HomeMy WebLinkAboutP_Site_Plan_181022_v1.pdf/
-LEGEND WETLAND
/ /// /j/ / F / WETLAND
— I �/ / i
— — V WETLAND EDGE
-
® PROPOSED DRILL SITE OR/// ///// / / / / / \ / / / �� I CITY OF RENT
ALTERNATE—
� DING COUNTY.
NOTES //
1. DRILL AND SAMPLE SOILS IN LOCATIONS // / / / /
SHOWN.
i
2. RESTORE SITE IMMEDIATELY AFTER SAMPLING. / / / �� / /"ate �/ / — B 02-18 (ALT) ��'
0 30 60 00
SCALE IN FEET \ 3. NO CLEARING OR GRADING IS ALLOWED.
B 02-1/8/ / V�
04
z
- --
Q9 0
Ind I
�BLACK RIVER
-
/ G� / / FLOW
OHVV
/ / /
�i — i / / / i / / ' ' / ' i / �� ,��j II� •� / ��
i
BVa--- % // u
12
— \ — — —
%�___—B 01-18 (ALT) --- 1
/ xa
ss
— - - - - -
--------
MONSTER RD SW
OMH •
------------
CB I -- CB CB/ - - - _ CBS
Know what's below.
Call before you dig.
(UNDERGROUND UTILITY LOCATIONS ARE APPROX.)
FIELD BOOK: --
SURVEYED: --
SURVEY BASE MAP: --
CHECKED: --
--
NUM. REVISION BY DATE
APPROVED: MARK RUEBEL, P.E. 10/2018
PROJECT TOM BEAN, P.E. 10/2018
MANAGER:
PROJECT No. 1129574
CONTRACT No. E00544E 18
' King County
Resources arks
Department Lad ResNatural Resources
Water and Land Resources Division
River and Floodplain
Management Section
Christie True, Director
BLACK RIVER PUMP STATION
GEOTECHNICAL EXPLORATION
EXPLORATION PLAN
SHEET
3
OF
3
SHEETS
--
--
DESIGNED:
--
NUM. RECORD CHANGES APPROVED BY DATE
KAY KITAMURA 10/2018
CAD DESIGN: