Loading...
HomeMy WebLinkAbout243.00< Y N MAINTENANCE ACCESS ROAD Y � (MODULAR GRID PAVEMENT \ POROUS PAVEMENT, ASPHALT, m '1 CONCRETE OR GRAVEL) FOR Z VEHICLE ACCESS 3 < ol, FLOW SPREADER MID-SWALE FLOW SPREADER J ,J , ROADWAY LENGTH DEPENDS ON (RECOMMENDED) T4, . 1�`J SWALE AREA (SEE NOTE) ,J, J, `J, „ ,J, BIOFILTRATION SWALE BOTTOM '41J, (MIN. SWALE LENGTH = 100 FT.) `J�,, J ,J 4 J, J,4 '4 NOTE: Longitudinal slope 1-6%. PLAN Provide underdrain for slopes < 1.5%. UNDERDRAIN FOR SLOPES < 1.5% SOIL AMENDED WITH COMPOST SWALE BOTTOM PERFORATED UNDERDRAIN PIPE CENTERED BENEATH SWALE 8' MINUS CLEAN DRAIN ROCK FILTER FABRIC NOTE: Underdrain must infilitrate or drain freely to an acceptable discharge point. SWALE DIVIDER FOR WIDTH >10 FT WATER QUALITY DESIGN DEPTH (Y) = 4" MAX. (2" FOR FREQUENTLY MOWED AREAS) Y+1 MIBOTTOM WIDTH = (B) X. = 16 FT+DIVIDER WID H MIN. =2FT TYPICAL SWALE SECTION 2" COMPOST TILLED INTO 6" NATIVE SOIL FILTER FABRIC WRAP OF TOP, SIDES AND BOTTOM 6" MIN. AMENDED SOIL O G 6, MIN. OVER PIPE PERFORATES PIPE UNDERDRAIN ao ^ CENTERED BENEATH SWALE ORIGINAL SOIL DETAIL A Gti� BIOFILTRATION SWALE SCHEMATIC Y STD. PLAN — 243.00 PUBLIC WORKS DEPARTMENT CROSS SECTION AND UNDERDRAIN ` DETAIL MARCH 2008