Loading...
HomeMy WebLinkAboutAdden 1 - ProspectusCAG-18-125, Adden #2-22 Prospectus Agency Project Title Date Type of Proposed Work Project Type (Check all that Apply) New Construction Reconstruction Railroad Bridge Path / Trail Pedestrian / Facilities Parking 3-R 2-R Other Roadway Width Number of Lanes Geometric Design Data Description Federal Functional &ODVVL¿FDWLRQ Terrain Posted Speed Design Speed Existing ADT Design Year ADT Design Year Design Hourly Volume (DHV) Through Route Urban Rural NHS Principal Arterial Minor Arterial Collector Major Collector Minor Collector Local Access Flat Roll Mountain Crossroad Urban Rural NHS Principal Arterial Minor Arterial Collector Major Collector Minor Collector Local Access Flat Roll Mountain Performance of Work Preliminary Engineering Will Be Performed By Others % Agency % Construction Will Be Performed By Contract % Agency % (QYLURQPHQWDO&ODVVL¿FDWLRQ Class I - Environmental Impact Statement (EIS) Project Involves NEPA/SEPA Section 404 Interagency Agreement Class III - Environmental Assessment (EA) Project Involves NEPA/SEPA Section 404 Interagency Agreements Class II - Categorically Excluded (CE) Projects Requiring Documentation (Documented CE) Environmental Considerations DOT Form 140-101 Revised 0/20Previous Editions Obsolete Page 2 City of Renton 4-22-2022 556 feet 25 mph N/A 16,500 N/A N/A N/A Consultant 90 10 Contractor 100 This is not a FHWA funded project. It is a state funded project. Therefore, NEPA is not applicable. SEPA is applicable. MDNS. Executive Order 05-05 is applicable. Bronson Way Bridge - Seismic Retrofit and Painting Agency Project Title Date Right of Way No Right of Way Needed *All construction required by the contract can be accomplished within the exiVting right of way. Right of Way Needed No Relocation Relocation Required Utilities No utility work required All utility work will be completed prior to the start of the construction contract All utility work will be completed in coordination with the construction contract Railroad No railroad work required All railroad work will be completed prior to the start of the construction contract All the railroad work will be completed in coordination with the construction contract 'HVFULSWLRQRI8WLOLW\5HORFDWLRQRU$GMXVWPHQWVDQG([LVWLQJ0DMRU6WUXFWXUHV,QYROYHGLQWKH3URMHFW )$$,QYROYHPHQW Is any airport located within 3.2 kilometers (2 miles) of the proposed project? Yes No Remarks This project has been reviewed by the legislative body of the administration agency or agencies, or it’s designee, and is not inconsistent with the agency’s comprehensive plan for community development. Agency ByDate Mayor Armondo Pavone DOT Form 140-101 Revised 0/20Previous Editions Obsolete Page 3 City of Renton 4-22-2022 A number of utilities utilize this bridge to cross over the Cedar River. Some permanent adjustments to utility routing and/or temporary relocations may need to occur in order to perform this bridge preservation work. The Renton Municipal Airport is located within 2 miles of the proposed project. However, this bridge preservation work will not involve construction equipment or activities that affect airport operations. Attest:Jason A. Seth, City Clerk 5/26/2022