HomeMy WebLinkAboutRC 20180323001142Instrument Number: 20180323001142 Document:COV Rec: $153.00 Page -1 of 6
Record Date:3/23/2018 3:37 I'M
Electronically Recorded King County, WA
City of Renton
Grantor: Weston Heights, LLC
Grantee: City of Renton
Legal Description: Weston Heights North Short Plat L.ot 4
Assessor's 'Fax Parcel I D#: 1123059132
IN CONSIDERATION of the approved City of Renton (check one of the following)
Vr residential building permit, Q commercial building permit, Ll clearing and grading permit,
0 subdivision permit, or D short subdivision permit for application file No.
LUA/SWp LUA16-000140 — relating to the real property ("Property") described above, the
Grantor(s), the owner(s) in fee of that Property, hereby covenants(covenant) with the City of Renton, a
political subdivision of the state of Washington, that he/she(they) wi I I observe, consent to, and abide by
the conditions and obligations set forth and described in Paragraphs I through 9 below with regard to th
Property, and hereby grants(grant) an easement as described in Paragraphs 2 and 3. Grantor(s) hereby
grants(grant), covenants(covenant), and agrees(agree) as follows:
1. The Grantor(s) or his/lier(their) successors in interest and assigns ("Owners ") shall at their
own cost, operate, maintain, and keep in good repair, the Property's drainage facilities constructed as
required in the approved construction plans and specifications 3916 on file with the City of
Renton and submitted to the City of Renton for the review and approval of permit(s)
U16-003996 & BL -W,4 -
A. The property's drainage facilities shall be maintained in compliance with the operation and
maintenance schedule included and attached herein as Exhibit B. Drainage facilities include pipes,
channels, flow control facilities, water quality facilities, on-site best managernent practices (BMPs) and
other engineered structures designed to manage and/or treat stormwater on the Property. On-site BMPs
include dispersion and infiltration devices, bioretention, permeable pavements, rainwater harvesting
systems, tree retention credit, reduced impervious surface footprint, vegetated roofs and other measures
designed to mimic pre -developed hydrology and minimize stormwater runoff on the Property.
2. City of Renton shall have the right to ingress and egress over those portions of the Property
necessary to perform inspections of the stormwater facilities and BMPs and conduct maintenance
activities s ecified in this Declaration of Covenant and in accordance with the Renton Municipal Code.
p . 0
City of Renton shall provide at least 30 days written notice to the Owners that entry on the Property is
M
Instrument Number: 20180323001142 Document:COV Rec: $153.00 Page -2 of 6
Record Date:3/23/2018 3:37 PM King County, WA
M
Instrument Number: 20180323001142 Document:COV Rec: $153.00 Page -3 of 6
Record Date:3/23/2018 3:37 PM King County, WA
Declaration of Covenant shall run with the land and be binding upon Grantor(s), and Or tor's(s')
successors in interest, and assigns.
9. This Declaration of Covenant may be terminated by execution of a written agreement by the
Owners and the City that is recorded by ming County in its real property records.
IN t I
__ p ction and Maintenance of
TSS )✓I2lC)p", this Declaration c� Covenant for 7e e
Drainage Facilities is executed this day of
"p R, oc ner of the Property
GRANTOR, owner of the Property
STATE OF WAS14INGTON )
COUNTY OF KING )ss.
On this day personally appeared before me:
to me known to be the individual(s) described in
and who executed the within and foregoing instrument and acknowledged that they signed the sante as
their free and voluntary act and deed, for the uses and purposes therein stated.
My appointment expires I
Instrument Number: 20180323001142 Document:COV Rec: 5153.00 Page -4 of 6
Record Date:3/23/2018 3:37 PM King County, WA
RD.. ...,
PROPOSED ROOF
DRAIN UNE15
oll Y M ..'
a
------------
1 F PIPE PER ----------------
G C SCALE C.Ell OF APPENDIX
° w ��C
� Inah � 5' 2 KCS
521.
20 ft �6� DRAIN STM -
A PORTION OF SECTION 11, 1 ._522 —
TOWNSHIP 23 Na RANGE 05 E S57°27'27"E 49.39
�,rr �e*r i•� ��u,'� «. � I �
iAPD ' s
IMI ,
PROVE
Instrument Number: 20180323001142 Document:COV Rec: $153.00 Page -5 of 6
Record Date:3/23/2018 3:37 PM King County, WA
EXHIBIT
MAINTENANCE INSTRUCTIONS FOR REDUCED IMPERVIOUS r ,
BMP: RESTR[CTED FOOTPRINT
,a
minimize the stormwater runoff impacts caused by o
imperviousThe total d 3,227 square feet without
These reduced impervious surface on-site BMP maintenance and operation instructions must be
recorded as an attachment to the required declaration of covenant and grant of easement per
these instructions is o explain to future property owners, the purpose of the BMP and how it must bip
instructionsmaintained. and operated. These be a minimum; the City of Renton may
require additional instructions based on site-specific conditions. See the City of Renton's Surface
Water f,
Instrument Number: 20180323001142 Document:COV Rec: $153.00 Page -6 of 6
Record Date:3/23/2018 3:37 PM King County, WA
Your property contains an on-site BMP (best management practice) called a "perforatedpipe
connecdon," which was installed to reduce the stonnwater runoff impacts of some or all of the
impervious surface on your property.
A perforated pipe connection is a length of drainage conveyance pipe with holes in the bottom,
designed to "leak" runoff, conveyed by the pipe, into a gravel filled trench where it can be soaked into
the surrounding soil. The connection is intended to provide opportunity for infiltration of any nmoff
-that fte�=_Kww=wla TQ* .) f nraL& _$7��-JEaS-a
ditch or roadway pipe system. This on-site BNP shall be maintained per Appendix A of the City of
Renton's Surface Water Design Manual.
0 The size and composition of the perforated pipe connection as depicted by the site plan and
design details must be maintained and may not be changed without written approval from the
City of Renton or through a future development permit from the City of Renton.
The soil overtop of the perforated portion of the system must not be compacted or covered
with impervious materials.
maintained and operated. These instructions .. are intended to be a minimum; the City of Renton may
require additional instructions based on site-specific conditions. See the City of Renton's Surface
Water Design Manual website for additional information and updates.
slope random fill
to road V ter fabric
drainage system 11 filter fbn,..
1B°' min 4" pert pipe
Zx 101 1/2"- 3/4" washed rock
5a
level trench ..9
. .
w/perf pipe
L
1-" 1 i ---24" minim
PLAN VIEW OF ROOF
NTS
TRENCH X -SECTION
NTS