HomeMy WebLinkAboutR-4035048 I 7 I 6 I 5 1 4I 3 i 2 Lo co C) C) ui c RECOMMENDED CONSTRUCTION SEQUENCE 1. PRE -CONSTRUCTION MEETING. 2. POST NOTICE OF CONSTRUCTION ACTIVITY SIGN WITH NAME AND PHONE NUMBER OF CESCL. oma cm NIA MATCH LINE SEET SHEET 2 3. FLAG OR FENCE CLEARING LIMITS. SEASON OR TWO DAY S DURING THE WET N , , , jj PLASTIC SHEETING OR EQUIVALENT. S I LT FENCE 4.- INSTALL CATCH BASIN PROTECTION IF REQUIRED 10. STABILIZE ALL AREAS THAT REACH FINAL GRADE WITHIN SEVEN DAYS. _Ir '0000 5. INSTALL PERIMETER PROTECTION (SILT FENCE, BRUSH BARRIER, ETC.). 11. SEED OR SOD ANY AREAS TO REMAIN UNWORKED FOR MORE THAN 30 DAYS. 43 6. CONSTRUCT SURFACE WATER CONTROLS (INTERCEPTOR DIKES, PIPE SLOPE ALL DISTURBED AREAS MUST BE STABILIZED AND BEST ETC.) SIMULTANEOUSLY WITH CLEARING AND GRADING FOR 12. UPON COMPLETION OF THE PROJECT, DRAINS, SILT FENCE/ CONSTRUCT ION LIMITS9 MANAGEMENT PRACTICES REMOVED IF APPROPRIATE. PROJECT DEVELOPMENT. V V SEE SHEET 37. MAINTAIN EROSION CONTROL MEASURES IN ACCORDANCE WITH CITY OR RENTON nC- T A T I A STANDARDS AND MANUFACTURER'S RECOMMENDATIONS. aaJ ,�-USE HIGH -VISIBILITY �0: 1w 0 rrvr rvvI v jrII��>f J�..-l< Il( .,,IlIl -I,��.I � I .���1^ C CC rvv vIi`III I. LRae ( II 'I I °4,e 4 CIL FENCE OUTSIDE OF SUBSTATION FENCE. V F W� SEE SHEET 39 DETAIL 3 ,o LLj re) . ..... .. ..... . . . .... ....... ....... .. . .. . ...... ... F Oc) CLEARING ... .......... ...... ....... LIMITS _0 .... . ... ...... . . ..... . . ..... . . .. .... . ....... . .. . .......... ....... ....... ...... .. .... . . ......... LLI F U) m n n n n Ld n >_ Ld �;y Ljj < V) 4. Ld V) . . . . . . . . . . �77 ....................... 4# 0 CL c L:j L: i L: L: L: L: L: D L: 1 . LLJ Li F: F:1 F.:1 F-1 F:1 F: I.- F.-:1 F. It It 0­ L J _j CATCH BASIN INSE RT "J1 (TYP FOR ALL CATCH 'A I r- DETAIL 1) r r - - - r r - - - BASINS, SEE SHEET 3 KEY ... DIVIDER INTO SLOPE TO PREVENT FLOW AROUND SIDES SILT ri ri FENCE 1i fi L: i L: i L: i L: L: i FT: I F_: I 0 0 -------- ------ -7 > ........... USE HIGH -VISIBILITY ........ ----------- ­­­, A\ FENCE OUTSIDE OF SUBSTATION FENCE. SEE SHEET 39 DETAIL 3 7 7 % . . . . . . . . . . . . . I . . . . . . . . . . . . . . .. . . ............. - - - - - - - - --- - % . . . . . . . . . . . . . . . MATCH LIN.E--,,,(230KV SIDE) (115KV SIDE) E TOPO LEGEND LEGEND: G EXISTING GAS LINE OHP EXISTING OVERHEAD POWER LINE T EXISTING UNDERGROUND TELEPHONE p EXISTING UNDERGROUND POWER w EXISTING WATER LINE 444 EXISTING CYCLONE FENCE LINE EXISTING PROPERTY LINE - - - 444--- POWER POLE W/ LUMINAIRE DPP POWER POLE n EXISTING SIGN EXISTING GUY ANCHOR 0 0 0 EXISTING STREET LIGHT 136 EXISTING CATCH BASIN 10 ELECTRICAL BOX + BENCHMARK T EXISTING TELEPHONE MANHOLE L (P EXISTING STORM DRAIN MANHOLE SDMH EXISTING FIREHYDRANT EXISTING DECIDUOUS TREE(DIA.) E 0 REBAR/CAP MARKED "SKODJE 19645" EXISTING SURFACE MONUMENT F7-777 EXISTING MONUMENT IN CASE EXISTING CONCRETE fug EXISTING GRAVEL • 59.5 SPOT ELEVATION u u 8 7 SPOT ELEVATION PROPOSED CONTOURS RECOMMENDED CONSTRUCTION SEQUENCE (CONTINUED) 8. RELOCATE SURFACE WATER CONTROLS AND EROSION CONTROL MEASURES OR INSTALL NEW MEASURES SO THAT AS SITE CONDITIONS CHANGE THE EROSION AND SEDIMENT CONTROL IS ALWAYS IN ACCORDANCE WITH THE CITY OF RENTON EROSION AND SEDIMENT CONTROL STANDARDS. 9. COVER ALL AREAS THAT WILL BE UNWORKED FOR MORE THAN SEVEN DAYS DURING THE DRY SEASO IT STRAW WOOD FIBER MULCH COMPOST EXISTING CONTOURS PROPERTY LINE CONSTRUCTION II II II - -- __--I 11 ST ATION O FEN CE LIMITS CONCRETE HANDL ING SLOPE AND FLOW DIRECTION FOUNDATIONS (REF ONLY) TYPE I CATCH BASIN (SEE DRAINAGE PLAN) TYPE It CATCH BASIN (SEE DRAINAGE PLAN) DITCH LINE DRIVEWAY CATCH BASIN INSERT CLEARING OR CONSTRUCTION LIMITS/HIGH VISIBILITY FENCE SILT FENCE F7 om 1. CONCRETE TRUCK CHUTES, PUMPS, AND INTERNALS SHALL BE WASHED OUT ONLY INTO AN ECO-PAN. 2. UNUSED CONCRETE REMAINING IN THE TRUCK AND PUMP SHALL BE RETURNED TO THE ORIGINATING BATCH PLANT FOR RECYCLING. 3. HAND TOOLS INCLUDING, BUT NOT LIMITED TO, SCREEDS, SHOVELS, RAKES, FLOATS, AND TROWELS SHALL BE WASHED OFF ONLY INTO AN ECO-PAN. 4. CONTAINED CONCRETE SHALL BE DISPOSED OF IN A MANNER THAT DOES NOT VIOLATE GROUNDWATER OR SURFACE WATER QUALITY STANDARDS, OR THE CONDITIONS OF THE NPDES PERMIT IF APPLICABLE. 5. CONTAINERS SHALL BE CHECKED FOR HOLES IN THE LINER DAILY DURING CONCRETE POURS AND REPAIRED THE SAME DAY. 30 0 30 60 GRAPHIC SCALE 1 30' 0 120 IN COMPLIANCE WITH CITY OF RENTON STANDARDS DEVELOPMENT ENGINEERING jtjohnson 05/09/2017 SURFACE WATER UTILITY rstraka 05/09/2017 - 10 ��jb <) OQY4D <) A, A V. REFERENCE DRAWINGS D-1 8730 SITE LAYOUT AND GENERAL NOTES D-1 8734 GRADING AND FENCING PLAN D-1 8736 DRAINAGE PLAN D-1 8737 FOUNDATION PLAN D-1 8738 STRUCTURAL PLAN REVISION DESCRIPTION: WO NUMBER: 111022315 PERMIT SUBMITTAL CAD ENGINEER REVIEWED APPROVED v 5 s.#-- /, 3, 4 �� tz DATE (M/D/Y) // / / -7 / /6 t7 11tv 2 R-403504 VORE CALL BEFORE YOU DIG Call: TOLL FREE E7 E7 E7 k4 1-800-424-5jj�) TEMPORARY EROSION/SEDIMENT CONTROL PLAN-230KV SWITCHYARD TALBOT HILL SUBSTATION *PUGET SUBSTATION DRAWING NO REV NO SOUND ENGINEERING D _ 1 8732_ 0 ENERGY DEPARTMENT SHEET-: 1 OF 3 SCALE: 1 30'-0" CLASS: S I TE FILE NO: CADD NO: $$DGN$$ CODE: TAL $FILE$