Loading...
HomeMy WebLinkAboutR-4035247 6 5 4 3 2 i 1 Lo L' J O 0 i W E 91 C HYDROMULCH PER SPECIFICATIONS (FEATHER HYDROMULCH TO STEM) FINISHED GRADE SOIL PER SPECIFICATIONS NATIVE SHRUBS PLANTING DETAIL NOT TO SCALE TREE PER PLAN AND SPECIFICATIONS ROOT CROWN 1" ABOVE FINISH GRADE MULCH PER SPECIFICATIONS SET ROOTBALL ON UNDISTURBED SUBGRADE. CUT AND REMOVE TWINE AND BURLAP FROM TOP AND SIDES OF ROOTBALL. (REMOVE ALL WIRE BASKETS.) AMENDED SOIL PER SPECIFICATIONS DECIDUOUS TREE PLANTING DETAIL NOT TO SCALE Ld w DEPTH AT LEAST ROOT LENGTH STEP 1 A w Q 0 SET R, CROW ORIGIN GRADE GENTLY LOOSENED AND PLACED IN NATURAL POSITION. STEP 2 STEP 3 BAR TWO INCHES FROM PLANT AND FIRM SOIL AGAINST BOTTOM OF ROOTS ONE YEAR TRANSPLANT PLANTING NOT TO SCALE STEP 4 COMMON BOTANICAL % % % NAME NAME WEIGHT PURITY GERMINATION TALL OR MEADOW SCHEDONORUS 75-80% 98% 90% FESCUE PRATENSIS SEASIDE AGROSTIS 10-15% 92% 85% BENTGRASS PALUSTRIS REDTOP AGROSTIS BENTGRASS GIGANTEA 5-10% 98% 90% -{dd,<-{ SEED MIXP-Q-< Z-< z-Q-0-< Q<<Q0< I � r� ��iced Omit IM41MA117mil NNUMN\FAI�m BI-=& ,Tr,/, 12, 23,266 TOTAL SOFT SCALE: I" = 2' EMERGENT PLANTING TYPICAL LAYOUT ADD 3" COMPOST PER PROJECT SPECIFICATIONS. TILL INTO TOP 6" OF NATIVE SOIL FOR TOTAL OF 9" AMENDED SOIL NOT TO SCALE PLANT CE x TRIANGULAR SPACING DIAGRAM NOT TO SCALE AGAINST TOP OF ROOTS STEP 5 AND CONFIRM PLANT IS PLUMB AND \ UNDAMAGED STEP 6 FIRM SOIL DOWN INTO THE HOLE TOWARD ROOTS STEP 7 AROUND THE PLANT AND CONFIRM PLANT IS UNDAMAGED AND PLUMB. DO NOT STEP ON PLANT. STEP 8 I POND ACC SS RAMP EMERGENT PLANG +++++++++ 7,000 TOTAL SOFT SCIENTIFIC NAME COMMON NAME SIZE SPACING COUNT PERC. • = CAREX OBNUPTA SLOUGH SEDGE I-YR TRANSPLANT I FT O.C. 3,071 38% DESCHAMPSIA CESPITOSA TUFTED HAIRGRASS I-YR TRANSPLANT I FT O.C. 2,101 26% SC I RPUS CYPER I NUS WOOLY SEDGE I -YR TRANSPLANT I FT O.C. 2,829 35% V SUAL BARR ER 4,378 TOTAL SOFT SCIENTIFIC NAME COMMON NAME SIZE SPACING COUNT PERC. ACER C I RC I NATUM VINE MAPLE 6' TALL 6 FT O.C. 11 1 1 % AMELANCHIER ALNIFOLIA SERVICEBERRY 6' TALL 6 FT O.C. 32 8% CORYLUS CORNUTA BEAKED HAZELNUT 5 GAL 6 FT O.C. 13 14% + MORELLA CER I FERA WAX MYRTLE 5 GAL 6 FT O.C. 15 15% GARRYA ELLIPTICA SILK TASSEL 5 GAL 6 FT O.C. 44 13% ARBUTUS UNEDO STRAWBERRY TREE 5 GAL 6 FT O.C. 36 25% IN COMPLIANCE WITH CITY OF RENTON STANDARDS DEVELOPMENT ENGINEERING tjohnson 05/09/2017 Ij 7 rCURRENT PLANNING vdolbee 05/09/2017 0 DRIVEWAY SCALE: 1 " = 12' VISUAL BARRIER PLANTING TYPICAL LAYOUT R-403524 O� WASN "� REVISION DESCRIPTION: WO NUMBER: 111022315 a `UKe - PERMIT SUBMITTAL VI S UAL- BARRIER PLANTING PLAN TAL_BOT HILL_ SUBSTATION DATE (M/D/Y) PUGET SUBSTATION DRAWING NO REV NO ys`cD CAD LM 12 / 13 / 1 6 ' SOUND ENGINEERING D —1 8 7 4 6 0 ENGINEER TILE 12 / 1 3 / 1 6 p�'L �gNDSCApE ENERGY DEPARTMENT SHEET: 3 OF 4 REVIEWED TLE 12 / 13 / 1 6 CLASS SITE ILE NO: E 0 C n $FILE$ 8 7 6 5 APPROVED / / CADD NO: $$DGN$$ CODE: TAL 4 3 2 1