Loading...
HomeMy WebLinkAbout252.00ACCESS ROAD TO INLET STRUCTURE ACCESS RAMP TO BOTTOM OF FIRST WETPOOL CELL (7HAV) (SEE TEXT) BERM TOP WIDTH 5' MIN. (IF EARTHEN) WQ DESIGN WS — DETENTION WS — OVERFLOW WS EMERGENCY OVERFLOW WS — PLANTINGS REQUIRED ON CUT SLOPES FOR LAKE tj PROTECTION FACILITIES —/II, d EMERGENCY SPILLWAY PER DETENTION FACILITY REQUIREMENTS width B I_1 A INLET PIPE & CATCH BASIN PER WETPOND FACILITY REQUIREMENTS FIRST WETPOOL CELL 25% TO 35% OF WETPOOL VOLUME, EXCLUDING ACCESS RAMP BERM OR BAFFLE AT WQ DESIGN WS OR SUBMERGED 1' BELOW WQ DESIGN WS EXTEND BERM ACROSS ENTIRE WETPOOL. SECOND WETPOOL CELL CONTROL MANHOLE & OUTLET PIPE SIZED PER DETENTION FACILITY REQUIREMENTS OUTLET EROSION CONTROL & ENERGY DISSIPATION PER DETENTION FACILITY REQUIREMENTS NOTE: Ito 1.This detail is a schematic representation only. Actual configuration O will vary depending on specific site constraints and applicable ° ACCESS ROAD TO design criteria. OUTLET STRUCTURE 2.Access Road shall meet the following design criteria. B 2.1. Maximum grade shall be 15 % for asphalt paving and 12 % for gravel or modular grid paving. 2.2. Outside turning radius shall be 40 feet, minimum. 2.3. Fence gates shall be located only on straight section of road. 2.4. Access roads shall be 15 feet in width on curves and 12 feet n straight sections. 2.5. A paved apron shall be provided where access roads connect to paved public roadways. 3. All facilities shall be fenced. Fence shall be provided around facility allowing proper maintenance per standard details unless otherwise specified. PUBLIC WORKS COMBINED DETENTION �NTo� DEPARTMENT AND WETPOND STD. PLAN 252.00 MARCH 2008