Loading...
HomeMy WebLinkAboutContractCAG-18-125 Washington State Department of Transportation Local Programs State Funding Agency and Address Agreement City of Renton Public Works Dept./Transportation Division Work by Public 1055 S Grady Way Agencies Renton, WA 98057 Agreeme be� Maximum Amount Authorized Location and Description of Work (See also Exhibit "A") 3,000,000.00 See attached Exhibit A for Project name, description and location. Participating Percentage Project Number / 100.00% This AGREEMENT is made and entered into this a day of oe_(� between the STATE OF WASHINGTON, Department of Transportation, acting by and through the Secretary of Transportation, hereinafter called the "STATE," and the above named organization, hereinafter call the "AGENCY." WHEREAS, the AGENCY is planning the work shown above, and in connection therewith, the AGENCY has requested financial assistance for the project or program, and WHEREAS, the AGENCY has requested funds for the above shown project or program, which has been selected by the STATE for funding assistance. NOW THEREFORE, in consideration of the terms, conditions, covenants, and performances contained herein, or attached and incorporated and made a part hereof, IT IS MUTUALLY AGREE AS FOLLOWS: Type of Work Estimate of Funding (1) Estimated Total Project Funds (2) Estimated Agency Funds (3) Estimated State Funds PE a. Agency 48,000.00 0.00 48,000.00 b. Other Consultants 570,000.00 0.00 570,000.00 c. Other 0.00 0.00 0.00 d. State 2,000.00 0.00 2,000.00 e. Total PE Cost Estimate (a+b+c+d) 620,000.00 0.00 620,000.00 Right of Way f. Agency 0.00 0.00 0.00 g. Other 0.00 0.00 0.00 h. Other 0.00 0.00 0.00 i. State 0.00 0.00 0.00 J. Total R/W Cost Estimate (f+g+h+i) 0.00 0.00 0.00 Construction k. Contract 0.00 0.00 0.00 1, Other Consultants 0.00 0.00 0.00 m. Other 0.00 0.00 0.00 n. Other 0.00 0.00 0.00 o. Agency 0.00 0.00 0.00 p. State 0.00 0.00 0.00 q. Total CN Cost Estimate (k+l+m+n+o+p) 0.00 0.00 0.00 r. Total Project Cost Estimate (e+j+q) 620,000.00 0.00 620,000.00 DOT Form 140-087 Page 1 Revised 06/2018 r General The AGENCY agrees to perform the above described work in accordance with the Project Application attached hereto as "Exhibit A" and made a part of this AGREEMENT. Plans, specifications, and cost estimates shall be prepared by the AGENCY in accordance with the current State of Washington Standard Specifications for Road, Bridge, and Municipal Construction and adopted design standards, unless otherwise noted. The AGENCY will incorporate the plans and specifications into the AGENCY's project and thereafter advertise the resulting project for bid and, assuming bids are received and a contract is awarded, administer the contract, or if the project is of a size which the AGENCY is authorized to perform with its own forces under the laws of the State of Washington, the AGENCY may proceed with its own forces. All work performed under this AGREEMENT shall comply with the applicable provisions of state law. II Payment The STATE, in consideration of the faithful performance of the work to be performed by the AGENCY, agrees to reimburse the AGENCY for the percentage of the actual direct and related indirect cost of the work shown above, up to the "MAXIMUM AMOUNT AUTHORIZED". The agency will comply with Governmental Accounting Auditing and Financial Reporting Standards and applicable state law and local regulations, policies and procedures. No payment will be made for work done prior to execution of this AGREEMENT. Partial payments shall be made by the STATE, upon request of the AGENCY, to cover costs incurred. These payments are not to be more frequent than one (1) per month. It is agreed that any such partial payment will not constitute agreement as to the appropriateness of any item and that, at the time of the final audit, all required adjustments will be made and reflected in a final payment. The AGENCY agrees to submit a final bill to the STATE within forty-five (45) days after the AGENCY has completed work. The AGENCY agrees that all costs in excess of the amount authorized and the AGENCY's matching funds shall be the responsibility of the AGENCY. III Audit The AGENCY agrees that an audit may be conducted by the STATE. During the progress of the work and for a period not less than three (3) years from the date of final payment to the AGENCY, the records and accounts pertaining to the work and accounting thereof are to be kept available for inspection and audit by the STATE and copies of all records, accounts, documents, or other data pertaining to the project will be furnished upon request. If any litigation, claim, or audit is commenced, the records and accounts along with supporting documentation shall be retained until all litigation, claim, or audit finding has been resolved even though such litigation, claim, or audit continues past the three-year retention period. IN WITNESS WH OF, the parties heret ave executed this AGREE VA Legal Relations No liability shall attach to the AGENCY or the STATE by reason of entering into this AGREEMENT except as expressly provided herein. V Nondiscrimination The AGENCY agrees to comply with all applicable state and federal laws, rules, and regulations pertaining to nondiscrimination and agrees to require the same of all subcontractors providing services or performing any work using funds provided under this AGREEMENT. VI Venue For the convenience of the parties to this AGREEMENT, it is agreed that any claims and/or causes of action which the AGENCY has against the STATE, growing out of this AGREEMENT or the project or program with which it is concerned, shall be brought only in the Superior Court for Thurston County. VII Termination The Secretary of the Department of Transportation may terminate this AGREEMENT if the funding becomes unavailable or if the Secretary determines that it is in the best interest of the STATE. Vill Final Report and Final Inspection Within ninety (90) days following the completion of the project and submission of the final billing for the project, a final report and/or final inspection shall be submitted to the Director, Highways & Local Programs containing the following information: Non -Capital Projects 1. A description of the project or program. 2. A summary of actual costs of the project or program. 3. An evaluation of the project or program. This should address aspects such as transportation and/or other benefits to the public. Capital Projects 1. A final inspection is required. IX Supplement This agreement may be modified or supplemented only in writing by parties. MENT on the day and y ar la written below. AGENCY ``ui►►►►►►,��� STATE `, ,���Fx�,,� By: By: �� ,y% irector, Local Programs nl&A dQ - Title: Mayor D is L a =*_ SEAL *_ :.:� =Date: 'W ATTEST : �,,� o.. DOT Revised 06/ 18 n e t h ' �q , �� p`k6 ;°j``�: DEC 6 6 2018 Page 2 EC4 i 8lT Aft MWashington State Department of Transportation A VK Local Agency Project State FedereAid Prospectus Prefix Route ( ) Date 9-17-18 Federal Aid Project Number DUNS Number 092278894 Local Agency Project Number CAG-18-125 WSDOT ( Use Only Federal Employer Tax ID Number 91-6001271 Agency CAAgency Federal Program Title City of Renton Z✓ Yes ❑ No ❑ 20.205 ❑ Other Project Title Start Latitude N 470 28' 55.6" Start Longitude W 1220 12' 10.8" Bronson Way Bridge - Seismic Retrofit and Painting End Latitude N 47" 28 56.8„ End Longitude W 122' 12 9.0" Project Termini From -To Nearest City Name Project Zip Code (+4) Mill Ave. S N Riverside Dr. Renton 98057-5647 Begin Mile Post End Mile Post Length of Project Award Type N/A N/A N/A Z✓ Local ❑ Local Forces ❑ State ❑ Railroad Route ID Begin Mile Point End Mile Point City Number County Number County Name 900 10.72 10.75 1070 17 King WSDOT Region Legislative District(s) Congressional District(s) Urban Area Number Northwest Region 37 9 1 Total Local Agency t to Phase Start Phase Estimated Cost Funding Funds Date Nearest Hundred Dollar Nearest Hundred Dollar Nearest Hundred Dollar Month Year P. E. 620,000 0 620,000 10 2018 R/W 0 0 0 N/A N/A Const. 2,380,000 0 2,380,000 5 2020 Total 3,000,000 0 3,000,000 Description of Existing Facility (Existing Design and Present Condition) Roadway Width Number of Lanes 56 feet 5 Bridge built in 1939. Main span is 2 steel thru-plate girders, with deck beams spanning between them to support deck. Fracture critical. Last painted in 1999. Seismic site class E. Seismic retrofit not done since built. Description of Proposed Work Description of Propose Work (Attach additional sheet(s) if necessary) seismic retrofit and painting. Local Agency Contact Person Title Phone Derek Akesson Transportation Project Manager 425-430-7337 Mailing Address City State Zip Code Renton City Hall - 5th Floor, 55 S Grady Way Renton WA 98057 By Project Prospectus v Approving Authority Title Transportation Design Manager Dates Liu i rurm iwu-iu i Page 1 Revised 04/2015 Previous Editions Obsolete