Loading...
HomeMy WebLinkAboutCM_Constuction_Mitigation_Description_SapphireOnTalbot_181101_v1.pdfBUFFER DATA LONGITUDINAL BUFFER SPACE = B SPEED (MPH) 25 30 35 40 45 50 55 60 65 70 LENGTH (feet) 155 200 250 305 360 425 495 570 645 730 TRANSPORTABLE ATTENUATOR ROLL AHEAD DISTANCE = R HOST VEHICLE WEIGHT HOST VEHICLE WEIGHT 9,900 TO 22,000 Ibs. I > 22,000 lbs. < 45 MPH 45-55 MPH > 55 MPH < 45 MPH 45-55 MPH > 55 MPH 100' 123' 172' 74' 100' 150' PROTECTIVE VEHICLE (WORK VEHICLE) = R NO SPECIFIED DISTANCE REQUIRED 300' ONE LANE .� ROAD AHEAD 48" 48" W20-4 48. W20 -7A ROAD BE WORK PREPARED AHEAD TO STOP 48" 48" W20.1 W20-7111 W20 -7B (OPTIONAL IF 40 MPH OR LESS) LEGEND FLAGGING STATION b TEMPORARY SIGN LOCATION D CHANNELIZING DEVICES PROTECTIVE VEHICLE SIGN SPACING = X (1) FED.AID PROJ.NO. RURAL HIGHWAYS 60 /65 MPH 800'± RURAL ROADS 45/55 MPH 500'± RURAL ROADS & URBAN ARTERIALS 35/40 MPH 350'± RURAL ROADS, URBAN ARTERIALS, 25 / 30 MPH RESIDENTIAL & BUSINESS DISTRICTS 200'± (2) URBAN STREETS 25 MPH OR LESS 100'± (2) (1) ALL SPACING MAY BE ADJUSTED TO ACCOMMODATE INTERSECTIONS AND DRIVEWAYS. (2) THIS SPACING MAY BE REDUCED IN URBAN AREAS TO FIT ROADWAY CONDITIONS. 50' TO 100' 6 DEVICE MIN I I R O AREA 59TO 100' 6 DEVICE W20 -7A ONE LANE ROAD AHEAD� W20-4 W20_7B (OPTIONAL IF 40 MPH OR LESS) 48" 48' BE ROAD PREPARED WORK To STOPrr AHEAD 48" 48" 48. 48' Or . W20-713ONE LANE W20.1 ROAD AHEAD 48" 48" W20 -7A W20-4 BE PREPARED > W20-713 IONAL IF 40 MPH ..RPT LESS) TO STOP 48' W20 -7B 48' ROAD CHANNELIZATION DEVICE SPACING (FEET) MPH TAPER TANGENT 50/65 10 TO 20 80 35/45 10 TO 20 60 25/30 1 10 TO 20 40 WORK NOTES AHEAD 48' 1. ALL SIGNS ARE BLACK ON ORANGE. ONE -LANE, TWO-WAY TRAFFIC CONTROL WITH FLAGGERS NOT TO SCALE 2. EXTENDING THE CHANNELIZING DEVICE TAPER ACROSS SHOULDER IS RECOMMENDED. 3. NIGHT WORK REQUIRES ADDITIONAL ROADWAY LIGHTING AT FLAGGING STATIONS. SEE THE STANDARD SPECIFICATIONS FOR ADDITIONAL DETAILS. 4. SEE SPECIAL PROVISIONS FOR WORK HOUR RESTRICTIONS. Plot 1 TIME 3:05:14 PMs•"•s "WAS FED.AID PROJ.NO. .e -E Amokxnx � �I/ Washington State Department of Transportation .ss TC7� DATE 1/212018 PLOTTED BY Ilddelf DESIGNED BY +". x ... Ex sx.E. o. ENTERED BY CHECKED BY c"x.xnm x"wnox xo. TRAFFIC CONTROL PLAN PROJ. ENGR. REGIONAL ADM. REVISION DATE BY