HomeMy WebLinkAboutR-39680200 C4 M C'M O i LU I-_ THE SOUTHWEST CORNER OF SECTI❑N 3, T❑WNSHIP 23 NORTH, RANGE 5 EAST, W,M,, IN KING COUNTY, WASHINGT❑N, RENTON, WASHINGT❑N CONSTRUCTION SEQUENCE FOUND RBC, LIMITS OF CON SILT FENCE 1. CONTRACTOR TO ARRANGE AND ATTEND A PRE -CONSTRUCTION UNREADABLE, PROP. COR N88°1 2'1 1 FOUND RBC, "VL CONFERENCE WITH THE CITY OF RENTON PRIOR TO BEGINNING SITEWORK. - - � - - - _ EXIST G. 0. 12' N. R VO VO VO 0 RS V _ 0 - - X NREADABLE, PROP. COR., 2. IDENTIFY AND MARK LIMITS OF CLEARING. _ VO VO 0 X 0.3 3' N. ROCKERY F 3. A COPY OF THE APPROVED TESC/SWPP PLAN IS TO BE KEPT ONSITE AT ALL EXISTIN GRAPHIC SCALE GARAC 10 0 5 10 20 TIMES DURING CONSTRUCTION. 5' W OD FENCE I x I I l 4. INSTALL TEMPORARY ROCK CONSTRUCTION ENTRANCE, FILTER FABRIC Co _ I T I FENCES, TEMPORARY SEDIMENT TRAP AND TEMPORARY INTERCEPTOR \ \ \ \ 0 C � m \ I \ SWALES AS REQUIRED. w I \ A MINIMUM OF ONE SET OF APPROVED CONSTRUCTION DRAWINGS AND A N M(w \ \\ 5. COPY OF THE CITY OF RENTON DESIGN AND CONSTRUCTION STANDARDS \ w SHALL BE MAINTAINED IN GOOD (LEDGIBLE) CONDITION ONSITE AT ALL I \ G N �E (: \ TIMES. D E v v \ \ 8 \ \ \ 6. BEGIN SITE GRADING AND UTILITY INSTALLATION GRADE AND PAVE 4 \ \ \ \ \ \ \ ° \ NEW ROCKERY ACCESS DRIVEWAY. w \ 6ft. LINE 438.0 \ \ \ PER\ GRADE \ \ \ \ \ \ \ I \ 7° CONSTRUCT FRONTAGE IMPROVEMENTS \ 438. - \ \ 37.44 N \� 8. A TRAFFIC CONTROL PLAN IS TO BE SUBMITTED BY THE CONTRACTOR TO \ \ Q 39.\ 438.44 33 � THE CITY OF RENTON AND APPROVED BY THE CITY PRIOR TO ANY SITE \ \ 438.44 437.24 ` 437.24 - 36':0 w RELATED ACTIVITIES (INCLUDING OFFSITE UTILITY CONNECTIONS) THAT \ \ Q \ \� COJN6 REQUIRE ROAD CLOSURE OR DISRUPTION OF ACCESS TO NEARBY g GRADE COVERED ) BUSINESSES THAT WILL LAST MORE THAN 15 MINUTES. \ \ \ I \ \ DECK 12 - 9 9. MAINTAIN TESC FACILITIES IN PROPER OPERATING CONDITION DURING ALL \ 440.75 437.15 D \' / / PHASES OF CONSTRUCTION. RELOCATE TESC FACILITIES AS NEEDED AS CONSTRUCTION PROGRESSES. I \ \ I I \ \ \STEW \ \ / bMo 10. COORDINATE UTILITY CONSTRUCTION AND CONNECTIONS WITH UTILITY 10, 0" \ \\ \\ I \ \1 \ \ / PROVIDERS. LPG. SINGLE FAMILY \ \\ ` 11. COMPLETE ONSITE, OFFSITE AND BUILDING CONSTRUCTION AND OBTAIN ETBA I X \ CIYT/UTILITY PROVIDER APPROVAL. INSTALL LANDSCAPING IN 43!J 0 I I CO 61O" i I F ° F . -44 1 ° 2 5 f I \ \ \ >> \ CONFORMANCE WITH LANDSCAPE PLANS. STABILIZE ALL EXPOSED AREAS. w I I I I i I \ \; EV 1 II � � � � 12. REMOVE ON MEASURESDIRECTED BY THE CITY OF EA OV RHA G I REShDENCE \ RENTINSPECTOR AFTER CITY APPROVAL. TAX PARCEL: �0 I I 1 X I I I N 02 �40.2 I I I i HX FARCEL: w l I I I 032305-9161 0 \ I\ I II II I 03h(D-1915Z - n I I I I NEW ROCKERY z I \\ \ \\ \ \40. PER GRADE \ I I \ oLU I \\ 1 1'-4" \ A�4` GETL�\\7\S� 4 z X I I I \ J \ I I of \ \E3� \ �\ 10,E I \\ \\\\\ ��� \\A\\ \\ 441.2 \\ BLDG. CON 36" \ \ go L SETBA 1 rr, �40 \ \ \ \ \ \ R�� \ \ \ \ \ R�� \ I I S&\ FENCE TRENCH DRAIN C�i \ m % 40.�Sz 437.44 \ DRAIN TO \ �P \ POSITIVE 41.1 ft. L NE I LIMITS\OF CONSTRUCTION OUTFALL D I -��- - UJ M R I I \ 440.63 \ 43 I 1 \ LLI cn C' I SODDED \ Z LAWN, D D CO 18\ LUI 440.� \ \ \ \ LU TYPICAL. CQNC PATH _ :� ...:.. I P°P :: : c� .. . �...... \ EXIST G. w Q Q. Q LL:`� ` ` ` ' `� ` ` ` \ �I TING 1 I \ROCKERY I . 1. c '�i. �.'.'..'.. `C C)ty\ �PSu�1 TSUGA I \ \ � =''�' - :DRIVEWAY •.SO:D.DE.D.\- \ MEt�1Z II/ :I ` ` . m cn . O IJG . rra J �LAWVNy::: �LLT FEE I R IN \ t• - EXIST I D REA \ :LL.... I ROCKERY \ 75 V I \ FOUND PK SET IN ATE -ASR�A T, PROP. CORNER .\.W.-014 FOUND BOLT IN LU J Q KE PROP CORNER, CON 36" V CINIUM OVATUM/EVERGR� N I �. T80.0 ''4 4 4 ;W� •LL % 1 1 , I UCKLEBERR MIN. 2 GAL. P� 30 DEDICATION AREA TO I GqS ; C7C;AT ;.�; \ �.W. �& �11 E Z I INLET PROTECTION J . LL . \ THE CITY OF RENTON / x \`PROTETI� C� I :LL:W::LL:y:W:.,: .,W..y.W....W..LL. J:.:.:.�•:.: �:•`. \ \ C. NO. 20160524000548. . O CON 6" \ Q�P�\ •DEC: 6" z CON 24 RRo N Q o SSC i / I \ \ �UREGON \ B MAHGNIA PENS Z ---- - `/ ` M 444.49 / / �P \ GRAPE. P NT 1- ON POTS \ b O 248'-O''NTS -----� \ / / P5Q \ X 4„ 442.74 4 / 0 UTILIZE EXISTING DRI AS CONSTRUCTION, CE\ L' ONCE COMPILE REMOCf) \ o\\ EXTRUDED ASPHALT IICURB II 2+ 0 I - I I X X�-X / EX STING DRIVE AND RE / CB d � O�MUNICATION LOCATE I VE91T I I EXTRUDED A P IAI T CURB I I RIM 432.04 c N I? - I I I II I I I 1 3+00 I II IE 429.49 S 12" w l w w I INLET P - - I - I w w w IAPPROX. WATERLINE LO T4 I -�- � � - I w � w w l w - fi- w SILFENCE II I I 11 II I fi w o0 i � CENTjERLINE OF ROAD � � ^ � N I0 M M (v) l0 - +� � d r/ d It � M M M fV a I RIM 446.33 /8 SS SS SS SS / fn SS SSA SS -�- SS -� SS S� I 1 I I I I I z I I SS I� SS i-- SS SS �- I I Q IE 437.83 E 8 3 I / I SS SS SI SS SS - I T RN TI N L O'BUNCO ENGINEERING 1042 West James Street, Suite 103 Kent, WA 98032 I I I 1 I I EX CURB CB EDGE OF ASPHALT RIM 444.85 d IE 440.75 E,W 12" EX CURB C IE 441.75 N 4" RIM 432.00 .- .__ ._ .. ._„ iLurr nnr REVISION SURVEYED: O DESIGNED: $O DRAWN: LM R CHECKED: BY DATE APPR APPROVEso D: SCALE: 1 "=20' ONE INCH AT FULL SCALE IF NOT ONE INCH SCALE ACCORDINGLY VERTICAL: NAVD 1988 HORIZONTAL: NAD 1983/1991 DATU M Call before you DI. 1-800-424-5555 UNDERGROUND SERVICE (USA) AVOID CUTTING UNDERGROUND UTILITY LINES. IT'S COSTLY CITY OF RENTON Planning/Building/Public Works Dept. THE 13 ELEMENTS OF A CONSTRUCTION SWPPP 1. Preserve Vegetation/Mark Clearing Limits: The clearing limits are indicated on the plan sheet. Furthermore, clearing and grading will be limited to only areas that need to be disturbed for grading/construction of the site and frontage improvements. Construction will require regarding the entire site. Field marking the clearing limits shall be completed prior to clearing and grading activities. 00 BMP's: Preserve Natural Vegetation (VEG) 2. Establish Construction Access: Access to the construction site shall co be limited to the rock construction entrance. The rock construction � entrance shall be installed off of The Street to provide access to the construction vehicle/equipment staging and employee parking areas. r BMP's: Rock construction entrance (CE) 3. Control of Flow Rates: Storm water detention: No detention is (� proposed for the site since the work should be completed in a short period of time. BMP's None Proposed 4. Installation of Sediment Controls: Sediment control will be provided through a combination of filtration through the surround on -site vegetation, or filter fence if required. , BMP's: Silt Fence (SF) Sediment Trap (ST) Interceptor Swale (IS), Inlet Protection (IP) as required 5. Soils Stabilization: Temporary and permanent soil stabilization will be provided. Temporary stabilization will be provided through the application of straw and/or plastic sheeting to exposed, worked earth. From October 1 until April 30, no exposed soil may remain exposed and unworked for more than two days; after May 1, no exposed soil may remain exposed and unworked for more than seven days. BMP's: Straw Covering, Plastic Sheeting, Final Landscaping(as required) 6. Slope Protection: There are no slopes on the site. However, stock piles shall be protected from erosion through cover and prevention of concentrated surface runoff flows. BMP's: Plastic Sheeting, (as required) 7. Protection of Permanent Drain Inlets: Inlet protection will be provided for all catch basins. BMP's: Inlet Protection (IP). 8. Stabilization of Channels and Outlets: All channel slopes shall be constructed and protected against erosion in accordance with City code. BMP's: None required 9. Pollutant Control: Pollutants shall be controlled through the on -site BMP's proposed above. 10. Dewatering Control: De -watering: Interception of the water table is not expected to occur. And should ground water flows be encountered, the water will be fliter for any sediment and the clean water flows will be up to grass areas on site on lots 3 and 4. BMP's: filter and pump. 11. BMP Maintenance: All BMP's and SWPPP elements shall be LO inspected daily and maintained as required. M 12. Project Management: The project shall be managed in a cooperative r effort by the project manager, contractor, engineer, and the city CD inspector. During the construction process, if unforeseen issues arise O that cannot be resolved on site, construction activity (other than SWPPP (D maintenance) shall be halted and the owner's representative and the I� project engineer are to be contacted and informed of the situation. The r Erosion Control Leed is Samuel Obunko 425-451-7300 It 13. Protect on -site stormwater management bmps for runoff from roofs 0- and other hard surface on -site stormwater management bmps used for runoff from roofs and other hard surfaces include: full dispersion, roof downspout full infiltration or dispersion systems, perforated stubout connections, rain gardens, bioretention systems, permeable pavement, sheetflow dispersion, and concentrated flow dispersion. the areas on the site to be used for these bmps shall be protected from siltation and compaction during construction by sequencing the construction in a fashion to install these bmps at the latterpart of the construction grading operations, by excluding equipment from the mps and the associated areas, and by using the erosion and sedimentation control bmps listed below. relevant bmp's bmp c 102: buffer zone NOTE: EXISTING UTILITY LOCATIONS SHOWN HEREON ARE APPROXIMATE ONLY. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO DETERMINE THE EXACT VERTICAL AND HORIZONTAL LOCATION OF ALL EXISTING UNDER- GROUND UTILITIES PRIOR TO COMMENCING CONSTRUCTION. NO REPRESENTATION IS MADE THAT ALL EXISTING UTILITIES ARE SHOWN HEREON. THE ENGINEER ASSUMES NO RESPONSIBILITY FOR UTILITIES NOT SHOWN OR UTILITIES NOT SHOWN IN THEIR PROPER LOCATION. CALL BEFORE YOU DIG: 1-800-424-5555. R-396802 IN COMPLIANCE WITH CITY OF RENTON STANDARDS DEVELOPMENT ENGINEERING bbannwarth 11 /02/2018 DATE: MR. MRS MONTANO SINGLE FAMILY RESIDENCE 10 11-18 SMALL SITE DRAINAGE FIEL PAGE: S W W P PLAN DRAWING N0: 2 SHEET: 2 OF: Z LU U Z LU 0 LU J G LL LU Z U) O Z Q Z O 2 U) IIr 2 iE 73