required overflow structure min. 54" dia. type 2 C.B. 36" min. dia. (typ.) SECTION A -A NTS A washed rock bedding and backfill to top of tank, min. 2' beyond edges settling vault or type 2 C.B. if required inlet pipe (flow through) 2" min. diameter air vent pipe welded to tank (required if no access riser on tank) type 2 C.B. or settling vault if required —411— 4' min. washed rock bedding and backfill to top of tank NOTES: 1. All metal parts corrosion resistant. 2. Steel parts galvanized and asphalt coate(treatment 1 or better). 3. Filter fabric to be placed over washed rock backfill. 4. The proposed bottom shall be at least 3 feet above the seasonal high water level and have at least 3 feet of permeable soil beneath the bottom. I y STD. PLAN - 238.10 + + PUBLIC WORKS TYPICAL INFILTRATION TANK DEPARTMENT MARCH 2008