Loading...
HomeMy WebLinkAboutR-4035068 ( I � 6 Lo co C) I C) I W Fom C _w cr W N A —I w Q 0 STANDARD STRENGTH FILTER FABRIC GRATE MAINTENANCE STANDARDS II I Millis I I� I II I 1. ANY ACCUMULATED SEDIMENT ON OR AROUND THE FILTER FABRIC SHALL VWITH MSEDIMENT I I) I LLNOTBE REMOVED WATER, AND ALLSEDIMENT SHALL -I I II I II I MUST BE DISPOSED OF AS FILL ON -SITE OR HAULED OFF -SITE. -I I I i CATCH BASIN I 2. ANY SEDIMENT IN THE CATCH BASIN INSERT SHALL BE (�I _ REMOVED WHEN THE SEDIMENT HAS FILLED ONE THIRD OF II I I I� II II THE AVAILABLE STORAGE. THE FILTER MEDIA FOR THE INSERT SHALL BE CLEANED OR REPLACED AT LEAST MONTHLY. FILTER FABRIC PROTECTION 3 FOMS IS CRIMANYLFORMSFORBOFHPROTECTOIONCATCH BASINAPROTECTION.MAINTENANUNLIKETHAT FAIL GRADUALLY, CATCH BASIN PROTECTION WILL FAIL NOTE: ONLY TO BE USED WHERE SUDDENLY AND COMPLETELY IF NOT MAINTAINED PROPERLY. PONDING OF WATER ABOVE THE CATCH BASIN WILL NOT CAUSE TRAFFIC PROBLEMS AND WHERE OVERFLOW WILL NOT RESULT IN EROSION OF SLOPES. /- CATCH BASIN GRATE OVERFLOW SOLID WALLS MEDI FORTER DEWATERING POROUS' BOTTOM CATCH BASIN INSERT NOTE: THIS DETAIL IS ONLY SCHEMATIC. ANY INSERT IS ALLOWED THAT HAS A MIN. 0.5 C.F. OF STORAGE, THE MEANS TO DEWATER THE STORED SEDIMENT, AN OVERFLOW, AND CAN BE EASILY MAINTAINED. FILTER FABRIC SKIRT SECURED WITH GRATE- CATCH BASIN GRATE POLYETHYLENE PROVIDE ADEQUATE STRAPPING PERFORATED POLYETHYLENE — DRAINAGE TUBING, DIAMETER —UWATERTIGHT CORRUGAI MIN_ 2" LARGER THAN -METAL RIB DEWATERING ORIFICE_ — TUBING SHALL COMPLY - WITH ASTM F667 AND — AASHTO M294. - --TACK WELD ' "s RETRIEVAL STRAP HE FILTER FABRIC INSERT (PSE M I D 9995728 ) OD OVERFLOW _ COLLECTED ( IIIf SEDIMENT _II�III= ALTERNATE I= CATCH BASIN INSERT I CATCH BASIN SEDIMENT CONTROL _T F19- -1 Arm m� we FOR INSTALLATION, SEE TECHNIQUES FOR TEMPORARY EROSION AND SEDIMENT CONTROL, PSE STANDARD 0150.3200 NTS 3.5' MIN. DEWATERING ORIFICE, SCHEDULE 40 STEEL STUB MIN. DIAMETER AS PER CALCULATIONS I 6` MIN. C--- 18" MIN' ALTERNATIVELY, METAL STAKES AND WIRE MAY BE USED TO CONCRETE BASE PREVENT FLOTATION �--- 2X RISER DIA. MIN. SEDIMENT POND RISER DETAIL 2 RISER PIPE (PRINCIPAL SPILLWAY) OPEN AT TOP WITH TRASH RACK PER FIG. 4.4.4� DEWATERING DEVICE (SEE RISER DETAIL) 1.5' _I i I-i I I - I I I -III -I I I� I WIRE —BACKED SILT FENCE, DEWATERING STAKED HAYBALES WRAPPED ORIFICE WITH FILTER FABRIC, OR EQUIVALENT DIVIDER DESIGN AND INSTALLATION SPECIFICATIONS 1. THE GEOTEXTILE USED MUST MEET THE STANDARDS LISTED BELOW. A COPY OF THE MANUFACTURER'S FABRIC SPECIFICATIONS MUST BE AVAILABLE ON SITE. AIDS (ASTM D-4751) = 30-100 SIEVE SIZE (0.60-0.15 mm) FOR SLIT FILM 50-100 SIEVE SIZE (0.30-0.15 mm) FOR OTHER FABRICS WATER PERMITTIVITY (ASTM D-4491) = 0.02 SEC' MIN. JOINTS IN FILTER FABRIC SHALL BE SPLICED GRAB TENSILE STRENGTH (ASTM D-4632) = 180 LBS MIN. FOR EXTRA STRENGTH FABRIC AT POSTS. USE STAPLES, WIRE RINGS, OR 100 LBS MIN. FOR STANDARD STRENGTH FABRIC EQUIVALENT TO ATTACH FABRIC TO POSTS. GRAB TENSILE ELONGATION (ASTM D-4632) = 30% MAX. ULTRAVIOLET RESISTANCE (ASTM D-4355) = 70% MIN. 2. STANDARD STRENGTH FABRIC REQUIRES WIRE BACKING TO INCREASE THE STRENGTH OF THE FENCE. WIRE BACKING OR CLOSER POST SPACING MAY BE REQUIRED FOR EXTRA STRENGTH FABRIC IF FIELD PERFORMANCE WARRANTS A STRONGER FENCE. 3. WHERE THE FENCE IS INSTALLED, THE SLOPE SHALL BE NO STEEPER THAN 2H:1V. �2J CREST OF 6' MIN. WIDTH EMERGENCY SPILLWAY _ 1' MIN. EMBANKMENT COMPACTED 95%. PERVIOUS MATERIALS SUCH AS GRAVEL OR CLEAN SAND SHALL NOT BE USED. ____- �_ ---------------- �'____ � _ __ ------ ----- -- - 9f II I I I I I I- DISCHARGE TO STABILIZED CONCRETE BASE CONVEYANCE, OUTLET OR (SEE RISER DETAIL) LEVEL SPREADER SEDIMENT POND SECTION rA 1 2 "x2 " BY 14 GA WIRE OR EQUIVALENT, IF STANDARD STRENGTH FABRIC USED. FILTER FABRIC n WAA I ----MIN. 4"x4" TRENCH----' L MAINTENANCE STANDARDS 1. ANY DAMAGE SHALL BE REPAIRED IMMEDIATELY BACKFILL TRENCH POST SPACING MAY BE WITH NATIVE SOIL OR 2. IF CONCENTRATED FLOWS ARE EVIDENT UPHILL OF THE FENCE, THEY MUST BE INTERCEPTED AND INCREASED TO 8' IF WIRE 314"_1.5" WASHED GRAVEL CONVEYED TO A SEDIMENT TRAP OR POND. BACKING IS USED 3. IT IS IMPORTANT TO CHECK THE UPHILL SIDE OF THE FENCE FOR SIGNS OF THE FENCE CLOGGING 2"x4" WOOD POSTS. STEEL FENCE AND ACTING AS A BARRIER TO FLOW AND THEN CAUSING CHANNELIZATION OF FLOWS PARALLEL TO NOTE: FILTER FABRIC FENCES POSTS, REBAR, OR EQUIVALENT THE FENCE. IF THIS OCCURS, REPLACE THE FENCE AND/OR REMOVE THE TRAPPED SEDIMENT. SHALL BE INSTALLED ALONG CONTOUR WHENEVER POSSIBLE 4. SEDIMENT MUST BE REMOVED WHEN IT IS 6 HIGH. 5. IF THE FILTER FABRIC HAS DETERIORATED DUE TO THE ULTRAVIOLET BREAKDOWN, IT SHALL BE REPLACED. SILT FENCE DESIGN AND INSTALLATION SPECIFICATIONS AND MAINTENANCE STANDARDS Nv c1w 2x2 WOOD POST FENCING i MATERIAL F- 6'_0„ MAX HIGH DENSITY POLYETHYLENE OR POLYPROPYLENE MESH, AND SHALL BE UV RESISTANT, ORANGE COLOR %)rf1T T e%AI mne.T ELEVATION FENCE ON SLOPE NOTES 1. POST SHALL HAVE SUFFICIENT STRENGTH AND DURABILITY TO SUPPORT THE FENCE THROUGH THE LIFE OF THE PROJECT. STAPLE TOP TIE SELF-LOCKING TIE NYLON 6/6 (MIN. GRADE), 50# MIN -TENSILE STRENGTH, STEEL T-BAR POST UV STABILIZED. SELF-LOCKING TIE - FENCING NYLON 6/6 (MIN. GRADE), MATERIAL 50# MIN. TENSILE STRENGTH, UV STABILIZED I ( cD �- 1 �~ I a / ENVIRONMENTALLY SENSITIVE AREA BOUNDARY STEEL T-BAR POST TYPICAL SECTION A HIGH VISIBILITY FENCE DETAIL rY�3 z 1 2 N 1 I I I I � I 8 7 6 5 4 $FILE$ IN COMPLIANCE WITH CITY OF RENTON STANDARDS DEVELOPMENT ENGINEERING JO�% jtjohnson 05/09/2017 ll SURFACE WATER UTILITY rstraka 05/09/2017 :01 R-403506 OEFOoE yoGo CALL BEFORE' �c YOU DIG Call: TOLL FREE 1-800-424-5555 REVISION DESCRIPTION: WO NUMBER: 111022315 TEMPORARY EROSION/SEDIMENT CONTROL PERMIT SUBMITTAL 49527 �GI STEg���� ssj4NAL ��� 11A6 « CAD ENGINEER REVIEWED APPROVED 3 NOTES AND DETAILS TALBOT HILL SUBSTATION RR DATE ( M/D/Y ) PUGET SUBSTATION DRAWING NO REV NO J . P4� 5L) n IG % I� % �� , SOUNDENGINEERING ENER D DEPARTMENT - 18732 0 •US �� �� l6 SHEET: 3 OF 3 SCALE: NONE CLASS: S I TE FILE NO: J wet,3 CADD N0: $$DGN$$ CODE: TAL 2 1 -E Eno k