Loading...
HomeMy WebLinkAboutR-403516C rr w w 0 8 ( 1 I I I + I _ �_ 1 UU TT SS RR PP NN • (FUTURE) I 217'-9" I 54' -0" 27' -0" 27' -0" 27' -0" 1. 27' -0" ' 27' -0" 27' -0" 27, -0" i 27' -0" 27'-0" o N i 1 D-15813 - J— - - — _j • N SECURo I CAMERATY I I zI o 1 I -1 POLE N Ja I D�581 3 FOUNDATION I > I N o O N �D-3797 D-3797 D-3797 D-3797 D-3797 0 ED- D-3797 D-3797 rnlw O D-3797 D-3797- - - co N CL U_ 1 1 1 D-3797 230KV BUS SUPPORT D-3797 1- - D-3797 � D-3797 D-3797 D-3797 � - - D-3797 - - D-3797 — - D-1 3744 D-3797 D-3797 FOUNDATIONS I D-3797 - 9210 D- I 10 I D-91210 D-91210 I D-91210 1 o D ` � 1 92 Co -I -- - - - --I-- - �T- --I- - + + - - - --- - - - - - - 230KV SWITCH STAND - FOUNDATIONS 1 :: :: :: I :: 8' -0"1 8' -0" 8' -0" 8' -0" 8' -0" 8' -0„ 8 , _0„ 8' +0„ I 8' _0„ 0 8' _0„ I I `I 1 D-1 7907 D-1 7907 D-1 7907 D-1 7907 D-1 7907 I - --- - - - - - - - - - - -- - - - - - - - —- - ' - 230KV PCB- - - -N FOUNDATIONS D-18742, D-18742� D-18742, D-18742 D-18742 0 I I `1 ao � 230KV DEAD END N =N FOUNDATIONS 0 0 1 ,D-17907 D-17907 iD-17907 ID-17907 D-13747 ,1 ' = t-- ---- - - - - - - - - --- - - - - --- - = - - - - 230KV PCB- - - 1 FOUNDATIONS LJJ I 13' -11 1/4- ` 8 -0 I Ld -I o 1 ' I I r I N D-9210 D-9210 D-9210 D-9210 D-27J1(4) a 1 230KV SWITCH STAND I :: :: :: :: _ _ _ AND YARD JUNCTION Lu 1 �a3097- - - - - + } _ _ `r I__ BOX SUPPORT - - z I i - _ FOUNDATIONS —j i�1 60 8, _0„ 8, _0„ 8, _0„ g' -0" 8'-0 8' -0" 1 0 0 1 0, _0„ 1 D-3797 00 D-------I-- - --i-I D 3797 D3797 D-379D-3797 230KV BUS U D-379 SUPPORT I- -- -- - -4- - —ID-13744 _ 'D-3797 D-3797'FOUNDATIONS D-15813 L------- - - -- El - - - - - - - - - -- - - - - - - --- -- E 1 D-3797 D-3797 D - 3 7 9 7 D-3797 D-3797 D-3797 LJD-3797 1 D-3797 0 00 1 I 27'-0" 27'-0" 27,_011 ( 27,_0„ I 27'-0" I 27'-0" I 27'-0" I 27'-0" I 27'-0" 1 FILL PIPE w/CONCRETE (TOP TO BE ROUNDED) 6 DIA x 7 -0 LONG SCH 40 GALV PIPE 1" x 2'-0"LONG (MIN) REFLECTIVE MATERIAL (MIN OF 2 PLACES) CONCRETE MATCH LINE �o i rn 1'-6" DETAIL 1 BOLLARD NTS INSTALL (2) BOLLARD SEE DETAIL 1 (230kV SIDE) t 1 15 k V S I D E) TOOL EDGE, APPLY FULL WIDTH BROOM (TYP) 6 `FINISH N J U c 0rn �v 1 0 ( 6 ) #4 REINFORCING--.,,R '•� BARS, LAP w/#4 > CORNER BARS 2' N #4 CORNER BARS �v Of-- t aa w> r °v'' > o ~ UGo I t b rn I 2"CLR TYP #4 BARS @ 12" 44 STD HOOKS 1'-10" @ 12" OC DETAIL 2 SPCC CONC CURB (TYPICAL CROSS SECTION) REINFORCING SHALL BE CONTINUOUS FULL LENGTH OF CURB. MINIMUM LAP BETWEEN INDIVIDUAL BARS SHALL BE 24" (TYP). NOT TO SCALE • • az ro �F—I �o z �o -O, -LL_ r 3w J i1 O ' SECURITY CAMERA POLE FOUNDATION 2, -0„ 230KV SWITCHYARD NORTH -SOUTH BASELINE D-15815 SECURITY ACCESS POST FOUNDATION - - - - —- - 6,_0„ v INSTALL (2) BOLLARD ,I SEE DETAIL 1 115KV SWITCHYARD NORTH -SOUTH BASELINE I SECURITY ACCESS clilln —POST FOUNDATION 7' - D-15815 1 0 EXISTING POLE 20 0 20 40 GRAPHIC SCALE 1 " = 20' f 1 I I ( 1 1 8 7 6 5 4 $FILE$ ■E 2 1 FOUNDATION SCHEDULE (230kV SHT 1 & SHT 2) LINE DWG NO QTY DESCRIPTION COMMENTS 1 D-2791 4 230KV AUGERED FOOTING 2 D-3097 r84 YARD JUNCTION BOX AND PANEL SUPPORT FOUNDATION 3 D-3797 230KV SINGLE PEDESTAL FOUNDATION 5 —0 X 5 —0 X 1 —0 4 D-9210 19 230KV SWITCH STAND FOUNDATION ADD 17, REV 1 E 5 D-13744 2 230KV SINGLE PEDESTAL FOUNDATION ADD 1, REV 1 5 O X5-0 X2-0 6 D-13747 2 PCB FDN 11'— 0" x 11'-0" X 1'-6" 230KV MITSUBISHI GAS BREAKER 7 D-15813 6 SECURITY CAMERA POLE FOUNDATION 4 -0 x 4 -0 x 1 -6 8 D-15815 2 SECURITY ACCESS POST FOUNDATION 2 -0 x 2'-0" x 1 -6 9 D-17907 16 230KV 3000A GAS POWER CIRCUIT BREAKER ADD 15, REV 1 FOUNDATION FOR SIEMENS 50KA BREAKER 10 D-18742 11 55' DEADEND TOWER FOUNDATION 11 NOTES: 1. ALL NEW FOUNDATION ELEVATIONS SHALL MATCH EXISTING FOUNDATIONS, UNLESS OTHERWISE NOTED. 2. STRUCTURAL CONCRETE, MINIMUM 28-DAY COMPRESSIVE STRENGTH, F'c = 4,000 PSI 51/2 SACKS CEMENT PER CUBIC YARD OF CONCRETE, MINIMUM AIR ENTRAINING ADMIXTURE TO PROVIDE AIR CONTENT OF 5% PLUS OR MINUS 1.5%, SLUMP 4" PLUS OR MINUS 1". 3. CONCRETE SHALL BE PLACED ON FIRM COMPACTED NATIVE SOIL. IF SOFT OR WET SOILS ARE ENCOUNTERED, OVER -EXCAVATE AND REPLACE WITH IMPORTED GRAVEL OR CRUSHED ROCK AS DIRECTED BY ENGINEER OR REPRESENTATIVE. COMPACT TO 95% DRY DENSITY OR AS DIRECTED. REFERENCE DRAWINGS D-18730 SITE PLAN AND GENERAL NOTES D-18734 GRADING AND FENCING PLAN D-18739 STRUCTURAL PLAN D-14569 STATION CONDUIT 230KV YARD LEGEND ElPROPOSED FOUNDATION Q EXISTING FOUNDATION IN COMPLIANCE WITH CITY OF RENTON STANDARDS DEVELOPMENT ENGINEERING jtjohnson 05/09/2017 ' 0 0 m m m m m ■ 0 0 m m m m m a ❑ ❑ ❑ ❑ 11 z 213OkV 11 ESWITCHTARD 5-18738± ZATa ILI LIT 7107111110 - ®m D o D®. ■■ i i0■r .®DoD®o ■ o o • �o ■■p ■•a o ep e o f at SR ■°a o • o • �a • �a ®®®® 0 USE 0 0 � 00 O oe .• ee ee oe o 0 0 KEY PLAN R-403516 THIS DRAWING SUPERSEDES D-2867_01 REVISION DESCRIPTION: WO NUMBER: 111023064 FOUNDATION PLAN PERMIT SUBMITTAL 2 3 0 K V S W I T C H Y A R D 3 CAD ENGINEER REVIEWED APPROVED TALBOT HILL SUBSTATION DATE ( M/D/Y ) PUGET SUBSTATION DRAWING NO REV NO SOUND ENGINEERING DEPARTMENT D— 18738 ENERGY 1 SHEET: 1 OF 2 SCALE: 1 "= 207-0" CLASS: FILE NO: J. a4 T 1 / 15-/1(, CADD NO: $$DGN$$ CODE: TAL 2 1 17 F- A