Loading...
HomeMy WebLinkAbout249.00ACCESS ROAD TO INLET STRUCTURE ACCESS RAMP TO BOTTOM OF FIRST WETPOOL CELL (7HA V) (SEE TEXT) FIRST WETPOOL CELL 25% TO 35% OF WETPOOL VOLUME, EXCLUDING ACCESS RAMP BERM TOP WIDTH 5' MIN. (IF EARTHEN) SECOND WETPOOL CELL EMERGENCY OVERFLOW WS EMERGENCY SPILLWAY PER DETENTION FACILITY REQUIREMENTS PLAN VIEW NTS NOTE: -� A INLET PIPE & CATCH BASIN PER DETENTION FACILITY REQUIREMENTS BERM OR BAFFLE AT DESIGN WS OR SUBMERGED 1' BELOW DESIGN W.S. EXTEND BERM ACROSS ENTIRE WETPOOL WIDTH. A PLANTINGS REQUIRED ON CUT SLOPES FOR LAKE PROTECTION FACILITIES MANHOLE & OUTLET PIPE SIZED TO PASS PEAK FLOW PER CONVEYANCE REQUIREMENTS OUTLET EROSION CONTROL & ENERGY DISSIPATION PER DETENTION FACILITY REQUIREMENTS 1. This detail is a schematic representation only. Actual configuration will vary depending on specific site constraints and applicable design criteria. 2. Access Road shall meet the following design criteria. 2.1. Maximum grade shall be 15 % for asphalt paving and 12 % for gravel or modular grid paving. 2.2. Outside turning radius shall be 40 feet, minimum. 2.3. Fence gates shall be located only on strafing section of road. 2.4. Access roads shall be 15 feet in width on curves and 12 feet n straight sections. 2.5. A paved apron shall be provided where access roads connect to paved public roadways. 3. All facilities shall be fenced. Fence shall be provided around facility allowing proper maintenance per standard details unless otherwise specified. 4. Wetponds with wetpool volumes less than or equal to 4,000 cubic feet may be single celled (i.e., no baffle or berm is required). G~�Y Grp STD. PLAN - 249.00 PUBLIC WORKS TYPICAL WETPOND ,A� DEPARTMENT MARCH 2008