Loading...
HomeMy WebLinkAboutR-4035078 A 7 U 6 \ 5 JL 4 1 3 2 1 1 C +* cr m m � +* A � 3 WIDE SHOULDER RE—ESTABLISH 5'-0" SHOULDER ISOLATION FENC EW 7' HIGH STATION FENCE' AND INSTALL 4" OF NEW YARD ROCK, TYP AROUND SUB . ..... AND FENCE, TYP SHEET 2 TO BE CONSTRUCTED IN SAME PLACE i (SEE SHEET 3. DETAIL 1 AS EXISTING FENCE. p 77, F. � ri FINISHED STATION SEE NOTE 1 20' WIDE STATION GATE .38-25 438-05 438-25 Lo Ln 438-05 ---------- ------ -- X -, -, " N `438-25 �1�1`���� ^��H� / / ~�/^ « ~� � � � ` LEGEND: °438^25 SPOT ELEVATION 444 — PROPOSED CONTOURS ---444-- EXISTING CONTOURS -�---- PROPERTY LINE STATION FENCE SLOPE AND FLOW DIRECTION -----| | | FOUNDATIONS (REF ONLY) L - - - -� F� TYPE [ CATCH BASIN �� (SEE DRAINAGE PLAN) TYPE [I CATCH BASIN x�r (SEE DRAINAGE PLAN) DITCH LINE DRIVEWAY GRADING NOTES SPCC YARD / / SPCC CURB AREA -' 1^ THE CONTRACTOR SHALL NOTIFY THE ENGINEER IN THE EVENT OR DISCOVERY OF POOR SOILS, GROUNDWATER OR DISCREPANCIES IN THE EXISTING CONDITIONS AS NOTED ON THE PLANS. 2. EMBANKMENTS DESIGNED TO IMPOUND WATER SHALL BE COMPACTED TO 95% WAX{WUW DENS lTY PER SECTION 2-03.3(14)C. METHOD C OF WSDOT STANDARD SPECIFICATIONS. 3` ALL AREAS RECEIVING FILL MATERIAL SHALL BE PREPARED BY REMOVING VECET4TION, NONCOMPLYING FILL, TOPSOIL AND OTHER UNSUITABLE WATERIAL, BY SCARIFYING THE SURFACE TO PROVIDE 4 BOND WITH THE NEW FILL, AND WHERE SLOPES ARE STEEPER THAN 3 HORIZONTAL TO 1 VERTICAL AND THE HEIGHT IS GREATER THAN 5 FEET, BY BENCHING INTO SOUND COMPETENT MATERIAL AS DETERMINED BY A SOILS ENGINEER. U���~�K_�� �`��� U ���� 1. INSTALL 4^ THICK LAYER OF YARD COURSE (PER PSE SPEC. 1275.1330) AND 9" OF BASE COURSE (PER PSE SPEC. 1275,1310) IN 230KV SWlTCHYARO, BACKFILL AREAS WITH BASE COURSE AND 4" OF YARD ROCK WHERE EXISTING FOUNDATIONS HAVE BEEN REMOVED AND NO NEW FOUNDATION IS LOCATED. THE NEW LAYER OF YARD COURSE WILL MATCH THE EXISTING YARD COURSE ELEVATION. 2, TOP OF FOUNDATIONS INCLUDING 5PCC CURB SET AT 439.33, INTENTION IS FOR TOP OF YARD ROCK TO BE 1" BELOW FOUNDATIONS. Hli ui TNORTH-SOUTH BASELINE ^IJROAD F CONTROL , / ( HOUSE APPROXIMATE EARTHWORK QUANTITIES U AANTITIES EXCAVATION: 12^400 CY EMBANKMENT: *8^800CY *INCLUDING IMPORTED FILL & ROCK (QUANTITIES SHOWN FOR PERMITTING PURPOSES ONLY, CONTRACTOR SHALL VERIFY QUANTITIES). IN COMPLIANCE WITH CITY OF RENTON STANDARDS DEVELOPMENT ENGINEERING 30 O 30 60 ��}���T� SCALE �.`,�...�� 1" = ]O' REVISION DESCRIPTION: J 'WE I R1 �4z 4 X_ / PERMIT SUBMITTAL mA U � REFERENCE K_FERK_NCK_ DRAWINGS D-18730 SITE LAYOUT AND GENERAL NOTES D-18732 TEMPORARY EROSION AND SEDIMENT CONTROL PLAN D-18735 ACCESS ROAD PLAN D-18736 DRAINAGE PLAN D-18737 DETENTION POND PLAN D-18738 FOUNDATION PLAN D-19739 STRUCTURAL PLAN 120 R-403507 ORE CALL BEFORE YOU DIG Call: TOLL FREE Err ������� ��� ������U� PLAN k �� GRADING ��U�� FENCING ���� ����U� 230K V SWITCHYARD � � k ��� HILL k U SUBSTATION ���� � � � ��� � ������� � � � �� ���� � �� � � ����DRAWING NO REV NO E A $F ILE$ 7 U 5 ENGINEER (2 0 At 3 2 | 1