Loading...
HomeMy WebLinkAboutP_Site_Plan_181022_v1.pdf/ -LEGEND WETLAND / /// /j/ / F / WETLAND — I �/ / i — — V WETLAND EDGE - ® PROPOSED DRILL SITE OR/// ///// / / / / / \ / / / �� I CITY OF RENT ALTERNATE— � DING COUNTY. NOTES // 1. DRILL AND SAMPLE SOILS IN LOCATIONS // / / / / SHOWN. i 2. RESTORE SITE IMMEDIATELY AFTER SAMPLING. / / / �� / /"ate �/ / — B 02-18 (ALT) ��' 0 30 60 00 SCALE IN FEET \ 3. NO CLEARING OR GRADING IS ALLOWED. B 02-1/8/ / V� 04 z - -- Q9 0 Ind I �BLACK RIVER - / G� / / FLOW OHVV / / / �i — i / / / i / / ' ' / ' i / �� ,��j II� •� / �� i BVa--- % // u 12 — \ — — — %�___—B 01-18 (ALT) --- 1 / xa ss — - - - - - -------- MONSTER RD SW OMH • ------------ CB I -- CB CB/ - - - _ CBS Know what's below. Call before you dig. (UNDERGROUND UTILITY LOCATIONS ARE APPROX.) FIELD BOOK: -- SURVEYED: -- SURVEY BASE MAP: -- CHECKED: -- -- NUM. REVISION BY DATE APPROVED: MARK RUEBEL, P.E. 10/2018 PROJECT TOM BEAN, P.E. 10/2018 MANAGER: PROJECT No. 1129574 CONTRACT No. E00544E 18 ' King County Resources arks Department Lad ResNatural Resources Water and Land Resources Division River and Floodplain Management Section Christie True, Director BLACK RIVER PUMP STATION GEOTECHNICAL EXPLORATION EXPLORATION PLAN SHEET 3 OF 3 SHEETS -- -- DESIGNED: -- NUM. RECORD CHANGES APPROVED BY DATE KAY KITAMURA 10/2018 CAD DESIGN: