Loading...
HomeMy WebLinkAboutMAY CREEK - TESC Revised 2018-10-11 Signed by TO.pdfMAY CREEK TRESTLE TESCPLANC-22Department of Natural Resources andParks - Parks and Recreation DivisionCapital Planning and Development201 S. Jackson St, Suite 700Seattle, Washington 98104Tel (206) 296-4232 | Fax (206) 263-6217FILE #REVISIONCHECKEDDRAWNDATEPROJ #8/21/18JLRPD32499EERC - MAY CREEK / RIPLEY LANETRESTLE REHABILITATIONRENTON, WAKING COUNTY, WA, CONTRACT NO. C01234C18OF 1811241 Willows Road NE, Suite 200Redmond, WA 98052425.822.4446www.otak.comRHC ENGINEERINGWWW.RHCENGINEERING.COM720 3RD AVE SUITE 1607SEATTLE WA 98104PH:206.623.5984 SILT FENCE DETAIL SCALE: N.T.S.SEE CITY OF RENTON SURFACE WATER STD. DETAIL 214.00PROVIDE SILT FENCE IN ACCORDANCE WITH CITY OF RENTONSURFACE WATER STANDARD (SWS) DETAIL #214.00.PROVIDE STABILIZED CONSTRUCTION ENTRANCE INACCORDANCE WITH CITY OF RENTON SWS DETAIL #215.10.INSTALL AND MAINTAIN EROSION CONTROL MEASURES INACCORDANCE WITH CITY OF RENTON SWS DETAILS.THE CITY OF RENTON 2017 SURFACE WATER DESIGN MANUAL.AS DIRECTED BY THE CITY OF RENTON.OCT. 1ST - APRIL 30TH, NO SOILS SHALL BE EXPOSED MORE THAN TWO CONSECUTIVE WORKING DAYS. EXPOSED SOILS SHALL BE STABILIZED AT THE END OF THE WORKDAY, PRIOR TO THE WKND, HOLIDAY OR PREDICTED RAIN EVENT. WKLY MAINT. REPORT TO REQUIRE TO BE SUBMITTED TO CITY OF RENTON.WET SEASON EROSION AND CONTROL MEASURES SHALL BE APPLICABLEFROM OCT. 1 - APRIL 30.*WHERE APPROPRIATE SANDBAGS OR AN EQUIVALENTBARRIER SHALL BE CONSTRUCTED BETWEEN THE PROJECTAREA AND THE SURFACE WATER IN ORDER TO ISOLATE THECONSTRUCTION AREA FROM HIGH WATER THAT MIGHTRESULT DUE TO PERCIPITATION.*113171810/11/18CETO10/11/18