Loading...
HomeMy WebLinkAbout253.00SLOPE VEGETATION PER DETENTION FACILITY REQUIREMENTS ACCESS ROAD PER DETENTION FIRST CELL FACILITY REQUIREMENTS DEPTH 4' MIN. TO 8' MAX. 2' min. SUBMERGED INLET INLET EROSION CONTROL/ SLOPE PROTECTION PER DETENTION FACILITY REQUIREMENTS SEDIMENT STORAGE DEPTH = V MIN. cocTInu OUTLET STRUCTURE (SEE DETAIL FIGURE) 2.5 ft MAX. WQ DESIGN WS IF REQUIRED, PLACE LINER IN SECOND CELL TO HOLD WATER DETENTION PER DETENTION FACILITY REQUIREMENTS NOTE: 1.This detail is a schematic representation only. Actual configuration will vary depending on specific site constraints and applicable design criteria. 2.Access Road shall meet the following design criteria. 2.1. Maximum grade shall be 15 % for asphalt paving and 12 % for gravel or modular grid paving. 2.2. Outside turning radius shall be 40 feet, minimum. 2.3. Fence gates shall be located only on straingh section of road. 2.4. Access roads shall be 15 feet in width on curves and 12 feet n straight sections. 2.5. A paved apron shall be provided where access roads connect to paved public roadways. 3. All facilities shall be fenced. Fence shall be provided around facility allowing proper maintenance per standard details unless otherwise specified. I 'y STD. PLAN - 253.00 + + PUBLIC WORKS COMBINED DETENTION DEPARTMENT AND STORMWATER WETLAND MARCH 2008 ��NTo� SECTIONS