Loading...
HomeMy WebLinkAboutRS_Drainage_180601_v2.pdf. Solera Subdivision Drainage Report October 2018 Solera Subdivision i Drainage Report October 2018 Prepared for: Quadrant Homes 15900 SE. Eastgate Way, Suite 300 Bellevue, WA 98008 Prepared by: Jeremy Febus, PE, LEED AP KPFF Consulting Engineers 1601 Fifth Avenue, Suite 1600 Seattle, WA 98101 (206) 622-5822 KPFF Project No. 117659 KPFF Consulting Engineers ii This Page Intentionally Left Blank Solera Subdivision iii Table of Contents 1. Project Overview .......................................................................................................... 1 2. Existing Conditions ....................................................................................................... 2 3. Conditions and Requirements Summary .......................................................................... 3 Core Requirement No. 1: Discharge at The natural Location ...................................................... 3 Core Requirement No. 2: Offsite Analysis .................................................................................. 3 Core Requirement No. 3: Flow Control ....................................................................................... 3 Core Requirement No. 4: Conveyance System ........................................................................... 3 Core Requirement No. 5: Construction Stormwater Pollution prevention .................................. 3 Core Requirement No. 6: Maintenance and Operations ............................................................. 3 Core Requirement No. 7: Financial Guarantees and Liability ....................................................... 3 Core Requirement No. 8: water quality ...................................................................................... 3 Core Requirement No. 9: On-Site BMPS .................................................................................... 4 special requirement No. 1: Other Adopted Area-Specific Requirements ..................................... 4 special requirement No. 2: Flood Hazard Area Delineation ......................................................... 4 special requirement No. 3: Flood Protection Facilities ................................................................. 4 special requirement No. 4: Source Control .................................................................................. 4 special requirement No. 5: oil control .......................................................................................... 4 special requirement No. 6: aquifer protection areas .................................................................... 4 4. Off-Site Analysis ........................................................................................................... 5 3.1 upstream analysis .................................................................................................................. 5 3.2 Downstream analysis ............................................................................................................ 5 5. Flow Control Analysis and Design ................................................................................... 7 6. Water Quality Analysis and Design ................................................................................. 9 6.1 Water Quality Requirement .................................................................................................. 9 6.2 On-site BMP Requirement .................................................................................................. 10 7. Conveyance System Analysis and Design ...................................................................... 10 8. Esc Analysis and Design .............................................................................................. 10 9. Special Reports and Studies ......................................................................................... 11 10. Bond Quantities and Declaration of Covenant ............................................................... 11 KPFF Consulting Engineers iv List of Figures Figure 1-1: Site Map .................................................................................................................................. 1 Figure 1-2: Site Topography ...................................................................................................................... 2 Figure 4-1: Predeveloped Areas ................................................................................................................ 7 Figure 4-2: Developed Areas ..................................................................................................................... 8 Figure 5-1: Surface Runoff Basins .............................................................................................................. 9 List of Tables Table 4-1: MGS Flood Peak Flow Rate Results ........................................................................................... 8 Appendices Appendix A Existing Conditions Site Map Proposed Conditions Site Plan Appendix B Flow Control Applications Map MGS Flood Peak Flow Report MGS Flood Bioretention Report Appendix C Geotechnical Report Infiltration Test Report Drainage Report – Solera Unit Lot Subdivision Appendix A 1. Project Overview The Solera Subdivision is a proposed residential and mixed use development at the northern corner of NE 10th Ave and Sunset Blvd in Renton, Washington. The project consists of 151 for-sale town home units, approximately 521 apartment units and roughly 39,000 sq ft of non-residential or commercial space. The project consists of 6 existing parcels which will be subdivided into 7 parcels including realignment and dedication of a portion of Jefferson Avenue NE ROW totaling 11.8 acres (Figure 1-1). The realigned and expanded public right-of-ways will bisect the site connecting NE 12th Street to NE 10th Street and Harrington Place to NE Sunset Boulevard. Additional frontage ROW dedications will be provides as well. Figure 1-1: Site Map SITE KPFF Consulting Engineers 2 2. Existing Conditions The site is substantially developed and paved in its existing condition. The current use, the Greater Hi-Lands Shopping Center and its accompanying surface parking lot occupy the majority of the site. A 1.1 acre parcel, in the southwest corner of the site, is undeveloped - consisting of lawn and gravel. The majority of the site slopes to the southwest at grades of 2-5%. The northern extent of the project site, near the existing US Bank building, slopes toward NE 12th St at grades of 2-5%. See Figure 2-1 for an overview of site topography. Figure 1-2: Site Topography Drainage Report – Solera Unit Lot Subdivision Appendix A 3. Conditions and Requirements Summary In compliance to the City of Renton city code, proposed development shall be in accordance with a city amended version of the 2016 King County Surface Water Manual City titled The Renton Surface Water Manual (RSWM). CORE REQUIREMENT NO. 1: DISCHARGE AT THE NATURAL L OCATION The project proposes to connect to existing public stormwater conveyance systems in NE 10th St and NE 12th St. These storm drains converge within ¼ mile downstream. CORE REQUIREMENT NO. 2: OFFSITE ANALYSIS An offsite analysis has been conducted, see Section 3. CORE REQUIREMENT NO. 3: FLOW CONTROL According to the Flow Control Application Map, from the RSWM the development is required to meet the Peak Rate Flow Control Standard – Match Existing. Developed flows must match 2, 10 and 100-yr peak flows which existed on site prior to May 1979. Existing improvements on the site were built in phases over a range of years from 1958 to 1977, and so for the purposes of this analysis, “existing conditions” are defined as the current land use. CORE REQUIREMENT NO. 4: CONVEYANCE SYSTEM Proposed conveyance system elements, both onsite and offsite, shall be analyzed, designed and constructed according to RSWM requirements. Conveyance system calculations will be provided during construction document permitting following entitlement. CORE REQUIREMENT NO. 5: CONSTRUCTION STORMWATER PO LLUTION PREVENTION Erosion and Sediment Control measures and Stormwater Pollution Prevention and Spill Control measures will be applied through a Construction Stormwater Pollution Prevention (CSWPP) plan to be prepared during construction permitting. CORE REQUIREMENT NO. 6: MAINTENANCE AND OPERATIONS Operation and Maintenance measures for stormwater infrastructure will be provided prior to Final Plat Submittal. CORE REQUIREMENT NO. 7: FINANCIAL GUARANTEES AND LI ABILITY Bond quantities for the City of Renton will be provided prior to construction permitting. CORE REQUIREMENT NO. 8: WATER QUALITY The project is required to apply Enhanced Basic WQ treatment due to the Commercial and multifamily land uses. To achieve this bioretention facilities have been proposed throughout the site, See Section 5 for a more detailed analysis. KPFF Consulting Engineers 4 CORE REQUIREMENT NO. 9: ON-SITE BMPS The project is satisfying the on-site BMP requirement by demonstrating compliance with the LID Performance Standard as described in Section 1.2.9.1.B in the RSWM. The LID Performance standard is being achieved through the use of bioretention facilities dispersed throughout the development. See Section 6 for a more detailed analysis. SPECIAL REQUIREMENT NO. 1: OTHER ADOPTED AREA-SPECI FIC REQUIREMENTS This project is within the Sunset Area Surface Water Master Plan (CH2M HILL, 2011) which requires the developer to install an 8 ft wide bioretention facility along the south side of NE 12th St. SPECIAL REQUIREMENT NO. 2: FLOOD HAZARD AREA DELINE ATION This project is not located in a flood hazard area. SPECIAL REQUIREMENT NO. 3: FLOOD PROTECTION FACILIT IES This project does not modify or use a flood protection facility. SPECIAL REQUIREMENT NO. 4: SOURCE CONTROL Source control requirements apply to projects proposing a commercial building or which require a Commercial Site Development permit. The commercial development will apply the appropriate BMP’s required during building permits. SPECIAL REQUIREMENT NO. 5: OIL CONTROL The project does not classify as a high use site and is thus exempt from the Special Requirement #5. SPECIAL REQUIREMENT NO. 6: AQUIFER PROTECTION AREAS The project is within wellhead protection zone 2. However, the project is not proposing any of the drainage facilities mentioned in Section 1.3.6 of the RSWM and thus special requirement No. 6 is not applicable. Drainage Report – Solera Unit Lot Subdivision Appendix A 4. Off-Site Analysis 3.1 UPSTREAM ANALYSIS The site is on a ridgeline. There are no upstream basins that drain onto the project site. 3.2 DOWNSTREAM ANALYSIS Approximately 90% of the existing development drains to the southwest, where it is collected in the public conveyance systems within NE 10th St. The Sunset Neighborhood park, directly across NE 10th St, has sized their bioretention cells to accommodate 0.77 acres of the flow from our site, while the rest of this runoff is conveyed west along 10th St toward Sunset Blvd. The remaining approximately 10% of existing runoff flows, to the north, where it discharges to the public stormwater conveyance system within NE 12th St. Flow from all of three of these discharge locations converge within ¼ mile downstream. The downstream path for this site’s runoff is contained within a piped public conveyance system. Approximately 1 mile downstream, the piped system crosses under Interstate 405 and outfalls into a series of wetlands. Runoff flows through the wetlands until it reaches a creek which flows to Lake Washington. The Sunset Area Storm Water Master Plan notes that there are no known capacity issues in the drainage system downstream of our site. KPFF Consulting Engineers 6 Figure 3-1: 1-Mile Downstream Flow Path Drainage Report – Solera Unit Lot Subdivision Appendix A 5. Flow Control Analysis and Design According to the Flow Control Application Map the project falls within the Peak Flow Control Standard (Existing Site conditions) Region (see Appendix B). This standard states that the 2, 10 and 100 yr peak flows for developed conditions must be less than peak flows that existed on site prior to May 1979. The King County Assessor’s Reports indicate that the latest improvements to the developed parcels were made in 1977. Street frontages being improved (Sunset Blvd, Harrington Pl, Kirkland Avenue NE, and NE 12th St) were all assumed to their current condition prior to the on-site parcels. See Figures 4-1 and 4-2 for a comparison of impervious and pervious surfaces in the existing and developed conditions. For this reason existing surveyed conditions were modeled as existing conditions in this analysis. Figure 5-1: Predeveloped Areas KPFF Consulting Engineers 8 Figure 5-2: Developed Areas Table 5-1: MGS Flood Peak Flow Rate Results The proposed improvements to the site will create more pervious surface than existed in May 1979. As a result, without the implementation of any flow control measures, te developed peak flows are less than predeveloped peak flows in the 2, 10 and 100yr condition – complying with Core Requirement #3. Predeveloped Peak Flows Developed Peak Flows 2 yr 4.35 cfs 3.92 cfs 10 yr 6.42 cfs 5.90 cfs 100 yr 11.34 cfs 10.64 cfs Drainage Report – Solera Unit Lot Subdivision Appendix A 6. Water Quality Analysis and LID Performance Standard Design The project is proposing to construct infiltrating bioretention cells to satisfy both Core Requirement No. 8 Water Quality and Core Requirement No. 9 On-site BMPs. 6.1 WATER QUALITY REQUIREMENT Over 50% of the developed site will be commercial and multifamily land use. According to the RSWM this triggers the need for Enhanced Basic Water Quality treatment. The treatment goal of Enhanced Basic Water Requirement can be achieved by treating targeted surface runoff with bioretention (Enhanced Basic Option 4, 6.1.2 RSWM). The project site has been subdivided into 67 sub-basins (Figure 5-1) Figure 5-1: Surface Runoff Basins The grading approach in each of these sub-basins is such that runoff will sheet flow from new PGIS and drain through a curb cut into a bioretention facility. Runoff will be treated in the bioretention cells and infiltrate into native soils. Additionally, the surface runoff from street frontage improvements will be treated using bioretention cells (basins 47-56). Bioretention facilities have been sized using MGS Flood methodology to treat 91% of runoff entering the cell. An infiltration rate of 6 in/hr was used for the amended soil and an infiltration rate of 0.7 in/hr was used for the underlying native soils consistent with infiltration test results completed by Earth Solutions Northwest LLC (report in Appendix C). It should be noted that the 0.7 in/hr is a conservative infiltration rate. Rates ranging from 2 in/hr – 20 in/hr were tested on site, but the lowest rate was used along with a correction factor to. The MGS Flood Report demonstrating compliance is located in Appendix B. KPFF Consulting Engineers 10 6.2 ON-SITE BMP REQUIREMENT According to section 1.2.9 of the RWSM, Core Requirement #9 can be satisfied by, 1) application of BMPs to the maximum extent feasible 2) or by using a continuous runoff model to demonstrate compliance with the Low Impact Development (LID) Performance Standard. This development has opted to use the LID performance Standard. In order to comply with this standard, “Stormwater discharges shall match developed discharge durations to pre-developed durations for the range of pre-developed discharge rates from 8% of the 2-year peak flow to 50% of the 2-yr peak flows.” The pre- developed condition is modeled as forested in this approach. The development has proposed to meet this requirement primarily through bioretention cells distributed throughout the site. Using the same basins, bioretention areas and infiltration rates as for Water Quality in section 6.1, duration flows, for each basin, were modeled using MGS flood methodology. Each individual basin’s duration flows were found to be compliant with the aforementioned LID standards. Overflow from each basin will tight line to the public conveyance system. The bioretention cell network functions in parallel not in series, and all site discharge converges within 0.25 miles downstream; therefore the area inputs and bioretention areas for each basin were summed to develop a single basin and single a point of compliance for the purposes of demonstrating satisfaction of the on-site BMP requirement. A single site basin flowing to a single bioretention cell was modeled and demonstrated to be compliant with LID and Water Quality standards for the site as a whole. Each individual basin’s MGS Flood Reports as well as the composite MGS Flood report is provided in Appendix B. 6.3 ON-SITE BMP MIXED USE LOTS Mixed-use lots will use a combination of green-roof and ground level bio-retention planters to achieve 100% of the LID performance standard. Meeting this requirement strictly through the use of bio-retention planters would require approximately 2,900 square feet and 2,200 Square feet of planter area on mixed Use Parcel A and B respectively. The preliminary drainage plan demonstrates that area in excess of this amount is available adjacent to the building structures. The mixed use parcels areas were included in the basin representing the entire site described in Section 6.2. The actual BMP sizing and placement will be refined and fully documented through individual site plan entitlements for each mixed-use parcel. 7. Conveyance System Analysis and Design No existing capacity issues are known within the downstream conveyance system. A detailed analysis will be performed for the projects receiving conveyance system during construction document permitting. Proposed conveyance system elements, both onsite and offsite, shall be analyzed, designed and constructed according to RSWM requirements. Conveyance system calculations will be provided during construction document permitting following entitlement. 8. Esc Analysis and Design Erosion and Sediment Control measures and Stormwater Pollution Prevention and Spill Control measures will be applied through a Construction Stormwater Pollution Prevention (CSWPP) plan. Drainage Report – Solera Unit Lot Subdivision Appendix A 9. Special Reports and Studies The Sunset Area Surface water Master Plan (CH2M HILL, 2011) discusses the City of Renton’s surface water management program within the Sunset Area. The Master Plan requires this project to install an 8’ bioretention facility along the south side of NE 12th St. 10. Bond Quantities and Declaration of Covenant Bond quantities for the City of Renton will be provided prior to construction permitting. Drainage Report – Solera Unit Lot Subdivision Appendix A KPFF Consulting Engineers 12 Appendix A 1. Existing Conditions Site Map 2. Proposed Conditions Site Plan NE 1 2 TH S T R E E T (A D ED I CA T ED PUB L I C R IGH T O F WA Y ) HARRINGTON PLACE NE (A DEDICATED PUBLIC RIGHT OF W A Y )KIRKLAND AVENUE NE(A DEDICATED PUBLIC RIGHT OF WAY)NE SUNSET BOULEVARD (A DEDICATED PUBLIC RIGHT OF WAY) SUNSET LANE NE (A DEDICATED PUBLIC RIGHT OF WAY)NE 10TH STREET(A DEDICATED PUBLIC RIGHT OF WAY)SUNSET LANE NE (A DEDICATED PUBLIC RIGHT OF WAY) NE SUNSET BOULEVARD (A DEDICATED PUBLIC RIGHT OF WAY) PERVIOUS: 1.8 ACRES IMPERVIOUS = 10.8 ACRES SUNSET BLVD KIRKLAND AVE NENE 12TH ST HARRINGTON PL NE NE 10TH STEXISTING CONDITIONS 1601 5th Avenue, Suite 1600 Seattle, WA 98101 206.622.5822 www.kpff.com PERVIOUS: 3.17 ACRES IMPERVIOUS = 9.43 ACRES SUNSET BLVD KIRKLAND AVE NENE 12TH ST HARRINGTON PL NE NE 10TH STDEVELOPED CONDITIONS Drainage Report - Rose Hill Subdivision Appendix B Appendix B 1. Flow Control Applications Map 2. MGS Flood Peak Flow Report 3. MGS Flood Bioretention Report LakeDesire ShadyLake (MudLake) PantherLake LakeYoungs LakeWashington Bl a c kRi ver Gr eenRiv e r C edarRi verUV900 UV167 UV515 UV169 UV900 UV169 UV167BN IncBN IncBBNNIInnccSSEERReennttoonn II ssss aa qquuaahh RR dd RReennttoonnMMaappllee VVaalllleeyyRRdd MMaapplleeVVaalllleeyyHHwwyy 110088tthhAAvveeSSEESSWW SSuunnsseettBBllvvdd RRaaiinnii eerrAAvveeNNNE 3rd StNE 3rd St SW 43rd StSW 43rd St SS EE CCaarrrrRR dd NE 4th StNE 4th St SSEE RReennttoonn MMaappllee VVaalllleeyy RRddLLooggaannAAvveeNN SR 515SR 515PPaarrkkAAvveeNNOOaakkeessddaalleeAAvveeSSWWSSuunnsseettBBllvvddNN EE DDuuvvaallllAAvveeNNEEI-405 FWYI-405 FWY II--440055FFWWYYSR 167SR 167114400tthh WWaayySS EENNEE 2277tthh SStt 115566tthhAAvveeSSEEUUnniioonnAAvveeNNEE111166tthhAAvveeSSEESW 7th StSW 7th St N 8th StN 8th St PP uuggeettDDrrSSEE RR ee nnttoonnAAvvee SS SSWW 2277tthh SStt BBeennssoonnRRddSSWWiilllliiaammssAAvveeSSMMoonnrrooeeAAvveeNNEESE 128th StSE 128th St II nntt eerr uurr bbaannAAvveeSS HHooqquuiiaammAAvveeNNEE8844tthhAAvveeSSSSEEPPeett rr oovvii tt sskkyyRRddEEVVaalllleeyyHHwwyySE 192nd StSE 192nd St SE 60th StSE 60th St TTaallbboottRRddSSRRee nn tt oo nn AAvveeSS116644tthhAAvveeSSEESE 208th StSE 208th St SE 72nd StSE 72nd St RRaaiinniieerr AAvvee SS 111166tthhAAvveeSSEES 128th StS 128th St NNeewwccaassttllee WWaayy SS 221122tthh SStt SS 118800tthh SStt CCooaall CCrreeeekkPPkkwwyySSEESW 41st StSW 41st St 114400tthhAAvveeSSEE112288tthhAAvveeSSEE6688tthhAAvveeSSSSEE 116688tthh SStt NE 12th StNE 12th St BBee aa ccoonn AA vv ee SS FFoorreesstt DDrr SSEE SSEE 116644tthh SStt 114488tthhAAvveeSSEESSEE MMaayy VVaalllleeyy RRdd SS EE JJ oo nn ee ss RR dd SSEE 22 00 44 tthh WW aayySW 34th StSW 34th St SE 144th StSE 144th St 114488tthhAAvveeSSEE115544tthhPPllSSEELL aa kk ee WWaa sshhii nnggtt oonnBBll vvddNNEEddmmoonnddssAAvveeNNEEAAbbeerrddeeeennAAvveeNNEEEEMM eerrcceerrWWaayyWWeessttVVaalllleeyyHHwwyyEast Valley RdEast Valley Rd,§-405 ,§-405 ,§-405 µ0 1 2Miles Flow Control Application Map Reference 15-A Date: 01/09/2014 Flow Control Standards Peak Rate Flow Control Standard (Existing Site Conditions) Flow Control Duration Standard (Existing Site Conditions) Flow Control Duration Standard (Forested Conditions) Flood Problem Flow Unincorporated King County Flow Control Standards Renton City Limits Potential Annexation Area PROJECT SITE ————————————————————————————————— MGS FLOOD PROJECT REPORT Program Version: MGSFlood 4.43 Program License Number: 200410007 Project Simulation Performed on: 03/08/2018 7:02 PM Report Generation Date: 03/08/2018 7:04 PM ————————————————————————————————— Input File Name: Biroetnetion WQ V BMP.fld Project Name: Solera Subdivision Analysis Title: Bioretention WQvBMP Comments: ———————————————— PRECIPITATION INPUT ———————————————— Computational Time Step (Minutes): 15 Extended Precipitation Time Series Selected Climatic Region Number: 0 Full Period of Record Available used for Routing Precipitation Station : 95004005 Puget West 40 in_5min 10/01/1939-10/01/2097 Evaporation Station : 951040 Puget West 40 in MAP Evaporation Scale Factor : 0.750 HSPF Parameter Region Number: 1 HSPF Parameter Region Name : USGS Default ********** Default HSPF Parameters Used (Not Modified by User) *************** ********************** WATERSHED DEFINITION *********************** Predevelopment/Post Development Tributary Area Summary Predeveloped Post Developed Total Subbasin Area (acres) 0.100 0.100 Area of Links that Include Precip/Evap (acres) 0.000 0.001 Total (acres) 0.100 0.101 ----------------------SCENARIO: PREDEVELOPED Number of Subbasins: 1 ---------- Subbasin : Subbasin 1 ---------- -------Area (Acres) -------- Impervious 0.100 ---------------------------------------------- Subbasin Total 0.100 ----------------------SCENARIO: POSTDEVELOPED Number of Subbasins: 1 ---------- Subbasin : Subbasin 1 ---------- -------Area (Acres) -------- Impervious 0.100 ---------------------------------------------- Subbasin Total 0.100 ************************* LINK DATA ******************************* ----------------------SCENARIO: PREDEVELOPED Number of Links: 0 FLOW CONTROL ************************* LINK DATA ******************************* ----------------------SCENARIO: POSTDEVELOPED Number of Links: 1 ------------------------------------------ Link Name: New Bio Lnk1 Link Type: Bioretention Facility Downstream Link: None Base Elevation (ft) : 100.00 Riser Crest Elevation (ft) : 103.00 Storage Depth (ft) : 3.00 Bottom Length (ft) : 5.0 Bottom Width (ft) : 6.0 Side Slopes (ft/ft) : L1= 3.00 L2= 3.00 W1= 3.00 W2= 3.00 Bottom Area (sq-ft) : 30. Area at Riser Crest El (sq-ft) : 552. (acres) : 0.013 Volume at Riser Crest (cu-ft) : 717. (ac-ft) : 0.016 Infiltration on Bottom only Selected Soil Properties Biosoil Thickness (ft) : 1.00 Biosoil Saturated Hydraulic Conductivity (in/hr) : 2.00 Biosoil Porosity (Percent) : 20.00 Maximum Elevation of Bioretention Soil : 101.00 Native Soil Hydraulic Conductivity (in/hr) : 0.50 Underdrain Present Orifice NOT Present in Under Drain Riser Geometry Riser Structure Type : Circular Riser Diameter (in) : 6.00 Common Length (ft) : 0.000 Riser Crest Elevation : 103.00 ft Hydraulic Structure Geometry Number of Devices: 0 **********************FLOOD FREQUENCY AND DURATION STATISTICS******************* ----------------------SCENARIO: PREDEVELOPED Number of Subbasins: 1 Number of Links: 0 ----------------------SCENARIO: POSTDEVELOPED Number of Subbasins: 1 Number of Links: 1 ********** Link: New Bio Lnk1 ********** Link WSEL Stats WSEL Frequency Data(ft) (Recurrence Interval Computed Using Gringorten Plotting Position) Tr (yrs) WSEL Peak (ft) ====================================== 1.05-Year 102.564 1.11-Year 102.778 1.25-Year 103.003 2.00-Year 103.023 3.33-Year 103.029 5-Year 103.034 10-Year 103.038 25-Year 103.046 50-Year 103.048 100-Year 103.049 ***********Groundwater Recharge Summary ************* Recharge is computed as input to Perlnd Groundwater Plus Infiltration in Structures Total Predeveloped Recharge During Simulation Model Element Recharge Amount (ac-ft) ----------------------------------------------------------------------------------------------- Subbasin: Subbasin 1 0.000 _____________________________________ Total: 0.000 Total Post Developed Recharge During Simulation Model Element Recharge Amount (ac-ft) ----------------------------------------------------------------------------------------------- Subbasin: Subbasin 1 0.000 Link: New Bio Lnk1 0.000 _____________________________________ Total: 0.000 Total Predevelopment Recharge Equals Post Developed Average Recharge Per Year, (Number of Years= 158) Predeveloped: 0.000 ac-ft/year, Post Developed: 0.000 ac-ft/year ***********Water Quality Facility Data ************* ----------------------SCENARIO: PREDEVELOPED Number of Links: 0 ----------------------SCENARIO: POSTDEVELOPED Number of Links: 1 ********** Link: New Bio Lnk1 ********** Infiltration/Filtration Statistics-------------------- Inflow Volume (ac-ft): 45.20 Inflow Volume Including PPT-Evap (ac-ft): 47.23 Total Runoff Infiltrated (ac-ft): 0.00, 0.00% Total Runoff Filtered (ac-ft): 43.78, 92.69% Primary Outflow To Downstream System (ac-ft): 47.18 Secondary Outflow To Downstream System (ac-ft): 0.00 Percent Treated (Infiltrated+Filtered)/Total Volume: 92.69% ***********Compliance Point Results ************* Scenario Predeveloped Compliance Subbasin: Subbasin 1 Scenario Postdeveloped Compliance Link: New Bio Lnk1 *** Point of Compliance Flow Frequency Data *** Recurrence Interval Computed Using Gringorten Plotting Position Predevelopment Runoff Postdevelopment Runoff Tr (Years) Discharge (cfs) Tr (Years) Discharge (cfs) ---------------------------------------------------------------------------------------------------------------------- 2-Year 3.814E-02 2-Year 1.928E-02 5-Year 4.963E-02 5-Year 3.534E-02 10-Year 5.581E-02 10-Year 4.216E-02 25-Year 6.500E-02 25-Year 5.376E-02 50-Year 8.392E-02 50-Year 5.666E-02 100-Year 9.771E-02 100-Year 5.929E-02 200-Year 0.101 200-Year 5.938E-02 ** Record too Short to Compute Peak Discharge for These Recurrence Intervals **** Flow Duration Performance **** Excursion at Predeveloped 50%Q2 (Must be Less Than or Equal to 0%): -71.9% PASS Maximum Excursion from 50%Q2 to Q2 (Must be Less Than or Equal to 0%): -58.0% PASS Maximum Excursion from Q2 to Q50 (Must be less than 10%): -57.2% PASS Percent Excursion from Q2 to Q50 (Must be less than 50%): 0.0% PASS ------------------------------------------------------------------------------------------------- MEETS ALL FLOW DURATION DESIGN CRITERIA: PASS ------------------------------------------------------------------------------------------------- **** LID Duration Performance **** Excursion at Predeveloped 8%Q2 (Must be Less Than 0%): -91.4% PASS Maximum Excursion from 8%Q2 to 50%Q2 (Must be Less Than 0%): -71.9% PASS ------------------------------------------------------------------------------------------------- MEETS ALL LID DURATION DESIGN CRITERIA: PASS ------------------------------------------------------------------------------------------------- Basin #Total Area (acres) Impervious Area (acres) Pervious Area (acres) Bioretention Bottom Area (SF) 1 0.295 0.188 0.107 350 2 0.132 0.106 0.026 189 3 0.137 0.091 0.046 168 4 0.088 0.072 0.016 126 5 0.176 0.142 0.034 253 6 0.111 0.073 0.038 133 7 0.110 0.095 0.015 171 8 0.218 0.186 0.032 325 9 0.132 0.077 0.055 150 10 0.110 0.096 0.014 180 11 0.222 0.196 0.026 300 12 0.111 0.059 0.052 140 13 0.102 0.070 0.032 140 14 0.102 0.070 0.032 140 15 0.164 0.119 0.045 225 16 0.152 0.107 0.045 200 17 0.153 0.122 0.031 225 18 0.156 0.093 0.063 180 19 0.149 0.111 0.038 200 20 0.161 0.125 0.036 220 21 0.146 0.110 0.036 220 22 0.054 0.034 0.020 220 23 0.075 0.056 0.018 100 24 0.136 0.100 0.035 180 25 0.152 0.097 0.056 200 26 0.158 0.122 0.036 225 27 0.148 0.110 0.038 200 28 0.161 0.105 0.055 196 29 0.165 0.140 0.025 250 30 0.240 0.165 0.075 300 31 0.227 0.173 0.054 361 32 0.218 0.204 3.000 361 33 0.134 0.072 0.062 165 34 0.053 0.038 0.015 70 35 0.076 0.064 0.012 120 36 0.077 0.054 0.023 105 37 0.104 0.088 0.016 160 38 0.285 0.216 0.069 385 39 0.070 0.054 0.016 99 40 0.055 0.042 0.013 80 41 0.078 0.041 0.037 100 42 0.056 0.038 0.018 80 43 0.101 0.078 0.022 162 44 0.102 0.081 0.021 162 45 0.221 0.184 0.037 310 46 0.138 0.106 0.032 190 47 0.238 0.193 0.046 341 48 0.103 0.088 0.015 154 49 0.140 0.088 0.052 190 50 0.148 0.101 0.047 200 51 0.099 0.055 0.044 130 52 0.143 0.099 0.044 130 53 0.222 0.148 0.074 300 54 0.083 0.050 0.034 110 55 0.298 0.189 0.109 390 56 0.079 0.066 0.013 120 57 0.079 0.031 0.048 80 58 0.218 0.175 0.043 310 59 0.233 0.156 0.077 310 60 0.139 0.080 0.059 170 61 0.132 0.075 0.056 150 62 0.064 0.023 0.042 60 63 0.064 0.034 0.030 70 64 0.046 0.020 0.025 45 65 0.039 0.022 0.017 45 66 0.048 0.026 0.022 35 67 0.051 0.030 0.021 35 Mixed Use A 2.038 1.528 0.510 2900 Mixed Use B 1.466 1.331 0.134 2365 Total 12.6 9.38 6.19 17656 ————————————————————————————————— MGS FLOOD PROJECT REPORT Program Version: MGSFlood 4.43 Program License Number: 200410007 Project Simulation Performed on: 10/10/2018 10:05 AM Report Generation Date: 10/10/2018 10:15 AM ————————————————————————————————— Input File Name: Whole Site.fld Project Name: Solera Analysis Title: BMP Performance Standard Comments: ———————————————— PRECIPITATION INPUT ———————————————— Computational Time Step (Minutes): 15 Extended Precipitation Time Series Selected Climatic Region Number: 0 Full Period of Record Available used for Routing Precipitation Station : 96004005 Puget East 40 in_5min 10/01/1939-10/01/2097 Evaporation Station : 961040 Puget East 40 in MAP Evaporation Scale Factor : 0.750 HSPF Parameter Region Number: 1 HSPF Parameter Region Name : USGS Default ********** Default HSPF Parameters Used (Not Modified by User) *************** ********************** WATERSHED DEFINITION *********************** Predevelopment/Post Development Tributary Area Summary Predeveloped Post Developed Total Subbasin Area (acres) 12.560 12.580 Area of Links that Include Precip/Evap (acres) 0.000 0.402 Total (acres) 12.560 12.982 ----------------------SCENARIO: PREDEVELOPED Number of Subbasins: 1 ---------- Subbasin : Subbasin 1 ---------- -------Area (Acres) -------- Till Forest 12.560 ---------------------------------------------- Subbasin Total 12.560 ----------------------SCENARIO: POSTDEVELOPED Number of Subbasins: 1 ---------- Subbasin : Whole Site ---------- -------Area (Acres) -------- Till Grass 3.200 Impervious 9.380 ---------------------------------------------- Subbasin Total 12.580 ************************* LINK DATA ******************************* ----------------------SCENARIO: PREDEVELOPED Number of Links: 0 ************************* LINK DATA ******************************* ----------------------SCENARIO: POSTDEVELOPED Number of Links: 1 ------------------------------------------ Link Name: Bioretention Link Type: Bioretention Facility Downstream Link: None Base Elevation (ft) : 100.00 Riser Crest Elevation (ft) : 100.50 Storage Depth (ft) : 0.50 Bottom Length (ft) : 175.0 Bottom Width (ft) : 100.0 Side Slopes (ft/ft) : L1= 0.00 L2= 0.00 W1= 0.00 W2= 0.00 Bottom Area (sq-ft) : 17500. Area at Riser Crest El (sq-ft) : 17,500. (acres) : 0.402 Volume at Riser Crest (cu-ft) : 16,625. (ac-ft) : 0.382 Infiltration on Bottom only Selected Soil Properties Biosoil Thickness (ft) : 1.50 Biosoil Saturated Hydraulic Conductivity (in/hr) : 6.00 Biosoil Porosity (Percent) : 30.00 Maximum Elevation of Bioretention Soil : 101.00 Native Soil Hydraulic Conductivity (in/hr) : 0.70 Riser Geometry Riser Structure Type : Circular Riser Diameter (in) : 6.00 Common Length (ft) : 0.000 Riser Crest Elevation : 100.50 ft Hydraulic Structure Geometry Number of Devices: 0 **********************FLOOD FREQUENCY AND DURATION STATISTICS******************* ----------------------SCENARIO: PREDEVELOPED Number of Subbasins: 1 Number of Links: 0 ----------------------SCENARIO: POSTDEVELOPED Number of Subbasins: 1 Number of Links: 1 ***********Groundwater Recharge Summary ************* Recharge is computed as input to Perlnd Groundwater Plus Infiltration in Structures Total Predeveloped Recharge During Simulation Model Element Recharge Amount (ac-ft) ----------------------------------------------------------------------------------------------- Subbasin: Subbasin 1 2165.708 _____________________________________ Total: 2165.708 Total Post Developed Recharge During Simulation Model Element Recharge Amount (ac-ft) ----------------------------------------------------------------------------------------------- Subbasin: Whole Site 391.074 Link: Bioretention 4661.303 _____________________________________ Total: 5052.377 Total Predevelopment Recharge is Less than Post Developed Average Recharge Per Year, (Number of Years= 158) Predeveloped: 13.707 ac-ft/year, Post Developed: 31.977 ac-ft/year ***********Water Quality Facility Data ************* ----------------------SCENARIO: PREDEVELOPED Number of Links: 0 ----------------------SCENARIO: POSTDEVELOPED Number of Links: 1 ********** Link: Bioretention ********** Infiltration/Filtration Statistics-------------------- Inflow Volume (ac-ft): 4849.04 Inflow Volume Including PPT-Evap (ac-ft): 5013.09 Total Runoff Infiltrated (ac-ft): 4661.30, 92.98% Total Runoff Filtered (ac-ft): 0.00, 0.00% Primary Outflow To Downstream System (ac-ft): 347.79 Secondary Outflow To Downstream System (ac-ft): 0.00 Percent Treated (Infiltrated+Filtered)/Total Volume: 92.98% ***********Compliance Point Results ************* Scenario Predeveloped Compliance Subbasin: Subbasin 1 Scenario Postdeveloped Compliance Link: Bioretention *** Point of Compliance Flow Frequency Data *** Recurrence Interval Computed Using Gringorten Plotting Position Predevelopment Runoff Postdevelopment Runoff Tr (Years) Discharge (cfs) Tr (Years) Discharge (cfs) ---------------------------------------------------------------------------------------------------------------------- 2-Year 0.268 2-Year 0.685 5-Year 0.436 5-Year 0.901 10-Year 0.588 10-Year 1.050 25-Year 0.745 25-Year 1.198 50-Year 0.951 50-Year 1.347 100-Year 1.031 100-Year 1.385 200-Year 1.604 200-Year 1.416 ** Record too Short to Compute Peak Discharge for These Recurrence Intervals **** LID Duration Performance **** Excursion at Predeveloped 8%Q2 (Must be Less Than 0%): -92.3% PASS Maximum Excursion from 8%Q2 to 50%Q2 (Must be Less Than 0%): -39.0% PASS ------------------------------------------------------------------------------------------------- MEETS ALL LID DURATION DESIGN CRITERIA: PASS ------------------------------------------------------------------------------------------------- ————————————————————————————————— MGS FLOOD PROJECT REPORT Program Version: MGSFlood 4.43 Program License Number: 200410007 Project Simulation Performed on: 09/28/2018 9:45 AM Report Generation Date: 09/28/2018 9:46 AM ————————————————————————————————— Input File Name: Basin 1.fld Project Name: Solera Analysis Title: BMP Performance Standard Comments: ———————————————— PRECIPITATION INPUT ———————————————— Computational Time Step (Minutes): 15 Extended Precipitation Time Series Selected Climatic Region Number: 0 Full Period of Record Available used for Routing Precipitation Station : 96004005 Puget East 40 in_5min 10/01/1939-10/01/2097 Evaporation Station : 961040 Puget East 40 in MAP Evaporation Scale Factor : 0.750 HSPF Parameter Region Number: 1 HSPF Parameter Region Name : USGS Default ********** Default HSPF Parameters Used (Not Modified by User) *************** ********************** WATERSHED DEFINITION *********************** Predevelopment/Post Development Tributary Area Summary Predeveloped Post Developed Total Subbasin Area (acres) 0.295 0.295 Area of Links that Include Precip/Evap (acres) 0.000 0.008 Total (acres) 0.295 0.303 ----------------------SCENARIO: PREDEVELOPED Number of Subbasins: 1 ---------- Subbasin : Subbasin 1 ---------- -------Area (Acres) -------- Till Forest 0.295 ---------------------------------------------- Subbasin Total 0.295 ----------------------SCENARIO: POSTDEVELOPED Number of Subbasins: 1 ---------- Subbasin : Developed ---------- -------Area (Acres) -------- Till Grass 0.107 Impervious 0.188 ---------------------------------------------- Subbasin Total 0.295 ************************* LINK DATA ******************************* ----------------------SCENARIO: PREDEVELOPED Number of Links: 0 ************************* LINK DATA ******************************* ----------------------SCENARIO: POSTDEVELOPED Number of Links: 1 ------------------------------------------ Link Name: Bioretention Link Type: Bioretention Facility Downstream Link: None Base Elevation (ft) : 100.00 Riser Crest Elevation (ft) : 100.50 Storage Depth (ft) : 0.50 Bottom Length (ft) : 25.0 Bottom Width (ft) : 14.0 Side Slopes (ft/ft) : L1= 0.00 L2= 0.00 W1= 0.00 W2= 0.00 Bottom Area (sq-ft) : 350. Area at Riser Crest El (sq-ft) : 350. (acres) : 0.008 Volume at Riser Crest (cu-ft) : 333. (ac-ft) : 0.008 Infiltration on Bottom only Selected Soil Properties Biosoil Thickness (ft) : 1.50 Biosoil Saturated Hydraulic Conductivity (in/hr) : 6.00 Biosoil Porosity (Percent) : 30.00 Maximum Elevation of Bioretention Soil : 101.00 Native Soil Hydraulic Conductivity (in/hr) : 1.00 Riser Geometry Riser Structure Type : Circular Riser Diameter (in) : 6.00 Common Length (ft) : 0.000 Riser Crest Elevation : 100.50 ft Hydraulic Structure Geometry Number of Devices: 0 **********************FLOOD FREQUENCY AND DURATION STATISTICS******************* ----------------------SCENARIO: PREDEVELOPED Number of Subbasins: 1 Number of Links: 0 ----------------------SCENARIO: POSTDEVELOPED Number of Subbasins: 1 Number of Links: 1 ***********Groundwater Recharge Summary ************* Recharge is computed as input to Perlnd Groundwater Plus Infiltration in Structures Total Predeveloped Recharge During Simulation Model Element Recharge Amount (ac-ft) ----------------------------------------------------------------------------------------------- Subbasin: Subbasin 1 50.867 _____________________________________ Total: 50.867 Total Post Developed Recharge During Simulation Model Element Recharge Amount (ac-ft) ----------------------------------------------------------------------------------------------- Subbasin: Developed 13.077 Link: Bioretention 103.745 _____________________________________ Total: 116.821 Total Predevelopment Recharge is Less than Post Developed Average Recharge Per Year, (Number of Years= 158) Predeveloped: 0.322 ac-ft/year, Post Developed: 0.739 ac-ft/year ***********Water Quality Facility Data ************* ----------------------SCENARIO: PREDEVELOPED Number of Links: 0 ----------------------SCENARIO: POSTDEVELOPED Number of Links: 1 ********** Link: Bioretention ********** Infiltration/Filtration Statistics-------------------- Inflow Volume (ac-ft): 105.81 Inflow Volume Including PPT-Evap (ac-ft): 109.04 Total Runoff Infiltrated (ac-ft): 103.74, 95.14% Total Runoff Filtered (ac-ft): 0.00, 0.00% Primary Outflow To Downstream System (ac-ft): 5.30 Secondary Outflow To Downstream System (ac-ft): 0.00 Percent Treated (Infiltrated+Filtered)/Total Volume: 95.14% ***********Compliance Point Results ************* Scenario Predeveloped Compliance Subbasin: Subbasin 1 Scenario Postdeveloped Compliance Link: Bioretention *** Point of Compliance Flow Frequency Data *** Recurrence Interval Computed Using Gringorten Plotting Position Predevelopment Runoff Postdevelopment Runoff Tr (Years) Discharge (cfs) Tr (Years) Discharge (cfs) ---------------------------------------------------------------------------------------------------------------------- 2-Year 6.286E-03 2-Year 4.705E-02 5-Year 1.025E-02 5-Year 7.587E-02 10-Year 1.380E-02 10-Year 9.407E-02 25-Year 1.750E-02 25-Year 0.120 50-Year 2.234E-02 50-Year 0.146 100-Year 2.421E-02 100-Year 0.169 200-Year 3.768E-02 200-Year 0.182 ** Record too Short to Compute Peak Discharge for These Recurrence Intervals **** LID Duration Performance **** Excursion at Predeveloped 8%Q2 (Must be Less Than 0%): -96.8% PASS Maximum Excursion from 8%Q2 to 50%Q2 (Must be Less Than 0%): -72.5% PASS ------------------------------------------------------------------------------------------------- MEETS ALL LID DURATION DESIGN CRITERIA: PASS ------------------------------------------------------------------------------------------------- ————————————————————————————————— MGS FLOOD PROJECT REPORT Program Version: MGSFlood 4.43 Program License Number: 200410007 Project Simulation Performed on: 09/28/2018 10:05 AM Report Generation Date: 09/28/2018 10:11 AM ————————————————————————————————— Input File Name: Basin 2.fld Project Name: Solera Analysis Title: BMP Performance Standard Comments: ———————————————— PRECIPITATION INPUT ———————————————— Computational Time Step (Minutes): 15 Extended Precipitation Time Series Selected Climatic Region Number: 0 Full Period of Record Available used for Routing Precipitation Station : 96004005 Puget East 40 in_5min 10/01/1939-10/01/2097 Evaporation Station : 961040 Puget East 40 in MAP Evaporation Scale Factor : 0.750 HSPF Parameter Region Number: 1 HSPF Parameter Region Name : USGS Default ********** Default HSPF Parameters Used (Not Modified by User) *************** ********************** WATERSHED DEFINITION *********************** Predevelopment/Post Development Tributary Area Summary Predeveloped Post Developed Total Subbasin Area (acres) 0.132 0.128 Area of Links that Include Precip/Evap (acres) 0.000 0.004 Total (acres) 0.132 0.132 ----------------------SCENARIO: PREDEVELOPED Number of Subbasins: 1 ---------- Subbasin : Subbasin 1 ---------- -------Area (Acres) -------- Till Forest 0.132 ---------------------------------------------- Subbasin Total 0.132 ----------------------SCENARIO: POSTDEVELOPED Number of Subbasins: 1 ---------- Subbasin : Developed ---------- -------Area (Acres) -------- Till Grass 0.022 Impervious 0.106 ---------------------------------------------- Subbasin Total 0.128 ************************* LINK DATA ******************************* ----------------------SCENARIO: PREDEVELOPED Number of Links: 0 ************************* LINK DATA ******************************* ----------------------SCENARIO: POSTDEVELOPED Number of Links: 1 ------------------------------------------ Link Name: Bioretention Link Type: Bioretention Facility Downstream Link: None Base Elevation (ft) : 100.00 Riser Crest Elevation (ft) : 100.50 Storage Depth (ft) : 0.50 Bottom Length (ft) : 21.0 Bottom Width (ft) : 9.0 Side Slopes (ft/ft) : L1= 0.00 L2= 0.00 W1= 0.00 W2= 0.00 Bottom Area (sq-ft) : 189. Area at Riser Crest El (sq-ft) : 189. (acres) : 0.004 Volume at Riser Crest (cu-ft) : 180. (ac-ft) : 0.004 Infiltration on Bottom only Selected Soil Properties Biosoil Thickness (ft) : 1.50 Biosoil Saturated Hydraulic Conductivity (in/hr) : 6.00 Biosoil Porosity (Percent) : 30.00 Maximum Elevation of Bioretention Soil : 101.00 Native Soil Hydraulic Conductivity (in/hr) : 1.00 Riser Geometry Riser Structure Type : Circular Riser Diameter (in) : 6.00 Common Length (ft) : 0.000 Riser Crest Elevation : 100.50 ft Hydraulic Structure Geometry Number of Devices: 0 **********************FLOOD FREQUENCY AND DURATION STATISTICS******************* ----------------------SCENARIO: PREDEVELOPED Number of Subbasins: 1 Number of Links: 0 ----------------------SCENARIO: POSTDEVELOPED Number of Subbasins: 1 Number of Links: 1 ***********Groundwater Recharge Summary ************* Recharge is computed as input to Perlnd Groundwater Plus Infiltration in Structures Total Predeveloped Recharge During Simulation Model Element Recharge Amount (ac-ft) ----------------------------------------------------------------------------------------------- Subbasin: Subbasin 1 22.761 _____________________________________ Total: 22.761 Total Post Developed Recharge During Simulation Model Element Recharge Amount (ac-ft) ----------------------------------------------------------------------------------------------- Subbasin: Developed 2.689 Link: Bioretention 51.187 _____________________________________ Total: 53.876 Total Predevelopment Recharge is Less than Post Developed Average Recharge Per Year, (Number of Years= 158) Predeveloped: 0.144 ac-ft/year, Post Developed: 0.341 ac-ft/year ***********Water Quality Facility Data ************* ----------------------SCENARIO: PREDEVELOPED Number of Links: 0 ----------------------SCENARIO: POSTDEVELOPED Number of Links: 1 ********** Link: Bioretention ********** Infiltration/Filtration Statistics-------------------- Inflow Volume (ac-ft): 51.95 Inflow Volume Including PPT-Evap (ac-ft): 53.74 Total Runoff Infiltrated (ac-ft): 51.19, 95.25% Total Runoff Filtered (ac-ft): 0.00, 0.00% Primary Outflow To Downstream System (ac-ft): 2.57 Secondary Outflow To Downstream System (ac-ft): 0.00 Percent Treated (Infiltrated+Filtered)/Total Volume: 95.25% ***********Compliance Point Results ************* Scenario Predeveloped Compliance Subbasin: Subbasin 1 Scenario Postdeveloped Compliance Link: Bioretention *** Point of Compliance Flow Frequency Data *** Recurrence Interval Computed Using Gringorten Plotting Position Predevelopment Runoff Postdevelopment Runoff Tr (Years) Discharge (cfs) Tr (Years) Discharge (cfs) ---------------------------------------------------------------------------------------------------------------------- 2-Year 2.813E-03 2-Year 2.572E-02 5-Year 4.584E-03 5-Year 3.980E-02 10-Year 6.177E-03 10-Year 4.607E-02 25-Year 7.832E-03 25-Year 5.677E-02 50-Year 9.995E-03 50-Year 6.788E-02 100-Year 1.083E-02 100-Year 8.002E-02 200-Year 1.686E-02 200-Year 8.775E-02 ** Record too Short to Compute Peak Discharge for These Recurrence Intervals **** LID Duration Performance **** Excursion at Predeveloped 8%Q2 (Must be Less Than 0%): -97.2% PASS Maximum Excursion from 8%Q2 to 50%Q2 (Must be Less Than 0%): -75.0% PASS ------------------------------------------------------------------------------------------------- MEETS ALL LID DURATION DESIGN CRITERIA: PASS ------------------------------------------------------------------------------------------------- ————————————————————————————————— MGS FLOOD PROJECT REPORT Program Version: MGSFlood 4.43 Program License Number: 200410007 Project Simulation Performed on: 09/28/2018 10:15 AM Report Generation Date: 09/28/2018 10:16 AM ————————————————————————————————— Input File Name: Basin 3.fld Project Name: Solera Analysis Title: BMP Performance Standard Comments: ———————————————— PRECIPITATION INPUT ———————————————— Computational Time Step (Minutes): 15 Extended Precipitation Time Series Selected Climatic Region Number: 0 Full Period of Record Available used for Routing Precipitation Station : 96004005 Puget East 40 in_5min 10/01/1939-10/01/2097 Evaporation Station : 961040 Puget East 40 in MAP Evaporation Scale Factor : 0.750 HSPF Parameter Region Number: 1 HSPF Parameter Region Name : USGS Default ********** Default HSPF Parameters Used (Not Modified by User) *************** ********************** WATERSHED DEFINITION *********************** Predevelopment/Post Development Tributary Area Summary Predeveloped Post Developed Total Subbasin Area (acres) 0.137 0.137 Area of Links that Include Precip/Evap (acres) 0.000 0.004 Total (acres) 0.137 0.141 ----------------------SCENARIO: PREDEVELOPED Number of Subbasins: 1 ---------- Subbasin : Subbasin 1 ---------- -------Area (Acres) -------- Till Forest 0.137 ---------------------------------------------- Subbasin Total 0.137 ----------------------SCENARIO: POSTDEVELOPED Number of Subbasins: 1 ---------- Subbasin : Developed ---------- -------Area (Acres) -------- Till Grass 0.046 Impervious 0.091 ---------------------------------------------- Subbasin Total 0.137 ************************* LINK DATA ******************************* ----------------------SCENARIO: PREDEVELOPED Number of Links: 0 ************************* LINK DATA ******************************* ----------------------SCENARIO: POSTDEVELOPED Number of Links: 1 ------------------------------------------ Link Name: Bioretention Link Type: Bioretention Facility Downstream Link: None Base Elevation (ft) : 100.00 Riser Crest Elevation (ft) : 100.50 Storage Depth (ft) : 0.50 Bottom Length (ft) : 21.0 Bottom Width (ft) : 8.0 Side Slopes (ft/ft) : L1= 0.00 L2= 0.00 W1= 0.00 W2= 0.00 Bottom Area (sq-ft) : 168. Area at Riser Crest El (sq-ft) : 168. (acres) : 0.004 Volume at Riser Crest (cu-ft) : 160. (ac-ft) : 0.004 Infiltration on Bottom only Selected Soil Properties Biosoil Thickness (ft) : 1.50 Biosoil Saturated Hydraulic Conductivity (in/hr) : 6.00 Biosoil Porosity (Percent) : 30.00 Maximum Elevation of Bioretention Soil : 101.00 Native Soil Hydraulic Conductivity (in/hr) : 1.00 Riser Geometry Riser Structure Type : Circular Riser Diameter (in) : 6.00 Common Length (ft) : 0.000 Riser Crest Elevation : 100.50 ft Hydraulic Structure Geometry Number of Devices: 0 **********************FLOOD FREQUENCY AND DURATION STATISTICS******************* ----------------------SCENARIO: PREDEVELOPED Number of Subbasins: 1 Number of Links: 0 ----------------------SCENARIO: POSTDEVELOPED Number of Subbasins: 1 Number of Links: 1 ***********Groundwater Recharge Summary ************* Recharge is computed as input to Perlnd Groundwater Plus Infiltration in Structures Total Predeveloped Recharge During Simulation Model Element Recharge Amount (ac-ft) ----------------------------------------------------------------------------------------------- Subbasin: Subbasin 1 23.623 _____________________________________ Total: 23.623 Total Post Developed Recharge During Simulation Model Element Recharge Amount (ac-ft) ----------------------------------------------------------------------------------------------- Subbasin: Developed 5.622 Link: Bioretention 49.106 _____________________________________ Total: 54.728 Total Predevelopment Recharge is Less than Post Developed Average Recharge Per Year, (Number of Years= 158) Predeveloped: 0.150 ac-ft/year, Post Developed: 0.346 ac-ft/year ***********Water Quality Facility Data ************* ----------------------SCENARIO: PREDEVELOPED Number of Links: 0 ----------------------SCENARIO: POSTDEVELOPED Number of Links: 1 ********** Link: Bioretention ********** Infiltration/Filtration Statistics-------------------- Inflow Volume (ac-ft): 50.05 Inflow Volume Including PPT-Evap (ac-ft): 51.61 Total Runoff Infiltrated (ac-ft): 49.11, 95.15% Total Runoff Filtered (ac-ft): 0.00, 0.00% Primary Outflow To Downstream System (ac-ft): 2.51 Secondary Outflow To Downstream System (ac-ft): 0.00 Percent Treated (Infiltrated+Filtered)/Total Volume: 95.15% ***********Compliance Point Results ************* Scenario Predeveloped Compliance Subbasin: Subbasin 1 Scenario Postdeveloped Compliance Link: Bioretention *** Point of Compliance Flow Frequency Data *** Recurrence Interval Computed Using Gringorten Plotting Position Predevelopment Runoff Postdevelopment Runoff Tr (Years) Discharge (cfs) Tr (Years) Discharge (cfs) ---------------------------------------------------------------------------------------------------------------------- 2-Year 2.919E-03 2-Year 2.299E-02 5-Year 4.758E-03 5-Year 3.816E-02 10-Year 6.411E-03 10-Year 4.425E-02 25-Year 8.128E-03 25-Year 5.653E-02 50-Year 1.037E-02 50-Year 7.166E-02 100-Year 1.124E-02 100-Year 8.227E-02 200-Year 1.750E-02 200-Year 8.514E-02 ** Record too Short to Compute Peak Discharge for These Recurrence Intervals **** LID Duration Performance **** Excursion at Predeveloped 8%Q2 (Must be Less Than 0%): -96.9% PASS Maximum Excursion from 8%Q2 to 50%Q2 (Must be Less Than 0%): -73.2% PASS ------------------------------------------------------------------------------------------------- MEETS ALL LID DURATION DESIGN CRITERIA: PASS ------------------------------------------------------------------------------------------------- ————————————————————————————————— MGS FLOOD PROJECT REPORT Program Version: MGSFlood 4.43 Program License Number: 200410007 Project Simulation Performed on: 09/28/2018 10:51 AM Report Generation Date: 09/28/2018 10:53 AM ————————————————————————————————— Input File Name: Basin 4.fld Project Name: Solera Analysis Title: BMP Performance Standard Comments: ———————————————— PRECIPITATION INPUT ———————————————— Computational Time Step (Minutes): 15 Extended Precipitation Time Series Selected Climatic Region Number: 0 Full Period of Record Available used for Routing Precipitation Station : 96004005 Puget East 40 in_5min 10/01/1939-10/01/2097 Evaporation Station : 961040 Puget East 40 in MAP Evaporation Scale Factor : 0.750 HSPF Parameter Region Number: 1 HSPF Parameter Region Name : USGS Default ********** Default HSPF Parameters Used (Not Modified by User) *************** ********************** WATERSHED DEFINITION *********************** Predevelopment/Post Development Tributary Area Summary Predeveloped Post Developed Total Subbasin Area (acres) 0.088 0.088 Area of Links that Include Precip/Evap (acres) 0.000 0.003 Total (acres) 0.088 0.091 ----------------------SCENARIO: PREDEVELOPED Number of Subbasins: 1 ---------- Subbasin : Subbasin 1 ---------- -------Area (Acres) -------- Till Forest 0.088 ---------------------------------------------- Subbasin Total 0.088 ----------------------SCENARIO: POSTDEVELOPED Number of Subbasins: 1 ---------- Subbasin : Developed ---------- -------Area (Acres) -------- Till Grass 0.016 Impervious 0.072 ---------------------------------------------- Subbasin Total 0.088 ************************* LINK DATA ******************************* ----------------------SCENARIO: PREDEVELOPED Number of Links: 0 ************************* LINK DATA ******************************* ----------------------SCENARIO: POSTDEVELOPED Number of Links: 1 ------------------------------------------ Link Name: Bioretention Link Type: Bioretention Facility Downstream Link: None Base Elevation (ft) : 100.00 Riser Crest Elevation (ft) : 100.50 Storage Depth (ft) : 0.50 Bottom Length (ft) : 21.0 Bottom Width (ft) : 6.0 Side Slopes (ft/ft) : L1= 0.00 L2= 0.00 W1= 0.00 W2= 0.00 Bottom Area (sq-ft) : 126. Area at Riser Crest El (sq-ft) : 126. (acres) : 0.003 Volume at Riser Crest (cu-ft) : 120. (ac-ft) : 0.003 Infiltration on Bottom only Selected Soil Properties Biosoil Thickness (ft) : 1.50 Biosoil Saturated Hydraulic Conductivity (in/hr) : 6.00 Biosoil Porosity (Percent) : 30.00 Maximum Elevation of Bioretention Soil : 101.00 Native Soil Hydraulic Conductivity (in/hr) : 1.00 Riser Geometry Riser Structure Type : Circular Riser Diameter (in) : 6.00 Common Length (ft) : 0.000 Riser Crest Elevation : 100.50 ft Hydraulic Structure Geometry Number of Devices: 0 **********************FLOOD FREQUENCY AND DURATION STATISTICS******************* ----------------------SCENARIO: PREDEVELOPED Number of Subbasins: 1 Number of Links: 0 ----------------------SCENARIO: POSTDEVELOPED Number of Subbasins: 1 Number of Links: 1 ***********Groundwater Recharge Summary ************* Recharge is computed as input to Perlnd Groundwater Plus Infiltration in Structures Total Predeveloped Recharge During Simulation Model Element Recharge Amount (ac-ft) ----------------------------------------------------------------------------------------------- Subbasin: Subbasin 1 15.174 _____________________________________ Total: 15.174 Total Post Developed Recharge During Simulation Model Element Recharge Amount (ac-ft) ----------------------------------------------------------------------------------------------- Subbasin: Developed 1.955 Link: Bioretention 34.840 _____________________________________ Total: 36.795 Total Predevelopment Recharge is Less than Post Developed Average Recharge Per Year, (Number of Years= 158) Predeveloped: 0.096 ac-ft/year, Post Developed: 0.233 ac-ft/year ***********Water Quality Facility Data ************* ----------------------SCENARIO: PREDEVELOPED Number of Links: 0 ----------------------SCENARIO: POSTDEVELOPED Number of Links: 1 ********** Link: Bioretention ********** Infiltration/Filtration Statistics-------------------- Inflow Volume (ac-ft): 35.50 Inflow Volume Including PPT-Evap (ac-ft): 36.69 Total Runoff Infiltrated (ac-ft): 34.84, 94.95% Total Runoff Filtered (ac-ft): 0.00, 0.00% Primary Outflow To Downstream System (ac-ft): 1.86 Secondary Outflow To Downstream System (ac-ft): 0.00 Percent Treated (Infiltrated+Filtered)/Total Volume: 94.95% ***********Compliance Point Results ************* Scenario Predeveloped Compliance Subbasin: Subbasin 1 Scenario Postdeveloped Compliance Link: Bioretention *** Point of Compliance Flow Frequency Data *** Recurrence Interval Computed Using Gringorten Plotting Position Predevelopment Runoff Postdevelopment Runoff Tr (Years) Discharge (cfs) Tr (Years) Discharge (cfs) ---------------------------------------------------------------------------------------------------------------------- 2-Year 1.875E-03 2-Year 1.795E-02 5-Year 3.056E-03 5-Year 2.814E-02 10-Year 4.118E-03 10-Year 3.237E-02 25-Year 5.221E-03 25-Year 3.963E-02 50-Year 6.663E-03 50-Year 4.972E-02 100-Year 7.221E-03 100-Year 5.503E-02 200-Year 1.124E-02 200-Year 5.963E-02 ** Record too Short to Compute Peak Discharge for These Recurrence Intervals **** LID Duration Performance **** Excursion at Predeveloped 8%Q2 (Must be Less Than 0%): -97.1% PASS Maximum Excursion from 8%Q2 to 50%Q2 (Must be Less Than 0%): -73.3% PASS ------------------------------------------------------------------------------------------------- MEETS ALL LID DURATION DESIGN CRITERIA: PASS ------------------------------------------------------------------------------------------------- ————————————————————————————————— MGS FLOOD PROJECT REPORT Program Version: MGSFlood 4.43 Program License Number: 200410007 Project Simulation Performed on: 09/28/2018 11:28 AM Report Generation Date: 10/03/2018 11:35 AM ————————————————————————————————— Input File Name: Basin 5.fld Project Name: Solera Analysis Title: BMP Performance Standard Comments: ———————————————— PRECIPITATION INPUT ———————————————— Computational Time Step (Minutes): 15 Extended Precipitation Time Series Selected Climatic Region Number: 0 Full Period of Record Available used for Routing Precipitation Station : 96004005 Puget East 40 in_5min 10/01/1939-10/01/2097 Evaporation Station : 961040 Puget East 40 in MAP Evaporation Scale Factor : 0.750 HSPF Parameter Region Number: 1 HSPF Parameter Region Name : USGS Default ********** Default HSPF Parameters Used (Not Modified by User) *************** ********************** WATERSHED DEFINITION *********************** Predevelopment/Post Development Tributary Area Summary Predeveloped Post Developed Total Subbasin Area (acres) 0.176 0.176 Area of Links that Include Precip/Evap (acres) 0.000 0.006 Total (acres) 0.176 0.182 ----------------------SCENARIO: PREDEVELOPED Number of Subbasins: 1 ---------- Subbasin : Subbasin 1 ---------- -------Area (Acres) -------- Till Forest 0.176 ---------------------------------------------- Subbasin Total 0.176 ----------------------SCENARIO: POSTDEVELOPED Number of Subbasins: 1 ---------- Subbasin : Developed ---------- -------Area (Acres) -------- Till Grass 0.034 Impervious 0.142 ---------------------------------------------- Subbasin Total 0.176 ************************* LINK DATA ******************************* ----------------------SCENARIO: PREDEVELOPED Number of Links: 0 ************************* LINK DATA ******************************* ----------------------SCENARIO: POSTDEVELOPED Number of Links: 1 ------------------------------------------ Link Name: Bioretention Link Type: Bioretention Facility Downstream Link: None Base Elevation (ft) : 100.00 Riser Crest Elevation (ft) : 100.50 Storage Depth (ft) : 0.50 Bottom Length (ft) : 23.0 Bottom Width (ft) : 11.0 Side Slopes (ft/ft) : L1= 0.00 L2= 0.00 W1= 0.00 W2= 0.00 Bottom Area (sq-ft) : 253. Area at Riser Crest El (sq-ft) : 253. (acres) : 0.006 Volume at Riser Crest (cu-ft) : 240. (ac-ft) : 0.006 Infiltration on Bottom only Selected Soil Properties Biosoil Thickness (ft) : 1.50 Biosoil Saturated Hydraulic Conductivity (in/hr) : 6.00 Biosoil Porosity (Percent) : 30.00 Maximum Elevation of Bioretention Soil : 101.00 Native Soil Hydraulic Conductivity (in/hr) : 1.00 Riser Geometry Riser Structure Type : Circular Riser Diameter (in) : 6.00 Common Length (ft) : 0.000 Riser Crest Elevation : 100.50 ft Hydraulic Structure Geometry Number of Devices: 0 **********************FLOOD FREQUENCY AND DURATION STATISTICS******************* ----------------------SCENARIO: PREDEVELOPED Number of Subbasins: 1 Number of Links: 0 ----------------------SCENARIO: POSTDEVELOPED Number of Subbasins: 1 Number of Links: 1 ***********Groundwater Recharge Summary ************* Recharge is computed as input to Perlnd Groundwater Plus Infiltration in Structures Total Predeveloped Recharge During Simulation Model Element Recharge Amount (ac-ft) ----------------------------------------------------------------------------------------------- Subbasin: Subbasin 1 30.348 _____________________________________ Total: 30.348 Total Post Developed Recharge During Simulation Model Element Recharge Amount (ac-ft) ----------------------------------------------------------------------------------------------- Subbasin: Developed 4.155 Link: Bioretention 69.381 _____________________________________ Total: 73.537 Total Predevelopment Recharge is Less than Post Developed Average Recharge Per Year, (Number of Years= 158) Predeveloped: 0.192 ac-ft/year, Post Developed: 0.465 ac-ft/year ***********Water Quality Facility Data ************* ----------------------SCENARIO: PREDEVELOPED Number of Links: 0 ----------------------SCENARIO: POSTDEVELOPED Number of Links: 1 ********** Link: Bioretention ********** Infiltration/Filtration Statistics-------------------- Inflow Volume (ac-ft): 70.50 Inflow Volume Including PPT-Evap (ac-ft): 72.89 Total Runoff Infiltrated (ac-ft): 69.38, 95.18% Total Runoff Filtered (ac-ft): 0.00, 0.00% Primary Outflow To Downstream System (ac-ft): 3.53 Secondary Outflow To Downstream System (ac-ft): 0.00 Percent Treated (Infiltrated+Filtered)/Total Volume: 95.18% ***********Compliance Point Results ************* Scenario Predeveloped Compliance Subbasin: Subbasin 1 Scenario Postdeveloped Compliance Link: Bioretention *** Point of Compliance Flow Frequency Data *** Recurrence Interval Computed Using Gringorten Plotting Position Predevelopment Runoff Postdevelopment Runoff Tr (Years) Discharge (cfs) Tr (Years) Discharge (cfs) ---------------------------------------------------------------------------------------------------------------------- 2-Year 3.750E-03 2-Year 3.447E-02 5-Year 6.113E-03 5-Year 5.451E-02 10-Year 8.236E-03 10-Year 6.240E-02 25-Year 1.044E-02 25-Year 7.703E-02 50-Year 1.333E-02 50-Year 9.241E-02 100-Year 1.444E-02 100-Year 0.109 200-Year 2.248E-02 200-Year 0.120 ** Record too Short to Compute Peak Discharge for These Recurrence Intervals **** LID Duration Performance **** Excursion at Predeveloped 8%Q2 (Must be Less Than 0%): -97.2% PASS Maximum Excursion from 8%Q2 to 50%Q2 (Must be Less Than 0%): -74.2% PASS ------------------------------------------------------------------------------------------------- MEETS ALL LID DURATION DESIGN CRITERIA: PASS ------------------------------------------------------------------------------------------------- ————————————————————————————————— MGS FLOOD PROJECT REPORT Program Version: MGSFlood 4.43 Program License Number: 200410007 Project Simulation Performed on: 09/28/2018 11:33 AM Report Generation Date: 09/28/2018 11:33 AM ————————————————————————————————— Input File Name: Basin 6.fld Project Name: Solera Analysis Title: BMP Performance Standard Comments: ———————————————— PRECIPITATION INPUT ———————————————— Computational Time Step (Minutes): 15 Extended Precipitation Time Series Selected Climatic Region Number: 0 Full Period of Record Available used for Routing Precipitation Station : 96004005 Puget East 40 in_5min 10/01/1939-10/01/2097 Evaporation Station : 961040 Puget East 40 in MAP Evaporation Scale Factor : 0.750 HSPF Parameter Region Number: 1 HSPF Parameter Region Name : USGS Default ********** Default HSPF Parameters Used (Not Modified by User) *************** ********************** WATERSHED DEFINITION *********************** Predevelopment/Post Development Tributary Area Summary Predeveloped Post Developed Total Subbasin Area (acres) 0.111 0.111 Area of Links that Include Precip/Evap (acres) 0.000 0.003 Total (acres) 0.111 0.114 ----------------------SCENARIO: PREDEVELOPED Number of Subbasins: 1 ---------- Subbasin : Subbasin 1 ---------- -------Area (Acres) -------- Till Forest 0.111 ---------------------------------------------- Subbasin Total 0.111 ----------------------SCENARIO: POSTDEVELOPED Number of Subbasins: 1 ---------- Subbasin : Developed ---------- -------Area (Acres) -------- Till Grass 0.038 Impervious 0.073 ---------------------------------------------- Subbasin Total 0.111 ************************* LINK DATA ******************************* ----------------------SCENARIO: PREDEVELOPED Number of Links: 0 ************************* LINK DATA ******************************* ----------------------SCENARIO: POSTDEVELOPED Number of Links: 1 ------------------------------------------ Link Name: Bioretention Link Type: Bioretention Facility Downstream Link: None Base Elevation (ft) : 100.00 Riser Crest Elevation (ft) : 100.50 Storage Depth (ft) : 0.50 Bottom Length (ft) : 19.0 Bottom Width (ft) : 7.0 Side Slopes (ft/ft) : L1= 0.00 L2= 0.00 W1= 0.00 W2= 0.00 Bottom Area (sq-ft) : 133. Area at Riser Crest El (sq-ft) : 133. (acres) : 0.003 Volume at Riser Crest (cu-ft) : 126. (ac-ft) : 0.003 Infiltration on Bottom only Selected Soil Properties Biosoil Thickness (ft) : 1.50 Biosoil Saturated Hydraulic Conductivity (in/hr) : 6.00 Biosoil Porosity (Percent) : 30.00 Maximum Elevation of Bioretention Soil : 101.00 Native Soil Hydraulic Conductivity (in/hr) : 1.00 Riser Geometry Riser Structure Type : Circular Riser Diameter (in) : 6.00 Common Length (ft) : 0.000 Riser Crest Elevation : 100.50 ft Hydraulic Structure Geometry Number of Devices: 0 **********************FLOOD FREQUENCY AND DURATION STATISTICS******************* ----------------------SCENARIO: PREDEVELOPED Number of Subbasins: 1 Number of Links: 0 ----------------------SCENARIO: POSTDEVELOPED Number of Subbasins: 1 Number of Links: 1 ***********Groundwater Recharge Summary ************* Recharge is computed as input to Perlnd Groundwater Plus Infiltration in Structures Total Predeveloped Recharge During Simulation Model Element Recharge Amount (ac-ft) ----------------------------------------------------------------------------------------------- Subbasin: Subbasin 1 19.140 _____________________________________ Total: 19.140 Total Post Developed Recharge During Simulation Model Element Recharge Amount (ac-ft) ----------------------------------------------------------------------------------------------- Subbasin: Developed 4.644 Link: Bioretention 39.498 _____________________________________ Total: 44.142 Total Predevelopment Recharge is Less than Post Developed Average Recharge Per Year, (Number of Years= 158) Predeveloped: 0.121 ac-ft/year, Post Developed: 0.279 ac-ft/year ***********Water Quality Facility Data ************* ----------------------SCENARIO: PREDEVELOPED Number of Links: 0 ----------------------SCENARIO: POSTDEVELOPED Number of Links: 1 ********** Link: Bioretention ********** Infiltration/Filtration Statistics-------------------- Inflow Volume (ac-ft): 40.37 Inflow Volume Including PPT-Evap (ac-ft): 41.60 Total Runoff Infiltrated (ac-ft): 39.50, 94.94% Total Runoff Filtered (ac-ft): 0.00, 0.00% Primary Outflow To Downstream System (ac-ft): 2.11 Secondary Outflow To Downstream System (ac-ft): 0.00 Percent Treated (Infiltrated+Filtered)/Total Volume: 94.94% ***********Compliance Point Results ************* Scenario Predeveloped Compliance Subbasin: Subbasin 1 Scenario Postdeveloped Compliance Link: Bioretention *** Point of Compliance Flow Frequency Data *** Recurrence Interval Computed Using Gringorten Plotting Position Predevelopment Runoff Postdevelopment Runoff Tr (Years) Discharge (cfs) Tr (Years) Discharge (cfs) ---------------------------------------------------------------------------------------------------------------------- 2-Year 2.365E-03 2-Year 1.914E-02 5-Year 3.855E-03 5-Year 3.126E-02 10-Year 5.194E-03 10-Year 3.634E-02 25-Year 6.586E-03 25-Year 4.569E-02 50-Year 8.405E-03 50-Year 5.773E-02 100-Year 9.108E-03 100-Year 7.027E-02 200-Year 1.418E-02 200-Year 7.399E-02 ** Record too Short to Compute Peak Discharge for These Recurrence Intervals **** LID Duration Performance **** Excursion at Predeveloped 8%Q2 (Must be Less Than 0%): -96.8% PASS Maximum Excursion from 8%Q2 to 50%Q2 (Must be Less Than 0%): -71.9% PASS ------------------------------------------------------------------------------------------------- MEETS ALL LID DURATION DESIGN CRITERIA: PASS ------------------------------------------------------------------------------------------------- ————————————————————————————————— MGS FLOOD PROJECT REPORT Program Version: MGSFlood 4.43 Program License Number: 200410007 Project Simulation Performed on: 09/28/2018 11:59 AM Report Generation Date: 10/03/2018 11:31 AM ————————————————————————————————— Input File Name: Basin 7.fld Project Name: Solera Analysis Title: BMP Performance Standard Comments: ———————————————— PRECIPITATION INPUT ———————————————— Computational Time Step (Minutes): 15 Extended Precipitation Time Series Selected Climatic Region Number: 0 Full Period of Record Available used for Routing Precipitation Station : 96004005 Puget East 40 in_5min 10/01/1939-10/01/2097 Evaporation Station : 961040 Puget East 40 in MAP Evaporation Scale Factor : 0.750 HSPF Parameter Region Number: 1 HSPF Parameter Region Name : USGS Default ********** Default HSPF Parameters Used (Not Modified by User) *************** ********************** WATERSHED DEFINITION *********************** Predevelopment/Post Development Tributary Area Summary Predeveloped Post Developed Total Subbasin Area (acres) 0.110 0.109 Area of Links that Include Precip/Evap (acres) 0.000 0.004 Total (acres) 0.110 0.113 ----------------------SCENARIO: PREDEVELOPED Number of Subbasins: 1 ---------- Subbasin : Subbasin 1 ---------- -------Area (Acres) -------- Till Forest 0.110 ---------------------------------------------- Subbasin Total 0.110 ----------------------SCENARIO: POSTDEVELOPED Number of Subbasins: 1 ---------- Subbasin : Developed ---------- -------Area (Acres) -------- Till Grass 0.014 Impervious 0.095 ---------------------------------------------- Subbasin Total 0.109 ************************* LINK DATA ******************************* ----------------------SCENARIO: PREDEVELOPED Number of Links: 0 ************************* LINK DATA ******************************* ----------------------SCENARIO: POSTDEVELOPED Number of Links: 1 ------------------------------------------ Link Name: Bioretention Link Type: Bioretention Facility Downstream Link: None Base Elevation (ft) : 100.00 Riser Crest Elevation (ft) : 100.50 Storage Depth (ft) : 0.50 Bottom Length (ft) : 19.0 Bottom Width (ft) : 9.0 Side Slopes (ft/ft) : L1= 0.00 L2= 0.00 W1= 0.00 W2= 0.00 Bottom Area (sq-ft) : 171. Area at Riser Crest El (sq-ft) : 171. (acres) : 0.004 Volume at Riser Crest (cu-ft) : 162. (ac-ft) : 0.004 Infiltration on Bottom only Selected Soil Properties Biosoil Thickness (ft) : 1.50 Biosoil Saturated Hydraulic Conductivity (in/hr) : 6.00 Biosoil Porosity (Percent) : 30.00 Maximum Elevation of Bioretention Soil : 101.00 Native Soil Hydraulic Conductivity (in/hr) : 1.00 Riser Geometry Riser Structure Type : Circular Riser Diameter (in) : 6.00 Common Length (ft) : 0.000 Riser Crest Elevation : 100.50 ft Hydraulic Structure Geometry Number of Devices: 0 **********************FLOOD FREQUENCY AND DURATION STATISTICS******************* ----------------------SCENARIO: PREDEVELOPED Number of Subbasins: 1 Number of Links: 0 ----------------------SCENARIO: POSTDEVELOPED Number of Subbasins: 1 Number of Links: 1 ***********Groundwater Recharge Summary ************* Recharge is computed as input to Perlnd Groundwater Plus Infiltration in Structures Total Predeveloped Recharge During Simulation Model Element Recharge Amount (ac-ft) ----------------------------------------------------------------------------------------------- Subbasin: Subbasin 1 18.967 _____________________________________ Total: 18.967 Total Post Developed Recharge During Simulation Model Element Recharge Amount (ac-ft) ----------------------------------------------------------------------------------------------- Subbasin: Developed 1.711 Link: Bioretention 44.919 _____________________________________ Total: 46.630 Total Predevelopment Recharge is Less than Post Developed Average Recharge Per Year, (Number of Years= 158) Predeveloped: 0.120 ac-ft/year, Post Developed: 0.295 ac-ft/year ***********Water Quality Facility Data ************* ----------------------SCENARIO: PREDEVELOPED Number of Links: 0 ----------------------SCENARIO: POSTDEVELOPED Number of Links: 1 ********** Link: Bioretention ********** Infiltration/Filtration Statistics-------------------- Inflow Volume (ac-ft): 45.41 Inflow Volume Including PPT-Evap (ac-ft): 47.05 Total Runoff Infiltrated (ac-ft): 44.92, 95.48% Total Runoff Filtered (ac-ft): 0.00, 0.00% Primary Outflow To Downstream System (ac-ft): 2.14 Secondary Outflow To Downstream System (ac-ft): 0.00 Percent Treated (Infiltrated+Filtered)/Total Volume: 95.48% ***********Compliance Point Results ************* Scenario Predeveloped Compliance Subbasin: Subbasin 1 Scenario Postdeveloped Compliance Link: Bioretention *** Point of Compliance Flow Frequency Data *** Recurrence Interval Computed Using Gringorten Plotting Position Predevelopment Runoff Postdevelopment Runoff Tr (Years) Discharge (cfs) Tr (Years) Discharge (cfs) ---------------------------------------------------------------------------------------------------------------------- 2-Year 2.344E-03 2-Year 2.269E-02 5-Year 3.820E-03 5-Year 3.503E-02 10-Year 5.147E-03 10-Year 4.035E-02 25-Year 6.526E-03 25-Year 4.948E-02 50-Year 8.329E-03 50-Year 5.899E-02 100-Year 9.026E-03 100-Year 6.939E-02 200-Year 1.405E-02 200-Year 7.651E-02 ** Record too Short to Compute Peak Discharge for These Recurrence Intervals **** LID Duration Performance **** Excursion at Predeveloped 8%Q2 (Must be Less Than 0%): -97.4% PASS Maximum Excursion from 8%Q2 to 50%Q2 (Must be Less Than 0%): -76.6% PASS ------------------------------------------------------------------------------------------------- MEETS ALL LID DURATION DESIGN CRITERIA: PASS ------------------------------------------------------------------------------------------------- ————————————————————————————————— MGS FLOOD PROJECT REPORT Program Version: MGSFlood 4.43 Program License Number: 200410007 Project Simulation Performed on: 09/28/2018 12:20 PM Report Generation Date: 09/28/2018 12:22 PM ————————————————————————————————— Input File Name: Basin 8.fld Project Name: Solera Analysis Title: BMP Performance Standard Comments: ———————————————— PRECIPITATION INPUT ———————————————— Computational Time Step (Minutes): 15 Extended Precipitation Time Series Selected Climatic Region Number: 0 Full Period of Record Available used for Routing Precipitation Station : 96004005 Puget East 40 in_5min 10/01/1939-10/01/2097 Evaporation Station : 961040 Puget East 40 in MAP Evaporation Scale Factor : 0.750 HSPF Parameter Region Number: 1 HSPF Parameter Region Name : USGS Default ********** Default HSPF Parameters Used (Not Modified by User) *************** ********************** WATERSHED DEFINITION *********************** Predevelopment/Post Development Tributary Area Summary Predeveloped Post Developed Total Subbasin Area (acres) 0.218 0.218 Area of Links that Include Precip/Evap (acres) 0.000 0.007 Total (acres) 0.218 0.225 ----------------------SCENARIO: PREDEVELOPED Number of Subbasins: 1 ---------- Subbasin : Subbasin 1 ---------- -------Area (Acres) -------- Till Forest 0.218 ---------------------------------------------- Subbasin Total 0.218 ----------------------SCENARIO: POSTDEVELOPED Number of Subbasins: 1 ---------- Subbasin : Developed ---------- -------Area (Acres) -------- Till Grass 0.032 Impervious 0.186 ---------------------------------------------- Subbasin Total 0.218 ************************* LINK DATA ******************************* ----------------------SCENARIO: PREDEVELOPED Number of Links: 0 ************************* LINK DATA ******************************* ----------------------SCENARIO: POSTDEVELOPED Number of Links: 1 ------------------------------------------ Link Name: Bioretention Link Type: Bioretention Facility Downstream Link: None Base Elevation (ft) : 100.00 Riser Crest Elevation (ft) : 100.50 Storage Depth (ft) : 0.50 Bottom Length (ft) : 25.0 Bottom Width (ft) : 13.0 Side Slopes (ft/ft) : L1= 0.00 L2= 0.00 W1= 0.00 W2= 0.00 Bottom Area (sq-ft) : 325. Area at Riser Crest El (sq-ft) : 325. (acres) : 0.007 Volume at Riser Crest (cu-ft) : 309. (ac-ft) : 0.007 Infiltration on Bottom only Selected Soil Properties Biosoil Thickness (ft) : 1.50 Biosoil Saturated Hydraulic Conductivity (in/hr) : 6.00 Biosoil Porosity (Percent) : 30.00 Maximum Elevation of Bioretention Soil : 101.00 Native Soil Hydraulic Conductivity (in/hr) : 1.00 Riser Geometry Riser Structure Type : Circular Riser Diameter (in) : 6.00 Common Length (ft) : 0.000 Riser Crest Elevation : 100.50 ft Hydraulic Structure Geometry Number of Devices: 0 **********************FLOOD FREQUENCY AND DURATION STATISTICS******************* ----------------------SCENARIO: PREDEVELOPED Number of Subbasins: 1 Number of Links: 0 ----------------------SCENARIO: POSTDEVELOPED Number of Subbasins: 1 Number of Links: 1 ***********Groundwater Recharge Summary ************* Recharge is computed as input to Perlnd Groundwater Plus Infiltration in Structures Total Predeveloped Recharge During Simulation Model Element Recharge Amount (ac-ft) ----------------------------------------------------------------------------------------------- Subbasin: Subbasin 1 37.590 _____________________________________ Total: 37.590 Total Post Developed Recharge During Simulation Model Element Recharge Amount (ac-ft) ----------------------------------------------------------------------------------------------- Subbasin: Developed 3.911 Link: Bioretention 88.306 _____________________________________ Total: 92.217 Total Predevelopment Recharge is Less than Post Developed Average Recharge Per Year, (Number of Years= 158) Predeveloped: 0.238 ac-ft/year, Post Developed: 0.584 ac-ft/year ***********Water Quality Facility Data ************* ----------------------SCENARIO: PREDEVELOPED Number of Links: 0 ----------------------SCENARIO: POSTDEVELOPED Number of Links: 1 ********** Link: Bioretention ********** Infiltration/Filtration Statistics-------------------- Inflow Volume (ac-ft): 89.83 Inflow Volume Including PPT-Evap (ac-ft): 92.92 Total Runoff Infiltrated (ac-ft): 88.31, 95.03% Total Runoff Filtered (ac-ft): 0.00, 0.00% Primary Outflow To Downstream System (ac-ft): 4.62 Secondary Outflow To Downstream System (ac-ft): 0.00 Percent Treated (Infiltrated+Filtered)/Total Volume: 95.03% ***********Compliance Point Results ************* Scenario Predeveloped Compliance Subbasin: Subbasin 1 Scenario Postdeveloped Compliance Link: Bioretention *** Point of Compliance Flow Frequency Data *** Recurrence Interval Computed Using Gringorten Plotting Position Predevelopment Runoff Postdevelopment Runoff Tr (Years) Discharge (cfs) Tr (Years) Discharge (cfs) ---------------------------------------------------------------------------------------------------------------------- 2-Year 4.645E-03 2-Year 4.477E-02 5-Year 7.571E-03 5-Year 6.960E-02 10-Year 1.020E-02 10-Year 7.925E-02 25-Year 1.293E-02 25-Year 9.916E-02 50-Year 1.651E-02 50-Year 0.119 100-Year 1.789E-02 100-Year 0.137 200-Year 2.784E-02 200-Year 0.153 ** Record too Short to Compute Peak Discharge for These Recurrence Intervals **** LID Duration Performance **** Excursion at Predeveloped 8%Q2 (Must be Less Than 0%): -97.1% PASS Maximum Excursion from 8%Q2 to 50%Q2 (Must be Less Than 0%): -73.5% PASS ------------------------------------------------------------------------------------------------- MEETS ALL LID DURATION DESIGN CRITERIA: PASS ------------------------------------------------------------------------------------------------- ————————————————————————————————— MGS FLOOD PROJECT REPORT Program Version: MGSFlood 4.43 Program License Number: 200410007 Project Simulation Performed on: 09/28/2018 12:26 PM Report Generation Date: 09/28/2018 12:27 PM ————————————————————————————————— Input File Name: Basin 9.fld Project Name: Solera Analysis Title: BMP Performance Standard Comments: ———————————————— PRECIPITATION INPUT ———————————————— Computational Time Step (Minutes): 15 Extended Precipitation Time Series Selected Climatic Region Number: 0 Full Period of Record Available used for Routing Precipitation Station : 96004005 Puget East 40 in_5min 10/01/1939-10/01/2097 Evaporation Station : 961040 Puget East 40 in MAP Evaporation Scale Factor : 0.750 HSPF Parameter Region Number: 1 HSPF Parameter Region Name : USGS Default ********** Default HSPF Parameters Used (Not Modified by User) *************** ********************** WATERSHED DEFINITION *********************** Predevelopment/Post Development Tributary Area Summary Predeveloped Post Developed Total Subbasin Area (acres) 0.132 0.132 Area of Links that Include Precip/Evap (acres) 0.000 0.003 Total (acres) 0.132 0.135 ----------------------SCENARIO: PREDEVELOPED Number of Subbasins: 1 ---------- Subbasin : Subbasin 1 ---------- -------Area (Acres) -------- Till Forest 0.132 ---------------------------------------------- Subbasin Total 0.132 ----------------------SCENARIO: POSTDEVELOPED Number of Subbasins: 1 ---------- Subbasin : Developed ---------- -------Area (Acres) -------- Till Grass 0.055 Impervious 0.077 ---------------------------------------------- Subbasin Total 0.132 ************************* LINK DATA ******************************* ----------------------SCENARIO: PREDEVELOPED Number of Links: 0 ************************* LINK DATA ******************************* ----------------------SCENARIO: POSTDEVELOPED Number of Links: 1 ------------------------------------------ Link Name: Bioretention Link Type: Bioretention Facility Downstream Link: None Base Elevation (ft) : 100.00 Riser Crest Elevation (ft) : 100.50 Storage Depth (ft) : 0.50 Bottom Length (ft) : 25.0 Bottom Width (ft) : 6.0 Side Slopes (ft/ft) : L1= 0.00 L2= 0.00 W1= 0.00 W2= 0.00 Bottom Area (sq-ft) : 150. Area at Riser Crest El (sq-ft) : 150. (acres) : 0.003 Volume at Riser Crest (cu-ft) : 143. (ac-ft) : 0.003 Infiltration on Bottom only Selected Soil Properties Biosoil Thickness (ft) : 1.50 Biosoil Saturated Hydraulic Conductivity (in/hr) : 6.00 Biosoil Porosity (Percent) : 30.00 Maximum Elevation of Bioretention Soil : 101.00 Native Soil Hydraulic Conductivity (in/hr) : 1.00 Riser Geometry Riser Structure Type : Circular Riser Diameter (in) : 6.00 Common Length (ft) : 0.000 Riser Crest Elevation : 100.50 ft Hydraulic Structure Geometry Number of Devices: 0 **********************FLOOD FREQUENCY AND DURATION STATISTICS******************* ----------------------SCENARIO: PREDEVELOPED Number of Subbasins: 1 Number of Links: 0 ----------------------SCENARIO: POSTDEVELOPED Number of Subbasins: 1 Number of Links: 1 ***********Groundwater Recharge Summary ************* Recharge is computed as input to Perlnd Groundwater Plus Infiltration in Structures Total Predeveloped Recharge During Simulation Model Element Recharge Amount (ac-ft) ----------------------------------------------------------------------------------------------- Subbasin: Subbasin 1 22.761 _____________________________________ Total: 22.761 Total Post Developed Recharge During Simulation Model Element Recharge Amount (ac-ft) ----------------------------------------------------------------------------------------------- Subbasin: Developed 6.722 Link: Bioretention 44.812 _____________________________________ Total: 51.533 Total Predevelopment Recharge is Less than Post Developed Average Recharge Per Year, (Number of Years= 158) Predeveloped: 0.144 ac-ft/year, Post Developed: 0.326 ac-ft/year ***********Water Quality Facility Data ************* ----------------------SCENARIO: PREDEVELOPED Number of Links: 0 ----------------------SCENARIO: POSTDEVELOPED Number of Links: 1 ********** Link: Bioretention ********** Infiltration/Filtration Statistics-------------------- Inflow Volume (ac-ft): 45.58 Inflow Volume Including PPT-Evap (ac-ft): 46.96 Total Runoff Infiltrated (ac-ft): 44.81, 95.42% Total Runoff Filtered (ac-ft): 0.00, 0.00% Primary Outflow To Downstream System (ac-ft): 2.16 Secondary Outflow To Downstream System (ac-ft): 0.00 Percent Treated (Infiltrated+Filtered)/Total Volume: 95.42% ***********Compliance Point Results ************* Scenario Predeveloped Compliance Subbasin: Subbasin 1 Scenario Postdeveloped Compliance Link: Bioretention *** Point of Compliance Flow Frequency Data *** Recurrence Interval Computed Using Gringorten Plotting Position Predevelopment Runoff Postdevelopment Runoff Tr (Years) Discharge (cfs) Tr (Years) Discharge (cfs) ---------------------------------------------------------------------------------------------------------------------- 2-Year 2.813E-03 2-Year 1.986E-02 5-Year 4.584E-03 5-Year 3.306E-02 10-Year 6.177E-03 10-Year 3.972E-02 25-Year 7.832E-03 25-Year 5.195E-02 50-Year 9.995E-03 50-Year 6.617E-02 100-Year 1.083E-02 100-Year 7.813E-02 200-Year 1.686E-02 200-Year 8.012E-02 ** Record too Short to Compute Peak Discharge for These Recurrence Intervals **** LID Duration Performance **** Excursion at Predeveloped 8%Q2 (Must be Less Than 0%): -97.0% PASS Maximum Excursion from 8%Q2 to 50%Q2 (Must be Less Than 0%): -74.2% PASS ------------------------------------------------------------------------------------------------- MEETS ALL LID DURATION DESIGN CRITERIA: PASS ------------------------------------------------------------------------------------------------- ————————————————————————————————— MGS FLOOD PROJECT REPORT Program Version: MGSFlood 4.43 Program License Number: 200410007 Project Simulation Performed on: 09/28/2018 12:37 PM Report Generation Date: 09/28/2018 12:40 PM ————————————————————————————————— Input File Name: Basin 10.fld Project Name: Solera Analysis Title: BMP Performance Standard Comments: ———————————————— PRECIPITATION INPUT ———————————————— Computational Time Step (Minutes): 15 Extended Precipitation Time Series Selected Climatic Region Number: 0 Full Period of Record Available used for Routing Precipitation Station : 96004005 Puget East 40 in_5min 10/01/1939-10/01/2097 Evaporation Station : 961040 Puget East 40 in MAP Evaporation Scale Factor : 0.750 HSPF Parameter Region Number: 1 HSPF Parameter Region Name : USGS Default ********** Default HSPF Parameters Used (Not Modified by User) *************** ********************** WATERSHED DEFINITION *********************** Predevelopment/Post Development Tributary Area Summary Predeveloped Post Developed Total Subbasin Area (acres) 0.110 0.110 Area of Links that Include Precip/Evap (acres) 0.000 0.004 Total (acres) 0.110 0.114 ----------------------SCENARIO: PREDEVELOPED Number of Subbasins: 1 ---------- Subbasin : Subbasin 1 ---------- -------Area (Acres) -------- Till Forest 0.110 ---------------------------------------------- Subbasin Total 0.110 ----------------------SCENARIO: POSTDEVELOPED Number of Subbasins: 1 ---------- Subbasin : Developed ---------- -------Area (Acres) -------- Till Grass 0.014 Impervious 0.096 ---------------------------------------------- Subbasin Total 0.110 ************************* LINK DATA ******************************* ----------------------SCENARIO: PREDEVELOPED Number of Links: 0 ************************* LINK DATA ******************************* ----------------------SCENARIO: POSTDEVELOPED Number of Links: 1 ------------------------------------------ Link Name: Bioretention Link Type: Bioretention Facility Downstream Link: None Base Elevation (ft) : 100.00 Riser Crest Elevation (ft) : 100.50 Storage Depth (ft) : 0.50 Bottom Length (ft) : 20.0 Bottom Width (ft) : 9.0 Side Slopes (ft/ft) : L1= 0.00 L2= 0.00 W1= 0.00 W2= 0.00 Bottom Area (sq-ft) : 180. Area at Riser Crest El (sq-ft) : 180. (acres) : 0.004 Volume at Riser Crest (cu-ft) : 171. (ac-ft) : 0.004 Infiltration on Bottom only Selected Soil Properties Biosoil Thickness (ft) : 1.50 Biosoil Saturated Hydraulic Conductivity (in/hr) : 6.00 Biosoil Porosity (Percent) : 30.00 Maximum Elevation of Bioretention Soil : 101.00 Native Soil Hydraulic Conductivity (in/hr) : 1.00 Riser Geometry Riser Structure Type : Circular Riser Diameter (in) : 6.00 Common Length (ft) : 0.000 Riser Crest Elevation : 100.50 ft Hydraulic Structure Geometry Number of Devices: 0 **********************FLOOD FREQUENCY AND DURATION STATISTICS******************* ----------------------SCENARIO: PREDEVELOPED Number of Subbasins: 1 Number of Links: 0 ----------------------SCENARIO: POSTDEVELOPED Number of Subbasins: 1 Number of Links: 1 ***********Groundwater Recharge Summary ************* Recharge is computed as input to Perlnd Groundwater Plus Infiltration in Structures Total Predeveloped Recharge During Simulation Model Element Recharge Amount (ac-ft) ----------------------------------------------------------------------------------------------- Subbasin: Subbasin 1 18.967 _____________________________________ Total: 18.967 Total Post Developed Recharge During Simulation Model Element Recharge Amount (ac-ft) ----------------------------------------------------------------------------------------------- Subbasin: Developed 1.711 Link: Bioretention 45.678 _____________________________________ Total: 47.389 Total Predevelopment Recharge is Less than Post Developed Average Recharge Per Year, (Number of Years= 158) Predeveloped: 0.120 ac-ft/year, Post Developed: 0.300 ac-ft/year ***********Water Quality Facility Data ************* ----------------------SCENARIO: PREDEVELOPED Number of Links: 0 ----------------------SCENARIO: POSTDEVELOPED Number of Links: 1 ********** Link: Bioretention ********** Infiltration/Filtration Statistics-------------------- Inflow Volume (ac-ft): 45.86 Inflow Volume Including PPT-Evap (ac-ft): 47.58 Total Runoff Infiltrated (ac-ft): 45.68, 95.99% Total Runoff Filtered (ac-ft): 0.00, 0.00% Primary Outflow To Downstream System (ac-ft): 1.92 Secondary Outflow To Downstream System (ac-ft): 0.00 Percent Treated (Infiltrated+Filtered)/Total Volume: 95.99% ***********Compliance Point Results ************* Scenario Predeveloped Compliance Subbasin: Subbasin 1 Scenario Postdeveloped Compliance Link: Bioretention *** Point of Compliance Flow Frequency Data *** Recurrence Interval Computed Using Gringorten Plotting Position Predevelopment Runoff Postdevelopment Runoff Tr (Years) Discharge (cfs) Tr (Years) Discharge (cfs) ---------------------------------------------------------------------------------------------------------------------- 2-Year 2.344E-03 2-Year 2.200E-02 5-Year 3.820E-03 5-Year 3.522E-02 10-Year 5.147E-03 10-Year 3.972E-02 25-Year 6.526E-03 25-Year 4.984E-02 50-Year 8.329E-03 50-Year 5.914E-02 100-Year 9.026E-03 100-Year 6.996E-02 200-Year 1.405E-02 200-Year 7.728E-02 ** Record too Short to Compute Peak Discharge for These Recurrence Intervals **** LID Duration Performance **** Excursion at Predeveloped 8%Q2 (Must be Less Than 0%): -97.8% PASS Maximum Excursion from 8%Q2 to 50%Q2 (Must be Less Than 0%): -79.5% PASS ------------------------------------------------------------------------------------------------- MEETS ALL LID DURATION DESIGN CRITERIA: PASS ------------------------------------------------------------------------------------------------- ————————————————————————————————— MGS FLOOD PROJECT REPORT Program Version: MGSFlood 4.43 Program License Number: 200410007 Project Simulation Performed on: 10/04/2018 4:25 PM Report Generation Date: 10/04/2018 4:37 PM ————————————————————————————————— Input File Name: Basin 11.fld Project Name: Solera Analysis Title: BMP Performance Standard Comments: ———————————————— PRECIPITATION INPUT ———————————————— Computational Time Step (Minutes): 15 Extended Precipitation Time Series Selected Climatic Region Number: 0 Full Period of Record Available used for Routing Precipitation Station : 96004005 Puget East 40 in_5min 10/01/1939-10/01/2097 Evaporation Station : 961040 Puget East 40 in MAP Evaporation Scale Factor : 0.750 HSPF Parameter Region Number: 1 HSPF Parameter Region Name : USGS Default ********** Default HSPF Parameters Used (Not Modified by User) *************** ********************** WATERSHED DEFINITION *********************** Predevelopment/Post Development Tributary Area Summary Predeveloped Post Developed Total Subbasin Area (acres) 0.222 0.222 Area of Links that Include Precip/Evap (acres) 0.000 0.007 Total (acres) 0.222 0.229 ----------------------SCENARIO: PREDEVELOPED Number of Subbasins: 1 ---------- Subbasin : Subbasin 1 ---------- -------Area (Acres) -------- Till Forest 0.222 ---------------------------------------------- Subbasin Total 0.222 ----------------------SCENARIO: POSTDEVELOPED Number of Subbasins: 1 ---------- Subbasin : Basin 11 ---------- -------Area (Acres) -------- Till Grass 0.053 Impervious 0.169 ---------------------------------------------- Subbasin Total 0.222 ************************* LINK DATA ******************************* ----------------------SCENARIO: PREDEVELOPED Number of Links: 0 ************************* LINK DATA ******************************* ----------------------SCENARIO: POSTDEVELOPED Number of Links: 1 ------------------------------------------ Link Name: Bioretention Link Type: Bioretention Facility Downstream Link: None Base Elevation (ft) : 100.00 Riser Crest Elevation (ft) : 100.50 Storage Depth (ft) : 0.50 Bottom Length (ft) : 25.0 Bottom Width (ft) : 12.0 Side Slopes (ft/ft) : L1= 0.00 L2= 0.00 W1= 0.00 W2= 0.00 Bottom Area (sq-ft) : 300. Area at Riser Crest El (sq-ft) : 300. (acres) : 0.007 Volume at Riser Crest (cu-ft) : 285. (ac-ft) : 0.007 Infiltration on Bottom only Selected Soil Properties Biosoil Thickness (ft) : 1.50 Biosoil Saturated Hydraulic Conductivity (in/hr) : 6.00 Biosoil Porosity (Percent) : 30.00 Maximum Elevation of Bioretention Soil : 101.00 Native Soil Hydraulic Conductivity (in/hr) : 0.70 Riser Geometry Riser Structure Type : Circular Riser Diameter (in) : 6.00 Common Length (ft) : 0.000 Riser Crest Elevation : 100.50 ft Hydraulic Structure Geometry Number of Devices: 0 **********************FLOOD FREQUENCY AND DURATION STATISTICS******************* ----------------------SCENARIO: PREDEVELOPED Number of Subbasins: 1 Number of Links: 0 ----------------------SCENARIO: POSTDEVELOPED Number of Subbasins: 1 Number of Links: 1 ***********Groundwater Recharge Summary ************* Recharge is computed as input to Perlnd Groundwater Plus Infiltration in Structures Total Predeveloped Recharge During Simulation Model Element Recharge Amount (ac-ft) ----------------------------------------------------------------------------------------------- Subbasin: Subbasin 1 38.279 _____________________________________ Total: 38.279 Total Post Developed Recharge During Simulation Model Element Recharge Amount (ac-ft) ----------------------------------------------------------------------------------------------- Subbasin: Basin 11 6.477 Link: Bioretention 81.450 _____________________________________ Total: 87.927 Total Predevelopment Recharge is Less than Post Developed Average Recharge Per Year, (Number of Years= 158) Predeveloped: 0.242 ac-ft/year, Post Developed: 0.556 ac-ft/year ***********Water Quality Facility Data ************* ----------------------SCENARIO: PREDEVELOPED Number of Links: 0 ----------------------SCENARIO: POSTDEVELOPED Number of Links: 1 ********** Link: Bioretention ********** Infiltration/Filtration Statistics-------------------- Inflow Volume (ac-ft): 86.43 Inflow Volume Including PPT-Evap (ac-ft): 89.24 Total Runoff Infiltrated (ac-ft): 81.45, 91.27% Total Runoff Filtered (ac-ft): 0.00, 0.00% Primary Outflow To Downstream System (ac-ft): 7.70 Secondary Outflow To Downstream System (ac-ft): 0.00 Percent Treated (Infiltrated+Filtered)/Total Volume: 91.27% ***********Compliance Point Results ************* Scenario Predeveloped Compliance Subbasin: Subbasin 1 Scenario Postdeveloped Compliance Link: Bioretention *** Point of Compliance Flow Frequency Data *** Recurrence Interval Computed Using Gringorten Plotting Position Predevelopment Runoff Postdevelopment Runoff Tr (Years) Discharge (cfs) Tr (Years) Discharge (cfs) ---------------------------------------------------------------------------------------------------------------------- 2-Year 4.731E-03 2-Year 4.733E-02 5-Year 7.710E-03 5-Year 7.131E-02 10-Year 1.039E-02 10-Year 8.162E-02 25-Year 1.317E-02 25-Year 0.102 50-Year 1.681E-02 50-Year 0.119 100-Year 1.822E-02 100-Year 0.137 200-Year 2.835E-02 200-Year 0.149 ** Record too Short to Compute Peak Discharge for These Recurrence Intervals **** LID Duration Performance **** Excursion at Predeveloped 8%Q2 (Must be Less Than 0%): -94.1% PASS Maximum Excursion from 8%Q2 to 50%Q2 (Must be Less Than 0%): -48.6% PASS ------------------------------------------------------------------------------------------------- MEETS ALL LID DURATION DESIGN CRITERIA: PASS ------------------------------------------------------------------------------------------------- ————————————————————————————————— MGS FLOOD PROJECT REPORT Program Version: MGSFlood 4.43 Program License Number: 200410007 Project Simulation Performed on: 10/04/2018 4:46 PM Report Generation Date: 10/04/2018 4:47 PM ————————————————————————————————— Input File Name: Basin 12.fld Project Name: Solera Analysis Title: BMP Performance Standard Comments: ———————————————— PRECIPITATION INPUT ———————————————— Computational Time Step (Minutes): 15 Extended Precipitation Time Series Selected Climatic Region Number: 0 Full Period of Record Available used for Routing Precipitation Station : 96004005 Puget East 40 in_5min 10/01/1939-10/01/2097 Evaporation Station : 961040 Puget East 40 in MAP Evaporation Scale Factor : 0.750 HSPF Parameter Region Number: 1 HSPF Parameter Region Name : USGS Default ********** Default HSPF Parameters Used (Not Modified by User) *************** ********************** WATERSHED DEFINITION *********************** Predevelopment/Post Development Tributary Area Summary Predeveloped Post Developed Total Subbasin Area (acres) 0.111 0.111 Area of Links that Include Precip/Evap (acres) 0.000 0.003 Total (acres) 0.111 0.114 ----------------------SCENARIO: PREDEVELOPED Number of Subbasins: 1 ---------- Subbasin : Subbasin 1 ---------- -------Area (Acres) -------- Till Forest 0.111 ---------------------------------------------- Subbasin Total 0.111 ----------------------SCENARIO: POSTDEVELOPED Number of Subbasins: 1 ---------- Subbasin : Basin 12 ---------- -------Area (Acres) -------- Till Grass 0.052 Impervious 0.059 ---------------------------------------------- Subbasin Total 0.111 ************************* LINK DATA ******************************* ----------------------SCENARIO: PREDEVELOPED Number of Links: 0 ************************* LINK DATA ******************************* ----------------------SCENARIO: POSTDEVELOPED Number of Links: 1 ------------------------------------------ Link Name: Bioretention Link Type: Bioretention Facility Downstream Link: None Base Elevation (ft) : 100.00 Riser Crest Elevation (ft) : 100.50 Storage Depth (ft) : 0.50 Bottom Length (ft) : 20.0 Bottom Width (ft) : 7.0 Side Slopes (ft/ft) : L1= 0.00 L2= 0.00 W1= 0.00 W2= 0.00 Bottom Area (sq-ft) : 140. Area at Riser Crest El (sq-ft) : 140. (acres) : 0.003 Volume at Riser Crest (cu-ft) : 133. (ac-ft) : 0.003 Infiltration on Bottom only Selected Soil Properties Biosoil Thickness (ft) : 1.50 Biosoil Saturated Hydraulic Conductivity (in/hr) : 6.00 Biosoil Porosity (Percent) : 30.00 Maximum Elevation of Bioretention Soil : 101.00 Native Soil Hydraulic Conductivity (in/hr) : 0.70 Riser Geometry Riser Structure Type : Circular Riser Diameter (in) : 6.00 Common Length (ft) : 0.000 Riser Crest Elevation : 100.50 ft Hydraulic Structure Geometry Number of Devices: 0 **********************FLOOD FREQUENCY AND DURATION STATISTICS******************* ----------------------SCENARIO: PREDEVELOPED Number of Subbasins: 1 Number of Links: 0 ----------------------SCENARIO: POSTDEVELOPED Number of Subbasins: 1 Number of Links: 1 ***********Groundwater Recharge Summary ************* Recharge is computed as input to Perlnd Groundwater Plus Infiltration in Structures Total Predeveloped Recharge During Simulation Model Element Recharge Amount (ac-ft) ----------------------------------------------------------------------------------------------- Subbasin: Subbasin 1 19.140 _____________________________________ Total: 19.140 Total Post Developed Recharge During Simulation Model Element Recharge Amount (ac-ft) ----------------------------------------------------------------------------------------------- Subbasin: Basin 12 6.355 Link: Bioretention 36.138 _____________________________________ Total: 42.493 Total Predevelopment Recharge is Less than Post Developed Average Recharge Per Year, (Number of Years= 158) Predeveloped: 0.121 ac-ft/year, Post Developed: 0.269 ac-ft/year ***********Water Quality Facility Data ************* ----------------------SCENARIO: PREDEVELOPED Number of Links: 0 ----------------------SCENARIO: POSTDEVELOPED Number of Links: 1 ********** Link: Bioretention ********** Infiltration/Filtration Statistics-------------------- Inflow Volume (ac-ft): 36.91 Inflow Volume Including PPT-Evap (ac-ft): 38.20 Total Runoff Infiltrated (ac-ft): 36.14, 94.60% Total Runoff Filtered (ac-ft): 0.00, 0.00% Primary Outflow To Downstream System (ac-ft): 2.05 Secondary Outflow To Downstream System (ac-ft): 0.00 Percent Treated (Infiltrated+Filtered)/Total Volume: 94.60% ***********Compliance Point Results ************* Scenario Predeveloped Compliance Subbasin: Subbasin 1 Scenario Postdeveloped Compliance Link: Bioretention *** Point of Compliance Flow Frequency Data *** Recurrence Interval Computed Using Gringorten Plotting Position Predevelopment Runoff Postdevelopment Runoff Tr (Years) Discharge (cfs) Tr (Years) Discharge (cfs) ---------------------------------------------------------------------------------------------------------------------- 2-Year 2.365E-03 2-Year 1.581E-02 5-Year 3.855E-03 5-Year 2.699E-02 10-Year 5.194E-03 10-Year 3.230E-02 25-Year 6.586E-03 25-Year 4.298E-02 50-Year 8.405E-03 50-Year 4.822E-02 100-Year 9.108E-03 100-Year 6.194E-02 200-Year 1.418E-02 200-Year 6.287E-02 ** Record too Short to Compute Peak Discharge for These Recurrence Intervals **** LID Duration Performance **** Excursion at Predeveloped 8%Q2 (Must be Less Than 0%): -96.1% PASS Maximum Excursion from 8%Q2 to 50%Q2 (Must be Less Than 0%): -68.1% PASS ------------------------------------------------------------------------------------------------- MEETS ALL LID DURATION DESIGN CRITERIA: PASS ------------------------------------------------------------------------------------------------- ————————————————————————————————— MGS FLOOD PROJECT REPORT Program Version: MGSFlood 4.43 Program License Number: 200410007 Project Simulation Performed on: 10/04/2018 5:00 PM Report Generation Date: 10/04/2018 5:01 PM ————————————————————————————————— Input File Name: Basin 12.fld Project Name: Solera Analysis Title: BMP Performance Standard Comments: ———————————————— PRECIPITATION INPUT ———————————————— Computational Time Step (Minutes): 15 Extended Precipitation Time Series Selected Climatic Region Number: 0 Full Period of Record Available used for Routing Precipitation Station : 96004005 Puget East 40 in_5min 10/01/1939-10/01/2097 Evaporation Station : 961040 Puget East 40 in MAP Evaporation Scale Factor : 0.750 HSPF Parameter Region Number: 1 HSPF Parameter Region Name : USGS Default ********** Default HSPF Parameters Used (Not Modified by User) *************** ********************** WATERSHED DEFINITION *********************** Predevelopment/Post Development Tributary Area Summary Predeveloped Post Developed Total Subbasin Area (acres) 0.102 0.102 Area of Links that Include Precip/Evap (acres) 0.000 0.003 Total (acres) 0.102 0.105 ----------------------SCENARIO: PREDEVELOPED Number of Subbasins: 1 ---------- Subbasin : Subbasin 1 ---------- -------Area (Acres) -------- Till Forest 0.102 ---------------------------------------------- Subbasin Total 0.102 ----------------------SCENARIO: POSTDEVELOPED Number of Subbasins: 1 ---------- Subbasin : Basin 13 ---------- -------Area (Acres) -------- Till Grass 0.032 Impervious 0.070 ---------------------------------------------- Subbasin Total 0.102 ************************* LINK DATA ******************************* ----------------------SCENARIO: PREDEVELOPED Number of Links: 0 ************************* LINK DATA ******************************* ----------------------SCENARIO: POSTDEVELOPED Number of Links: 1 ------------------------------------------ Link Name: Bioretention Link Type: Bioretention Facility Downstream Link: None Base Elevation (ft) : 100.00 Riser Crest Elevation (ft) : 100.50 Storage Depth (ft) : 0.50 Bottom Length (ft) : 20.0 Bottom Width (ft) : 7.0 Side Slopes (ft/ft) : L1= 0.00 L2= 0.00 W1= 0.00 W2= 0.00 Bottom Area (sq-ft) : 140. Area at Riser Crest El (sq-ft) : 140. (acres) : 0.003 Volume at Riser Crest (cu-ft) : 133. (ac-ft) : 0.003 Infiltration on Bottom only Selected Soil Properties Biosoil Thickness (ft) : 1.50 Biosoil Saturated Hydraulic Conductivity (in/hr) : 6.00 Biosoil Porosity (Percent) : 30.00 Maximum Elevation of Bioretention Soil : 101.00 Native Soil Hydraulic Conductivity (in/hr) : 0.70 Riser Geometry Riser Structure Type : Circular Riser Diameter (in) : 6.00 Common Length (ft) : 0.000 Riser Crest Elevation : 100.50 ft Hydraulic Structure Geometry Number of Devices: 0 **********************FLOOD FREQUENCY AND DURATION STATISTICS******************* ----------------------SCENARIO: PREDEVELOPED Number of Subbasins: 1 Number of Links: 0 ----------------------SCENARIO: POSTDEVELOPED Number of Subbasins: 1 Number of Links: 1 ***********Groundwater Recharge Summary ************* Recharge is computed as input to Perlnd Groundwater Plus Infiltration in Structures Total Predeveloped Recharge During Simulation Model Element Recharge Amount (ac-ft) ----------------------------------------------------------------------------------------------- Subbasin: Subbasin 1 17.588 _____________________________________ Total: 17.588 Total Post Developed Recharge During Simulation Model Element Recharge Amount (ac-ft) ----------------------------------------------------------------------------------------------- Subbasin: Basin 13 3.911 Link: Bioretention 36.435 _____________________________________ Total: 40.346 Total Predevelopment Recharge is Less than Post Developed Average Recharge Per Year, (Number of Years= 158) Predeveloped: 0.111 ac-ft/year, Post Developed: 0.255 ac-ft/year ***********Water Quality Facility Data ************* ----------------------SCENARIO: PREDEVELOPED Number of Links: 0 ----------------------SCENARIO: POSTDEVELOPED Number of Links: 1 ********** Link: Bioretention ********** Infiltration/Filtration Statistics-------------------- Inflow Volume (ac-ft): 37.82 Inflow Volume Including PPT-Evap (ac-ft): 39.13 Total Runoff Infiltrated (ac-ft): 36.44, 93.12% Total Runoff Filtered (ac-ft): 0.00, 0.00% Primary Outflow To Downstream System (ac-ft): 2.67 Secondary Outflow To Downstream System (ac-ft): 0.00 Percent Treated (Infiltrated+Filtered)/Total Volume: 93.12% ***********Compliance Point Results ************* Scenario Predeveloped Compliance Subbasin: Subbasin 1 Scenario Postdeveloped Compliance Link: Bioretention *** Point of Compliance Flow Frequency Data *** Recurrence Interval Computed Using Gringorten Plotting Position Predevelopment Runoff Postdevelopment Runoff Tr (Years) Discharge (cfs) Tr (Years) Discharge (cfs) ---------------------------------------------------------------------------------------------------------------------- 2-Year 2.174E-03 2-Year 1.890E-02 5-Year 3.542E-03 5-Year 2.991E-02 10-Year 4.773E-03 10-Year 3.499E-02 25-Year 6.052E-03 25-Year 4.384E-02 50-Year 7.723E-03 50-Year 5.070E-02 100-Year 8.369E-03 100-Year 6.104E-02 200-Year 1.303E-02 200-Year 6.444E-02 ** Record too Short to Compute Peak Discharge for These Recurrence Intervals **** LID Duration Performance **** Excursion at Predeveloped 8%Q2 (Must be Less Than 0%): -95.4% PASS Maximum Excursion from 8%Q2 to 50%Q2 (Must be Less Than 0%): -60.2% PASS ------------------------------------------------------------------------------------------------- MEETS ALL LID DURATION DESIGN CRITERIA: PASS ------------------------------------------------------------------------------------------------- ————————————————————————————————— MGS FLOOD PROJECT REPORT Program Version: MGSFlood 4.43 Program License Number: 200410007 Project Simulation Performed on: 10/04/2018 5:00 PM Report Generation Date: 10/04/2018 5:01 PM ————————————————————————————————— Input File Name: Basin 12.fld Project Name: Solera Analysis Title: BMP Performance Standard Comments: ———————————————— PRECIPITATION INPUT ———————————————— Computational Time Step (Minutes): 15 Extended Precipitation Time Series Selected Climatic Region Number: 0 Full Period of Record Available used for Routing Precipitation Station : 96004005 Puget East 40 in_5min 10/01/1939-10/01/2097 Evaporation Station : 961040 Puget East 40 in MAP Evaporation Scale Factor : 0.750 HSPF Parameter Region Number: 1 HSPF Parameter Region Name : USGS Default ********** Default HSPF Parameters Used (Not Modified by User) *************** ********************** WATERSHED DEFINITION *********************** Predevelopment/Post Development Tributary Area Summary Predeveloped Post Developed Total Subbasin Area (acres) 0.102 0.102 Area of Links that Include Precip/Evap (acres) 0.000 0.003 Total (acres) 0.102 0.105 ----------------------SCENARIO: PREDEVELOPED Number of Subbasins: 1 ---------- Subbasin : Subbasin 1 ---------- -------Area (Acres) -------- Till Forest 0.102 ---------------------------------------------- Subbasin Total 0.102 ----------------------SCENARIO: POSTDEVELOPED Number of Subbasins: 1 ---------- Subbasin : Basin 13 ---------- -------Area (Acres) -------- Till Grass 0.032 Impervious 0.070 ---------------------------------------------- Subbasin Total 0.102 ************************* LINK DATA ******************************* ----------------------SCENARIO: PREDEVELOPED Number of Links: 0 ************************* LINK DATA ******************************* ----------------------SCENARIO: POSTDEVELOPED Number of Links: 1 ------------------------------------------ Link Name: Bioretention Link Type: Bioretention Facility Downstream Link: None Base Elevation (ft) : 100.00 Riser Crest Elevation (ft) : 100.50 Storage Depth (ft) : 0.50 Bottom Length (ft) : 20.0 Bottom Width (ft) : 7.0 Side Slopes (ft/ft) : L1= 0.00 L2= 0.00 W1= 0.00 W2= 0.00 Bottom Area (sq-ft) : 140. Area at Riser Crest El (sq-ft) : 140. (acres) : 0.003 Volume at Riser Crest (cu-ft) : 133. (ac-ft) : 0.003 Infiltration on Bottom only Selected Soil Properties Biosoil Thickness (ft) : 1.50 Biosoil Saturated Hydraulic Conductivity (in/hr) : 6.00 Biosoil Porosity (Percent) : 30.00 Maximum Elevation of Bioretention Soil : 101.00 Native Soil Hydraulic Conductivity (in/hr) : 0.70 Riser Geometry Riser Structure Type : Circular Riser Diameter (in) : 6.00 Common Length (ft) : 0.000 Riser Crest Elevation : 100.50 ft Hydraulic Structure Geometry Number of Devices: 0 **********************FLOOD FREQUENCY AND DURATION STATISTICS******************* ----------------------SCENARIO: PREDEVELOPED Number of Subbasins: 1 Number of Links: 0 ----------------------SCENARIO: POSTDEVELOPED Number of Subbasins: 1 Number of Links: 1 ***********Groundwater Recharge Summary ************* Recharge is computed as input to Perlnd Groundwater Plus Infiltration in Structures Total Predeveloped Recharge During Simulation Model Element Recharge Amount (ac-ft) ----------------------------------------------------------------------------------------------- Subbasin: Subbasin 1 17.588 _____________________________________ Total: 17.588 Total Post Developed Recharge During Simulation Model Element Recharge Amount (ac-ft) ----------------------------------------------------------------------------------------------- Subbasin: Basin 13 3.911 Link: Bioretention 36.435 _____________________________________ Total: 40.346 Total Predevelopment Recharge is Less than Post Developed Average Recharge Per Year, (Number of Years= 158) Predeveloped: 0.111 ac-ft/year, Post Developed: 0.255 ac-ft/year ***********Water Quality Facility Data ************* ----------------------SCENARIO: PREDEVELOPED Number of Links: 0 ----------------------SCENARIO: POSTDEVELOPED Number of Links: 1 ********** Link: Bioretention ********** Infiltration/Filtration Statistics-------------------- Inflow Volume (ac-ft): 37.82 Inflow Volume Including PPT-Evap (ac-ft): 39.13 Total Runoff Infiltrated (ac-ft): 36.44, 93.12% Total Runoff Filtered (ac-ft): 0.00, 0.00% Primary Outflow To Downstream System (ac-ft): 2.67 Secondary Outflow To Downstream System (ac-ft): 0.00 Percent Treated (Infiltrated+Filtered)/Total Volume: 93.12% ***********Compliance Point Results ************* Scenario Predeveloped Compliance Subbasin: Subbasin 1 Scenario Postdeveloped Compliance Link: Bioretention *** Point of Compliance Flow Frequency Data *** Recurrence Interval Computed Using Gringorten Plotting Position Predevelopment Runoff Postdevelopment Runoff Tr (Years) Discharge (cfs) Tr (Years) Discharge (cfs) ---------------------------------------------------------------------------------------------------------------------- 2-Year 2.174E-03 2-Year 1.890E-02 5-Year 3.542E-03 5-Year 2.991E-02 10-Year 4.773E-03 10-Year 3.499E-02 25-Year 6.052E-03 25-Year 4.384E-02 50-Year 7.723E-03 50-Year 5.070E-02 100-Year 8.369E-03 100-Year 6.104E-02 200-Year 1.303E-02 200-Year 6.444E-02 ** Record too Short to Compute Peak Discharge for These Recurrence Intervals **** LID Duration Performance **** Excursion at Predeveloped 8%Q2 (Must be Less Than 0%): -95.4% PASS Maximum Excursion from 8%Q2 to 50%Q2 (Must be Less Than 0%): -60.2% PASS ------------------------------------------------------------------------------------------------- MEETS ALL LID DURATION DESIGN CRITERIA: PASS ------------------------------------------------------------------------------------------------- ————————————————————————————————— MGS FLOOD PROJECT REPORT Program Version: MGSFlood 4.43 Program License Number: 200410007 Project Simulation Performed on: 10/04/2018 5:06 PM Report Generation Date: 10/04/2018 5:11 PM ————————————————————————————————— Input File Name: Basin 15.fld Project Name: Solera Analysis Title: BMP Performance Standard Comments: ———————————————— PRECIPITATION INPUT ———————————————— Computational Time Step (Minutes): 15 Extended Precipitation Time Series Selected Climatic Region Number: 0 Full Period of Record Available used for Routing Precipitation Station : 96004005 Puget East 40 in_5min 10/01/1939-10/01/2097 Evaporation Station : 961040 Puget East 40 in MAP Evaporation Scale Factor : 0.750 HSPF Parameter Region Number: 1 HSPF Parameter Region Name : USGS Default ********** Default HSPF Parameters Used (Not Modified by User) *************** ********************** WATERSHED DEFINITION *********************** Predevelopment/Post Development Tributary Area Summary Predeveloped Post Developed Total Subbasin Area (acres) 0.164 0.164 Area of Links that Include Precip/Evap (acres) 0.000 0.005 Total (acres) 0.164 0.169 ----------------------SCENARIO: PREDEVELOPED Number of Subbasins: 1 ---------- Subbasin : Subbasin 1 ---------- -------Area (Acres) -------- Till Forest 0.164 ---------------------------------------------- Subbasin Total 0.164 ----------------------SCENARIO: POSTDEVELOPED Number of Subbasins: 1 ---------- Subbasin : Basin 14 ---------- -------Area (Acres) -------- Till Grass 0.045 Impervious 0.119 ---------------------------------------------- Subbasin Total 0.164 ************************* LINK DATA ******************************* ----------------------SCENARIO: PREDEVELOPED Number of Links: 0 ************************* LINK DATA ******************************* ----------------------SCENARIO: POSTDEVELOPED Number of Links: 1 ------------------------------------------ Link Name: Bioretention Link Type: Bioretention Facility Downstream Link: None Base Elevation (ft) : 100.00 Riser Crest Elevation (ft) : 100.50 Storage Depth (ft) : 0.50 Bottom Length (ft) : 25.0 Bottom Width (ft) : 9.0 Side Slopes (ft/ft) : L1= 0.00 L2= 0.00 W1= 0.00 W2= 0.00 Bottom Area (sq-ft) : 225. Area at Riser Crest El (sq-ft) : 225. (acres) : 0.005 Volume at Riser Crest (cu-ft) : 214. (ac-ft) : 0.005 Infiltration on Bottom only Selected Soil Properties Biosoil Thickness (ft) : 1.50 Biosoil Saturated Hydraulic Conductivity (in/hr) : 6.00 Biosoil Porosity (Percent) : 30.00 Maximum Elevation of Bioretention Soil : 101.00 Native Soil Hydraulic Conductivity (in/hr) : 0.70 Riser Geometry Riser Structure Type : Circular Riser Diameter (in) : 6.00 Common Length (ft) : 0.000 Riser Crest Elevation : 100.50 ft Hydraulic Structure Geometry Number of Devices: 0 **********************FLOOD FREQUENCY AND DURATION STATISTICS******************* ----------------------SCENARIO: PREDEVELOPED Number of Subbasins: 1 Number of Links: 0 ----------------------SCENARIO: POSTDEVELOPED Number of Subbasins: 1 Number of Links: 1 ***********Groundwater Recharge Summary ************* Recharge is computed as input to Perlnd Groundwater Plus Infiltration in Structures Total Predeveloped Recharge During Simulation Model Element Recharge Amount (ac-ft) ----------------------------------------------------------------------------------------------- Subbasin: Subbasin 1 28.278 _____________________________________ Total: 28.278 Total Post Developed Recharge During Simulation Model Element Recharge Amount (ac-ft) ----------------------------------------------------------------------------------------------- Subbasin: Basin 14 5.499 Link: Bioretention 59.564 _____________________________________ Total: 65.064 Total Predevelopment Recharge is Less than Post Developed Average Recharge Per Year, (Number of Years= 158) Predeveloped: 0.179 ac-ft/year, Post Developed: 0.412 ac-ft/year ***********Water Quality Facility Data ************* ----------------------SCENARIO: PREDEVELOPED Number of Links: 0 ----------------------SCENARIO: POSTDEVELOPED Number of Links: 1 ********** Link: Bioretention ********** Infiltration/Filtration Statistics-------------------- Inflow Volume (ac-ft): 62.40 Inflow Volume Including PPT-Evap (ac-ft): 64.51 Total Runoff Infiltrated (ac-ft): 59.56, 92.34% Total Runoff Filtered (ac-ft): 0.00, 0.00% Primary Outflow To Downstream System (ac-ft): 4.89 Secondary Outflow To Downstream System (ac-ft): 0.00 Percent Treated (Infiltrated+Filtered)/Total Volume: 92.34% ***********Compliance Point Results ************* Scenario Predeveloped Compliance Subbasin: Subbasin 1 Scenario Postdeveloped Compliance Link: Bioretention *** Point of Compliance Flow Frequency Data *** Recurrence Interval Computed Using Gringorten Plotting Position Predevelopment Runoff Postdevelopment Runoff Tr (Years) Discharge (cfs) Tr (Years) Discharge (cfs) ---------------------------------------------------------------------------------------------------------------------- 2-Year 3.495E-03 2-Year 3.249E-02 5-Year 5.696E-03 5-Year 5.065E-02 10-Year 7.674E-03 10-Year 5.864E-02 25-Year 9.730E-03 25-Year 7.213E-02 50-Year 1.242E-02 50-Year 8.385E-02 100-Year 1.346E-02 100-Year 9.965E-02 200-Year 2.095E-02 200-Year 0.107 ** Record too Short to Compute Peak Discharge for These Recurrence Intervals **** LID Duration Performance **** Excursion at Predeveloped 8%Q2 (Must be Less Than 0%): -94.8% PASS Maximum Excursion from 8%Q2 to 50%Q2 (Must be Less Than 0%): -55.3% PASS ------------------------------------------------------------------------------------------------- MEETS ALL LID DURATION DESIGN CRITERIA: PASS ------------------------------------------------------------------------------------------------- ————————————————————————————————— MGS FLOOD PROJECT REPORT Program Version: MGSFlood 4.43 Program License Number: 200410007 Project Simulation Performed on: 10/04/2018 5:14 PM Report Generation Date: 10/04/2018 5:14 PM ————————————————————————————————— Input File Name: Basin 16.fld Project Name: Solera Analysis Title: BMP Performance Standard Comments: ———————————————— PRECIPITATION INPUT ———————————————— Computational Time Step (Minutes): 15 Extended Precipitation Time Series Selected Climatic Region Number: 0 Full Period of Record Available used for Routing Precipitation Station : 96004005 Puget East 40 in_5min 10/01/1939-10/01/2097 Evaporation Station : 961040 Puget East 40 in MAP Evaporation Scale Factor : 0.750 HSPF Parameter Region Number: 1 HSPF Parameter Region Name : USGS Default ********** Default HSPF Parameters Used (Not Modified by User) *************** ********************** WATERSHED DEFINITION *********************** Predevelopment/Post Development Tributary Area Summary Predeveloped Post Developed Total Subbasin Area (acres) 0.152 0.147 Area of Links that Include Precip/Evap (acres) 0.000 0.005 Total (acres) 0.152 0.152 ----------------------SCENARIO: PREDEVELOPED Number of Subbasins: 1 ---------- Subbasin : Subbasin 1 ---------- -------Area (Acres) -------- Till Forest 0.152 ---------------------------------------------- Subbasin Total 0.152 ----------------------SCENARIO: POSTDEVELOPED Number of Subbasins: 1 ---------- Subbasin : Basin 16 ---------- -------Area (Acres) -------- Till Grass 0.040 Impervious 0.107 ---------------------------------------------- Subbasin Total 0.147 ************************* LINK DATA ******************************* ----------------------SCENARIO: PREDEVELOPED Number of Links: 0 ************************* LINK DATA ******************************* ----------------------SCENARIO: POSTDEVELOPED Number of Links: 1 ------------------------------------------ Link Name: Bioretention Link Type: Bioretention Facility Downstream Link: None Base Elevation (ft) : 100.00 Riser Crest Elevation (ft) : 100.50 Storage Depth (ft) : 0.50 Bottom Length (ft) : 25.0 Bottom Width (ft) : 8.0 Side Slopes (ft/ft) : L1= 0.00 L2= 0.00 W1= 0.00 W2= 0.00 Bottom Area (sq-ft) : 200. Area at Riser Crest El (sq-ft) : 200. (acres) : 0.005 Volume at Riser Crest (cu-ft) : 190. (ac-ft) : 0.004 Infiltration on Bottom only Selected Soil Properties Biosoil Thickness (ft) : 1.50 Biosoil Saturated Hydraulic Conductivity (in/hr) : 6.00 Biosoil Porosity (Percent) : 30.00 Maximum Elevation of Bioretention Soil : 101.00 Native Soil Hydraulic Conductivity (in/hr) : 0.70 Riser Geometry Riser Structure Type : Circular Riser Diameter (in) : 6.00 Common Length (ft) : 0.000 Riser Crest Elevation : 100.50 ft Hydraulic Structure Geometry Number of Devices: 0 **********************FLOOD FREQUENCY AND DURATION STATISTICS******************* ----------------------SCENARIO: PREDEVELOPED Number of Subbasins: 1 Number of Links: 0 ----------------------SCENARIO: POSTDEVELOPED Number of Subbasins: 1 Number of Links: 1 ***********Groundwater Recharge Summary ************* Recharge is computed as input to Perlnd Groundwater Plus Infiltration in Structures Total Predeveloped Recharge During Simulation Model Element Recharge Amount (ac-ft) ----------------------------------------------------------------------------------------------- Subbasin: Subbasin 1 26.209 _____________________________________ Total: 26.209 Total Post Developed Recharge During Simulation Model Element Recharge Amount (ac-ft) ----------------------------------------------------------------------------------------------- Subbasin: Basin 16 4.888 Link: Bioretention 53.331 _____________________________________ Total: 58.219 Total Predevelopment Recharge is Less than Post Developed Average Recharge Per Year, (Number of Years= 158) Predeveloped: 0.166 ac-ft/year, Post Developed: 0.368 ac-ft/year ***********Water Quality Facility Data ************* ----------------------SCENARIO: PREDEVELOPED Number of Links: 0 ----------------------SCENARIO: POSTDEVELOPED Number of Links: 1 ********** Link: Bioretention ********** Infiltration/Filtration Statistics-------------------- Inflow Volume (ac-ft): 56.02 Inflow Volume Including PPT-Evap (ac-ft): 57.89 Total Runoff Infiltrated (ac-ft): 53.33, 92.13% Total Runoff Filtered (ac-ft): 0.00, 0.00% Primary Outflow To Downstream System (ac-ft): 4.51 Secondary Outflow To Downstream System (ac-ft): 0.00 Percent Treated (Infiltrated+Filtered)/Total Volume: 92.13% ***********Compliance Point Results ************* Scenario Predeveloped Compliance Subbasin: Subbasin 1 Scenario Postdeveloped Compliance Link: Bioretention *** Point of Compliance Flow Frequency Data *** Recurrence Interval Computed Using Gringorten Plotting Position Predevelopment Runoff Postdevelopment Runoff Tr (Years) Discharge (cfs) Tr (Years) Discharge (cfs) ---------------------------------------------------------------------------------------------------------------------- 2-Year 3.239E-03 2-Year 2.931E-02 5-Year 5.279E-03 5-Year 4.562E-02 10-Year 7.113E-03 10-Year 5.295E-02 25-Year 9.018E-03 25-Year 6.464E-02 50-Year 1.151E-02 50-Year 7.745E-02 100-Year 1.247E-02 100-Year 8.945E-02 200-Year 1.941E-02 200-Year 9.598E-02 ** Record too Short to Compute Peak Discharge for These Recurrence Intervals **** LID Duration Performance **** Excursion at Predeveloped 8%Q2 (Must be Less Than 0%): -94.7% PASS Maximum Excursion from 8%Q2 to 50%Q2 (Must be Less Than 0%): -54.6% PASS ------------------------------------------------------------------------------------------------- MEETS ALL LID DURATION DESIGN CRITERIA: PASS ------------------------------------------------------------------------------------------------- ————————————————————————————————— MGS FLOOD PROJECT REPORT Program Version: MGSFlood 4.43 Program License Number: 200410007 Project Simulation Performed on: 10/04/2018 5:16 PM Report Generation Date: 10/04/2018 5:16 PM ————————————————————————————————— Input File Name: Basin 17.fld Project Name: Solera Analysis Title: BMP Performance Standard Comments: ———————————————— PRECIPITATION INPUT ———————————————— Computational Time Step (Minutes): 15 Extended Precipitation Time Series Selected Climatic Region Number: 0 Full Period of Record Available used for Routing Precipitation Station : 96004005 Puget East 40 in_5min 10/01/1939-10/01/2097 Evaporation Station : 961040 Puget East 40 in MAP Evaporation Scale Factor : 0.750 HSPF Parameter Region Number: 1 HSPF Parameter Region Name : USGS Default ********** Default HSPF Parameters Used (Not Modified by User) *************** ********************** WATERSHED DEFINITION *********************** Predevelopment/Post Development Tributary Area Summary Predeveloped Post Developed Total Subbasin Area (acres) 0.153 0.153 Area of Links that Include Precip/Evap (acres) 0.000 0.005 Total (acres) 0.153 0.158 ----------------------SCENARIO: PREDEVELOPED Number of Subbasins: 1 ---------- Subbasin : Subbasin 1 ---------- -------Area (Acres) -------- Till Forest 0.153 ---------------------------------------------- Subbasin Total 0.153 ----------------------SCENARIO: POSTDEVELOPED Number of Subbasins: 1 ---------- Subbasin : Basin 17 ---------- -------Area (Acres) -------- Till Grass 0.031 Impervious 0.122 ---------------------------------------------- Subbasin Total 0.153 ************************* LINK DATA ******************************* ----------------------SCENARIO: PREDEVELOPED Number of Links: 0 ************************* LINK DATA ******************************* ----------------------SCENARIO: POSTDEVELOPED Number of Links: 1 ------------------------------------------ Link Name: Bioretention Link Type: Bioretention Facility Downstream Link: None Base Elevation (ft) : 100.00 Riser Crest Elevation (ft) : 100.50 Storage Depth (ft) : 0.50 Bottom Length (ft) : 25.0 Bottom Width (ft) : 9.0 Side Slopes (ft/ft) : L1= 0.00 L2= 0.00 W1= 0.00 W2= 0.00 Bottom Area (sq-ft) : 225. Area at Riser Crest El (sq-ft) : 225. (acres) : 0.005 Volume at Riser Crest (cu-ft) : 214. (ac-ft) : 0.005 Infiltration on Bottom only Selected Soil Properties Biosoil Thickness (ft) : 1.50 Biosoil Saturated Hydraulic Conductivity (in/hr) : 6.00 Biosoil Porosity (Percent) : 30.00 Maximum Elevation of Bioretention Soil : 101.00 Native Soil Hydraulic Conductivity (in/hr) : 0.70 Riser Geometry Riser Structure Type : Circular Riser Diameter (in) : 6.00 Common Length (ft) : 0.000 Riser Crest Elevation : 100.50 ft Hydraulic Structure Geometry Number of Devices: 0 **********************FLOOD FREQUENCY AND DURATION STATISTICS******************* ----------------------SCENARIO: PREDEVELOPED Number of Subbasins: 1 Number of Links: 0 ----------------------SCENARIO: POSTDEVELOPED Number of Subbasins: 1 Number of Links: 1 ***********Groundwater Recharge Summary ************* Recharge is computed as input to Perlnd Groundwater Plus Infiltration in Structures Total Predeveloped Recharge During Simulation Model Element Recharge Amount (ac-ft) ----------------------------------------------------------------------------------------------- Subbasin: Subbasin 1 26.382 _____________________________________ Total: 26.382 Total Post Developed Recharge During Simulation Model Element Recharge Amount (ac-ft) ----------------------------------------------------------------------------------------------- Subbasin: Basin 17 3.789 Link: Bioretention 58.151 _____________________________________ Total: 61.939 Total Predevelopment Recharge is Less than Post Developed Average Recharge Per Year, (Number of Years= 158) Predeveloped: 0.167 ac-ft/year, Post Developed: 0.392 ac-ft/year ***********Water Quality Facility Data ************* ----------------------SCENARIO: PREDEVELOPED Number of Links: 0 ----------------------SCENARIO: POSTDEVELOPED Number of Links: 1 ********** Link: Bioretention ********** Infiltration/Filtration Statistics-------------------- Inflow Volume (ac-ft): 60.93 Inflow Volume Including PPT-Evap (ac-ft): 63.06 Total Runoff Infiltrated (ac-ft): 58.15, 92.22% Total Runoff Filtered (ac-ft): 0.00, 0.00% Primary Outflow To Downstream System (ac-ft): 4.86 Secondary Outflow To Downstream System (ac-ft): 0.00 Percent Treated (Infiltrated+Filtered)/Total Volume: 92.22% ***********Compliance Point Results ************* Scenario Predeveloped Compliance Subbasin: Subbasin 1 Scenario Postdeveloped Compliance Link: Bioretention *** Point of Compliance Flow Frequency Data *** Recurrence Interval Computed Using Gringorten Plotting Position Predevelopment Runoff Postdevelopment Runoff Tr (Years) Discharge (cfs) Tr (Years) Discharge (cfs) ---------------------------------------------------------------------------------------------------------------------- 2-Year 3.260E-03 2-Year 3.291E-02 5-Year 5.314E-03 5-Year 4.939E-02 10-Year 7.160E-03 10-Year 5.762E-02 25-Year 9.078E-03 25-Year 6.935E-02 50-Year 1.158E-02 50-Year 8.141E-02 100-Year 1.255E-02 100-Year 9.581E-02 200-Year 1.954E-02 200-Year 0.105 ** Record too Short to Compute Peak Discharge for These Recurrence Intervals **** LID Duration Performance **** Excursion at Predeveloped 8%Q2 (Must be Less Than 0%): -94.9% PASS Maximum Excursion from 8%Q2 to 50%Q2 (Must be Less Than 0%): -55.2% PASS ------------------------------------------------------------------------------------------------- MEETS ALL LID DURATION DESIGN CRITERIA: PASS ------------------------------------------------------------------------------------------------- ————————————————————————————————— MGS FLOOD PROJECT REPORT Program Version: MGSFlood 4.43 Program License Number: 200410007 Project Simulation Performed on: 10/04/2018 5:17 PM Report Generation Date: 10/04/2018 5:17 PM ————————————————————————————————— Input File Name: Basin 18.fld Project Name: Solera Analysis Title: BMP Performance Standard Comments: ———————————————— PRECIPITATION INPUT ———————————————— Computational Time Step (Minutes): 15 Extended Precipitation Time Series Selected Climatic Region Number: 0 Full Period of Record Available used for Routing Precipitation Station : 96004005 Puget East 40 in_5min 10/01/1939-10/01/2097 Evaporation Station : 961040 Puget East 40 in MAP Evaporation Scale Factor : 0.750 HSPF Parameter Region Number: 1 HSPF Parameter Region Name : USGS Default ********** Default HSPF Parameters Used (Not Modified by User) *************** ********************** WATERSHED DEFINITION *********************** Predevelopment/Post Development Tributary Area Summary Predeveloped Post Developed Total Subbasin Area (acres) 0.156 0.156 Area of Links that Include Precip/Evap (acres) 0.000 0.004 Total (acres) 0.156 0.160 ----------------------SCENARIO: PREDEVELOPED Number of Subbasins: 1 ---------- Subbasin : Subbasin 1 ---------- -------Area (Acres) -------- Till Forest 0.156 ---------------------------------------------- Subbasin Total 0.156 ----------------------SCENARIO: POSTDEVELOPED Number of Subbasins: 1 ---------- Subbasin : Basin 18 ---------- -------Area (Acres) -------- Till Grass 0.063 Impervious 0.093 ---------------------------------------------- Subbasin Total 0.156 ************************* LINK DATA ******************************* ----------------------SCENARIO: PREDEVELOPED Number of Links: 0 ************************* LINK DATA ******************************* ----------------------SCENARIO: POSTDEVELOPED Number of Links: 1 ------------------------------------------ Link Name: Bioretention Link Type: Bioretention Facility Downstream Link: None Base Elevation (ft) : 100.00 Riser Crest Elevation (ft) : 100.50 Storage Depth (ft) : 0.50 Bottom Length (ft) : 20.0 Bottom Width (ft) : 9.0 Side Slopes (ft/ft) : L1= 0.00 L2= 0.00 W1= 0.00 W2= 0.00 Bottom Area (sq-ft) : 180. Area at Riser Crest El (sq-ft) : 180. (acres) : 0.004 Volume at Riser Crest (cu-ft) : 171. (ac-ft) : 0.004 Infiltration on Bottom only Selected Soil Properties Biosoil Thickness (ft) : 1.50 Biosoil Saturated Hydraulic Conductivity (in/hr) : 6.00 Biosoil Porosity (Percent) : 30.00 Maximum Elevation of Bioretention Soil : 101.00 Native Soil Hydraulic Conductivity (in/hr) : 0.70 Riser Geometry Riser Structure Type : Circular Riser Diameter (in) : 6.00 Common Length (ft) : 0.000 Riser Crest Elevation : 100.50 ft Hydraulic Structure Geometry Number of Devices: 0 **********************FLOOD FREQUENCY AND DURATION STATISTICS******************* ----------------------SCENARIO: PREDEVELOPED Number of Subbasins: 1 Number of Links: 0 ----------------------SCENARIO: POSTDEVELOPED Number of Subbasins: 1 Number of Links: 1 ***********Groundwater Recharge Summary ************* Recharge is computed as input to Perlnd Groundwater Plus Infiltration in Structures Total Predeveloped Recharge During Simulation Model Element Recharge Amount (ac-ft) ----------------------------------------------------------------------------------------------- Subbasin: Subbasin 1 26.899 _____________________________________ Total: 26.899 Total Post Developed Recharge During Simulation Model Element Recharge Amount (ac-ft) ----------------------------------------------------------------------------------------------- Subbasin: Basin 18 7.699 Link: Bioretention 51.445 _____________________________________ Total: 59.144 Total Predevelopment Recharge is Less than Post Developed Average Recharge Per Year, (Number of Years= 158) Predeveloped: 0.170 ac-ft/year, Post Developed: 0.374 ac-ft/year ***********Water Quality Facility Data ************* ----------------------SCENARIO: PREDEVELOPED Number of Links: 0 ----------------------SCENARIO: POSTDEVELOPED Number of Links: 1 ********** Link: Bioretention ********** Infiltration/Filtration Statistics-------------------- Inflow Volume (ac-ft): 54.37 Inflow Volume Including PPT-Evap (ac-ft): 56.02 Total Runoff Infiltrated (ac-ft): 51.45, 91.83% Total Runoff Filtered (ac-ft): 0.00, 0.00% Primary Outflow To Downstream System (ac-ft): 4.53 Secondary Outflow To Downstream System (ac-ft): 0.00 Percent Treated (Infiltrated+Filtered)/Total Volume: 91.83% ***********Compliance Point Results ************* Scenario Predeveloped Compliance Subbasin: Subbasin 1 Scenario Postdeveloped Compliance Link: Bioretention *** Point of Compliance Flow Frequency Data *** Recurrence Interval Computed Using Gringorten Plotting Position Predevelopment Runoff Postdevelopment Runoff Tr (Years) Discharge (cfs) Tr (Years) Discharge (cfs) ---------------------------------------------------------------------------------------------------------------------- 2-Year 3.324E-03 2-Year 2.739E-02 5-Year 5.418E-03 5-Year 4.298E-02 10-Year 7.300E-03 10-Year 5.082E-02 25-Year 9.256E-03 25-Year 6.314E-02 50-Year 1.181E-02 50-Year 7.983E-02 100-Year 1.280E-02 100-Year 9.401E-02 200-Year 1.992E-02 200-Year 9.445E-02 ** Record too Short to Compute Peak Discharge for These Recurrence Intervals **** LID Duration Performance **** Excursion at Predeveloped 8%Q2 (Must be Less Than 0%): -93.9% PASS Maximum Excursion from 8%Q2 to 50%Q2 (Must be Less Than 0%): -50.4% PASS ------------------------------------------------------------------------------------------------- MEETS ALL LID DURATION DESIGN CRITERIA: PASS ------------------------------------------------------------------------------------------------- ————————————————————————————————— MGS FLOOD PROJECT REPORT Program Version: MGSFlood 4.43 Program License Number: 200410007 Project Simulation Performed on: 10/04/2018 5:19 PM Report Generation Date: 10/04/2018 5:19 PM ————————————————————————————————— Input File Name: Basin 19.fld Project Name: Solera Analysis Title: BMP Performance Standard Comments: ———————————————— PRECIPITATION INPUT ———————————————— Computational Time Step (Minutes): 15 Extended Precipitation Time Series Selected Climatic Region Number: 0 Full Period of Record Available used for Routing Precipitation Station : 96004005 Puget East 40 in_5min 10/01/1939-10/01/2097 Evaporation Station : 961040 Puget East 40 in MAP Evaporation Scale Factor : 0.750 HSPF Parameter Region Number: 1 HSPF Parameter Region Name : USGS Default ********** Default HSPF Parameters Used (Not Modified by User) *************** ********************** WATERSHED DEFINITION *********************** Predevelopment/Post Development Tributary Area Summary Predeveloped Post Developed Total Subbasin Area (acres) 0.149 0.149 Area of Links that Include Precip/Evap (acres) 0.000 0.005 Total (acres) 0.149 0.154 ----------------------SCENARIO: PREDEVELOPED Number of Subbasins: 1 ---------- Subbasin : Subbasin 1 ---------- -------Area (Acres) -------- Till Forest 0.149 ---------------------------------------------- Subbasin Total 0.149 ----------------------SCENARIO: POSTDEVELOPED Number of Subbasins: 1 ---------- Subbasin : Basin 19 ---------- -------Area (Acres) -------- Till Grass 0.038 Impervious 0.111 ---------------------------------------------- Subbasin Total 0.149 ************************* LINK DATA ******************************* ----------------------SCENARIO: PREDEVELOPED Number of Links: 0 ************************* LINK DATA ******************************* ----------------------SCENARIO: POSTDEVELOPED Number of Links: 1 ------------------------------------------ Link Name: Bioretention Link Type: Bioretention Facility Downstream Link: None Base Elevation (ft) : 100.00 Riser Crest Elevation (ft) : 100.50 Storage Depth (ft) : 0.50 Bottom Length (ft) : 20.0 Bottom Width (ft) : 10.0 Side Slopes (ft/ft) : L1= 0.00 L2= 0.00 W1= 0.00 W2= 0.00 Bottom Area (sq-ft) : 200. Area at Riser Crest El (sq-ft) : 200. (acres) : 0.005 Volume at Riser Crest (cu-ft) : 190. (ac-ft) : 0.004 Infiltration on Bottom only Selected Soil Properties Biosoil Thickness (ft) : 1.50 Biosoil Saturated Hydraulic Conductivity (in/hr) : 6.00 Biosoil Porosity (Percent) : 30.00 Maximum Elevation of Bioretention Soil : 101.00 Native Soil Hydraulic Conductivity (in/hr) : 0.70 Riser Geometry Riser Structure Type : Circular Riser Diameter (in) : 6.00 Common Length (ft) : 0.000 Riser Crest Elevation : 100.50 ft Hydraulic Structure Geometry Number of Devices: 0 **********************FLOOD FREQUENCY AND DURATION STATISTICS******************* ----------------------SCENARIO: PREDEVELOPED Number of Subbasins: 1 Number of Links: 0 ----------------------SCENARIO: POSTDEVELOPED Number of Subbasins: 1 Number of Links: 1 ***********Groundwater Recharge Summary ************* Recharge is computed as input to Perlnd Groundwater Plus Infiltration in Structures Total Predeveloped Recharge During Simulation Model Element Recharge Amount (ac-ft) ----------------------------------------------------------------------------------------------- Subbasin: Subbasin 1 25.692 _____________________________________ Total: 25.692 Total Post Developed Recharge During Simulation Model Element Recharge Amount (ac-ft) ----------------------------------------------------------------------------------------------- Subbasin: Basin 19 4.644 Link: Bioretention 54.233 _____________________________________ Total: 58.877 Total Predevelopment Recharge is Less than Post Developed Average Recharge Per Year, (Number of Years= 158) Predeveloped: 0.163 ac-ft/year, Post Developed: 0.373 ac-ft/year ***********Water Quality Facility Data ************* ----------------------SCENARIO: PREDEVELOPED Number of Links: 0 ----------------------SCENARIO: POSTDEVELOPED Number of Links: 1 ********** Link: Bioretention ********** Infiltration/Filtration Statistics-------------------- Inflow Volume (ac-ft): 57.41 Inflow Volume Including PPT-Evap (ac-ft): 59.28 Total Runoff Infiltrated (ac-ft): 54.23, 91.49% Total Runoff Filtered (ac-ft): 0.00, 0.00% Primary Outflow To Downstream System (ac-ft): 4.98 Secondary Outflow To Downstream System (ac-ft): 0.00 Percent Treated (Infiltrated+Filtered)/Total Volume: 91.49% ***********Compliance Point Results ************* Scenario Predeveloped Compliance Subbasin: Subbasin 1 Scenario Postdeveloped Compliance Link: Bioretention *** Point of Compliance Flow Frequency Data *** Recurrence Interval Computed Using Gringorten Plotting Position Predevelopment Runoff Postdevelopment Runoff Tr (Years) Discharge (cfs) Tr (Years) Discharge (cfs) ---------------------------------------------------------------------------------------------------------------------- 2-Year 3.175E-03 2-Year 3.238E-02 5-Year 5.175E-03 5-Year 4.702E-02 10-Year 6.972E-03 10-Year 5.467E-02 25-Year 8.840E-03 25-Year 6.671E-02 50-Year 1.128E-02 50-Year 8.301E-02 100-Year 1.223E-02 100-Year 9.158E-02 200-Year 1.903E-02 200-Year 9.838E-02 ** Record too Short to Compute Peak Discharge for These Recurrence Intervals **** LID Duration Performance **** Excursion at Predeveloped 8%Q2 (Must be Less Than 0%): -94.2% PASS Maximum Excursion from 8%Q2 to 50%Q2 (Must be Less Than 0%): -50.3% PASS ------------------------------------------------------------------------------------------------- MEETS ALL LID DURATION DESIGN CRITERIA: PASS ------------------------------------------------------------------------------------------------- ————————————————————————————————— MGS FLOOD PROJECT REPORT Program Version: MGSFlood 4.43 Program License Number: 200410007 Project Simulation Performed on: 10/04/2018 5:21 PM Report Generation Date: 10/04/2018 5:21 PM ————————————————————————————————— Input File Name: Basin 20.fld Project Name: Solera Analysis Title: BMP Performance Standard Comments: ———————————————— PRECIPITATION INPUT ———————————————— Computational Time Step (Minutes): 15 Extended Precipitation Time Series Selected Climatic Region Number: 0 Full Period of Record Available used for Routing Precipitation Station : 96004005 Puget East 40 in_5min 10/01/1939-10/01/2097 Evaporation Station : 961040 Puget East 40 in MAP Evaporation Scale Factor : 0.750 HSPF Parameter Region Number: 1 HSPF Parameter Region Name : USGS Default ********** Default HSPF Parameters Used (Not Modified by User) *************** ********************** WATERSHED DEFINITION *********************** Predevelopment/Post Development Tributary Area Summary Predeveloped Post Developed Total Subbasin Area (acres) 0.161 0.161 Area of Links that Include Precip/Evap (acres) 0.000 0.005 Total (acres) 0.161 0.166 ----------------------SCENARIO: PREDEVELOPED Number of Subbasins: 1 ---------- Subbasin : Subbasin 1 ---------- -------Area (Acres) -------- Till Forest 0.161 ---------------------------------------------- Subbasin Total 0.161 ----------------------SCENARIO: POSTDEVELOPED Number of Subbasins: 1 ---------- Subbasin : Basin 20 ---------- -------Area (Acres) -------- Till Grass 0.036 Impervious 0.125 ---------------------------------------------- Subbasin Total 0.161 ************************* LINK DATA ******************************* ----------------------SCENARIO: PREDEVELOPED Number of Links: 0 ************************* LINK DATA ******************************* ----------------------SCENARIO: POSTDEVELOPED Number of Links: 1 ------------------------------------------ Link Name: Bioretention Link Type: Bioretention Facility Downstream Link: None Base Elevation (ft) : 100.00 Riser Crest Elevation (ft) : 100.50 Storage Depth (ft) : 0.50 Bottom Length (ft) : 20.0 Bottom Width (ft) : 11.0 Side Slopes (ft/ft) : L1= 0.00 L2= 0.00 W1= 0.00 W2= 0.00 Bottom Area (sq-ft) : 220. Area at Riser Crest El (sq-ft) : 220. (acres) : 0.005 Volume at Riser Crest (cu-ft) : 209. (ac-ft) : 0.005 Infiltration on Bottom only Selected Soil Properties Biosoil Thickness (ft) : 1.50 Biosoil Saturated Hydraulic Conductivity (in/hr) : 6.00 Biosoil Porosity (Percent) : 30.00 Maximum Elevation of Bioretention Soil : 101.00 Native Soil Hydraulic Conductivity (in/hr) : 0.70 Riser Geometry Riser Structure Type : Circular Riser Diameter (in) : 6.00 Common Length (ft) : 0.000 Riser Crest Elevation : 100.50 ft Hydraulic Structure Geometry Number of Devices: 0 **********************FLOOD FREQUENCY AND DURATION STATISTICS******************* ----------------------SCENARIO: PREDEVELOPED Number of Subbasins: 1 Number of Links: 0 ----------------------SCENARIO: POSTDEVELOPED Number of Subbasins: 1 Number of Links: 1 ***********Groundwater Recharge Summary ************* Recharge is computed as input to Perlnd Groundwater Plus Infiltration in Structures Total Predeveloped Recharge During Simulation Model Element Recharge Amount (ac-ft) ----------------------------------------------------------------------------------------------- Subbasin: Subbasin 1 27.761 _____________________________________ Total: 27.761 Total Post Developed Recharge During Simulation Model Element Recharge Amount (ac-ft) ----------------------------------------------------------------------------------------------- Subbasin: Basin 20 4.400 Link: Bioretention 59.575 _____________________________________ Total: 63.975 Total Predevelopment Recharge is Less than Post Developed Average Recharge Per Year, (Number of Years= 158) Predeveloped: 0.176 ac-ft/year, Post Developed: 0.405 ac-ft/year ***********Water Quality Facility Data ************* ----------------------SCENARIO: PREDEVELOPED Number of Links: 0 ----------------------SCENARIO: POSTDEVELOPED Number of Links: 1 ********** Link: Bioretention ********** Infiltration/Filtration Statistics-------------------- Inflow Volume (ac-ft): 63.28 Inflow Volume Including PPT-Evap (ac-ft): 65.35 Total Runoff Infiltrated (ac-ft): 59.57, 91.16% Total Runoff Filtered (ac-ft): 0.00, 0.00% Primary Outflow To Downstream System (ac-ft): 5.71 Secondary Outflow To Downstream System (ac-ft): 0.00 Percent Treated (Infiltrated+Filtered)/Total Volume: 91.16% ***********Compliance Point Results ************* Scenario Predeveloped Compliance Subbasin: Subbasin 1 Scenario Postdeveloped Compliance Link: Bioretention *** Point of Compliance Flow Frequency Data *** Recurrence Interval Computed Using Gringorten Plotting Position Predevelopment Runoff Postdevelopment Runoff Tr (Years) Discharge (cfs) Tr (Years) Discharge (cfs) ---------------------------------------------------------------------------------------------------------------------- 2-Year 3.431E-03 2-Year 3.483E-02 5-Year 5.592E-03 5-Year 5.371E-02 10-Year 7.534E-03 10-Year 6.063E-02 25-Year 9.552E-03 25-Year 7.596E-02 50-Year 1.219E-02 50-Year 9.136E-02 100-Year 1.321E-02 100-Year 0.100 200-Year 2.056E-02 200-Year 0.109 ** Record too Short to Compute Peak Discharge for These Recurrence Intervals **** LID Duration Performance **** Excursion at Predeveloped 8%Q2 (Must be Less Than 0%): -94.1% PASS Maximum Excursion from 8%Q2 to 50%Q2 (Must be Less Than 0%): -48.4% PASS ------------------------------------------------------------------------------------------------- MEETS ALL LID DURATION DESIGN CRITERIA: PASS ------------------------------------------------------------------------------------------------- ————————————————————————————————— MGS FLOOD PROJECT REPORT Program Version: MGSFlood 4.43 Program License Number: 200410007 Project Simulation Performed on: 10/05/2018 8:23 AM Report Generation Date: 10/05/2018 8:24 AM ————————————————————————————————— Input File Name: Basin 21.fld Project Name: Solera Analysis Title: BMP Performance Standard Comments: ———————————————— PRECIPITATION INPUT ———————————————— Computational Time Step (Minutes): 15 Extended Precipitation Time Series Selected Climatic Region Number: 0 Full Period of Record Available used for Routing Precipitation Station : 96004005 Puget East 40 in_5min 10/01/1939-10/01/2097 Evaporation Station : 961040 Puget East 40 in MAP Evaporation Scale Factor : 0.750 HSPF Parameter Region Number: 1 HSPF Parameter Region Name : USGS Default ********** Default HSPF Parameters Used (Not Modified by User) *************** ********************** WATERSHED DEFINITION *********************** Predevelopment/Post Development Tributary Area Summary Predeveloped Post Developed Total Subbasin Area (acres) 0.146 0.146 Area of Links that Include Precip/Evap (acres) 0.000 0.005 Total (acres) 0.146 0.151 ----------------------SCENARIO: PREDEVELOPED Number of Subbasins: 1 ---------- Subbasin : Subbasin 1 ---------- -------Area (Acres) -------- Till Forest 0.146 ---------------------------------------------- Subbasin Total 0.146 ----------------------SCENARIO: POSTDEVELOPED Number of Subbasins: 1 ---------- Subbasin : Basin 21 ---------- -------Area (Acres) -------- Till Grass 0.036 Impervious 0.110 ---------------------------------------------- Subbasin Total 0.146 ************************* LINK DATA ******************************* ----------------------SCENARIO: PREDEVELOPED Number of Links: 0 ************************* LINK DATA ******************************* ----------------------SCENARIO: POSTDEVELOPED Number of Links: 1 ------------------------------------------ Link Name: Bioretention Link Type: Bioretention Facility Downstream Link: None Base Elevation (ft) : 100.00 Riser Crest Elevation (ft) : 100.50 Storage Depth (ft) : 0.50 Bottom Length (ft) : 20.0 Bottom Width (ft) : 11.0 Side Slopes (ft/ft) : L1= 0.00 L2= 0.00 W1= 0.00 W2= 0.00 Bottom Area (sq-ft) : 220. Area at Riser Crest El (sq-ft) : 220. (acres) : 0.005 Volume at Riser Crest (cu-ft) : 209. (ac-ft) : 0.005 Infiltration on Bottom only Selected Soil Properties Biosoil Thickness (ft) : 1.50 Biosoil Saturated Hydraulic Conductivity (in/hr) : 6.00 Biosoil Porosity (Percent) : 30.00 Maximum Elevation of Bioretention Soil : 101.00 Native Soil Hydraulic Conductivity (in/hr) : 0.70 Riser Geometry Riser Structure Type : Circular Riser Diameter (in) : 6.00 Common Length (ft) : 0.000 Riser Crest Elevation : 100.50 ft Hydraulic Structure Geometry Number of Devices: 0 **********************FLOOD FREQUENCY AND DURATION STATISTICS******************* ----------------------SCENARIO: PREDEVELOPED Number of Subbasins: 1 Number of Links: 0 ----------------------SCENARIO: POSTDEVELOPED Number of Subbasins: 1 Number of Links: 1 ***********Groundwater Recharge Summary ************* Recharge is computed as input to Perlnd Groundwater Plus Infiltration in Structures Total Predeveloped Recharge During Simulation Model Element Recharge Amount (ac-ft) ----------------------------------------------------------------------------------------------- Subbasin: Subbasin 1 25.175 _____________________________________ Total: 25.175 Total Post Developed Recharge During Simulation Model Element Recharge Amount (ac-ft) ----------------------------------------------------------------------------------------------- Subbasin: Basin 21 4.400 Link: Bioretention 54.812 _____________________________________ Total: 59.212 Total Predevelopment Recharge is Less than Post Developed Average Recharge Per Year, (Number of Years= 158) Predeveloped: 0.159 ac-ft/year, Post Developed: 0.375 ac-ft/year ***********Water Quality Facility Data ************* ----------------------SCENARIO: PREDEVELOPED Number of Links: 0 ----------------------SCENARIO: POSTDEVELOPED Number of Links: 1 ********** Link: Bioretention ********** Infiltration/Filtration Statistics-------------------- Inflow Volume (ac-ft): 56.56 Inflow Volume Including PPT-Evap (ac-ft): 58.63 Total Runoff Infiltrated (ac-ft): 54.81, 93.49% Total Runoff Filtered (ac-ft): 0.00, 0.00% Primary Outflow To Downstream System (ac-ft): 3.78 Secondary Outflow To Downstream System (ac-ft): 0.00 Percent Treated (Infiltrated+Filtered)/Total Volume: 93.49% ***********Compliance Point Results ************* Scenario Predeveloped Compliance Subbasin: Subbasin 1 Scenario Postdeveloped Compliance Link: Bioretention *** Point of Compliance Flow Frequency Data *** Recurrence Interval Computed Using Gringorten Plotting Position Predevelopment Runoff Postdevelopment Runoff Tr (Years) Discharge (cfs) Tr (Years) Discharge (cfs) ---------------------------------------------------------------------------------------------------------------------- 2-Year 3.111E-03 2-Year 2.811E-02 5-Year 5.071E-03 5-Year 4.426E-02 10-Year 6.832E-03 10-Year 5.151E-02 25-Year 8.662E-03 25-Year 6.404E-02 50-Year 1.105E-02 50-Year 7.483E-02 100-Year 1.198E-02 100-Year 8.968E-02 200-Year 1.865E-02 200-Year 9.704E-02 ** Record too Short to Compute Peak Discharge for These Recurrence Intervals **** LID Duration Performance **** Excursion at Predeveloped 8%Q2 (Must be Less Than 0%): -95.8% PASS Maximum Excursion from 8%Q2 to 50%Q2 (Must be Less Than 0%): -63.1% PASS ------------------------------------------------------------------------------------------------- MEETS ALL LID DURATION DESIGN CRITERIA: PASS ------------------------------------------------------------------------------------------------- ————————————————————————————————— MGS FLOOD PROJECT REPORT Program Version: MGSFlood 4.43 Program License Number: 200410007 Project Simulation Performed on: 10/05/2018 8:23 AM Report Generation Date: 10/08/2018 11:42 AM ————————————————————————————————— Input File Name: Basin 22.fld Project Name: Solera Analysis Title: BMP Performance Standard Comments: ———————————————— PRECIPITATION INPUT ———————————————— Computational Time Step (Minutes): 15 Extended Precipitation Time Series Selected Climatic Region Number: 0 Full Period of Record Available used for Routing Precipitation Station : 96004005 Puget East 40 in_5min 10/01/1939-10/01/2097 Evaporation Station : 961040 Puget East 40 in MAP Evaporation Scale Factor : 0.750 HSPF Parameter Region Number: 1 HSPF Parameter Region Name : USGS Default ********** Default HSPF Parameters Used (Not Modified by User) *************** ********************** WATERSHED DEFINITION *********************** Predevelopment/Post Development Tributary Area Summary Predeveloped Post Developed Total Subbasin Area (acres) 0.146 0.146 Area of Links that Include Precip/Evap (acres) 0.000 0.005 Total (acres) 0.146 0.151 ----------------------SCENARIO: PREDEVELOPED Number of Subbasins: 1 ---------- Subbasin : Subbasin 1 ---------- -------Area (Acres) -------- Till Forest 0.146 ---------------------------------------------- Subbasin Total 0.146 ----------------------SCENARIO: POSTDEVELOPED Number of Subbasins: 1 ---------- Subbasin : Basin 21 ---------- -------Area (Acres) -------- Till Grass 0.036 Impervious 0.110 ---------------------------------------------- Subbasin Total 0.146 ************************* LINK DATA ******************************* ----------------------SCENARIO: PREDEVELOPED Number of Links: 0 ************************* LINK DATA ******************************* ----------------------SCENARIO: POSTDEVELOPED Number of Links: 1 ------------------------------------------ Link Name: Bioretention Link Type: Bioretention Facility Downstream Link: None Base Elevation (ft) : 100.00 Riser Crest Elevation (ft) : 100.50 Storage Depth (ft) : 0.50 Bottom Length (ft) : 20.0 Bottom Width (ft) : 11.0 Side Slopes (ft/ft) : L1= 0.00 L2= 0.00 W1= 0.00 W2= 0.00 Bottom Area (sq-ft) : 220. Area at Riser Crest El (sq-ft) : 220. (acres) : 0.005 Volume at Riser Crest (cu-ft) : 209. (ac-ft) : 0.005 Infiltration on Bottom only Selected Soil Properties Biosoil Thickness (ft) : 1.50 Biosoil Saturated Hydraulic Conductivity (in/hr) : 6.00 Biosoil Porosity (Percent) : 30.00 Maximum Elevation of Bioretention Soil : 101.00 Native Soil Hydraulic Conductivity (in/hr) : 0.70 Riser Geometry Riser Structure Type : Circular Riser Diameter (in) : 6.00 Common Length (ft) : 0.000 Riser Crest Elevation : 100.50 ft Hydraulic Structure Geometry Number of Devices: 0 **********************FLOOD FREQUENCY AND DURATION STATISTICS******************* ----------------------SCENARIO: PREDEVELOPED Number of Subbasins: 1 Number of Links: 0 ----------------------SCENARIO: POSTDEVELOPED Number of Subbasins: 1 Number of Links: 1 ***********Groundwater Recharge Summary ************* Recharge is computed as input to Perlnd Groundwater Plus Infiltration in Structures Total Predeveloped Recharge During Simulation Model Element Recharge Amount (ac-ft) ----------------------------------------------------------------------------------------------- Subbasin: Subbasin 1 25.175 _____________________________________ Total: 25.175 Total Post Developed Recharge During Simulation Model Element Recharge Amount (ac-ft) ----------------------------------------------------------------------------------------------- Subbasin: Basin 21 4.400 Link: Bioretention 54.812 _____________________________________ Total: 59.212 Total Predevelopment Recharge is Less than Post Developed Average Recharge Per Year, (Number of Years= 158) Predeveloped: 0.159 ac-ft/year, Post Developed: 0.375 ac-ft/year ***********Water Quality Facility Data ************* ----------------------SCENARIO: PREDEVELOPED Number of Links: 0 ----------------------SCENARIO: POSTDEVELOPED Number of Links: 1 ********** Link: Bioretention ********** Infiltration/Filtration Statistics-------------------- Inflow Volume (ac-ft): 56.56 Inflow Volume Including PPT-Evap (ac-ft): 58.63 Total Runoff Infiltrated (ac-ft): 54.81, 93.49% Total Runoff Filtered (ac-ft): 0.00, 0.00% Primary Outflow To Downstream System (ac-ft): 3.78 Secondary Outflow To Downstream System (ac-ft): 0.00 Percent Treated (Infiltrated+Filtered)/Total Volume: 93.49% ***********Compliance Point Results ************* Scenario Predeveloped Compliance Subbasin: Subbasin 1 Scenario Postdeveloped Compliance Link: Bioretention *** Point of Compliance Flow Frequency Data *** Recurrence Interval Computed Using Gringorten Plotting Position Predevelopment Runoff Postdevelopment Runoff Tr (Years) Discharge (cfs) Tr (Years) Discharge (cfs) ---------------------------------------------------------------------------------------------------------------------- 2-Year 3.111E-03 2-Year 2.811E-02 5-Year 5.071E-03 5-Year 4.426E-02 10-Year 6.832E-03 10-Year 5.151E-02 25-Year 8.662E-03 25-Year 6.404E-02 50-Year 1.105E-02 50-Year 7.483E-02 100-Year 1.198E-02 100-Year 8.968E-02 200-Year 1.865E-02 200-Year 9.704E-02 ** Record too Short to Compute Peak Discharge for These Recurrence Intervals **** LID Duration Performance **** Excursion at Predeveloped 8%Q2 (Must be Less Than 0%): -95.8% PASS Maximum Excursion from 8%Q2 to 50%Q2 (Must be Less Than 0%): -63.1% PASS ------------------------------------------------------------------------------------------------- MEETS ALL LID DURATION DESIGN CRITERIA: PASS ------------------------------------------------------------------------------------------------- ————————————————————————————————— MGS FLOOD PROJECT REPORT Program Version: MGSFlood 4.43 Program License Number: 200410007 Project Simulation Performed on: 10/05/2018 11:52 AM Report Generation Date: 10/05/2018 11:52 AM ————————————————————————————————— Input File Name: Basin 23.fld Project Name: Solera Analysis Title: BMP Performance Standard Comments: ———————————————— PRECIPITATION INPUT ———————————————— Computational Time Step (Minutes): 15 Extended Precipitation Time Series Selected Climatic Region Number: 0 Full Period of Record Available used for Routing Precipitation Station : 96004005 Puget East 40 in_5min 10/01/1939-10/01/2097 Evaporation Station : 961040 Puget East 40 in MAP Evaporation Scale Factor : 0.750 HSPF Parameter Region Number: 1 HSPF Parameter Region Name : USGS Default ********** Default HSPF Parameters Used (Not Modified by User) *************** ********************** WATERSHED DEFINITION *********************** Predevelopment/Post Development Tributary Area Summary Predeveloped Post Developed Total Subbasin Area (acres) 0.075 0.074 Area of Links that Include Precip/Evap (acres) 0.000 0.002 Total (acres) 0.075 0.076 ----------------------SCENARIO: PREDEVELOPED Number of Subbasins: 1 ---------- Subbasin : Subbasin 1 ---------- -------Area (Acres) -------- Till Forest 0.075 ---------------------------------------------- Subbasin Total 0.075 ----------------------SCENARIO: POSTDEVELOPED Number of Subbasins: 1 ---------- Subbasin : Basin 23 ---------- -------Area (Acres) -------- Till Grass 0.018 Impervious 0.056 ---------------------------------------------- Subbasin Total 0.074 ************************* LINK DATA ******************************* ----------------------SCENARIO: PREDEVELOPED Number of Links: 0 ************************* LINK DATA ******************************* ----------------------SCENARIO: POSTDEVELOPED Number of Links: 1 ------------------------------------------ Link Name: Bioretention Link Type: Bioretention Facility Downstream Link: None Base Elevation (ft) : 100.00 Riser Crest Elevation (ft) : 100.50 Storage Depth (ft) : 0.50 Bottom Length (ft) : 20.0 Bottom Width (ft) : 5.0 Side Slopes (ft/ft) : L1= 0.00 L2= 0.00 W1= 0.00 W2= 0.00 Bottom Area (sq-ft) : 100. Area at Riser Crest El (sq-ft) : 100. (acres) : 0.002 Volume at Riser Crest (cu-ft) : 95. (ac-ft) : 0.002 Infiltration on Bottom only Selected Soil Properties Biosoil Thickness (ft) : 1.50 Biosoil Saturated Hydraulic Conductivity (in/hr) : 6.00 Biosoil Porosity (Percent) : 30.00 Maximum Elevation of Bioretention Soil : 101.00 Native Soil Hydraulic Conductivity (in/hr) : 0.70 Riser Geometry Riser Structure Type : Circular Riser Diameter (in) : 6.00 Common Length (ft) : 0.000 Riser Crest Elevation : 100.50 ft Hydraulic Structure Geometry Number of Devices: 0 **********************FLOOD FREQUENCY AND DURATION STATISTICS******************* ----------------------SCENARIO: PREDEVELOPED Number of Subbasins: 1 Number of Links: 0 ----------------------SCENARIO: POSTDEVELOPED Number of Subbasins: 1 Number of Links: 1 ***********Groundwater Recharge Summary ************* Recharge is computed as input to Perlnd Groundwater Plus Infiltration in Structures Total Predeveloped Recharge During Simulation Model Element Recharge Amount (ac-ft) ----------------------------------------------------------------------------------------------- Subbasin: Subbasin 1 12.932 _____________________________________ Total: 12.932 Total Post Developed Recharge During Simulation Model Element Recharge Amount (ac-ft) ----------------------------------------------------------------------------------------------- Subbasin: Basin 23 2.200 Link: Bioretention 27.099 _____________________________________ Total: 29.299 Total Predevelopment Recharge is Less than Post Developed Average Recharge Per Year, (Number of Years= 158) Predeveloped: 0.082 ac-ft/year, Post Developed: 0.185 ac-ft/year ***********Water Quality Facility Data ************* ----------------------SCENARIO: PREDEVELOPED Number of Links: 0 ----------------------SCENARIO: POSTDEVELOPED Number of Links: 1 ********** Link: Bioretention ********** Infiltration/Filtration Statistics-------------------- Inflow Volume (ac-ft): 28.73 Inflow Volume Including PPT-Evap (ac-ft): 29.66 Total Runoff Infiltrated (ac-ft): 27.10, 91.35% Total Runoff Filtered (ac-ft): 0.00, 0.00% Primary Outflow To Downstream System (ac-ft): 2.53 Secondary Outflow To Downstream System (ac-ft): 0.00 Percent Treated (Infiltrated+Filtered)/Total Volume: 91.35% ***********Compliance Point Results ************* Scenario Predeveloped Compliance Subbasin: Subbasin 1 Scenario Postdeveloped Compliance Link: Bioretention *** Point of Compliance Flow Frequency Data *** Recurrence Interval Computed Using Gringorten Plotting Position Predevelopment Runoff Postdevelopment Runoff Tr (Years) Discharge (cfs) Tr (Years) Discharge (cfs) ---------------------------------------------------------------------------------------------------------------------- 2-Year 1.598E-03 2-Year 1.652E-02 5-Year 2.605E-03 5-Year 2.453E-02 10-Year 3.510E-03 10-Year 2.839E-02 25-Year 4.450E-03 25-Year 3.471E-02 50-Year 5.679E-03 50-Year 4.186E-02 100-Year 6.154E-03 100-Year 5.019E-02 200-Year 9.579E-03 200-Year 5.069E-02 ** Record too Short to Compute Peak Discharge for These Recurrence Intervals **** LID Duration Performance **** Excursion at Predeveloped 8%Q2 (Must be Less Than 0%): -94.2% PASS Maximum Excursion from 8%Q2 to 50%Q2 (Must be Less Than 0%): -50.1% PASS ------------------------------------------------------------------------------------------------- MEETS ALL LID DURATION DESIGN CRITERIA: PASS ------------------------------------------------------------------------------------------------- ————————————————————————————————— MGS FLOOD PROJECT REPORT Program Version: MGSFlood 4.43 Program License Number: 200410007 Project Simulation Performed on: 10/05/2018 12:00 PM Report Generation Date: 10/05/2018 12:00 PM ————————————————————————————————— Input File Name: Basin 24.fld Project Name: Solera Analysis Title: BMP Performance Standard Comments: ———————————————— PRECIPITATION INPUT ———————————————— Computational Time Step (Minutes): 15 Extended Precipitation Time Series Selected Climatic Region Number: 0 Full Period of Record Available used for Routing Precipitation Station : 96004005 Puget East 40 in_5min 10/01/1939-10/01/2097 Evaporation Station : 961040 Puget East 40 in MAP Evaporation Scale Factor : 0.750 HSPF Parameter Region Number: 1 HSPF Parameter Region Name : USGS Default ********** Default HSPF Parameters Used (Not Modified by User) *************** ********************** WATERSHED DEFINITION *********************** Predevelopment/Post Development Tributary Area Summary Predeveloped Post Developed Total Subbasin Area (acres) 0.136 0.135 Area of Links that Include Precip/Evap (acres) 0.000 0.004 Total (acres) 0.136 0.139 ----------------------SCENARIO: PREDEVELOPED Number of Subbasins: 1 ---------- Subbasin : Subbasin 1 ---------- -------Area (Acres) -------- Till Forest 0.136 ---------------------------------------------- Subbasin Total 0.136 ----------------------SCENARIO: POSTDEVELOPED Number of Subbasins: 1 ---------- Subbasin : Basin 24 ---------- -------Area (Acres) -------- Till Grass 0.035 Impervious 0.100 ---------------------------------------------- Subbasin Total 0.135 ************************* LINK DATA ******************************* ----------------------SCENARIO: PREDEVELOPED Number of Links: 0 ************************* LINK DATA ******************************* ----------------------SCENARIO: POSTDEVELOPED Number of Links: 1 ------------------------------------------ Link Name: Bioretention Link Type: Bioretention Facility Downstream Link: None Base Elevation (ft) : 100.00 Riser Crest Elevation (ft) : 100.50 Storage Depth (ft) : 0.50 Bottom Length (ft) : 20.0 Bottom Width (ft) : 9.0 Side Slopes (ft/ft) : L1= 0.00 L2= 0.00 W1= 0.00 W2= 0.00 Bottom Area (sq-ft) : 180. Area at Riser Crest El (sq-ft) : 180. (acres) : 0.004 Volume at Riser Crest (cu-ft) : 171. (ac-ft) : 0.004 Infiltration on Bottom only Selected Soil Properties Biosoil Thickness (ft) : 1.50 Biosoil Saturated Hydraulic Conductivity (in/hr) : 6.00 Biosoil Porosity (Percent) : 30.00 Maximum Elevation of Bioretention Soil : 101.00 Native Soil Hydraulic Conductivity (in/hr) : 0.70 Riser Geometry Riser Structure Type : Circular Riser Diameter (in) : 6.00 Common Length (ft) : 0.000 Riser Crest Elevation : 100.50 ft Hydraulic Structure Geometry Number of Devices: 0 **********************FLOOD FREQUENCY AND DURATION STATISTICS******************* ----------------------SCENARIO: PREDEVELOPED Number of Subbasins: 1 Number of Links: 0 ----------------------SCENARIO: POSTDEVELOPED Number of Subbasins: 1 Number of Links: 1 ***********Groundwater Recharge Summary ************* Recharge is computed as input to Perlnd Groundwater Plus Infiltration in Structures Total Predeveloped Recharge During Simulation Model Element Recharge Amount (ac-ft) ----------------------------------------------------------------------------------------------- Subbasin: Subbasin 1 23.450 _____________________________________ Total: 23.450 Total Post Developed Recharge During Simulation Model Element Recharge Amount (ac-ft) ----------------------------------------------------------------------------------------------- Subbasin: Basin 24 4.277 Link: Bioretention 48.973 _____________________________________ Total: 53.250 Total Predevelopment Recharge is Less than Post Developed Average Recharge Per Year, (Number of Years= 158) Predeveloped: 0.148 ac-ft/year, Post Developed: 0.337 ac-ft/year ***********Water Quality Facility Data ************* ----------------------SCENARIO: PREDEVELOPED Number of Links: 0 ----------------------SCENARIO: POSTDEVELOPED Number of Links: 1 ********** Link: Bioretention ********** Infiltration/Filtration Statistics-------------------- Inflow Volume (ac-ft): 51.87 Inflow Volume Including PPT-Evap (ac-ft): 53.56 Total Runoff Infiltrated (ac-ft): 48.97, 91.44% Total Runoff Filtered (ac-ft): 0.00, 0.00% Primary Outflow To Downstream System (ac-ft): 4.53 Secondary Outflow To Downstream System (ac-ft): 0.00 Percent Treated (Infiltrated+Filtered)/Total Volume: 91.44% ***********Compliance Point Results ************* Scenario Predeveloped Compliance Subbasin: Subbasin 1 Scenario Postdeveloped Compliance Link: Bioretention *** Point of Compliance Flow Frequency Data *** Recurrence Interval Computed Using Gringorten Plotting Position Predevelopment Runoff Postdevelopment Runoff Tr (Years) Discharge (cfs) Tr (Years) Discharge (cfs) ---------------------------------------------------------------------------------------------------------------------- 2-Year 2.898E-03 2-Year 2.827E-02 5-Year 4.723E-03 5-Year 4.279E-02 10-Year 6.364E-03 10-Year 4.932E-02 25-Year 8.069E-03 25-Year 6.096E-02 50-Year 1.030E-02 50-Year 7.570E-02 100-Year 1.116E-02 100-Year 8.376E-02 200-Year 1.737E-02 200-Year 8.912E-02 ** Record too Short to Compute Peak Discharge for These Recurrence Intervals **** LID Duration Performance **** Excursion at Predeveloped 8%Q2 (Must be Less Than 0%): -94.2% PASS Maximum Excursion from 8%Q2 to 50%Q2 (Must be Less Than 0%): -50.1% PASS ------------------------------------------------------------------------------------------------- MEETS ALL LID DURATION DESIGN CRITERIA: PASS ------------------------------------------------------------------------------------------------- ————————————————————————————————— MGS FLOOD PROJECT REPORT Program Version: MGSFlood 4.43 Program License Number: 200410007 Project Simulation Performed on: 10/05/2018 12:45 PM Report Generation Date: 10/05/2018 12:46 PM ————————————————————————————————— Input File Name: Basin 25.fld Project Name: Solera Analysis Title: BMP Performance Standard Comments: ———————————————— PRECIPITATION INPUT ———————————————— Computational Time Step (Minutes): 15 Extended Precipitation Time Series Selected Climatic Region Number: 0 Full Period of Record Available used for Routing Precipitation Station : 96004005 Puget East 40 in_5min 10/01/1939-10/01/2097 Evaporation Station : 961040 Puget East 40 in MAP Evaporation Scale Factor : 0.750 HSPF Parameter Region Number: 1 HSPF Parameter Region Name : USGS Default ********** Default HSPF Parameters Used (Not Modified by User) *************** ********************** WATERSHED DEFINITION *********************** Predevelopment/Post Development Tributary Area Summary Predeveloped Post Developed Total Subbasin Area (acres) 0.152 0.153 Area of Links that Include Precip/Evap (acres) 0.000 0.005 Total (acres) 0.152 0.158 ----------------------SCENARIO: PREDEVELOPED Number of Subbasins: 1 ---------- Subbasin : Subbasin 1 ---------- -------Area (Acres) -------- Till Forest 0.152 ---------------------------------------------- Subbasin Total 0.152 ----------------------SCENARIO: POSTDEVELOPED Number of Subbasins: 1 ---------- Subbasin : Basin 25 ---------- -------Area (Acres) -------- Till Grass 0.056 Impervious 0.097 ---------------------------------------------- Subbasin Total 0.153 ************************* LINK DATA ******************************* ----------------------SCENARIO: PREDEVELOPED Number of Links: 0 ************************* LINK DATA ******************************* ----------------------SCENARIO: POSTDEVELOPED Number of Links: 1 ------------------------------------------ Link Name: Bioretention Link Type: Bioretention Facility Downstream Link: None Base Elevation (ft) : 100.00 Riser Crest Elevation (ft) : 100.50 Storage Depth (ft) : 0.50 Bottom Length (ft) : 20.0 Bottom Width (ft) : 10.0 Side Slopes (ft/ft) : L1= 0.00 L2= 0.00 W1= 0.00 W2= 0.00 Bottom Area (sq-ft) : 200. Area at Riser Crest El (sq-ft) : 200. (acres) : 0.005 Volume at Riser Crest (cu-ft) : 190. (ac-ft) : 0.004 Infiltration on Bottom only Selected Soil Properties Biosoil Thickness (ft) : 1.50 Biosoil Saturated Hydraulic Conductivity (in/hr) : 6.00 Biosoil Porosity (Percent) : 30.00 Maximum Elevation of Bioretention Soil : 101.00 Native Soil Hydraulic Conductivity (in/hr) : 0.70 Riser Geometry Riser Structure Type : Circular Riser Diameter (in) : 6.00 Common Length (ft) : 0.000 Riser Crest Elevation : 100.50 ft Hydraulic Structure Geometry Number of Devices: 0 **********************FLOOD FREQUENCY AND DURATION STATISTICS******************* ----------------------SCENARIO: PREDEVELOPED Number of Subbasins: 1 Number of Links: 0 ----------------------SCENARIO: POSTDEVELOPED Number of Subbasins: 1 Number of Links: 1 ***********Groundwater Recharge Summary ************* Recharge is computed as input to Perlnd Groundwater Plus Infiltration in Structures Total Predeveloped Recharge During Simulation Model Element Recharge Amount (ac-ft) ----------------------------------------------------------------------------------------------- Subbasin: Subbasin 1 26.209 _____________________________________ Total: 26.209 Total Post Developed Recharge During Simulation Model Element Recharge Amount (ac-ft) ----------------------------------------------------------------------------------------------- Subbasin: Basin 25 6.844 Link: Bioretention 52.819 _____________________________________ Total: 59.662 Total Predevelopment Recharge is Less than Post Developed Average Recharge Per Year, (Number of Years= 158) Predeveloped: 0.166 ac-ft/year, Post Developed: 0.378 ac-ft/year ***********Water Quality Facility Data ************* ----------------------SCENARIO: PREDEVELOPED Number of Links: 0 ----------------------SCENARIO: POSTDEVELOPED Number of Links: 1 ********** Link: Bioretention ********** Infiltration/Filtration Statistics-------------------- Inflow Volume (ac-ft): 54.75 Inflow Volume Including PPT-Evap (ac-ft): 56.61 Total Runoff Infiltrated (ac-ft): 52.82, 93.31% Total Runoff Filtered (ac-ft): 0.00, 0.00% Primary Outflow To Downstream System (ac-ft): 3.76 Secondary Outflow To Downstream System (ac-ft): 0.00 Percent Treated (Infiltrated+Filtered)/Total Volume: 93.31% ***********Compliance Point Results ************* Scenario Predeveloped Compliance Subbasin: Subbasin 1 Scenario Postdeveloped Compliance Link: Bioretention *** Point of Compliance Flow Frequency Data *** Recurrence Interval Computed Using Gringorten Plotting Position Predevelopment Runoff Postdevelopment Runoff Tr (Years) Discharge (cfs) Tr (Years) Discharge (cfs) ---------------------------------------------------------------------------------------------------------------------- 2-Year 3.239E-03 2-Year 2.577E-02 5-Year 5.279E-03 5-Year 4.294E-02 10-Year 7.113E-03 10-Year 5.025E-02 25-Year 9.018E-03 25-Year 6.245E-02 50-Year 1.151E-02 50-Year 7.354E-02 100-Year 1.247E-02 100-Year 8.925E-02 200-Year 1.941E-02 200-Year 9.382E-02 ** Record too Short to Compute Peak Discharge for These Recurrence Intervals **** LID Duration Performance **** Excursion at Predeveloped 8%Q2 (Must be Less Than 0%): -95.3% PASS Maximum Excursion from 8%Q2 to 50%Q2 (Must be Less Than 0%): -60.6% PASS ------------------------------------------------------------------------------------------------- MEETS ALL LID DURATION DESIGN CRITERIA: PASS ------------------------------------------------------------------------------------------------- ————————————————————————————————— MGS FLOOD PROJECT REPORT Program Version: MGSFlood 4.43 Program License Number: 200410007 Project Simulation Performed on: 10/05/2018 12:50 PM Report Generation Date: 10/05/2018 12:51 PM ————————————————————————————————— Input File Name: Basin 26.fld Project Name: Solera Analysis Title: BMP Performance Standard Comments: ———————————————— PRECIPITATION INPUT ———————————————— Computational Time Step (Minutes): 15 Extended Precipitation Time Series Selected Climatic Region Number: 0 Full Period of Record Available used for Routing Precipitation Station : 96004005 Puget East 40 in_5min 10/01/1939-10/01/2097 Evaporation Station : 961040 Puget East 40 in MAP Evaporation Scale Factor : 0.750 HSPF Parameter Region Number: 1 HSPF Parameter Region Name : USGS Default ********** Default HSPF Parameters Used (Not Modified by User) *************** ********************** WATERSHED DEFINITION *********************** Predevelopment/Post Development Tributary Area Summary Predeveloped Post Developed Total Subbasin Area (acres) 0.158 0.158 Area of Links that Include Precip/Evap (acres) 0.000 0.005 Total (acres) 0.158 0.163 ----------------------SCENARIO: PREDEVELOPED Number of Subbasins: 1 ---------- Subbasin : Subbasin 1 ---------- -------Area (Acres) -------- Till Forest 0.158 ---------------------------------------------- Subbasin Total 0.158 ----------------------SCENARIO: POSTDEVELOPED Number of Subbasins: 1 ---------- Subbasin : Basin 26 ---------- -------Area (Acres) -------- Till Grass 0.036 Impervious 0.122 ---------------------------------------------- Subbasin Total 0.158 ************************* LINK DATA ******************************* ----------------------SCENARIO: PREDEVELOPED Number of Links: 0 ************************* LINK DATA ******************************* ----------------------SCENARIO: POSTDEVELOPED Number of Links: 1 ------------------------------------------ Link Name: Bioretention Link Type: Bioretention Facility Downstream Link: None Base Elevation (ft) : 100.00 Riser Crest Elevation (ft) : 100.50 Storage Depth (ft) : 0.50 Bottom Length (ft) : 25.0 Bottom Width (ft) : 9.0 Side Slopes (ft/ft) : L1= 0.00 L2= 0.00 W1= 0.00 W2= 0.00 Bottom Area (sq-ft) : 225. Area at Riser Crest El (sq-ft) : 225. (acres) : 0.005 Volume at Riser Crest (cu-ft) : 214. (ac-ft) : 0.005 Infiltration on Bottom only Selected Soil Properties Biosoil Thickness (ft) : 1.50 Biosoil Saturated Hydraulic Conductivity (in/hr) : 6.00 Biosoil Porosity (Percent) : 30.00 Maximum Elevation of Bioretention Soil : 101.00 Native Soil Hydraulic Conductivity (in/hr) : 0.70 Riser Geometry Riser Structure Type : Circular Riser Diameter (in) : 6.00 Common Length (ft) : 0.000 Riser Crest Elevation : 100.50 ft Hydraulic Structure Geometry Number of Devices: 0 **********************FLOOD FREQUENCY AND DURATION STATISTICS******************* ----------------------SCENARIO: PREDEVELOPED Number of Subbasins: 1 Number of Links: 0 ----------------------SCENARIO: POSTDEVELOPED Number of Subbasins: 1 Number of Links: 1 ***********Groundwater Recharge Summary ************* Recharge is computed as input to Perlnd Groundwater Plus Infiltration in Structures Total Predeveloped Recharge During Simulation Model Element Recharge Amount (ac-ft) ----------------------------------------------------------------------------------------------- Subbasin: Subbasin 1 27.244 _____________________________________ Total: 27.244 Total Post Developed Recharge During Simulation Model Element Recharge Amount (ac-ft) ----------------------------------------------------------------------------------------------- Subbasin: Basin 26 4.400 Link: Bioretention 58.994 _____________________________________ Total: 63.393 Total Predevelopment Recharge is Less than Post Developed Average Recharge Per Year, (Number of Years= 158) Predeveloped: 0.172 ac-ft/year, Post Developed: 0.401 ac-ft/year ***********Water Quality Facility Data ************* ----------------------SCENARIO: PREDEVELOPED Number of Links: 0 ----------------------SCENARIO: POSTDEVELOPED Number of Links: 1 ********** Link: Bioretention ********** Infiltration/Filtration Statistics-------------------- Inflow Volume (ac-ft): 61.94 Inflow Volume Including PPT-Evap (ac-ft): 64.05 Total Runoff Infiltrated (ac-ft): 58.99, 92.10% Total Runoff Filtered (ac-ft): 0.00, 0.00% Primary Outflow To Downstream System (ac-ft): 5.01 Secondary Outflow To Downstream System (ac-ft): 0.00 Percent Treated (Infiltrated+Filtered)/Total Volume: 92.10% ***********Compliance Point Results ************* Scenario Predeveloped Compliance Subbasin: Subbasin 1 Scenario Postdeveloped Compliance Link: Bioretention *** Point of Compliance Flow Frequency Data *** Recurrence Interval Computed Using Gringorten Plotting Position Predevelopment Runoff Postdevelopment Runoff Tr (Years) Discharge (cfs) Tr (Years) Discharge (cfs) ---------------------------------------------------------------------------------------------------------------------- 2-Year 3.367E-03 2-Year 3.310E-02 5-Year 5.487E-03 5-Year 5.027E-02 10-Year 7.394E-03 10-Year 5.883E-02 25-Year 9.374E-03 25-Year 7.219E-02 50-Year 1.196E-02 50-Year 8.299E-02 100-Year 1.296E-02 100-Year 9.795E-02 200-Year 2.018E-02 200-Year 0.106 ** Record too Short to Compute Peak Discharge for These Recurrence Intervals **** LID Duration Performance **** Excursion at Predeveloped 8%Q2 (Must be Less Than 0%): -94.8% PASS Maximum Excursion from 8%Q2 to 50%Q2 (Must be Less Than 0%): -54.3% PASS ------------------------------------------------------------------------------------------------- MEETS ALL LID DURATION DESIGN CRITERIA: PASS ------------------------------------------------------------------------------------------------- ————————————————————————————————— MGS FLOOD PROJECT REPORT Program Version: MGSFlood 4.43 Program License Number: 200410007 Project Simulation Performed on: 10/05/2018 1:07 PM Report Generation Date: 10/05/2018 1:08 PM ————————————————————————————————— Input File Name: Basin 27.fld Project Name: Solera Analysis Title: BMP Performance Standard Comments: ———————————————— PRECIPITATION INPUT ———————————————— Computational Time Step (Minutes): 15 Extended Precipitation Time Series Selected Climatic Region Number: 0 Full Period of Record Available used for Routing Precipitation Station : 96004005 Puget East 40 in_5min 10/01/1939-10/01/2097 Evaporation Station : 961040 Puget East 40 in MAP Evaporation Scale Factor : 0.750 HSPF Parameter Region Number: 1 HSPF Parameter Region Name : USGS Default ********** Default HSPF Parameters Used (Not Modified by User) *************** ********************** WATERSHED DEFINITION *********************** Predevelopment/Post Development Tributary Area Summary Predeveloped Post Developed Total Subbasin Area (acres) 0.148 0.148 Area of Links that Include Precip/Evap (acres) 0.000 0.005 Total (acres) 0.148 0.153 ----------------------SCENARIO: PREDEVELOPED Number of Subbasins: 1 ---------- Subbasin : Subbasin 1 ---------- -------Area (Acres) -------- Till Forest 0.148 ---------------------------------------------- Subbasin Total 0.148 ----------------------SCENARIO: POSTDEVELOPED Number of Subbasins: 1 ---------- Subbasin : Basin 27 ---------- -------Area (Acres) -------- Till Grass 0.038 Impervious 0.110 ---------------------------------------------- Subbasin Total 0.148 ************************* LINK DATA ******************************* ----------------------SCENARIO: PREDEVELOPED Number of Links: 0 ************************* LINK DATA ******************************* ----------------------SCENARIO: POSTDEVELOPED Number of Links: 1 ------------------------------------------ Link Name: Bioretention Link Type: Bioretention Facility Downstream Link: None Base Elevation (ft) : 100.00 Riser Crest Elevation (ft) : 100.50 Storage Depth (ft) : 0.50 Bottom Length (ft) : 20.0 Bottom Width (ft) : 10.0 Side Slopes (ft/ft) : L1= 0.00 L2= 0.00 W1= 0.00 W2= 0.00 Bottom Area (sq-ft) : 200. Area at Riser Crest El (sq-ft) : 200. (acres) : 0.005 Volume at Riser Crest (cu-ft) : 190. (ac-ft) : 0.004 Infiltration on Bottom only Selected Soil Properties Biosoil Thickness (ft) : 1.50 Biosoil Saturated Hydraulic Conductivity (in/hr) : 6.00 Biosoil Porosity (Percent) : 30.00 Maximum Elevation of Bioretention Soil : 101.00 Native Soil Hydraulic Conductivity (in/hr) : 0.70 Riser Geometry Riser Structure Type : Circular Riser Diameter (in) : 6.00 Common Length (ft) : 0.000 Riser Crest Elevation : 100.50 ft Hydraulic Structure Geometry Number of Devices: 0 **********************FLOOD FREQUENCY AND DURATION STATISTICS******************* ----------------------SCENARIO: PREDEVELOPED Number of Subbasins: 1 Number of Links: 0 ----------------------SCENARIO: POSTDEVELOPED Number of Subbasins: 1 Number of Links: 1 ***********Groundwater Recharge Summary ************* Recharge is computed as input to Perlnd Groundwater Plus Infiltration in Structures Total Predeveloped Recharge During Simulation Model Element Recharge Amount (ac-ft) ----------------------------------------------------------------------------------------------- Subbasin: Subbasin 1 25.519 _____________________________________ Total: 25.519 Total Post Developed Recharge During Simulation Model Element Recharge Amount (ac-ft) ----------------------------------------------------------------------------------------------- Subbasin: Basin 27 4.644 Link: Bioretention 53.928 _____________________________________ Total: 58.572 Total Predevelopment Recharge is Less than Post Developed Average Recharge Per Year, (Number of Years= 158) Predeveloped: 0.162 ac-ft/year, Post Developed: 0.371 ac-ft/year ***********Water Quality Facility Data ************* ----------------------SCENARIO: PREDEVELOPED Number of Links: 0 ----------------------SCENARIO: POSTDEVELOPED Number of Links: 1 ********** Link: Bioretention ********** Infiltration/Filtration Statistics-------------------- Inflow Volume (ac-ft): 56.96 Inflow Volume Including PPT-Evap (ac-ft): 58.83 Total Runoff Infiltrated (ac-ft): 53.93, 91.66% Total Runoff Filtered (ac-ft): 0.00, 0.00% Primary Outflow To Downstream System (ac-ft): 4.85 Secondary Outflow To Downstream System (ac-ft): 0.00 Percent Treated (Infiltrated+Filtered)/Total Volume: 91.66% ***********Compliance Point Results ************* Scenario Predeveloped Compliance Subbasin: Subbasin 1 Scenario Postdeveloped Compliance Link: Bioretention *** Point of Compliance Flow Frequency Data *** Recurrence Interval Computed Using Gringorten Plotting Position Predevelopment Runoff Postdevelopment Runoff Tr (Years) Discharge (cfs) Tr (Years) Discharge (cfs) ---------------------------------------------------------------------------------------------------------------------- 2-Year 3.154E-03 2-Year 3.104E-02 5-Year 5.140E-03 5-Year 4.656E-02 10-Year 6.926E-03 10-Year 5.420E-02 25-Year 8.781E-03 25-Year 6.613E-02 50-Year 1.121E-02 50-Year 8.140E-02 100-Year 1.214E-02 100-Year 9.083E-02 200-Year 1.890E-02 200-Year 9.760E-02 ** Record too Short to Compute Peak Discharge for These Recurrence Intervals **** LID Duration Performance **** Excursion at Predeveloped 8%Q2 (Must be Less Than 0%): -94.4% PASS Maximum Excursion from 8%Q2 to 50%Q2 (Must be Less Than 0%): -51.4% PASS ------------------------------------------------------------------------------------------------- MEETS ALL LID DURATION DESIGN CRITERIA: PASS ------------------------------------------------------------------------------------------------- ————————————————————————————————— MGS FLOOD PROJECT REPORT Program Version: MGSFlood 4.43 Program License Number: 200410007 Project Simulation Performed on: 10/05/2018 1:24 PM Report Generation Date: 10/05/2018 1:25 PM ————————————————————————————————— Input File Name: Basin 28.fld Project Name: Solera Analysis Title: BMP Performance Standard Comments: ———————————————— PRECIPITATION INPUT ———————————————— Computational Time Step (Minutes): 15 Extended Precipitation Time Series Selected Climatic Region Number: 0 Full Period of Record Available used for Routing Precipitation Station : 96004005 Puget East 40 in_5min 10/01/1939-10/01/2097 Evaporation Station : 961040 Puget East 40 in MAP Evaporation Scale Factor : 0.750 HSPF Parameter Region Number: 1 HSPF Parameter Region Name : USGS Default ********** Default HSPF Parameters Used (Not Modified by User) *************** ********************** WATERSHED DEFINITION *********************** Predevelopment/Post Development Tributary Area Summary Predeveloped Post Developed Total Subbasin Area (acres) 0.161 0.160 Area of Links that Include Precip/Evap (acres) 0.000 0.004 Total (acres) 0.161 0.164 ----------------------SCENARIO: PREDEVELOPED Number of Subbasins: 1 ---------- Subbasin : Subbasin 1 ---------- -------Area (Acres) -------- Till Forest 0.161 ---------------------------------------------- Subbasin Total 0.161 ----------------------SCENARIO: POSTDEVELOPED Number of Subbasins: 1 ---------- Subbasin : Basin 28 ---------- -------Area (Acres) -------- Till Grass 0.055 Impervious 0.105 ---------------------------------------------- Subbasin Total 0.160 ************************* LINK DATA ******************************* ----------------------SCENARIO: PREDEVELOPED Number of Links: 0 ************************* LINK DATA ******************************* ----------------------SCENARIO: POSTDEVELOPED Number of Links: 1 ------------------------------------------ Link Name: Bioretention Link Type: Bioretention Facility Downstream Link: None Base Elevation (ft) : 100.00 Riser Crest Elevation (ft) : 100.50 Storage Depth (ft) : 0.50 Bottom Length (ft) : 14.0 Bottom Width (ft) : 14.0 Side Slopes (ft/ft) : L1= 0.00 L2= 0.00 W1= 0.00 W2= 0.00 Bottom Area (sq-ft) : 196. Area at Riser Crest El (sq-ft) : 196. (acres) : 0.004 Volume at Riser Crest (cu-ft) : 186. (ac-ft) : 0.004 Infiltration on Bottom only Selected Soil Properties Biosoil Thickness (ft) : 1.50 Biosoil Saturated Hydraulic Conductivity (in/hr) : 6.00 Biosoil Porosity (Percent) : 30.00 Maximum Elevation of Bioretention Soil : 101.00 Native Soil Hydraulic Conductivity (in/hr) : 0.70 Riser Geometry Riser Structure Type : Circular Riser Diameter (in) : 6.00 Common Length (ft) : 0.000 Riser Crest Elevation : 100.50 ft Hydraulic Structure Geometry Number of Devices: 0 **********************FLOOD FREQUENCY AND DURATION STATISTICS******************* ----------------------SCENARIO: PREDEVELOPED Number of Subbasins: 1 Number of Links: 0 ----------------------SCENARIO: POSTDEVELOPED Number of Subbasins: 1 Number of Links: 1 ***********Groundwater Recharge Summary ************* Recharge is computed as input to Perlnd Groundwater Plus Infiltration in Structures Total Predeveloped Recharge During Simulation Model Element Recharge Amount (ac-ft) ----------------------------------------------------------------------------------------------- Subbasin: Subbasin 1 27.761 _____________________________________ Total: 27.761 Total Post Developed Recharge During Simulation Model Element Recharge Amount (ac-ft) ----------------------------------------------------------------------------------------------- Subbasin: Basin 28 6.722 Link: Bioretention 54.935 _____________________________________ Total: 61.656 Total Predevelopment Recharge is Less than Post Developed Average Recharge Per Year, (Number of Years= 158) Predeveloped: 0.176 ac-ft/year, Post Developed: 0.390 ac-ft/year ***********Water Quality Facility Data ************* ----------------------SCENARIO: PREDEVELOPED Number of Links: 0 ----------------------SCENARIO: POSTDEVELOPED Number of Links: 1 ********** Link: Bioretention ********** Infiltration/Filtration Statistics-------------------- Inflow Volume (ac-ft): 58.14 Inflow Volume Including PPT-Evap (ac-ft): 59.95 Total Runoff Infiltrated (ac-ft): 54.93, 91.63% Total Runoff Filtered (ac-ft): 0.00, 0.00% Primary Outflow To Downstream System (ac-ft): 4.97 Secondary Outflow To Downstream System (ac-ft): 0.00 Percent Treated (Infiltrated+Filtered)/Total Volume: 91.63% ***********Compliance Point Results ************* Scenario Predeveloped Compliance Subbasin: Subbasin 1 Scenario Postdeveloped Compliance Link: Bioretention *** Point of Compliance Flow Frequency Data *** Recurrence Interval Computed Using Gringorten Plotting Position Predevelopment Runoff Postdevelopment Runoff Tr (Years) Discharge (cfs) Tr (Years) Discharge (cfs) ---------------------------------------------------------------------------------------------------------------------- 2-Year 3.431E-03 2-Year 3.165E-02 5-Year 5.592E-03 5-Year 4.695E-02 10-Year 7.534E-03 10-Year 5.454E-02 25-Year 9.552E-03 25-Year 6.714E-02 50-Year 1.219E-02 50-Year 8.498E-02 100-Year 1.321E-02 100-Year 9.701E-02 200-Year 2.056E-02 200-Year 0.100 ** Record too Short to Compute Peak Discharge for These Recurrence Intervals **** LID Duration Performance **** Excursion at Predeveloped 8%Q2 (Must be Less Than 0%): -94.0% PASS Maximum Excursion from 8%Q2 to 50%Q2 (Must be Less Than 0%): -49.9% PASS ------------------------------------------------------------------------------------------------- MEETS ALL LID DURATION DESIGN CRITERIA: PASS ------------------------------------------------------------------------------------------------- ————————————————————————————————— MGS FLOOD PROJECT REPORT Program Version: MGSFlood 4.43 Program License Number: 200410007 Project Simulation Performed on: 10/05/2018 1:41 PM Report Generation Date: 10/05/2018 1:42 PM ————————————————————————————————— Input File Name: Basin 29.fld Project Name: Solera Analysis Title: BMP Performance Standard Comments: ———————————————— PRECIPITATION INPUT ———————————————— Computational Time Step (Minutes): 15 Extended Precipitation Time Series Selected Climatic Region Number: 0 Full Period of Record Available used for Routing Precipitation Station : 96004005 Puget East 40 in_5min 10/01/1939-10/01/2097 Evaporation Station : 961040 Puget East 40 in MAP Evaporation Scale Factor : 0.750 HSPF Parameter Region Number: 1 HSPF Parameter Region Name : USGS Default ********** Default HSPF Parameters Used (Not Modified by User) *************** ********************** WATERSHED DEFINITION *********************** Predevelopment/Post Development Tributary Area Summary Predeveloped Post Developed Total Subbasin Area (acres) 0.165 0.165 Area of Links that Include Precip/Evap (acres) 0.000 0.006 Total (acres) 0.165 0.171 ----------------------SCENARIO: PREDEVELOPED Number of Subbasins: 1 ---------- Subbasin : Subbasin 1 ---------- -------Area (Acres) -------- Till Forest 0.165 ---------------------------------------------- Subbasin Total 0.165 ----------------------SCENARIO: POSTDEVELOPED Number of Subbasins: 1 ---------- Subbasin : Basin 29 ---------- -------Area (Acres) -------- Till Grass 0.025 Impervious 0.140 ---------------------------------------------- Subbasin Total 0.165 ************************* LINK DATA ******************************* ----------------------SCENARIO: PREDEVELOPED Number of Links: 0 ************************* LINK DATA ******************************* ----------------------SCENARIO: POSTDEVELOPED Number of Links: 1 ------------------------------------------ Link Name: Bioretention Link Type: Bioretention Facility Downstream Link: None Base Elevation (ft) : 100.00 Riser Crest Elevation (ft) : 100.50 Storage Depth (ft) : 0.50 Bottom Length (ft) : 25.0 Bottom Width (ft) : 10.0 Side Slopes (ft/ft) : L1= 0.00 L2= 0.00 W1= 0.00 W2= 0.00 Bottom Area (sq-ft) : 250. Area at Riser Crest El (sq-ft) : 250. (acres) : 0.006 Volume at Riser Crest (cu-ft) : 238. (ac-ft) : 0.005 Infiltration on Bottom only Selected Soil Properties Biosoil Thickness (ft) : 1.50 Biosoil Saturated Hydraulic Conductivity (in/hr) : 6.00 Biosoil Porosity (Percent) : 30.00 Maximum Elevation of Bioretention Soil : 101.00 Native Soil Hydraulic Conductivity (in/hr) : 0.70 Riser Geometry Riser Structure Type : Circular Riser Diameter (in) : 6.00 Common Length (ft) : 0.000 Riser Crest Elevation : 100.50 ft Hydraulic Structure Geometry Number of Devices: 0 **********************FLOOD FREQUENCY AND DURATION STATISTICS******************* ----------------------SCENARIO: PREDEVELOPED Number of Subbasins: 1 Number of Links: 0 ----------------------SCENARIO: POSTDEVELOPED Number of Subbasins: 1 Number of Links: 1 ***********Groundwater Recharge Summary ************* Recharge is computed as input to Perlnd Groundwater Plus Infiltration in Structures Total Predeveloped Recharge During Simulation Model Element Recharge Amount (ac-ft) ----------------------------------------------------------------------------------------------- Subbasin: Subbasin 1 28.451 _____________________________________ Total: 28.451 Total Post Developed Recharge During Simulation Model Element Recharge Amount (ac-ft) ----------------------------------------------------------------------------------------------- Subbasin: Basin 29 3.055 Link: Bioretention 64.412 _____________________________________ Total: 67.467 Total Predevelopment Recharge is Less than Post Developed Average Recharge Per Year, (Number of Years= 158) Predeveloped: 0.180 ac-ft/year, Post Developed: 0.427 ac-ft/year ***********Water Quality Facility Data ************* ----------------------SCENARIO: PREDEVELOPED Number of Links: 0 ----------------------SCENARIO: POSTDEVELOPED Number of Links: 1 ********** Link: Bioretention ********** Infiltration/Filtration Statistics-------------------- Inflow Volume (ac-ft): 67.80 Inflow Volume Including PPT-Evap (ac-ft): 70.18 Total Runoff Infiltrated (ac-ft): 64.41, 91.79% Total Runoff Filtered (ac-ft): 0.00, 0.00% Primary Outflow To Downstream System (ac-ft): 5.70 Secondary Outflow To Downstream System (ac-ft): 0.00 Percent Treated (Infiltrated+Filtered)/Total Volume: 91.79% ***********Compliance Point Results ************* Scenario Predeveloped Compliance Subbasin: Subbasin 1 Scenario Postdeveloped Compliance Link: Bioretention *** Point of Compliance Flow Frequency Data *** Recurrence Interval Computed Using Gringorten Plotting Position Predevelopment Runoff Postdevelopment Runoff Tr (Years) Discharge (cfs) Tr (Years) Discharge (cfs) ---------------------------------------------------------------------------------------------------------------------- 2-Year 3.516E-03 2-Year 3.712E-02 5-Year 5.731E-03 5-Year 5.751E-02 10-Year 7.721E-03 10-Year 6.304E-02 25-Year 9.790E-03 25-Year 7.714E-02 50-Year 1.249E-02 50-Year 9.036E-02 100-Year 1.354E-02 100-Year 0.106 200-Year 2.107E-02 200-Year 0.117 ** Record too Short to Compute Peak Discharge for These Recurrence Intervals **** LID Duration Performance **** Excursion at Predeveloped 8%Q2 (Must be Less Than 0%): -94.7% PASS Maximum Excursion from 8%Q2 to 50%Q2 (Must be Less Than 0%): -53.1% PASS ------------------------------------------------------------------------------------------------- MEETS ALL LID DURATION DESIGN CRITERIA: PASS ------------------------------------------------------------------------------------------------- ————————————————————————————————— MGS FLOOD PROJECT REPORT Program Version: MGSFlood 4.43 Program License Number: 200410007 Project Simulation Performed on: 10/05/2018 1:48 PM Report Generation Date: 10/05/2018 1:48 PM ————————————————————————————————— Input File Name: Basin 30.fld Project Name: Solera Analysis Title: BMP Performance Standard Comments: ———————————————— PRECIPITATION INPUT ———————————————— Computational Time Step (Minutes): 15 Extended Precipitation Time Series Selected Climatic Region Number: 0 Full Period of Record Available used for Routing Precipitation Station : 96004005 Puget East 40 in_5min 10/01/1939-10/01/2097 Evaporation Station : 961040 Puget East 40 in MAP Evaporation Scale Factor : 0.750 HSPF Parameter Region Number: 1 HSPF Parameter Region Name : USGS Default ********** Default HSPF Parameters Used (Not Modified by User) *************** ********************** WATERSHED DEFINITION *********************** Predevelopment/Post Development Tributary Area Summary Predeveloped Post Developed Total Subbasin Area (acres) 0.240 0.240 Area of Links that Include Precip/Evap (acres) 0.000 0.007 Total (acres) 0.240 0.247 ----------------------SCENARIO: PREDEVELOPED Number of Subbasins: 1 ---------- Subbasin : Subbasin 1 ---------- -------Area (Acres) -------- Till Forest 0.240 ---------------------------------------------- Subbasin Total 0.240 ----------------------SCENARIO: POSTDEVELOPED Number of Subbasins: 1 ---------- Subbasin : Basin 30 ---------- -------Area (Acres) -------- Till Grass 0.075 Impervious 0.165 ---------------------------------------------- Subbasin Total 0.240 ************************* LINK DATA ******************************* ----------------------SCENARIO: PREDEVELOPED Number of Links: 0 ************************* LINK DATA ******************************* ----------------------SCENARIO: POSTDEVELOPED Number of Links: 1 ------------------------------------------ Link Name: Bioretention Link Type: Bioretention Facility Downstream Link: None Base Elevation (ft) : 100.00 Riser Crest Elevation (ft) : 100.50 Storage Depth (ft) : 0.50 Bottom Length (ft) : 25.0 Bottom Width (ft) : 12.0 Side Slopes (ft/ft) : L1= 0.00 L2= 0.00 W1= 0.00 W2= 0.00 Bottom Area (sq-ft) : 300. Area at Riser Crest El (sq-ft) : 300. (acres) : 0.007 Volume at Riser Crest (cu-ft) : 285. (ac-ft) : 0.007 Infiltration on Bottom only Selected Soil Properties Biosoil Thickness (ft) : 1.50 Biosoil Saturated Hydraulic Conductivity (in/hr) : 6.00 Biosoil Porosity (Percent) : 30.00 Maximum Elevation of Bioretention Soil : 101.00 Native Soil Hydraulic Conductivity (in/hr) : 0.70 Riser Geometry Riser Structure Type : Circular Riser Diameter (in) : 6.00 Common Length (ft) : 0.000 Riser Crest Elevation : 100.50 ft Hydraulic Structure Geometry Number of Devices: 0 **********************FLOOD FREQUENCY AND DURATION STATISTICS******************* ----------------------SCENARIO: PREDEVELOPED Number of Subbasins: 1 Number of Links: 0 ----------------------SCENARIO: POSTDEVELOPED Number of Subbasins: 1 Number of Links: 1 ***********Groundwater Recharge Summary ************* Recharge is computed as input to Perlnd Groundwater Plus Infiltration in Structures Total Predeveloped Recharge During Simulation Model Element Recharge Amount (ac-ft) ----------------------------------------------------------------------------------------------- Subbasin: Subbasin 1 41.383 _____________________________________ Total: 41.383 Total Post Developed Recharge During Simulation Model Element Recharge Amount (ac-ft) ----------------------------------------------------------------------------------------------- Subbasin: Basin 30 9.166 Link: Bioretention 83.881 _____________________________________ Total: 93.047 Total Predevelopment Recharge is Less than Post Developed Average Recharge Per Year, (Number of Years= 158) Predeveloped: 0.262 ac-ft/year, Post Developed: 0.589 ac-ft/year ***********Water Quality Facility Data ************* ----------------------SCENARIO: PREDEVELOPED Number of Links: 0 ----------------------SCENARIO: POSTDEVELOPED Number of Links: 1 ********** Link: Bioretention ********** Infiltration/Filtration Statistics-------------------- Inflow Volume (ac-ft): 89.06 Inflow Volume Including PPT-Evap (ac-ft): 91.85 Total Runoff Infiltrated (ac-ft): 83.88, 91.33% Total Runoff Filtered (ac-ft): 0.00, 0.00% Primary Outflow To Downstream System (ac-ft): 7.89 Secondary Outflow To Downstream System (ac-ft): 0.00 Percent Treated (Infiltrated+Filtered)/Total Volume: 91.33% ***********Compliance Point Results ************* Scenario Predeveloped Compliance Subbasin: Subbasin 1 Scenario Postdeveloped Compliance Link: Bioretention *** Point of Compliance Flow Frequency Data *** Recurrence Interval Computed Using Gringorten Plotting Position Predevelopment Runoff Postdevelopment Runoff Tr (Years) Discharge (cfs) Tr (Years) Discharge (cfs) ---------------------------------------------------------------------------------------------------------------------- 2-Year 5.114E-03 2-Year 4.780E-02 5-Year 8.335E-03 5-Year 7.210E-02 10-Year 1.123E-02 10-Year 8.277E-02 25-Year 1.424E-02 25-Year 0.103 50-Year 1.817E-02 50-Year 0.128 100-Year 1.969E-02 100-Year 0.143 200-Year 3.065E-02 200-Year 0.154 ** Record too Short to Compute Peak Discharge for These Recurrence Intervals **** LID Duration Performance **** Excursion at Predeveloped 8%Q2 (Must be Less Than 0%): -93.8% PASS Maximum Excursion from 8%Q2 to 50%Q2 (Must be Less Than 0%): -47.9% PASS ------------------------------------------------------------------------------------------------- MEETS ALL LID DURATION DESIGN CRITERIA: PASS ------------------------------------------------------------------------------------------------- ————————————————————————————————— MGS FLOOD PROJECT REPORT Program Version: MGSFlood 4.43 Program License Number: 200410007 Project Simulation Performed on: 10/05/2018 1:52 PM Report Generation Date: 10/05/2018 1:53 PM ————————————————————————————————— Input File Name: Basin 31.fld Project Name: Solera Analysis Title: BMP Performance Standard Comments: ———————————————— PRECIPITATION INPUT ———————————————— Computational Time Step (Minutes): 15 Extended Precipitation Time Series Selected Climatic Region Number: 0 Full Period of Record Available used for Routing Precipitation Station : 96004005 Puget East 40 in_5min 10/01/1939-10/01/2097 Evaporation Station : 961040 Puget East 40 in MAP Evaporation Scale Factor : 0.750 HSPF Parameter Region Number: 1 HSPF Parameter Region Name : USGS Default ********** Default HSPF Parameters Used (Not Modified by User) *************** ********************** WATERSHED DEFINITION *********************** Predevelopment/Post Development Tributary Area Summary Predeveloped Post Developed Total Subbasin Area (acres) 0.227 0.227 Area of Links that Include Precip/Evap (acres) 0.000 0.008 Total (acres) 0.227 0.235 ----------------------SCENARIO: PREDEVELOPED Number of Subbasins: 1 ---------- Subbasin : Subbasin 1 ---------- -------Area (Acres) -------- Till Forest 0.227 ---------------------------------------------- Subbasin Total 0.227 ----------------------SCENARIO: POSTDEVELOPED Number of Subbasins: 1 ---------- Subbasin : Basin 31 ---------- -------Area (Acres) -------- Till Grass 0.054 Impervious 0.173 ---------------------------------------------- Subbasin Total 0.227 ************************* LINK DATA ******************************* ----------------------SCENARIO: PREDEVELOPED Number of Links: 0 ************************* LINK DATA ******************************* ----------------------SCENARIO: POSTDEVELOPED Number of Links: 1 ------------------------------------------ Link Name: Bioretention Link Type: Bioretention Facility Downstream Link: None Base Elevation (ft) : 100.00 Riser Crest Elevation (ft) : 100.50 Storage Depth (ft) : 0.50 Bottom Length (ft) : 19.0 Bottom Width (ft) : 19.0 Side Slopes (ft/ft) : L1= 0.00 L2= 0.00 W1= 0.00 W2= 0.00 Bottom Area (sq-ft) : 361. Area at Riser Crest El (sq-ft) : 361. (acres) : 0.008 Volume at Riser Crest (cu-ft) : 343. (ac-ft) : 0.008 Infiltration on Bottom only Selected Soil Properties Biosoil Thickness (ft) : 1.50 Biosoil Saturated Hydraulic Conductivity (in/hr) : 6.00 Biosoil Porosity (Percent) : 30.00 Maximum Elevation of Bioretention Soil : 101.00 Native Soil Hydraulic Conductivity (in/hr) : 0.70 Riser Geometry Riser Structure Type : Circular Riser Diameter (in) : 6.00 Common Length (ft) : 0.000 Riser Crest Elevation : 100.50 ft Hydraulic Structure Geometry Number of Devices: 0 **********************FLOOD FREQUENCY AND DURATION STATISTICS******************* ----------------------SCENARIO: PREDEVELOPED Number of Subbasins: 1 Number of Links: 0 ----------------------SCENARIO: POSTDEVELOPED Number of Subbasins: 1 Number of Links: 1 ***********Groundwater Recharge Summary ************* Recharge is computed as input to Perlnd Groundwater Plus Infiltration in Structures Total Predeveloped Recharge During Simulation Model Element Recharge Amount (ac-ft) ----------------------------------------------------------------------------------------------- Subbasin: Subbasin 1 39.141 _____________________________________ Total: 39.141 Total Post Developed Recharge During Simulation Model Element Recharge Amount (ac-ft) ----------------------------------------------------------------------------------------------- Subbasin: Basin 31 6.599 Link: Bioretention 86.547 _____________________________________ Total: 93.146 Total Predevelopment Recharge is Less than Post Developed Average Recharge Per Year, (Number of Years= 158) Predeveloped: 0.248 ac-ft/year, Post Developed: 0.590 ac-ft/year ***********Water Quality Facility Data ************* ----------------------SCENARIO: PREDEVELOPED Number of Links: 0 ----------------------SCENARIO: POSTDEVELOPED Number of Links: 1 ********** Link: Bioretention ********** Infiltration/Filtration Statistics-------------------- Inflow Volume (ac-ft): 88.42 Inflow Volume Including PPT-Evap (ac-ft): 91.83 Total Runoff Infiltrated (ac-ft): 86.55, 94.24% Total Runoff Filtered (ac-ft): 0.00, 0.00% Primary Outflow To Downstream System (ac-ft): 5.24 Secondary Outflow To Downstream System (ac-ft): 0.00 Percent Treated (Infiltrated+Filtered)/Total Volume: 94.24% ***********Compliance Point Results ************* Scenario Predeveloped Compliance Subbasin: Subbasin 1 Scenario Postdeveloped Compliance Link: Bioretention *** Point of Compliance Flow Frequency Data *** Recurrence Interval Computed Using Gringorten Plotting Position Predevelopment Runoff Postdevelopment Runoff Tr (Years) Discharge (cfs) Tr (Years) Discharge (cfs) ---------------------------------------------------------------------------------------------------------------------- 2-Year 4.837E-03 2-Year 4.265E-02 5-Year 7.884E-03 5-Year 6.753E-02 10-Year 1.062E-02 10-Year 7.775E-02 25-Year 1.347E-02 25-Year 9.964E-02 50-Year 1.719E-02 50-Year 0.108 100-Year 1.863E-02 100-Year 0.139 200-Year 2.899E-02 200-Year 0.154 ** Record too Short to Compute Peak Discharge for These Recurrence Intervals **** LID Duration Performance **** Excursion at Predeveloped 8%Q2 (Must be Less Than 0%): -96.3% PASS Maximum Excursion from 8%Q2 to 50%Q2 (Must be Less Than 0%): -67.7% PASS ------------------------------------------------------------------------------------------------- MEETS ALL LID DURATION DESIGN CRITERIA: PASS ------------------------------------------------------------------------------------------------- ————————————————————————————————— MGS FLOOD PROJECT REPORT Program Version: MGSFlood 4.43 Program License Number: 200410007 Project Simulation Performed on: 10/05/2018 1:58 PM Report Generation Date: 10/05/2018 1:59 PM ————————————————————————————————— Input File Name: Basin 32.fld Project Name: Solera Analysis Title: BMP Performance Standard Comments: ———————————————— PRECIPITATION INPUT ———————————————— Computational Time Step (Minutes): 15 Extended Precipitation Time Series Selected Climatic Region Number: 0 Full Period of Record Available used for Routing Precipitation Station : 96004005 Puget East 40 in_5min 10/01/1939-10/01/2097 Evaporation Station : 961040 Puget East 40 in MAP Evaporation Scale Factor : 0.750 HSPF Parameter Region Number: 1 HSPF Parameter Region Name : USGS Default ********** Default HSPF Parameters Used (Not Modified by User) *************** ********************** WATERSHED DEFINITION *********************** Predevelopment/Post Development Tributary Area Summary Predeveloped Post Developed Total Subbasin Area (acres) 0.218 0.218 Area of Links that Include Precip/Evap (acres) 0.000 0.008 Total (acres) 0.218 0.226 ----------------------SCENARIO: PREDEVELOPED Number of Subbasins: 1 ---------- Subbasin : Subbasin 1 ---------- -------Area (Acres) -------- Till Forest 0.218 ---------------------------------------------- Subbasin Total 0.218 ----------------------SCENARIO: POSTDEVELOPED Number of Subbasins: 1 ---------- Subbasin : Basin 32 ---------- -------Area (Acres) -------- Till Grass 0.014 Impervious 0.204 ---------------------------------------------- Subbasin Total 0.218 ************************* LINK DATA ******************************* ----------------------SCENARIO: PREDEVELOPED Number of Links: 0 ************************* LINK DATA ******************************* ----------------------SCENARIO: POSTDEVELOPED Number of Links: 1 ------------------------------------------ Link Name: Bioretention Link Type: Bioretention Facility Downstream Link: None Base Elevation (ft) : 100.00 Riser Crest Elevation (ft) : 100.50 Storage Depth (ft) : 0.50 Bottom Length (ft) : 19.0 Bottom Width (ft) : 19.0 Side Slopes (ft/ft) : L1= 0.00 L2= 0.00 W1= 0.00 W2= 0.00 Bottom Area (sq-ft) : 361. Area at Riser Crest El (sq-ft) : 361. (acres) : 0.008 Volume at Riser Crest (cu-ft) : 343. (ac-ft) : 0.008 Infiltration on Bottom only Selected Soil Properties Biosoil Thickness (ft) : 1.50 Biosoil Saturated Hydraulic Conductivity (in/hr) : 6.00 Biosoil Porosity (Percent) : 30.00 Maximum Elevation of Bioretention Soil : 101.00 Native Soil Hydraulic Conductivity (in/hr) : 0.70 Riser Geometry Riser Structure Type : Circular Riser Diameter (in) : 6.00 Common Length (ft) : 0.000 Riser Crest Elevation : 100.50 ft Hydraulic Structure Geometry Number of Devices: 0 **********************FLOOD FREQUENCY AND DURATION STATISTICS******************* ----------------------SCENARIO: PREDEVELOPED Number of Subbasins: 1 Number of Links: 0 ----------------------SCENARIO: POSTDEVELOPED Number of Subbasins: 1 Number of Links: 1 ***********Groundwater Recharge Summary ************* Recharge is computed as input to Perlnd Groundwater Plus Infiltration in Structures Total Predeveloped Recharge During Simulation Model Element Recharge Amount (ac-ft) ----------------------------------------------------------------------------------------------- Subbasin: Subbasin 1 37.590 _____________________________________ Total: 37.590 Total Post Developed Recharge During Simulation Model Element Recharge Amount (ac-ft) ----------------------------------------------------------------------------------------------- Subbasin: Basin 32 1.711 Link: Bioretention 89.862 _____________________________________ Total: 91.573 Total Predevelopment Recharge is Less than Post Developed Average Recharge Per Year, (Number of Years= 158) Predeveloped: 0.238 ac-ft/year, Post Developed: 0.580 ac-ft/year ***********Water Quality Facility Data ************* ----------------------SCENARIO: PREDEVELOPED Number of Links: 0 ----------------------SCENARIO: POSTDEVELOPED Number of Links: 1 ********** Link: Bioretention ********** Infiltration/Filtration Statistics-------------------- Inflow Volume (ac-ft): 94.28 Inflow Volume Including PPT-Evap (ac-ft): 97.79 Total Runoff Infiltrated (ac-ft): 89.86, 91.89% Total Runoff Filtered (ac-ft): 0.00, 0.00% Primary Outflow To Downstream System (ac-ft): 7.81 Secondary Outflow To Downstream System (ac-ft): 0.00 Percent Treated (Infiltrated+Filtered)/Total Volume: 91.89% ***********Compliance Point Results ************* Scenario Predeveloped Compliance Subbasin: Subbasin 1 Scenario Postdeveloped Compliance Link: Bioretention *** Point of Compliance Flow Frequency Data *** Recurrence Interval Computed Using Gringorten Plotting Position Predevelopment Runoff Postdevelopment Runoff Tr (Years) Discharge (cfs) Tr (Years) Discharge (cfs) ---------------------------------------------------------------------------------------------------------------------- 2-Year 4.645E-03 2-Year 5.198E-02 5-Year 7.571E-03 5-Year 7.693E-02 10-Year 1.020E-02 10-Year 8.725E-02 25-Year 1.293E-02 25-Year 0.111 50-Year 1.651E-02 50-Year 0.126 100-Year 1.789E-02 100-Year 0.144 200-Year 2.784E-02 200-Year 0.164 ** Record too Short to Compute Peak Discharge for These Recurrence Intervals **** LID Duration Performance **** Excursion at Predeveloped 8%Q2 (Must be Less Than 0%): -95.0% PASS Maximum Excursion from 8%Q2 to 50%Q2 (Must be Less Than 0%): -54.2% PASS ------------------------------------------------------------------------------------------------- MEETS ALL LID DURATION DESIGN CRITERIA: PASS ------------------------------------------------------------------------------------------------- ————————————————————————————————— MGS FLOOD PROJECT REPORT Program Version: MGSFlood 4.43 Program License Number: 200410007 Project Simulation Performed on: 10/05/2018 2:10 PM Report Generation Date: 10/05/2018 2:10 PM ————————————————————————————————— Input File Name: Basin 33.fld Project Name: Solera Analysis Title: BMP Performance Standard Comments: ———————————————— PRECIPITATION INPUT ———————————————— Computational Time Step (Minutes): 15 Extended Precipitation Time Series Selected Climatic Region Number: 0 Full Period of Record Available used for Routing Precipitation Station : 96004005 Puget East 40 in_5min 10/01/1939-10/01/2097 Evaporation Station : 961040 Puget East 40 in MAP Evaporation Scale Factor : 0.750 HSPF Parameter Region Number: 1 HSPF Parameter Region Name : USGS Default ********** Default HSPF Parameters Used (Not Modified by User) *************** ********************** WATERSHED DEFINITION *********************** Predevelopment/Post Development Tributary Area Summary Predeveloped Post Developed Total Subbasin Area (acres) 0.134 0.134 Area of Links that Include Precip/Evap (acres) 0.000 0.004 Total (acres) 0.134 0.138 ----------------------SCENARIO: PREDEVELOPED Number of Subbasins: 1 ---------- Subbasin : Subbasin 1 ---------- -------Area (Acres) -------- Till Forest 0.134 ---------------------------------------------- Subbasin Total 0.134 ----------------------SCENARIO: POSTDEVELOPED Number of Subbasins: 1 ---------- Subbasin : Basin 33 ---------- -------Area (Acres) -------- Till Grass 0.062 Impervious 0.072 ---------------------------------------------- Subbasin Total 0.134 ************************* LINK DATA ******************************* ----------------------SCENARIO: PREDEVELOPED Number of Links: 0 ************************* LINK DATA ******************************* ----------------------SCENARIO: POSTDEVELOPED Number of Links: 1 ------------------------------------------ Link Name: Bioretention Link Type: Bioretention Facility Downstream Link: None Base Elevation (ft) : 100.00 Riser Crest Elevation (ft) : 100.50 Storage Depth (ft) : 0.50 Bottom Length (ft) : 15.0 Bottom Width (ft) : 11.0 Side Slopes (ft/ft) : L1= 0.00 L2= 0.00 W1= 0.00 W2= 0.00 Bottom Area (sq-ft) : 165. Area at Riser Crest El (sq-ft) : 165. (acres) : 0.004 Volume at Riser Crest (cu-ft) : 157. (ac-ft) : 0.004 Infiltration on Bottom only Selected Soil Properties Biosoil Thickness (ft) : 1.50 Biosoil Saturated Hydraulic Conductivity (in/hr) : 6.00 Biosoil Porosity (Percent) : 30.00 Maximum Elevation of Bioretention Soil : 101.00 Native Soil Hydraulic Conductivity (in/hr) : 0.70 Riser Geometry Riser Structure Type : Circular Riser Diameter (in) : 6.00 Common Length (ft) : 0.000 Riser Crest Elevation : 100.50 ft Hydraulic Structure Geometry Number of Devices: 0 **********************FLOOD FREQUENCY AND DURATION STATISTICS******************* ----------------------SCENARIO: PREDEVELOPED Number of Subbasins: 1 Number of Links: 0 ----------------------SCENARIO: POSTDEVELOPED Number of Subbasins: 1 Number of Links: 1 ***********Groundwater Recharge Summary ************* Recharge is computed as input to Perlnd Groundwater Plus Infiltration in Structures Total Predeveloped Recharge During Simulation Model Element Recharge Amount (ac-ft) ----------------------------------------------------------------------------------------------- Subbasin: Subbasin 1 23.105 _____________________________________ Total: 23.105 Total Post Developed Recharge During Simulation Model Element Recharge Amount (ac-ft) ----------------------------------------------------------------------------------------------- Subbasin: Basin 33 7.577 Link: Bioretention 43.563 _____________________________________ Total: 51.140 Total Predevelopment Recharge is Less than Post Developed Average Recharge Per Year, (Number of Years= 158) Predeveloped: 0.146 ac-ft/year, Post Developed: 0.324 ac-ft/year ***********Water Quality Facility Data ************* ----------------------SCENARIO: PREDEVELOPED Number of Links: 0 ----------------------SCENARIO: POSTDEVELOPED Number of Links: 1 ********** Link: Bioretention ********** Infiltration/Filtration Statistics-------------------- Inflow Volume (ac-ft): 44.75 Inflow Volume Including PPT-Evap (ac-ft): 46.27 Total Runoff Infiltrated (ac-ft): 43.56, 94.15% Total Runoff Filtered (ac-ft): 0.00, 0.00% Primary Outflow To Downstream System (ac-ft): 2.69 Secondary Outflow To Downstream System (ac-ft): 0.00 Percent Treated (Infiltrated+Filtered)/Total Volume: 94.15% ***********Compliance Point Results ************* Scenario Predeveloped Compliance Subbasin: Subbasin 1 Scenario Postdeveloped Compliance Link: Bioretention *** Point of Compliance Flow Frequency Data *** Recurrence Interval Computed Using Gringorten Plotting Position Predevelopment Runoff Postdevelopment Runoff Tr (Years) Discharge (cfs) Tr (Years) Discharge (cfs) ---------------------------------------------------------------------------------------------------------------------- 2-Year 2.855E-03 2-Year 1.940E-02 5-Year 4.654E-03 5-Year 3.286E-02 10-Year 6.271E-03 10-Year 3.936E-02 25-Year 7.950E-03 25-Year 5.184E-02 50-Year 1.015E-02 50-Year 5.917E-02 100-Year 1.100E-02 100-Year 7.496E-02 200-Year 1.711E-02 200-Year 7.649E-02 ** Record too Short to Compute Peak Discharge for These Recurrence Intervals **** LID Duration Performance **** Excursion at Predeveloped 8%Q2 (Must be Less Than 0%): -95.7% PASS Maximum Excursion from 8%Q2 to 50%Q2 (Must be Less Than 0%): -65.3% PASS ------------------------------------------------------------------------------------------------- MEETS ALL LID DURATION DESIGN CRITERIA: PASS ------------------------------------------------------------------------------------------------- ————————————————————————————————— MGS FLOOD PROJECT REPORT Program Version: MGSFlood 4.43 Program License Number: 200410007 Project Simulation Performed on: 10/05/2018 2:12 PM Report Generation Date: 10/05/2018 2:13 PM ————————————————————————————————— Input File Name: Basin 34.fld Project Name: Solera Analysis Title: BMP Performance Standard Comments: ———————————————— PRECIPITATION INPUT ———————————————— Computational Time Step (Minutes): 15 Extended Precipitation Time Series Selected Climatic Region Number: 0 Full Period of Record Available used for Routing Precipitation Station : 96004005 Puget East 40 in_5min 10/01/1939-10/01/2097 Evaporation Station : 961040 Puget East 40 in MAP Evaporation Scale Factor : 0.750 HSPF Parameter Region Number: 1 HSPF Parameter Region Name : USGS Default ********** Default HSPF Parameters Used (Not Modified by User) *************** ********************** WATERSHED DEFINITION *********************** Predevelopment/Post Development Tributary Area Summary Predeveloped Post Developed Total Subbasin Area (acres) 0.053 0.053 Area of Links that Include Precip/Evap (acres) 0.000 0.002 Total (acres) 0.053 0.055 ----------------------SCENARIO: PREDEVELOPED Number of Subbasins: 1 ---------- Subbasin : Subbasin 1 ---------- -------Area (Acres) -------- Till Forest 0.053 ---------------------------------------------- Subbasin Total 0.053 ----------------------SCENARIO: POSTDEVELOPED Number of Subbasins: 1 ---------- Subbasin : Basin 34 ---------- -------Area (Acres) -------- Till Grass 0.015 Impervious 0.038 ---------------------------------------------- Subbasin Total 0.053 ************************* LINK DATA ******************************* ----------------------SCENARIO: PREDEVELOPED Number of Links: 0 ************************* LINK DATA ******************************* ----------------------SCENARIO: POSTDEVELOPED Number of Links: 1 ------------------------------------------ Link Name: Bioretention Link Type: Bioretention Facility Downstream Link: None Base Elevation (ft) : 100.00 Riser Crest Elevation (ft) : 100.50 Storage Depth (ft) : 0.50 Bottom Length (ft) : 10.0 Bottom Width (ft) : 7.0 Side Slopes (ft/ft) : L1= 0.00 L2= 0.00 W1= 0.00 W2= 0.00 Bottom Area (sq-ft) : 70. Area at Riser Crest El (sq-ft) : 70. (acres) : 0.002 Volume at Riser Crest (cu-ft) : 67. (ac-ft) : 0.002 Infiltration on Bottom only Selected Soil Properties Biosoil Thickness (ft) : 1.50 Biosoil Saturated Hydraulic Conductivity (in/hr) : 6.00 Biosoil Porosity (Percent) : 30.00 Maximum Elevation of Bioretention Soil : 101.00 Native Soil Hydraulic Conductivity (in/hr) : 0.70 Riser Geometry Riser Structure Type : Circular Riser Diameter (in) : 6.00 Common Length (ft) : 0.000 Riser Crest Elevation : 100.50 ft Hydraulic Structure Geometry Number of Devices: 0 **********************FLOOD FREQUENCY AND DURATION STATISTICS******************* ----------------------SCENARIO: PREDEVELOPED Number of Subbasins: 1 Number of Links: 0 ----------------------SCENARIO: POSTDEVELOPED Number of Subbasins: 1 Number of Links: 1 ***********Groundwater Recharge Summary ************* Recharge is computed as input to Perlnd Groundwater Plus Infiltration in Structures Total Predeveloped Recharge During Simulation Model Element Recharge Amount (ac-ft) ----------------------------------------------------------------------------------------------- Subbasin: Subbasin 1 9.139 _____________________________________ Total: 9.139 Total Post Developed Recharge During Simulation Model Element Recharge Amount (ac-ft) ----------------------------------------------------------------------------------------------- Subbasin: Basin 34 1.833 Link: Bioretention 18.999 _____________________________________ Total: 20.832 Total Predevelopment Recharge is Less than Post Developed Average Recharge Per Year, (Number of Years= 158) Predeveloped: 0.058 ac-ft/year, Post Developed: 0.132 ac-ft/year ***********Water Quality Facility Data ************* ----------------------SCENARIO: PREDEVELOPED Number of Links: 0 ----------------------SCENARIO: POSTDEVELOPED Number of Links: 1 ********** Link: Bioretention ********** Infiltration/Filtration Statistics-------------------- Inflow Volume (ac-ft): 20.05 Inflow Volume Including PPT-Evap (ac-ft): 20.71 Total Runoff Infiltrated (ac-ft): 19.00, 91.75% Total Runoff Filtered (ac-ft): 0.00, 0.00% Primary Outflow To Downstream System (ac-ft): 1.69 Secondary Outflow To Downstream System (ac-ft): 0.00 Percent Treated (Infiltrated+Filtered)/Total Volume: 91.75% ***********Compliance Point Results ************* Scenario Predeveloped Compliance Subbasin: Subbasin 1 Scenario Postdeveloped Compliance Link: Bioretention *** Point of Compliance Flow Frequency Data *** Recurrence Interval Computed Using Gringorten Plotting Position Predevelopment Runoff Postdevelopment Runoff Tr (Years) Discharge (cfs) Tr (Years) Discharge (cfs) ---------------------------------------------------------------------------------------------------------------------- 2-Year 1.129E-03 2-Year 1.104E-02 5-Year 1.841E-03 5-Year 1.682E-02 10-Year 2.480E-03 10-Year 1.891E-02 25-Year 3.145E-03 25-Year 2.372E-02 50-Year 4.013E-03 50-Year 2.882E-02 100-Year 4.349E-03 100-Year 3.593E-02 200-Year 6.769E-03 200-Year 3.648E-02 ** Record too Short to Compute Peak Discharge for These Recurrence Intervals **** LID Duration Performance **** Excursion at Predeveloped 8%Q2 (Must be Less Than 0%): -94.4% PASS Maximum Excursion from 8%Q2 to 50%Q2 (Must be Less Than 0%): -52.2% PASS ------------------------------------------------------------------------------------------------- MEETS ALL LID DURATION DESIGN CRITERIA: PASS ------------------------------------------------------------------------------------------------- ————————————————————————————————— MGS FLOOD PROJECT REPORT Program Version: MGSFlood 4.43 Program License Number: 200410007 Project Simulation Performed on: 10/05/2018 2:28 PM Report Generation Date: 10/05/2018 2:28 PM ————————————————————————————————— Input File Name: Basin 35.fld Project Name: Solera Analysis Title: BMP Performance Standard Comments: ———————————————— PRECIPITATION INPUT ———————————————— Computational Time Step (Minutes): 15 Extended Precipitation Time Series Selected Climatic Region Number: 0 Full Period of Record Available used for Routing Precipitation Station : 96004005 Puget East 40 in_5min 10/01/1939-10/01/2097 Evaporation Station : 961040 Puget East 40 in MAP Evaporation Scale Factor : 0.750 HSPF Parameter Region Number: 1 HSPF Parameter Region Name : USGS Default ********** Default HSPF Parameters Used (Not Modified by User) *************** ********************** WATERSHED DEFINITION *********************** Predevelopment/Post Development Tributary Area Summary Predeveloped Post Developed Total Subbasin Area (acres) 0.076 0.076 Area of Links that Include Precip/Evap (acres) 0.000 0.003 Total (acres) 0.076 0.079 ----------------------SCENARIO: PREDEVELOPED Number of Subbasins: 1 ---------- Subbasin : Subbasin 1 ---------- -------Area (Acres) -------- Till Forest 0.076 ---------------------------------------------- Subbasin Total 0.076 ----------------------SCENARIO: POSTDEVELOPED Number of Subbasins: 1 ---------- Subbasin : Basin 35 ---------- -------Area (Acres) -------- Till Grass 0.012 Impervious 0.064 ---------------------------------------------- Subbasin Total 0.076 ************************* LINK DATA ******************************* ----------------------SCENARIO: PREDEVELOPED Number of Links: 0 ************************* LINK DATA ******************************* ----------------------SCENARIO: POSTDEVELOPED Number of Links: 1 ------------------------------------------ Link Name: Bioretention Link Type: Bioretention Facility Downstream Link: None Base Elevation (ft) : 100.00 Riser Crest Elevation (ft) : 100.50 Storage Depth (ft) : 0.50 Bottom Length (ft) : 12.0 Bottom Width (ft) : 10.0 Side Slopes (ft/ft) : L1= 0.00 L2= 0.00 W1= 0.00 W2= 0.00 Bottom Area (sq-ft) : 120. Area at Riser Crest El (sq-ft) : 120. (acres) : 0.003 Volume at Riser Crest (cu-ft) : 114. (ac-ft) : 0.003 Infiltration on Bottom only Selected Soil Properties Biosoil Thickness (ft) : 1.50 Biosoil Saturated Hydraulic Conductivity (in/hr) : 6.00 Biosoil Porosity (Percent) : 30.00 Maximum Elevation of Bioretention Soil : 101.00 Native Soil Hydraulic Conductivity (in/hr) : 0.70 Riser Geometry Riser Structure Type : Circular Riser Diameter (in) : 6.00 Common Length (ft) : 0.000 Riser Crest Elevation : 100.50 ft Hydraulic Structure Geometry Number of Devices: 0 **********************FLOOD FREQUENCY AND DURATION STATISTICS******************* ----------------------SCENARIO: PREDEVELOPED Number of Subbasins: 1 Number of Links: 0 ----------------------SCENARIO: POSTDEVELOPED Number of Subbasins: 1 Number of Links: 1 ***********Groundwater Recharge Summary ************* Recharge is computed as input to Perlnd Groundwater Plus Infiltration in Structures Total Predeveloped Recharge During Simulation Model Element Recharge Amount (ac-ft) ----------------------------------------------------------------------------------------------- Subbasin: Subbasin 1 13.105 _____________________________________ Total: 13.105 Total Post Developed Recharge During Simulation Model Element Recharge Amount (ac-ft) ----------------------------------------------------------------------------------------------- Subbasin: Basin 35 1.467 Link: Bioretention 29.896 _____________________________________ Total: 31.362 Total Predevelopment Recharge is Less than Post Developed Average Recharge Per Year, (Number of Years= 158) Predeveloped: 0.083 ac-ft/year, Post Developed: 0.198 ac-ft/year ***********Water Quality Facility Data ************* ----------------------SCENARIO: PREDEVELOPED Number of Links: 0 ----------------------SCENARIO: POSTDEVELOPED Number of Links: 1 ********** Link: Bioretention ********** Infiltration/Filtration Statistics-------------------- Inflow Volume (ac-ft): 31.11 Inflow Volume Including PPT-Evap (ac-ft): 32.25 Total Runoff Infiltrated (ac-ft): 29.90, 92.70% Total Runoff Filtered (ac-ft): 0.00, 0.00% Primary Outflow To Downstream System (ac-ft): 2.33 Secondary Outflow To Downstream System (ac-ft): 0.00 Percent Treated (Infiltrated+Filtered)/Total Volume: 92.70% ***********Compliance Point Results ************* Scenario Predeveloped Compliance Subbasin: Subbasin 1 Scenario Postdeveloped Compliance Link: Bioretention *** Point of Compliance Flow Frequency Data *** Recurrence Interval Computed Using Gringorten Plotting Position Predevelopment Runoff Postdevelopment Runoff Tr (Years) Discharge (cfs) Tr (Years) Discharge (cfs) ---------------------------------------------------------------------------------------------------------------------- 2-Year 1.620E-03 2-Year 1.687E-02 5-Year 2.640E-03 5-Year 2.539E-02 10-Year 3.556E-03 10-Year 3.039E-02 25-Year 4.509E-03 25-Year 3.567E-02 50-Year 5.754E-03 50-Year 4.115E-02 100-Year 6.236E-03 100-Year 4.868E-02 200-Year 9.706E-03 200-Year 5.302E-02 ** Record too Short to Compute Peak Discharge for These Recurrence Intervals **** LID Duration Performance **** Excursion at Predeveloped 8%Q2 (Must be Less Than 0%): -95.4% PASS Maximum Excursion from 8%Q2 to 50%Q2 (Must be Less Than 0%): -59.2% PASS ------------------------------------------------------------------------------------------------- MEETS ALL LID DURATION DESIGN CRITERIA: PASS ------------------------------------------------------------------------------------------------- ————————————————————————————————— MGS FLOOD PROJECT REPORT Program Version: MGSFlood 4.43 Program License Number: 200410007 Project Simulation Performed on: 10/05/2018 2:33 PM Report Generation Date: 10/05/2018 2:33 PM ————————————————————————————————— Input File Name: Basin 36.fld Project Name: Solera Analysis Title: BMP Performance Standard Comments: ———————————————— PRECIPITATION INPUT ———————————————— Computational Time Step (Minutes): 15 Extended Precipitation Time Series Selected Climatic Region Number: 0 Full Period of Record Available used for Routing Precipitation Station : 96004005 Puget East 40 in_5min 10/01/1939-10/01/2097 Evaporation Station : 961040 Puget East 40 in MAP Evaporation Scale Factor : 0.750 HSPF Parameter Region Number: 1 HSPF Parameter Region Name : USGS Default ********** Default HSPF Parameters Used (Not Modified by User) *************** ********************** WATERSHED DEFINITION *********************** Predevelopment/Post Development Tributary Area Summary Predeveloped Post Developed Total Subbasin Area (acres) 0.077 0.077 Area of Links that Include Precip/Evap (acres) 0.000 0.002 Total (acres) 0.077 0.079 ----------------------SCENARIO: PREDEVELOPED Number of Subbasins: 1 ---------- Subbasin : Subbasin 1 ---------- -------Area (Acres) -------- Till Forest 0.077 ---------------------------------------------- Subbasin Total 0.077 ----------------------SCENARIO: POSTDEVELOPED Number of Subbasins: 1 ---------- Subbasin : Basin 36 ---------- -------Area (Acres) -------- Till Grass 0.023 Impervious 0.054 ---------------------------------------------- Subbasin Total 0.077 ************************* LINK DATA ******************************* ----------------------SCENARIO: PREDEVELOPED Number of Links: 0 ************************* LINK DATA ******************************* ----------------------SCENARIO: POSTDEVELOPED Number of Links: 1 ------------------------------------------ Link Name: Bioretention Link Type: Bioretention Facility Downstream Link: None Base Elevation (ft) : 100.00 Riser Crest Elevation (ft) : 100.50 Storage Depth (ft) : 0.50 Bottom Length (ft) : 21.0 Bottom Width (ft) : 5.0 Side Slopes (ft/ft) : L1= 0.00 L2= 0.00 W1= 0.00 W2= 0.00 Bottom Area (sq-ft) : 105. Area at Riser Crest El (sq-ft) : 105. (acres) : 0.002 Volume at Riser Crest (cu-ft) : 100. (ac-ft) : 0.002 Infiltration on Bottom only Selected Soil Properties Biosoil Thickness (ft) : 1.50 Biosoil Saturated Hydraulic Conductivity (in/hr) : 6.00 Biosoil Porosity (Percent) : 30.00 Maximum Elevation of Bioretention Soil : 101.00 Native Soil Hydraulic Conductivity (in/hr) : 0.70 Riser Geometry Riser Structure Type : Circular Riser Diameter (in) : 6.00 Common Length (ft) : 0.000 Riser Crest Elevation : 100.50 ft Hydraulic Structure Geometry Number of Devices: 0 **********************FLOOD FREQUENCY AND DURATION STATISTICS******************* ----------------------SCENARIO: PREDEVELOPED Number of Subbasins: 1 Number of Links: 0 ----------------------SCENARIO: POSTDEVELOPED Number of Subbasins: 1 Number of Links: 1 ***********Groundwater Recharge Summary ************* Recharge is computed as input to Perlnd Groundwater Plus Infiltration in Structures Total Predeveloped Recharge During Simulation Model Element Recharge Amount (ac-ft) ----------------------------------------------------------------------------------------------- Subbasin: Subbasin 1 13.277 _____________________________________ Total: 13.277 Total Post Developed Recharge During Simulation Model Element Recharge Amount (ac-ft) ----------------------------------------------------------------------------------------------- Subbasin: Basin 36 2.811 Link: Bioretention 27.642 _____________________________________ Total: 30.453 Total Predevelopment Recharge is Less than Post Developed Average Recharge Per Year, (Number of Years= 158) Predeveloped: 0.084 ac-ft/year, Post Developed: 0.193 ac-ft/year ***********Water Quality Facility Data ************* ----------------------SCENARIO: PREDEVELOPED Number of Links: 0 ----------------------SCENARIO: POSTDEVELOPED Number of Links: 1 ********** Link: Bioretention ********** Infiltration/Filtration Statistics-------------------- Inflow Volume (ac-ft): 28.84 Inflow Volume Including PPT-Evap (ac-ft): 29.82 Total Runoff Infiltrated (ac-ft): 27.64, 92.71% Total Runoff Filtered (ac-ft): 0.00, 0.00% Primary Outflow To Downstream System (ac-ft): 2.16 Secondary Outflow To Downstream System (ac-ft): 0.00 Percent Treated (Infiltrated+Filtered)/Total Volume: 92.71% ***********Compliance Point Results ************* Scenario Predeveloped Compliance Subbasin: Subbasin 1 Scenario Postdeveloped Compliance Link: Bioretention *** Point of Compliance Flow Frequency Data *** Recurrence Interval Computed Using Gringorten Plotting Position Predevelopment Runoff Postdevelopment Runoff Tr (Years) Discharge (cfs) Tr (Years) Discharge (cfs) ---------------------------------------------------------------------------------------------------------------------- 2-Year 1.641E-03 2-Year 1.507E-02 5-Year 2.674E-03 5-Year 2.353E-02 10-Year 3.603E-03 10-Year 2.694E-02 25-Year 4.569E-03 25-Year 3.342E-02 50-Year 5.830E-03 50-Year 4.100E-02 100-Year 6.318E-03 100-Year 4.665E-02 200-Year 9.834E-03 200-Year 4.904E-02 ** Record too Short to Compute Peak Discharge for These Recurrence Intervals **** LID Duration Performance **** Excursion at Predeveloped 8%Q2 (Must be Less Than 0%): -95.1% PASS Maximum Excursion from 8%Q2 to 50%Q2 (Must be Less Than 0%): -57.8% PASS ------------------------------------------------------------------------------------------------- MEETS ALL LID DURATION DESIGN CRITERIA: PASS ------------------------------------------------------------------------------------------------- ————————————————————————————————— MGS FLOOD PROJECT REPORT Program Version: MGSFlood 4.43 Program License Number: 200410007 Project Simulation Performed on: 10/05/2018 2:35 PM Report Generation Date: 10/05/2018 2:36 PM ————————————————————————————————— Input File Name: Basin 37.fld Project Name: Solera Analysis Title: BMP Performance Standard Comments: ———————————————— PRECIPITATION INPUT ———————————————— Computational Time Step (Minutes): 15 Extended Precipitation Time Series Selected Climatic Region Number: 0 Full Period of Record Available used for Routing Precipitation Station : 96004005 Puget East 40 in_5min 10/01/1939-10/01/2097 Evaporation Station : 961040 Puget East 40 in MAP Evaporation Scale Factor : 0.750 HSPF Parameter Region Number: 1 HSPF Parameter Region Name : USGS Default ********** Default HSPF Parameters Used (Not Modified by User) *************** ********************** WATERSHED DEFINITION *********************** Predevelopment/Post Development Tributary Area Summary Predeveloped Post Developed Total Subbasin Area (acres) 0.104 0.104 Area of Links that Include Precip/Evap (acres) 0.000 0.004 Total (acres) 0.104 0.108 ----------------------SCENARIO: PREDEVELOPED Number of Subbasins: 1 ---------- Subbasin : Subbasin 1 ---------- -------Area (Acres) -------- Till Forest 0.104 ---------------------------------------------- Subbasin Total 0.104 ----------------------SCENARIO: POSTDEVELOPED Number of Subbasins: 1 ---------- Subbasin : Basin 37 ---------- -------Area (Acres) -------- Till Grass 0.016 Impervious 0.088 ---------------------------------------------- Subbasin Total 0.104 ************************* LINK DATA ******************************* ----------------------SCENARIO: PREDEVELOPED Number of Links: 0 ************************* LINK DATA ******************************* ----------------------SCENARIO: POSTDEVELOPED Number of Links: 1 ------------------------------------------ Link Name: Bioretention Link Type: Bioretention Facility Downstream Link: None Base Elevation (ft) : 100.00 Riser Crest Elevation (ft) : 100.50 Storage Depth (ft) : 0.50 Bottom Length (ft) : 16.0 Bottom Width (ft) : 10.0 Side Slopes (ft/ft) : L1= 0.00 L2= 0.00 W1= 0.00 W2= 0.00 Bottom Area (sq-ft) : 160. Area at Riser Crest El (sq-ft) : 160. (acres) : 0.004 Volume at Riser Crest (cu-ft) : 152. (ac-ft) : 0.003 Infiltration on Bottom only Selected Soil Properties Biosoil Thickness (ft) : 1.50 Biosoil Saturated Hydraulic Conductivity (in/hr) : 6.00 Biosoil Porosity (Percent) : 30.00 Maximum Elevation of Bioretention Soil : 101.00 Native Soil Hydraulic Conductivity (in/hr) : 0.70 Riser Geometry Riser Structure Type : Circular Riser Diameter (in) : 6.00 Common Length (ft) : 0.000 Riser Crest Elevation : 100.50 ft Hydraulic Structure Geometry Number of Devices: 0 **********************FLOOD FREQUENCY AND DURATION STATISTICS******************* ----------------------SCENARIO: PREDEVELOPED Number of Subbasins: 1 Number of Links: 0 ----------------------SCENARIO: POSTDEVELOPED Number of Subbasins: 1 Number of Links: 1 ***********Groundwater Recharge Summary ************* Recharge is computed as input to Perlnd Groundwater Plus Infiltration in Structures Total Predeveloped Recharge During Simulation Model Element Recharge Amount (ac-ft) ----------------------------------------------------------------------------------------------- Subbasin: Subbasin 1 17.933 _____________________________________ Total: 17.933 Total Post Developed Recharge During Simulation Model Element Recharge Amount (ac-ft) ----------------------------------------------------------------------------------------------- Subbasin: Basin 37 1.955 Link: Bioretention 40.718 _____________________________________ Total: 42.673 Total Predevelopment Recharge is Less than Post Developed Average Recharge Per Year, (Number of Years= 158) Predeveloped: 0.113 ac-ft/year, Post Developed: 0.270 ac-ft/year ***********Water Quality Facility Data ************* ----------------------SCENARIO: PREDEVELOPED Number of Links: 0 ----------------------SCENARIO: POSTDEVELOPED Number of Links: 1 ********** Link: Bioretention ********** Infiltration/Filtration Statistics-------------------- Inflow Volume (ac-ft): 42.67 Inflow Volume Including PPT-Evap (ac-ft): 44.20 Total Runoff Infiltrated (ac-ft): 40.72, 92.13% Total Runoff Filtered (ac-ft): 0.00, 0.00% Primary Outflow To Downstream System (ac-ft): 3.43 Secondary Outflow To Downstream System (ac-ft): 0.00 Percent Treated (Infiltrated+Filtered)/Total Volume: 92.13% ***********Compliance Point Results ************* Scenario Predeveloped Compliance Subbasin: Subbasin 1 Scenario Postdeveloped Compliance Link: Bioretention *** Point of Compliance Flow Frequency Data *** Recurrence Interval Computed Using Gringorten Plotting Position Predevelopment Runoff Postdevelopment Runoff Tr (Years) Discharge (cfs) Tr (Years) Discharge (cfs) ---------------------------------------------------------------------------------------------------------------------- 2-Year 2.216E-03 2-Year 2.361E-02 5-Year 3.612E-03 5-Year 3.503E-02 10-Year 4.867E-03 10-Year 4.131E-02 25-Year 6.170E-03 25-Year 4.875E-02 50-Year 7.875E-03 50-Year 5.672E-02 100-Year 8.534E-03 100-Year 6.667E-02 200-Year 1.328E-02 200-Year 7.292E-02 ** Record too Short to Compute Peak Discharge for These Recurrence Intervals **** LID Duration Performance **** Excursion at Predeveloped 8%Q2 (Must be Less Than 0%): -95.0% PASS Maximum Excursion from 8%Q2 to 50%Q2 (Must be Less Than 0%): -55.6% PASS ------------------------------------------------------------------------------------------------- MEETS ALL LID DURATION DESIGN CRITERIA: PASS ------------------------------------------------------------------------------------------------- ————————————————————————————————— MGS FLOOD PROJECT REPORT Program Version: MGSFlood 4.43 Program License Number: 200410007 Project Simulation Performed on: 10/05/2018 2:39 PM Report Generation Date: 10/05/2018 2:39 PM ————————————————————————————————— Input File Name: Basin 38.fld Project Name: Solera Analysis Title: BMP Performance Standard Comments: ———————————————— PRECIPITATION INPUT ———————————————— Computational Time Step (Minutes): 15 Extended Precipitation Time Series Selected Climatic Region Number: 0 Full Period of Record Available used for Routing Precipitation Station : 96004005 Puget East 40 in_5min 10/01/1939-10/01/2097 Evaporation Station : 961040 Puget East 40 in MAP Evaporation Scale Factor : 0.750 HSPF Parameter Region Number: 1 HSPF Parameter Region Name : USGS Default ********** Default HSPF Parameters Used (Not Modified by User) *************** ********************** WATERSHED DEFINITION *********************** Predevelopment/Post Development Tributary Area Summary Predeveloped Post Developed Total Subbasin Area (acres) 0.285 0.285 Area of Links that Include Precip/Evap (acres) 0.000 0.009 Total (acres) 0.285 0.294 ----------------------SCENARIO: PREDEVELOPED Number of Subbasins: 1 ---------- Subbasin : Subbasin 1 ---------- -------Area (Acres) -------- Till Forest 0.285 ---------------------------------------------- Subbasin Total 0.285 ----------------------SCENARIO: POSTDEVELOPED Number of Subbasins: 1 ---------- Subbasin : Basin 38 ---------- -------Area (Acres) -------- Till Grass 0.069 Impervious 0.216 ---------------------------------------------- Subbasin Total 0.285 ************************* LINK DATA ******************************* ----------------------SCENARIO: PREDEVELOPED Number of Links: 0 ************************* LINK DATA ******************************* ----------------------SCENARIO: POSTDEVELOPED Number of Links: 1 ------------------------------------------ Link Name: Bioretention Link Type: Bioretention Facility Downstream Link: None Base Elevation (ft) : 100.00 Riser Crest Elevation (ft) : 100.50 Storage Depth (ft) : 0.50 Bottom Length (ft) : 35.0 Bottom Width (ft) : 11.0 Side Slopes (ft/ft) : L1= 0.00 L2= 0.00 W1= 0.00 W2= 0.00 Bottom Area (sq-ft) : 385. Area at Riser Crest El (sq-ft) : 385. (acres) : 0.009 Volume at Riser Crest (cu-ft) : 366. (ac-ft) : 0.008 Infiltration on Bottom only Selected Soil Properties Biosoil Thickness (ft) : 1.50 Biosoil Saturated Hydraulic Conductivity (in/hr) : 6.00 Biosoil Porosity (Percent) : 30.00 Maximum Elevation of Bioretention Soil : 101.00 Native Soil Hydraulic Conductivity (in/hr) : 0.70 Riser Geometry Riser Structure Type : Circular Riser Diameter (in) : 6.00 Common Length (ft) : 0.000 Riser Crest Elevation : 100.50 ft Hydraulic Structure Geometry Number of Devices: 0 **********************FLOOD FREQUENCY AND DURATION STATISTICS******************* ----------------------SCENARIO: PREDEVELOPED Number of Subbasins: 1 Number of Links: 0 ----------------------SCENARIO: POSTDEVELOPED Number of Subbasins: 1 Number of Links: 1 ***********Groundwater Recharge Summary ************* Recharge is computed as input to Perlnd Groundwater Plus Infiltration in Structures Total Predeveloped Recharge During Simulation Model Element Recharge Amount (ac-ft) ----------------------------------------------------------------------------------------------- Subbasin: Subbasin 1 49.142 _____________________________________ Total: 49.142 Total Post Developed Recharge During Simulation Model Element Recharge Amount (ac-ft) ----------------------------------------------------------------------------------------------- Subbasin: Basin 38 8.433 Link: Bioretention 104.425 _____________________________________ Total: 112.857 Total Predevelopment Recharge is Less than Post Developed Average Recharge Per Year, (Number of Years= 158) Predeveloped: 0.311 ac-ft/year, Post Developed: 0.714 ac-ft/year ***********Water Quality Facility Data ************* ----------------------SCENARIO: PREDEVELOPED Number of Links: 0 ----------------------SCENARIO: POSTDEVELOPED Number of Links: 1 ********** Link: Bioretention ********** Infiltration/Filtration Statistics-------------------- Inflow Volume (ac-ft): 110.72 Inflow Volume Including PPT-Evap (ac-ft): 114.33 Total Runoff Infiltrated (ac-ft): 104.42, 91.34% Total Runoff Filtered (ac-ft): 0.00, 0.00% Primary Outflow To Downstream System (ac-ft): 9.77 Secondary Outflow To Downstream System (ac-ft): 0.00 Percent Treated (Infiltrated+Filtered)/Total Volume: 91.34% ***********Compliance Point Results ************* Scenario Predeveloped Compliance Subbasin: Subbasin 1 Scenario Postdeveloped Compliance Link: Bioretention *** Point of Compliance Flow Frequency Data *** Recurrence Interval Computed Using Gringorten Plotting Position Predevelopment Runoff Postdevelopment Runoff Tr (Years) Discharge (cfs) Tr (Years) Discharge (cfs) ---------------------------------------------------------------------------------------------------------------------- 2-Year 6.073E-03 2-Year 5.878E-02 5-Year 9.898E-03 5-Year 8.941E-02 10-Year 1.334E-02 10-Year 0.105 25-Year 1.691E-02 25-Year 0.127 50-Year 2.158E-02 50-Year 0.151 100-Year 2.339E-02 100-Year 0.175 200-Year 3.640E-02 200-Year 0.193 ** Record too Short to Compute Peak Discharge for These Recurrence Intervals **** LID Duration Performance **** Excursion at Predeveloped 8%Q2 (Must be Less Than 0%): -94.1% PASS Maximum Excursion from 8%Q2 to 50%Q2 (Must be Less Than 0%): -48.8% PASS ------------------------------------------------------------------------------------------------- MEETS ALL LID DURATION DESIGN CRITERIA: PASS ------------------------------------------------------------------------------------------------- ————————————————————————————————— MGS FLOOD PROJECT REPORT Program Version: MGSFlood 4.43 Program License Number: 200410007 Project Simulation Performed on: 10/05/2018 2:42 PM Report Generation Date: 10/05/2018 2:43 PM ————————————————————————————————— Input File Name: Basin 39.fld Project Name: Solera Analysis Title: BMP Performance Standard Comments: ———————————————— PRECIPITATION INPUT ———————————————— Computational Time Step (Minutes): 15 Extended Precipitation Time Series Selected Climatic Region Number: 0 Full Period of Record Available used for Routing Precipitation Station : 96004005 Puget East 40 in_5min 10/01/1939-10/01/2097 Evaporation Station : 961040 Puget East 40 in MAP Evaporation Scale Factor : 0.750 HSPF Parameter Region Number: 1 HSPF Parameter Region Name : USGS Default ********** Default HSPF Parameters Used (Not Modified by User) *************** ********************** WATERSHED DEFINITION *********************** Predevelopment/Post Development Tributary Area Summary Predeveloped Post Developed Total Subbasin Area (acres) 0.070 0.070 Area of Links that Include Precip/Evap (acres) 0.000 0.002 Total (acres) 0.070 0.072 ----------------------SCENARIO: PREDEVELOPED Number of Subbasins: 1 ---------- Subbasin : Subbasin 1 ---------- -------Area (Acres) -------- Till Forest 0.070 ---------------------------------------------- Subbasin Total 0.070 ----------------------SCENARIO: POSTDEVELOPED Number of Subbasins: 1 ---------- Subbasin : Basin 39 ---------- -------Area (Acres) -------- Till Grass 0.016 Impervious 0.054 ---------------------------------------------- Subbasin Total 0.070 ************************* LINK DATA ******************************* ----------------------SCENARIO: PREDEVELOPED Number of Links: 0 ************************* LINK DATA ******************************* ----------------------SCENARIO: POSTDEVELOPED Number of Links: 1 ------------------------------------------ Link Name: Bioretention Link Type: Bioretention Facility Downstream Link: None Base Elevation (ft) : 100.00 Riser Crest Elevation (ft) : 100.50 Storage Depth (ft) : 0.50 Bottom Length (ft) : 11.0 Bottom Width (ft) : 9.0 Side Slopes (ft/ft) : L1= 0.00 L2= 0.00 W1= 0.00 W2= 0.00 Bottom Area (sq-ft) : 99. Area at Riser Crest El (sq-ft) : 99. (acres) : 0.002 Volume at Riser Crest (cu-ft) : 94. (ac-ft) : 0.002 Infiltration on Bottom only Selected Soil Properties Biosoil Thickness (ft) : 1.50 Biosoil Saturated Hydraulic Conductivity (in/hr) : 6.00 Biosoil Porosity (Percent) : 30.00 Maximum Elevation of Bioretention Soil : 101.00 Native Soil Hydraulic Conductivity (in/hr) : 0.70 Riser Geometry Riser Structure Type : Circular Riser Diameter (in) : 6.00 Common Length (ft) : 0.000 Riser Crest Elevation : 100.50 ft Hydraulic Structure Geometry Number of Devices: 0 **********************FLOOD FREQUENCY AND DURATION STATISTICS******************* ----------------------SCENARIO: PREDEVELOPED Number of Subbasins: 1 Number of Links: 0 ----------------------SCENARIO: POSTDEVELOPED Number of Subbasins: 1 Number of Links: 1 ***********Groundwater Recharge Summary ************* Recharge is computed as input to Perlnd Groundwater Plus Infiltration in Structures Total Predeveloped Recharge During Simulation Model Element Recharge Amount (ac-ft) ----------------------------------------------------------------------------------------------- Subbasin: Subbasin 1 12.070 _____________________________________ Total: 12.070 Total Post Developed Recharge During Simulation Model Element Recharge Amount (ac-ft) ----------------------------------------------------------------------------------------------- Subbasin: Basin 39 1.955 Link: Bioretention 26.080 _____________________________________ Total: 28.036 Total Predevelopment Recharge is Less than Post Developed Average Recharge Per Year, (Number of Years= 158) Predeveloped: 0.076 ac-ft/year, Post Developed: 0.177 ac-ft/year ***********Water Quality Facility Data ************* ----------------------SCENARIO: PREDEVELOPED Number of Links: 0 ----------------------SCENARIO: POSTDEVELOPED Number of Links: 1 ********** Link: Bioretention ********** Infiltration/Filtration Statistics-------------------- Inflow Volume (ac-ft): 27.43 Inflow Volume Including PPT-Evap (ac-ft): 28.36 Total Runoff Infiltrated (ac-ft): 26.08, 91.96% Total Runoff Filtered (ac-ft): 0.00, 0.00% Primary Outflow To Downstream System (ac-ft): 2.25 Secondary Outflow To Downstream System (ac-ft): 0.00 Percent Treated (Infiltrated+Filtered)/Total Volume: 91.96% ***********Compliance Point Results ************* Scenario Predeveloped Compliance Subbasin: Subbasin 1 Scenario Postdeveloped Compliance Link: Bioretention *** Point of Compliance Flow Frequency Data *** Recurrence Interval Computed Using Gringorten Plotting Position Predevelopment Runoff Postdevelopment Runoff Tr (Years) Discharge (cfs) Tr (Years) Discharge (cfs) ---------------------------------------------------------------------------------------------------------------------- 2-Year 1.492E-03 2-Year 1.504E-02 5-Year 2.431E-03 5-Year 2.304E-02 10-Year 3.276E-03 10-Year 2.636E-02 25-Year 4.153E-03 25-Year 3.192E-02 50-Year 5.300E-03 50-Year 3.951E-02 100-Year 5.744E-03 100-Year 4.552E-02 200-Year 8.940E-03 200-Year 4.723E-02 ** Record too Short to Compute Peak Discharge for These Recurrence Intervals **** LID Duration Performance **** Excursion at Predeveloped 8%Q2 (Must be Less Than 0%): -94.7% PASS Maximum Excursion from 8%Q2 to 50%Q2 (Must be Less Than 0%): -53.9% PASS ------------------------------------------------------------------------------------------------- MEETS ALL LID DURATION DESIGN CRITERIA: PASS ------------------------------------------------------------------------------------------------- ————————————————————————————————— MGS FLOOD PROJECT REPORT Program Version: MGSFlood 4.43 Program License Number: 200410007 Project Simulation Performed on: 10/05/2018 2:44 PM Report Generation Date: 10/05/2018 2:44 PM ————————————————————————————————— Input File Name: Basin 40.fld Project Name: Solera Analysis Title: BMP Performance Standard Comments: ———————————————— PRECIPITATION INPUT ———————————————— Computational Time Step (Minutes): 15 Extended Precipitation Time Series Selected Climatic Region Number: 0 Full Period of Record Available used for Routing Precipitation Station : 96004005 Puget East 40 in_5min 10/01/1939-10/01/2097 Evaporation Station : 961040 Puget East 40 in MAP Evaporation Scale Factor : 0.750 HSPF Parameter Region Number: 1 HSPF Parameter Region Name : USGS Default ********** Default HSPF Parameters Used (Not Modified by User) *************** ********************** WATERSHED DEFINITION *********************** Predevelopment/Post Development Tributary Area Summary Predeveloped Post Developed Total Subbasin Area (acres) 0.055 0.055 Area of Links that Include Precip/Evap (acres) 0.000 0.002 Total (acres) 0.055 0.057 ----------------------SCENARIO: PREDEVELOPED Number of Subbasins: 1 ---------- Subbasin : Subbasin 1 ---------- -------Area (Acres) -------- Till Forest 0.055 ---------------------------------------------- Subbasin Total 0.055 ----------------------SCENARIO: POSTDEVELOPED Number of Subbasins: 1 ---------- Subbasin : Basin 40 ---------- -------Area (Acres) -------- Till Grass 0.013 Impervious 0.042 ---------------------------------------------- Subbasin Total 0.055 ************************* LINK DATA ******************************* ----------------------SCENARIO: PREDEVELOPED Number of Links: 0 ************************* LINK DATA ******************************* ----------------------SCENARIO: POSTDEVELOPED Number of Links: 1 ------------------------------------------ Link Name: Bioretention Link Type: Bioretention Facility Downstream Link: None Base Elevation (ft) : 100.00 Riser Crest Elevation (ft) : 100.50 Storage Depth (ft) : 0.50 Bottom Length (ft) : 10.0 Bottom Width (ft) : 8.0 Side Slopes (ft/ft) : L1= 0.00 L2= 0.00 W1= 0.00 W2= 0.00 Bottom Area (sq-ft) : 80. Area at Riser Crest El (sq-ft) : 80. (acres) : 0.002 Volume at Riser Crest (cu-ft) : 76. (ac-ft) : 0.002 Infiltration on Bottom only Selected Soil Properties Biosoil Thickness (ft) : 1.50 Biosoil Saturated Hydraulic Conductivity (in/hr) : 6.00 Biosoil Porosity (Percent) : 30.00 Maximum Elevation of Bioretention Soil : 101.00 Native Soil Hydraulic Conductivity (in/hr) : 0.70 Riser Geometry Riser Structure Type : Circular Riser Diameter (in) : 6.00 Common Length (ft) : 0.000 Riser Crest Elevation : 100.50 ft Hydraulic Structure Geometry Number of Devices: 0 **********************FLOOD FREQUENCY AND DURATION STATISTICS******************* ----------------------SCENARIO: PREDEVELOPED Number of Subbasins: 1 Number of Links: 0 ----------------------SCENARIO: POSTDEVELOPED Number of Subbasins: 1 Number of Links: 1 ***********Groundwater Recharge Summary ************* Recharge is computed as input to Perlnd Groundwater Plus Infiltration in Structures Total Predeveloped Recharge During Simulation Model Element Recharge Amount (ac-ft) ----------------------------------------------------------------------------------------------- Subbasin: Subbasin 1 9.484 _____________________________________ Total: 9.484 Total Post Developed Recharge During Simulation Model Element Recharge Amount (ac-ft) ----------------------------------------------------------------------------------------------- Subbasin: Basin 40 1.589 Link: Bioretention 20.567 _____________________________________ Total: 22.156 Total Predevelopment Recharge is Less than Post Developed Average Recharge Per Year, (Number of Years= 158) Predeveloped: 0.060 ac-ft/year, Post Developed: 0.140 ac-ft/year ***********Water Quality Facility Data ************* ----------------------SCENARIO: PREDEVELOPED Number of Links: 0 ----------------------SCENARIO: POSTDEVELOPED Number of Links: 1 ********** Link: Bioretention ********** Infiltration/Filtration Statistics-------------------- Inflow Volume (ac-ft): 21.44 Inflow Volume Including PPT-Evap (ac-ft): 22.20 Total Runoff Infiltrated (ac-ft): 20.57, 92.65% Total Runoff Filtered (ac-ft): 0.00, 0.00% Primary Outflow To Downstream System (ac-ft): 1.62 Secondary Outflow To Downstream System (ac-ft): 0.00 Percent Treated (Infiltrated+Filtered)/Total Volume: 92.65% ***********Compliance Point Results ************* Scenario Predeveloped Compliance Subbasin: Subbasin 1 Scenario Postdeveloped Compliance Link: Bioretention *** Point of Compliance Flow Frequency Data *** Recurrence Interval Computed Using Gringorten Plotting Position Predevelopment Runoff Postdevelopment Runoff Tr (Years) Discharge (cfs) Tr (Years) Discharge (cfs) ---------------------------------------------------------------------------------------------------------------------- 2-Year 1.172E-03 2-Year 1.139E-02 5-Year 1.910E-03 5-Year 1.766E-02 10-Year 2.574E-03 10-Year 2.058E-02 25-Year 3.263E-03 25-Year 2.488E-02 50-Year 4.164E-03 50-Year 2.987E-02 100-Year 4.513E-03 100-Year 3.417E-02 200-Year 7.024E-03 200-Year 3.633E-02 ** Record too Short to Compute Peak Discharge for These Recurrence Intervals **** LID Duration Performance **** Excursion at Predeveloped 8%Q2 (Must be Less Than 0%): -95.2% PASS Maximum Excursion from 8%Q2 to 50%Q2 (Must be Less Than 0%): -58.2% PASS ------------------------------------------------------------------------------------------------- MEETS ALL LID DURATION DESIGN CRITERIA: PASS ------------------------------------------------------------------------------------------------- ————————————————————————————————— MGS FLOOD PROJECT REPORT Program Version: MGSFlood 4.43 Program License Number: 200410007 Project Simulation Performed on: 10/05/2018 2:47 PM Report Generation Date: 10/05/2018 2:47 PM ————————————————————————————————— Input File Name: Basin 41.fld Project Name: Solera Analysis Title: BMP Performance Standard Comments: ———————————————— PRECIPITATION INPUT ———————————————— Computational Time Step (Minutes): 15 Extended Precipitation Time Series Selected Climatic Region Number: 0 Full Period of Record Available used for Routing Precipitation Station : 96004005 Puget East 40 in_5min 10/01/1939-10/01/2097 Evaporation Station : 961040 Puget East 40 in MAP Evaporation Scale Factor : 0.750 HSPF Parameter Region Number: 1 HSPF Parameter Region Name : USGS Default ********** Default HSPF Parameters Used (Not Modified by User) *************** ********************** WATERSHED DEFINITION *********************** Predevelopment/Post Development Tributary Area Summary Predeveloped Post Developed Total Subbasin Area (acres) 0.078 0.078 Area of Links that Include Precip/Evap (acres) 0.000 0.002 Total (acres) 0.078 0.080 ----------------------SCENARIO: PREDEVELOPED Number of Subbasins: 1 ---------- Subbasin : Subbasin 1 ---------- -------Area (Acres) -------- Till Forest 0.078 ---------------------------------------------- Subbasin Total 0.078 ----------------------SCENARIO: POSTDEVELOPED Number of Subbasins: 1 ---------- Subbasin : Basin 41 ---------- -------Area (Acres) -------- Till Grass 0.037 Impervious 0.041 ---------------------------------------------- Subbasin Total 0.078 ************************* LINK DATA ******************************* ----------------------SCENARIO: PREDEVELOPED Number of Links: 0 ************************* LINK DATA ******************************* ----------------------SCENARIO: POSTDEVELOPED Number of Links: 1 ------------------------------------------ Link Name: Bioretention Link Type: Bioretention Facility Downstream Link: None Base Elevation (ft) : 100.00 Riser Crest Elevation (ft) : 100.50 Storage Depth (ft) : 0.50 Bottom Length (ft) : 20.0 Bottom Width (ft) : 5.0 Side Slopes (ft/ft) : L1= 0.00 L2= 0.00 W1= 0.00 W2= 0.00 Bottom Area (sq-ft) : 100. Area at Riser Crest El (sq-ft) : 100. (acres) : 0.002 Volume at Riser Crest (cu-ft) : 95. (ac-ft) : 0.002 Infiltration on Bottom only Selected Soil Properties Biosoil Thickness (ft) : 1.50 Biosoil Saturated Hydraulic Conductivity (in/hr) : 6.00 Biosoil Porosity (Percent) : 30.00 Maximum Elevation of Bioretention Soil : 101.00 Native Soil Hydraulic Conductivity (in/hr) : 0.70 Riser Geometry Riser Structure Type : Circular Riser Diameter (in) : 6.00 Common Length (ft) : 0.000 Riser Crest Elevation : 100.50 ft Hydraulic Structure Geometry Number of Devices: 0 **********************FLOOD FREQUENCY AND DURATION STATISTICS******************* ----------------------SCENARIO: PREDEVELOPED Number of Subbasins: 1 Number of Links: 0 ----------------------SCENARIO: POSTDEVELOPED Number of Subbasins: 1 Number of Links: 1 ***********Groundwater Recharge Summary ************* Recharge is computed as input to Perlnd Groundwater Plus Infiltration in Structures Total Predeveloped Recharge During Simulation Model Element Recharge Amount (ac-ft) ----------------------------------------------------------------------------------------------- Subbasin: Subbasin 1 13.449 _____________________________________ Total: 13.449 Total Post Developed Recharge During Simulation Model Element Recharge Amount (ac-ft) ----------------------------------------------------------------------------------------------- Subbasin: Basin 41 4.522 Link: Bioretention 25.386 _____________________________________ Total: 29.908 Total Predevelopment Recharge is Less than Post Developed Average Recharge Per Year, (Number of Years= 158) Predeveloped: 0.085 ac-ft/year, Post Developed: 0.189 ac-ft/year ***********Water Quality Facility Data ************* ----------------------SCENARIO: PREDEVELOPED Number of Links: 0 ----------------------SCENARIO: POSTDEVELOPED Number of Links: 1 ********** Link: Bioretention ********** Infiltration/Filtration Statistics-------------------- Inflow Volume (ac-ft): 25.82 Inflow Volume Including PPT-Evap (ac-ft): 26.75 Total Runoff Infiltrated (ac-ft): 25.39, 94.92% Total Runoff Filtered (ac-ft): 0.00, 0.00% Primary Outflow To Downstream System (ac-ft): 1.35 Secondary Outflow To Downstream System (ac-ft): 0.00 Percent Treated (Infiltrated+Filtered)/Total Volume: 94.92% ***********Compliance Point Results ************* Scenario Predeveloped Compliance Subbasin: Subbasin 1 Scenario Postdeveloped Compliance Link: Bioretention *** Point of Compliance Flow Frequency Data *** Recurrence Interval Computed Using Gringorten Plotting Position Predevelopment Runoff Postdevelopment Runoff Tr (Years) Discharge (cfs) Tr (Years) Discharge (cfs) ---------------------------------------------------------------------------------------------------------------------- 2-Year 1.662E-03 2-Year 1.054E-02 5-Year 2.709E-03 5-Year 1.887E-02 10-Year 3.650E-03 10-Year 2.250E-02 25-Year 4.628E-03 25-Year 3.014E-02 50-Year 5.906E-03 50-Year 3.354E-02 100-Year 6.400E-03 100-Year 4.354E-02 200-Year 9.962E-03 200-Year 4.386E-02 ** Record too Short to Compute Peak Discharge for These Recurrence Intervals **** LID Duration Performance **** Excursion at Predeveloped 8%Q2 (Must be Less Than 0%): -96.3% PASS Maximum Excursion from 8%Q2 to 50%Q2 (Must be Less Than 0%): -70.2% PASS ------------------------------------------------------------------------------------------------- MEETS ALL LID DURATION DESIGN CRITERIA: PASS ------------------------------------------------------------------------------------------------- ————————————————————————————————— MGS FLOOD PROJECT REPORT Program Version: MGSFlood 4.43 Program License Number: 200410007 Project Simulation Performed on: 10/05/2018 2:48 PM Report Generation Date: 10/05/2018 2:49 PM ————————————————————————————————— Input File Name: Basin 42.fld Project Name: Solera Analysis Title: BMP Performance Standard Comments: ———————————————— PRECIPITATION INPUT ———————————————— Computational Time Step (Minutes): 15 Extended Precipitation Time Series Selected Climatic Region Number: 0 Full Period of Record Available used for Routing Precipitation Station : 96004005 Puget East 40 in_5min 10/01/1939-10/01/2097 Evaporation Station : 961040 Puget East 40 in MAP Evaporation Scale Factor : 0.750 HSPF Parameter Region Number: 1 HSPF Parameter Region Name : USGS Default ********** Default HSPF Parameters Used (Not Modified by User) *************** ********************** WATERSHED DEFINITION *********************** Predevelopment/Post Development Tributary Area Summary Predeveloped Post Developed Total Subbasin Area (acres) 0.056 0.056 Area of Links that Include Precip/Evap (acres) 0.000 0.002 Total (acres) 0.056 0.058 ----------------------SCENARIO: PREDEVELOPED Number of Subbasins: 1 ---------- Subbasin : Subbasin 1 ---------- -------Area (Acres) -------- Till Forest 0.056 ---------------------------------------------- Subbasin Total 0.056 ----------------------SCENARIO: POSTDEVELOPED Number of Subbasins: 1 ---------- Subbasin : Basin 42 ---------- -------Area (Acres) -------- Till Grass 0.018 Impervious 0.038 ---------------------------------------------- Subbasin Total 0.056 ************************* LINK DATA ******************************* ----------------------SCENARIO: PREDEVELOPED Number of Links: 0 ************************* LINK DATA ******************************* ----------------------SCENARIO: POSTDEVELOPED Number of Links: 1 ------------------------------------------ Link Name: Bioretention Link Type: Bioretention Facility Downstream Link: None Base Elevation (ft) : 100.00 Riser Crest Elevation (ft) : 100.50 Storage Depth (ft) : 0.50 Bottom Length (ft) : 16.0 Bottom Width (ft) : 5.0 Side Slopes (ft/ft) : L1= 0.00 L2= 0.00 W1= 0.00 W2= 0.00 Bottom Area (sq-ft) : 80. Area at Riser Crest El (sq-ft) : 80. (acres) : 0.002 Volume at Riser Crest (cu-ft) : 76. (ac-ft) : 0.002 Infiltration on Bottom only Selected Soil Properties Biosoil Thickness (ft) : 1.50 Biosoil Saturated Hydraulic Conductivity (in/hr) : 6.00 Biosoil Porosity (Percent) : 30.00 Maximum Elevation of Bioretention Soil : 101.00 Native Soil Hydraulic Conductivity (in/hr) : 0.70 Riser Geometry Riser Structure Type : Circular Riser Diameter (in) : 6.00 Common Length (ft) : 0.000 Riser Crest Elevation : 100.50 ft Hydraulic Structure Geometry Number of Devices: 0 **********************FLOOD FREQUENCY AND DURATION STATISTICS******************* ----------------------SCENARIO: PREDEVELOPED Number of Subbasins: 1 Number of Links: 0 ----------------------SCENARIO: POSTDEVELOPED Number of Subbasins: 1 Number of Links: 1 ***********Groundwater Recharge Summary ************* Recharge is computed as input to Perlnd Groundwater Plus Infiltration in Structures Total Predeveloped Recharge During Simulation Model Element Recharge Amount (ac-ft) ----------------------------------------------------------------------------------------------- Subbasin: Subbasin 1 9.656 _____________________________________ Total: 9.656 Total Post Developed Recharge During Simulation Model Element Recharge Amount (ac-ft) ----------------------------------------------------------------------------------------------- Subbasin: Basin 42 2.200 Link: Bioretention 20.104 _____________________________________ Total: 22.304 Total Predevelopment Recharge is Less than Post Developed Average Recharge Per Year, (Number of Years= 158) Predeveloped: 0.061 ac-ft/year, Post Developed: 0.141 ac-ft/year ***********Water Quality Facility Data ************* ----------------------SCENARIO: PREDEVELOPED Number of Links: 0 ----------------------SCENARIO: POSTDEVELOPED Number of Links: 1 ********** Link: Bioretention ********** Infiltration/Filtration Statistics-------------------- Inflow Volume (ac-ft): 20.66 Inflow Volume Including PPT-Evap (ac-ft): 21.40 Total Runoff Infiltrated (ac-ft): 20.10, 93.93% Total Runoff Filtered (ac-ft): 0.00, 0.00% Primary Outflow To Downstream System (ac-ft): 1.29 Secondary Outflow To Downstream System (ac-ft): 0.00 Percent Treated (Infiltrated+Filtered)/Total Volume: 93.93% ***********Compliance Point Results ************* Scenario Predeveloped Compliance Subbasin: Subbasin 1 Scenario Postdeveloped Compliance Link: Bioretention *** Point of Compliance Flow Frequency Data *** Recurrence Interval Computed Using Gringorten Plotting Position Predevelopment Runoff Postdevelopment Runoff Tr (Years) Discharge (cfs) Tr (Years) Discharge (cfs) ---------------------------------------------------------------------------------------------------------------------- 2-Year 1.193E-03 2-Year 9.876E-03 5-Year 1.945E-03 5-Year 1.616E-02 10-Year 2.621E-03 10-Year 1.904E-02 25-Year 3.323E-03 25-Year 2.383E-02 50-Year 4.240E-03 50-Year 2.750E-02 100-Year 4.595E-03 100-Year 3.347E-02 200-Year 7.152E-03 200-Year 3.498E-02 ** Record too Short to Compute Peak Discharge for These Recurrence Intervals **** LID Duration Performance **** Excursion at Predeveloped 8%Q2 (Must be Less Than 0%): -96.0% PASS Maximum Excursion from 8%Q2 to 50%Q2 (Must be Less Than 0%): -65.6% PASS ------------------------------------------------------------------------------------------------- MEETS ALL LID DURATION DESIGN CRITERIA: PASS ------------------------------------------------------------------------------------------------- ————————————————————————————————— MGS FLOOD PROJECT REPORT Program Version: MGSFlood 4.43 Program License Number: 200410007 Project Simulation Performed on: 10/05/2018 2:56 PM Report Generation Date: 10/05/2018 2:56 PM ————————————————————————————————— Input File Name: Basin 43.fld Project Name: Solera Analysis Title: BMP Performance Standard Comments: ———————————————— PRECIPITATION INPUT ———————————————— Computational Time Step (Minutes): 15 Extended Precipitation Time Series Selected Climatic Region Number: 0 Full Period of Record Available used for Routing Precipitation Station : 96004005 Puget East 40 in_5min 10/01/1939-10/01/2097 Evaporation Station : 961040 Puget East 40 in MAP Evaporation Scale Factor : 0.750 HSPF Parameter Region Number: 1 HSPF Parameter Region Name : USGS Default ********** Default HSPF Parameters Used (Not Modified by User) *************** ********************** WATERSHED DEFINITION *********************** Predevelopment/Post Development Tributary Area Summary Predeveloped Post Developed Total Subbasin Area (acres) 0.101 0.100 Area of Links that Include Precip/Evap (acres) 0.000 0.004 Total (acres) 0.101 0.104 ----------------------SCENARIO: PREDEVELOPED Number of Subbasins: 1 ---------- Subbasin : Subbasin 1 ---------- -------Area (Acres) -------- Till Forest 0.101 ---------------------------------------------- Subbasin Total 0.101 ----------------------SCENARIO: POSTDEVELOPED Number of Subbasins: 1 ---------- Subbasin : Basin 43 ---------- -------Area (Acres) -------- Till Grass 0.022 Impervious 0.078 ---------------------------------------------- Subbasin Total 0.100 ************************* LINK DATA ******************************* ----------------------SCENARIO: PREDEVELOPED Number of Links: 0 ************************* LINK DATA ******************************* ----------------------SCENARIO: POSTDEVELOPED Number of Links: 1 ------------------------------------------ Link Name: Bioretention Link Type: Bioretention Facility Downstream Link: None Base Elevation (ft) : 100.00 Riser Crest Elevation (ft) : 100.50 Storage Depth (ft) : 0.50 Bottom Length (ft) : 27.0 Bottom Width (ft) : 6.0 Side Slopes (ft/ft) : L1= 0.00 L2= 0.00 W1= 0.00 W2= 0.00 Bottom Area (sq-ft) : 162. Area at Riser Crest El (sq-ft) : 162. (acres) : 0.004 Volume at Riser Crest (cu-ft) : 154. (ac-ft) : 0.004 Infiltration on Bottom only Selected Soil Properties Biosoil Thickness (ft) : 1.50 Biosoil Saturated Hydraulic Conductivity (in/hr) : 6.00 Biosoil Porosity (Percent) : 30.00 Maximum Elevation of Bioretention Soil : 101.00 Native Soil Hydraulic Conductivity (in/hr) : 0.70 Riser Geometry Riser Structure Type : Circular Riser Diameter (in) : 6.00 Common Length (ft) : 0.000 Riser Crest Elevation : 100.50 ft Hydraulic Structure Geometry Number of Devices: 0 **********************FLOOD FREQUENCY AND DURATION STATISTICS******************* ----------------------SCENARIO: PREDEVELOPED Number of Subbasins: 1 Number of Links: 0 ----------------------SCENARIO: POSTDEVELOPED Number of Subbasins: 1 Number of Links: 1 ***********Groundwater Recharge Summary ************* Recharge is computed as input to Perlnd Groundwater Plus Infiltration in Structures Total Predeveloped Recharge During Simulation Model Element Recharge Amount (ac-ft) ----------------------------------------------------------------------------------------------- Subbasin: Subbasin 1 17.415 _____________________________________ Total: 17.415 Total Post Developed Recharge During Simulation Model Element Recharge Amount (ac-ft) ----------------------------------------------------------------------------------------------- Subbasin: Basin 43 2.689 Link: Bioretention 38.572 _____________________________________ Total: 41.261 Total Predevelopment Recharge is Less than Post Developed Average Recharge Per Year, (Number of Years= 158) Predeveloped: 0.110 ac-ft/year, Post Developed: 0.261 ac-ft/year ***********Water Quality Facility Data ************* ----------------------SCENARIO: PREDEVELOPED Number of Links: 0 ----------------------SCENARIO: POSTDEVELOPED Number of Links: 1 ********** Link: Bioretention ********** Infiltration/Filtration Statistics-------------------- Inflow Volume (ac-ft): 39.40 Inflow Volume Including PPT-Evap (ac-ft): 40.93 Total Runoff Infiltrated (ac-ft): 38.57, 94.24% Total Runoff Filtered (ac-ft): 0.00, 0.00% Primary Outflow To Downstream System (ac-ft): 2.34 Secondary Outflow To Downstream System (ac-ft): 0.00 Percent Treated (Infiltrated+Filtered)/Total Volume: 94.24% ***********Compliance Point Results ************* Scenario Predeveloped Compliance Subbasin: Subbasin 1 Scenario Postdeveloped Compliance Link: Bioretention *** Point of Compliance Flow Frequency Data *** Recurrence Interval Computed Using Gringorten Plotting Position Predevelopment Runoff Postdevelopment Runoff Tr (Years) Discharge (cfs) Tr (Years) Discharge (cfs) ---------------------------------------------------------------------------------------------------------------------- 2-Year 2.152E-03 2-Year 1.947E-02 5-Year 3.508E-03 5-Year 3.085E-02 10-Year 4.726E-03 10-Year 3.607E-02 25-Year 5.992E-03 25-Year 4.432E-02 50-Year 7.647E-03 50-Year 5.134E-02 100-Year 8.287E-03 100-Year 6.220E-02 200-Year 1.290E-02 200-Year 6.726E-02 ** Record too Short to Compute Peak Discharge for These Recurrence Intervals **** LID Duration Performance **** Excursion at Predeveloped 8%Q2 (Must be Less Than 0%): -96.4% PASS Maximum Excursion from 8%Q2 to 50%Q2 (Must be Less Than 0%): -68.3% PASS ------------------------------------------------------------------------------------------------- MEETS ALL LID DURATION DESIGN CRITERIA: PASS ------------------------------------------------------------------------------------------------- ————————————————————————————————— MGS FLOOD PROJECT REPORT Program Version: MGSFlood 4.43 Program License Number: 200410007 Project Simulation Performed on: 10/05/2018 2:58 PM Report Generation Date: 10/05/2018 2:58 PM ————————————————————————————————— Input File Name: Basin 44.fld Project Name: Solera Analysis Title: BMP Performance Standard Comments: ———————————————— PRECIPITATION INPUT ———————————————— Computational Time Step (Minutes): 15 Extended Precipitation Time Series Selected Climatic Region Number: 0 Full Period of Record Available used for Routing Precipitation Station : 96004005 Puget East 40 in_5min 10/01/1939-10/01/2097 Evaporation Station : 961040 Puget East 40 in MAP Evaporation Scale Factor : 0.750 HSPF Parameter Region Number: 1 HSPF Parameter Region Name : USGS Default ********** Default HSPF Parameters Used (Not Modified by User) *************** ********************** WATERSHED DEFINITION *********************** Predevelopment/Post Development Tributary Area Summary Predeveloped Post Developed Total Subbasin Area (acres) 0.102 0.102 Area of Links that Include Precip/Evap (acres) 0.000 0.004 Total (acres) 0.102 0.106 ----------------------SCENARIO: PREDEVELOPED Number of Subbasins: 1 ---------- Subbasin : Subbasin 1 ---------- -------Area (Acres) -------- Till Forest 0.102 ---------------------------------------------- Subbasin Total 0.102 ----------------------SCENARIO: POSTDEVELOPED Number of Subbasins: 1 ---------- Subbasin : Basin 44 ---------- -------Area (Acres) -------- Till Grass 0.021 Impervious 0.081 ---------------------------------------------- Subbasin Total 0.102 ************************* LINK DATA ******************************* ----------------------SCENARIO: PREDEVELOPED Number of Links: 0 ************************* LINK DATA ******************************* ----------------------SCENARIO: POSTDEVELOPED Number of Links: 1 ------------------------------------------ Link Name: Bioretention Link Type: Bioretention Facility Downstream Link: None Base Elevation (ft) : 100.00 Riser Crest Elevation (ft) : 100.50 Storage Depth (ft) : 0.50 Bottom Length (ft) : 27.0 Bottom Width (ft) : 6.0 Side Slopes (ft/ft) : L1= 0.00 L2= 0.00 W1= 0.00 W2= 0.00 Bottom Area (sq-ft) : 162. Area at Riser Crest El (sq-ft) : 162. (acres) : 0.004 Volume at Riser Crest (cu-ft) : 154. (ac-ft) : 0.004 Infiltration on Bottom only Selected Soil Properties Biosoil Thickness (ft) : 1.50 Biosoil Saturated Hydraulic Conductivity (in/hr) : 6.00 Biosoil Porosity (Percent) : 30.00 Maximum Elevation of Bioretention Soil : 101.00 Native Soil Hydraulic Conductivity (in/hr) : 0.70 Riser Geometry Riser Structure Type : Circular Riser Diameter (in) : 6.00 Common Length (ft) : 0.000 Riser Crest Elevation : 100.50 ft Hydraulic Structure Geometry Number of Devices: 0 **********************FLOOD FREQUENCY AND DURATION STATISTICS******************* ----------------------SCENARIO: PREDEVELOPED Number of Subbasins: 1 Number of Links: 0 ----------------------SCENARIO: POSTDEVELOPED Number of Subbasins: 1 Number of Links: 1 ***********Groundwater Recharge Summary ************* Recharge is computed as input to Perlnd Groundwater Plus Infiltration in Structures Total Predeveloped Recharge During Simulation Model Element Recharge Amount (ac-ft) ----------------------------------------------------------------------------------------------- Subbasin: Subbasin 1 17.588 _____________________________________ Total: 17.588 Total Post Developed Recharge During Simulation Model Element Recharge Amount (ac-ft) ----------------------------------------------------------------------------------------------- Subbasin: Basin 44 2.566 Link: Bioretention 39.411 _____________________________________ Total: 41.977 Total Predevelopment Recharge is Less than Post Developed Average Recharge Per Year, (Number of Years= 158) Predeveloped: 0.111 ac-ft/year, Post Developed: 0.266 ac-ft/year ***********Water Quality Facility Data ************* ----------------------SCENARIO: PREDEVELOPED Number of Links: 0 ----------------------SCENARIO: POSTDEVELOPED Number of Links: 1 ********** Link: Bioretention ********** Infiltration/Filtration Statistics-------------------- Inflow Volume (ac-ft): 40.54 Inflow Volume Including PPT-Evap (ac-ft): 42.07 Total Runoff Infiltrated (ac-ft): 39.41, 93.67% Total Runoff Filtered (ac-ft): 0.00, 0.00% Primary Outflow To Downstream System (ac-ft): 2.64 Secondary Outflow To Downstream System (ac-ft): 0.00 Percent Treated (Infiltrated+Filtered)/Total Volume: 93.67% ***********Compliance Point Results ************* Scenario Predeveloped Compliance Subbasin: Subbasin 1 Scenario Postdeveloped Compliance Link: Bioretention *** Point of Compliance Flow Frequency Data *** Recurrence Interval Computed Using Gringorten Plotting Position Predevelopment Runoff Postdevelopment Runoff Tr (Years) Discharge (cfs) Tr (Years) Discharge (cfs) ---------------------------------------------------------------------------------------------------------------------- 2-Year 2.174E-03 2-Year 2.048E-02 5-Year 3.542E-03 5-Year 3.200E-02 10-Year 4.773E-03 10-Year 3.726E-02 25-Year 6.052E-03 25-Year 4.605E-02 50-Year 7.723E-03 50-Year 5.356E-02 100-Year 8.369E-03 100-Year 6.393E-02 200-Year 1.303E-02 200-Year 6.926E-02 ** Record too Short to Compute Peak Discharge for These Recurrence Intervals **** LID Duration Performance **** Excursion at Predeveloped 8%Q2 (Must be Less Than 0%): -96.0% PASS Maximum Excursion from 8%Q2 to 50%Q2 (Must be Less Than 0%): -64.8% PASS ------------------------------------------------------------------------------------------------- MEETS ALL LID DURATION DESIGN CRITERIA: PASS ------------------------------------------------------------------------------------------------- ————————————————————————————————— MGS FLOOD PROJECT REPORT Program Version: MGSFlood 4.43 Program License Number: 200410007 Project Simulation Performed on: 10/10/2018 3:01 PM Report Generation Date: 10/10/2018 3:02 PM ————————————————————————————————— Input File Name: Basin 45.fld Project Name: Solera Analysis Title: BMP Performance Standard Comments: ———————————————— PRECIPITATION INPUT ———————————————— Computational Time Step (Minutes): 15 Extended Precipitation Time Series Selected Climatic Region Number: 0 Full Period of Record Available used for Routing Precipitation Station : 96004005 Puget East 40 in_5min 10/01/1939-10/01/2097 Evaporation Station : 961040 Puget East 40 in MAP Evaporation Scale Factor : 0.750 HSPF Parameter Region Number: 1 HSPF Parameter Region Name : USGS Default ********** Default HSPF Parameters Used (Not Modified by User) *************** ********************** WATERSHED DEFINITION *********************** Predevelopment/Post Development Tributary Area Summary Predeveloped Post Developed Total Subbasin Area (acres) 0.221 0.221 Area of Links that Include Precip/Evap (acres) 0.000 0.007 Total (acres) 0.221 0.228 ----------------------SCENARIO: PREDEVELOPED Number of Subbasins: 1 ---------- Subbasin : Subbasin 1 ---------- -------Area (Acres) -------- Till Forest 0.221 ---------------------------------------------- Subbasin Total 0.221 ----------------------SCENARIO: POSTDEVELOPED Number of Subbasins: 1 ---------- Subbasin : Basin 45 ---------- -------Area (Acres) -------- Till Grass 0.037 Impervious 0.184 ---------------------------------------------- Subbasin Total 0.221 ************************* LINK DATA ******************************* ----------------------SCENARIO: PREDEVELOPED Number of Links: 0 ************************* LINK DATA ******************************* ----------------------SCENARIO: POSTDEVELOPED Number of Links: 1 ------------------------------------------ Link Name: Bioretention Link Type: Bioretention Facility Downstream Link: None Base Elevation (ft) : 100.00 Riser Crest Elevation (ft) : 100.50 Storage Depth (ft) : 0.50 Bottom Length (ft) : 32.0 Bottom Width (ft) : 10.0 Side Slopes (ft/ft) : L1= 0.00 L2= 0.00 W1= 0.00 W2= 0.00 Bottom Area (sq-ft) : 320. Area at Riser Crest El (sq-ft) : 320. (acres) : 0.007 Volume at Riser Crest (cu-ft) : 304. (ac-ft) : 0.007 Infiltration on Bottom only Selected Soil Properties Biosoil Thickness (ft) : 1.50 Biosoil Saturated Hydraulic Conductivity (in/hr) : 6.00 Biosoil Porosity (Percent) : 30.00 Maximum Elevation of Bioretention Soil : 101.00 Native Soil Hydraulic Conductivity (in/hr) : 0.70 Riser Geometry Riser Structure Type : Circular Riser Diameter (in) : 6.00 Common Length (ft) : 0.000 Riser Crest Elevation : 100.50 ft Hydraulic Structure Geometry Number of Devices: 0 **********************FLOOD FREQUENCY AND DURATION STATISTICS******************* ----------------------SCENARIO: PREDEVELOPED Number of Subbasins: 1 Number of Links: 0 ----------------------SCENARIO: POSTDEVELOPED Number of Subbasins: 1 Number of Links: 1 ***********Groundwater Recharge Summary ************* Recharge is computed as input to Perlnd Groundwater Plus Infiltration in Structures Total Predeveloped Recharge During Simulation Model Element Recharge Amount (ac-ft) ----------------------------------------------------------------------------------------------- Subbasin: Subbasin 1 38.107 _____________________________________ Total: 38.107 Total Post Developed Recharge During Simulation Model Element Recharge Amount (ac-ft) ----------------------------------------------------------------------------------------------- Subbasin: Basin 45 4.522 Link: Bioretention 84.761 _____________________________________ Total: 89.283 Total Predevelopment Recharge is Less than Post Developed Average Recharge Per Year, (Number of Years= 158) Predeveloped: 0.241 ac-ft/year, Post Developed: 0.565 ac-ft/year ***********Water Quality Facility Data ************* ----------------------SCENARIO: PREDEVELOPED Number of Links: 0 ----------------------SCENARIO: POSTDEVELOPED Number of Links: 1 ********** Link: Bioretention ********** Infiltration/Filtration Statistics-------------------- Inflow Volume (ac-ft): 89.94 Inflow Volume Including PPT-Evap (ac-ft): 92.97 Total Runoff Infiltrated (ac-ft): 84.76, 91.17% Total Runoff Filtered (ac-ft): 0.00, 0.00% Primary Outflow To Downstream System (ac-ft): 8.09 Secondary Outflow To Downstream System (ac-ft): 0.00 Percent Treated (Infiltrated+Filtered)/Total Volume: 91.17% ***********Compliance Point Results ************* Scenario Predeveloped Compliance Subbasin: Subbasin 1 Scenario Postdeveloped Compliance Link: Bioretention *** Point of Compliance Flow Frequency Data *** Recurrence Interval Computed Using Gringorten Plotting Position Predevelopment Runoff Postdevelopment Runoff Tr (Years) Discharge (cfs) Tr (Years) Discharge (cfs) ---------------------------------------------------------------------------------------------------------------------- 2-Year 4.709E-03 2-Year 5.050E-02 5-Year 7.675E-03 5-Year 7.619E-02 10-Year 1.034E-02 10-Year 8.836E-02 25-Year 1.311E-02 25-Year 0.105 50-Year 1.673E-02 50-Year 0.120 100-Year 1.813E-02 100-Year 0.140 200-Year 2.823E-02 200-Year 0.156 ** Record too Short to Compute Peak Discharge for These Recurrence Intervals **** LID Duration Performance **** Excursion at Predeveloped 8%Q2 (Must be Less Than 0%): -94.2% PASS Maximum Excursion from 8%Q2 to 50%Q2 (Must be Less Than 0%): -48.8% PASS ------------------------------------------------------------------------------------------------- MEETS ALL LID DURATION DESIGN CRITERIA: PASS ------------------------------------------------------------------------------------------------- ————————————————————————————————— MGS FLOOD PROJECT REPORT Program Version: MGSFlood 4.43 Program License Number: 200410007 Project Simulation Performed on: 10/05/2018 3:04 PM Report Generation Date: 10/05/2018 3:04 PM ————————————————————————————————— Input File Name: Basin 46.fld Project Name: Solera Analysis Title: BMP Performance Standard Comments: ———————————————— PRECIPITATION INPUT ———————————————— Computational Time Step (Minutes): 15 Extended Precipitation Time Series Selected Climatic Region Number: 0 Full Period of Record Available used for Routing Precipitation Station : 96004005 Puget East 40 in_5min 10/01/1939-10/01/2097 Evaporation Station : 961040 Puget East 40 in MAP Evaporation Scale Factor : 0.750 HSPF Parameter Region Number: 1 HSPF Parameter Region Name : USGS Default ********** Default HSPF Parameters Used (Not Modified by User) *************** ********************** WATERSHED DEFINITION *********************** Predevelopment/Post Development Tributary Area Summary Predeveloped Post Developed Total Subbasin Area (acres) 0.138 0.138 Area of Links that Include Precip/Evap (acres) 0.000 0.004 Total (acres) 0.138 0.142 ----------------------SCENARIO: PREDEVELOPED Number of Subbasins: 1 ---------- Subbasin : Subbasin 1 ---------- -------Area (Acres) -------- Till Forest 0.138 ---------------------------------------------- Subbasin Total 0.138 ----------------------SCENARIO: POSTDEVELOPED Number of Subbasins: 1 ---------- Subbasin : Basin 46 ---------- -------Area (Acres) -------- Till Grass 0.032 Impervious 0.106 ---------------------------------------------- Subbasin Total 0.138 ************************* LINK DATA ******************************* ----------------------SCENARIO: PREDEVELOPED Number of Links: 0 ************************* LINK DATA ******************************* ----------------------SCENARIO: POSTDEVELOPED Number of Links: 1 ------------------------------------------ Link Name: Bioretention Link Type: Bioretention Facility Downstream Link: None Base Elevation (ft) : 100.00 Riser Crest Elevation (ft) : 100.50 Storage Depth (ft) : 0.50 Bottom Length (ft) : 19.0 Bottom Width (ft) : 10.0 Side Slopes (ft/ft) : L1= 0.00 L2= 0.00 W1= 0.00 W2= 0.00 Bottom Area (sq-ft) : 190. Area at Riser Crest El (sq-ft) : 190. (acres) : 0.004 Volume at Riser Crest (cu-ft) : 181. (ac-ft) : 0.004 Infiltration on Bottom only Selected Soil Properties Biosoil Thickness (ft) : 1.50 Biosoil Saturated Hydraulic Conductivity (in/hr) : 6.00 Biosoil Porosity (Percent) : 30.00 Maximum Elevation of Bioretention Soil : 101.00 Native Soil Hydraulic Conductivity (in/hr) : 0.70 Riser Geometry Riser Structure Type : Circular Riser Diameter (in) : 6.00 Common Length (ft) : 0.000 Riser Crest Elevation : 100.50 ft Hydraulic Structure Geometry Number of Devices: 0 **********************FLOOD FREQUENCY AND DURATION STATISTICS******************* ----------------------SCENARIO: PREDEVELOPED Number of Subbasins: 1 Number of Links: 0 ----------------------SCENARIO: POSTDEVELOPED Number of Subbasins: 1 Number of Links: 1 ***********Groundwater Recharge Summary ************* Recharge is computed as input to Perlnd Groundwater Plus Infiltration in Structures Total Predeveloped Recharge During Simulation Model Element Recharge Amount (ac-ft) ----------------------------------------------------------------------------------------------- Subbasin: Subbasin 1 23.795 _____________________________________ Total: 23.795 Total Post Developed Recharge During Simulation Model Element Recharge Amount (ac-ft) ----------------------------------------------------------------------------------------------- Subbasin: Basin 46 3.911 Link: Bioretention 51.007 _____________________________________ Total: 54.918 Total Predevelopment Recharge is Less than Post Developed Average Recharge Per Year, (Number of Years= 158) Predeveloped: 0.151 ac-ft/year, Post Developed: 0.348 ac-ft/year ***********Water Quality Facility Data ************* ----------------------SCENARIO: PREDEVELOPED Number of Links: 0 ----------------------SCENARIO: POSTDEVELOPED Number of Links: 1 ********** Link: Bioretention ********** Infiltration/Filtration Statistics-------------------- Inflow Volume (ac-ft): 53.96 Inflow Volume Including PPT-Evap (ac-ft): 55.74 Total Runoff Infiltrated (ac-ft): 51.01, 91.50% Total Runoff Filtered (ac-ft): 0.00, 0.00% Primary Outflow To Downstream System (ac-ft): 4.67 Secondary Outflow To Downstream System (ac-ft): 0.00 Percent Treated (Infiltrated+Filtered)/Total Volume: 91.50% ***********Compliance Point Results ************* Scenario Predeveloped Compliance Subbasin: Subbasin 1 Scenario Postdeveloped Compliance Link: Bioretention *** Point of Compliance Flow Frequency Data *** Recurrence Interval Computed Using Gringorten Plotting Position Predevelopment Runoff Postdevelopment Runoff Tr (Years) Discharge (cfs) Tr (Years) Discharge (cfs) ---------------------------------------------------------------------------------------------------------------------- 2-Year 2.941E-03 2-Year 2.942E-02 5-Year 4.793E-03 5-Year 4.506E-02 10-Year 6.458E-03 10-Year 5.183E-02 25-Year 8.188E-03 25-Year 6.357E-02 50-Year 1.045E-02 50-Year 7.749E-02 100-Year 1.132E-02 100-Year 8.567E-02 200-Year 1.762E-02 200-Year 9.241E-02 ** Record too Short to Compute Peak Discharge for These Recurrence Intervals **** LID Duration Performance **** Excursion at Predeveloped 8%Q2 (Must be Less Than 0%): -94.3% PASS Maximum Excursion from 8%Q2 to 50%Q2 (Must be Less Than 0%): -50.7% PASS ------------------------------------------------------------------------------------------------- MEETS ALL LID DURATION DESIGN CRITERIA: PASS ------------------------------------------------------------------------------------------------- ————————————————————————————————— MGS FLOOD PROJECT REPORT Program Version: MGSFlood 4.43 Program License Number: 200410007 Project Simulation Performed on: 10/05/2018 3:06 PM Report Generation Date: 10/05/2018 3:06 PM ————————————————————————————————— Input File Name: Basin 47.fld Project Name: Solera Analysis Title: BMP Performance Standard Comments: ———————————————— PRECIPITATION INPUT ———————————————— Computational Time Step (Minutes): 15 Extended Precipitation Time Series Selected Climatic Region Number: 0 Full Period of Record Available used for Routing Precipitation Station : 96004005 Puget East 40 in_5min 10/01/1939-10/01/2097 Evaporation Station : 961040 Puget East 40 in MAP Evaporation Scale Factor : 0.750 HSPF Parameter Region Number: 1 HSPF Parameter Region Name : USGS Default ********** Default HSPF Parameters Used (Not Modified by User) *************** ********************** WATERSHED DEFINITION *********************** Predevelopment/Post Development Tributary Area Summary Predeveloped Post Developed Total Subbasin Area (acres) 0.238 0.239 Area of Links that Include Precip/Evap (acres) 0.000 0.008 Total (acres) 0.238 0.247 ----------------------SCENARIO: PREDEVELOPED Number of Subbasins: 1 ---------- Subbasin : Subbasin 1 ---------- -------Area (Acres) -------- Till Forest 0.238 ---------------------------------------------- Subbasin Total 0.238 ----------------------SCENARIO: POSTDEVELOPED Number of Subbasins: 1 ---------- Subbasin : Basin 47 ---------- -------Area (Acres) -------- Till Grass 0.046 Impervious 0.193 ---------------------------------------------- Subbasin Total 0.239 ************************* LINK DATA ******************************* ----------------------SCENARIO: PREDEVELOPED Number of Links: 0 ************************* LINK DATA ******************************* ----------------------SCENARIO: POSTDEVELOPED Number of Links: 1 ------------------------------------------ Link Name: Bioretention Link Type: Bioretention Facility Downstream Link: None Base Elevation (ft) : 100.00 Riser Crest Elevation (ft) : 100.50 Storage Depth (ft) : 0.50 Bottom Length (ft) : 31.0 Bottom Width (ft) : 11.0 Side Slopes (ft/ft) : L1= 0.00 L2= 0.00 W1= 0.00 W2= 0.00 Bottom Area (sq-ft) : 341. Area at Riser Crest El (sq-ft) : 341. (acres) : 0.008 Volume at Riser Crest (cu-ft) : 324. (ac-ft) : 0.007 Infiltration on Bottom only Selected Soil Properties Biosoil Thickness (ft) : 1.50 Biosoil Saturated Hydraulic Conductivity (in/hr) : 6.00 Biosoil Porosity (Percent) : 30.00 Maximum Elevation of Bioretention Soil : 101.00 Native Soil Hydraulic Conductivity (in/hr) : 0.70 Riser Geometry Riser Structure Type : Circular Riser Diameter (in) : 6.00 Common Length (ft) : 0.000 Riser Crest Elevation : 100.50 ft Hydraulic Structure Geometry Number of Devices: 0 **********************FLOOD FREQUENCY AND DURATION STATISTICS******************* ----------------------SCENARIO: PREDEVELOPED Number of Subbasins: 1 Number of Links: 0 ----------------------SCENARIO: POSTDEVELOPED Number of Subbasins: 1 Number of Links: 1 ***********Groundwater Recharge Summary ************* Recharge is computed as input to Perlnd Groundwater Plus Infiltration in Structures Total Predeveloped Recharge During Simulation Model Element Recharge Amount (ac-ft) ----------------------------------------------------------------------------------------------- Subbasin: Subbasin 1 41.038 _____________________________________ Total: 41.038 Total Post Developed Recharge During Simulation Model Element Recharge Amount (ac-ft) ----------------------------------------------------------------------------------------------- Subbasin: Basin 47 5.622 Link: Bioretention 90.484 _____________________________________ Total: 96.106 Total Predevelopment Recharge is Less than Post Developed Average Recharge Per Year, (Number of Years= 158) Predeveloped: 0.260 ac-ft/year, Post Developed: 0.608 ac-ft/year ***********Water Quality Facility Data ************* ----------------------SCENARIO: PREDEVELOPED Number of Links: 0 ----------------------SCENARIO: POSTDEVELOPED Number of Links: 1 ********** Link: Bioretention ********** Infiltration/Filtration Statistics-------------------- Inflow Volume (ac-ft): 95.78 Inflow Volume Including PPT-Evap (ac-ft): 99.00 Total Runoff Infiltrated (ac-ft): 90.48, 91.40% Total Runoff Filtered (ac-ft): 0.00, 0.00% Primary Outflow To Downstream System (ac-ft): 8.40 Secondary Outflow To Downstream System (ac-ft): 0.00 Percent Treated (Infiltrated+Filtered)/Total Volume: 91.40% ***********Compliance Point Results ************* Scenario Predeveloped Compliance Subbasin: Subbasin 1 Scenario Postdeveloped Compliance Link: Bioretention *** Point of Compliance Flow Frequency Data *** Recurrence Interval Computed Using Gringorten Plotting Position Predevelopment Runoff Postdevelopment Runoff Tr (Years) Discharge (cfs) Tr (Years) Discharge (cfs) ---------------------------------------------------------------------------------------------------------------------- 2-Year 5.072E-03 2-Year 5.193E-02 5-Year 8.266E-03 5-Year 7.889E-02 10-Year 1.114E-02 10-Year 9.113E-02 25-Year 1.412E-02 25-Year 0.110 50-Year 1.802E-02 50-Year 0.130 100-Year 1.953E-02 100-Year 0.150 200-Year 3.040E-02 200-Year 0.166 ** Record too Short to Compute Peak Discharge for These Recurrence Intervals **** LID Duration Performance **** Excursion at Predeveloped 8%Q2 (Must be Less Than 0%): -94.3% PASS Maximum Excursion from 8%Q2 to 50%Q2 (Must be Less Than 0%): -49.9% PASS ------------------------------------------------------------------------------------------------- MEETS ALL LID DURATION DESIGN CRITERIA: PASS ------------------------------------------------------------------------------------------------- ————————————————————————————————— MGS FLOOD PROJECT REPORT Program Version: MGSFlood 4.43 Program License Number: 200410007 Project Simulation Performed on: 10/05/2018 3:30 PM Report Generation Date: 10/05/2018 3:30 PM ————————————————————————————————— Input File Name: Basin 48.fld Project Name: Solera Analysis Title: BMP Performance Standard Comments: ———————————————— PRECIPITATION INPUT ———————————————— Computational Time Step (Minutes): 15 Extended Precipitation Time Series Selected Climatic Region Number: 0 Full Period of Record Available used for Routing Precipitation Station : 96004005 Puget East 40 in_5min 10/01/1939-10/01/2097 Evaporation Station : 961040 Puget East 40 in MAP Evaporation Scale Factor : 0.750 HSPF Parameter Region Number: 1 HSPF Parameter Region Name : USGS Default ********** Default HSPF Parameters Used (Not Modified by User) *************** ********************** WATERSHED DEFINITION *********************** Predevelopment/Post Development Tributary Area Summary Predeveloped Post Developed Total Subbasin Area (acres) 0.103 0.103 Area of Links that Include Precip/Evap (acres) 0.000 0.004 Total (acres) 0.103 0.107 ----------------------SCENARIO: PREDEVELOPED Number of Subbasins: 1 ---------- Subbasin : Subbasin 1 ---------- -------Area (Acres) -------- Till Forest 0.103 ---------------------------------------------- Subbasin Total 0.103 ----------------------SCENARIO: POSTDEVELOPED Number of Subbasins: 1 ---------- Subbasin : Basin 47 ---------- -------Area (Acres) -------- Till Grass 0.015 Impervious 0.088 ---------------------------------------------- Subbasin Total 0.103 ************************* LINK DATA ******************************* ----------------------SCENARIO: PREDEVELOPED Number of Links: 0 ************************* LINK DATA ******************************* ----------------------SCENARIO: POSTDEVELOPED Number of Links: 1 ------------------------------------------ Link Name: Bioretention Link Type: Bioretention Facility Downstream Link: None Base Elevation (ft) : 100.00 Riser Crest Elevation (ft) : 100.50 Storage Depth (ft) : 0.50 Bottom Length (ft) : 14.0 Bottom Width (ft) : 11.0 Side Slopes (ft/ft) : L1= 0.00 L2= 0.00 W1= 0.00 W2= 0.00 Bottom Area (sq-ft) : 154. Area at Riser Crest El (sq-ft) : 154. (acres) : 0.004 Volume at Riser Crest (cu-ft) : 146. (ac-ft) : 0.003 Infiltration on Bottom only Selected Soil Properties Biosoil Thickness (ft) : 1.50 Biosoil Saturated Hydraulic Conductivity (in/hr) : 6.00 Biosoil Porosity (Percent) : 30.00 Maximum Elevation of Bioretention Soil : 101.00 Native Soil Hydraulic Conductivity (in/hr) : 0.70 Riser Geometry Riser Structure Type : Circular Riser Diameter (in) : 6.00 Common Length (ft) : 0.000 Riser Crest Elevation : 100.50 ft Hydraulic Structure Geometry Number of Devices: 0 **********************FLOOD FREQUENCY AND DURATION STATISTICS******************* ----------------------SCENARIO: PREDEVELOPED Number of Subbasins: 1 Number of Links: 0 ----------------------SCENARIO: POSTDEVELOPED Number of Subbasins: 1 Number of Links: 1 ***********Groundwater Recharge Summary ************* Recharge is computed as input to Perlnd Groundwater Plus Infiltration in Structures Total Predeveloped Recharge During Simulation Model Element Recharge Amount (ac-ft) ----------------------------------------------------------------------------------------------- Subbasin: Subbasin 1 17.760 _____________________________________ Total: 17.760 Total Post Developed Recharge During Simulation Model Element Recharge Amount (ac-ft) ----------------------------------------------------------------------------------------------- Subbasin: Basin 47 1.833 Link: Bioretention 40.151 _____________________________________ Total: 41.984 Total Predevelopment Recharge is Less than Post Developed Average Recharge Per Year, (Number of Years= 158) Predeveloped: 0.112 ac-ft/year, Post Developed: 0.266 ac-ft/year ***********Water Quality Facility Data ************* ----------------------SCENARIO: PREDEVELOPED Number of Links: 0 ----------------------SCENARIO: POSTDEVELOPED Number of Links: 1 ********** Link: Bioretention ********** Infiltration/Filtration Statistics-------------------- Inflow Volume (ac-ft): 42.47 Inflow Volume Including PPT-Evap (ac-ft): 43.94 Total Runoff Infiltrated (ac-ft): 40.15, 91.38% Total Runoff Filtered (ac-ft): 0.00, 0.00% Primary Outflow To Downstream System (ac-ft): 3.74 Secondary Outflow To Downstream System (ac-ft): 0.00 Percent Treated (Infiltrated+Filtered)/Total Volume: 91.38% ***********Compliance Point Results ************* Scenario Predeveloped Compliance Subbasin: Subbasin 1 Scenario Postdeveloped Compliance Link: Bioretention *** Point of Compliance Flow Frequency Data *** Recurrence Interval Computed Using Gringorten Plotting Position Predevelopment Runoff Postdevelopment Runoff Tr (Years) Discharge (cfs) Tr (Years) Discharge (cfs) ---------------------------------------------------------------------------------------------------------------------- 2-Year 2.195E-03 2-Year 2.476E-02 5-Year 3.577E-03 5-Year 3.661E-02 10-Year 4.820E-03 10-Year 4.273E-02 25-Year 6.111E-03 25-Year 5.107E-02 50-Year 7.799E-03 50-Year 5.978E-02 100-Year 8.451E-03 100-Year 6.630E-02 200-Year 1.315E-02 200-Year 7.254E-02 ** Record too Short to Compute Peak Discharge for These Recurrence Intervals **** LID Duration Performance **** Excursion at Predeveloped 8%Q2 (Must be Less Than 0%): -94.5% PASS Maximum Excursion from 8%Q2 to 50%Q2 (Must be Less Than 0%): -50.9% PASS ------------------------------------------------------------------------------------------------- MEETS ALL LID DURATION DESIGN CRITERIA: PASS ------------------------------------------------------------------------------------------------- ————————————————————————————————— MGS FLOOD PROJECT REPORT Program Version: MGSFlood 4.43 Program License Number: 200410007 Project Simulation Performed on: 10/05/2018 3:35 PM Report Generation Date: 10/05/2018 3:35 PM ————————————————————————————————— Input File Name: Basin 49.fld Project Name: Solera Analysis Title: BMP Performance Standard Comments: ———————————————— PRECIPITATION INPUT ———————————————— Computational Time Step (Minutes): 15 Extended Precipitation Time Series Selected Climatic Region Number: 0 Full Period of Record Available used for Routing Precipitation Station : 96004005 Puget East 40 in_5min 10/01/1939-10/01/2097 Evaporation Station : 961040 Puget East 40 in MAP Evaporation Scale Factor : 0.750 HSPF Parameter Region Number: 1 HSPF Parameter Region Name : USGS Default ********** Default HSPF Parameters Used (Not Modified by User) *************** ********************** WATERSHED DEFINITION *********************** Predevelopment/Post Development Tributary Area Summary Predeveloped Post Developed Total Subbasin Area (acres) 0.140 0.140 Area of Links that Include Precip/Evap (acres) 0.000 0.004 Total (acres) 0.140 0.144 ----------------------SCENARIO: PREDEVELOPED Number of Subbasins: 1 ---------- Subbasin : Subbasin 1 ---------- -------Area (Acres) -------- Till Forest 0.140 ---------------------------------------------- Subbasin Total 0.140 ----------------------SCENARIO: POSTDEVELOPED Number of Subbasins: 1 ---------- Subbasin : Basin 49 ---------- -------Area (Acres) -------- Till Grass 0.052 Impervious 0.088 ---------------------------------------------- Subbasin Total 0.140 ************************* LINK DATA ******************************* ----------------------SCENARIO: PREDEVELOPED Number of Links: 0 ************************* LINK DATA ******************************* ----------------------SCENARIO: POSTDEVELOPED Number of Links: 1 ------------------------------------------ Link Name: Bioretention Link Type: Bioretention Facility Downstream Link: None Base Elevation (ft) : 100.00 Riser Crest Elevation (ft) : 100.50 Storage Depth (ft) : 0.50 Bottom Length (ft) : 19.0 Bottom Width (ft) : 10.0 Side Slopes (ft/ft) : L1= 0.00 L2= 0.00 W1= 0.00 W2= 0.00 Bottom Area (sq-ft) : 190. Area at Riser Crest El (sq-ft) : 190. (acres) : 0.004 Volume at Riser Crest (cu-ft) : 181. (ac-ft) : 0.004 Infiltration on Bottom only Selected Soil Properties Biosoil Thickness (ft) : 1.50 Biosoil Saturated Hydraulic Conductivity (in/hr) : 6.00 Biosoil Porosity (Percent) : 30.00 Maximum Elevation of Bioretention Soil : 101.00 Native Soil Hydraulic Conductivity (in/hr) : 0.70 Riser Geometry Riser Structure Type : Circular Riser Diameter (in) : 6.00 Common Length (ft) : 0.000 Riser Crest Elevation : 100.50 ft Hydraulic Structure Geometry Number of Devices: 0 **********************FLOOD FREQUENCY AND DURATION STATISTICS******************* ----------------------SCENARIO: PREDEVELOPED Number of Subbasins: 1 Number of Links: 0 ----------------------SCENARIO: POSTDEVELOPED Number of Subbasins: 1 Number of Links: 1 ***********Groundwater Recharge Summary ************* Recharge is computed as input to Perlnd Groundwater Plus Infiltration in Structures Total Predeveloped Recharge During Simulation Model Element Recharge Amount (ac-ft) ----------------------------------------------------------------------------------------------- Subbasin: Subbasin 1 24.140 _____________________________________ Total: 24.140 Total Post Developed Recharge During Simulation Model Element Recharge Amount (ac-ft) ----------------------------------------------------------------------------------------------- Subbasin: Basin 49 6.355 Link: Bioretention 48.584 _____________________________________ Total: 54.939 Total Predevelopment Recharge is Less than Post Developed Average Recharge Per Year, (Number of Years= 158) Predeveloped: 0.153 ac-ft/year, Post Developed: 0.348 ac-ft/year ***********Water Quality Facility Data ************* ----------------------SCENARIO: PREDEVELOPED Number of Links: 0 ----------------------SCENARIO: POSTDEVELOPED Number of Links: 1 ********** Link: Bioretention ********** Infiltration/Filtration Statistics-------------------- Inflow Volume (ac-ft): 49.91 Inflow Volume Including PPT-Evap (ac-ft): 51.68 Total Runoff Infiltrated (ac-ft): 48.58, 94.01% Total Runoff Filtered (ac-ft): 0.00, 0.00% Primary Outflow To Downstream System (ac-ft): 3.07 Secondary Outflow To Downstream System (ac-ft): 0.00 Percent Treated (Infiltrated+Filtered)/Total Volume: 94.01% ***********Compliance Point Results ************* Scenario Predeveloped Compliance Subbasin: Subbasin 1 Scenario Postdeveloped Compliance Link: Bioretention *** Point of Compliance Flow Frequency Data *** Recurrence Interval Computed Using Gringorten Plotting Position Predevelopment Runoff Postdevelopment Runoff Tr (Years) Discharge (cfs) Tr (Years) Discharge (cfs) ---------------------------------------------------------------------------------------------------------------------- 2-Year 2.983E-03 2-Year 2.304E-02 5-Year 4.862E-03 5-Year 3.743E-02 10-Year 6.551E-03 10-Year 4.458E-02 25-Year 8.306E-03 25-Year 5.692E-02 50-Year 1.060E-02 50-Year 6.589E-02 100-Year 1.149E-02 100-Year 8.153E-02 200-Year 1.788E-02 200-Year 8.556E-02 ** Record too Short to Compute Peak Discharge for These Recurrence Intervals **** LID Duration Performance **** Excursion at Predeveloped 8%Q2 (Must be Less Than 0%): -95.9% PASS Maximum Excursion from 8%Q2 to 50%Q2 (Must be Less Than 0%): -65.3% PASS ------------------------------------------------------------------------------------------------- MEETS ALL LID DURATION DESIGN CRITERIA: PASS ------------------------------------------------------------------------------------------------- ————————————————————————————————— MGS FLOOD PROJECT REPORT Program Version: MGSFlood 4.43 Program License Number: 200410007 Project Simulation Performed on: 10/05/2018 3:38 PM Report Generation Date: 10/05/2018 3:38 PM ————————————————————————————————— Input File Name: Basin 50.fld Project Name: Solera Analysis Title: BMP Performance Standard Comments: ———————————————— PRECIPITATION INPUT ———————————————— Computational Time Step (Minutes): 15 Extended Precipitation Time Series Selected Climatic Region Number: 0 Full Period of Record Available used for Routing Precipitation Station : 96004005 Puget East 40 in_5min 10/01/1939-10/01/2097 Evaporation Station : 961040 Puget East 40 in MAP Evaporation Scale Factor : 0.750 HSPF Parameter Region Number: 1 HSPF Parameter Region Name : USGS Default ********** Default HSPF Parameters Used (Not Modified by User) *************** ********************** WATERSHED DEFINITION *********************** Predevelopment/Post Development Tributary Area Summary Predeveloped Post Developed Total Subbasin Area (acres) 0.148 0.148 Area of Links that Include Precip/Evap (acres) 0.000 0.005 Total (acres) 0.148 0.153 ----------------------SCENARIO: PREDEVELOPED Number of Subbasins: 1 ---------- Subbasin : Subbasin 1 ---------- -------Area (Acres) -------- Till Forest 0.148 ---------------------------------------------- Subbasin Total 0.148 ----------------------SCENARIO: POSTDEVELOPED Number of Subbasins: 1 ---------- Subbasin : Basin 50 ---------- -------Area (Acres) -------- Till Grass 0.047 Impervious 0.101 ---------------------------------------------- Subbasin Total 0.148 ************************* LINK DATA ******************************* ----------------------SCENARIO: PREDEVELOPED Number of Links: 0 ************************* LINK DATA ******************************* ----------------------SCENARIO: POSTDEVELOPED Number of Links: 1 ------------------------------------------ Link Name: Bioretention Link Type: Bioretention Facility Downstream Link: None Base Elevation (ft) : 100.00 Riser Crest Elevation (ft) : 100.50 Storage Depth (ft) : 0.50 Bottom Length (ft) : 20.0 Bottom Width (ft) : 10.0 Side Slopes (ft/ft) : L1= 0.00 L2= 0.00 W1= 0.00 W2= 0.00 Bottom Area (sq-ft) : 200. Area at Riser Crest El (sq-ft) : 200. (acres) : 0.005 Volume at Riser Crest (cu-ft) : 190. (ac-ft) : 0.004 Infiltration on Bottom only Selected Soil Properties Biosoil Thickness (ft) : 1.50 Biosoil Saturated Hydraulic Conductivity (in/hr) : 6.00 Biosoil Porosity (Percent) : 30.00 Maximum Elevation of Bioretention Soil : 101.00 Native Soil Hydraulic Conductivity (in/hr) : 0.70 Riser Geometry Riser Structure Type : Circular Riser Diameter (in) : 6.00 Common Length (ft) : 0.000 Riser Crest Elevation : 100.50 ft Hydraulic Structure Geometry Number of Devices: 0 **********************FLOOD FREQUENCY AND DURATION STATISTICS******************* ----------------------SCENARIO: PREDEVELOPED Number of Subbasins: 1 Number of Links: 0 ----------------------SCENARIO: POSTDEVELOPED Number of Subbasins: 1 Number of Links: 1 ***********Groundwater Recharge Summary ************* Recharge is computed as input to Perlnd Groundwater Plus Infiltration in Structures Total Predeveloped Recharge During Simulation Model Element Recharge Amount (ac-ft) ----------------------------------------------------------------------------------------------- Subbasin: Subbasin 1 25.519 _____________________________________ Total: 25.519 Total Post Developed Recharge During Simulation Model Element Recharge Amount (ac-ft) ----------------------------------------------------------------------------------------------- Subbasin: Basin 50 5.744 Link: Bioretention 52.599 _____________________________________ Total: 58.343 Total Predevelopment Recharge is Less than Post Developed Average Recharge Per Year, (Number of Years= 158) Predeveloped: 0.162 ac-ft/year, Post Developed: 0.369 ac-ft/year ***********Water Quality Facility Data ************* ----------------------SCENARIO: PREDEVELOPED Number of Links: 0 ----------------------SCENARIO: POSTDEVELOPED Number of Links: 1 ********** Link: Bioretention ********** Infiltration/Filtration Statistics-------------------- Inflow Volume (ac-ft): 54.74 Inflow Volume Including PPT-Evap (ac-ft): 56.60 Total Runoff Infiltrated (ac-ft): 52.60, 92.93% Total Runoff Filtered (ac-ft): 0.00, 0.00% Primary Outflow To Downstream System (ac-ft): 3.97 Secondary Outflow To Downstream System (ac-ft): 0.00 Percent Treated (Infiltrated+Filtered)/Total Volume: 92.93% ***********Compliance Point Results ************* Scenario Predeveloped Compliance Subbasin: Subbasin 1 Scenario Postdeveloped Compliance Link: Bioretention *** Point of Compliance Flow Frequency Data *** Recurrence Interval Computed Using Gringorten Plotting Position Predevelopment Runoff Postdevelopment Runoff Tr (Years) Discharge (cfs) Tr (Years) Discharge (cfs) ---------------------------------------------------------------------------------------------------------------------- 2-Year 3.154E-03 2-Year 2.762E-02 5-Year 5.140E-03 5-Year 4.332E-02 10-Year 6.926E-03 10-Year 5.043E-02 25-Year 8.781E-03 25-Year 6.259E-02 50-Year 1.121E-02 50-Year 7.354E-02 100-Year 1.214E-02 100-Year 8.824E-02 200-Year 1.890E-02 200-Year 9.378E-02 ** Record too Short to Compute Peak Discharge for These Recurrence Intervals **** LID Duration Performance **** Excursion at Predeveloped 8%Q2 (Must be Less Than 0%): -95.2% PASS Maximum Excursion from 8%Q2 to 50%Q2 (Must be Less Than 0%): -58.7% PASS ------------------------------------------------------------------------------------------------- MEETS ALL LID DURATION DESIGN CRITERIA: PASS ------------------------------------------------------------------------------------------------- ————————————————————————————————— MGS FLOOD PROJECT REPORT Program Version: MGSFlood 4.43 Program License Number: 200410007 Project Simulation Performed on: 10/05/2018 3:45 PM Report Generation Date: 10/05/2018 3:45 PM ————————————————————————————————— Input File Name: Basin 51.fld Project Name: Solera Analysis Title: BMP Performance Standard Comments: ———————————————— PRECIPITATION INPUT ———————————————— Computational Time Step (Minutes): 15 Extended Precipitation Time Series Selected Climatic Region Number: 0 Full Period of Record Available used for Routing Precipitation Station : 96004005 Puget East 40 in_5min 10/01/1939-10/01/2097 Evaporation Station : 961040 Puget East 40 in MAP Evaporation Scale Factor : 0.750 HSPF Parameter Region Number: 1 HSPF Parameter Region Name : USGS Default ********** Default HSPF Parameters Used (Not Modified by User) *************** ********************** WATERSHED DEFINITION *********************** Predevelopment/Post Development Tributary Area Summary Predeveloped Post Developed Total Subbasin Area (acres) 0.099 0.099 Area of Links that Include Precip/Evap (acres) 0.000 0.003 Total (acres) 0.099 0.102 ----------------------SCENARIO: PREDEVELOPED Number of Subbasins: 1 ---------- Subbasin : Subbasin 1 ---------- -------Area (Acres) -------- Till Forest 0.099 ---------------------------------------------- Subbasin Total 0.099 ----------------------SCENARIO: POSTDEVELOPED Number of Subbasins: 1 ---------- Subbasin : Basin 51 ---------- -------Area (Acres) -------- Till Grass 0.044 Impervious 0.055 ---------------------------------------------- Subbasin Total 0.099 ************************* LINK DATA ******************************* ----------------------SCENARIO: PREDEVELOPED Number of Links: 0 ************************* LINK DATA ******************************* ----------------------SCENARIO: POSTDEVELOPED Number of Links: 1 ------------------------------------------ Link Name: Bioretention Link Type: Bioretention Facility Downstream Link: None Base Elevation (ft) : 100.00 Riser Crest Elevation (ft) : 100.50 Storage Depth (ft) : 0.50 Bottom Length (ft) : 13.0 Bottom Width (ft) : 10.0 Side Slopes (ft/ft) : L1= 0.00 L2= 0.00 W1= 0.00 W2= 0.00 Bottom Area (sq-ft) : 130. Area at Riser Crest El (sq-ft) : 130. (acres) : 0.003 Volume at Riser Crest (cu-ft) : 124. (ac-ft) : 0.003 Infiltration on Bottom only Selected Soil Properties Biosoil Thickness (ft) : 1.50 Biosoil Saturated Hydraulic Conductivity (in/hr) : 6.00 Biosoil Porosity (Percent) : 30.00 Maximum Elevation of Bioretention Soil : 101.00 Native Soil Hydraulic Conductivity (in/hr) : 0.70 Riser Geometry Riser Structure Type : Circular Riser Diameter (in) : 6.00 Common Length (ft) : 0.000 Riser Crest Elevation : 100.50 ft Hydraulic Structure Geometry Number of Devices: 0 **********************FLOOD FREQUENCY AND DURATION STATISTICS******************* ----------------------SCENARIO: PREDEVELOPED Number of Subbasins: 1 Number of Links: 0 ----------------------SCENARIO: POSTDEVELOPED Number of Subbasins: 1 Number of Links: 1 ***********Groundwater Recharge Summary ************* Recharge is computed as input to Perlnd Groundwater Plus Infiltration in Structures Total Predeveloped Recharge During Simulation Model Element Recharge Amount (ac-ft) ----------------------------------------------------------------------------------------------- Subbasin: Subbasin 1 17.070 _____________________________________ Total: 17.070 Total Post Developed Recharge During Simulation Model Element Recharge Amount (ac-ft) ----------------------------------------------------------------------------------------------- Subbasin: Basin 51 5.377 Link: Bioretention 32.894 _____________________________________ Total: 38.271 Total Predevelopment Recharge is Less than Post Developed Average Recharge Per Year, (Number of Years= 158) Predeveloped: 0.108 ac-ft/year, Post Developed: 0.242 ac-ft/year ***********Water Quality Facility Data ************* ----------------------SCENARIO: PREDEVELOPED Number of Links: 0 ----------------------SCENARIO: POSTDEVELOPED Number of Links: 1 ********** Link: Bioretention ********** Infiltration/Filtration Statistics-------------------- Inflow Volume (ac-ft): 33.51 Inflow Volume Including PPT-Evap (ac-ft): 34.71 Total Runoff Infiltrated (ac-ft): 32.89, 94.77% Total Runoff Filtered (ac-ft): 0.00, 0.00% Primary Outflow To Downstream System (ac-ft): 1.81 Secondary Outflow To Downstream System (ac-ft): 0.00 Percent Treated (Infiltrated+Filtered)/Total Volume: 94.77% ***********Compliance Point Results ************* Scenario Predeveloped Compliance Subbasin: Subbasin 1 Scenario Postdeveloped Compliance Link: Bioretention *** Point of Compliance Flow Frequency Data *** Recurrence Interval Computed Using Gringorten Plotting Position Predevelopment Runoff Postdevelopment Runoff Tr (Years) Discharge (cfs) Tr (Years) Discharge (cfs) ---------------------------------------------------------------------------------------------------------------------- 2-Year 2.110E-03 2-Year 1.446E-02 5-Year 3.438E-03 5-Year 2.471E-02 10-Year 4.633E-03 10-Year 2.945E-02 25-Year 5.874E-03 25-Year 3.898E-02 50-Year 7.496E-03 50-Year 4.354E-02 100-Year 8.123E-03 100-Year 5.591E-02 200-Year 1.264E-02 200-Year 5.716E-02 ** Record too Short to Compute Peak Discharge for These Recurrence Intervals **** LID Duration Performance **** Excursion at Predeveloped 8%Q2 (Must be Less Than 0%): -96.3% PASS Maximum Excursion from 8%Q2 to 50%Q2 (Must be Less Than 0%): -69.5% PASS ------------------------------------------------------------------------------------------------- MEETS ALL LID DURATION DESIGN CRITERIA: PASS ------------------------------------------------------------------------------------------------- ————————————————————————————————— MGS FLOOD PROJECT REPORT Program Version: MGSFlood 4.43 Program License Number: 200410007 Project Simulation Performed on: 10/05/2018 3:45 PM Report Generation Date: 10/05/2018 3:45 PM ————————————————————————————————— Input File Name: Basin 51.fld Project Name: Solera Analysis Title: BMP Performance Standard Comments: ———————————————— PRECIPITATION INPUT ———————————————— Computational Time Step (Minutes): 15 Extended Precipitation Time Series Selected Climatic Region Number: 0 Full Period of Record Available used for Routing Precipitation Station : 96004005 Puget East 40 in_5min 10/01/1939-10/01/2097 Evaporation Station : 961040 Puget East 40 in MAP Evaporation Scale Factor : 0.750 HSPF Parameter Region Number: 1 HSPF Parameter Region Name : USGS Default ********** Default HSPF Parameters Used (Not Modified by User) *************** ********************** WATERSHED DEFINITION *********************** Predevelopment/Post Development Tributary Area Summary Predeveloped Post Developed Total Subbasin Area (acres) 0.099 0.099 Area of Links that Include Precip/Evap (acres) 0.000 0.003 Total (acres) 0.099 0.102 ----------------------SCENARIO: PREDEVELOPED Number of Subbasins: 1 ---------- Subbasin : Subbasin 1 ---------- -------Area (Acres) -------- Till Forest 0.099 ---------------------------------------------- Subbasin Total 0.099 ----------------------SCENARIO: POSTDEVELOPED Number of Subbasins: 1 ---------- Subbasin : Basin 51 ---------- -------Area (Acres) -------- Till Grass 0.044 Impervious 0.055 ---------------------------------------------- Subbasin Total 0.099 ************************* LINK DATA ******************************* ----------------------SCENARIO: PREDEVELOPED Number of Links: 0 ************************* LINK DATA ******************************* ----------------------SCENARIO: POSTDEVELOPED Number of Links: 1 ------------------------------------------ Link Name: Bioretention Link Type: Bioretention Facility Downstream Link: None Base Elevation (ft) : 100.00 Riser Crest Elevation (ft) : 100.50 Storage Depth (ft) : 0.50 Bottom Length (ft) : 13.0 Bottom Width (ft) : 10.0 Side Slopes (ft/ft) : L1= 0.00 L2= 0.00 W1= 0.00 W2= 0.00 Bottom Area (sq-ft) : 130. Area at Riser Crest El (sq-ft) : 130. (acres) : 0.003 Volume at Riser Crest (cu-ft) : 124. (ac-ft) : 0.003 Infiltration on Bottom only Selected Soil Properties Biosoil Thickness (ft) : 1.50 Biosoil Saturated Hydraulic Conductivity (in/hr) : 6.00 Biosoil Porosity (Percent) : 30.00 Maximum Elevation of Bioretention Soil : 101.00 Native Soil Hydraulic Conductivity (in/hr) : 0.70 Riser Geometry Riser Structure Type : Circular Riser Diameter (in) : 6.00 Common Length (ft) : 0.000 Riser Crest Elevation : 100.50 ft Hydraulic Structure Geometry Number of Devices: 0 **********************FLOOD FREQUENCY AND DURATION STATISTICS******************* ----------------------SCENARIO: PREDEVELOPED Number of Subbasins: 1 Number of Links: 0 ----------------------SCENARIO: POSTDEVELOPED Number of Subbasins: 1 Number of Links: 1 ***********Groundwater Recharge Summary ************* Recharge is computed as input to Perlnd Groundwater Plus Infiltration in Structures Total Predeveloped Recharge During Simulation Model Element Recharge Amount (ac-ft) ----------------------------------------------------------------------------------------------- Subbasin: Subbasin 1 17.070 _____________________________________ Total: 17.070 Total Post Developed Recharge During Simulation Model Element Recharge Amount (ac-ft) ----------------------------------------------------------------------------------------------- Subbasin: Basin 51 5.377 Link: Bioretention 32.894 _____________________________________ Total: 38.271 Total Predevelopment Recharge is Less than Post Developed Average Recharge Per Year, (Number of Years= 158) Predeveloped: 0.108 ac-ft/year, Post Developed: 0.242 ac-ft/year ***********Water Quality Facility Data ************* ----------------------SCENARIO: PREDEVELOPED Number of Links: 0 ----------------------SCENARIO: POSTDEVELOPED Number of Links: 1 ********** Link: Bioretention ********** Infiltration/Filtration Statistics-------------------- Inflow Volume (ac-ft): 33.51 Inflow Volume Including PPT-Evap (ac-ft): 34.71 Total Runoff Infiltrated (ac-ft): 32.89, 94.77% Total Runoff Filtered (ac-ft): 0.00, 0.00% Primary Outflow To Downstream System (ac-ft): 1.81 Secondary Outflow To Downstream System (ac-ft): 0.00 Percent Treated (Infiltrated+Filtered)/Total Volume: 94.77% ***********Compliance Point Results ************* Scenario Predeveloped Compliance Subbasin: Subbasin 1 Scenario Postdeveloped Compliance Link: Bioretention *** Point of Compliance Flow Frequency Data *** Recurrence Interval Computed Using Gringorten Plotting Position Predevelopment Runoff Postdevelopment Runoff Tr (Years) Discharge (cfs) Tr (Years) Discharge (cfs) ---------------------------------------------------------------------------------------------------------------------- 2-Year 2.110E-03 2-Year 1.446E-02 5-Year 3.438E-03 5-Year 2.471E-02 10-Year 4.633E-03 10-Year 2.945E-02 25-Year 5.874E-03 25-Year 3.898E-02 50-Year 7.496E-03 50-Year 4.354E-02 100-Year 8.123E-03 100-Year 5.591E-02 200-Year 1.264E-02 200-Year 5.716E-02 ** Record too Short to Compute Peak Discharge for These Recurrence Intervals **** LID Duration Performance **** Excursion at Predeveloped 8%Q2 (Must be Less Than 0%): -96.3% PASS Maximum Excursion from 8%Q2 to 50%Q2 (Must be Less Than 0%): -69.5% PASS ------------------------------------------------------------------------------------------------- MEETS ALL LID DURATION DESIGN CRITERIA: PASS ------------------------------------------------------------------------------------------------- ————————————————————————————————— MGS FLOOD PROJECT REPORT Program Version: MGSFlood 4.43 Program License Number: 200410007 Project Simulation Performed on: 10/05/2018 3:50 PM Report Generation Date: 10/05/2018 3:51 PM ————————————————————————————————— Input File Name: Basin 53.fld Project Name: Solera Analysis Title: BMP Performance Standard Comments: ———————————————— PRECIPITATION INPUT ———————————————— Computational Time Step (Minutes): 15 Extended Precipitation Time Series Selected Climatic Region Number: 0 Full Period of Record Available used for Routing Precipitation Station : 96004005 Puget East 40 in_5min 10/01/1939-10/01/2097 Evaporation Station : 961040 Puget East 40 in MAP Evaporation Scale Factor : 0.750 HSPF Parameter Region Number: 1 HSPF Parameter Region Name : USGS Default ********** Default HSPF Parameters Used (Not Modified by User) *************** ********************** WATERSHED DEFINITION *********************** Predevelopment/Post Development Tributary Area Summary Predeveloped Post Developed Total Subbasin Area (acres) 0.222 0.223 Area of Links that Include Precip/Evap (acres) 0.000 0.007 Total (acres) 0.222 0.230 ----------------------SCENARIO: PREDEVELOPED Number of Subbasins: 1 ---------- Subbasin : Subbasin 1 ---------- -------Area (Acres) -------- Till Forest 0.222 ---------------------------------------------- Subbasin Total 0.222 ----------------------SCENARIO: POSTDEVELOPED Number of Subbasins: 1 ---------- Subbasin : Basin 53 ---------- -------Area (Acres) -------- Till Grass 0.100 Impervious 0.123 ---------------------------------------------- Subbasin Total 0.223 ************************* LINK DATA ******************************* ----------------------SCENARIO: PREDEVELOPED Number of Links: 0 ************************* LINK DATA ******************************* ----------------------SCENARIO: POSTDEVELOPED Number of Links: 1 ------------------------------------------ Link Name: Bioretention Link Type: Bioretention Facility Downstream Link: None Base Elevation (ft) : 100.00 Riser Crest Elevation (ft) : 100.50 Storage Depth (ft) : 0.50 Bottom Length (ft) : 30.0 Bottom Width (ft) : 10.0 Side Slopes (ft/ft) : L1= 0.00 L2= 0.00 W1= 0.00 W2= 0.00 Bottom Area (sq-ft) : 300. Area at Riser Crest El (sq-ft) : 300. (acres) : 0.007 Volume at Riser Crest (cu-ft) : 285. (ac-ft) : 0.007 Infiltration on Bottom only Selected Soil Properties Biosoil Thickness (ft) : 1.50 Biosoil Saturated Hydraulic Conductivity (in/hr) : 6.00 Biosoil Porosity (Percent) : 30.00 Maximum Elevation of Bioretention Soil : 101.00 Native Soil Hydraulic Conductivity (in/hr) : 0.70 Riser Geometry Riser Structure Type : Circular Riser Diameter (in) : 6.00 Common Length (ft) : 0.000 Riser Crest Elevation : 100.50 ft Hydraulic Structure Geometry Number of Devices: 0 **********************FLOOD FREQUENCY AND DURATION STATISTICS******************* ----------------------SCENARIO: PREDEVELOPED Number of Subbasins: 1 Number of Links: 0 ----------------------SCENARIO: POSTDEVELOPED Number of Subbasins: 1 Number of Links: 1 ***********Groundwater Recharge Summary ************* Recharge is computed as input to Perlnd Groundwater Plus Infiltration in Structures Total Predeveloped Recharge During Simulation Model Element Recharge Amount (ac-ft) ----------------------------------------------------------------------------------------------- Subbasin: Subbasin 1 38.279 _____________________________________ Total: 38.279 Total Post Developed Recharge During Simulation Model Element Recharge Amount (ac-ft) ----------------------------------------------------------------------------------------------- Subbasin: Basin 53 12.221 Link: Bioretention 74.259 _____________________________________ Total: 86.480 Total Predevelopment Recharge is Less than Post Developed Average Recharge Per Year, (Number of Years= 158) Predeveloped: 0.242 ac-ft/year, Post Developed: 0.547 ac-ft/year ***********Water Quality Facility Data ************* ----------------------SCENARIO: PREDEVELOPED Number of Links: 0 ----------------------SCENARIO: POSTDEVELOPED Number of Links: 1 ********** Link: Bioretention ********** Infiltration/Filtration Statistics-------------------- Inflow Volume (ac-ft): 75.26 Inflow Volume Including PPT-Evap (ac-ft): 78.03 Total Runoff Infiltrated (ac-ft): 74.26, 95.16% Total Runoff Filtered (ac-ft): 0.00, 0.00% Primary Outflow To Downstream System (ac-ft): 3.77 Secondary Outflow To Downstream System (ac-ft): 0.00 Percent Treated (Infiltrated+Filtered)/Total Volume: 95.16% ***********Compliance Point Results ************* Scenario Predeveloped Compliance Subbasin: Subbasin 1 Scenario Postdeveloped Compliance Link: Bioretention *** Point of Compliance Flow Frequency Data *** Recurrence Interval Computed Using Gringorten Plotting Position Predevelopment Runoff Postdevelopment Runoff Tr (Years) Discharge (cfs) Tr (Years) Discharge (cfs) ---------------------------------------------------------------------------------------------------------------------- 2-Year 4.731E-03 2-Year 3.059E-02 5-Year 7.710E-03 5-Year 5.330E-02 10-Year 1.039E-02 10-Year 6.458E-02 25-Year 1.317E-02 25-Year 8.199E-02 50-Year 1.681E-02 50-Year 9.334E-02 100-Year 1.822E-02 100-Year 0.125 200-Year 2.835E-02 200-Year 0.130 ** Record too Short to Compute Peak Discharge for These Recurrence Intervals **** LID Duration Performance **** Excursion at Predeveloped 8%Q2 (Must be Less Than 0%): -96.6% PASS Maximum Excursion from 8%Q2 to 50%Q2 (Must be Less Than 0%): -71.6% PASS ------------------------------------------------------------------------------------------------- MEETS ALL LID DURATION DESIGN CRITERIA: PASS ------------------------------------------------------------------------------------------------- ————————————————————————————————— MGS FLOOD PROJECT REPORT Program Version: MGSFlood 4.43 Program License Number: 200410007 Project Simulation Performed on: 10/05/2018 3:53 PM Report Generation Date: 10/05/2018 3:53 PM ————————————————————————————————— Input File Name: Basin 54.fld Project Name: Solera Analysis Title: BMP Performance Standard Comments: ———————————————— PRECIPITATION INPUT ———————————————— Computational Time Step (Minutes): 15 Extended Precipitation Time Series Selected Climatic Region Number: 0 Full Period of Record Available used for Routing Precipitation Station : 96004005 Puget East 40 in_5min 10/01/1939-10/01/2097 Evaporation Station : 961040 Puget East 40 in MAP Evaporation Scale Factor : 0.750 HSPF Parameter Region Number: 1 HSPF Parameter Region Name : USGS Default ********** Default HSPF Parameters Used (Not Modified by User) *************** ********************** WATERSHED DEFINITION *********************** Predevelopment/Post Development Tributary Area Summary Predeveloped Post Developed Total Subbasin Area (acres) 0.083 0.084 Area of Links that Include Precip/Evap (acres) 0.000 0.003 Total (acres) 0.083 0.087 ----------------------SCENARIO: PREDEVELOPED Number of Subbasins: 1 ---------- Subbasin : Subbasin 1 ---------- -------Area (Acres) -------- Till Forest 0.083 ---------------------------------------------- Subbasin Total 0.083 ----------------------SCENARIO: POSTDEVELOPED Number of Subbasins: 1 ---------- Subbasin : Basin 54 ---------- -------Area (Acres) -------- Till Grass 0.034 Impervious 0.050 ---------------------------------------------- Subbasin Total 0.084 ************************* LINK DATA ******************************* ----------------------SCENARIO: PREDEVELOPED Number of Links: 0 ************************* LINK DATA ******************************* ----------------------SCENARIO: POSTDEVELOPED Number of Links: 1 ------------------------------------------ Link Name: Bioretention Link Type: Bioretention Facility Downstream Link: None Base Elevation (ft) : 100.00 Riser Crest Elevation (ft) : 100.50 Storage Depth (ft) : 0.50 Bottom Length (ft) : 11.0 Bottom Width (ft) : 10.0 Side Slopes (ft/ft) : L1= 0.00 L2= 0.00 W1= 0.00 W2= 0.00 Bottom Area (sq-ft) : 110. Area at Riser Crest El (sq-ft) : 110. (acres) : 0.003 Volume at Riser Crest (cu-ft) : 105. (ac-ft) : 0.002 Infiltration on Bottom only Selected Soil Properties Biosoil Thickness (ft) : 1.50 Biosoil Saturated Hydraulic Conductivity (in/hr) : 6.00 Biosoil Porosity (Percent) : 30.00 Maximum Elevation of Bioretention Soil : 101.00 Native Soil Hydraulic Conductivity (in/hr) : 0.70 Riser Geometry Riser Structure Type : Circular Riser Diameter (in) : 6.00 Common Length (ft) : 0.000 Riser Crest Elevation : 100.50 ft Hydraulic Structure Geometry Number of Devices: 0 **********************FLOOD FREQUENCY AND DURATION STATISTICS******************* ----------------------SCENARIO: PREDEVELOPED Number of Subbasins: 1 Number of Links: 0 ----------------------SCENARIO: POSTDEVELOPED Number of Subbasins: 1 Number of Links: 1 ***********Groundwater Recharge Summary ************* Recharge is computed as input to Perlnd Groundwater Plus Infiltration in Structures Total Predeveloped Recharge During Simulation Model Element Recharge Amount (ac-ft) ----------------------------------------------------------------------------------------------- Subbasin: Subbasin 1 14.312 _____________________________________ Total: 14.312 Total Post Developed Recharge During Simulation Model Element Recharge Amount (ac-ft) ----------------------------------------------------------------------------------------------- Subbasin: Basin 54 4.155 Link: Bioretention 28.472 _____________________________________ Total: 32.627 Total Predevelopment Recharge is Less than Post Developed Average Recharge Per Year, (Number of Years= 158) Predeveloped: 0.091 ac-ft/year, Post Developed: 0.206 ac-ft/year ***********Water Quality Facility Data ************* ----------------------SCENARIO: PREDEVELOPED Number of Links: 0 ----------------------SCENARIO: POSTDEVELOPED Number of Links: 1 ********** Link: Bioretention ********** Infiltration/Filtration Statistics-------------------- Inflow Volume (ac-ft): 29.25 Inflow Volume Including PPT-Evap (ac-ft): 30.27 Total Runoff Infiltrated (ac-ft): 28.47, 94.05% Total Runoff Filtered (ac-ft): 0.00, 0.00% Primary Outflow To Downstream System (ac-ft): 1.79 Secondary Outflow To Downstream System (ac-ft): 0.00 Percent Treated (Infiltrated+Filtered)/Total Volume: 94.05% ***********Compliance Point Results ************* Scenario Predeveloped Compliance Subbasin: Subbasin 1 Scenario Postdeveloped Compliance Link: Bioretention *** Point of Compliance Flow Frequency Data *** Recurrence Interval Computed Using Gringorten Plotting Position Predevelopment Runoff Postdevelopment Runoff Tr (Years) Discharge (cfs) Tr (Years) Discharge (cfs) ---------------------------------------------------------------------------------------------------------------------- 2-Year 1.769E-03 2-Year 1.321E-02 5-Year 2.883E-03 5-Year 2.211E-02 10-Year 3.884E-03 10-Year 2.611E-02 25-Year 4.924E-03 25-Year 3.381E-02 50-Year 6.285E-03 50-Year 3.886E-02 100-Year 6.810E-03 100-Year 4.837E-02 200-Year 1.060E-02 200-Year 4.977E-02 ** Record too Short to Compute Peak Discharge for These Recurrence Intervals **** LID Duration Performance **** Excursion at Predeveloped 8%Q2 (Must be Less Than 0%): -95.8% PASS Maximum Excursion from 8%Q2 to 50%Q2 (Must be Less Than 0%): -65.4% PASS ------------------------------------------------------------------------------------------------- MEETS ALL LID DURATION DESIGN CRITERIA: PASS ------------------------------------------------------------------------------------------------- ————————————————————————————————— MGS FLOOD PROJECT REPORT Program Version: MGSFlood 4.43 Program License Number: 200410007 Project Simulation Performed on: 10/05/2018 3:55 PM Report Generation Date: 10/05/2018 3:55 PM ————————————————————————————————— Input File Name: Basin 55.fld Project Name: Solera Analysis Title: BMP Performance Standard Comments: ———————————————— PRECIPITATION INPUT ———————————————— Computational Time Step (Minutes): 15 Extended Precipitation Time Series Selected Climatic Region Number: 0 Full Period of Record Available used for Routing Precipitation Station : 96004005 Puget East 40 in_5min 10/01/1939-10/01/2097 Evaporation Station : 961040 Puget East 40 in MAP Evaporation Scale Factor : 0.750 HSPF Parameter Region Number: 1 HSPF Parameter Region Name : USGS Default ********** Default HSPF Parameters Used (Not Modified by User) *************** ********************** WATERSHED DEFINITION *********************** Predevelopment/Post Development Tributary Area Summary Predeveloped Post Developed Total Subbasin Area (acres) 0.298 0.298 Area of Links that Include Precip/Evap (acres) 0.000 0.009 Total (acres) 0.298 0.307 ----------------------SCENARIO: PREDEVELOPED Number of Subbasins: 1 ---------- Subbasin : Subbasin 1 ---------- -------Area (Acres) -------- Till Forest 0.298 ---------------------------------------------- Subbasin Total 0.298 ----------------------SCENARIO: POSTDEVELOPED Number of Subbasins: 1 ---------- Subbasin : Basin 55 ---------- -------Area (Acres) -------- Till Grass 0.120 Impervious 0.178 ---------------------------------------------- Subbasin Total 0.298 ************************* LINK DATA ******************************* ----------------------SCENARIO: PREDEVELOPED Number of Links: 0 ************************* LINK DATA ******************************* ----------------------SCENARIO: POSTDEVELOPED Number of Links: 1 ------------------------------------------ Link Name: Bioretention Link Type: Bioretention Facility Downstream Link: None Base Elevation (ft) : 100.00 Riser Crest Elevation (ft) : 100.50 Storage Depth (ft) : 0.50 Bottom Length (ft) : 39.0 Bottom Width (ft) : 10.0 Side Slopes (ft/ft) : L1= 0.00 L2= 0.00 W1= 0.00 W2= 0.00 Bottom Area (sq-ft) : 390. Area at Riser Crest El (sq-ft) : 390. (acres) : 0.009 Volume at Riser Crest (cu-ft) : 371. (ac-ft) : 0.009 Infiltration on Bottom only Selected Soil Properties Biosoil Thickness (ft) : 1.50 Biosoil Saturated Hydraulic Conductivity (in/hr) : 6.00 Biosoil Porosity (Percent) : 30.00 Maximum Elevation of Bioretention Soil : 101.00 Native Soil Hydraulic Conductivity (in/hr) : 0.70 Riser Geometry Riser Structure Type : Circular Riser Diameter (in) : 6.00 Common Length (ft) : 0.000 Riser Crest Elevation : 100.50 ft Hydraulic Structure Geometry Number of Devices: 0 **********************FLOOD FREQUENCY AND DURATION STATISTICS******************* ----------------------SCENARIO: PREDEVELOPED Number of Subbasins: 1 Number of Links: 0 ----------------------SCENARIO: POSTDEVELOPED Number of Subbasins: 1 Number of Links: 1 ***********Groundwater Recharge Summary ************* Recharge is computed as input to Perlnd Groundwater Plus Infiltration in Structures Total Predeveloped Recharge During Simulation Model Element Recharge Amount (ac-ft) ----------------------------------------------------------------------------------------------- Subbasin: Subbasin 1 51.384 _____________________________________ Total: 51.384 Total Post Developed Recharge During Simulation Model Element Recharge Amount (ac-ft) ----------------------------------------------------------------------------------------------- Subbasin: Basin 55 14.665 Link: Bioretention 101.115 _____________________________________ Total: 115.781 Total Predevelopment Recharge is Less than Post Developed Average Recharge Per Year, (Number of Years= 158) Predeveloped: 0.325 ac-ft/year, Post Developed: 0.733 ac-ft/year ***********Water Quality Facility Data ************* ----------------------SCENARIO: PREDEVELOPED Number of Links: 0 ----------------------SCENARIO: POSTDEVELOPED Number of Links: 1 ********** Link: Bioretention ********** Infiltration/Filtration Statistics-------------------- Inflow Volume (ac-ft): 103.94 Inflow Volume Including PPT-Evap (ac-ft): 107.55 Total Runoff Infiltrated (ac-ft): 101.12, 94.02% Total Runoff Filtered (ac-ft): 0.00, 0.00% Primary Outflow To Downstream System (ac-ft): 6.38 Secondary Outflow To Downstream System (ac-ft): 0.00 Percent Treated (Infiltrated+Filtered)/Total Volume: 94.02% ***********Compliance Point Results ************* Scenario Predeveloped Compliance Subbasin: Subbasin 1 Scenario Postdeveloped Compliance Link: Bioretention *** Point of Compliance Flow Frequency Data *** Recurrence Interval Computed Using Gringorten Plotting Position Predevelopment Runoff Postdevelopment Runoff Tr (Years) Discharge (cfs) Tr (Years) Discharge (cfs) ---------------------------------------------------------------------------------------------------------------------- 2-Year 6.350E-03 2-Year 4.586E-02 5-Year 1.035E-02 5-Year 7.630E-02 10-Year 1.394E-02 10-Year 8.977E-02 25-Year 1.768E-02 25-Year 0.118 50-Year 2.256E-02 50-Year 0.132 100-Year 2.445E-02 100-Year 0.170 200-Year 3.806E-02 200-Year 0.181 ** Record too Short to Compute Peak Discharge for These Recurrence Intervals **** LID Duration Performance **** Excursion at Predeveloped 8%Q2 (Must be Less Than 0%): -95.7% PASS Maximum Excursion from 8%Q2 to 50%Q2 (Must be Less Than 0%): -64.7% PASS ------------------------------------------------------------------------------------------------- MEETS ALL LID DURATION DESIGN CRITERIA: PASS ------------------------------------------------------------------------------------------------- ————————————————————————————————— MGS FLOOD PROJECT REPORT Program Version: MGSFlood 4.43 Program License Number: 200410007 Project Simulation Performed on: 10/05/2018 3:57 PM Report Generation Date: 10/05/2018 3:57 PM ————————————————————————————————— Input File Name: Basin 56.fld Project Name: Solera Analysis Title: BMP Performance Standard Comments: ———————————————— PRECIPITATION INPUT ———————————————— Computational Time Step (Minutes): 15 Extended Precipitation Time Series Selected Climatic Region Number: 0 Full Period of Record Available used for Routing Precipitation Station : 96004005 Puget East 40 in_5min 10/01/1939-10/01/2097 Evaporation Station : 961040 Puget East 40 in MAP Evaporation Scale Factor : 0.750 HSPF Parameter Region Number: 1 HSPF Parameter Region Name : USGS Default ********** Default HSPF Parameters Used (Not Modified by User) *************** ********************** WATERSHED DEFINITION *********************** Predevelopment/Post Development Tributary Area Summary Predeveloped Post Developed Total Subbasin Area (acres) 0.079 0.079 Area of Links that Include Precip/Evap (acres) 0.000 0.003 Total (acres) 0.079 0.082 ----------------------SCENARIO: PREDEVELOPED Number of Subbasins: 1 ---------- Subbasin : Subbasin 1 ---------- -------Area (Acres) -------- Till Forest 0.079 ---------------------------------------------- Subbasin Total 0.079 ----------------------SCENARIO: POSTDEVELOPED Number of Subbasins: 1 ---------- Subbasin : Basin 56 ---------- -------Area (Acres) -------- Till Grass 0.013 Impervious 0.066 ---------------------------------------------- Subbasin Total 0.079 ************************* LINK DATA ******************************* ----------------------SCENARIO: PREDEVELOPED Number of Links: 0 ************************* LINK DATA ******************************* ----------------------SCENARIO: POSTDEVELOPED Number of Links: 1 ------------------------------------------ Link Name: Bioretention Link Type: Bioretention Facility Downstream Link: None Base Elevation (ft) : 100.00 Riser Crest Elevation (ft) : 100.50 Storage Depth (ft) : 0.50 Bottom Length (ft) : 12.0 Bottom Width (ft) : 10.0 Side Slopes (ft/ft) : L1= 0.00 L2= 0.00 W1= 0.00 W2= 0.00 Bottom Area (sq-ft) : 120. Area at Riser Crest El (sq-ft) : 120. (acres) : 0.003 Volume at Riser Crest (cu-ft) : 114. (ac-ft) : 0.003 Infiltration on Bottom only Selected Soil Properties Biosoil Thickness (ft) : 1.50 Biosoil Saturated Hydraulic Conductivity (in/hr) : 6.00 Biosoil Porosity (Percent) : 30.00 Maximum Elevation of Bioretention Soil : 101.00 Native Soil Hydraulic Conductivity (in/hr) : 0.70 Riser Geometry Riser Structure Type : Circular Riser Diameter (in) : 6.00 Common Length (ft) : 0.000 Riser Crest Elevation : 100.50 ft Hydraulic Structure Geometry Number of Devices: 0 **********************FLOOD FREQUENCY AND DURATION STATISTICS******************* ----------------------SCENARIO: PREDEVELOPED Number of Subbasins: 1 Number of Links: 0 ----------------------SCENARIO: POSTDEVELOPED Number of Subbasins: 1 Number of Links: 1 ***********Groundwater Recharge Summary ************* Recharge is computed as input to Perlnd Groundwater Plus Infiltration in Structures Total Predeveloped Recharge During Simulation Model Element Recharge Amount (ac-ft) ----------------------------------------------------------------------------------------------- Subbasin: Subbasin 1 13.622 _____________________________________ Total: 13.622 Total Post Developed Recharge During Simulation Model Element Recharge Amount (ac-ft) ----------------------------------------------------------------------------------------------- Subbasin: Basin 56 1.589 Link: Bioretention 30.706 _____________________________________ Total: 32.295 Total Predevelopment Recharge is Less than Post Developed Average Recharge Per Year, (Number of Years= 158) Predeveloped: 0.086 ac-ft/year, Post Developed: 0.204 ac-ft/year ***********Water Quality Facility Data ************* ----------------------SCENARIO: PREDEVELOPED Number of Links: 0 ----------------------SCENARIO: POSTDEVELOPED Number of Links: 1 ********** Link: Bioretention ********** Infiltration/Filtration Statistics-------------------- Inflow Volume (ac-ft): 32.21 Inflow Volume Including PPT-Evap (ac-ft): 33.35 Total Runoff Infiltrated (ac-ft): 30.71, 92.09% Total Runoff Filtered (ac-ft): 0.00, 0.00% Primary Outflow To Downstream System (ac-ft): 2.61 Secondary Outflow To Downstream System (ac-ft): 0.00 Percent Treated (Infiltrated+Filtered)/Total Volume: 92.09% ***********Compliance Point Results ************* Scenario Predeveloped Compliance Subbasin: Subbasin 1 Scenario Postdeveloped Compliance Link: Bioretention *** Point of Compliance Flow Frequency Data *** Recurrence Interval Computed Using Gringorten Plotting Position Predevelopment Runoff Postdevelopment Runoff Tr (Years) Discharge (cfs) Tr (Years) Discharge (cfs) ---------------------------------------------------------------------------------------------------------------------- 2-Year 1.683E-03 2-Year 1.775E-02 5-Year 2.744E-03 5-Year 2.685E-02 10-Year 3.697E-03 10-Year 3.149E-02 25-Year 4.687E-03 25-Year 3.800E-02 50-Year 5.982E-03 50-Year 4.266E-02 100-Year 6.482E-03 100-Year 5.046E-02 200-Year 1.009E-02 200-Year 5.490E-02 ** Record too Short to Compute Peak Discharge for These Recurrence Intervals **** LID Duration Performance **** Excursion at Predeveloped 8%Q2 (Must be Less Than 0%): -95.0% PASS Maximum Excursion from 8%Q2 to 50%Q2 (Must be Less Than 0%): -55.4% PASS ------------------------------------------------------------------------------------------------- MEETS ALL LID DURATION DESIGN CRITERIA: PASS ------------------------------------------------------------------------------------------------- ————————————————————————————————— MGS FLOOD PROJECT REPORT Program Version: MGSFlood 4.43 Program License Number: 200410007 Project Simulation Performed on: 10/05/2018 4:00 PM Report Generation Date: 10/05/2018 4:00 PM ————————————————————————————————— Input File Name: Basin 57.fld Project Name: Solera Analysis Title: BMP Performance Standard Comments: ———————————————— PRECIPITATION INPUT ———————————————— Computational Time Step (Minutes): 15 Extended Precipitation Time Series Selected Climatic Region Number: 0 Full Period of Record Available used for Routing Precipitation Station : 96004005 Puget East 40 in_5min 10/01/1939-10/01/2097 Evaporation Station : 961040 Puget East 40 in MAP Evaporation Scale Factor : 0.750 HSPF Parameter Region Number: 1 HSPF Parameter Region Name : USGS Default ********** Default HSPF Parameters Used (Not Modified by User) *************** ********************** WATERSHED DEFINITION *********************** Predevelopment/Post Development Tributary Area Summary Predeveloped Post Developed Total Subbasin Area (acres) 0.079 0.079 Area of Links that Include Precip/Evap (acres) 0.000 0.002 Total (acres) 0.079 0.081 ----------------------SCENARIO: PREDEVELOPED Number of Subbasins: 1 ---------- Subbasin : Subbasin 1 ---------- -------Area (Acres) -------- Till Forest 0.079 ---------------------------------------------- Subbasin Total 0.079 ----------------------SCENARIO: POSTDEVELOPED Number of Subbasins: 1 ---------- Subbasin : Basin 57 ---------- -------Area (Acres) -------- Till Grass 0.048 Impervious 0.031 ---------------------------------------------- Subbasin Total 0.079 ************************* LINK DATA ******************************* ----------------------SCENARIO: PREDEVELOPED Number of Links: 0 ************************* LINK DATA ******************************* ----------------------SCENARIO: POSTDEVELOPED Number of Links: 1 ------------------------------------------ Link Name: Bioretention Link Type: Bioretention Facility Downstream Link: None Base Elevation (ft) : 100.00 Riser Crest Elevation (ft) : 100.50 Storage Depth (ft) : 0.50 Bottom Length (ft) : 10.0 Bottom Width (ft) : 8.0 Side Slopes (ft/ft) : L1= 0.00 L2= 0.00 W1= 0.00 W2= 0.00 Bottom Area (sq-ft) : 80. Area at Riser Crest El (sq-ft) : 80. (acres) : 0.002 Volume at Riser Crest (cu-ft) : 76. (ac-ft) : 0.002 Infiltration on Bottom only Selected Soil Properties Biosoil Thickness (ft) : 1.50 Biosoil Saturated Hydraulic Conductivity (in/hr) : 6.00 Biosoil Porosity (Percent) : 30.00 Maximum Elevation of Bioretention Soil : 101.00 Native Soil Hydraulic Conductivity (in/hr) : 0.70 Riser Geometry Riser Structure Type : Circular Riser Diameter (in) : 6.00 Common Length (ft) : 0.000 Riser Crest Elevation : 100.50 ft Hydraulic Structure Geometry Number of Devices: 0 **********************FLOOD FREQUENCY AND DURATION STATISTICS******************* ----------------------SCENARIO: PREDEVELOPED Number of Subbasins: 1 Number of Links: 0 ----------------------SCENARIO: POSTDEVELOPED Number of Subbasins: 1 Number of Links: 1 ***********Groundwater Recharge Summary ************* Recharge is computed as input to Perlnd Groundwater Plus Infiltration in Structures Total Predeveloped Recharge During Simulation Model Element Recharge Amount (ac-ft) ----------------------------------------------------------------------------------------------- Subbasin: Subbasin 1 13.622 _____________________________________ Total: 13.622 Total Post Developed Recharge During Simulation Model Element Recharge Amount (ac-ft) ----------------------------------------------------------------------------------------------- Subbasin: Basin 57 5.866 Link: Bioretention 22.760 _____________________________________ Total: 28.626 Total Predevelopment Recharge is Less than Post Developed Average Recharge Per Year, (Number of Years= 158) Predeveloped: 0.086 ac-ft/year, Post Developed: 0.181 ac-ft/year ***********Water Quality Facility Data ************* ----------------------SCENARIO: PREDEVELOPED Number of Links: 0 ----------------------SCENARIO: POSTDEVELOPED Number of Links: 1 ********** Link: Bioretention ********** Infiltration/Filtration Statistics-------------------- Inflow Volume (ac-ft): 23.55 Inflow Volume Including PPT-Evap (ac-ft): 24.28 Total Runoff Infiltrated (ac-ft): 22.76, 93.74% Total Runoff Filtered (ac-ft): 0.00, 0.00% Primary Outflow To Downstream System (ac-ft): 1.51 Secondary Outflow To Downstream System (ac-ft): 0.00 Percent Treated (Infiltrated+Filtered)/Total Volume: 93.74% ***********Compliance Point Results ************* Scenario Predeveloped Compliance Subbasin: Subbasin 1 Scenario Postdeveloped Compliance Link: Bioretention *** Point of Compliance Flow Frequency Data *** Recurrence Interval Computed Using Gringorten Plotting Position Predevelopment Runoff Postdevelopment Runoff Tr (Years) Discharge (cfs) Tr (Years) Discharge (cfs) ---------------------------------------------------------------------------------------------------------------------- 2-Year 1.683E-03 2-Year 9.016E-03 5-Year 2.744E-03 5-Year 1.732E-02 10-Year 3.697E-03 10-Year 2.191E-02 25-Year 4.687E-03 25-Year 2.867E-02 50-Year 5.982E-03 50-Year 3.669E-02 100-Year 6.482E-03 100-Year 4.163E-02 200-Year 1.009E-02 200-Year 4.416E-02 ** Record too Short to Compute Peak Discharge for These Recurrence Intervals **** LID Duration Performance **** Excursion at Predeveloped 8%Q2 (Must be Less Than 0%): -94.3% PASS Maximum Excursion from 8%Q2 to 50%Q2 (Must be Less Than 0%): -61.5% PASS ------------------------------------------------------------------------------------------------- MEETS ALL LID DURATION DESIGN CRITERIA: PASS ------------------------------------------------------------------------------------------------- ————————————————————————————————— MGS FLOOD PROJECT REPORT Program Version: MGSFlood 4.43 Program License Number: 200410007 Project Simulation Performed on: 10/05/2018 4:02 PM Report Generation Date: 10/05/2018 4:02 PM ————————————————————————————————— Input File Name: Basin 58.fld Project Name: Solera Analysis Title: BMP Performance Standard Comments: ———————————————— PRECIPITATION INPUT ———————————————— Computational Time Step (Minutes): 15 Extended Precipitation Time Series Selected Climatic Region Number: 0 Full Period of Record Available used for Routing Precipitation Station : 96004005 Puget East 40 in_5min 10/01/1939-10/01/2097 Evaporation Station : 961040 Puget East 40 in MAP Evaporation Scale Factor : 0.750 HSPF Parameter Region Number: 1 HSPF Parameter Region Name : USGS Default ********** Default HSPF Parameters Used (Not Modified by User) *************** ********************** WATERSHED DEFINITION *********************** Predevelopment/Post Development Tributary Area Summary Predeveloped Post Developed Total Subbasin Area (acres) 0.218 0.218 Area of Links that Include Precip/Evap (acres) 0.000 0.007 Total (acres) 0.218 0.225 ----------------------SCENARIO: PREDEVELOPED Number of Subbasins: 1 ---------- Subbasin : Subbasin 1 ---------- -------Area (Acres) -------- Till Forest 0.218 ---------------------------------------------- Subbasin Total 0.218 ----------------------SCENARIO: POSTDEVELOPED Number of Subbasins: 1 ---------- Subbasin : Basin 58 ---------- -------Area (Acres) -------- Till Grass 0.043 Impervious 0.175 ---------------------------------------------- Subbasin Total 0.218 ************************* LINK DATA ******************************* ----------------------SCENARIO: PREDEVELOPED Number of Links: 0 ************************* LINK DATA ******************************* ----------------------SCENARIO: POSTDEVELOPED Number of Links: 1 ------------------------------------------ Link Name: Bioretention Link Type: Bioretention Facility Downstream Link: None Base Elevation (ft) : 100.00 Riser Crest Elevation (ft) : 100.50 Storage Depth (ft) : 0.50 Bottom Length (ft) : 31.0 Bottom Width (ft) : 10.0 Side Slopes (ft/ft) : L1= 0.00 L2= 0.00 W1= 0.00 W2= 0.00 Bottom Area (sq-ft) : 310. Area at Riser Crest El (sq-ft) : 310. (acres) : 0.007 Volume at Riser Crest (cu-ft) : 295. (ac-ft) : 0.007 Infiltration on Bottom only Selected Soil Properties Biosoil Thickness (ft) : 1.50 Biosoil Saturated Hydraulic Conductivity (in/hr) : 6.00 Biosoil Porosity (Percent) : 30.00 Maximum Elevation of Bioretention Soil : 101.00 Native Soil Hydraulic Conductivity (in/hr) : 0.70 Riser Geometry Riser Structure Type : Circular Riser Diameter (in) : 6.00 Common Length (ft) : 0.000 Riser Crest Elevation : 100.50 ft Hydraulic Structure Geometry Number of Devices: 0 **********************FLOOD FREQUENCY AND DURATION STATISTICS******************* ----------------------SCENARIO: PREDEVELOPED Number of Subbasins: 1 Number of Links: 0 ----------------------SCENARIO: POSTDEVELOPED Number of Subbasins: 1 Number of Links: 1 ***********Groundwater Recharge Summary ************* Recharge is computed as input to Perlnd Groundwater Plus Infiltration in Structures Total Predeveloped Recharge During Simulation Model Element Recharge Amount (ac-ft) ----------------------------------------------------------------------------------------------- Subbasin: Subbasin 1 37.590 _____________________________________ Total: 37.590 Total Post Developed Recharge During Simulation Model Element Recharge Amount (ac-ft) ----------------------------------------------------------------------------------------------- Subbasin: Basin 58 5.255 Link: Bioretention 82.316 _____________________________________ Total: 87.571 Total Predevelopment Recharge is Less than Post Developed Average Recharge Per Year, (Number of Years= 158) Predeveloped: 0.238 ac-ft/year, Post Developed: 0.554 ac-ft/year ***********Water Quality Facility Data ************* ----------------------SCENARIO: PREDEVELOPED Number of Links: 0 ----------------------SCENARIO: POSTDEVELOPED Number of Links: 1 ********** Link: Bioretention ********** Infiltration/Filtration Statistics-------------------- Inflow Volume (ac-ft): 87.11 Inflow Volume Including PPT-Evap (ac-ft): 90.03 Total Runoff Infiltrated (ac-ft): 82.32, 91.43% Total Runoff Filtered (ac-ft): 0.00, 0.00% Primary Outflow To Downstream System (ac-ft): 7.63 Secondary Outflow To Downstream System (ac-ft): 0.00 Percent Treated (Infiltrated+Filtered)/Total Volume: 91.43% ***********Compliance Point Results ************* Scenario Predeveloped Compliance Subbasin: Subbasin 1 Scenario Postdeveloped Compliance Link: Bioretention *** Point of Compliance Flow Frequency Data *** Recurrence Interval Computed Using Gringorten Plotting Position Predevelopment Runoff Postdevelopment Runoff Tr (Years) Discharge (cfs) Tr (Years) Discharge (cfs) ---------------------------------------------------------------------------------------------------------------------- 2-Year 4.645E-03 2-Year 4.744E-02 5-Year 7.571E-03 5-Year 7.259E-02 10-Year 1.020E-02 10-Year 8.175E-02 25-Year 1.293E-02 25-Year 9.920E-02 50-Year 1.651E-02 50-Year 0.117 100-Year 1.789E-02 100-Year 0.137 200-Year 2.784E-02 200-Year 0.151 ** Record too Short to Compute Peak Discharge for These Recurrence Intervals **** LID Duration Performance **** Excursion at Predeveloped 8%Q2 (Must be Less Than 0%): -94.3% PASS Maximum Excursion from 8%Q2 to 50%Q2 (Must be Less Than 0%): -50.1% PASS ------------------------------------------------------------------------------------------------- MEETS ALL LID DURATION DESIGN CRITERIA: PASS ------------------------------------------------------------------------------------------------- ————————————————————————————————— MGS FLOOD PROJECT REPORT Program Version: MGSFlood 4.43 Program License Number: 200410007 Project Simulation Performed on: 10/05/2018 4:04 PM Report Generation Date: 10/05/2018 4:04 PM ————————————————————————————————— Input File Name: Basin 59.fld Project Name: Solera Analysis Title: BMP Performance Standard Comments: ———————————————— PRECIPITATION INPUT ———————————————— Computational Time Step (Minutes): 15 Extended Precipitation Time Series Selected Climatic Region Number: 0 Full Period of Record Available used for Routing Precipitation Station : 96004005 Puget East 40 in_5min 10/01/1939-10/01/2097 Evaporation Station : 961040 Puget East 40 in MAP Evaporation Scale Factor : 0.750 HSPF Parameter Region Number: 1 HSPF Parameter Region Name : USGS Default ********** Default HSPF Parameters Used (Not Modified by User) *************** ********************** WATERSHED DEFINITION *********************** Predevelopment/Post Development Tributary Area Summary Predeveloped Post Developed Total Subbasin Area (acres) 0.233 0.233 Area of Links that Include Precip/Evap (acres) 0.000 0.007 Total (acres) 0.233 0.240 ----------------------SCENARIO: PREDEVELOPED Number of Subbasins: 1 ---------- Subbasin : Subbasin 1 ---------- -------Area (Acres) -------- Till Forest 0.233 ---------------------------------------------- Subbasin Total 0.233 ----------------------SCENARIO: POSTDEVELOPED Number of Subbasins: 1 ---------- Subbasin : Basin 59 ---------- -------Area (Acres) -------- Till Grass 0.077 Impervious 0.156 ---------------------------------------------- Subbasin Total 0.233 ************************* LINK DATA ******************************* ----------------------SCENARIO: PREDEVELOPED Number of Links: 0 ************************* LINK DATA ******************************* ----------------------SCENARIO: POSTDEVELOPED Number of Links: 1 ------------------------------------------ Link Name: Bioretention Link Type: Bioretention Facility Downstream Link: None Base Elevation (ft) : 100.00 Riser Crest Elevation (ft) : 100.50 Storage Depth (ft) : 0.50 Bottom Length (ft) : 31.0 Bottom Width (ft) : 10.0 Side Slopes (ft/ft) : L1= 0.00 L2= 0.00 W1= 0.00 W2= 0.00 Bottom Area (sq-ft) : 310. Area at Riser Crest El (sq-ft) : 310. (acres) : 0.007 Volume at Riser Crest (cu-ft) : 295. (ac-ft) : 0.007 Infiltration on Bottom only Selected Soil Properties Biosoil Thickness (ft) : 1.50 Biosoil Saturated Hydraulic Conductivity (in/hr) : 6.00 Biosoil Porosity (Percent) : 30.00 Maximum Elevation of Bioretention Soil : 101.00 Native Soil Hydraulic Conductivity (in/hr) : 0.70 Riser Geometry Riser Structure Type : Circular Riser Diameter (in) : 6.00 Common Length (ft) : 0.000 Riser Crest Elevation : 100.50 ft Hydraulic Structure Geometry Number of Devices: 0 **********************FLOOD FREQUENCY AND DURATION STATISTICS******************* ----------------------SCENARIO: PREDEVELOPED Number of Subbasins: 1 Number of Links: 0 ----------------------SCENARIO: POSTDEVELOPED Number of Subbasins: 1 Number of Links: 1 ***********Groundwater Recharge Summary ************* Recharge is computed as input to Perlnd Groundwater Plus Infiltration in Structures Total Predeveloped Recharge During Simulation Model Element Recharge Amount (ac-ft) ----------------------------------------------------------------------------------------------- Subbasin: Subbasin 1 40.176 _____________________________________ Total: 40.176 Total Post Developed Recharge During Simulation Model Element Recharge Amount (ac-ft) ----------------------------------------------------------------------------------------------- Subbasin: Basin 59 9.410 Link: Bioretention 82.057 _____________________________________ Total: 91.467 Total Predevelopment Recharge is Less than Post Developed Average Recharge Per Year, (Number of Years= 158) Predeveloped: 0.254 ac-ft/year, Post Developed: 0.579 ac-ft/year ***********Water Quality Facility Data ************* ----------------------SCENARIO: PREDEVELOPED Number of Links: 0 ----------------------SCENARIO: POSTDEVELOPED Number of Links: 1 ********** Link: Bioretention ********** Infiltration/Filtration Statistics-------------------- Inflow Volume (ac-ft): 85.43 Inflow Volume Including PPT-Evap (ac-ft): 88.31 Total Runoff Infiltrated (ac-ft): 82.06, 92.92% Total Runoff Filtered (ac-ft): 0.00, 0.00% Primary Outflow To Downstream System (ac-ft): 6.21 Secondary Outflow To Downstream System (ac-ft): 0.00 Percent Treated (Infiltrated+Filtered)/Total Volume: 92.92% ***********Compliance Point Results ************* Scenario Predeveloped Compliance Subbasin: Subbasin 1 Scenario Postdeveloped Compliance Link: Bioretention *** Point of Compliance Flow Frequency Data *** Recurrence Interval Computed Using Gringorten Plotting Position Predevelopment Runoff Postdevelopment Runoff Tr (Years) Discharge (cfs) Tr (Years) Discharge (cfs) ---------------------------------------------------------------------------------------------------------------------- 2-Year 4.965E-03 2-Year 4.132E-02 5-Year 8.092E-03 5-Year 6.717E-02 10-Year 1.090E-02 10-Year 7.812E-02 25-Year 1.382E-02 25-Year 9.598E-02 50-Year 1.764E-02 50-Year 0.114 100-Year 1.912E-02 100-Year 0.138 200-Year 2.976E-02 200-Year 0.148 ** Record too Short to Compute Peak Discharge for These Recurrence Intervals **** LID Duration Performance **** Excursion at Predeveloped 8%Q2 (Must be Less Than 0%): -95.1% PASS Maximum Excursion from 8%Q2 to 50%Q2 (Must be Less Than 0%): -58.1% PASS ------------------------------------------------------------------------------------------------- MEETS ALL LID DURATION DESIGN CRITERIA: PASS ------------------------------------------------------------------------------------------------- ————————————————————————————————— MGS FLOOD PROJECT REPORT Program Version: MGSFlood 4.43 Program License Number: 200410007 Project Simulation Performed on: 10/05/2018 4:06 PM Report Generation Date: 10/05/2018 4:07 PM ————————————————————————————————— Input File Name: Basin 60.fld Project Name: Solera Analysis Title: BMP Performance Standard Comments: ———————————————— PRECIPITATION INPUT ———————————————— Computational Time Step (Minutes): 15 Extended Precipitation Time Series Selected Climatic Region Number: 0 Full Period of Record Available used for Routing Precipitation Station : 96004005 Puget East 40 in_5min 10/01/1939-10/01/2097 Evaporation Station : 961040 Puget East 40 in MAP Evaporation Scale Factor : 0.750 HSPF Parameter Region Number: 1 HSPF Parameter Region Name : USGS Default ********** Default HSPF Parameters Used (Not Modified by User) *************** ********************** WATERSHED DEFINITION *********************** Predevelopment/Post Development Tributary Area Summary Predeveloped Post Developed Total Subbasin Area (acres) 0.139 0.139 Area of Links that Include Precip/Evap (acres) 0.000 0.004 Total (acres) 0.139 0.143 ----------------------SCENARIO: PREDEVELOPED Number of Subbasins: 1 ---------- Subbasin : Subbasin 1 ---------- -------Area (Acres) -------- Till Forest 0.139 ---------------------------------------------- Subbasin Total 0.139 ----------------------SCENARIO: POSTDEVELOPED Number of Subbasins: 1 ---------- Subbasin : Basin 60 ---------- -------Area (Acres) -------- Till Grass 0.059 Impervious 0.080 ---------------------------------------------- Subbasin Total 0.139 ************************* LINK DATA ******************************* ----------------------SCENARIO: PREDEVELOPED Number of Links: 0 ************************* LINK DATA ******************************* ----------------------SCENARIO: POSTDEVELOPED Number of Links: 1 ------------------------------------------ Link Name: Bioretention Link Type: Bioretention Facility Downstream Link: None Base Elevation (ft) : 100.00 Riser Crest Elevation (ft) : 100.50 Storage Depth (ft) : 0.50 Bottom Length (ft) : 17.0 Bottom Width (ft) : 10.0 Side Slopes (ft/ft) : L1= 0.00 L2= 0.00 W1= 0.00 W2= 0.00 Bottom Area (sq-ft) : 170. Area at Riser Crest El (sq-ft) : 170. (acres) : 0.004 Volume at Riser Crest (cu-ft) : 162. (ac-ft) : 0.004 Infiltration on Bottom only Selected Soil Properties Biosoil Thickness (ft) : 1.50 Biosoil Saturated Hydraulic Conductivity (in/hr) : 6.00 Biosoil Porosity (Percent) : 30.00 Maximum Elevation of Bioretention Soil : 101.00 Native Soil Hydraulic Conductivity (in/hr) : 0.70 Riser Geometry Riser Structure Type : Circular Riser Diameter (in) : 6.00 Common Length (ft) : 0.000 Riser Crest Elevation : 100.50 ft Hydraulic Structure Geometry Number of Devices: 0 **********************FLOOD FREQUENCY AND DURATION STATISTICS******************* ----------------------SCENARIO: PREDEVELOPED Number of Subbasins: 1 Number of Links: 0 ----------------------SCENARIO: POSTDEVELOPED Number of Subbasins: 1 Number of Links: 1 ***********Groundwater Recharge Summary ************* Recharge is computed as input to Perlnd Groundwater Plus Infiltration in Structures Total Predeveloped Recharge During Simulation Model Element Recharge Amount (ac-ft) ----------------------------------------------------------------------------------------------- Subbasin: Subbasin 1 23.968 _____________________________________ Total: 23.968 Total Post Developed Recharge During Simulation Model Element Recharge Amount (ac-ft) ----------------------------------------------------------------------------------------------- Subbasin: Basin 60 7.210 Link: Bioretention 46.015 _____________________________________ Total: 53.225 Total Predevelopment Recharge is Less than Post Developed Average Recharge Per Year, (Number of Years= 158) Predeveloped: 0.152 ac-ft/year, Post Developed: 0.337 ac-ft/year ***********Water Quality Facility Data ************* ----------------------SCENARIO: PREDEVELOPED Number of Links: 0 ----------------------SCENARIO: POSTDEVELOPED Number of Links: 1 ********** Link: Bioretention ********** Infiltration/Filtration Statistics-------------------- Inflow Volume (ac-ft): 47.73 Inflow Volume Including PPT-Evap (ac-ft): 49.30 Total Runoff Infiltrated (ac-ft): 46.01, 93.33% Total Runoff Filtered (ac-ft): 0.00, 0.00% Primary Outflow To Downstream System (ac-ft): 3.27 Secondary Outflow To Downstream System (ac-ft): 0.00 Percent Treated (Infiltrated+Filtered)/Total Volume: 93.33% ***********Compliance Point Results ************* Scenario Predeveloped Compliance Subbasin: Subbasin 1 Scenario Postdeveloped Compliance Link: Bioretention *** Point of Compliance Flow Frequency Data *** Recurrence Interval Computed Using Gringorten Plotting Position Predevelopment Runoff Postdevelopment Runoff Tr (Years) Discharge (cfs) Tr (Years) Discharge (cfs) ---------------------------------------------------------------------------------------------------------------------- 2-Year 2.962E-03 2-Year 2.198E-02 5-Year 4.828E-03 5-Year 3.665E-02 10-Year 6.505E-03 10-Year 4.363E-02 25-Year 8.247E-03 25-Year 5.553E-02 50-Year 1.052E-02 50-Year 6.687E-02 100-Year 1.141E-02 100-Year 7.922E-02 200-Year 1.775E-02 200-Year 8.166E-02 ** Record too Short to Compute Peak Discharge for These Recurrence Intervals **** LID Duration Performance **** Excursion at Predeveloped 8%Q2 (Must be Less Than 0%): -95.1% PASS Maximum Excursion from 8%Q2 to 50%Q2 (Must be Less Than 0%): -60.2% PASS ------------------------------------------------------------------------------------------------- MEETS ALL LID DURATION DESIGN CRITERIA: PASS ------------------------------------------------------------------------------------------------- ————————————————————————————————— MGS FLOOD PROJECT REPORT Program Version: MGSFlood 4.43 Program License Number: 200410007 Project Simulation Performed on: 10/05/2018 4:17 PM Report Generation Date: 10/05/2018 4:17 PM ————————————————————————————————— Input File Name: Basin 61.fld Project Name: Solera Analysis Title: BMP Performance Standard Comments: ———————————————— PRECIPITATION INPUT ———————————————— Computational Time Step (Minutes): 15 Extended Precipitation Time Series Selected Climatic Region Number: 0 Full Period of Record Available used for Routing Precipitation Station : 96004005 Puget East 40 in_5min 10/01/1939-10/01/2097 Evaporation Station : 961040 Puget East 40 in MAP Evaporation Scale Factor : 0.750 HSPF Parameter Region Number: 1 HSPF Parameter Region Name : USGS Default ********** Default HSPF Parameters Used (Not Modified by User) *************** ********************** WATERSHED DEFINITION *********************** Predevelopment/Post Development Tributary Area Summary Predeveloped Post Developed Total Subbasin Area (acres) 0.132 0.131 Area of Links that Include Precip/Evap (acres) 0.000 0.003 Total (acres) 0.132 0.134 ----------------------SCENARIO: PREDEVELOPED Number of Subbasins: 1 ---------- Subbasin : Subbasin 1 ---------- -------Area (Acres) -------- Till Forest 0.132 ---------------------------------------------- Subbasin Total 0.132 ----------------------SCENARIO: POSTDEVELOPED Number of Subbasins: 1 ---------- Subbasin : Basin 62 ---------- -------Area (Acres) -------- Till Grass 0.056 Impervious 0.075 ---------------------------------------------- Subbasin Total 0.131 ************************* LINK DATA ******************************* ----------------------SCENARIO: PREDEVELOPED Number of Links: 0 ************************* LINK DATA ******************************* ----------------------SCENARIO: POSTDEVELOPED Number of Links: 1 ------------------------------------------ Link Name: Bioretention Link Type: Bioretention Facility Downstream Link: None Base Elevation (ft) : 100.00 Riser Crest Elevation (ft) : 100.50 Storage Depth (ft) : 0.50 Bottom Length (ft) : 15.0 Bottom Width (ft) : 10.0 Side Slopes (ft/ft) : L1= 0.00 L2= 0.00 W1= 0.00 W2= 0.00 Bottom Area (sq-ft) : 150. Area at Riser Crest El (sq-ft) : 150. (acres) : 0.003 Volume at Riser Crest (cu-ft) : 143. (ac-ft) : 0.003 Infiltration on Bottom only Selected Soil Properties Biosoil Thickness (ft) : 1.50 Biosoil Saturated Hydraulic Conductivity (in/hr) : 6.00 Biosoil Porosity (Percent) : 30.00 Maximum Elevation of Bioretention Soil : 101.00 Native Soil Hydraulic Conductivity (in/hr) : 0.70 Riser Geometry Riser Structure Type : Circular Riser Diameter (in) : 6.00 Common Length (ft) : 0.000 Riser Crest Elevation : 100.50 ft Hydraulic Structure Geometry Number of Devices: 0 **********************FLOOD FREQUENCY AND DURATION STATISTICS******************* ----------------------SCENARIO: PREDEVELOPED Number of Subbasins: 1 Number of Links: 0 ----------------------SCENARIO: POSTDEVELOPED Number of Subbasins: 1 Number of Links: 1 ***********Groundwater Recharge Summary ************* Recharge is computed as input to Perlnd Groundwater Plus Infiltration in Structures Total Predeveloped Recharge During Simulation Model Element Recharge Amount (ac-ft) ----------------------------------------------------------------------------------------------- Subbasin: Subbasin 1 22.761 _____________________________________ Total: 22.761 Total Post Developed Recharge During Simulation Model Element Recharge Amount (ac-ft) ----------------------------------------------------------------------------------------------- Subbasin: Basin 62 6.844 Link: Bioretention 42.665 _____________________________________ Total: 49.508 Total Predevelopment Recharge is Less than Post Developed Average Recharge Per Year, (Number of Years= 158) Predeveloped: 0.144 ac-ft/year, Post Developed: 0.313 ac-ft/year ***********Water Quality Facility Data ************* ----------------------SCENARIO: PREDEVELOPED Number of Links: 0 ----------------------SCENARIO: POSTDEVELOPED Number of Links: 1 ********** Link: Bioretention ********** Infiltration/Filtration Statistics-------------------- Inflow Volume (ac-ft): 44.89 Inflow Volume Including PPT-Evap (ac-ft): 46.27 Total Runoff Infiltrated (ac-ft): 42.66, 92.21% Total Runoff Filtered (ac-ft): 0.00, 0.00% Primary Outflow To Downstream System (ac-ft): 3.57 Secondary Outflow To Downstream System (ac-ft): 0.00 Percent Treated (Infiltrated+Filtered)/Total Volume: 92.21% ***********Compliance Point Results ************* Scenario Predeveloped Compliance Subbasin: Subbasin 1 Scenario Postdeveloped Compliance Link: Bioretention *** Point of Compliance Flow Frequency Data *** Recurrence Interval Computed Using Gringorten Plotting Position Predevelopment Runoff Postdevelopment Runoff Tr (Years) Discharge (cfs) Tr (Years) Discharge (cfs) ---------------------------------------------------------------------------------------------------------------------- 2-Year 2.813E-03 2-Year 2.179E-02 5-Year 4.584E-03 5-Year 3.517E-02 10-Year 6.177E-03 10-Year 4.154E-02 25-Year 7.832E-03 25-Year 5.246E-02 50-Year 9.995E-03 50-Year 6.636E-02 100-Year 1.083E-02 100-Year 7.844E-02 200-Year 1.686E-02 200-Year 7.856E-02 ** Record too Short to Compute Peak Discharge for These Recurrence Intervals **** LID Duration Performance **** Excursion at Predeveloped 8%Q2 (Must be Less Than 0%): -94.1% PASS Maximum Excursion from 8%Q2 to 50%Q2 (Must be Less Than 0%): -52.9% PASS ------------------------------------------------------------------------------------------------- MEETS ALL LID DURATION DESIGN CRITERIA: PASS ------------------------------------------------------------------------------------------------- ————————————————————————————————— MGS FLOOD PROJECT REPORT Program Version: MGSFlood 4.43 Program License Number: 200410007 Project Simulation Performed on: 10/05/2018 4:19 PM Report Generation Date: 10/05/2018 4:20 PM ————————————————————————————————— Input File Name: Basin 62.fld Project Name: Solera Analysis Title: BMP Performance Standard Comments: ———————————————— PRECIPITATION INPUT ———————————————— Computational Time Step (Minutes): 15 Extended Precipitation Time Series Selected Climatic Region Number: 0 Full Period of Record Available used for Routing Precipitation Station : 96004005 Puget East 40 in_5min 10/01/1939-10/01/2097 Evaporation Station : 961040 Puget East 40 in MAP Evaporation Scale Factor : 0.750 HSPF Parameter Region Number: 1 HSPF Parameter Region Name : USGS Default ********** Default HSPF Parameters Used (Not Modified by User) *************** ********************** WATERSHED DEFINITION *********************** Predevelopment/Post Development Tributary Area Summary Predeveloped Post Developed Total Subbasin Area (acres) 0.064 0.065 Area of Links that Include Precip/Evap (acres) 0.000 0.001 Total (acres) 0.064 0.066 ----------------------SCENARIO: PREDEVELOPED Number of Subbasins: 1 ---------- Subbasin : Subbasin 1 ---------- -------Area (Acres) -------- Till Forest 0.064 ---------------------------------------------- Subbasin Total 0.064 ----------------------SCENARIO: POSTDEVELOPED Number of Subbasins: 1 ---------- Subbasin : Basin 62 ---------- -------Area (Acres) -------- Till Grass 0.042 Impervious 0.023 ---------------------------------------------- Subbasin Total 0.065 ************************* LINK DATA ******************************* ----------------------SCENARIO: PREDEVELOPED Number of Links: 0 ************************* LINK DATA ******************************* ----------------------SCENARIO: POSTDEVELOPED Number of Links: 1 ------------------------------------------ Link Name: Bioretention Link Type: Bioretention Facility Downstream Link: None Base Elevation (ft) : 100.00 Riser Crest Elevation (ft) : 100.50 Storage Depth (ft) : 0.50 Bottom Length (ft) : 10.0 Bottom Width (ft) : 6.0 Side Slopes (ft/ft) : L1= 0.00 L2= 0.00 W1= 0.00 W2= 0.00 Bottom Area (sq-ft) : 60. Area at Riser Crest El (sq-ft) : 60. (acres) : 0.001 Volume at Riser Crest (cu-ft) : 57. (ac-ft) : 0.001 Infiltration on Bottom only Selected Soil Properties Biosoil Thickness (ft) : 1.50 Biosoil Saturated Hydraulic Conductivity (in/hr) : 6.00 Biosoil Porosity (Percent) : 30.00 Maximum Elevation of Bioretention Soil : 101.00 Native Soil Hydraulic Conductivity (in/hr) : 0.70 Riser Geometry Riser Structure Type : Circular Riser Diameter (in) : 6.00 Common Length (ft) : 0.000 Riser Crest Elevation : 100.50 ft Hydraulic Structure Geometry Number of Devices: 0 **********************FLOOD FREQUENCY AND DURATION STATISTICS******************* ----------------------SCENARIO: PREDEVELOPED Number of Subbasins: 1 Number of Links: 0 ----------------------SCENARIO: POSTDEVELOPED Number of Subbasins: 1 Number of Links: 1 ***********Groundwater Recharge Summary ************* Recharge is computed as input to Perlnd Groundwater Plus Infiltration in Structures Total Predeveloped Recharge During Simulation Model Element Recharge Amount (ac-ft) ----------------------------------------------------------------------------------------------- Subbasin: Subbasin 1 11.035 _____________________________________ Total: 11.035 Total Post Developed Recharge During Simulation Model Element Recharge Amount (ac-ft) ----------------------------------------------------------------------------------------------- Subbasin: Basin 62 5.133 Link: Bioretention 17.938 _____________________________________ Total: 23.071 Total Predevelopment Recharge is Less than Post Developed Average Recharge Per Year, (Number of Years= 158) Predeveloped: 0.070 ac-ft/year, Post Developed: 0.146 ac-ft/year ***********Water Quality Facility Data ************* ----------------------SCENARIO: PREDEVELOPED Number of Links: 0 ----------------------SCENARIO: POSTDEVELOPED Number of Links: 1 ********** Link: Bioretention ********** Infiltration/Filtration Statistics-------------------- Inflow Volume (ac-ft): 18.76 Inflow Volume Including PPT-Evap (ac-ft): 19.30 Total Runoff Infiltrated (ac-ft): 17.94, 92.94% Total Runoff Filtered (ac-ft): 0.00, 0.00% Primary Outflow To Downstream System (ac-ft): 1.36 Secondary Outflow To Downstream System (ac-ft): 0.00 Percent Treated (Infiltrated+Filtered)/Total Volume: 92.94% ***********Compliance Point Results ************* Scenario Predeveloped Compliance Subbasin: Subbasin 1 Scenario Postdeveloped Compliance Link: Bioretention *** Point of Compliance Flow Frequency Data *** Recurrence Interval Computed Using Gringorten Plotting Position Predevelopment Runoff Postdevelopment Runoff Tr (Years) Discharge (cfs) Tr (Years) Discharge (cfs) ---------------------------------------------------------------------------------------------------------------------- 2-Year 1.364E-03 2-Year 7.125E-03 5-Year 2.223E-03 5-Year 1.382E-02 10-Year 2.995E-03 10-Year 1.779E-02 25-Year 3.797E-03 25-Year 2.322E-02 50-Year 4.846E-03 50-Year 2.947E-02 100-Year 5.251E-03 100-Year 3.360E-02 200-Year 8.174E-03 200-Year 3.984E-02 ** Record too Short to Compute Peak Discharge for These Recurrence Intervals **** LID Duration Performance **** Excursion at Predeveloped 8%Q2 (Must be Less Than 0%): -93.0% PASS Maximum Excursion from 8%Q2 to 50%Q2 (Must be Less Than 0%): -55.6% PASS ------------------------------------------------------------------------------------------------- MEETS ALL LID DURATION DESIGN CRITERIA: PASS ------------------------------------------------------------------------------------------------- ————————————————————————————————— MGS FLOOD PROJECT REPORT Program Version: MGSFlood 4.43 Program License Number: 200410007 Project Simulation Performed on: 10/05/2018 4:21 PM Report Generation Date: 10/05/2018 4:21 PM ————————————————————————————————— Input File Name: Basin 63.fld Project Name: Solera Analysis Title: BMP Performance Standard Comments: ———————————————— PRECIPITATION INPUT ———————————————— Computational Time Step (Minutes): 15 Extended Precipitation Time Series Selected Climatic Region Number: 0 Full Period of Record Available used for Routing Precipitation Station : 96004005 Puget East 40 in_5min 10/01/1939-10/01/2097 Evaporation Station : 961040 Puget East 40 in MAP Evaporation Scale Factor : 0.750 HSPF Parameter Region Number: 1 HSPF Parameter Region Name : USGS Default ********** Default HSPF Parameters Used (Not Modified by User) *************** ********************** WATERSHED DEFINITION *********************** Predevelopment/Post Development Tributary Area Summary Predeveloped Post Developed Total Subbasin Area (acres) 0.064 0.064 Area of Links that Include Precip/Evap (acres) 0.000 0.002 Total (acres) 0.064 0.066 ----------------------SCENARIO: PREDEVELOPED Number of Subbasins: 1 ---------- Subbasin : Subbasin 1 ---------- -------Area (Acres) -------- Till Forest 0.064 ---------------------------------------------- Subbasin Total 0.064 ----------------------SCENARIO: POSTDEVELOPED Number of Subbasins: 1 ---------- Subbasin : Basin 63 ---------- -------Area (Acres) -------- Till Grass 0.030 Impervious 0.034 ---------------------------------------------- Subbasin Total 0.064 ************************* LINK DATA ******************************* ----------------------SCENARIO: PREDEVELOPED Number of Links: 0 ************************* LINK DATA ******************************* ----------------------SCENARIO: POSTDEVELOPED Number of Links: 1 ------------------------------------------ Link Name: Bioretention Link Type: Bioretention Facility Downstream Link: None Base Elevation (ft) : 100.00 Riser Crest Elevation (ft) : 100.50 Storage Depth (ft) : 0.50 Bottom Length (ft) : 10.0 Bottom Width (ft) : 7.0 Side Slopes (ft/ft) : L1= 0.00 L2= 0.00 W1= 0.00 W2= 0.00 Bottom Area (sq-ft) : 70. Area at Riser Crest El (sq-ft) : 70. (acres) : 0.002 Volume at Riser Crest (cu-ft) : 67. (ac-ft) : 0.002 Infiltration on Bottom only Selected Soil Properties Biosoil Thickness (ft) : 1.50 Biosoil Saturated Hydraulic Conductivity (in/hr) : 6.00 Biosoil Porosity (Percent) : 30.00 Maximum Elevation of Bioretention Soil : 101.00 Native Soil Hydraulic Conductivity (in/hr) : 0.70 Riser Geometry Riser Structure Type : Circular Riser Diameter (in) : 6.00 Common Length (ft) : 0.000 Riser Crest Elevation : 100.50 ft Hydraulic Structure Geometry Number of Devices: 0 **********************FLOOD FREQUENCY AND DURATION STATISTICS******************* ----------------------SCENARIO: PREDEVELOPED Number of Subbasins: 1 Number of Links: 0 ----------------------SCENARIO: POSTDEVELOPED Number of Subbasins: 1 Number of Links: 1 ***********Groundwater Recharge Summary ************* Recharge is computed as input to Perlnd Groundwater Plus Infiltration in Structures Total Predeveloped Recharge During Simulation Model Element Recharge Amount (ac-ft) ----------------------------------------------------------------------------------------------- Subbasin: Subbasin 1 11.035 _____________________________________ Total: 11.035 Total Post Developed Recharge During Simulation Model Element Recharge Amount (ac-ft) ----------------------------------------------------------------------------------------------- Subbasin: Basin 63 3.666 Link: Bioretention 20.223 _____________________________________ Total: 23.889 Total Predevelopment Recharge is Less than Post Developed Average Recharge Per Year, (Number of Years= 158) Predeveloped: 0.070 ac-ft/year, Post Developed: 0.151 ac-ft/year ***********Water Quality Facility Data ************* ----------------------SCENARIO: PREDEVELOPED Number of Links: 0 ----------------------SCENARIO: POSTDEVELOPED Number of Links: 1 ********** Link: Bioretention ********** Infiltration/Filtration Statistics-------------------- Inflow Volume (ac-ft): 21.28 Inflow Volume Including PPT-Evap (ac-ft): 21.92 Total Runoff Infiltrated (ac-ft): 20.22, 92.27% Total Runoff Filtered (ac-ft): 0.00, 0.00% Primary Outflow To Downstream System (ac-ft): 1.68 Secondary Outflow To Downstream System (ac-ft): 0.00 Percent Treated (Infiltrated+Filtered)/Total Volume: 92.27% ***********Compliance Point Results ************* Scenario Predeveloped Compliance Subbasin: Subbasin 1 Scenario Postdeveloped Compliance Link: Bioretention *** Point of Compliance Flow Frequency Data *** Recurrence Interval Computed Using Gringorten Plotting Position Predevelopment Runoff Postdevelopment Runoff Tr (Years) Discharge (cfs) Tr (Years) Discharge (cfs) ---------------------------------------------------------------------------------------------------------------------- 2-Year 1.364E-03 2-Year 1.015E-02 5-Year 2.223E-03 5-Year 1.673E-02 10-Year 2.995E-03 10-Year 2.091E-02 25-Year 3.797E-03 25-Year 2.567E-02 50-Year 4.846E-03 50-Year 3.188E-02 100-Year 5.251E-03 100-Year 3.798E-02 200-Year 8.174E-03 200-Year 4.462E-02 ** Record too Short to Compute Peak Discharge for These Recurrence Intervals **** LID Duration Performance **** Excursion at Predeveloped 8%Q2 (Must be Less Than 0%): -94.0% PASS Maximum Excursion from 8%Q2 to 50%Q2 (Must be Less Than 0%): -53.0% PASS ------------------------------------------------------------------------------------------------- MEETS ALL LID DURATION DESIGN CRITERIA: PASS ------------------------------------------------------------------------------------------------- ————————————————————————————————— MGS FLOOD PROJECT REPORT Program Version: MGSFlood 4.43 Program License Number: 200410007 Project Simulation Performed on: 10/05/2018 4:28 PM Report Generation Date: 10/05/2018 4:28 PM ————————————————————————————————— Input File Name: Basin 64.fld Project Name: Solera Analysis Title: BMP Performance Standard Comments: ———————————————— PRECIPITATION INPUT ———————————————— Computational Time Step (Minutes): 15 Extended Precipitation Time Series Selected Climatic Region Number: 0 Full Period of Record Available used for Routing Precipitation Station : 96004005 Puget East 40 in_5min 10/01/1939-10/01/2097 Evaporation Station : 961040 Puget East 40 in MAP Evaporation Scale Factor : 0.750 HSPF Parameter Region Number: 1 HSPF Parameter Region Name : USGS Default ********** Default HSPF Parameters Used (Not Modified by User) *************** ********************** WATERSHED DEFINITION *********************** Predevelopment/Post Development Tributary Area Summary Predeveloped Post Developed Total Subbasin Area (acres) 0.046 0.045 Area of Links that Include Precip/Evap (acres) 0.000 0.001 Total (acres) 0.046 0.046 ----------------------SCENARIO: PREDEVELOPED Number of Subbasins: 1 ---------- Subbasin : Subbasin 1 ---------- -------Area (Acres) -------- Till Forest 0.046 ---------------------------------------------- Subbasin Total 0.046 ----------------------SCENARIO: POSTDEVELOPED Number of Subbasins: 1 ---------- Subbasin : Basin 64 ---------- -------Area (Acres) -------- Till Grass 0.025 Impervious 0.020 ---------------------------------------------- Subbasin Total 0.045 ************************* LINK DATA ******************************* ----------------------SCENARIO: PREDEVELOPED Number of Links: 0 ************************* LINK DATA ******************************* ----------------------SCENARIO: POSTDEVELOPED Number of Links: 1 ------------------------------------------ Link Name: Bioretention Link Type: Bioretention Facility Downstream Link: None Base Elevation (ft) : 100.00 Riser Crest Elevation (ft) : 100.50 Storage Depth (ft) : 0.50 Bottom Length (ft) : 9.0 Bottom Width (ft) : 5.0 Side Slopes (ft/ft) : L1= 0.00 L2= 0.00 W1= 0.00 W2= 0.00 Bottom Area (sq-ft) : 45. Area at Riser Crest El (sq-ft) : 45. (acres) : 0.001 Volume at Riser Crest (cu-ft) : 43. (ac-ft) : 0.001 Infiltration on Bottom only Selected Soil Properties Biosoil Thickness (ft) : 1.50 Biosoil Saturated Hydraulic Conductivity (in/hr) : 6.00 Biosoil Porosity (Percent) : 30.00 Maximum Elevation of Bioretention Soil : 101.00 Native Soil Hydraulic Conductivity (in/hr) : 0.70 Riser Geometry Riser Structure Type : Circular Riser Diameter (in) : 6.00 Common Length (ft) : 0.000 Riser Crest Elevation : 100.50 ft Hydraulic Structure Geometry Number of Devices: 0 **********************FLOOD FREQUENCY AND DURATION STATISTICS******************* ----------------------SCENARIO: PREDEVELOPED Number of Subbasins: 1 Number of Links: 0 ----------------------SCENARIO: POSTDEVELOPED Number of Subbasins: 1 Number of Links: 1 ***********Groundwater Recharge Summary ************* Recharge is computed as input to Perlnd Groundwater Plus Infiltration in Structures Total Predeveloped Recharge During Simulation Model Element Recharge Amount (ac-ft) ----------------------------------------------------------------------------------------------- Subbasin: Subbasin 1 7.932 _____________________________________ Total: 7.932 Total Post Developed Recharge During Simulation Model Element Recharge Amount (ac-ft) ----------------------------------------------------------------------------------------------- Subbasin: Basin 64 3.055 Link: Bioretention 13.324 _____________________________________ Total: 16.379 Total Predevelopment Recharge is Less than Post Developed Average Recharge Per Year, (Number of Years= 158) Predeveloped: 0.050 ac-ft/year, Post Developed: 0.104 ac-ft/year ***********Water Quality Facility Data ************* ----------------------SCENARIO: PREDEVELOPED Number of Links: 0 ----------------------SCENARIO: POSTDEVELOPED Number of Links: 1 ********** Link: Bioretention ********** Infiltration/Filtration Statistics-------------------- Inflow Volume (ac-ft): 13.99 Inflow Volume Including PPT-Evap (ac-ft): 14.40 Total Runoff Infiltrated (ac-ft): 13.32, 92.50% Total Runoff Filtered (ac-ft): 0.00, 0.00% Primary Outflow To Downstream System (ac-ft): 1.07 Secondary Outflow To Downstream System (ac-ft): 0.00 Percent Treated (Infiltrated+Filtered)/Total Volume: 92.50% ***********Compliance Point Results ************* Scenario Predeveloped Compliance Subbasin: Subbasin 1 Scenario Postdeveloped Compliance Link: Bioretention *** Point of Compliance Flow Frequency Data *** Recurrence Interval Computed Using Gringorten Plotting Position Predevelopment Runoff Postdevelopment Runoff Tr (Years) Discharge (cfs) Tr (Years) Discharge (cfs) ---------------------------------------------------------------------------------------------------------------------- 2-Year 9.802E-04 2-Year 6.054E-03 5-Year 1.598E-03 5-Year 1.062E-02 10-Year 2.153E-03 10-Year 1.434E-02 25-Year 2.729E-03 25-Year 1.707E-02 50-Year 3.483E-03 50-Year 2.151E-02 100-Year 3.774E-03 100-Year 2.474E-02 200-Year 5.875E-03 200-Year 2.977E-02 ** Record too Short to Compute Peak Discharge for These Recurrence Intervals **** LID Duration Performance **** Excursion at Predeveloped 8%Q2 (Must be Less Than 0%): -93.5% PASS Maximum Excursion from 8%Q2 to 50%Q2 (Must be Less Than 0%): -54.3% PASS ------------------------------------------------------------------------------------------------- MEETS ALL LID DURATION DESIGN CRITERIA: PASS ------------------------------------------------------------------------------------------------- ————————————————————————————————— MGS FLOOD PROJECT REPORT Program Version: MGSFlood 4.43 Program License Number: 200410007 Project Simulation Performed on: 10/05/2018 4:29 PM Report Generation Date: 10/05/2018 4:30 PM ————————————————————————————————— Input File Name: Basin 65.fld Project Name: Solera Analysis Title: BMP Performance Standard Comments: ———————————————— PRECIPITATION INPUT ———————————————— Computational Time Step (Minutes): 15 Extended Precipitation Time Series Selected Climatic Region Number: 0 Full Period of Record Available used for Routing Precipitation Station : 96004005 Puget East 40 in_5min 10/01/1939-10/01/2097 Evaporation Station : 961040 Puget East 40 in MAP Evaporation Scale Factor : 0.750 HSPF Parameter Region Number: 1 HSPF Parameter Region Name : USGS Default ********** Default HSPF Parameters Used (Not Modified by User) *************** ********************** WATERSHED DEFINITION *********************** Predevelopment/Post Development Tributary Area Summary Predeveloped Post Developed Total Subbasin Area (acres) 0.039 0.039 Area of Links that Include Precip/Evap (acres) 0.000 0.001 Total (acres) 0.039 0.040 ----------------------SCENARIO: PREDEVELOPED Number of Subbasins: 1 ---------- Subbasin : Subbasin 1 ---------- -------Area (Acres) -------- Till Forest 0.039 ---------------------------------------------- Subbasin Total 0.039 ----------------------SCENARIO: POSTDEVELOPED Number of Subbasins: 1 ---------- Subbasin : Basin 65 ---------- -------Area (Acres) -------- Till Grass 0.017 Impervious 0.022 ---------------------------------------------- Subbasin Total 0.039 ************************* LINK DATA ******************************* ----------------------SCENARIO: PREDEVELOPED Number of Links: 0 ************************* LINK DATA ******************************* ----------------------SCENARIO: POSTDEVELOPED Number of Links: 1 ------------------------------------------ Link Name: Bioretention Link Type: Bioretention Facility Downstream Link: None Base Elevation (ft) : 100.00 Riser Crest Elevation (ft) : 100.50 Storage Depth (ft) : 0.50 Bottom Length (ft) : 9.0 Bottom Width (ft) : 5.0 Side Slopes (ft/ft) : L1= 0.00 L2= 0.00 W1= 0.00 W2= 0.00 Bottom Area (sq-ft) : 45. Area at Riser Crest El (sq-ft) : 45. (acres) : 0.001 Volume at Riser Crest (cu-ft) : 43. (ac-ft) : 0.001 Infiltration on Bottom only Selected Soil Properties Biosoil Thickness (ft) : 1.50 Biosoil Saturated Hydraulic Conductivity (in/hr) : 6.00 Biosoil Porosity (Percent) : 30.00 Maximum Elevation of Bioretention Soil : 101.00 Native Soil Hydraulic Conductivity (in/hr) : 0.70 Riser Geometry Riser Structure Type : Circular Riser Diameter (in) : 6.00 Common Length (ft) : 0.000 Riser Crest Elevation : 100.50 ft Hydraulic Structure Geometry Number of Devices: 0 **********************FLOOD FREQUENCY AND DURATION STATISTICS******************* ----------------------SCENARIO: PREDEVELOPED Number of Subbasins: 1 Number of Links: 0 ----------------------SCENARIO: POSTDEVELOPED Number of Subbasins: 1 Number of Links: 1 ***********Groundwater Recharge Summary ************* Recharge is computed as input to Perlnd Groundwater Plus Infiltration in Structures Total Predeveloped Recharge During Simulation Model Element Recharge Amount (ac-ft) ----------------------------------------------------------------------------------------------- Subbasin: Subbasin 1 6.725 _____________________________________ Total: 6.725 Total Post Developed Recharge During Simulation Model Element Recharge Amount (ac-ft) ----------------------------------------------------------------------------------------------- Subbasin: Basin 65 2.078 Link: Bioretention 12.670 _____________________________________ Total: 14.747 Total Predevelopment Recharge is Less than Post Developed Average Recharge Per Year, (Number of Years= 158) Predeveloped: 0.043 ac-ft/year, Post Developed: 0.093 ac-ft/year ***********Water Quality Facility Data ************* ----------------------SCENARIO: PREDEVELOPED Number of Links: 0 ----------------------SCENARIO: POSTDEVELOPED Number of Links: 1 ********** Link: Bioretention ********** Infiltration/Filtration Statistics-------------------- Inflow Volume (ac-ft): 13.28 Inflow Volume Including PPT-Evap (ac-ft): 13.70 Total Runoff Infiltrated (ac-ft): 12.67, 92.51% Total Runoff Filtered (ac-ft): 0.00, 0.00% Primary Outflow To Downstream System (ac-ft): 1.02 Secondary Outflow To Downstream System (ac-ft): 0.00 Percent Treated (Infiltrated+Filtered)/Total Volume: 92.51% ***********Compliance Point Results ************* Scenario Predeveloped Compliance Subbasin: Subbasin 1 Scenario Postdeveloped Compliance Link: Bioretention *** Point of Compliance Flow Frequency Data *** Recurrence Interval Computed Using Gringorten Plotting Position Predevelopment Runoff Postdevelopment Runoff Tr (Years) Discharge (cfs) Tr (Years) Discharge (cfs) ---------------------------------------------------------------------------------------------------------------------- 2-Year 8.311E-04 2-Year 6.480E-03 5-Year 1.354E-03 5-Year 1.044E-02 10-Year 1.825E-03 10-Year 1.303E-02 25-Year 2.314E-03 25-Year 1.569E-02 50-Year 2.953E-03 50-Year 1.973E-02 100-Year 3.200E-03 100-Year 2.368E-02 200-Year 4.981E-03 200-Year 2.809E-02 ** Record too Short to Compute Peak Discharge for These Recurrence Intervals **** LID Duration Performance **** Excursion at Predeveloped 8%Q2 (Must be Less Than 0%): -94.4% PASS Maximum Excursion from 8%Q2 to 50%Q2 (Must be Less Than 0%): -55.3% PASS ------------------------------------------------------------------------------------------------- MEETS ALL LID DURATION DESIGN CRITERIA: PASS ------------------------------------------------------------------------------------------------- ————————————————————————————————— MGS FLOOD PROJECT REPORT Program Version: MGSFlood 4.43 Program License Number: 200410007 Project Simulation Performed on: 10/10/2018 2:52 PM Report Generation Date: 10/10/2018 2:52 PM ————————————————————————————————— Input File Name: Basin 66.fld Project Name: Solera Analysis Title: BMP Performance Standard Comments: ———————————————— PRECIPITATION INPUT ———————————————— Computational Time Step (Minutes): 15 Extended Precipitation Time Series Selected Climatic Region Number: 0 Full Period of Record Available used for Routing Precipitation Station : 96004005 Puget East 40 in_5min 10/01/1939-10/01/2097 Evaporation Station : 961040 Puget East 40 in MAP Evaporation Scale Factor : 0.750 HSPF Parameter Region Number: 1 HSPF Parameter Region Name : USGS Default ********** Default HSPF Parameters Used (Not Modified by User) *************** ********************** WATERSHED DEFINITION *********************** Predevelopment/Post Development Tributary Area Summary Predeveloped Post Developed Total Subbasin Area (acres) 0.048 0.048 Area of Links that Include Precip/Evap (acres) 0.000 0.001 Total (acres) 0.048 0.049 ----------------------SCENARIO: PREDEVELOPED Number of Subbasins: 1 ---------- Subbasin : Subbasin 1 ---------- -------Area (Acres) -------- Till Forest 0.048 ---------------------------------------------- Subbasin Total 0.048 ----------------------SCENARIO: POSTDEVELOPED Number of Subbasins: 1 ---------- Subbasin : Basin 66 ---------- -------Area (Acres) -------- Till Grass 0.022 Impervious 0.026 ---------------------------------------------- Subbasin Total 0.048 ************************* LINK DATA ******************************* ----------------------SCENARIO: PREDEVELOPED Number of Links: 0 ************************* LINK DATA ******************************* ----------------------SCENARIO: POSTDEVELOPED Number of Links: 1 ------------------------------------------ Link Name: Bioretention Link Type: Bioretention Facility Downstream Link: None Base Elevation (ft) : 100.00 Riser Crest Elevation (ft) : 100.50 Storage Depth (ft) : 0.50 Bottom Length (ft) : 9.0 Bottom Width (ft) : 6.0 Side Slopes (ft/ft) : L1= 0.00 L2= 0.00 W1= 0.00 W2= 0.00 Bottom Area (sq-ft) : 54. Area at Riser Crest El (sq-ft) : 54. (acres) : 0.001 Volume at Riser Crest (cu-ft) : 51. (ac-ft) : 0.001 Infiltration on Bottom only Selected Soil Properties Biosoil Thickness (ft) : 1.50 Biosoil Saturated Hydraulic Conductivity (in/hr) : 6.00 Biosoil Porosity (Percent) : 30.00 Maximum Elevation of Bioretention Soil : 101.00 Native Soil Hydraulic Conductivity (in/hr) : 0.70 Riser Geometry Riser Structure Type : Circular Riser Diameter (in) : 6.00 Common Length (ft) : 0.000 Riser Crest Elevation : 100.50 ft Hydraulic Structure Geometry Number of Devices: 0 **********************FLOOD FREQUENCY AND DURATION STATISTICS******************* ----------------------SCENARIO: PREDEVELOPED Number of Subbasins: 1 Number of Links: 0 ----------------------SCENARIO: POSTDEVELOPED Number of Subbasins: 1 Number of Links: 1 ***********Groundwater Recharge Summary ************* Recharge is computed as input to Perlnd Groundwater Plus Infiltration in Structures Total Predeveloped Recharge During Simulation Model Element Recharge Amount (ac-ft) ----------------------------------------------------------------------------------------------- Subbasin: Subbasin 1 8.277 _____________________________________ Total: 8.277 Total Post Developed Recharge During Simulation Model Element Recharge Amount (ac-ft) ----------------------------------------------------------------------------------------------- Subbasin: Basin 66 2.689 Link: Bioretention 15.340 _____________________________________ Total: 18.029 Total Predevelopment Recharge is Less than Post Developed Average Recharge Per Year, (Number of Years= 158) Predeveloped: 0.052 ac-ft/year, Post Developed: 0.114 ac-ft/year ***********Water Quality Facility Data ************* ----------------------SCENARIO: PREDEVELOPED Number of Links: 0 ----------------------SCENARIO: POSTDEVELOPED Number of Links: 1 ********** Link: Bioretention ********** Infiltration/Filtration Statistics-------------------- Inflow Volume (ac-ft): 16.08 Inflow Volume Including PPT-Evap (ac-ft): 16.58 Total Runoff Infiltrated (ac-ft): 15.34, 92.54% Total Runoff Filtered (ac-ft): 0.00, 0.00% Primary Outflow To Downstream System (ac-ft): 1.23 Secondary Outflow To Downstream System (ac-ft): 0.00 Percent Treated (Infiltrated+Filtered)/Total Volume: 92.54% ***********Compliance Point Results ************* Scenario Predeveloped Compliance Subbasin: Subbasin 1 Scenario Postdeveloped Compliance Link: Bioretention *** Point of Compliance Flow Frequency Data *** Recurrence Interval Computed Using Gringorten Plotting Position Predevelopment Runoff Postdevelopment Runoff Tr (Years) Discharge (cfs) Tr (Years) Discharge (cfs) ---------------------------------------------------------------------------------------------------------------------- 2-Year 1.023E-03 2-Year 7.696E-03 5-Year 1.667E-03 5-Year 1.260E-02 10-Year 2.246E-03 10-Year 1.525E-02 25-Year 2.848E-03 25-Year 1.936E-02 50-Year 3.634E-03 50-Year 2.403E-02 100-Year 3.939E-03 100-Year 2.871E-02 200-Year 6.130E-03 200-Year 3.362E-02 ** Record too Short to Compute Peak Discharge for These Recurrence Intervals **** LID Duration Performance **** Excursion at Predeveloped 8%Q2 (Must be Less Than 0%): -94.3% PASS Maximum Excursion from 8%Q2 to 50%Q2 (Must be Less Than 0%): -55.1% PASS ------------------------------------------------------------------------------------------------- MEETS ALL LID DURATION DESIGN CRITERIA: PASS ------------------------------------------------------------------------------------------------- ————————————————————————————————— MGS FLOOD PROJECT REPORT Program Version: MGSFlood 4.43 Program License Number: 200410007 Project Simulation Performed on: 10/10/2018 2:36 PM Report Generation Date: 10/10/2018 2:40 PM ————————————————————————————————— Input File Name: Basin 67.fld Project Name: Solera Analysis Title: BMP Performance Standard Comments: ———————————————— PRECIPITATION INPUT ———————————————— Computational Time Step (Minutes): 15 Extended Precipitation Time Series Selected Climatic Region Number: 0 Full Period of Record Available used for Routing Precipitation Station : 96004005 Puget East 40 in_5min 10/01/1939-10/01/2097 Evaporation Station : 961040 Puget East 40 in MAP Evaporation Scale Factor : 0.750 HSPF Parameter Region Number: 1 HSPF Parameter Region Name : USGS Default ********** Default HSPF Parameters Used (Not Modified by User) *************** ********************** WATERSHED DEFINITION *********************** Predevelopment/Post Development Tributary Area Summary Predeveloped Post Developed Total Subbasin Area (acres) 0.051 0.051 Area of Links that Include Precip/Evap (acres) 0.000 0.001 Total (acres) 0.051 0.052 ----------------------SCENARIO: PREDEVELOPED Number of Subbasins: 1 ---------- Subbasin : Subbasin 1 ---------- -------Area (Acres) -------- Till Forest 0.051 ---------------------------------------------- Subbasin Total 0.051 ----------------------SCENARIO: POSTDEVELOPED Number of Subbasins: 1 ---------- Subbasin : Basin 67 ---------- -------Area (Acres) -------- Till Grass 0.021 Impervious 0.030 ---------------------------------------------- Subbasin Total 0.051 ************************* LINK DATA ******************************* ----------------------SCENARIO: PREDEVELOPED Number of Links: 0 ************************* LINK DATA ******************************* ----------------------SCENARIO: POSTDEVELOPED Number of Links: 1 ------------------------------------------ Link Name: Bioretention Link Type: Bioretention Facility Downstream Link: None Base Elevation (ft) : 100.00 Riser Crest Elevation (ft) : 100.50 Storage Depth (ft) : 0.50 Bottom Length (ft) : 10.0 Bottom Width (ft) : 6.0 Side Slopes (ft/ft) : L1= 0.00 L2= 0.00 W1= 0.00 W2= 0.00 Bottom Area (sq-ft) : 60. Area at Riser Crest El (sq-ft) : 60. (acres) : 0.001 Volume at Riser Crest (cu-ft) : 57. (ac-ft) : 0.001 Infiltration on Bottom only Selected Soil Properties Biosoil Thickness (ft) : 1.50 Biosoil Saturated Hydraulic Conductivity (in/hr) : 6.00 Biosoil Porosity (Percent) : 30.00 Maximum Elevation of Bioretention Soil : 101.00 Native Soil Hydraulic Conductivity (in/hr) : 0.70 Riser Geometry Riser Structure Type : Circular Riser Diameter (in) : 6.00 Common Length (ft) : 0.000 Riser Crest Elevation : 100.50 ft Hydraulic Structure Geometry Number of Devices: 0 **********************FLOOD FREQUENCY AND DURATION STATISTICS******************* ----------------------SCENARIO: PREDEVELOPED Number of Subbasins: 1 Number of Links: 0 ----------------------SCENARIO: POSTDEVELOPED Number of Subbasins: 1 Number of Links: 1 ***********Groundwater Recharge Summary ************* Recharge is computed as input to Perlnd Groundwater Plus Infiltration in Structures Total Predeveloped Recharge During Simulation Model Element Recharge Amount (ac-ft) ----------------------------------------------------------------------------------------------- Subbasin: Subbasin 1 8.794 _____________________________________ Total: 8.794 Total Post Developed Recharge During Simulation Model Element Recharge Amount (ac-ft) ----------------------------------------------------------------------------------------------- Subbasin: Basin 67 2.566 Link: Bioretention 16.832 _____________________________________ Total: 19.399 Total Predevelopment Recharge is Less than Post Developed Average Recharge Per Year, (Number of Years= 158) Predeveloped: 0.056 ac-ft/year, Post Developed: 0.123 ac-ft/year ***********Water Quality Facility Data ************* ----------------------SCENARIO: PREDEVELOPED Number of Links: 0 ----------------------SCENARIO: POSTDEVELOPED Number of Links: 1 ********** Link: Bioretention ********** Infiltration/Filtration Statistics-------------------- Inflow Volume (ac-ft): 17.67 Inflow Volume Including PPT-Evap (ac-ft): 18.23 Total Runoff Infiltrated (ac-ft): 16.83, 92.35% Total Runoff Filtered (ac-ft): 0.00, 0.00% Primary Outflow To Downstream System (ac-ft): 1.38 Secondary Outflow To Downstream System (ac-ft): 0.00 Percent Treated (Infiltrated+Filtered)/Total Volume: 92.35% ***********Compliance Point Results ************* Scenario Predeveloped Compliance Subbasin: Subbasin 1 Scenario Postdeveloped Compliance Link: Bioretention *** Point of Compliance Flow Frequency Data *** Recurrence Interval Computed Using Gringorten Plotting Position Predevelopment Runoff Postdevelopment Runoff Tr (Years) Discharge (cfs) Tr (Years) Discharge (cfs) ---------------------------------------------------------------------------------------------------------------------- 2-Year 1.087E-03 2-Year 8.734E-03 5-Year 1.771E-03 5-Year 1.404E-02 10-Year 2.387E-03 10-Year 1.639E-02 25-Year 3.026E-03 25-Year 2.083E-02 50-Year 3.862E-03 50-Year 2.608E-02 100-Year 4.185E-03 100-Year 3.166E-02 200-Year 6.513E-03 200-Year 3.624E-02 ** Record too Short to Compute Peak Discharge for These Recurrence Intervals **** LID Duration Performance **** Excursion at Predeveloped 8%Q2 (Must be Less Than 0%): -94.4% PASS Maximum Excursion from 8%Q2 to 50%Q2 (Must be Less Than 0%): -54.3% PASS ------------------------------------------------------------------------------------------------- MEETS ALL LID DURATION DESIGN CRITERIA: PASS ------------------------------------------------------------------------------------------------- ————————————————————————————————— MGS FLOOD PROJECT REPORT Program Version: MGSFlood 4.43 Program License Number: 200410007 Project Simulation Performed on: 10/08/2018 1:31 PM Report Generation Date: 10/08/2018 1:35 PM ————————————————————————————————— Input File Name: Mixed Use A.fld Project Name: Solera Analysis Title: BMP Performance Standard Comments: ———————————————— PRECIPITATION INPUT ———————————————— Computational Time Step (Minutes): 15 Extended Precipitation Time Series Selected Climatic Region Number: 0 Full Period of Record Available used for Routing Precipitation Station : 96004005 Puget East 40 in_5min 10/01/1939-10/01/2097 Evaporation Station : 961040 Puget East 40 in MAP Evaporation Scale Factor : 0.750 HSPF Parameter Region Number: 1 HSPF Parameter Region Name : USGS Default ********** Default HSPF Parameters Used (Not Modified by User) *************** ********************** WATERSHED DEFINITION *********************** Predevelopment/Post Development Tributary Area Summary Predeveloped Post Developed Total Subbasin Area (acres) 2.038 2.038 Area of Links that Include Precip/Evap (acres) 0.000 0.067 Total (acres) 2.038 2.104 ----------------------SCENARIO: PREDEVELOPED Number of Subbasins: 1 ---------- Subbasin : Subbasin 1 ---------- -------Area (Acres) -------- Till Forest 2.038 ---------------------------------------------- Subbasin Total 2.038 ----------------------SCENARIO: POSTDEVELOPED Number of Subbasins: 1 ---------- Subbasin : Mixed Use A ---------- -------Area (Acres) -------- Till Grass 0.510 Impervious 1.528 ---------------------------------------------- Subbasin Total 2.038 ************************* LINK DATA ******************************* ----------------------SCENARIO: PREDEVELOPED Number of Links: 0 ************************* LINK DATA ******************************* ----------------------SCENARIO: POSTDEVELOPED Number of Links: 1 ------------------------------------------ Link Name: Bioretention Link Type: Bioretention Facility Downstream Link: None Base Elevation (ft) : 100.00 Riser Crest Elevation (ft) : 100.50 Storage Depth (ft) : 0.50 Bottom Length (ft) : 145.0 Bottom Width (ft) : 20.0 Side Slopes (ft/ft) : L1= 0.00 L2= 0.00 W1= 0.00 W2= 0.00 Bottom Area (sq-ft) : 2900. Area at Riser Crest El (sq-ft) : 2,900. (acres) : 0.067 Volume at Riser Crest (cu-ft) : 2,755. (ac-ft) : 0.063 Infiltration on Bottom only Selected Soil Properties Biosoil Thickness (ft) : 1.50 Biosoil Saturated Hydraulic Conductivity (in/hr) : 6.00 Biosoil Porosity (Percent) : 30.00 Maximum Elevation of Bioretention Soil : 101.00 Native Soil Hydraulic Conductivity (in/hr) : 0.70 Riser Geometry Riser Structure Type : Circular Riser Diameter (in) : 6.00 Common Length (ft) : 0.000 Riser Crest Elevation : 100.50 ft Hydraulic Structure Geometry Number of Devices: 0 **********************FLOOD FREQUENCY AND DURATION STATISTICS******************* ----------------------SCENARIO: PREDEVELOPED Number of Subbasins: 1 Number of Links: 0 ----------------------SCENARIO: POSTDEVELOPED Number of Subbasins: 1 Number of Links: 1 ***********Groundwater Recharge Summary ************* Recharge is computed as input to Perlnd Groundwater Plus Infiltration in Structures Total Predeveloped Recharge During Simulation Model Element Recharge Amount (ac-ft) ----------------------------------------------------------------------------------------------- Subbasin: Subbasin 1 351.410 _____________________________________ Total: 351.410 Total Post Developed Recharge During Simulation Model Element Recharge Amount (ac-ft) ----------------------------------------------------------------------------------------------- Subbasin: Mixed Use A 62.327 Link: Bioretention 754.774 _____________________________________ Total: 817.101 Total Predevelopment Recharge is Less than Post Developed Average Recharge Per Year, (Number of Years= 158) Predeveloped: 2.224 ac-ft/year, Post Developed: 5.172 ac-ft/year ***********Water Quality Facility Data ************* ----------------------SCENARIO: PREDEVELOPED Number of Links: 0 ----------------------SCENARIO: POSTDEVELOPED Number of Links: 1 ********** Link: Bioretention ********** Infiltration/Filtration Statistics-------------------- Inflow Volume (ac-ft): 787.59 Inflow Volume Including PPT-Evap (ac-ft): 814.82 Total Runoff Infiltrated (ac-ft): 754.77, 92.63% Total Runoff Filtered (ac-ft): 0.00, 0.00% Primary Outflow To Downstream System (ac-ft): 59.35 Secondary Outflow To Downstream System (ac-ft): 0.00 Percent Treated (Infiltrated+Filtered)/Total Volume: 92.63% ***********Compliance Point Results ************* Scenario Predeveloped Compliance Subbasin: Subbasin 1 Scenario Postdeveloped Compliance Link: Bioretention *** Point of Compliance Flow Frequency Data *** Recurrence Interval Computed Using Gringorten Plotting Position Predevelopment Runoff Postdevelopment Runoff Tr (Years) Discharge (cfs) Tr (Years) Discharge (cfs) ---------------------------------------------------------------------------------------------------------------------- 2-Year 4.343E-02 2-Year 0.318 5-Year 7.078E-02 5-Year 0.436 10-Year 9.537E-02 10-Year 0.480 25-Year 0.121 25-Year 0.589 50-Year 0.154 50-Year 0.632 100-Year 0.167 100-Year 0.669 200-Year 0.260 200-Year 0.733 ** Record too Short to Compute Peak Discharge for These Recurrence Intervals **** LID Duration Performance **** Excursion at Predeveloped 8%Q2 (Must be Less Than 0%): -94.5% PASS Maximum Excursion from 8%Q2 to 50%Q2 (Must be Less Than 0%): -54.7% PASS ------------------------------------------------------------------------------------------------- MEETS ALL LID DURATION DESIGN CRITERIA: PASS ------------------------------------------------------------------------------------------------- ————————————————————————————————— MGS FLOOD PROJECT REPORT Program Version: MGSFlood 4.43 Program License Number: 200410007 Project Simulation Performed on: 10/10/2018 2:24 PM Report Generation Date: 10/10/2018 2:25 PM ————————————————————————————————— Input File Name: Mixed Use B.fld Project Name: Solera Analysis Title: BMP Performance Standard Comments: ———————————————— PRECIPITATION INPUT ———————————————— Computational Time Step (Minutes): 15 Extended Precipitation Time Series Selected Climatic Region Number: 0 Full Period of Record Available used for Routing Precipitation Station : 96004005 Puget East 40 in_5min 10/01/1939-10/01/2097 Evaporation Station : 961040 Puget East 40 in MAP Evaporation Scale Factor : 0.750 HSPF Parameter Region Number: 1 HSPF Parameter Region Name : USGS Default ********** Default HSPF Parameters Used (Not Modified by User) *************** ********************** WATERSHED DEFINITION *********************** Predevelopment/Post Development Tributary Area Summary Predeveloped Post Developed Total Subbasin Area (acres) 1.466 1.414 Area of Links that Include Precip/Evap (acres) 0.000 0.054 Total (acres) 1.466 1.468 ----------------------SCENARIO: PREDEVELOPED Number of Subbasins: 1 ---------- Subbasin : Subbasin 1 ---------- -------Area (Acres) -------- Till Forest 1.466 ---------------------------------------------- Subbasin Total 1.466 ----------------------SCENARIO: POSTDEVELOPED Number of Subbasins: 1 ---------- Subbasin : Whole Site ---------- -------Area (Acres) -------- Till Grass 0.083 Impervious 1.331 ---------------------------------------------- Subbasin Total 1.414 ************************* LINK DATA ******************************* ----------------------SCENARIO: PREDEVELOPED Number of Links: 0 ************************* LINK DATA ******************************* ----------------------SCENARIO: POSTDEVELOPED Number of Links: 1 ------------------------------------------ Link Name: Bioretention Link Type: Bioretention Facility Downstream Link: None Base Elevation (ft) : 100.00 Riser Crest Elevation (ft) : 100.50 Storage Depth (ft) : 0.50 Bottom Length (ft) : 215.0 Bottom Width (ft) : 11.0 Side Slopes (ft/ft) : L1= 0.00 L2= 0.00 W1= 0.00 W2= 0.00 Bottom Area (sq-ft) : 2365. Area at Riser Crest El (sq-ft) : 2,365. (acres) : 0.054 Volume at Riser Crest (cu-ft) : 2,247. (ac-ft) : 0.052 Infiltration on Bottom only Selected Soil Properties Biosoil Thickness (ft) : 1.50 Biosoil Saturated Hydraulic Conductivity (in/hr) : 6.00 Biosoil Porosity (Percent) : 30.00 Maximum Elevation of Bioretention Soil : 101.00 Native Soil Hydraulic Conductivity (in/hr) : 0.70 Riser Geometry Riser Structure Type : Circular Riser Diameter (in) : 6.00 Common Length (ft) : 0.000 Riser Crest Elevation : 100.50 ft Hydraulic Structure Geometry Number of Devices: 0 **********************FLOOD FREQUENCY AND DURATION STATISTICS******************* ----------------------SCENARIO: PREDEVELOPED Number of Subbasins: 1 Number of Links: 0 ----------------------SCENARIO: POSTDEVELOPED Number of Subbasins: 1 Number of Links: 1 ***********Groundwater Recharge Summary ************* Recharge is computed as input to Perlnd Groundwater Plus Infiltration in Structures Total Predeveloped Recharge During Simulation Model Element Recharge Amount (ac-ft) ----------------------------------------------------------------------------------------------- Subbasin: Subbasin 1 252.781 _____________________________________ Total: 252.781 Total Post Developed Recharge During Simulation Model Element Recharge Amount (ac-ft) ----------------------------------------------------------------------------------------------- Subbasin: Whole Site 10.143 Link: Bioretention 586.064 _____________________________________ Total: 596.207 Total Predevelopment Recharge is Less than Post Developed Average Recharge Per Year, (Number of Years= 158) Predeveloped: 1.600 ac-ft/year, Post Developed: 3.773 ac-ft/year ***********Water Quality Facility Data ************* ----------------------SCENARIO: PREDEVELOPED Number of Links: 0 ----------------------SCENARIO: POSTDEVELOPED Number of Links: 1 ********** Link: Bioretention ********** Infiltration/Filtration Statistics-------------------- Inflow Volume (ac-ft): 613.44 Inflow Volume Including PPT-Evap (ac-ft): 636.49 Total Runoff Infiltrated (ac-ft): 586.06, 92.08% Total Runoff Filtered (ac-ft): 0.00, 0.00% Primary Outflow To Downstream System (ac-ft): 49.68 Secondary Outflow To Downstream System (ac-ft): 0.00 Percent Treated (Infiltrated+Filtered)/Total Volume: 92.08% ***********Compliance Point Results ************* Scenario Predeveloped Compliance Subbasin: Subbasin 1 Scenario Postdeveloped Compliance Link: Bioretention *** Point of Compliance Flow Frequency Data *** Recurrence Interval Computed Using Gringorten Plotting Position Predevelopment Runoff Postdevelopment Runoff Tr (Years) Discharge (cfs) Tr (Years) Discharge (cfs) ---------------------------------------------------------------------------------------------------------------------- 2-Year 3.124E-02 2-Year 0.286 5-Year 5.091E-02 5-Year 0.390 10-Year 6.860E-02 10-Year 0.426 25-Year 8.698E-02 25-Year 0.505 50-Year 0.111 50-Year 0.545 100-Year 0.120 100-Year 0.559 200-Year 0.187 200-Year 0.623 ** Record too Short to Compute Peak Discharge for These Recurrence Intervals **** LID Duration Performance **** Excursion at Predeveloped 8%Q2 (Must be Less Than 0%): -94.6% PASS Maximum Excursion from 8%Q2 to 50%Q2 (Must be Less Than 0%): -53.5% PASS ------------------------------------------------------------------------------------------------- MEETS ALL LID DURATION DESIGN CRITERIA: PASS ------------------------------------------------------------------------------------------------- Drainage Report - Rose Hill Subdivision Appendix C Appendix C Geotechnical Report INFILTRATION TEST MEMO Drainage Report - Rose Hill Subdivision Appendix D . EarthSolutionsNWLLC EarthSolutions NW LLC Geotechnical Engineering Geology Environmental Scientists Construction Monitoring 1805 -136th Place N.E.,Suite 201 Bellevue,WA 98005 (425)449-4704 Fax (425)449-4711 www.earthsolutionsnw.com GEOTECHNICAL ENGINEERING STUDY RENTON HIGHLANDS TOWNHOMES NORTHEAST SUNSET BOULEVARD RENTON,WASHINGTON ES-5719 Drwn. Checked Date Date Proj.No. Plate Earth Solutions NWLLC Geotechnical Engineering,Construction Monitoring EarthSolutionsNWLLC EarthSolutions NW LLC and Environmental Sciences Vicinity Map Renton Highlands Townhomes Renton,Washington MRS CGH 01/29/2018 Jan.2018 5719 1 NORTH NOTE:This plate may contain areas of color.ESNW cannot be responsible for any subsequent misinterpretation of the information resulting from black &white reproductions of this plate. Reference: King County,Washington Map 626 By The Thomas Guide Rand McNally 32nd Edition SITE Plate Proj.No. Date Checked By Drwn.ByEarthSolutionsNWLLCGeotechnicalEngineering,ConstructionMonitoringandEnvironmentalSciencesEarthSolutionsNWLLCEarthSolutionsNWLLCBoringLocationPlanRentonHighlandsTownhomesRenton,WashingtonMRS CGH 01/29/2018 5719 2 NORTH NOT -TO -SCALE NOTE:This plate may contain areas of color.ESNW cannot be responsible for any subsequent misinterpretation of the information resulting from black &white reproductions of this plate. NOTE:The graphics shown on this plate are not intended for design purposes or precise scale measurements,but only to illustrate the approximate test locations relative to the approximate locations of existing and /or proposed site features.The information illustrated is largely based on data provided by the client at the time of our study.ESNW cannot be responsible for subsequent design changes or interpretation of the data by others. LEGEND Approximate Location of ESNW Boring,Proj.No. ES-5719,Dec.2017 Subject Site Existing Building KIRKLAND AVENUE N.E. N.E. SUNSET BOULEVARDN.E. 12TH STREET HARRINGTON AVENUE N.E.N.E.10T H ST R EETApartments SUNSET LANE N.E.B-1 B-2 B-3 B-4 B-5B-6 B-7 B-8 B-9 B-10 B-11 B-12 B-13 B-1 HARRINGTON PL. N.E. Drwn. Checked Date Date Proj.No. Plate Earth Solutions NWLLC Geotechnical Engineering,Construction Monitoring EarthSolutionsNWLLC EarthSolutions NW LLC and Environmental Sciences CANTILEVER &SINGLE TIEBACK WALL D =Pile Embedment (per Structural Eng.) 2' H (Wall Height) Active Earth Pressure Passive Earth Pressure EFP=350pcf EFP=35pcf Surcharge (W here Applicable) Traffic Surcharge or Building Surcharge (W here Applicable) Excavation Level SCHEMATIC ONLY -NOT TO SCALE NOT A CONSTRUCTION DRAW ING NOTES: Diagram for pressure distribution illustration only,not a design drawing. Passive Pressure includes a factor of safety of 1.5. For adjacent building or traffic surcharge see text. NOTE: See text for recommended Slope Backfill and At-Rest Pressures. Neglect Upper 2 feet of Passive Pressure Renton Highlands Townhomes Renton,Washington MRS CGH 01/29/2018 Jan.2018 5719 3 Drwn. Checked Date Date Proj.No. Plate Earth Solutions NWLLC Geotechnical Engineering,Construction Monitoring EarthSolutionsNWLLC EarthSolutions NW LLC and Environmental Sciences NO LOAD ZONE D =Pile Embedment (per Structural Eng.) H (Wall Height) Traffic Surcharge or Building Surcharge (W here Applicable) Excavation Level SCHEMATIC ONLY -NOT TO SCALE NOT A CONSTRUCTION DRAW ING H/4 60 Tieback No Load Zone Renton Highlands Townhomes Renton,Washington MRS CGH 01/29/2018 Jan.2018 5719 4 Drwn. Checked Date Date Proj.No. Plate Earth Solutions NWLLC Geotechnical Engineering,Construction Monitoring EarthSolutionsNWLLC EarthSolutions NW LLC and Environmental Sciences SHORING WALL DRAINAGE W ood Lagging Native Soil Excavation PVC Tightline Structural Fill Foundation (per Plan) Drain Grate Waterproofing and Insulation per Architectural Plan Continuous Sheet Drain (Placed with Filter Fabric Facing Shoring) Concrete Facing Slab-On-Grade Floor (per Plan) NOTE:Drain through wall should be installed at middle of lagging. SCHEMATIC ONLY -NOT TO SCALE NOT A CONSTRUCTION DRAW ING Renton Highlands Townhomes Renton,Washington MRS CGH 01/29/2018 Jan.2018 5719 5 Drwn. Checked Date Date Proj.No. Plate Earth Solutions NWLLC Geotechnical Engineering,Construction Monitoring and Environmental Sciences EarthSolutionsNWLLC EarthSolutions NW LLC RETAINING WALL DRAINAGE DETAIL NOTES: Free-draining Backfill should consist of soil having less than 5 percent fines. Percent passing No.4 sieve should be 25 to 75 percent. Sheet Drain may be feasible in lieu of Free-draining Backfill,per ESNW recommendations. Drain Pipe should consist of perforated, rigid PVC Pipe surrounded with 1-inch Drain Rock. LEGEND: Free-draining Structural Backfill 1-inch Drain Rock 18"Min. Structural Fill Perforated Rigid Drain Pipe (Surround in Drain Rock) SCHEMATIC ONLY -NOT TO SCALE NOT A CONSTRUCTION DRAWING Renton Highlands Townhomes Renton,Washington MRS CGH 01/29/2018 Jan.2018 5719 6 Drwn. Checked Date Date Proj.No. Plate Earth Solutions NWLLC Geotechnical Engineering,Construction Monitoring and Environmental Sciences EarthSolutionsNWLLC EarthSolutions NW LLC FOOTING DRAIN DETAIL Slope Perforated Rigid Drain Pipe (Surround in Drain Rock) 18"Min. NOTES: Do NOT tie roof downspouts to Footing Drain. Surface Seal to consist of 12"of less permeable,suitable soil.Slope away from building. LEGEND: Surface Seal:native soil or other low-permeability material. 1-inch Drain Rock SCHEMATIC ONLY -NOT TO SCALE NOT A CONSTRUCTION DRAW ING Renton Highlands Townhomes Renton,Washington MRS CGH 01/29/2018 Jan.2018 5719 7 Drainage Report - Rose Hill Subdivision Appendix E . Geotechnical Engineering,Construction Obser vation/Testing and Environmental Services Drwn.CAM Checked CGH Date July 2018 Date 07/10/2018 Proj.No.5719.02 Plate 1 Earth Solutions NWLLCEarthSolutionsNWLLC EarthSolutions NW LLC Vicinity Map Solera Renton,Washington NORTH NOTE:This plate may contain areas of color.ESNW cannot be responsible for any subsequent misinterpretation of the information resulting from black &white reproductions of this plate. Reference: King County,Washington Map 626 By The Thomas Guide Rand McNally 32nd Edition SITE GeotechnicalEngineering,ConstructionObservation/TestingandEnvironmentalServicesPlate Proj.No. Date Checked By Drwn.ByEarthSolutionsNWLLCEarthSolutionsNWLLCEarthSolutionsNWLLCSubsurfaceExplorationPlanSolera Renton,WashingtonCAM CGH 07/10/2018 5719.02 2 NORTH NOT -TO -SCALE NOTE:This plate may contain areas of color.ESNW cannot be responsible for any subsequent misinterpretation of the information resulting from black &white reproductions of this plate. NOTE:The graphics shown on this plate are not intended for design purposes or precise scale measurements,but only to illustrate the approximate test locations relative to the approximate locations of existing and /or proposed site features.The information illustrated is largely based on data provided by the client at the time of our study.ESNW cannot be responsible for subsequent design changes or interpretation of the data by others. LEGEND Approximate Location of ESNW Test Pit,Proj.No. ES-5719.02,June 2018 Approximate Location of ESNW Boring,Proj.No. ES-5719,Dec.2017 Subject Site Existing Building B-1 TP-1 KIRKLAND AVENUE N.E. N.E. SUNSET BOULEVARDN.E. 12TH STREET HARRINGTON AVENUE N.E.N.E.10T H ST R EETApartments SUNSET LANE N.E.B-1 B-2 B-3 B-4 B-5B-6 B-7 B-8 B-9 B-10 B-11 B-12 B-13 HARRINGTON PL. N.E.TP-1 TP-4 TP-2 TP-3 Drainage Report - Rose Hill Subdivision Appendix F Appendix F Operation and Maintenance Drainage Report - Rose Hill Subdivision Appendix G Appendix G Bond Quantities & Draft Declaration of Covenant