HomeMy WebLinkAboutAdden 1 - ProspectusCAG-18-125, Adden #2-22 Prospectus
Agency Project Title Date
Type of Proposed Work
Project Type (Check all that Apply)
New Construction
Reconstruction
Railroad
Bridge
Path / Trail
Pedestrian / Facilities
Parking
3-R
2-R
Other
Roadway Width Number of Lanes
Geometric Design Data
Description
Federal
Functional
&ODVVL¿FDWLRQ
Terrain
Posted Speed
Design Speed
Existing ADT
Design Year ADT
Design Year
Design Hourly Volume (DHV)
Through Route
Urban
Rural
NHS
Principal Arterial
Minor Arterial
Collector
Major Collector
Minor Collector
Local Access
Flat Roll Mountain
Crossroad
Urban
Rural
NHS
Principal Arterial
Minor Arterial
Collector
Major Collector
Minor Collector
Local Access
Flat Roll Mountain
Performance of Work
Preliminary Engineering Will Be Performed By Others
%
Agency
%
Construction Will Be Performed By Contract
%
Agency
%
(QYLURQPHQWDO&ODVVL¿FDWLRQ
Class I - Environmental Impact Statement (EIS)
Project Involves NEPA/SEPA Section 404
Interagency Agreement
Class III - Environmental Assessment (EA)
Project Involves NEPA/SEPA Section 404
Interagency Agreements
Class II - Categorically Excluded (CE)
Projects Requiring Documentation
(Documented CE)
Environmental Considerations
DOT Form 140-101
Revised 0/20Previous Editions Obsolete
Page 2
City of Renton 4-22-2022
556 feet
25 mph
N/A
16,500
N/A
N/A
N/A
Consultant 90 10
Contractor 100
This is not a FHWA funded project. It is a state funded project. Therefore, NEPA is not applicable. SEPA is
applicable. MDNS. Executive Order 05-05 is applicable.
Bronson Way Bridge - Seismic Retrofit and Painting
Agency Project Title Date
Right of Way
No Right of Way Needed
*All construction required by the
contract can be accomplished
within the exiVting right of way.
Right of Way Needed
No Relocation Relocation Required
Utilities
No utility work required
All utility work will be completed prior to the start
of the construction contract
All utility work will be completed in coordination
with the construction contract
Railroad
No railroad work required
All railroad work will be completed prior to the start of
the construction contract
All the railroad work will be completed in coordination
with the construction contract
'HVFULSWLRQRI8WLOLW\5HORFDWLRQRU$GMXVWPHQWVDQG([LVWLQJ0DMRU6WUXFWXUHV,QYROYHGLQWKH3URMHFW
)$$,QYROYHPHQW
Is any airport located within 3.2 kilometers (2 miles) of the proposed project? Yes No
Remarks
This project has been reviewed by the legislative body of the administration agency or agencies, or it’s
designee, and is not inconsistent with the agency’s comprehensive plan for community development.
Agency
ByDate Mayor Armondo Pavone
DOT Form 140-101
Revised 0/20Previous Editions Obsolete Page 3
City of Renton 4-22-2022
A number of utilities utilize this bridge to cross over the Cedar River. Some permanent adjustments to utility
routing and/or temporary relocations may need to occur in order to perform this bridge preservation work.
The Renton Municipal Airport is located within 2 miles of the proposed project. However, this bridge
preservation work will not involve construction equipment or activities that affect airport operations.
Attest:Jason A. Seth, City Clerk
5/26/2022