Loading...
HomeMy WebLinkAboutCommittee of the Whole - 06 Aug 2018 - Agenda - Pdf AGENDA Committee of the Whole Meeting 5:00 PM - Monday, August 6, 2018 Conferencing Center, 7th Floor, City Hall – 1055 S. Grady Way 1. CAC Polling Report a) Memo b) Presentation c) Survey 2. Budget Workshop/CIP Prioritization a) 2019-2020 Preliminary CIP Memo and Attachments b) CIP Presentation EXECUTIVEDEPARTMENTMEM0RANDUMDATE:August3,2018TO:EdPrince,CouncilPresidentMembersofRentonCityCouncilVIA:DenisLaw,MayorFROM:RobertHarrison,ChiefAdministrativeOfficerZLAJt4SUBJECT:SummaryoftelephonepollingforCACrecommendationsEMCResearchhascompletedpollingbasedontheCACparksrecommendationsforRecreationalinvestment.Thereportisattached.ThepollingresultswillbediscussedattheCommitteeoftheWholeonAugust6,2018.Thetotalnumberofinterviewswas450,withamarginoferrorof4.6%witha95%confidenceinterval.Belowisaquicksummaryandsomeadditionalconsiderations:Overall•MostbelievethattheCityisheadedintherightdirection.Sixty-six¾ofthesurveyrespondentsansweredintheaffirmative,with15%believingtheCityisonthewrongtrack.•ThetopthreecitedproblemsinRentonwereTraffic,Crime/Safety,andHomelessness.•MostbelievethattheconditionandvarietyofRentonparksandtrailsaregood.TherewerealsohighmarksforthequalityoflifeinRentonandthejobthatRentongovernmentisdoingoverall.TheCityreceivedmixedreviewsontheuseoftaxdollars,whichisnotuncommoninthesetypesofsurveys.•Improvingmaintenanceofroads,maintainingexistingparksandrecreationfacilities,andhiringmorepoliceofficerswereseenasareasofprimaryimportance.ParksProposal•Supportfortheinitialparksandrecreationproposalof$70millionwassplit,withastrongerlevelofintensityfocusedonoppositionoftheproposal.•ThehighestoverallidentifiedprioritywastoconductthemajorrepairsoftheCityparksandrecreationfacilities.Thereweresomeadditionalindividualprojectsthathadsupport,buttheintensityofsupportforcompletingtheseprojectsislower.AGENDA ITEM #1. a) RentonCityCouncilPage2of2August6,2018•Afterreviewingtheproposedprojectsintheproposal,respondentsupportimprovesmarginally,butthereisstillstrongoppositiontoa$70millionproposal.A$40milliondollarproposalwasalsotestedbasedontheCACpriorityprojects.Thesmallerproposalhasmoresupport,butthisappearstoberelativetothecomparisonofa$70millionproposal.Conclusions•Giventhelukewarmsupport,andstrongerintensityofoppositionforaballotproposal,aballotproposaldoesnotmakesensetopursueatthistime.•Thereissupportforimprovementsandinvestmentsintoexistingfacilitiesandthemaintenanceandmajorrepairsofthosefacilities.•Thereissufficientcouncil-manicbondingcapacitythatbondscouldbeissuedtocovertheinvestmentcostsintomajorrepairsandmaintenanceoftheparksandtrailsystem.•Giventherecentcouncil-manicreviewoftheFacilitiesReport,theremaybeanopportunitytocombinemajorcriticalfacilitiesinvestmentalongwiththeinvestmentintoparksandtrailsintoasinglecouncil-manicbond.TheCouncilhashadtheopportunitytoreviewbothreportsandmaywanttoconsiderpotentialinvestmentsaspartofthe2019-2020CityBudget.•Therewassupportforspecificinvestmentsinsomeparkprojects,likeconnectingCedarRiverTrailwithCoulonPark,improvementsatPhilipArnoldandLibertyParks,HenryMosesPoolExpansion,andpotentiallyanewparkattheNarcoproperty.TherearesomealternativefundingopportunitiesthattheCitycancontinuetopursuetoinvestintosomeoftheseprojectsincluding,butnotlimitedto,statecapitalbudgetrequests,private/publicpartnerships,grants,andsomelocalinvestmentbytheCityofgeneraltaxrevenues.Pursuingthisstrategywillrequireamuchlongerterminvestmentstrategyasitcantakeseveralyearstopiecetogetherthisfunding,generallydoneoneprojectatatime.AstheCouncilconsiderstheseprojects,wecanevaluatethevariousfundingopportunitiesandmakesomedeterminationsastothepotentialsuccessofcertainprojectsthatwouldbemorelikelytobefundedthroughtheseadditionalopportunities.cc:KellyBeymer,CommunityServicesAdministratorLeslieBetlach,ParksPlanning/NaturalResourcesDirectorAGENDA ITEM #1. a) City of Renton, Washington Parks and Trails June 2018AGENDA ITEM #1. b) 18-6921 Renton, WA Phone Survey | 2 Methodology Live telephone survey of residents in Renton, Washington. Conducted June 24 –29, 2018. 450 total interviews; Margin of Error +4.6 percentage points at the 95% confidence interval. Conducted by trained, professional interviewers, on both landlines and cell phones. Please note that due to rounding, some percentages may not add up to exactly 100%.AGENDA ITEM #1. b) 18-6921 Renton, WA Phone Survey | 3 Renton by Zip Code City of Renton by Zip Code AGENDA ITEM #1. b) Opinion EnvironmentAGENDA ITEM #1. b) 18-6921 Renton, WA Phone Survey | 5 Right Direction/Wrong Track in Renton Q3. Do you feel that things in Renton are generally going in the right direction or do you feel things have gotten pretty ser iously off on the wrong track? Most believe the City of Renton to be headed in the right direction. At least 6-in-10 within each zip code hold an optimistic view of the City, particularly those in the eastern zip codes of 98058 and 98059. Right Direction 66% Wrong Track 15% (Don't Know/ Refused) 19% 60% 66% 60% 68% 73% 24% 19% 18% 12% 19% 16% 15% 23% 20% 8% 98055 (22%) 98056 (27%) 98057 (11%) 98058 (17%) 98059 (23%) Right Direction (DK/Ref.)Wrong Track AGENDA ITEM #1. b) 18-6921 Renton, WA Phone Survey | 6 Most Important Problem in Renton Traffic is the most frequently cited problem facing the City today, followed by Crime, Homelessness, and issues related to th e recent pace of growth in Renton. 16% 13% 11% 9% 8% 6% 4% 3% 3% 2% 2% 7% 3% 12% Traffic Crime/Safety Homelessness Cost of Housing Growth (e.g. Over-Population, Over-Development, Gentrification) Infrastructure (e.g. Roads, Public transportation, Parks) Downtown Needs Revitalization Taxes/Spending Education/Schools Government/Politicians Drugs Other None/Nothing Don't Know/Refused Q4. What do you think is the most important problem facing the City of Renton today? AGENDA ITEM #1. b) Perceptions of Local Government & City ServicesAGENDA ITEM #1. b) 18-6921 Renton, WA Phone Survey | 8 City of Renton Approval Ratings by Issue The City receives good ratings on quality of life, but with relatively low intensity of opinion. Most believe the condition of parks to be good. The City gets mixed reviews on the job it does using tax dollars responsibly. 25% 24% 11% 6% 5% 48% 53% 65% 57% 35% 6% 6% 1% 10% 21% 18% 14% 21% 21% 28% 4% 3% 2% 6% 12% +52 +59 +53 +36 +1 The variety of public parks and trails available to you in Renton The condition of public parks and trails in Renton The overall quality of life in the City of Renton The job the City of Renton government is doing overall The job the City of Renton is doing using tax dollars responsibly Excellent Good (DK/No Opinion)Only Fair Poor Q5-9. I’d like you to rate the job the City of Renton is doing, on a variety of issues. Using a scale of excellent, good, only f air, or poor, please rate each of the following. If you aren’t sure one way or the other, please just say so. Net Positive AGENDA ITEM #1. b) 18-6921 Renton, WA Phone Survey | 9 Importance of City Services Improving road maintenance tops the list as the most important City service. Maintaining existing park facilities and hiring more police officers are also seen as important. 42% 34% 36% 19% 16% 19% 13% 13% 42% 48% 36% 47% 42% 35% 35% 25% 9% 11% 14% 18% 19% 17% 17% 17% 5% 5% 10% 10% 15% 19% 21% 23% 2% 3% 4% 6% 7% 11% 13% 22% 5.8 5.6 5.4 4.9 4.7 4.5 4.1 3.7 Improving maintenance of roads in Renton Maintaining existing park and recreation facilities in Renton Hiring more police officers in Renton Improving and renovating existing parks in Renton Increasing the type and availability of recreation activities in Renton parks Expanding the pedestrian and bike trail network in Renton Adding more parks in Renton Increasing the number of dog-friendly, off-leash parks 7 - Extremely Important 5-6 4/(DK)2-3 1 - Not at all Important Q10-17. I’m going to read you a list of functions and services provided by the City of Renton Parks and Trails Department. Afte r each one, please rate how important that item is to you, using a scale of 1 to 7, where 1 means not at all important, and 7 means extre mely important. Mean AGENDA ITEM #1. b) Support for Park Funding ProposalsAGENDA ITEM #1. b) 18-6921 Renton, WA Phone Survey | 11 Parks Proposal –Initial Q18. In general, do you strongly support, somewhat support, somewhat oppose, or strongly oppose this proposal? There is split support for the initial parks and recreation proposal, with a stronger level of intensity on the oppose side. Strongly 12% Strongly 25% Somewhat 37% Somewhat 23% Support 49% Oppose 49% (DK/Refused) 3% There may be a proposal for funding major park maintenance, park improvements, and new parks in Renton. The proposal pays for repairs and renovations at multiple City parks; builds new parks and recreation facilities including at the East Plateau and near Carco Theater, adds a dog park and community garden, and expand trails in the City. The proposal costs $70 million, and would raise property taxes by 29 cents for every $1,000 of assessed value for 20 years, or about $110 per year for the owner of a $378,000 home, the average home value in Renton. AGENDA ITEM #1. b) 18-6921 Renton, WA Phone Survey | 12 Parks Proposal –Subgroups Q18. In general, do you strongly support, somewhat support, somewhat oppose, or strongly oppose this proposal? Support for the proposal is highest among those under the age of 50, along with those who most frequently utilize the parks and trails the City has to offer. Support is strongest in the northern zip code of 98056. 49% 48% 49% 57% 42% 45% 48% 49% 47% 55% 40% 46% 48% 59% 41% 41% 60% 49% 36% 62% 29% 3% 1% 5% 1% 5% 3% 3% 4% 3% 3% 4% 2% 2% 3% 2% 6% 3% 7% 2% 3% 49% 51% 46% 42% 53% 52% 49% 47% 49% 43% 55% 52% 49% 39% 57% 52% 37% 51% 57% 35% 68% 0 -3 +2 +16 -11 -7 -1 +3 -2 +12 -15 -6 -1 +20 -17 -11 +23 -2 -21 +27 -40 Overall Male (47%) Female (53%) 18-49 (37%) 50-64 (33%) 65+/Ref. (30%) White (73%) Non-White (27%) 98055 (22%) 98056 (27%) 98057 (11%) 98058 (17%) 98059 (23%) Visit Parks Weekly/More (44%) Visit Parks Monthly/Rarely (46%) Never Visit Parks/(Refused) (10%) Utilize Trails Weekly/More (28%) Utilize Trails Monthly/Rarely (46%) Never Utilize Trails/(Refused) (26%) Adding more parks in Renton - Important (49%) Adding more parks in Renton - Not Important (35%) Support (DK/Refused)Oppose Net Support AGENDA ITEM #1. b) 18-6921 Renton, WA Phone Survey | 13 Priority of Individual Projects ➢[Major Repairs] Conduct major repairs and renovations to 43 existing parks and recreation facilities in the City of Renton. ➢[New Trail from Cedar River Trail] Build a new trail that would connect Cedar River Trail and Coulon Park, with an eventual connection to East Rail Corridor Trail. ➢[Philip Arnold and Liberty Parks] Make improvements and renovate the ballfields, playgrounds, and community buildings at Phillip Arnold Park and Liberty Park. ➢[Expand Henry Moses] Expand Henry Moses Aquatic Center and renovate fields and lighting at the Cedar River Park. ➢[New NARCO Park] Create a new park at the NARCO property, which is on the south side of the river across from Renton Community Center with turf soccer fields, picnic facilities, a play area, a BMX bike park, and a climbing wall. ➢[Pedestrian and Bike Trail] Expand the pedestrian and bike trail between South Renton and Downtown. ➢[New Neighborhood Park] Create a new neighborhood park with a picnic area, playfields, restrooms, and parking in the East Plateau. ➢[New Community Garden] Add a new community garden to an existing neighborhood park. ➢[New Dog Park] Add another dog park in the City.AGENDA ITEM #1. b) 18-6921 Renton, WA Phone Survey | 14 Priority of Individual Projects Specific new park and trail projects are a high priority with low intensity, like connecting Cedar River Trail with Coulon Pa rk and building a new park near the NARCO property. The highest overall priority by mean is conducting major repairs to existing parks and recreation facilities. A new dog park is a very low priority for residents. 14% 21% 14% 15% 15% 15% 11% 11% 11% 44% 32% 37% 34% 32% 30% 28% 29% 19% 17% 17% 19% 18% 16% 16% 21% 16% 11% 17% 16% 20% 20% 17% 21% 19% 23% 22% 9% 15% 10% 13% 20% 19% 21% 22% 37% 4.5 4.4 4.4 4.3 4.1 4.0 3.8 3.7 3.2 [Major Repairs] [New Trail from Cedar River Trail] [Philip Arnold and Liberty Parks] [Expand Henry Moses] [New NARCO Park] [Pedestrian and Bike Trail] [New Neighborhood Park] [New Community Garden] [New Dog Park] 7 - Very High Priority 5-6 4/(DK)2-3 1 - Very Low Priority Q19-27. This proposal would fund a series of projects in the City of Renton. I would like to read you a list of these projects. Please rate each one using a scale of 1 to 7, where 1 means you feel that item should be a very low priority for the City of Renton and 7 mean s that you feel that item should be a very high priority for the City of Renton. Mean AGENDA ITEM #1. b) 18-6921 Renton, WA Phone Survey | 15 Parks Proposal –After Individual Projects Q28. Given what you’ve heard, do you strongly support, somewhat support, somewhat oppose, or strongly oppose this proposal? After hearing a list of individual projects that could be funded by the parks proposal, support improves marginally, but there is still strong opposition. Strongly 14% Strongly 25% Somewhat 39% Somewhat 21% Support 53%Oppose 46% (DK/Refused) 1% After Individual Projects I would like to ask you again about the proposal for funding major park maintenance, park improvements, and new parks in Renton, which would cost the average homeowner $110 in property taxes per year. Strongly 12% Strongly 25% Somewhat 37% Somewhat 23% Support 49% Oppose 49% (DK/Refused) 3% Initial AGENDA ITEM #1. b) 18-6921 Renton, WA Phone Survey | 16 Alternative Ask Q29. In general, do you strongly support, somewhat support, somewhat oppose, or strongly oppose this proposal? A smaller $40 million proposal has more support, but this is only in the context of hearing a higher number, previously. Strongly 14% Strongly 25% Somewhat 39% Somewhat 21% Support 53%Oppose 46% (DK/Refused) 1% After Individual Projects What if instead the proposal included only the repairs and renovations of existing City parks and facilities, the expansion a t Henry Moses Aquatic Center, field renovations and lighting at the Cedar River Park, and the new neighborhood park with a picnic area, playfields, restrooms, and parking in the East Plateau, and nothing else? This smaller proposal would cost $40 million and would raise property taxes by 17 cents for every $1,000 of assessed value for 20 years, or about $64 per year. Strongly 12% Strongly 25% Somewhat 37% Somewhat 23% Support 49% Oppose 49% (DK/Refused) 3% Initial Strongly 21% Strongly 22% Somewhat 37%Somewhat 17% Support 58% Oppose 39% (DK/Refused) 2% Alternative Ask AGENDA ITEM #1. b) Ian Stewart Ian@emcresearch.com 206.204.8032 Brendan Kara Brendan@emcresearch.com 202.6865902 Ben Richter Ben@emcresearch.com 202.686.5903 AGENDA ITEM #1. b) Live Telephone Survey City of Renton, Washington Conducted: June 24 – 29, 2018 n=450; Margin of Error + 4.6 percentage points EMC Research #18-6921 All numbers in this document represent percentage (%) values, unless otherwise noted. Please note that due to rounding, percentages may not add up to exactly 100%. GREETING: Hello, my name is ________, may I speak with (NAME ON LIST)? INTERVIEWER: NOL ONLY INTRO: Hello, my name is ________, and I'm conducting a survey for __________ to find out how people feel about issues in the City of Renton. We are not trying to sell anything, and are collecting this information on a scientific and completely confidential basis. 1. Do you live in the City of Renton? Yes → CONTINUE 100 No → TERMINATE - 2. Gender (RECORD FROM OBSERVATION) Male 47 Female 53 3. Do you feel that things in Renton are generally going in the right direction or do you feel things have gotten pretty seriously off on the wrong track? Right Direction 66 Wrong Track 15 (Don't Know/Refused) 19 AGENDA ITEM #1. c) EMC Research #18-6921 -2- 4. What do you think is the most important problem facing the City of Renton today? (Open-Ended; Responses Coded Into Categories) Traffic 16 Crime/Safety 13 Homelessness 11 Cost of Housing 9 Growth (e.g. Over-Population, Over-Development, Gentrification) 8 Infrastructure (e.g. Roads, Public transportation, Parks) 6 Downtown Needs Revitalization 4 Taxes/Spending 3 Education/Schools 3 Government/Politicians 2 Drugs 2 Other 7 None/Nothing 3 Don't Know/Refused 12 5INT. I’d like you to rate the job the City of Renton is doing, on a variety of issues. Using a scale of excellent, good, only fair, or poor, please rate each of the following. If you aren’t sure one way or the other, please just say so. [BEFORE EACH: How would you rate (QX)?] (PROMPT IF NECESSARY: Would you say it is excellent, good, only fair, or poor?) SCALE: Excellent Good Only Fair Poor (Don’t Know/ No Opinion) Total Positive Total Negative (ALWAYS ASK FIRST) 5. The overall quality of life in the City of Renton 11 65 21 2 1 76 23 (RANDOMIZE) 6. The job the City of Renton government is doing overall 6 57 21 6 10 63 27 7. The job the City of Renton is doing using tax dollars responsibly 5 35 28 12 21 40 39 8. The condition of public parks and trails in Renton 24 53 14 3 6 77 18 9. The variety of public parks and trails available to you in Renton 25 48 18 4 6 73 21 (END RANDOMIZE) AGENDA ITEM #1. c) EMC Research #18-6921 -3- 10INT. I’m going to read you a list of functions and services provided by the City of Renton Parks and Trails Department. After each one, please rate how important that item is to you, using a scale of 1 to 7, where 1 means not at all important, and 7 means extremely important. (PROMPT IF NECESSARY: How would you rate that item, with 1 being not at all important, and 7 being extremely important?) Not at all Important Extremely Important (DK/ Refused) Mean SCALE: 1 2 3 4 5 6 7 (RANDOMIZE) 10. Maintaining existing park and recreation facilities in Renton 3 1 4 10 26 22 34 1 5.59 11. Adding more parks in Renton 13 9 12 16 25 10 13 0 4.15 12. Improving and renovating existing parks in Renton 6 3 8 17 29 18 19 1 4.93 13. Increasing the type and availability of recreation activities in Renton parks 7 3 12 16 25 17 16 3 4.71 14. Increasing the number of dog-friendly, off-leash parks 22 10 13 11 17 8 13 6 3.72 15. Expanding the pedestrian and bike trail network in Renton 11 7 11 14 22 13 19 3 4.47 16. Hiring more police officers in Renton 4 3 7 11 23 13 36 3 5.39 17. Improving maintenance of roads in Renton 2 1 4 9 21 22 42 1 5.79 (END RANDOMIZE) 18. There may be a proposal for funding major park maintenance, park improvements, and new parks in Renton. The proposal pays for repairs and renovations at multiple City parks; builds new parks and recreation facilities including at the East Plateau and near Carco Theater, adds a dog park and community garden, and expand trails in the City. The proposal costs $70 million, and would raise property taxes by 29 cents for every $1,000 of assessed value for 20 years, or about $110 per year for the owner of a $378,000 home, the average home value in Renton. In general, do you strongly support, somewhat support, somewhat oppose, or strongly oppose this proposal? Strongly Support 12  49 Somewhat Support 37 Somewhat Oppose 23  49 Strongly Oppose 25 (Don’t know/Refused) 3 AGENDA ITEM #1. c) EMC Research #18-6921 -4- 19INT. This proposal would fund a series of projects in the City of Renton. I would like to read you a list of these projects. Please rate each one using a scale of 1 to 7, where 1 means you feel that item should be a very low priority for the City of Renton and 7 means that you feel that item should be a very high priority for the City of Renton. (PROMPT IF NECESSARY: How would you rate that project on a scale of 1 to 7, where 1 is a very low priority and 7 is a very high priority?) Very Low Priority Very High Priority (DK/ Refused) Mean SCALE: 1 2 3 4 5 6 7 (RANDOMIZE) 19. [Major repairs] Conduct major repairs and renovations to 43 existing parks and recreation facilities in the City of Renton. 9 6 11 16 26 18 14 1 4.54 20. [New neighborhood park] Create a new neighborhood park with a picnic area, playfields, restrooms, and parking in the East Plateau. 21 11 8 18 19 9 11 3 3.76 21. [New NARCO park] Create a new park at the NARCO property, which is on the south side of the river across from Renton Community Center with turf soccer fields, picnic facilities, a play area, a BMX bike park, and a climbing wall. 20 7 11 15 18 13 15 1 4.06 22. [New dog park] Add another dog park in the City. 37 12 9 10 12 8 11 1 3.16 23. [Expand Henry Moses] Expand Henry Moses Aquatic Center and renovate fields and lighting at the Cedar River Park. 13 8 12 15 21 13 15 3 4.26 24. [Pedestrian and bike trail] Expand the pedestrian and bike trail between South Renton and Downtown. 19 9 12 15 20 10 15 1 3.98 25. [New community garden] Add a new community garden to an existing neighborhood park. 22 11 12 15 15 14 11 1 3.75 26. [New trail from Cedar River Trail] Build a new trail that would connect Cedar River Trail and Coulon Park, with an eventual connection to East Rail Corridor Trail. 15 7 9 15 18 14 21 2 4.41 27. [Philip Arnold and Liberty Parks] Make improvements and renovate the ballfields, playgrounds, and community buildings at Phillip Arnold Park and Liberty Park. 10 8 12 17 20 17 14 3 4.38 (END RANDOMIZE) AGENDA ITEM #1. c) EMC Research #18-6921 -5- 28. I would like to ask you again about the proposal for funding major park maintenance, park improvements, and new parks in Renton, which would cost the average homeowner $110 in property taxes per year. Given what you’ve heard, do you strongly support, somewhat support, somewhat oppose, or strongly oppose this proposal? Strongly Support 14 → 53 Somewhat Support 39 Somewhat Oppose 21 → 46 Strongly Oppose 25 (Don’t know/Refused) 1 29. What if instead the proposal included only the repairs and renovations of existing City parks and facilities, the expansion at Henry Moses Aquatic Center, field renovations and lighting at the Cedar River Park, and the new neighborhood park with a picnic area, playfields, restrooms, and parking in the East Plateau, and nothing else? This smaller proposal would cost $40 million and would raise property taxes by 17 cents for every $1,000 of assessed value for 20 years, or about $64 per year. In general, do you strongly support, somewhat support, somewhat oppose, or strongly oppose this proposal? Strongly Support 21 → 58 Somewhat Support 37 Somewhat Oppose 17 → 39 Strongly Oppose 22 (Don’t know/Refused) 2 My last questions are for statistical purposes only. 29. In what year were you born? (IF REFUSED THEN ASK FOLLOWUP: “Which age group are you in? (READ LIST)…”) (Years Coded into Age Categories) 18-29 6 30-39 13 40-49 18 50-64 33 65 or over 28 (Refused) 2 30. Do you have any children under the age of 18 living in your home? Yes 25 No 73 (Don’t Know/Refused) 1 AGENDA ITEM #1. c) EMC Research #18-6921 -6- 31. How often would you say you visit parks or playgrounds maintained by the City of Renton? (READ LIST IF NEEDED) Everyday 8 Multiple times per week 15 Once a week 21 Once a month/Rarely 46 Never 9 (Don’t Know/Refused) 2 32. And how often would you say you utilize trails maintained by the City of Renton? (READ LIST IF NEEDED) Everyday 3 Multiple times per week 10 Once a week 15 Once a month/Rarely 46 Never 24 (Don’t Know/Refused) 2 33. We are trying to gather opinions of people from a variety of backgrounds. Which of the following best describes your ethnicity? (READ LIST) Caucasian or White 69 Asian or Asian American 9 Hispanic or Latino 3 Black or African American 8 Pacific Islander 1 Native American 1 Or is your ethnicity one that I did not mention? (Not Mentioned/Other) 5 (Don’t Know/Refused) 5 Thank you! Zip Code (from Sample) 98055 22 98056 27 98057 11 98058 17 98059 23 AGENDA ITEM #1. c) ADMINISTRATIVE SERVICES M E M O R A N D U M DATE: August 2, 2018 TO: Ed Prince, Council President Members of the Renton City Council CC: Denis Law, Mayor FROM: Kelly Beymer, Community Services Administrator Gregg Zimmerman, Public Works Administrator Jan Hawn, Administrative Services Administrator SUBJECT: Preliminary Capital Project Review As Council has directed and in accordance to the capital budget process, the City Council will preview and provide direction regarding the priorities of preliminary capital projects being considered for the upcoming Capital Investment Plan (CIP). Attached is the preliminary CIP for the planning period 2019‐2024. As stated, this is preliminary as we have not specifically identified all funding sources or determined if it is possible to accomplish these projects in the planning horizon depending on project priority. However, it should be noted that funding for projects to be completed in 2019 and 2020 have adequate funding sources as currently presented. We hope to walk through the General Government and Transportation projects at the Committee of the Whole on Monday August 6, and confirm the list is complete. Also included in the packet are the Enterprise fund projects (Airport, Golf Course, and Utilities). Staff has gone through and made recommendations on priorities for Enterprise Fund projects based on the system needs. We do not plan to walk through these projects but will take any Council questions and changes. Attachments: AGENDA ITEM #2. a) This page is intended to be blank AGENDA ITEM #2. a) 2019/2020 Proposed Budget City of Renton, Washington 2019 2020 2021 2022 2023 2024 4,740 4,600 25,785 7,615 14,030 69,760 126,530 20,805 23,801 35,906 56,930 80,576 75,578 293,596 925 525 992 4,435 5,800 - 12,677 72 76 1,135 130 1,048 380 2,841 9,130 7,880 5,530 5,230 5,230 5,230 38,230 7,000 4,700 4,500 4,500 4,500 4,500 29,700 3,450 5,200 4,300 3,300 3,400 3,800 23,450 Total 46,122 46,782 78,148 82,140 114,584 159,248 527,024 2019 2020 2021 2022 2023 2024 General Fund Sources 3,551 4,495 2,285 2,475 1,820 1,880 16,506 Restricted taxes 2,073 2,442 10,620 2,480 2,540 57,695 77,850 Mitigation Fees 2,328 2,140 760 800 250 - 6,278 Bond Proceeds 7,500 - - - - - 7,500 Grants/Contributions Awarded 10,659 12,357 8,150 675 - - 31,841 Grants/Contribution Anticipated 450 9,222 3,350 4,455 5,650 - 23,127 Fund Balance 20,186 15,501 15,157 16,920 14,328 13,910 96,002 Total 46,747 46,157 40,322 27,805 24,588 73,485 259,104 Balance Available / (Unfunded Needs)625 (625) (37,826) (54,335) (89,996) (85,763) (267,920) General Government Surface Water Utility Wastewater Utility Water Utility Golf Course CITY WIDE SUMMARY Project Total Departments 2019 through 2024 (in thousands of dollars) Resources Proposed Projected Project Total Airport Transportation CAPITAL INVESTMENT PROGRAM - SUMMARY Proposed Projected AGENDA ITEM #2. a) 2019/2020 Adopted Budget City of Renton, Washington Life to Date Projects Priority Type*Thru 2018 2019 2020 2021 2022 2023 2024 Sunset EIS Park 1 D 9,932 600 - - - - - 10,532 Tree Maintenance 2 M - 425 425 450 450 475 475 2,700 Coulon Park - Swim Beach 3 M - 80 250 200 2,000 - - 2,530 MM Structural Reviews & Repair 4 M 141 - 15 400 25 40 - 621 Coulon Park - Parking Lot Repairs 5 M - 300 200 - - - - 500 Parking Lot and Drive Repairs 6 M - 90 125 90 125 125 125 680 Philip Arnold Park Improvements 7 D - 600 - - - - 3,000 3,600 Coulon Park - Turf Replacement 8 M 75 25 25 25 25 25 25 225 Playgrounds, Kiosks, Interpretive Signs 9 M 425 - 400 300 200 150 300 1,775 Sport Court Repairs 10 M - - 150 505 80 100 80 915 Parks, Recreation and Natural Areas Plan 11 P - 30 - - - - 230 260 Parks and Park Buildings ADA Transition Plan 12 R - 75 - - - - - 75 Coulon Park - Lighting Repairs 13 M 54 25 - - - - - 79 Regis Park Athletic Field Expansion 14 D 594 600 300 3,000 300 3,500 - 8,294 Lighting System Upgrades 15 M - - 110 110 110 110 110 550 Liberty Park Improvements 16 D - 600 - - - - - 600 Piazza Master Plan & Redevelopment 17 D 100 400 600 6,500 - - - 7,600 Coulon Park - 5 Year Structural Review 18 M 135 - - - 150 - - 285 Coulon Park - Bulkhead (Rosewall) Repairs 19 M - - - 120 50 1,000 - 1,170 Coulon Park - Irrigation System Replacement 20 M - - - 500 500 - - 1,000 Coulon - Shoreline Erosion 21 X 135 - - 100 150 800 - 1,185 Paths, Walks, Patios and Boardwalks 22 M - - - 80 75 40 100 295 Irrigation Renovation, Automation and Conservation 23 M - - - 250 265 265 - 780 Cleveland-Richardson Wetland Assess./Delineation 24 P - - - 45 - - - 45 Ballfield Renovation 25 M - - - 250 150 150 150 700 MM Landscape Renovation & Repair 26 M - - - 150 150 - - 300 MM Fencing, Guardrails, Bullrails, and Railings 27 M 124 - - 20 - - - 144 MM Shoreline and Bank Stabilization 28 M 237 - - 300 100 300 2,000 2,937 Acquisition - Renton Connector 29 A - - - 2,000 - - - 2,000 Acquisition - Tri-Park Property 30 A - - - 8,000 - - - 8,000 Habitat Enhancement 31 M - - - 25 25 25 25 100 Springbrook Trail Missing Link 32 D - - - - 150 300 2,020 2,470 Park Master Planning 33 P - - - 90 90 90 90 360 Black River Riparian Forest 34 D - - - 125 125 400 2,020 2,670 MM Boundary, Topographic, Site Surveys 35 M 59 - - 100 70 120 60 409 Maplewood Community Park 36 D - - - 150 500 4,040 225 4,915 Trails and Bicycle Master Plan 37 P - - - - - 125 - 125 Coulon Park - Wood Removal (DNR Lease)38 M - - - - - - 350 350 Coulon Park - Structural Repairs 39 M 2,928 - - - - - 250 3,178 Coulon Park - Landscape Renovation 40 M - - - - - 50 50 100 Coulon Park - Log Replacement 41 M - - - - - - 30 30 Acquisition Opportunity - Coulon Park 42 A - - - - - - 1,000 1,000 Sam Chastain Trail 43 D - - - - - - 5,630 5,630 Narco Property (Tri-Park Plan)44 D - - - - - - 14,300 14,300 Cedar River Park (Tri-Park Plan)45 D - - - - - - 19,600 19,600 Liberty Park (Tri-Park Plan)46 D - - - - - - 5,430 5,430 May Creek/McAskill Park 47 D - - - - - - 6,570 6,570 Burnett Linear Park 48 D - - - - - - 610 610 Thomas Teasdale Park Renovation 49 D - - - - - - 706 706 Community Gardens/Greenhouses 50 D - - - - - - 21 21 Dog Parks 51 D - - - - - - 553 553 Community Garden 52 D - - - - - - 615 615 Citywide Park Improvements/QOL 53 D - - - - - - 1,500 1,500 Integrated Pest Management Program (IPM)54 M - - - - - - 100 100 PARKS SUBTOTAL 14,939 3,850 2,600 23,885 5,865 12,230 68,350 131,719 * NOTE: A - Acquisition, C- Cross Category, D - Development, M - Maintenance, P - Planning, R - Regulatory ** Project has been approved but no project code has been assigned yet *** Project names in Green are part of the Quality of Life Initiative Proposal and are contingent on the proposal's approval Project Total PARKS S U M M A R Y B Y C O U N C I L P R I O R I T Y GENERAL GOVERNMENT CAPITAL INVESTMENT PROGRAM 2019 through 2024 (in thousands of dollars) Proposed P r o j e c t e d AGENDA ITEM #2. a) 2019/2020 Adopted Budget City of Renton, Washington Life to Date Projects Priority Type*Thru 2018 2019 2020 2021 2022 2023 2024 Project Total PARKS S U M M A R Y B Y C O U N C I L P R I O R I T Y GENERAL GOVERNMENT CAPITAL INVESTMENT PROGRAM 2019 through 2024 (in thousands of dollars) Proposed P r o j e c t e d City Hall Elevator Modernization 1 M - 652 - - - - - 652 City Hall Major HVAC and Fire Component Replacement - Phase 2 2 M - - 353 - - - - 353 Renton Community Center Major HVAC Component Replacement 3 M - - 1,200 - - - - 1,200 City Wide Security System upgrades 4 M - 90 90 - - - - 180 Renton Community Center Audio and Video Systems 5 M - - 200 - - - - 200 City Hall Heat Pump and VAT Replacement 6 M - - - 1,900 - - - 1,900 Coulon Bathhouse Renovation 7 M - - - - - - 610 610 Sr. Center Court and Fountain Renovation 8 M - - - - 400 - - 400 City Shops Roof Replacement 9 M - - - - - 800 - 800 City Shops HVAC and Generator Replacement 10 M - - - - 500 - - 500 Roof Replacement Parks Maintenance Shop and Parks Outbuilding 11 M - - - - 250 - - 250 Coulon Maintenance Building HVAC Replacement 12 M - - - - 50 - - 50 North Highlands and Highlands HVAC Replacement 13 M - - - - 550 - - 550 HMAC upgrades and repairs 14 M - - - - - 1,000 - 1,000 City Hall Electrical 15 M - - - - - - 800 800 Capital Projects Coordinator 16 M - 148 157 305 FACILITIES SUBTOTAL - 890 2,000 1,900 1,750 1,800 1,410 9,750 GENERAL GOVERNMENT TOTAL 14,939 4,740 4,600 25,785 7,615 14,030 69,760 141,469 Life to Date Resources:Thru 2018 2019 2020 2021 2022 2023 2024 General Fund Sources - 1,738 2,268 - - - - 3,858 Restricted Taxes 8,437 1,373 1,732 9,900 1,750 1,800 56,945 81,780 Mitigation Fees 2,932 1,629 600 - - - - 5,161 Bond Proceeds - - - - - - - - Grants/Contributions Awarded 3,570 - - - - - - 3,570 Grants/Contributions Anticipated - - - - - - - - Fund Balance - - - - - - - - Total Resources 14,939 4,740 4,600 9,900 1,750 1,800 56,945 94,369 Balance Available / (Unfunded Needs)- - - (15,885) (5,865) (12,230) (12,815) (47,100) Project Total FACILITIES Proposed P r o j e c t e d AGENDA ITEM #2. a) 2019/2020 Proposed Budget City of Renton, Washington Priority Number:1 Project Title: Project Category: Status: Appropriated To-Date 2019 2020 2021 2022 2023 2024 Total Project Expenditures Expenditures Planning/Design - - - - - - - - Project Management - - - - - - - - Major Maintenance - - - - - - - - Land Acquisitions - - - - - - - - Construction 9,932 600 - - - - - 10,532 Total Expenditures 9,932 600 - - - - - 10,532 Appropriated To-Date 2019 2020 2021 2022 2023 2024 Total Project Resources Resources General Fund Sources - - - - - - - - Restricted Taxes 4,024 - - - - - - 4,024 Mitigation Fees 2,338 600 - - - - - 2,938 Bond Proceeds - - - - - - - - Grants/Contributions Awarded 3,570 - - - - - - 3,570 Grants/Contributions Anticipated - - - - - - - - Fund Balance - - - - - - - - Total Resources 9,932 600 - - - - - 10,532 *Restricted Taxes include REET, Fuel, Utility, and KC Levy funds Description and Scope Construction of Phase II (final phase) of a new 3.2 acre neighborhood park. Phase II improvements include a water feature, gazebo, arbors, 2 children's play areas, fitness area, picnic facilities, completion of the looped walk system and art. Rationale Identified in the Sunset Area Investment Strategy and the EIS to support planned growth, meet service demands, and provide for a vibrant community. This project significantly increases the quality of life for those in the community. GG - PARKS CAPITAL INVESTMENT PROGRAM 2019 through 2024 (in thousands of dollars) Sunset EIS Park Development Extension of Previously Approved AGENDA ITEM #2. a) 2019/2020 Proposed Budget City of Renton, Washington Priority Number:2 Project Title: Project Category: Status: Appropriated To-Date 2019 2020 2021 2022 2023 2024 Total Project Expenditures Expenditures Planning/Design - - - - - - - - Project Management - - - - - - - - Major Maintenance - - - - - - - - Land Acquisitions - - - - - - - - Construction - 425 425 450 450 475 475 2,700 Total Expenditures - 425 425 450 450 475 475 2,700 Appropriated To-Date 2019 2020 2021 2022 2023 2024 Total Project Resources Resources General Fund Sources - 425 425 - - - - 850 Restricted Taxes - - - - - - - - Mitigation Fees - - - - - - - - Bond Proceeds - - - - - - - - Grants/Contributions Awarded - - - - - - - - Grants/Contributions Anticipated - - - - - - - - Fund Balance - - - - - - - - Total Resources - 425 425 - - - - 850 *Restricted Taxes include REET, Fuel, Utility, and KC Levy funds Community Services maintains trees citywide as part of the Urban Forestry Program. Work is accomplished in-house, in combination with consultant contracts (tree inspections) and construction contracts (tree maintenance and removal), and managed by the Urban Forestry Manager. Planting new trees is also included in this program. Rationale Maintaining trees in the community helps improve public safety and promotes vibrancy in the environment adding to make the City more aesthetic for its residents. GG - PARKS CAPITAL INVESTMENT PROGRAM 2019 through 2024 (in thousands of dollars) Tree Maintenance Maintenance and Preservation Previously Approved Description and Scope AGENDA ITEM #2. a) 2019/2020 Proposed Budget City of Renton, Washington Priority Number:3 Project Title: Project Category: Status: Appropriated To-Date 2019 2020 2021 2022 2023 2024 Total Project Expenditures Expenditures Planning/Design - 80 250 200 - - - 530 Project Management - - - - - - - - Major Maintenance - - - - - - - - Land Acquisitions - - - - - - - - Construction - - - - 2,000 - - 2,000 Total Expenditures - 80 250 200 2,000 - - 2,530 Appropriated To-Date 2019 2020 2021 2022 2023 2024 Total Project Resources Resources General Fund Sources - - - - - - - - Restricted Taxes - 80 250 - - - - 330 Mitigation Fees - - - - - - - - Bond Proceeds - - - - - - - - Grants/Contributions Awarded - - - - - - - - Grants/Contributions Anticipated - - - - - - - - Fund Balance - - - - - - - - Total Resources - 80 250 - - - - 330 *Restricted Taxes include REET, Fuel, Utility, and KC Levy funds Significant erosion and undercutting is occurring along the promenade adjacent to the swim beach. Geotechnical and hydrologic investigations will be required in order to develop a solution for design and construction. This is a phased project and will require environmental permitting. Rationale Project maintains a safe, healthy and vibrant community, meets service demands, and provides high quality customer service. Identified in the Parks, Trails and Community Facilities Initiative. GG - PARKS CAPITAL INVESTMENT PROGRAM 2019 through 2024 (in thousands of dollars) Coulon Park - Swim Beach Maintenance and Preservation New Description and Scope AGENDA ITEM #2. a) 2019/2020 Proposed Budget City of Renton, Washington Priority Number:4 Project Title: Project Category: Status: Appropriated To-Date 2019 2020 2021 2022 2023 2024 Total Project Expenditures Expenditures Planning/Design - - 15 - 25 40 - 80 Project Management - - - - - - - - Major Maintenance - - - - - - - - Land Acquisitions - - - - - - - - Construction 141 - - 400 - - - 541 Total Expenditures 141 - 15 400 25 40 - 621 Appropriated To-Date 2019 2020 2021 2022 2023 2024 Total Project Resources Resources General Fund Sources - - - - - - - - Restricted Taxes 141 - 15 - - - - 156 Mitigation Fees - - - - - - - - Bond Proceeds - - - - - - - - Grants/Contributions Awarded - - - - - - - - Grants/Contributions Anticipated - - - - - - - - Fund Balance - - - - - - - - Total Resources 141 - 15 - - - - 156 *Restricted Taxes include REET, Fuel, Utility, and KC Levy funds In order to maintain City assets, structural reviews are completed every 3 to 5 years on every major outdoor park structure to include bridges, waterwalks, retaining walls, fishing piers, docks, ramps, wave breaks, etc. Identified repairs are then programmed and executed. The Cedar River Trestle Bridge timber inspection is scheduled for 2020. Rationale Structural reviews and repair are a significant aspect of keeping the city's outdoor park structures safe and operating, driving public safety and quality of life in the parks throughout the city. Identified in the Parks, Trails and Community Facilities Initiative. GG - PARKS CAPITAL INVESTMENT PROGRAM 2019 through 2024 (in thousands of dollars) MM Structural Reviews & Repair Maintenance and Preservation Previously Approved Description and Scope AGENDA ITEM #2. a) 2019/2020 Proposed Budget City of Renton, Washington Priority Number:5 Project Title: Project Category: Status: Appropriated To-Date 2019 2020 2021 2022 2023 2024 Total Project Expenditures Expenditures Planning/Design - - - - - - - - Project Management - - - - - - - - Major Maintenance - - - - - - - - Land Acquisitions - - - - - - - - Construction - 300 200 - - - - 500 Total Expenditures - 300 200 - - - - 500 Appropriated To-Date 2019 2020 2021 2022 2023 2024 Total Project Resources Resources General Fund Sources - - - - - - - - Restricted Taxes - 300 200 - - - - 500 Mitigation Fees - - - - - - - - Bond Proceeds - - - - - - - - Grants/Contributions Awarded - - - - - - - - Grants/Contributions Anticipated - - - - - - - - Fund Balance - - - - - - - - Total Resources - 300 200 - - - - 500 *Restricted Taxes include REET, Fuel, Utility, and KC Levy funds A road and parking pavement assessment was completed in 2015 identifying High (0-5 years), Medium (5-7 years) and Low (7-10 years) priority paving repair and paving replacement projects throughout the park. The park is heavily used and over 50 years old. Repairs/replacement maintains the park infrastructure, public accessibility and safety. Rationale Having safe and accessible parking at Coulon Park boosts the quality of life for all visitors. As a fixture drawing in visitors from all of King County, the upkeep of the park helps build eminence for the city. Identified in the Parks, Trails and Community Facilities Initiative. GG - PARKS CAPITAL INVESTMENT PROGRAM 2019 through 2024 (in thousands of dollars) Coulon Park - Parking Lot Repairs Maintenance and Preservation Previously Approved Description and Scope AGENDA ITEM #2. a) 2019/2020 Proposed Budget City of Renton, Washington Priority Number:6 Project Title: Project Category: Status: Appropriated To-Date 2019 2020 2021 2022 2023 2024 Total Project Expenditures Expenditures Planning/Design - - - - - - - Project Management - - - - - - - - Major Maintenance - - - - - - - - Land Acquisitions - - - - - - - - Construction - 90 125 90 125 125 125 680 Total Expenditures - 90 125 90 125 125 125 680 Appropriated To-Date 2019 2020 2021 2022 2023 2024 Total Project Resources Resources General Fund Sources - - - - - - - - Restricted Taxes - 90 125 - - - - 215 Mitigation Fees - - - - - - - - Bond Proceeds - - - - - - - - Grants/Contributions Awarded - - - - - - - - Grants/Contributions Anticipated - - - - - - - - Fund Balance - - - - - - - - Total Resources - 90 125 - - - - 215 *Restricted Taxes include REET, Fuel, Utility, and KC Levy funds Parking lot and driveway reconstruction activities to include resurfacing, sealcoating, patching, curb repairs/replacement, drainage improvements and re-striping. 2019 repairs are schedule for the Renton Sr. Activity Center and 2020 repairs are located at Talbot Hill Reservoir Park. Rationale Park visitors need a safe, accessible place to park while visiting all the parks around the city. Upkeeping the parking lots and drives draw in park visitors and increases the quality of their experience. Identified in the Parks, Trails and Community Facilities Initiative. GG - PARKS CAPITAL INVESTMENT PROGRAM 2019 through 2024 (in thousands of dollars) Parking Lot and Drive Repairs Maintenance and Preservation Previously Approved Description and Scope AGENDA ITEM #2. a) 2019/2020 Proposed Budget City of Renton, Washington Priority Number:7 Project Title: Project Category: Status: Appropriated To-Date 2019 2020 2021 2022 2023 2024 Total Project Expenditures Expenditures Planning/Design - - - - - - 360 360 Project Management - - - - - - - - Major Maintenance - - - - - - - - Land Acquisitions - - - - - - - - Construction - 600 - - - - 2,640 3,240 Total Expenditures - 600 - - - - 3,000 3,600 Appropriated To-Date 2019 2020 2021 2022 2023 2024 Total Project Resources Resources General Fund Sources - - - - - - - - Restricted Taxes - 171 - - - - - 171 Mitigation Fees - 429 - - - - - 429 Bond Proceeds - - - - - - - Grants/Contributions Awarded - - - - - - - - Grants/Contributions Anticipated - - - - - - - - Fund Balance - - - - - - - - Total Resources - 600 - - - - - 600 *Restricted Taxes include REET, Fuel, Utility, and KC Levy funds 2019 improvements include relocating and expanding the 15 year-old play area with new equipment, adding an ADA walk, removing the abandoned restroom facility, expanding the picnic area, and a adding retaining wall/seating area at the basketball court. Future improvements include design and construction of renovated ballfield for year round use and re-purposing the activity building. Rationale These updates to Phillip Arnold Park will make the park safer for all visitors as well as improving the quality of life for those visiting the park and the surrounding neighborhood, ultimately building a vibrant community. Identified in the Parks, Trails and Community Facilities Initiative. GG - PARKS CAPITAL INVESTMENT PROGRAM 2019 through 2024 (in thousands of dollars) Philip Arnold Park Improvements Development Extension Description and Scope AGENDA ITEM #2. a) 2019/2020 Proposed Budget City of Renton, Washington Priority Number:8 Project Title: Project Category: Status: Appropriated To-Date 2019 2020 2021 2022 2023 2024 Total Project Expenditures Expenditures Planning/Design - - - - - - - - Project Management - - - - - - - - Major Maintenance - - - - - - - - Land Acquisitions - - - - - - - - Construction 75 25 25 25 25 25 25 225 Total Expenditures 75 25 25 25 25 25 25 225 Appropriated To-Date 2019 2020 2021 2022 2023 2024 Total Project Resources Resources General Fund Sources - - - - - - - - Restricted Taxes 75 25 25 - - - - 125 Mitigation Fees - - - - - - - - Bond Proceeds - - - - - - - - Grants/Contributions Awarded - - - - - - - - Grants/Contributions Anticipated - - - - - - - - Fund Balance - - - - - - - - Total Resources 75 25 25 - - - - 125 *Restricted Taxes include REET, Fuel, Utility, and KC Levy funds Due to ongoing, extensive, heavy park use, the turf requires replacement in identified areas on an annual basis. Rationale Turf maintenance is a primary aspect of keeping Coulon Park a beautiful and reputable park in the city, as well as maintaining the level of enjoyment for its visitors. GG - PARKS CAPITAL INVESTMENT PROGRAM 2019 through 2024 (in thousands of dollars) Coulon Park - Turf Replacement Maintenance and Preservation Previously Approved Description and Scope AGENDA ITEM #2. a) 2019/2020 Proposed Budget City of Renton, Washington Priority Number:9 Project Title: Project Category: Status: Appropriated To-Date 2019 2020 2021 2022 2023 2024 Total Project Expenditures Expenditures Planning/Design - - - - - - - - Project Management - - - - - - - - Major Maintenance - - - - - - - - Land Acquisitions - - - - - - - - Construction 425 - 400 300 200 150 300 1,775 Total Expenditures 425 - 400 300 200 150 300 1,775 Appropriated To-Date 2019 2020 2021 2022 2023 2024 Total Project Resources Resources General Fund Sources - - - - - - - - Restricted Taxes 425 - 400 - - - - 825 Mitigation Fees - - - - - - - - Bond Proceeds - - - - - - - - Grants/Contributions Awarded - - - - - - - - Grants/Contributions Anticipated - - - - - - - - Fund Balance - - - - - - - - Total Resources 425 - 400 - - - - 825 *Restricted Taxes include REET, Fuel, Utility, and KC Levy funds Projects include removing and replacing 15 year old, and older, playground equipment & support amenities, that have outlived their play value (safety & effectiveness). Projects also include installing new and/or replacing kiosks & interpretive signage that has deteriorated due to age and weather impacts. Coulon Park playground is identified for 2020. Maplewood, Windsor Hill, Kennydale Beach, Kiwanis, Highlands and Cascade Parks are identified through 2024. Rationale Project contributes toward providing a safe, healthy, and vibrant community, meeting service demands and providing high quality customer service. Projects identified in the Parks, Trails and Community Facilities Initiative. GG - PARKS CAPITAL INVESTMENT PROGRAM 2019 through 2024 (in thousands of dollars) Playgrounds, Kiosks, Interpretive Signs Maintenance and Preservation Previously Approved Description and Scope AGENDA ITEM #2. a) 2019/2020 Proposed Budget City of Renton, Washington Priority Number:10 Project Title: Project Category: Status: Appropriated To-Date 2019 2020 2021 2022 2023 2024 Total Project Expenditures Expenditures Planning/Design - - - 50 - - - 50 Project Management - - - - - - - - Major Maintenance - - - - - - - - Land Acquisitions - - - - - - - - Construction - - 150 455 80 100 80 865 Total Expenditures - - 150 505 80 100 80 915 Appropriated To-Date 2019 2020 2021 2022 2023 2024 Total Project Resources Resources General Fund Sources - - - - - - - - Restricted Taxes - - 150 - - - - 150 Mitigation Fees - - - - - - - - Bond Proceeds - - - - - - - - Grants/Contributions Awarded - - - - - - - - Grants/Contributions Anticipated - - - - - - - - Fund Balance - - - - - - - - Total Resources - - 150 - - - - 150 *Restricted Taxes include REET, Fuel, Utility, and KC Levy funds Projects include safety repairs, replacement, resurfacing, reconstruction, seal-coating, patching, drainage improvements and re-striping existing surfaces for 17 tennis courts and 13 basketball courts throughout the system. The Teasdale Park sport court is scheduled for 2020, the Bocce Ball court (and fountain) (2021), Talbot Hill tennis courts (2022), Highlands tennis (2023), and Kennydale Lions basketball court (2024). Rationale Maintaining the upkeep and appearance of the sport courts in various points of the city, this project improves safety of those active visitors and improves the overall quality of user experience. Identified in the Parks, Trails and Community Facilities Initiative. GG - PARKS CAPITAL INVESTMENT PROGRAM 2019 through 2024 (in thousands of dollars) Sport Court Repairs Maintenance and Preservation Previously Approved Description and Scope AGENDA ITEM #2. a) 2019/2020 Proposed Budget City of Renton, Washington Priority Number:11 Project Title:Parks, Recreation and Natural Areas Plan Project Category: Status: Appropriated To-Date 2019 2020 2021 2022 2023 2024 Total Project Expenditures Expenditures Planning/Design - 30 - - - - 230 260 Project Management - - - - - - - - Major Maintenance - - - - - - - - Land Acquisitions - - - - - - - - Construction - - - - - - - - Total Expenditures - 30 - - - - 230 260 Appropriated To-Date 2019 2020 2021 2022 2023 2024 Total Project Resources Resources General Fund Sources - - - - - - - - Restricted Taxes - 30 - - - - - 30 Mitigation Fees - - - - - - - - Bond Proceeds - - - - - - - - Grants/Contributions Awarded - - - - - - - - Grants/Contributions Anticipated - - - - - - - - Fund Balance - - - - - - - - Total Resources - 30 - - - - - 30 *Restricted Taxes include REET, Fuel, Utility, and KC Levy funds Plan is a 20-year vision for parks, recreation, and natural areas and is the blueprint for planning, acquisition & development. Current & future needs, level of service, policy language, implementation strategies, & an investment program are included. The Plan is updated every 6 years to maintain grant eligibility. The 2019 budget request is to provide additional funding to ensure project is adequately funded. 6 Year update (2024). Rationale Supports planned growth, meets growing service demands, and provides for a vibrant community. GG - PARKS CAPITAL INVESTMENT PROGRAM 2019 through 2024 (in thousands of dollars) Planning Extension of Previously Approved Project Description and Scope AGENDA ITEM #2. a) 2019/2020 Proposed Budget City of Renton, Washington Priority Number:12 Project Title:Parks and Park Buildings ADA Transition Plan Project Category: Status: Appropriated To-Date 2019 2020 2021 2022 2023 2024 Total Project Expenditures Expenditures Planning/Design - 75 - - - - - 75 Project Management - - - - - - - - Major Maintenance - - - - - - - - Land Acquisitions - - - - - - - - Construction - - - - - - - - Total Expenditures - 75 - - - - - 75 Appropriated To-Date 2019 2020 2021 2022 2023 2024 Total Project Resources Resources General Fund Sources - 75 - - - - - 75 Restricted Taxes - - - - - - - - Mitigation Fees - - - - - - - - Bond Proceeds - - - - - - - - Grants/Contributions Awarded - - - - - - - - Grants/Contributions Anticipated - - - - - - - - Fund Balance - - - - - - - - Total Resources - 75 - - - - - 75 *Restricted Taxes include REET, Fuel, Utility, and KC Levy funds Title II of the Americans with Disabilities Act (ADA) of 1990 prohibits all state and local governments from discriminating on the basis of disability. A comprehensive evaluation of parks and park facilities will be conducted to determine what types of access barriers exist for individuals with disabilities. This plan will be used to help guide future planning and implementation of necessary accessibility improvements. Rationale This project helps ensure that the city parks are accessible to all members of the community in a safe way, improving the quality of life for all. GG - PARKS CAPITAL INVESTMENT PROGRAM 2019 through 2024 (in thousands of dollars) Regulatory New Request Description and Scope AGENDA ITEM #2. a) 2019/2020 Proposed Budget City of Renton, Washington Priority Number:13 Project Title: Project Category: Status: Appropriated To-Date 2019 2020 2021 2022 2023 2024 Total Project Expenditures Expenditures Planning/Design - - - - - - - - Project Management - - - - - - - - Major Maintenance - - - - - - - - Land Acquisitions - - - - - - - - Construction 54 25 - - - - - 79 Total Expenditures 54 25 - - - - - 79 Appropriated To-Date 2019 2020 2021 2022 2023 2024 Total Project Resources Resources General Fund Sources - - - - - - - - Restricted Taxes 54 25 - - - - - 79 Mitigation Fees - - - - - - - - Bond Proceeds - - - - - - - - Grants/Contributions Awarded - - - - - - - - Grants/Contributions Anticipated - - - - - - - - Fund Balance - - - - - - - - Total Resources 54 25 - - - - - 79 *Restricted Taxes include REET, Fuel, Utility, and KC Levy funds Project includes replacing incandescent lights with energy saving LED lights. Rationale Projects contribute toward providing a safe, healthy, and vibrant community, meeting service demands and providing high quality customer service. Identified in the Parks, Trails and Community Facilities Initiative. GG - PARKS CAPITAL INVESTMENT PROGRAM 2019 through 2024 (in thousands of dollars) Coulon Park - Lighting Repairs Maintenance and Preservation Previously Approved Description and Scope AGENDA ITEM #2. a) 2019/2020 Proposed Budget City of Renton, Washington Priority Number:14 Project Title: Project Category: Status: Appropriated To-Date 2019 2020 2021 2022 2023 2024 Total Project Expenditures Expenditures Planning/Design - - 300 - 300 - - 600 Project Management - - - - - - - - Major Maintenance - - - - - - - - Land Acquisitions - - - - - - - - Construction 594 600 - 3,000 - 3,500 - 7,694 Total Expenditures 594 600 300 3,000 300 3,500 - 8,294 Appropriated To-Date 2019 2020 2021 2022 2023 2024 Total Project Resources Resources General Fund Sources - - - - - - - - Restricted Taxes - - 300 - - - - 300 Mitigation Fees 594 600 - - - - - 1,194 Bond Proceeds - - - - - - - - Grants/Contributions Awarded - - - - - - - - Grants/Contributions Anticipated - - - - - - - - Fund Balance - - - - - - - - Total Resources 594 600 300 - - - - 1,494 *Restricted Taxes include REET, Fuel, Utility, and KC Levy funds Phase I improvements were completed in 2000 (lighted dirt soccer field, lighted basketball court & turf softball field, & parking). Environmental regulations constrain future development to include a lighted turf fields, restroom with potable water & additional parking. The Park will be constructed in multiple phases. 2019 improvements include the restroom construction. 2020 includes Phase 2 Design (of 3 phases) to convert the dirt soccer field to turf and add a new lighted turf soccer field. Rationale Project identified as #1 citywide priority in the Parks, Recreation and Natural Areas Plan (2011). GG - PARKS CAPITAL INVESTMENT PROGRAM 2019 through 2024 (in thousands of dollars) Regis Park Athletic Field Expansion Development Previously Approved Description and Scope AGENDA ITEM #2. a) 2019/2020 Proposed Budget City of Renton, Washington Priority Number:15 Project Title: Project Category: Status: Appropriated To-Date 2019 2020 2021 2022 2023 2024 Total Project Expenditures Expenditures Planning/Design - - - - - - - - Project Management - - - - - - - - Major Maintenance - - - - - - - - Land Acquisitions - - - - - - - - Construction - - 110 110 110 110 110 550 Total Expenditures - - 110 110 110 110 110 550 Appropriated To-Date 2019 2020 2021 2022 2023 2024 Total Project Resources Resources General Fund Sources - - - - - - - - Restricted Taxes - - 110 - - - - 110 Mitigation Fees - - - - - - - - Bond Proceeds - - - - - - - - Grants/Contributions Awarded - - - - - - - - Grants/Contributions Anticipated - - - - - - - - Fund Balance - - - - - - - - Total Resources - - 110 - - - - 110 *Restricted Taxes include REET, Fuel, Utility, and KC Levy funds Projects include replacing lights, poles and electrical systems that have outlived their useful life and replacing them with new poles and LED lights for reduced energy costs. Many lights and poles were installed as part of the original park construction in the 1960's and the 1970's. Kiwanis Park has been identified for 2020. Rationale Lighting increases the safety for park visitors during dusk and evening hours, extending the amount of time the park can be utilized by its visitors. Projects identified in the Parks, Trails and Community Facilities Initiative. GG - PARKS CAPITAL INVESTMENT PROGRAM 2019 through 2024 (in thousands of dollars) Lighting System Upgrades Maintenance and Preservation Previously Approved Description and Scope AGENDA ITEM #2. a) 2019/2020 Proposed Budget City of Renton, Washington Priority Number:16 Project Title: Project Category: Status: Appropriated To-Date 2019 2020 2021 2022 2023 2024 Total Project Expenditures Expenditures Planning/Design - - - - - - - - Project Management - - - - - - - - Major Maintenance - - - - - - - - Land Acquisitions - - - - - - - - Construction - 600 - - - - - 600 Total Expenditures - 600 - - - - - 600 Appropriated To-Date 2019 2020 2021 2022 2023 2024 Total Project Resources Resources General Fund Sources - 600 - - - - - 600 Restricted Taxes - - - - - - - - Mitigation Fees - - - - - - - - Bond Proceeds - - - - - - - - Grants/Contributions Awarded - - - - - - - - Grants/Contributions Anticipated - - - - - - - - Fund Balance - - - - - - - - Total Resources - 600 - - - - - 600 *Restricted Taxes include REET, Fuel, Utility, and KC Levy funds 2019 returns the project funding that was redirected to funding the Coulon Structural repairs. Project includes a master plan, design and construction drawings, and construction for the redevelopment/replacement of the playground (originally installed in 1997), restroom, picnic area and shelter, riverfront habitat and connection to the Library. Rationale First identified as part of the new library in 2016. Supports planned growth, a vibrant community and meets service demands. Identified in the Parks, Trails and Community Facilities Initiative. GG - PARKS CAPITAL INVESTMENT PROGRAM 2019 through 2024 (in thousands of dollars) Liberty Park Improvements Development Previously Approved Description and Scope AGENDA ITEM #2. a) 2019/2020 Proposed Budget City of Renton, Washington Priority Number:17 Project Title: Project Category: Status: Appropriated To-Date 2019 2020 2021 2022 2023 2024 Total Project Expenditures Expenditures Planning/Design 100 400 600 - - - - 1,100 Project Management - - - - - - - - Major Maintenance - - - - - - - - Land Acquisitions - - - - - - - - Construction - - - 6,500 - - - 6,500 Total Expenditures 100 400 600 6,500 - - - 7,600 Appropriated To-Date 2019 2020 2021 2022 2023 2024 Total Project Resources Resources General Fund Sources - 400 - - - - - 400 Restricted Taxes 100 - - - - - - 100 Mitigation Fees - - 600 - - - - 600 Bond Proceeds - - - - - - - - Grants/Contributions Awarded - - - - - - - - Grants/Contributions Anticipated - - - - - - - - Fund Balance - - - - - - - - Total Resources 100 400 600 - - - - 1,100 *Restricted Taxes include REET, Fuel, Utility, and KC Levy funds Description and Scope Rebudgeting funding that was directed toward the Downtown Civic Core Vision and Action Plan. 2019 funding will include re-master planning the existing park north to the existing Cedar River Trail and between Burnett and Logan as identified in the adopted Downtown Civic Core Vision and Action Plan. 2020 funding develops design and construction documents. Rationale Project identified in the Downtown Civic Core Vision and Action Plan. Supports planned growth, meets service demands and provides for a vibrant community. GG - PARKS CAPITAL INVESTMENT PROGRAM 2019 through 2024 (in thousands of dollars) Piazza Master Plan & Redevelopment Development Previously Approved AGENDA ITEM #2. a) 2019/2020 Proposed Budget City of Renton, Washington Priority Number:18 Project Title: Project Category: Status: Appropriated To-Date 2019 2020 2021 2022 2023 2024 Total Project Expenditures Expenditures Planning/Design - - - - 150 - - 150 Project Management - - - - - - - - Major Maintenance - - - - - - - - Land Acquisitions - - - - - - - - Construction 135 - - - - - - 135 Total Expenditures 135 - - - 150 - - 285 Appropriated To-Date 2019 2020 2021 2022 2023 2024 Total Project Resources Resources General Fund Sources - - - - - - - - Restricted Taxes 135 - - - - - - 135 Mitigation Fees - - - - - - - - Bond Proceeds - - - - - - - - Grants/Contributions Awarded - - - - - - - - Grants/Contributions Anticipated - - - - - - - - Fund Balance - - - - - - - - Total Resources 135 - - - - - - 135 *Restricted Taxes include REET, Fuel, Utility, and KC Levy funds In order to maintain the park assets, structural reviews are completed every 5 years on every major outdoor and in-water park structure to include bridges, waterwalks, retaining walls, fishing piers, docks, ramps, wave breaks, etc. Identified repairs are then programmed and executed. This will be the third structural report, followed by reports completed in 2012 and 2017. Rationale Structural reviews and repair are a significant aspect of keeping the city's outdoor park structures safe and operating, driving public safety and quality of life for the most heavily visited park in the city. GG - PARKS CAPITAL INVESTMENT PROGRAM 2019 through 2024 (in thousands of dollars) Coulon Park - 5 Year Structural Review Maintenance and Preservation Previously Approved Description and Scope AGENDA ITEM #2. a) 2019/2020 Proposed Budget City of Renton, Washington Priority Number:19 Project Title:Coulon Park - Bulkhead (Rosewall) Repairs Project Category: Status: Appropriated To-Date 2019 2020 2021 2022 2023 2024 Total Project Expenditures Expenditures Planning/Design - - - 120 50 - - 170 Project Management - - - - - - - - Major Maintenance - - - - - - - - Land Acquisitions - - - - - - - - Construction - - - - - 1,000 - 1,000 Total Expenditures - - - 120 50 1,000 - 1,170 Appropriated To-Date 2019 2020 2021 2022 2023 2024 Total Project Resources Resources General Fund Sources - - - - - - - - Restricted Taxes - - - - - - - - Mitigation Fees - - - - - - - - Bond Proceeds - - - - - - - - Grants/Contributions Awarded - - - - - - - - Grants/Contributions Anticipated - - - - - - - - Fund Balance - - - - - - - - Total Resources - - - - - - - - *Restricted Taxes include REET, Fuel, Utility, and KC Levy funds Timber retaining wall is beginning to tilt and was identified for repairs in the 2017 structural assessment report. Environmental permitting will be required. Rationale This project is essential in keeping this area at Coulon Park a safe place for people to visit. Identified in the Parks, Trails and Community Facilities Initiative. GG - PARKS CAPITAL INVESTMENT PROGRAM 2019 through 2024 (in thousands of dollars) Maintenance and Preservation New Description and Scope AGENDA ITEM #2. a) 2019/2020 Proposed Budget City of Renton, Washington Priority Number:20 Project Title:Coulon Park - Irrigation System Replacement Project Category: Status: Appropriated To-Date 2019 2020 2021 2022 2023 2024 Total Project Expenditures Expenditures Planning/Design - - - - - - - - Project Management - - - - - - - - Major Maintenance - - - - - - - - Land Acquisitions - - - - - - - - Construction - - - 500 500 - - 1,000 Total Expenditures - - - 500 500 - - 1,000 Appropriated To-Date 2019 2020 2021 2022 2023 2024 Total Project Resources Resources General Fund Sources - - - - - - - - Restricted Taxes - - - - - - - - Mitigation Fees - - - - - - - - Bond Proceeds - - - - - - - - Grants/Contributions Awarded - - - - - - - - Grants/Contributions Anticipated - - - - - - - - Fund Balance - - - - - - - - Total Resources - - - - - - - - *Restricted Taxes include REET, Fuel, Utility, and KC Levy funds The irrigation system at the south end of Coulon Park is over 50 years old, and over 36 years old in the remainder of the park. The system is outdated and has outlived its useful life; repairs are ongoing. Replacement will result in reduced water consumption with more efficient water delivery with reduced maintenance costs. The south end of the park is programmed for 2021 and the north end for 2022. Rationale This project will help with the overall upkeep of the park, maintaining its quality levels for visitors. Identified in the Parks, Trails and Community Facilities Initiative. GG - PARKS CAPITAL INVESTMENT PROGRAM 2019 through 2024 (in thousands of dollars) Maintenance and Preservation Previously Approved Description and Scope AGENDA ITEM #2. a) 2019/2020 Proposed Budget City of Renton, Washington Priority Number:21 Project Title: Project Category: Status: Appropriated To-Date 2019 2020 2021 2022 2023 2024 Total Project Expenditures Expenditures Planning/Design - - - 100 150 - - 250 Project Management - - - - - - - - Major Maintenance - - - - - - - - Land Acquisitions - - - - - - - - Construction 135 - - - - 800 - 935 Total Expenditures 135 - - 100 150 800 - 1,185 Appropriated To-Date 2019 2020 2021 2022 2023 2024 Total Project Resources Resources General Fund Sources - - - - - - - - Restricted Taxes 135 - - - - - - 135 Mitigation Fees - - - - - - - - Bond Proceeds - - - - - - - - Grants/Contributions Awarded - - - - - - - - Grants/Contributions Anticipated - - - - - - - - Fund Balance - - - - - - - - Total Resources 135 - - - - - - 135 *Restricted Taxes include REET, Fuel, Utility, and KC Levy funds Investigate and develop solution to shoreline erosion located north of IVARs and extending to the north end of the park. Geotechnical and structural assessments required in order to develop plans for construction along with environmental permitting. This is a phased project. Rationale Project maintains service demands and provides a safe and vibrant community. Identified in the Parks, Trails and Community Facilities Initiative. GG - PARKS CAPITAL INVESTMENT PROGRAM 2019 through 2024 (in thousands of dollars) Coulon - Shoreline Erosion Cross-Category New Description and Scope AGENDA ITEM #2. a) 2019/2020 Proposed Budget City of Renton, Washington Priority Number:22 Project Title: Project Category: Status: Appropriated To-Date 2019 2020 2021 2022 2023 2024 Total Project Expenditures Expenditures Planning/Design - - - - - - - - Project Management - - - - - - - - Major Maintenance - - - - - - - - Land Acquisitions - - - - - - - - Construction - - - 80 75 40 100 295 Total Expenditures - - - 80 75 40 100 295 Appropriated To-Date 2019 2020 2021 2022 2023 2024 Total Project Resources Resources General Fund Sources - - - - - - - - Restricted Taxes - - - - - - - - Mitigation Fees - - - - - - - - Bond Proceeds - - - - - - - - Grants/Contributions Awarded - - - - - - - - Grants/Contributions Anticipated - - - - - - - - Fund Balance - - - - - - - - Total Resources - - - - - - - - *Restricted Taxes include REET, Fuel, Utility, and KC Levy funds Work includes ADA accessibility improvements and additions, and safety repairs and replacements to include heaving, broken, and settling pathways, trails, sidewalks, patios and boardwalks. Cedar River Trail-Bronson to Logan left bank (2021), Jones Park (2022), Cedar River Park and Heritage Park (2023), and the Cedar River Trail from Narco to Ron Reigs Park (2023) are programmed. Rationale This project helps ensure that the city parks are accessible to all members of the community in a safe way, improving the quality of life for all. Identified in the Parks, Trails and Community Facilities Initiative. GG - PARKS CAPITAL INVESTMENT PROGRAM 2019 through 2024 (in thousands of dollars) Paths, Walks, Patios and Boardwalks Maintenance and Preservation Previously Approved Description and Scope AGENDA ITEM #2. a) 2019/2020 Proposed Budget City of Renton, Washington Priority Number:23 Project Title:Irrigation Renovation, Automation and Conservation Project Category: Status: Appropriated To-Date 2019 2020 2021 2022 2023 2024 Total Project Expenditures Expenditures Planning/Design - - - - - - - - Project Management - - - - - - - - Major Maintenance - - - - - - - - Land Acquisitions - - - - - - - - Construction - - - 250 265 265 - 780 Total Expenditures - - - 250 265 265 - 780 Appropriated To-Date 2019 2020 2021 2022 2023 2024 Total Project Resources Resources General Fund Sources - - - - - - - - Restricted Taxes - - - - - - - - Mitigation Fees - - - - - - - - Bond Proceeds - - - - - - - - Grants/Contributions Awarded - - - - - - - - Grants/Contributions Anticipated - - - - - - - - Fund Balance - - - - - - - - Total Resources - - - - - - - - *Restricted Taxes include REET, Fuel, Utility, and KC Levy funds This project upgrades and/or replaces outdated irrigation systems & water saving devices that have outlived their useful life; repairs are on- going. Replacement will result in reduced water consumption with more effective water delivery and reduced maintenance costs. Kiwanis Parks is scheduled for 2021, Tiffany Park for 2022, Philip Arnold for 2023. Rationale Provides a safe, healthy, vibrant community and meets service demands. GG - PARKS CAPITAL INVESTMENT PROGRAM 2019 through 2024 (in thousands of dollars) Maintenance and Preservation Previously Approved Description and Scope AGENDA ITEM #2. a) 2019/2020 Proposed Budget City of Renton, Washington Priority Number:24 Project Title:Cleveland-Richardson Wetland Assess./Delineation Project Category: Status: Appropriated To-Date 2019 2020 2021 2022 2023 2024 Total Project Expenditures Expenditures Planning/Design - - - 45 - - - 45 Project Management - - - - - - - - Major Maintenance - - - - - - - - Land Acquisitions - - - - - - - - Construction - - - - - - - - Total Expenditures - - - 45 - - - 45 Appropriated To-Date 2019 2020 2021 2022 2023 2024 Total Project Resources Resources General Fund Sources - - - - - - - - Restricted Taxes - - - - - - - - Mitigation Fees - - - - - - - - Bond Proceeds - - - - - - - - Grants/Contributions Awarded - - - - - - - - Grants/Contributions Anticipated - - - - - - - - Fund Balance - - - - - - - - Total Resources - - - - - - - - *Restricted Taxes include REET, Fuel, Utility, and KC Levy funds The City acquired the 24 acre property in 1995. 4 year-round streams, 1 intermittent stream and a pond are located on the property. Wetlands are likely. The Wetland Assessment and Delineation will identify and map environmental elements and associated setbacks, which is the first step in determining how the park may be developed in the future. Rationale As the city population continues to rise, the park space per resident continues to decrease. Increasing the amount of park space is the only way to meet this increasing demand, which improves the quality of life for those in the community. GG - PARKS CAPITAL INVESTMENT PROGRAM 2019 through 2024 (in thousands of dollars) Planning New Request Description and Scope AGENDA ITEM #2. a) 2019/2020 Proposed Budget City of Renton, Washington Priority Number:25 Project Title: Project Category: Status: Appropriated To-Date 2019 2020 2021 2022 2023 2024 Total Project Expenditures Expenditures Planning/Design - - - - - - - - Project Management - - - - - - - - Major Maintenance - - - - - - - - Land Acquisitions - - - - - - - - Construction - - - 250 150 150 150 700 Total Expenditures - - - 250 150 150 150 700 Appropriated To-Date 2019 2020 2021 2022 2023 2024 Total Project Resources Resources General Fund Sources - - - - - - - - Restricted Taxes - - - - - - - - Mitigation Fees - - - - - - - - Bond Proceeds - - - - - - - - Grants/Contributions Awarded - - - - - - - - Grants/Contributions Anticipated - - - - - - - - Fund Balance - - - - - - - - Total Resources - - - - - - - - *Restricted Taxes include REET, Fuel, Utility, and KC Levy funds Older ballfields require periodic major renovations to maintain infrastructure & safety, increase playability, & decrease staff time in field preparation. Work includes drainage, grading, turf, material replacement, backstop replacements & upgrades, player bench repairs & upgrades, & bleacher upgrades & replacements. Liberty Park (2021), system wide dugouts (2022), Teasdale (2023), & Kiwanis (2024) are programmed. Rationale Provides a safe, healthy, vibrant community and meets service demands. Identified in the Parks, Trails and Community Facilities Initiative. GG - PARKS CAPITAL INVESTMENT PROGRAM 2019 through 2024 (in thousands of dollars) Ballfield Renovation Maintenance and Preservation Previously Approved Description and Scope AGENDA ITEM #2. a) 2019/2020 Proposed Budget City of Renton, Washington Priority Number:26 Project Title: Project Category: Status: Appropriated To-Date 2019 2020 2021 2022 2023 2024 Total Project Expenditures Expenditures Planning/Design - - - - - - - - Project Management - - - - - - - - Major Maintenance - - - - - - - - Land Acquisitions - - - - - - - - Construction - - - 150 150 - - 300 Total Expenditures - - - 150 150 - - 300 Appropriated To-Date 2019 2020 2021 2022 2023 2024 Total Project Resources Resources General Fund Sources - - - - - - - - Restricted Taxes - - - - - - - - Mitigation Fees - - - - - - - - Bond Proceeds - - - - - - - - Grants/Contributions Awarded - - - - - - - - Grants/Contributions Anticipated - - - - - - - - Fund Balance - - - - - - - - Total Resources - - - - - - - - *Restricted Taxes include REET, Fuel, Utility, and KC Levy funds In a mature park system, landscape renovation removes and replaces landscape plantings (includes turf) that have succumbed to disease, vandalism, drainage issues, and drought, and/or outlived their useful life. Soil amendments, drainage and irrigation are also components that are included. Cedar River Park Bank is programmed for 2021 and Maplewood Roadside Park for 2022. Rationale Project contributes toward providing a safe, healthy, and vibrant community, meeting service demands and providing high quality customer service. GG - PARKS CAPITAL INVESTMENT PROGRAM 2019 through 2024 (in thousands of dollars) MM Landscape Renovation & Repair Maintenance and Preservation Previously Approved Description and Scope AGENDA ITEM #2. a) 2019/2020 Proposed Budget City of Renton, Washington Priority Number:27 Project Title: Project Category: Status: Appropriated To-Date 2019 2020 2021 2022 2023 2024 Total Project Expenditures Expenditures Planning/Design - - - - - - - - Project Management - - - - - - - - Major Maintenance - - - - - - - - Land Acquisitions - - - - - - - - Construction 124 - - 20 - - - 144 Total Expenditures 124 - - 20 - - - 144 Appropriated To-Date 2019 2020 2021 2022 2023 2024 Total Project Resources Resources General Fund Sources - - - - - - - - Restricted Taxes 124 - - - - - - 124 Mitigation Fees - - - - - - - - Bond Proceeds - - - - - - - - Grants/Contributions Awarded - - - - - - - - Grants/Contributions Anticipated - - - - - - - - Fund Balance - - - - - - - - Total Resources 124 - - - - - - 124 *Restricted Taxes include REET, Fuel, Utility, and KC Levy funds Replacement and/or installation of fencing, guardrails, bullrails, and railings along park boundaries, waterwalks, walkways with significant elevation change, and parking lots to ensure safe public access and use. Cascade Park is programmed for 2021. Rationale Project contributes toward providing a safe, healthy, and vibrant community, meeting service demands and providing high quality customer service. Projects identified in the Parks, Trails and Community Facilities Initiative. GG - PARKS CAPITAL INVESTMENT PROGRAM 2019 through 2024 (in thousands of dollars) Maintenance and Preservation Previously Approved Description and Scope MM Fencing, Guardrails, Bullrails, and Railings AGENDA ITEM #2. a) 2019/2020 Proposed Budget City of Renton, Washington Priority Number:28 Project Title: Project Category: Status: Appropriated To-Date 2019 2020 2021 2022 2023 2024 Total Project Expenditures Expenditures Planning/Design - - - - 100 300 - 400 Project Management - - - - - - - - Major Maintenance - - - - - - - - Land Acquisitions - - - - - - - - Construction 237 - - 300 - - 2,000 2,537 Total Expenditures 237 - - 300 100 300 2,000 2,937 Appropriated To-Date 2019 2020 2021 2022 2023 2024 Total Project Resources Resources General Fund Sources - - - - - - - - Restricted Taxes 237 - - - - - - 237 Mitigation Fees - - - - - - - - Bond Proceeds - - - - - - - - Grants/Contributions Awarded - - - - - - - - Grants/Contributions Anticipated - - - - - - - - Fund Balance - - - - - - - - Total Resources 237 - - - - - - 237 *Restricted Taxes include REET, Fuel, Utility, and KC Levy funds Major maintenance is necessary in order to maintain City assets and infrastructure in a safe, accessible, and operational manner. Along bodies of water, environmental design and permitting considerations are incorporated into the project. Jones Park bank stabilization is programed for 2021 and the Cedar River Trail for years 2022-2024. Rationale Project contributes toward providing a safe, healthy, and vibrant community, meeting service demands and providing high quality customer service. Projects identified in the Parks, Trails and Community Facilities Initiative. GG - PARKS CAPITAL INVESTMENT PROGRAM 2019 through 2024 (in thousands of dollars) MM Shoreline and Bank Stabilization Maintenance and Preservation Previously Approved Description and Scope AGENDA ITEM #2. a) 2019/2020 Proposed Budget City of Renton, Washington Priority Number:29 Project Title: Project Category: Status: Appropriated To-Date 2019 2020 2021 2022 2023 2024 Total Project Expenditures Expenditures Planning/Design - - - - - - - Project Management - - - - - - - - Major Maintenance - - - - - - - - Land Acquisitions - - - 2,000 - - - 2,000 Construction - - - - - - - - Total Expenditures - - - 2,000 - - - 2,000 Appropriated To-Date 2019 2020 2021 2022 2023 2024 Total Project Resources Resources General Fund Sources - - - - - - - - Restricted Taxes - - - - - - - - Mitigation Fees - - - - - - - - Bond Proceeds - - - - - - - - Grants/Contributions Awarded - - - - - - - - Grants/Contributions Anticipated - - - - - - - - Fund Balance - - - - - - - - Total Resources - - - - - - - - *Restricted Taxes include REET, Fuel, Utility, and KC Levy funds Acquire property north of 2nd Avenue as identified in the adopted Downtown Civic Core Vision and Action Plan to connect downtown to the Cedar River Trail, the Lake Washington Loop Trail and the East Side Rail Corridor. Rationale First identified in the adopted Downtown Civic Core Vision and Action Plan (2018). Supports planned growth, meets service demands and provides for a vibrant community. GG - PARKS CAPITAL INVESTMENT PROGRAM 2019 through 2024 (in thousands of dollars) Acquisition - Renton Connector Acquisition New Description and Scope AGENDA ITEM #2. a) 2019/2020 Proposed Budget City of Renton, Washington Priority Number:30 Project Title: Project Category: Status: Appropriated To-Date 2019 2020 2021 2022 2023 2024 Total Project Expenditures Expenditures Planning/Design - - - - - - - Project Management - - - - - - - - Major Maintenance - - - - - - - - Land Acquisitions - - - 8,000 - - - 8,000 Construction - - - - - - - - Total Expenditures - - - 8,000 - - - 8,000 Appropriated To-Date 2019 2020 2021 2022 2023 2024 Total Project Resources Resources General Fund Sources - - - - - - - - Restricted Taxes - - - 8,000 - - - 8,000 Mitigation Fees - - - - - - - - Bond Proceeds - - - - - - - - Grants/Contributions Awarded - - - - - - - - Grants/Contributions Anticipated - - - - - - - - Fund Balance - - - - - - - - Total Resources - - - 8,000 - - - 8,000 *Restricted Taxes include REET, Fuel, Utility, and KC Levy funds Acquire property adjacent to existing Cedar River Park as part of the adopted Tri-Park Master Plan. Future development to include re- located ballfields. Rationale First identified in the adopted Tri-Park Master Plan (2006) and the Parks, Recreation and Natural Areas Plan (2011). Supports planned growth, meets service demands and provides for a vibrant community. GG - PARKS CAPITAL INVESTMENT PROGRAM 2019 through 2024 (in thousands of dollars) Acquisition - Tri-Park Property Acquisition New Description and Scope AGENDA ITEM #2. a) 2019/2020 Proposed Budget City of Renton, Washington Priority Number:31 Project Title: Project Category: Status: Appropriated To-Date 2019 2020 2021 2022 2023 2024 Total Project Expenditures Expenditures Planning/Design - - - - - - - - Project Management - - - - - - - - Major Maintenance - - - - - - - - Land Acquisitions - - - - - - - - Construction - - - 25 25 25 25 100 Total Expenditures - - - 25 25 25 25 100 Appropriated To-Date 2019 2020 2021 2022 2023 2024 Total Project Resources Resources General Fund Sources - - - - - - - - Restricted Taxes - - - - - - - - Mitigation Fees - - - - - - - - Bond Proceeds - - - - - - - - Grants/Contributions Awarded - - - - - - - - Grants/Contributions Anticipated - - - - - - - - Fund Balance - - - - - - - - Total Resources - - - - - - - - *Restricted Taxes include REET, Fuel, Utility, and KC Levy funds Funds are used to maintain and improve natural area habitats by procuring and installing native plants and controlling invasive plant spread to ensure habitat monitoring requirements are met during the required monitoring period. Rationale Provides a safe, healthy, vibrant community and meets service demands. GG - PARKS CAPITAL INVESTMENT PROGRAM 2019 through 2024 (in thousands of dollars) Habitat Enhancement Maintenance and Preservation Previously Approved Description and Scope AGENDA ITEM #2. a) 2019/2020 Proposed Budget City of Renton, Washington Priority Number:32 Project Title: Project Category: Status: Appropriated To-Date 2019 2020 2021 2022 2023 2024 Total Project Expenditures Expenditures Planning/Design - - - - 150 300 - 450 Project Management - - - - - - - - Major Maintenance - - - - - - - - Land Acquisitions - - - - - - - - Construction - - - - - - 2,020 2,020 Total Expenditures - - - - 150 300 2,020 2,470 Appropriated To-Date 2019 2020 2021 2022 2023 2024 Total Project Resources Resources General Fund Sources - - - - - - - - Restricted Taxes - - - - - - - - Mitigation Fees - - - - - - - - Bond Proceeds - - - - - - - - Grants/Contributions Awarded - - - - - - - - Grants/Contributions Anticipated - - - - - - - - Fund Balance - - - - - - - - Total Resources - - - - - - - - *Restricted Taxes include REET, Fuel, Utility, and KC Levy funds Description and Scope Construct remaining missing boardwalk link in the existing system between SW 43 Street and SW Grady Way. Trail links to a countywide regional trail system including the Interurban Trail and extends to the City of Pacific to the south and north to South Seattle. Future acquisitions remain - one parcel. Rationale Supports planned growth, meets service demands and provides for a vibrant community. GG - PARKS CAPITAL INVESTMENT PROGRAM 2019 through 2024 (in thousands of dollars) Springbrook Trail Missing Link Development Previously Approved AGENDA ITEM #2. a) 2019/2020 Proposed Budget City of Renton, Washington Priority Number:33 Project Title: Project Category: Status: Appropriated To-Date 2019 2020 2021 2022 2023 2024 Total Project Expenditures Expenditures Planning/Design - - - 90 90 90 90 360 Project Management - - - - - - - - Major Maintenance - - - - - - - - Land Acquisitions - - - - - - - - Construction - - - - - - - - Total Expenditures - - - 90 90 90 90 360 Appropriated To-Date 2019 2020 2021 2022 2023 2024 Total Project Resources Resources General Fund Sources - - - - - - - - Restricted Taxes - - - - - - - - Mitigation Fees - - - - - - - - Bond Proceeds - - - - - - - - Grants/Contributions Awarded - - - - - - - - Grants/Contributions Anticipated - - - - - - - - Fund Balance - - - - - - - - Total Resources - - - - - - - - *Restricted Taxes include REET, Fuel, Utility, and KC Levy funds Park master planning is utilized for undeveloped parks, under-developed park areas, and for developed parks that are becoming outdated. Park master planning is done at the individual park level and guides park development in subsequent years. The process involves assessing community needs and translating that information into a framework for meeting the physical, spatial, and facility requirements to satisfy those needs. Rationale Provides a safe, healthy, vibrant community and meets service demands. GG - PARKS CAPITAL INVESTMENT PROGRAM 2019 through 2024 (in thousands of dollars) Park Master Planning Planning Previously Approved Description and Scope AGENDA ITEM #2. a) 2019/2020 Proposed Budget City of Renton, Washington Priority Number:34 Project Title: Project Category: Status: Appropriated To-Date 2019 2020 2021 2022 2023 2024 Total Project Expenditures Expenditures Planning/Design - - - 125 125 400 - 650 Project Management - - - - - - - - Major Maintenance - - - - - - - - Land Acquisitions - - - - - - - - Construction - - - - - - 2,020 2,020 Total Expenditures - - - 125 125 400 2,020 2,670 Appropriated To-Date 2019 2020 2021 2022 2023 2024 Total Project Resources Resources General Fund Sources - - - - - - - - Restricted Taxes - - - - - - - - Mitigation Fees - - - - - - - - Bond Proceeds - - - - - - - - Grants/Contributions Awarded - - - - - - - - Grants/Contributions Anticipated - - - - - - - - Fund Balance - - - - - - - - Total Resources - - - - - - - - *Restricted Taxes include REET, Fuel, Utility, and KC Levy funds Description and Scope An active heron colony, an estimated 75 species of avifauna, and numerous mammals inhabit this area. An interpretive learning center, soft surface paths to view wildlife, and sensitive habitat enhancement are planned. A wildlife/habitat inventory and assessment, environmental studies, master planning, design and construction documents and construction will complete the project. Rationale This project was identified as a #2 citywide priority in the adopted Parks, Recreation and Natural Areas Plan (2011). Supports planned growth, meets service demands and provides for a vibrant community. GG - PARKS CAPITAL INVESTMENT PROGRAM 2019 through 2024 (in thousands of dollars) Black River Riparian Forest Development Previously Approved AGENDA ITEM #2. a) 2019/2020 Proposed Budget City of Renton, Washington Priority Number:35 Project Title: Project Category: Status: Appropriated To-Date 2019 2020 2021 2022 2023 2024 Total Project Expenditures Expenditures Planning/Design - - - 100 70 120 60 350 Project Management - - - - - - - - Major Maintenance - - - - - - - - Land Acquisitions - - - - - - - - Construction 59 - - - - - 59 Total Expenditures 59 - - 100 70 120 60 409 Appropriated To-Date 2019 2020 2021 2022 2023 2024 Total Project Resources Resources General Fund Sources - - - - - - - - Restricted Taxes 59 - - - - - - 59 Mitigation Fees - - - - - - - - Bond Proceeds - - - - - - - - Grants/Contributions Awarded - - - - - - - - Grants/Contributions Anticipated - - - - - - - - Fund Balance - - - - - - - - Total Resources 59 - - - - - - 59 *Restricted Taxes include REET, Fuel, Utility, and KC Levy funds Many parks throughout the system do not have current boundary, topographic and site surveys reflecting existing conditions. Surveys provide the baseline information for future maintenance and development projects as well as define park boundaries to minimize encroachment. Jones Park is programmed for 2021, Cascade Park and the Springbrook Trail for 2022, Kennydale Lions for 2023 and Maplewood Park for 2024. Rationale Project contributes toward providing a safe, healthy, and vibrant community, meeting service demands and providing high quality customer service. GG - PARKS CAPITAL INVESTMENT PROGRAM 2019 through 2024 (in thousands of dollars) MM Boundary, Topographic, Site Surveys Maintenance and Preservation Previously Approved Description and Scope AGENDA ITEM #2. a) 2019/2020 Proposed Budget City of Renton, Washington Priority Number:36 Project Title: Project Category: Status: Appropriated To-Date 2019 2020 2021 2022 2023 2024 Total Project Expenditures Expenditures Planning/Design - - - 150 500 - 225 875 Project Management - - - - - - - - Major Maintenance - - - - - - - - Land Acquisitions - - - - - - - - Construction - - - - - 4,040 - 4,040 Total Expenditures - - - 150 500 4,040 225 4,915 Appropriated To-Date 2019 2020 2021 2022 2023 2024 Total Project Resources Resources General Fund Sources - - - - - - - - Restricted Taxes - - - - - - - - Mitigation Fees - - - - - - - - Bond Proceeds - - - - - - - - Grants/Contributions Awarded - - - - - - - - Grants/Contributions Anticipated - - - - - - - - Fund Balance - - - - - - - - Total Resources - - - - - - - - *Restricted Taxes include REET, Fuel, Utility, and KC Levy funds Description and Scope This 40 acre site is currently owned by King County and will be transferred to the City of Renton (date unknown) for future use as a park site. Future improvements will include passive and active uses and will be master planned, and designed and constructed in two phases. Rationale This project was identified as a #5 citywide priority in the adopted parks, Recreation and Natural Areas Plan (2011). Supports planned growth, meets service demands and provides for a vibrant community. GG - PARKS CAPITAL INVESTMENT PROGRAM 2019 through 2024 (in thousands of dollars) Maplewood Community Park Development Previously Approved AGENDA ITEM #2. a) 2019/2020 Proposed Budget City of Renton, Washington Priority Number:37 Project Title: Project Category: Status: Appropriated To-Date 2019 2020 2021 2022 2023 2024 Total Project Expenditures Expenditures Planning/Design - - - - - 125 - 125 Project Management - - - - - - - - Major Maintenance - - - - - - - - Land Acquisitions - - - - - - - - Construction - - - - - - - - Total Expenditures - - - - - 125 - 125 Appropriated To-Date 2019 2020 2021 2022 2023 2024 Total Project Resources Resources General Fund Sources - - - - - - - - Restricted Taxes - - - - - - - - Mitigation Fees - - - - - - - - Bond Proceeds - - - - - - - - Grants/Contributions Awarded - - - - - - - - Grants/Contributions Anticipated - - - - - - - - Fund Balance - - - - - - - - Total Resources - - - - - - - - *Restricted Taxes include REET, Fuel, Utility, and KC Levy funds Update to the 2018 Trails and Bicycle Master Plan which expires in 2024. In order to maintain grant eligibility (parks and trails), the plan is required to be updated and certified every six years; the City also uses the plan to obtain transportation grants. Public Works contributes 50% of the cost for consultant services; the figure below represents 50% of the total budget amount required. Rationale Provides a safe, healthy, vibrant community and meets service demands. GG - PARKS CAPITAL INVESTMENT PROGRAM 2019 through 2024 (in thousands of dollars) Trails and Bicycle Master Plan Planning Previously Approved Description and Scope AGENDA ITEM #2. a) 2019/2020 Proposed Budget City of Renton, Washington Priority Number:38 Project Title: Project Category: Status: Appropriated To-Date 2019 2020 2021 2022 2023 2024 Total Project Expenditures Expenditures Planning/Design - - - - - - 350 350 Project Management - - - - - - - - Major Maintenance - - - - - - - - Land Acquisitions - - - - - - - - Construction - - - - - - - - Total Expenditures - - - - - - 350 350 Appropriated To-Date 2019 2020 2021 2022 2023 2024 Total Project Resources Resources General Fund Sources - - - - - - - - Restricted Taxes - - - - - - - - Mitigation Fees - - - - - - - - Bond Proceeds - - - - - - - - Grants/Contributions Awarded - - - - - - - - Grants/Contributions Anticipated - - - - - - - - Fund Balance - - - - - - - - Total Resources - - - - - - - - *Restricted Taxes include REET, Fuel, Utility, and KC Levy funds As required by the 30-year lease agreement with the State Department of Natural Resources, the City is required to replace all existing treated wood within the Lease Area with untreated wood, steel, concrete or recycled plastic by 7/1/2028. The City will also be required to renovate or replace the existing docks, rafts, floats, wharves and piers to provide 50% grated surface (with 60% functional open space) also by 2028. 2024 funding commences the design process. Rationale Project maintains a safe, healthy and vibrant community and meets services demands. GG - PARKS CAPITAL INVESTMENT PROGRAM 2019 through 2024 (in thousands of dollars) Coulon Park - Wood Removal (DNR Lease) Maintenance and Preservation New Description and Scope AGENDA ITEM #2. a) 2019/2020 Proposed Budget City of Renton, Washington Priority Number:39 Project Title: Project Category: Status: Appropriated To-Date 2019 2020 2021 2022 2023 2024 Total Project Expenditures Expenditures Planning/Design - - - - - - - - Project Management - - - - - - - - Major Maintenance - - - - - - - - Land Acquisitions - - - - - - - - Construction 2,928 - - - - - 250 3,178 Total Expenditures 2,928 - - - - - 250 3,178 Appropriated To-Date 2019 2020 2021 2022 2023 2024 Total Project Resources Resources General Fund Sources - - - - - - - - Restricted Taxes 2,928 - - - - - - 2,928 Mitigation Fees - - - - - - - - Bond Proceeds - - - - - - - - Grants/Contributions Awarded - - - - - - - - Grants/Contributions Anticipated - - - - - - - - Fund Balance - - - - - - - - Total Resources 2,928 - - - - - - 2,928 *Restricted Taxes include REET, Fuel, Utility, and KC Levy funds In order to maintain City assets, structural reviews are completed every 5 years on every major outdoor structure to include bridges, waterwalks, retaining walls, fishing piers, docks, ramps, wave breaks, etc. Identified repairs are then programmed and executed in order to maintain the park assets in a safe condition and accessible to the public. Rationale Projects contribute toward providing a safe, healthy, and vibrant community, meeting service demands and providing high quality customer service. Identified in the Parks, Trails and Community Facilities Initiative. GG - PARKS CAPITAL INVESTMENT PROGRAM 2019 through 2024 (in thousands of dollars) Coulon Park - Structural Repairs Maintenance and Preservation Previously Approved Description and Scope AGENDA ITEM #2. a) 2019/2020 Proposed Budget City of Renton, Washington Priority Number:40 Project Title: Project Category: Status: Appropriated To-Date 2019 2020 2021 2022 2023 2024 Total Project Expenditures Expenditures Planning/Design - - - - - - - - Project Management - - - - - - - - Major Maintenance - - - - - - - - Land Acquisitions - - - - - - - - Construction - - - - - 50 50 100 Total Expenditures - - - - - 50 50 100 Appropriated To-Date 2019 2020 2021 2022 2023 2024 Total Project Resources Resources General Fund Sources - - - - - - - - Restricted Taxes - - - - - - - - Mitigation Fees - - - - - - - - Bond Proceeds - - - - - - - - Grants/Contributions Awarded - - - - - - - - Grants/Contributions Anticipated - - - - - - - - Fund Balance - - - - - - - - Total Resources - - - - - - - - *Restricted Taxes include REET, Fuel, Utility, and KC Levy funds The south end of the park is over 50 years old and the north end is over 36 years old. In a mature park system, landscape renovation removes and replaces landscape plantings that have succumbed to disease, vandalism, drainage issues, and drought, and/or outlived their useful life. Soil amendments, drainage and irrigation are also components that are included. The south end is scheduled for 2023 and the north end for 2024 Rationale Project maintains a safe, healthy and vibrant community and meets services demands. GG - PARKS CAPITAL INVESTMENT PROGRAM 2019 through 2024 (in thousands of dollars) Coulon Park - Landscape Renovation Maintenance and Preservation Previously Approved Description and Scope AGENDA ITEM #2. a) 2019/2020 Proposed Budget City of Renton, Washington Priority Number:41 Project Title: Project Category: Status: Appropriated To-Date 2019 2020 2021 2022 2023 2024 Total Project Expenditures Expenditures Planning/Design - - - - - - - - Project Management - - - - - - - - Major Maintenance - - - - - - - - Land Acquisitions - - - - - - - - Construction - - - - - - 30 30 Total Expenditures - - - - - - 30 30 Appropriated To-Date 2019 2020 2021 2022 2023 2024 Total Project Resources Resources General Fund Sources - - - - - - - - Restricted Taxes - - - - - - - - Mitigation Fees - - - - - - - - Bond Proceeds - - - - - - - - Grants/Contributions Awarded - - - - - - - - Grants/Contributions Anticipated - - - - - - - - Fund Balance - - - - - - - - Total Resources - - - - - - - - *Restricted Taxes include REET, Fuel, Utility, and KC Levy funds As identified in the 2017 Structural Assessment, one log from the original log boom (west end, log 13) is waterlogged and has lost significant freeboard. The recommended action is to observe, remove or replace as needed. Rationale Project maintains a safe, healthy and vibrant community and meets services demands. GG - PARKS CAPITAL INVESTMENT PROGRAM 2019 through 2024 (in thousands of dollars) Coulon Park - Log Replacement Maintenance and Preservation Previously Approved Description and Scope AGENDA ITEM #2. a) 2019/2020 Proposed Budget City of Renton, Washington Priority Number:42 Project Title: Project Category: Status: Appropriated To-Date 2019 2020 2021 2022 2023 2024 Total Project Expenditures Expenditures Planning/Design - - - - - - - - Project Management - - - - - - - - Major Maintenance - - - - - - - - Land Acquisitions - - - - - - 1,000 1,000 Construction - - - - - - - - Total Expenditures - - - - - - 1,000 1,000 Appropriated To-Date 2019 2020 2021 2022 2023 2024 Total Project Resources Resources General Fund Sources - - - - - - - - Restricted Taxes - - - - - - - - Mitigation Fees - - - - - - - - Bond Proceeds - - - - - - - - Grants/Contributions Awarded - - - - - - - - Grants/Contributions Anticipated - - - - - - - - Fund Balance - - - - - - - - Total Resources - - - - - - - - *Restricted Taxes include REET, Fuel, Utility, and KC Levy funds Description and Scope Research and identify parcels for potential acquisition to support Coulon Park. Rationale Supports planned growth, meets service demands and provides for a vibrant community. GG - PARKS CAPITAL INVESTMENT PROGRAM 2019 through 2024 (in thousands of dollars) Acquisition Opportunity - Coulon Park Acquisition Previously Approved AGENDA ITEM #2. a) 2019/2020 Proposed Budget City of Renton, Washington Priority Number:43 Project Title: Project Category: Status: Appropriated To-Date 2019 2020 2021 2022 2023 2024 Total Project Expenditures Expenditures Planning/Design - - - - - - 675 675 Project Management - - - - - - - - Major Maintenance - - - - - - - - Land Acquisitions - - - - - - - - Construction - - - - - - 4,955 4,955 Total Expenditures - - - - - - 5,630 5,630 Appropriated To-Date 2019 2020 2021 2022 2023 2024 Total Project Resources Resources General Fund Sources - - - - - - - - Restricted Taxes - - - - - - 5,630 5,630 Mitigation Fees - - - - - - - - Bond Proceeds - - - - - - - - Grants/Contributions Awarded - - - - - - - - Grants/Contributions Anticipated - - - - - - - - Fund Balance - - - - - - - - Total Resources - - - - - - 5,630 5,630 *Restricted Taxes include REET, Fuel, Utility, and KC Levy funds Connection from the terminus of the Cedar River Trail at the Renton Rowing Center to Gene Coulon Memorial Beach Park as per the Sam Chastain Waterfront Trail Master Plan. A combination of over water and on land connections will be made via waterwalk, soft surface and hard surface trails. It is anticipated that by the end of 2018 all easements will have been obtained. Rationale First identified in the Sam Chastain Waterfront Trail (2003) and the adopted Trails and Bicycle Master Plan (2009). Supports a vibrant community, supports planned growth and meets service demands. Identified in the Parks, Trails and Community Facilities Initiative. GG - PARKS CAPITAL INVESTMENT PROGRAM 2019 through 2024 (in thousands of dollars) Sam Chastain Trail Development New Description and Scope AGENDA ITEM #2. a) 2019/2020 Proposed Budget City of Renton, Washington Priority Number:44 Project Title: Project Category: Status: Appropriated To-Date 2019 2020 2021 2022 2023 2024 Total Project Expenditures Expenditures Planning/Design - - - - - - 1,300 1,300 Project Management - - - - - - - - Major Maintenance - - - - - - - - Land Acquisitions - - - - - - 3,500 3,500 Construction - - - - - - 9,500 9,500 Total Expenditures - - - - - - 14,300 14,300 Appropriated To-Date 2019 2020 2021 2022 2023 2024 Total Project Resources Resources General Fund Sources - - - - - - - - Restricted Taxes - - - - - - 14,300 14,300 Mitigation Fees - - - - - - - - Bond Proceeds - - - - - - - - Grants/Contributions Awarded - - - - - - - - Grants/Contributions Anticipated - - - - - - - - Fund Balance - - - - - - - - Total Resources - - - - - - 14,300 14,300 *Restricted Taxes include REET, Fuel, Utility, and KC Levy funds Design and develops the Narco Property as per adopted Tri-Park Master Plan. Includes 4 all-weather soccer fields, parking, bmx facility, restrooms, play areas and relocated Cedar River Trail (existing temporary off-leash park will be relocated). As per the grant agreements utilized to purchase the property, the City will be required to pay back the current market value of 7.5 acres (approximately) of the flat area for future field development. Rationale Property acquired in 1993 and plan first identified in the adopted Tri-Park Plan (2006) and the adopted Parks, Recreation, and Natural Areas Plan (2011). Supports planned growth, meets service demands and provides for a vibrant community. Identified in the Parks, Trails and Community Facilities Initiative. GG - PARKS CAPITAL INVESTMENT PROGRAM 2019 through 2024 (in thousands of dollars) Narco Property (Tri-Park Plan) Development New Description and Scope AGENDA ITEM #2. a) 2019/2020 Proposed Budget City of Renton, Washington Priority Number:45 Project Title: Project Category: Status: Appropriated To-Date 2019 2020 2021 2022 2023 2024 Total Project Expenditures Expenditures Planning/Design - - - - - - 2,350 2,350 Project Management - - - - - - - Major Maintenance - - - - - - - - Land Acquisitions - - - - - - - - Construction - - - - - - 17,250 17,250 Total Expenditures - - - - - - 19,600 19,600 Appropriated To-Date 2019 2020 2021 2022 2023 2024 Total Project Resources Resources General Fund Sources - - - - - - - - Restricted Taxes - - - - - - 19,600 19,600 Mitigation Fees - - - - - - - - Bond Proceeds - - - - - - - - Grants/Contributions Awarded - - - - - - - - Grants/Contributions Anticipated - - - - - - - - Fund Balance - - - - - - - - Total Resources - - - - - - 19,600 19,600 *Restricted Taxes include REET, Fuel, Utility, and KC Levy funds Renovates Cedar River Park to include expanded aquatic facility, reconfigures fields, adds parking. Project includes master planning, design and construction document preparation and construction. Rationale First identified in the adopted Tri-Park Plan (2006) and the Parks, Recreation and Natural Areas Plan (2011). Supports planned growth, meets service demands and provides for a vibrant community. Identified in the Parks, Trails and Community Facilities Initiative. GG - PARKS CAPITAL INVESTMENT PROGRAM 2019 through 2024 (in thousands of dollars) Cedar River Park (Tri-Park Plan) Development New Description and Scope AGENDA ITEM #2. a) 2019/2020 Proposed Budget City of Renton, Washington Priority Number:46 Project Title: Project Category: Status: Appropriated To-Date 2019 2020 2021 2022 2023 2024 Total Project Expenditures Expenditures Planning/Design - - - - - - 650 650 Project Management - - - - - - - - Major Maintenance - - - - - - - - Land Acquisitions - - - - - - - - Construction - - - - - - 4,780 4,780 Total Expenditures - - - - - - 5,430 5,430 Appropriated To-Date 2019 2020 2021 2022 2023 2024 Total Project Resources Resources General Fund Sources - - - - - - - - Restricted Taxes - - - - - - 5,430 5,430 Mitigation Fees - - - - - - - - Bond Proceeds - - - - - - - - Grants/Contributions Awarded - - - - - - - - Grants/Contributions Anticipated - - - - - - - - Fund Balance - - - - - - - - Total Resources - - - - - - 5,430 5,430 *Restricted Taxes include REET, Fuel, Utility, and KC Levy funds Renovates Liberty Park to include relocated skate park, tennis, basketball, youth/teen facility, parking, passive area for potential off leash park, parking and restroom as per adopted Tri Park Plan. Potentially relocates ballfields and play area. Project includes master planning, design and construction drawings and construction. Rationale First identified in the adopted Tri-Park Master Plan (2006) and in the adopted Parks, Recreation and Natural Areas Plan (2011). Meets service demands and provides for a vibrant community. Identified in the Parks, Trails and Community Facilities Initiative. GG - PARKS CAPITAL INVESTMENT PROGRAM 2019 through 2024 (in thousands of dollars) Liberty Park (Tri-Park Plan) Development New Description and Scope AGENDA ITEM #2. a) 2019/2020 Proposed Budget City of Renton, Washington Priority Number:47 Project Title: Project Category: Status: Appropriated To-Date 2019 2020 2021 2022 2023 2024 Total Project Expenditures Expenditures Planning/Design - - - - - - 550 550 Project Management - - - - - - - - Major Maintenance - - - - - - - - Land Acquisitions - - - - - - - - Construction - - - - - - 6,020 6,020 Total Expenditures - - - - - - 6,570 6,570 Appropriated To-Date 2019 2020 2021 2022 2023 2024 Total Project Resources Resources General Fund Sources - - - - - - - - Restricted Taxes - - - - - - 6,570 6,570 Mitigation Fees - - - - - - - - Bond Proceeds - - - - - - - - Grants/Contributions Awarded - - - - - - - - Grants/Contributions Anticipated - - - - - - - - Fund Balance - - - - - - - - Total Resources - - - - - - 6,570 6,570 *Restricted Taxes include REET, Fuel, Utility, and KC Levy funds Develop Master Plan, design and construction documents and complete park improvements based upon adopted Concept Plan to include children's play area, picnic facilities, parking, restroom, multi-purpose fields, basketball court and walking paths. Rationale First identified in the adopted Parks, Recreation and Natural Areas Plan (2011). Supports planned growth, meets service demands and provides for a vibrant community. Identified in the Parks, trails and Community Facilities Initiative. GG - PARKS CAPITAL INVESTMENT PROGRAM 2019 through 2024 (in thousands of dollars) May Creek/McAskill Park New Description and Scope Development AGENDA ITEM #2. a) 2019/2020 Proposed Budget City of Renton, Washington Priority Number:48 Project Title: Project Category: Status: Appropriated To-Date 2019 2020 2021 2022 2023 2024 Total Project Expenditures Expenditures Planning/Design - - - - - - 130 130 Project Management - - - - - - 480 480 Major Maintenance - - - - - - - - Land Acquisitions - - - - - - - - Construction - - - - - - - - Total Expenditures - - - - - - 610 610 Appropriated To-Date 2019 2020 2021 2022 2023 2024 Total Project Resources Resources General Fund Sources - - - - - - - - Restricted Taxes - - - - - - 610 610 Mitigation Fees - - - - - - - - Bond Proceeds - - - - - - - - Grants/Contributions Awarded - - - - - - - - Grants/Contributions Anticipated - - - - - - - - Fund Balance - - - - - - - - Total Resources - - - - - - 610 610 *Restricted Taxes include REET, Fuel, Utility, and KC Levy funds Expand bicycle/pedestrian connection between South Renton and the City Center as per the adopted Downtown Civic Core Vision and Action Plan. Rationale First identified in the adopted Parks, Recreation and Natural Areas Plan (2011) and in the adopted Downtown Core Vision and Action Plan (2018). Supports planned growth, meets service demands and provides for a vibrant community. Identified in the Parks, Trails and Community Facilities Initiative. GG - PARKS CAPITAL INVESTMENT PROGRAM 2019 through 2024 (in thousands of dollars) Burnett Linear Park Development New Description and Scope AGENDA ITEM #2. a) 2019/2020 Proposed Budget City of Renton, Washington Priority Number:49 Project Title: Project Category: Status: Appropriated To-Date 2019 2020 2021 2022 2023 2024 Total Project Expenditures Expenditures Planning/Design - - - - - - 206 206 Project Management - - - - - - - Major Maintenance - - - - - - - - Land Acquisitions - - - - - - - - Construction - - - - - - 500 500 Total Expenditures - - - - - - 706 706 Appropriated To-Date 2019 2020 2021 2022 2023 2024 Total Project Resources Resources General Fund Sources - - - - - - - - Restricted Taxes - - - - - - 706 706 Mitigation Fees - - - - - - - - Bond Proceeds - - - - - - - - Grants/Contributions Awarded - - - - - - - - Grants/Contributions Anticipated - - - - - - - - Fund Balance - - - - - - - - Total Resources - - - - - - 706 706 *Restricted Taxes include REET, Fuel, Utility, and KC Levy funds Redevelop the existing turf ballfield for adaptive use and repurpose the existing activity building. Rationale First identified in the adopted Parks, Recreation and Natural Areas Plan (2011). Builds an inclusive City, meets service demands and provides for a vibrant community. Identified in the Parks, Trails and Community Facilities Initiative. GG - PARKS CAPITAL INVESTMENT PROGRAM 2019 through 2024 (in thousands of dollars) Thomas Teasdale Park Renovation Development New Description and Scope AGENDA ITEM #2. a) 2019/2020 Proposed Budget City of Renton, Washington Priority Number:50 Project Title: Project Category: Status: Appropriated To-Date 2019 2020 2021 2022 2023 2024 Total Project Expenditures Expenditures Planning/Design - - - - - - - - Project Management - - - - - - - - Major Maintenance - - - - - - - - Land Acquisitions - - - - - - - - Construction - - - - - - 21 21 Total Expenditures - - - - - - 21 21 Appropriated To-Date 2019 2020 2021 2022 2023 2024 Total Project Resources Resources General Fund Sources - - - - - - - - Restricted Taxes - - - - - - 21 21 Mitigation Fees - - - - - - - - Bond Proceeds - - - - - - - - Grants/Contributions Awarded - - - - - - - - Grants/Contributions Anticipated - - - - - - - - Fund Balance - - - - - - - - Total Resources - - - - - - 21 21 *Restricted Taxes include REET, Fuel, Utility, and KC Levy funds Expand existing Community Garden with the potential to develop into a neighborhood park. Rationale First identified in the adopted Parks, Recreation and Natural Areas Plan (2011). Meets service demands, supports planned growth and support a vibrant community. Identified in the Parks, Trails and Community Facilities Initiative. GG - PARKS CAPITAL INVESTMENT PROGRAM 2019 through 2024 (in thousands of dollars) Community Gardens/Greenhouses Development New Description and Scope AGENDA ITEM #2. a) 2019/2020 Proposed Budget City of Renton, Washington Priority Number:51 Project Title: Project Category: Status: Appropriated To-Date 2019 2020 2021 2022 2023 2024 Total Project Expenditures Expenditures Planning/Design - - - - - - - - Project Management - - - - - - - - Major Maintenance - - - - - - - - Land Acquisitions - - - - - - - - Construction - - - - - - 553 553 Total Expenditures - - - - - - 553 553 Appropriated To-Date 2019 2020 2021 2022 2023 2024 Total Project Resources Resources General Fund Sources - - - - - - - - Restricted Taxes - - - - - - 553 553 Mitigation Fees - - - - - - - - Bond Proceeds - - - - - - - - Grants/Contributions Awarded - - - - - - - - Grants/Contributions Anticipated - - - - - - - - Fund Balance - - - - - - - - Total Resources - - - - - - 553 553 *Restricted Taxes include REET, Fuel, Utility, and KC Levy funds Work with the community to identify locations and to construct off leash facilities throughout the community. Rationale First identified in the adopted Parks, Recreation and Natural Areas Plan (2011). Meets service demands, supports planned growth and supports a vibrant community. Identified in the Parks, Trails and Community Facilities Initiative. GG - PARKS CAPITAL INVESTMENT PROGRAM 2019 through 2024 (in thousands of dollars) Dog Parks Development New Description and Scope AGENDA ITEM #2. a) 2019/2020 Proposed Budget City of Renton, Washington Priority Number:52 Project Title: Project Category: Status: Appropriated To-Date 2019 2020 2021 2022 2023 2024 Total Project Expenditures Expenditures Planning/Design - - - - - - - - Project Management - - - - - - - - Major Maintenance - - - - - - - - Land Acquisitions - - - - - - - - Construction - - - - - - 615 615 Total Expenditures - - - - - - 615 615 Appropriated To-Date 2019 2020 2021 2022 2023 2024 Total Project Resources Resources General Fund Sources - - - - - - - - Restricted Taxes - - - - - - 615 615 Mitigation Fees - - - - - - - - Bond Proceeds - - - - - - - - Grants/Contributions Awarded - - - - - - - - Grants/Contributions Anticipated - - - - - - - - Fund Balance - - - - - - - - Total Resources - - - - - - 615 615 *Restricted Taxes include REET, Fuel, Utility, and KC Levy funds Work with the community to identify locations throughout the community and construct new community gardens. Rationale First identified in the adopted Parks, Recreation and Natural Areas Plan (2011). Meets services demands, supports planned growth and supports a vibrant community. Identified in the Parks, Trails and Community Facilities Initiative. GG - PARKS CAPITAL INVESTMENT PROGRAM 2019 through 2024 (in thousands of dollars) Community Garden Development New Description and Scope AGENDA ITEM #2. a) 2019/2020 Proposed Budget City of Renton, Washington Priority Number:53 Project Title: Project Category: Status: Appropriated To-Date 2019 2020 2021 2022 2023 2024 Total Project Expenditures Expenditures Planning/Design - - - - - - 200 200 Project Management - - - - - - - - Major Maintenance - - - - - - - - Land Acquisitions - - - - - - - - Construction - - - - - - 1,300 1,300 Total Expenditures - - - - - - 1,500 1,500 Appropriated To-Date 2019 2020 2021 2022 2023 2024 Total Project Resources Resources General Fund Sources - - - - - - - - Restricted Taxes - - - - - - 1,500 1,500 Mitigation Fees - - - - - - - - Bond Proceeds - - - - - - - - Grants/Contributions Awarded - - - - - - - - Grants/Contributions Anticipated - - - - - - - - Fund Balance - - - - - - - - Total Resources - - - - - - 1,500 1,500 *Restricted Taxes include REET, Fuel, Utility, and KC Levy funds Funding for citywide park design and construction improvements with specific locations to be identified. Rationale Supports planned growth, meets service demands and supports a vibrant community. Identified in the Parks, Trails and Community Facilities Initiative. GG - PARKS CAPITAL INVESTMENT PROGRAM 2019 through 2024 (in thousands of dollars) Citywide Park Improvements/QOL Development New Description and Scope AGENDA ITEM #2. a) 2019/2020 Proposed Budget City of Renton, Washington Priority Number:54 Project Title:Integrated Pest Management Program (IPM) Project Category: Status: Appropriated To-Date 2019 2020 2021 2022 2023 2024 Total Project Expenditures Expenditures Planning/Design - - - - - - 100 100 Project Management - - - - - - - - Major Maintenance - - - - - - - - Land Acquisitions - - - - - - - - Construction - - - - - - - - Total Expenditures - - - - - - 100 100 Appropriated To-Date 2019 2020 2021 2022 2023 2024 Total Project Resources Resources General Fund Sources - - - - - - - - Restricted Taxes - - - - - - - - Mitigation Fees - - - - - - - - Bond Proceeds - - - - - - - - Grants/Contributions Awarded - - - - - - - - Grants/Contributions Anticipated - - - - - - - - Fund Balance - - - - - - - - Total Resources - - - - - - - - *Restricted Taxes include REET, Fuel, Utility, and KC Levy funds IPM manages pests through a hierarchy of choices, the first being the least toxic approach in an effort to reduce the use of chemical controls. While the CS Department practices IPM, the department has no formal program to date. A formal program will bring effectiveness of IPM practices to the department and demonstrate leadership to the public in the control of weeds and other pests using the least toxic alternatives available. Rationale Provides a safe, healthy, vibrant community and meets service demands. GG - PARKS CAPITAL INVESTMENT PROGRAM 2019 through 2024 (in thousands of dollars) Maintenance and Preservation Previously Approved Description and Scope AGENDA ITEM #2. a) 2019/2020 Proposed Budget City of Renton, Washington Priority Number:1 Project Title: Project Category: Maintenance and Preservation Status:Extension of Previously Approved Appropriated To-Date 2019 2020 2021 2022 2023 2024 Total Project Expenditures Expenditures Planning/Design - - - - - - - - Project Management - - - - - - - - Major Maintenance - 652 - - - - - 652 Land Acquisitions - - - - - - - - Construction - - - - - - - - Total Expenditures - 652 - - - - - 652 Appropriated To-Date 2019 2020 2021 2022 2023 2024 Total Project Resources Resources General Fund Sources - - - - - - - - Restricted Taxes - 652 - - - - - 652 Mitigation Fees - - - - - - - - Bond Proceeds - - - - - - - - Grants/Contributions Awarded - - - - - - - - Grants/Contributions Anticipated - - - - - - - - Fund Balance - - - - - - - - Total Resources - 652 - - - - - 652 *Restricted Taxes include REET, Fuel, Utility, and KC Levy funds Elevator Modernization is already under contract and construction has begun. This request is for additional funds to complete the project. Completion of this project is imperative to keeping City Hall functioning so that the City may achieve its goals. GG - FACILITES CAPITAL INVESTMENT PROGRAM 2019 through 2024 (in thousands of dollars) City Hall Elevator Modernization Description and Scope General Contractor cost for lobby and penthouse code updates. Generator Design Generator construction. Rationale AGENDA ITEM #2. a) 2019/2020 Proposed Budget City of Renton, Washington Priority Number:2 Project Title:City Hall Major HVAC and Fire Component Replacement - Phase 2 Project Category: Maintenance and Preservation Status:Previously Approved Appropriated To-Date 2019 2020 2021 2022 2023 2024 Total Project Expenditures Expenditures Planning/Design - - - - - - - - Project Management - - - - - - - - Major Maintenance - - 353 - - - - 353 Land Acquisitions - - - - - - - - Construction - - - - - - - - Total Expenditures - - 353 - - - - 353 Appropriated To-Date 2019 2020 2021 2022 2023 2024 Total Project Resources Resources General Fund Sources - - 353 - - - - 353 Restricted Taxes - - - - - - - - Mitigation Fees - - - - - - - - Bond Proceeds - - - - - - - - Grants/Contributions Awarded - - - - - - - - Grants/Contributions Anticipated - - - - - - - - Fund Balance - - - - - - - - Total Resources - - 353 - - - - 353 *Restricted Taxes include REET, Fuel, Utility, and KC Levy funds City Hall boilers are the main source of heat for City Hall. The fire pump provides fire protection to all floors of city hall. The units are essential to the continuing function and safety of City Hall operations, especially IT operations. Completion of this project is imperative to keeping City Hall functioning so that the City may achieve its goals. GG - FACILITES CAPITAL INVESTMENT PROGRAM 2019 through 2024 (in thousands of dollars) Description and Scope Major HVAC items are at the end of life and must be replaced before complete failure. This project replaces Major HVAC Components and Fire systems at City Hall. It also replaces City Hall Boilers and AC cooling units for IT server room, along with replacement of the City Hall Fire Pump. Rationale AGENDA ITEM #2. a) 2019/2020 Proposed Budget City of Renton, Washington Priority Number:3 Project Title:Renton Community Center Major HVAC Component Replacement Project Category: Maintenance and Preservation Status:Previously Approved Appropriated To-Date 2019 2020 2021 2022 2023 2024 Total Project Expenditures Expenditures Planning/Design - - - - - - - - Project Management - - - - - - - - Major Maintenance - - 1,200 1,200 Land Acquisitions - - - - - - - - Construction - - - - - - - - Total Expenditures - - 1,200 - - - - 1,200 Appropriated To-Date 2019 2020 2021 2022 2023 2024 Total Project Resources Resources General Fund Sources - - 1,200 - - - - 1,200 Restricted Taxes - - - - - - - - Mitigation Fees - - - - - - - - Bond Proceeds - - - - - - - - Grants/Contributions Awarded - - - - - - - - Grants/Contributions Anticipated - - - - - - - - Fund Balance - - - - - - - - Total Resources - - 1,200 - - - - 1,200 *Restricted Taxes include REET, Fuel, Utility, and KC Levy funds The fourteen air handler unit and chiller is the main source of fresh air and cooling for the Renton Community Center. Completion of this project is imperative to keeping the Renton Community Center functioning. GG - FACILITES CAPITAL INVESTMENT PROGRAM 2019 through 2024 (in thousands of dollars) Description and Scope Major HVAC items are at the end of life and must replace before complete failure. This project replaces major HVAC components at Renton Community Center, replacing fourteen air handler units and one chiller. Rationale AGENDA ITEM #2. a) 2019/2020 Proposed Budget City of Renton, Washington Priority Number:4 Project Title: Project Category: Development Status:Previously Approved Appropriated To-Date 2019 2020 2021 2022 2023 2024 Total Project Expenditures Expenditures Planning/Design - - - - - - - - Project Management - 90 90 - - - - 180 Major Maintenance - - - - - - - - Land Acquisitions - - - - - - - - Construction - - - - - - - - Total Expenditures - 90 90 - - - - 180 Appropriated To-Date 2019 2020 2021 2022 2023 2024 Total Project Resources Resources General Fund Sources - 90 90 - - - - 180 Restricted Taxes - - - - - - - - Mitigation Fees - - - - - - - - Bond Proceeds - - - - - - - - Grants/Contributions Awarded - - - - - - - - Grants/Contributions Anticipated - - - - - - - - Fund Balance - - - - - - - - Total Resources - 90 90 - - - - 180 *Restricted Taxes include REET, Fuel, Utility, and KC Levy funds As safety concurs continue to grow, the faculties division is receiving more requests from departments to add cameras and panic buttons to help protect city assets and investments. A security alarm system creates a safer working environment, particularly employees work late shifts or odd hours. GG - FACILITES CAPITAL INVESTMENT PROGRAM 2019 through 2024 (in thousands of dollars) City Wide Security System Upgrades Description and Scope Upgrade current Avigilon and Lenel security systems and install security cameras, badging, and alarm systems. Rationale AGENDA ITEM #2. a) 2019/2020 Proposed Budget City of Renton, Washington Priority Number:5 Project Title:Renton Community Center Audio and Video Systems Project Category: Cross-Category Status:Previously Approved Appropriated To-Date 2019 2020 2021 2022 2023 2024 Total Project Expenditures Expenditures Planning/Design - - 20 - - - - 20 Project Management - - 50 - - - - 50 Major Maintenance - - - - - - - - Land Acquisitions - - - - - - - - Construction - - 130 - - - - 130 Total Expenditures - - 200 - - - - 200 Appropriated To-Date 2019 2020 2021 2022 2023 2024 Total Project Resources Resources General Fund Sources - - 200 - - - - 200 Restricted Taxes - - - - - - - - Mitigation Fees - - - - - - - - Bond Proceeds - - - - - - - - Grants/Contributions Awarded - - - - - - - - Grants/Contributions Anticipated - - - - - - - - Fund Balance - - - - - - - - Total Resources - - 200 - - - - 200 *Restricted Taxes include REET, Fuel, Utility, and KC Levy funds The banquet room and the class rooms have high volume of use by both the public and City use for training, workshops along with both private and public meetings . Currently the systems in place have numerous complications and compatibility issues. The expectation from users is to have compatible equipment with various platforms and wireless pairing ability. This would increase usability of renters and City users, and ultimately make the community center more competitive in the rental market. GG - FACILITES CAPITAL INVESTMENT PROGRAM 2019 through 2024 (in thousands of dollars) Description and Scope AV and sound upgrades are needed for the Renton Community Center. Upgrade audio and video to state-of-the-art commercial entertainment system. Install smart TVs, wireless routers, and projectors throughout the community center to have wireless and Bluetooth connectivity. Rationale AGENDA ITEM #2. a) 2019/2020 Proposed Budget City of Renton, Washington Priority Number:6 Project Title: Project Category: Maintenance and Preservation Status:New Request Appropriated To-Date 2019 2020 2021 2022 2023 2024 Total Project Expenditures Expenditures Planning/Design - - - - - - - - Project Management - - - - - - - - Major Maintenance - - - 1,900 - - - 1,900 Land Acquisitions - - - - - - - - Construction - - - - - - - - Total Expenditures - - - 1,900 - - - 1,900 Appropriated To-Date 2019 2020 2021 2022 2023 2024 Total Project Resources Resources General Fund Sources - - - - - - - - Restricted Taxes - - - 1,900 - - - 1,900 Mitigation Fees - - - - - - - - Bond Proceeds - - - - - - - - Grants/Contributions Awarded - - - - - - - - Grants/Contributions Anticipated - - - - - - - - Fund Balance - - - - - - - - Total Resources - - - 1,900 - - - 1,900 *Restricted Taxes include REET, Fuel, Utility, and KC Levy funds VAT and Heat Pumps are crucial components of the HVAC system. Without these we would not be able to control air flow, heat or cooling of the HVAC system. Completion of this project is imperative to keeping City Hall functioning so that the City may achieve its goals. GG - FACILITES CAPITAL INVESTMENT PROGRAM 2019 through 2024 (in thousands of dollars) City Hall Heat Pump and VAT Replacement Description and Scope VAT and Heat Pumps help maintain proper cooling and heat operations, as the temperature in the space is satisfied, a VAT box closes to limit the flow of cool air into the space. As the temperature increases in the space, the box opens to bring the temperature back down. This project would replace over 150 variable air terminals and heat pumps throughout out City Hall. Rationale AGENDA ITEM #2. a) 2019/2020 Proposed Budget City of Renton, Washington Priority Number:7 Project Title: Project Category: Maintenance and Preservation Status:New Request Appropriated To-Date 2019 2020 2021 2022 2023 2024 Total Project Expenditures Expenditures Planning/Design - - - - - - - - Project Management - - - - - - - - Major Maintenance - - - - - - 610 610 Land Acquisitions - - - - - - - - Construction - - - - - - - - Total Expenditures - - - - - - 610 610 Appropriated To-Date 2019 2020 2021 2022 2023 2024 Total Project Resources Resources General Fund Sources - - - - - - - - Restricted Taxes - - - - - - 610 610 Mitigation Fees - - - - - - - - Bond Proceeds - - - - - - - - Grants/Contributions Awarded - - - - - - - - Grants/Contributions Anticipated - - - - - - - - Fund Balance - - - - - - - - Total Resources - - - - - - 610 610 *Restricted Taxes include REET, Fuel, Utility, and KC Levy funds Coulon is the city's most popular park as identified FCA the bathhouse is in need of major repairs to continue serving visitors to help deliver a high-quality parks experience. GG - FACILITES CAPITAL INVESTMENT PROGRAM 2019 through 2024 (in thousands of dollars) Coulon Bathhouse Renovation Description and Scope Full renovation of the bathhouse HVAC, roof showers, and electrical. Rationale AGENDA ITEM #2. a) 2019/2020 Proposed Budget City of Renton, Washington Priority Number:8 Project Title: Project Category: Maintenance and Preservation Status:New Request Appropriated To-Date 2019 2020 2021 2022 2023 2024 Total Project Expenditures Expenditures Planning/Design - - - - - - - - Project Management - - - - - - - - Major Maintenance - - - - 400 - - 400 Land Acquisitions - - - - - - - - Construction - - - - - - - - Total Expenditures - - - - 400 - - 400 Appropriated To-Date 2019 2020 2021 2022 2023 2024 Total Project Resources Resources General Fund Sources - - - - - - - - Restricted Taxes - - - - 400 - - 400 Mitigation Fees - - - - - - - - Bond Proceeds - - - - - - - - Grants/Contributions Awarded - - - - - - - - Grants/Contributions Anticipated - - - - - - - - Fund Balance - - - - - - - - Total Resources - - - - 400 - - 400 *Restricted Taxes include REET, Fuel, Utility, and KC Levy funds The senior center is a focal point for the City's senior community. Addressing the goal to increase quality of life, this project would refurbish the sport court and fountain at the senior center to renew the beauty and functionality of this space, for visitors and passerby alike. GG - FACILITES CAPITAL INVESTMENT PROGRAM 2019 through 2024 (in thousands of dollars) Sr. Center Court and Fountain Renovation Description and Scope Joint project with parks to replace and repair the existing sport court and fountain. Current condition of the sport courts has left it unusable and the fountain also needs major maintenance. Rationale AGENDA ITEM #2. a) 2019/2020 Proposed Budget City of Renton, Washington Priority Number:9 Project Title: Project Category: Maintenance and Preservation Status:New Request Appropriated To-Date 2019 2020 2021 2022 2023 2024 Total Project Expenditures Expenditures Planning/Design - - - - - - - - Project Management - - - - - - - - Major Maintenance - - - - - 800 - 800 Land Acquisitions - - - - - - - - Construction - - - - - - - - Total Expenditures - - - - - 800 - 800 Appropriated To-Date 2019 2020 2021 2022 2023 2024 Total Project Resources Resources General Fund Sources - - - - - - - - Restricted Taxes - - - - - 800 - 800 Mitigation Fees - - - - - - - - Bond Proceeds - - - - - - - - Grants/Contributions Awarded - - - - - - - - Grants/Contributions Anticipated - - - - - - - - Fund Balance - - - - - - - - Total Resources - - - - - 800 - 800 *Restricted Taxes include REET, Fuel, Utility, and KC Levy funds Facilities condition assessment found multiple water leaks throughout city shops building that is causing interior mold and mildew issues. Roof leaks pose a fire threat from shorted wire and can compromise structural integrity. This project addresses the safety concern at the city shops that are key in the continuing function of the city. GG - FACILITES CAPITAL INVESTMENT PROGRAM 2019 through 2024 (in thousands of dollars) City Shops Roof Replacement Description and Scope The roof is over 20 years old and has reached its end of life. This project replaces the roofs at city shops that were identified in the facilities condition assessment. Rationale AGENDA ITEM #2. a) 2019/2020 Proposed Budget City of Renton, Washington Priority Number:10 Project Title:City Shops HVAC and Generator Replacement Project Category: Maintenance and Preservation Status:New Request Appropriated To-Date 2019 2020 2021 2022 2023 2024 Total Project Expenditures Expenditures Planning/Design - - - - - - - - Project Management - - - - - - - - Major Maintenance - - - - 500 - - 500 Land Acquisitions - - - - - - - - Construction - - - - - - - - Total Expenditures - - - - 500 - - 500 Appropriated To-Date 2019 2020 2021 2022 2023 2024 Total Project Resources Resources General Fund Sources - - - - - - - - Restricted Taxes - - - - 500 - - 500 Mitigation Fees - - - - - - - - Bond Proceeds - - - - - - - - Grants/Contributions Awarded - - - - - - - - Grants/Contributions Anticipated - - - - - - - - Fund Balance - - - - - - - - Total Resources - - - - 500 - - 500 *Restricted Taxes include REET, Fuel, Utility, and KC Levy funds Equipment identified in the FCA will be reaching end of life. HVAC units are the only source of fresh air, heating, and cooling. Without HVAC unit public works building will have to be shut down. Backup Generators are essential in an emergency event where power has been lost to the building to keep operations continuing. Addressing this issue is key to the continuing operation of these facilities. GG - FACILITES CAPITAL INVESTMENT PROGRAM 2019 through 2024 (in thousands of dollars) Description and Scope Replace HVAC and generator at city shops that were identified in the facilities condition assessment. Rationale AGENDA ITEM #2. a) 2019/2020 Proposed Budget City of Renton, Washington Priority Number:11 Project Title:Roof Replacement Parks Maintenance Shop and Parks Outbuilding Project Category: Maintenance and Preservation Status:New Request Appropriated To-Date 2019 2020 2021 2022 2023 2024 Total Project Expenditures Expenditures Planning/Design - - - - - - - - Project Management - - - - - - - - Major Maintenance - - - - 250 - - 250 Land Acquisitions - - - - - - - - Construction - - - - - - - - Total Expenditures - - - - 250 - - 250 Appropriated To-Date 2019 2020 2021 2022 2023 2024 Total Project Resources Resources General Fund Sources - - - - - - - - Restricted Taxes - - - - 250 - - 250 Mitigation Fees - - - - - - - - Bond Proceeds - - - - - - - - Grants/Contributions Awarded - - - - - - - - Grants/Contributions Anticipated - - - - - - - - Fund Balance - - - - - - - - Total Resources - - - - 250 - - 250 *Restricted Taxes include REET, Fuel, Utility, and KC Levy funds Facilities condition assessment found multiple water leaks throughout the parks maintenance shop and parks outbuildings that is causing interior mold and mildew issues. Roof leaks pose a fire threat from shorted wire and can compromise structural integrity. Addressing this issue is key to the continuing operation of these facilities. GG - FACILITES CAPITAL INVESTMENT PROGRAM 2019 through 2024 (in thousands of dollars) Description and Scope The roof is over 20 years old and has reached its end of life. This project replaces the roof that was identified in the facilities condition assessment as end of life. Rationale AGENDA ITEM #2. a) 2019/2020 Proposed Budget City of Renton, Washington Priority Number:12 Project Title:Coulon Maintenance Building HVAC Replacement Project Category: Maintenance and Preservation Status:New Request Appropriated To-Date 2019 2020 2021 2022 2023 2024 Total Project Expenditures Expenditures Planning/Design - - - - - - - - Project Management - - - - - - - - Major Maintenance - - - - 50 - - 50 Land Acquisitions - - - - - - - - Construction - - - - - - - - Total Expenditures - - - - 50 - - 50 Appropriated To-Date 2019 2020 2021 2022 2023 2024 Total Project Resources Resources General Fund Sources - - - - - - - - Restricted Taxes - - - - 50 - - 50 Mitigation Fees - - - - - - - - Bond Proceeds - - - - - - - - Grants/Contributions Awarded - - - - - - - - Grants/Contributions Anticipated - - - - - - - - Fund Balance - - - - - - - - Total Resources - - - - 50 - - 50 *Restricted Taxes include REET, Fuel, Utility, and KC Levy funds HVAC units are the only source of fresh air, heating and cooling. Without the HVAC unit Parks maintenance building will have to be shut down. Therefore, this project is imperative to keeping the maintenance building operating, which ultimately helps sustain the quality of the park itself. GG - FACILITES CAPITAL INVESTMENT PROGRAM 2019 through 2024 (in thousands of dollars) Description and Scope Replace HVAC equipment that was identified in the facilities condition assessment as end of life. Rationale AGENDA ITEM #2. a) 2019/2020 Proposed Budget City of Renton, Washington Priority Number:13 Project Title:North Highlands and Highlands HVAC Replacement Project Category: Maintenance and Preservation Status:New Request Appropriated To-Date 2019 2020 2021 2022 2023 2024 Total Project Expenditures Expenditures Planning/Design - - - - - - - - Project Management - - - - - - - - Major Maintenance - - - - 550 - - 550 Land Acquisitions - - - - - - - - Construction - - - - - - - - Total Expenditures - - - - 550 - - 550 Appropriated To-Date 2019 2020 2021 2022 2023 2024 Total Project Resources Resources General Fund Sources - - - - - - - - Restricted Taxes - - - - 550 - - 550 Mitigation Fees - - - - - - - - Bond Proceeds - - - - - - - - Grants/Contributions Awarded - - - - - - - - Grants/Contributions Anticipated - - - - - - - - Fund Balance - - - - - - - - Total Resources - - - - 550 - - 550 *Restricted Taxes include REET, Fuel, Utility, and KC Levy funds HVAC units are the only source of fresh air, heating and cooling. Without the HVAC unit North highlands and Highlands will have to be shut down. Therefore, this project is imperative to keeping these buildings operating. GG - FACILITES CAPITAL INVESTMENT PROGRAM 2019 through 2024 (in thousands of dollars) Description and Scope Replace HVAC equipment that was identified in the facilities condition assessment as end of life. Rationale AGENDA ITEM #2. a) 2019/2020 Proposed Budget City of Renton, Washington Priority Number:14 Project Title: Project Category: Maintenance and Preservation Status:Extension of Previously Approved Project Appropriated To-Date 2019 2020 2021 2022 2023 2024 Total Project Expenditures Expenditures Planning/Design - - - - - - - - Project Management - - - - - - - - Major Maintenance - - - - - 1,000 - 1,000 Land Acquisitions - - - - - - - - Construction - - - - - - - - Total Expenditures - - - - - 1,000 - 1,000 Appropriated To-Date 2019 2020 2021 2022 2023 2024 Total Project Resources Resources General Fund Sources - - - - - - - - Restricted Taxes - - - - - 1,000 - 1,000 Mitigation Fees - - - - - - - - Bond Proceeds - - - - - - - - Grants/Contributions Awarded - - - - - - - - Grants/Contributions Anticipated - - - - - - - - Fund Balance - - - - - - - - Total Resources - - - - - 1,000 - 1,000 *Restricted Taxes include REET, Fuel, Utility, and KC Levy funds The HMAC is a pivotal recreation location for the community and its continued operating will continue to build the quality of life for the community. This project is essential in its continued, safe operation. GG - FACILITES CAPITAL INVESTMENT PROGRAM 2019 through 2024 (in thousands of dollars) HMAC Upgrades and Repairs Description and Scope All items are noted in the FCA and are at the end of their life. Without the upgrades and repairs we will not be able to keep the pool open. This project replaces pump motors pool tiles and splash pad along with HVAC upgrades. Rationale AGENDA ITEM #2. a) 2019/2020 Proposed Budget City of Renton, Washington Priority Number:15 Project Title: Project Category: Maintenance and Preservation Status:New Request Appropriated To-Date 2019 2020 2021 2022 2023 2024 Total Project Expenditures Expenditures Planning/Design - - - - - - - - Project Management - - - - - - - - Major Maintenance - - - - - - 800 800 Land Acquisitions - - - - - - - - Construction - - - - - - - - Total Expenditures - - - - - - 800 800 Appropriated To-Date 2019 2020 2021 2022 2023 2024 Total Project Resources Resources General Fund Sources - - - - - - - - Restricted Taxes - - - - - - 800 800 Mitigation Fees - - - - - - - - Bond Proceeds - - - - - - - - Grants/Contributions Awarded - - - - - - - - Grants/Contributions Anticipated - - - - - - - - Fund Balance - - - - - - - - Total Resources - - - - - - 800 800 *Restricted Taxes include REET, Fuel, Utility, and KC Levy funds The City Hall needs a functioning electrical network to continue operations. GG - FACILITES CAPITAL INVESTMENT PROGRAM 2019 through 2024 (in thousands of dollars) City Hall Electrical Description and Scope Replace end of life electrical panels transformer breakers and other associated components Rationale AGENDA ITEM #2. a) 2019/2020 Proposed Budget City of Renton, Washington Life to Date Project Projects TIP #Type*Thru 2018 2019 2020 2021 2022 2023 2024 Total Street Overlay 1 M 3,525 1,090 1,170 2,070 2,170 2,260 2,360 14,645 Arterial Rehabilitation Program 2 M - - - - 1,540 1,610 1,680 4,830 Arterial Rehabilitation Program - Renton Ave Resurfacing 2.1 M - 550 - - - - - 550 Arterial Rehabilitation - SW 43rd St Pavement Preservation 2.2 M - - 220 1,820 - - - 2,040 Walkway Program 3 M 83 200 250 250 250 250 250 1,533 Roadway Safety and Guardrail Program 4 M 30 25 25 30 30 35 35 210 Intersection Safety & Mobility Program 5 C 200 250 200 350 350 350 350 2,050 Traffic Safety Program 6 M 297 150 150 150 150 150 150 1,197 Traffic Operation Devices Program 7 M 279 120 120 120 120 120 120 999 Intelligent Transportation Systems (ITS) Program 8 M 70 60 60 60 60 60 60 430 Sidewalk Rehabilitation and Replacement Program 9 M 922 100 110 110 110 110 110 1,572 Bridge Inspection & Repair Program 10 M 225 90 50 100 100 100 100 765 Barrier Free Transition Plan Implementation 11 M 60 60 80 80 80 80 80 520 Project Development & Pre-Design Program 12 M 210 150 150 150 150 150 150 1,110 Arterial Circulation Program 13 M 200 145 150 150 150 150 150 1,095 1% For The Arts Program 14 D 44 15 15 15 15 15 15 134 Bronson Way N Bridge Repair 15 M 70 420 2,510 - - - - 3,000 Duvall Ave NE - NE 7th St to Sunset Blvd NE 16 M 4,992 1,512 - - - - - 6,504 Houser Way N Bridge Repair 17 M 70 470 2,532 223 - - - 3,295 Lake Washington Loop Trail 18 D 2,138 340 1,425 - 1,200 950 3,250 9,303 NE Sunset Boulevard (SR 900) Corridor Improvements 19 M 1,692 459 2,750 7,550 6,850 6,450 6,250 32,001 Park Avenue North Extension 20 D 1,050 5,825 625 - - - - 7,500 Rainier Ave S/N Phase 4 - S 3rd Street to NW 3rd Pl 21 D 2,049 1,500 1,951 8,800 5,750 250 - 20,300 Renton Connector 22 C - - - 279 621 3,963 8,850 13,713 116th Ave SE Improvements 23 C 875 - - 1,600 3,700 2,600 2,200 10,975 South 2nd Street Conversion Project 24 D - - 200 1,350 7,800 7,800 - 17,150 Williams Ave N Bridge Repair 25 M 70 470 2,640 - - - - 3,180 Williams Ave S and Wells Ave S Conversion Project 26 C 3,642 1,934 6,348 - - - - 11,924 Carr Road Improvements 27 D 784 50 - - - - - 834 Houser Way S/N Non-Motorized Improvements 28 D - - - - 385 836 966 2,187 Houser Way North - North 8th Street to Lake Washington Blvd 29 D - - - - 1,065 1,560 2,340 4,965 Lake to Sound (L2S) Trail 30 D 910 2,800 - - - - - 3,710 Lake Washington Blvd N - Park Ave N to Gene Coulon Memorial Park 31 D 443 2,000 - - - - - 2,443 Lind Ave SW - SW 16th St to SW 43rd St 32 D - - - - 400 1,650 2,350 4,400 Logan Ave North Improvements 33 D 7,353 - - - - 1,240 10,000 18,593 Maple Valley Highway Barriers 34 D - - - 299 2,839 - - 3,138 Monster Road SW/68th Ave S Roadway Improvements 35 D - - - - - 50 8,000 8,050 36. NE 3rd_4th 36 D 3,719 20 20 750 4,190 5,180 3,200 17,079 Nile Ave NE Bridge Repair 37 C - - 50 200 - - - 250 Rainier Ave N Corridor Improvements (Phase 5)38 D - - - - - 100 2,000 2,100 Renton Bus Rapid Transit (BRT) Improvements 39 D - - - - 3,195 9,053 9,053 21,301 Transit Master Plan 40 P - - - 300 200 - - 500 South 3rd Street Conversion Project 41 C - - - 4,000 6,500 10,700 - 21,200 7th Street Corridor Improvements - Naches Ave S to Talbot Road S 42 D 1,659 - - 200 1,600 10,364 3,609 17,432 South Grady Way - Talbot Rd South to Rainier Ave South 43 C - - - 550 1,760 1,690 - 4,000 South Lake Washington Transit Stop 44 D - - - 4,350 - - - 4,350 Sunset Area Green Connections 45 D - - - - 3,600 10,700 7,900 22,200 37,661 20,805 23,801 35,906 56,930 80,576 75,578 331,257 Life to Date Project Resources:Thru 2018 2019 2020 2021 2022 2023 2024 Total General Fund Sources 5,023 1,813 2,227 2,285 2,475 1,820 1,880 17,523 Restricted Taxes 1,543 700 710 720 730 740 750 5,893 Mitigation Fees 4,015 699 1,540 760 800 250 - 8,064 Bond Proceeds - 7,500 - - - - - 7,500 Grants/Contributions Awarded 22,914 10,495 12,357 8,000 - - - 53,766 Grants/Contributions Anticipated 300 (300) 6,222 2,100 4,455 - - 12,777 Fund Balance 3,866 523 120 100 - - - 4,609 37,661 21,430 23,176 13,965 8,460 2,810 2,630 110,132 - 625 (625) (21,941) (48,470) (77,766) (72,948) (221,125) * NOTE: A - Acquisition, C- Cross Category, D - Development, M - Maintenance, P - Planning ** Projects under construction and/or with a phase under construction P r o j e c t e d Proposed P r o j e c t e d Total S U M M A R Y B Y C O U N C I L P R I O R I T Y TRANSPORTATION CAPITAL INVESTMENT PROGRAM Balance Available / (Unfunded Needs) Total Resources 2019 through 2024 (in thousands of dollars) Proposed AGENDA ITEM #2. a) 2019/2020 Proposed Budget City of Renton, Washington TIP Number:1 Project Title: Project Category: Maintenance and Preservation Status:Extension of Previously Approved Project Appropriated To-Date 2019 2020 2021 2022 2023 2024 Total Project Expenditures Expenditures Planning/Design 4 4 4 4 4 4 4 28 Project Management - - - - - - - - Major Maintenance - - - - - - - - Land Acquisitions - - - - - - - - Construction 3,521 1,086 1,166 2,066 2,166 2,256 2,356 14,617 Total Expenditures 3,525 1,090 1,170 2,070 2,170 2,260 2,360 14,645 Appropriated To-Date 2019 2020 2021 2022 2023 2024 Total Project Resources Resources General Fund Sources 1,395 390 460 490 530 560 600 4,425 Restricted Taxes 1,330 700 710 720 730 740 750 5,680 Mitigation Fees 800 - - - - - - 800 Bond Proceeds - - - - - - - - Grants/Contributions Awarded - - - - - - - - Grants/Contributions Anticipated - - - - - - - - Fund Balance - - - - - - - - Total Resources 3,525 1,090 1,170 1,210 1,260 1,300 1,350 10,905 *Restricted Taxes include REET, Fuel, Utility, and KC Levy funds Asphalt concrete pavement (ACP) overlay and slurry seal of streets provide for improved driving surface and are highly cost- effective ways of avoiding expensive repairs and reconstruction. The Pavement Management System and biennial survey of roadway conditions greatly improve the efficiency of the Overlay Program, ultimately improving public safety and quality of life. TRANSPORTATION CAPITAL INVESTMENT PROGRAM 2019 through 2024 (in thousands of dollars) Street Overlay Description and Scope Annual program for repairing and resurfacing existing roadways. Installation of ADA compliant curb ramps has been incorporated into the Street Overlay Program in accordance with federal requirements. This program funds overlays on neighborhood streets and collector streets while the Arterial Rehabilitation Program (TIP No. 2) funds principal and minor arterials. This program allocates $100K/yr for the overlay of alleyways. Rationale AGENDA ITEM #2. a) 2019/2020 Proposed Budget City of Renton, Washington TIP Number:2 Project Title: Project Category: Maintenance and Preservation Status:Extension of Previously Approved Project Appropriated To-Date 2019 2020 2021 2022 2023 2024 Total Project Expenditures Expenditures Planning/Design - - - - - - - - Project Management - - - - - - - - Major Maintenance - - - - - - - - Land Acquisitions - - - - - - - - Construction - - - - 1,540 1,610 1,680 4,830 Total Expenditures - - - - 1,540 1,610 1,680 4,830 Appropriated To-Date 2019 2020 2021 2022 2023 2024 Total Project Resources Resources General Fund Sources - - - - 510 530 550 1,590 Restricted Taxes - - - - - - - - Mitigation Fees - - - - - - - - Bond Proceeds - - - - - - - - Grants/Contributions Awarded - - - - - - - - Grants/Contributions Anticipated - - - - - - - - Fund Balance - - - - - - - - Total Resources - - - - 510 530 550 1,590 *Restricted Taxes include REET, Fuel, Utility, and KC Levy funds The Overlay Program (TIP #1) concentrates to a great degree on maintaining residential streets for public safety and quality of life, where relatively small traffic volumes and less truck and bus traffic make standard asphalt overlays a long term means of maintenance. Arterial streets can often deteriorate rather quickly and often require more costly rehabilitation measures and/or costly temporary repairs to avoid more extensive deterioration. TRANSPORTATION CAPITAL INVESTMENT PROGRAM 2019 through 2024 (in thousands of dollars) Arterial Rehabilitation Program Description and Scope This program provides for the rehabilitation of principal and minor arterial streets. Installation of ADA-compliant curb ramps has been incorporated into the annual Arterial Rehabilitation and Overlay programs according to new federal requirements. This program will provide funding for the City match for larger federally funded projects. Rationale AGENDA ITEM #2. a) 2019/2020 Proposed Budget City of Renton, Washington TIP Number:2.1 Project Title: Project Category: Maintenance and Preservation Status:Extension of previously approved project Appropriated To-Date 2019 2020 2021 2022 2023 2024 Total Project Expenditures Expenditures Planning/Design - - - - - - - - Project Management - - - - - - - - Major Maintenance - - - - - - - - Land Acquisitions - - - - - - - - Construction - 550 - - - - - 550 Total Expenditures - 550 - - - - - 550 Appropriated To-Date 2019 2020 2021 2022 2023 2024 Total Project Resources Resources General Fund Sources - 275 - - - - - 275 Restricted Taxes - - - - - - - - Mitigation Fees - - - - - - - - Bond Proceeds - - - - - - - - Grants/Contributions Awarded - - - - - - - - Grants/Contributions Anticipated - - - - - - - - Fund Balance - 275 - - - - - 275 Total Resources - 550 - - - - - 550 *Restricted Taxes include REET, Fuel, Utility, and KC Levy funds The roadway is classified as a T-2 truck route carrying 5.8 million tons of freight annually. The overall condition of the pavement will be improved and the project will extend the pavement life (12-15 years). Renton Ave S is also an alternate route to SR-900, connecting Renton to the Skyway area and South Seattle. TRANSPORTATION CAPITAL INVESTMENT PROGRAM 2019 through 2024 (in thousands of dollars) Arterial Rehabilitation Program - Renton Ave Resurfacing Description and Scope This project will resurface 0.60 miles of Renton Ave S from S 130th St (west City limits) to Hardie Ave SW and upgrade ADA ramps to current standards. Rationale AGENDA ITEM #2. a) 2019/2020 Proposed Budget City of Renton, Washington TIP Number:2.2 Project Title: Project Category: Maintenance and Preservation Status:New Request Appropriated To-Date 2019 2020 2021 2022 2023 2024 Total Project Expenditures Expenditures Planning/Design - - 220 - - - - 220 Project Management - - - - - - - - Major Maintenance - - - - - - - - Land Acquisitions - - - - - - - - Construction - - - 1,820 - - - 1,820 Total Expenditures - - 220 1,820 - - - 2,040 Appropriated To-Date 2019 2020 2021 2022 2023 2024 Total Project Resources Resources General Fund Sources - - 220 820 - - - 1,040 Restricted Taxes - - - - - - - - Mitigation Fees - - - - - - - - Bond Proceeds - - - - - - - - Grants/Contributions Awarded - - - 1,000 - - - 1,000 Grants/Contributions Anticipated - - - - - - - - Fund Balance - - - - - - - - Total Resources - - 220 1,820 - - - 2,040 *Restricted Taxes include REET, Fuel, Utility, and KC Levy funds This principal arterial and T-1 truck route is a major east-west corridor that serves and directly connects to the Sounder Station. SW 43rd St connects directly to SR 167 and is used as a main access to Valley Medical Center, IKEA, and other major employment centers. Resurfacing this roadway will improve the overall condition of the pavement and the project will extend the pavement life (12-15 years) of this key east-west South County corridor aiding economic development and quality of life. TRANSPORTATION CAPITAL INVESTMENT PROGRAM 2019 through 2024 (in thousands of dollars) Arterial Rehabilitation - SW 43rd St Pavement Preservation Description and Scope This project will resurface the roadway from the western city limits to the SR 167 Ramps, except where there are existing concrete panels. This project will also upgrade all intersection ramps to current ADA standards as well as install and replace all delineation to City of Renton standards. Also included in this project are the adjustment or evaluation for replacement of existing features affected by resurfacing such as monuments, catch basins, or drainage grates. Rationale AGENDA ITEM #2. a) 2019/2020 Proposed Budget City of Renton, Washington TIP Number:3 Project Title: Project Category: Maintenance and Preservation Status:Extension of Previously Approved Project Appropriated To-Date 2019 2020 2021 2022 2023 2024 Total Project Expenditures Expenditures Planning/Design 2 30 30 30 30 30 30 182 Project Management - - - - - - - - Major Maintenance - - - - - - - - Land Acquisitions - - - - - - - - Construction 81 170 220 220 220 220 220 1,351 Total Expenditures 83 200 250 250 250 250 250 1,533 Appropriated To-Date 2019 2020 2021 2022 2023 2024 Total Project Resources Resources General Fund Sources 83 200 250 100 100 100 100 933 Restricted Taxes - - - - - - - - Mitigation Fees - - - - - - - - Bond Proceeds - - - - - - - - Grants/Contributions Awarded - - - - - - - - Grants/Contributions Anticipated - - - - - - - - Fund Balance - - - - - - - - Total Resources 83 200 250 100 100 100 100 933 *Restricted Taxes include REET, Fuel, Utility, and KC Levy funds Providing safe and convenient non-motorized facilities is an integral part of a complete transportation network. Specific improvements will respond to the needs of school children, the aged and persons with disabilities, and support increased use of transit greatly improving the quality of life for all citizens. TRANSPORTATION CAPITAL INVESTMENT PROGRAM 2019 through 2024 (in thousands of dollars) Walkway Program Description and Scope This program provides for the design and construction of non-motorized transportation facilities for pedestrians as well as provide City match funding for larger federal and state funded projects. Projects are identified and prioritized using criteria from the Comprehensive Citywide Walkway Study, Council direction, and through coordination with the City's Neighborhood Program. Rationale AGENDA ITEM #2. a) 2019/2020 Proposed Budget City of Renton, Washington TIP Number:4 Project Title: Project Category: Maintenance and Preservation Status:Extension of Previously Approved Project Appropriated To-Date 2019 2020 2021 2022 2023 2024 Total Project Expenditures Expenditures Planning/Design 3 3 3 3 3 3 3 21 Project Management - - - - - - - - Major Maintenance - - - - - - - - Land Acquisitions - - - - - - - - Construction 27 22 22 27 27 32 32 189 Total Expenditures 30 25 25 30 30 35 35 210 Appropriated To-Date 2019 2020 2021 2022 2023 2024 Total Project Resources Resources General Fund Sources 30 25 25 30 30 35 35 210 Restricted Taxes - - - - - - - - Mitigation Fees - - - - - - - - Bond Proceeds - - - - - - - - Grants/Contributions Awarded - - - - - - - - Grants/Contributions Anticipated - - - - - - - - Fund Balance - - - - - - - - Total Resources 30 25 25 30 30 35 35 210 *Restricted Taxes include REET, Fuel, Utility, and KC Levy funds This program will implement roadside safety improvements including barrier systems and hazardous object removal improving overall public safety. TRANSPORTATION CAPITAL INVESTMENT PROGRAM 2019 through 2024 (in thousands of dollars) Roadway Safety and Guardrail Program Description and Scope This program will provide guardrail improvements each year and improve the safety of the roadside environment. Rationale AGENDA ITEM #2. a) 2019/2020 Proposed Budget City of Renton, Washington TIP Number:5 Project Title: Project Category: Maintenance and Preservation Status:Cross Category Appropriated To-Date 2019 2020 2021 2022 2023 2024 Total Project Expenditures Expenditures Planning/Design 44 45 45 45 45 45 45 314 Project Management - - - - - - - - Major Maintenance - - - - - - - - Land Acquisitions - - - - - - - - Construction 156 205 155 305 305 305 305 1,736 Total Expenditures 200 250 200 350 350 350 350 2,050 Appropriated To-Date 2019 2020 2021 2022 2023 2024 Total Project Resources Resources General Fund Sources 200 - - - - - - 200 Restricted Taxes - - - - - - - - Mitigation Fees - 250 200 - - - - 450 Bond Proceeds - - - - - - - - Grants/Contributions Awarded - - - - - - - - Grants/Contributions Anticipated - - - - - - - - Fund Balance - - - - - - - - Total Resources 200 250 200 - - - - 650 *Restricted Taxes include REET, Fuel, Utility, and KC Levy funds Historically, one traffic signal is designed and constructed every two-three years to meet public safety and mobility needs. This program budgets for projects needed to meet increasing demand, and the need for signalized traffic control. Elements used to prioritize project intersections may include vehicular approach volumes, accident analysis, signal-warrant analysis, and pedestrian volume. TRANSPORTATION CAPITAL INVESTMENT PROGRAM 2019 through 2024 (in thousands of dollars) Intersection Safety & Mobility Program Description and Scope This program will install new traffic signals, software systems to improve traffic signal timing operations, tactics central signal system upgrades or make improvements to existing signals identified by the Transportation Systems' Traffic Signal Priority List. The Priority List is determined by citizen concerns, intersection safety, mobility needs, and intersections that meet MUTCD traffic signal warrants. Rationale AGENDA ITEM #2. a) 2019/2020 Proposed Budget City of Renton, Washington TIP Number:6 Project Title: Project Category: Maintenance and Preservation Status:Extension of Previously Approved Project Appropriated To-Date 2019 2020 2021 2022 2023 2024 Total Project Expenditures Expenditures Planning/Design 54 20 20 20 20 20 20 174 Project Management - - - - - - - - Major Maintenance - - - - - - - - Land Acquisitions - - - - - - - - Construction 243 130 130 130 130 130 130 1,023 Total Expenditures 297 150 150 150 150 150 150 1,197 Appropriated To-Date 2019 2020 2021 2022 2023 2024 Total Project Resources Resources General Fund Sources 189 130 50 - - - - 369 Restricted Taxes - - - - - - - - Mitigation Fees 5 10 80 - - - - 95 Bond Proceeds - - - - - - - - Grants/Contributions Awarded - - - - - - - - Grants/Contributions Anticipated - - - - - - - - Fund Balance 103 10 20 - - - - 133 Total Resources 297 150 150 - - - - 597 *Restricted Taxes include REET, Fuel, Utility, and KC Levy funds Historically, this level of traffic safety improvements are required on an annual basis. This program budgets for safety projects to address these needs. Projects are typically identified through citizen concerns, analysis of accident records or observation by City Traffic Operations personnel, improving both public safety and quality of life. TRANSPORTATION CAPITAL INVESTMENT PROGRAM 2019 through 2024 (in thousands of dollars) Traffic Safety Program Description and Scope This ongoing yearly program provides funding for special small-scale traffic safety improvements that are identified and require materials, labor or equipment. This program includes converting school zone signs to electronic operation, installation of pedestrian safety traffic signals including Rectangular Rapid Flashing Beacons (RRFB), and Hawk hybrid beacon signals, bulbouts and radar speed signs for traffic calming. Rationale AGENDA ITEM #2. a) 2019/2020 Proposed Budget City of Renton, Washington TIP Number:7 Project Title: Project Category: Maintenance and Preservation Status:Extension of Previously Approved Project Appropriated To-Date 2019 2020 2021 2022 2023 2024 Total Project Expenditures Expenditures Planning/Design - - - - - - - - Project Management - - - - - - - - Major Maintenance - - - - - - - - Land Acquisitions - - - - - - - - Construction 279 120 120 120 120 120 120 999 Total Expenditures 279 120 120 120 120 120 120 999 Appropriated To-Date 2019 2020 2021 2022 2023 2024 Total Project Resources Resources General Fund Sources 182 120 120 120 120 120 120 902 Restricted Taxes - - - - - - - - Mitigation Fees - - - - - - - - Bond Proceeds - - - - - - - - Grants/Contributions Awarded - - - - - - - - Grants/Contributions Anticipated - - - - - - - - Fund Balance 97 - - - - - - 97 Total Resources 279 120 120 120 120 120 120 999 *Restricted Taxes include REET, Fuel, Utility, and KC Levy funds Most of Renton's traffic signals and UPS systems require extensive maintenance and replacement programs to keep traffic signals operating as efficiently as possible. Signage requires a maintenance program to maintain retro reflectivity requirements. Pavement deterioration has increased the number of failed loops throughout the City and as loops fail they are replaced with video detection cameras and associated equipment greatly increasing public safety. TRANSPORTATION CAPITAL INVESTMENT PROGRAM 2019 through 2024 (in thousands of dollars) Traffic Operation Devices Program Description and Scope The City of Renton owns and operates 135 traffic signals, 4800+ street lights, 700+ lane miles and 12,000+ signs. This program replaces failed video detection cameras, signal heads, signal cabinets, UPS batteries and LED indications as needed based on the findings from yearly maintenance programs. This program also provides for new/replacement of signs that are obsolete, faded or that do not meet retro reflectivity requirements, replacement of damaged luminaire and signal poles. This program also replaces pavement markings and failed C-curbing with a more maintenance friendly composite curbing. Rationale AGENDA ITEM #2. a) 2019/2020 Proposed Budget City of Renton, Washington TIP Number:8 Project Title:Intelligent Transportation Systems (ITS) Program Project Category: Maintenance and Preservation Status:Extension of Previously Approved Project Appropriated To-Date 2019 2020 2021 2022 2023 2024 Total Project Expenditures Expenditures Planning/Design 5 10 10 10 10 10 10 65 Project Management - - - - - - - - Major Maintenance - - - - - - - - Land Acquisitions - - - - - - - - Construction 65 50 50 50 50 50 50 365 Total Expenditures 70 60 60 60 60 60 60 430 Appropriated To-Date 2019 2020 2021 2022 2023 2024 Total Project Resources Resources General Fund Sources 60 - - - - - - 60 Restricted Taxes - - - - - - - - Mitigation Fees - 60 60 60 - - - 180 Bond Proceeds - - - - - - - - Grants/Contributions Awarded - - - - - - - - Grants/Contributions Anticipated - - - - - - - - Fund Balance 10 - - - - - - 10 Total Resources 70 60 60 60 - - - 250 *Restricted Taxes include REET, Fuel, Utility, and KC Levy funds Improving the capacity and efficiency of the existing roadway system is a very cost effective element of the transportation program and improving public safety and quality of life. Installing fiber communication creates higher bandwidths so PTZ cameras can be installed. Fiber optic communication provides the Traffic Management Center with real time traffic conditions, adaptive signal control and ability to view video detection systems. The goal is to have fiber installed to all 135 traffic signals. TRANSPORTATION CAPITAL INVESTMENT PROGRAM 2019 through 2024 (in thousands of dollars) Description and Scope Provides for improvements to the operational efficiency of the roadway system, including development and implementation of signal coordination programs, Adaptive Signal Control, installation of fiber communication, PTZ cameras, Radar signs, LED signs, transit signal priority, Intelligent Traffic Systems (ITS) Master Plan and signal improvements such as protective/permissive phasing. Rationale AGENDA ITEM #2. a) 2019/2020 Proposed Budget City of Renton, Washington TIP Number:9 Project Title: Project Category: Maintenance and Preservation Status:Extension of Previously Approved Project Appropriated To-Date 2019 2020 2021 2022 2023 2024 Total Project Expenditures Expenditures Planning/Design 62 - - - - - - 62 Project Management - - - - - - - - Major Maintenance - - - - - - - - Land Acquisitions - - - - - - - - Construction 860 100 110 110 110 110 110 1,510 Total Expenditures 922 100 110 110 110 110 110 1,572 Appropriated To-Date 2019 2020 2021 2022 2023 2024 Total Project Resources Resources General Fund Sources 200 100 110 110 110 110 110 850 Restricted Taxes - - - - - - - - Mitigation Fees - - - - - - - - Bond Proceeds - - - - - - - - Grants/Contributions Awarded - - - - - - - - Grants/Contributions Anticipated - - - - - - - - Fund Balance 722 - - - - - - 722 Total Resources 922 100 110 110 110 110 110 1,572 *Restricted Taxes include REET, Fuel, Utility, and KC Levy funds In order to address deficiencies and provide safe and convenient non-motorized facilities for pedestrians in neighborhoods, the City must have a program to analyze, repair or replace damaged or deteriorated curb and gutter, sidewalks, and curb ramps. There are some places where curb ramps do not exist or are not to current ADA standards and they will be upgraded through this program. This program greatly increases public safety and quality of life. TRANSPORTATION CAPITAL INVESTMENT PROGRAM 2019 through 2024 (in thousands of dollars) Sidewalk Rehabilitation and Replacement Program Description and Scope This program provides for the replacement of existing curb and gutter, sidewalks, and curb ramps where such facilities have deteriorated or have been damaged. Rationale AGENDA ITEM #2. a) 2019/2020 Proposed Budget City of Renton, Washington TIP Number:10 Project Title: Project Category: Maintenance and Preservation Status:Extension of Previously Approved Project Appropriated To-Date 2019 2020 2021 2022 2023 2024 Total Project Expenditures Expenditures Planning/Design 175 30 20 40 40 40 40 385 Project Management - - - - - - - - Major Maintenance - - - - - - - - Land Acquisitions - - - - - - - - Construction 50 60 30 60 60 60 60 380 Total Expenditures 225 90 50 100 100 100 100 765 Appropriated To-Date 2019 2020 2021 2022 2023 2024 Total Project Resources Resources General Fund Sources 110 90 50 50 50 50 50 450 Restricted Taxes - - - - - - - - Mitigation Fees - - - - - - - - Bond Proceeds - - - - - - - - Grants/Contributions Awarded - - - - - - - - Grants/Contributions Anticipated - - - - - - - - Fund Balance 115 - - - - - - 115 Total Resources 225 90 50 50 50 50 50 565 *Restricted Taxes include REET, Fuel, Utility, and KC Levy funds Per Federal Regulations, the City is required to perform a bridge condition inspection for all bridges, located in the public right-of- way and open for public use, that span 20-ft or more. WSDOT recommends condition inspections be performed on all short span and pedestrian bridges, located with the public right-of-way and open for public use. In order to qualify for Federal Highway Administration (FHWA) bridge funding, the City must stay in compliance with the Federal Regulations. TRANSPORTATION CAPITAL INVESTMENT PROGRAM 2019 through 2024 (in thousands of dollars) Bridge Inspection & Repair Program Description and Scope The Transportation Division inspects 27 bridge structures owned by the City of Renton, every two years. The purpose of these inspections is to monitor the condition of bridge elements in order to identify structural deficiencies in need of repair. The goals of the program are to keep the bridges open and safe for public use, preserve bridge infrastructure by maximizing the useful lie through active maintenance, retrofitting and rehabilitation, and replace bridges with reliable new structures when repair or rehabilitation is not feasible. Rationale AGENDA ITEM #2. a) 2019/2020 Proposed Budget City of Renton, Washington TIP Number:11 Project Title: Project Category: Maintenance and Preservation Status:Extension of Previously Approved Project Appropriated To-Date 2019 2020 2021 2022 2023 2024 Total Project Expenditures Expenditures Planning/Design 5 10 10 10 10 10 10 65 Project Management - - - - - - - - Major Maintenance - - - - - - - - Land Acquisitions - - - - - - - - Construction 55 50 70 70 70 70 70 455 Total Expenditures 60 60 80 80 80 80 80 520 Appropriated To-Date 2019 2020 2021 2022 2023 2024 Total Project Resources Resources General Fund Sources 35 60 80 - - - - 175 Restricted Taxes - - - - - - - - Mitigation Fees - - - - - - - - Bond Proceeds - - - - - - - - Grants/Contributions Awarded - - - - - - - - Grants/Contributions Anticipated - - - - - - - - Fund Balance 25 - - - - - - 25 Total Resources 60 60 80 - - - - 200 *Restricted Taxes include REET, Fuel, Utility, and KC Levy funds This program implements projects that support the City's effort to transition pedestrian facilities within the right-of-way into conformity with provisions contained in the Americans with Disabilities Act (ADA) Guidelines. A programmatic approach is required to ensure compliance with federal law and ultimately help make all pedestrian facilities safe for the public. TRANSPORTATION CAPITAL INVESTMENT PROGRAM 2019 through 2024 (in thousands of dollars) Barrier Free Transition Plan Implementation Description and Scope This program provides funding for designing and building features on an "as needed" basis in response to individual requests to improve access for individuals with special needs. A project list has been developed based upon sites identified in the Transition Plan section of the City of Renton Comprehensive Citywide Sidewalk Study. Rationale AGENDA ITEM #2. a) 2019/2020 Proposed Budget City of Renton, Washington TIP Number:12 Project Title: Project Category: Maintenance and Preservation Status:Extension of Previously Approved Project Appropriated To-Date 2019 2020 2021 2022 2023 2024 Total Project Expenditures Expenditures Planning/Design 210 150 150 150 150 150 150 1,110 Project Management - - - - - - - - Major Maintenance - - - - - - - - Land Acquisitions - - - - - - - - Construction - - - - - - - - Total Expenditures 210 150 150 150 150 150 150 1,110 Appropriated To-Date 2019 2020 2021 2022 2023 2024 Total Project Resources Resources General Fund Sources 210 150 150 150 150 150 150 1,110 Restricted Taxes - - - - - - - - Mitigation Fees - - - - - - - - Bond Proceeds - - - - - - - - Grants/Contributions Awarded - - - - - - - - Grants/Contributions Anticipated - - - - - - - - Fund Balance - - - - - - - - Total Resources 210 150 150 150 150 150 150 1,110 *Restricted Taxes include REET, Fuel, Utility, and KC Levy funds Other critical activities to develop future capital improvement projects consist of but are not limited to project scoping, cost estimates, pre-design, interlocal agreements, analyses of existing and projected transportation problems, local and regional mobility goals and deficiency analysis. TRANSPORTATION CAPITAL INVESTMENT PROGRAM 2019 through 2024 (in thousands of dollars) Project Development & Pre-Design Program Description and Scope Perform critical activities needed for the development of transportation projects that will best serve the needs of Renton and be eligible for grant applications. Also provides for the monitoring of active grant projects for compliance with State and Federal laws, regulations and specifications. Rationale AGENDA ITEM #2. a) 2019/2020 Proposed Budget City of Renton, Washington TIP Number:13 Project Title: Project Category: Maintenance and Preservation Status:Extension of Previously Approved Project Appropriated To-Date 2019 2020 2021 2022 2023 2024 Total Project Expenditures Expenditures Planning/Design 200 145 150 150 150 150 150 1,095 Project Management - - - - - - - - Major Maintenance - - - - - - - - Land Acquisitions - - - - - - - - Construction - - - - - - - - Total Expenditures 200 145 150 150 150 150 150 1,095 Appropriated To-Date 2019 2020 2021 2022 2023 2024 Total Project Resources Resources General Fund Sources 198 145 150 150 150 150 150 1,093 Restricted Taxes - - - - - - - - Mitigation Fees - - - - - - - - Bond Proceeds - - - - - - - - Grants/Contributions Awarded - - - - - - - - Grants/Contributions Anticipated - - - - - - - - Fund Balance 2 - - - - - - 2 Total Resources 200 145 150 150 150 150 150 1,095 *Restricted Taxes include REET, Fuel, Utility, and KC Levy funds State and Federal government regulations and legislation, the Growth Management Act (GMA), and the Puget Sound Regional Council Vision 2040 highlight the increasing importance of making sure that local and regional transportation plans are coordinated to the benefit of Renton make ongoing multi-modal planning a high priority need. In order to meet the City's Business Plan Goals, transportation will play a key role with public and private partnerships to promote economic vitality. TRANSPORTATION CAPITAL INVESTMENT PROGRAM 2019 through 2024 (in thousands of dollars) Arterial Circulation Program Description and Scope This program provides for the short and long-range planning and traffic analyses required to evaluate and update proposed transportation improvements projects, to assess the impacts of new development proposals, and to recommend local and regional transportation system improvements for all modes of travel. This program also covers programmatic activities to maintain eligibility for grant funding, such as assuring that project specifications and management comply with current State and Federal standards and regulations, Title VI reporting and ADA Transition Plan implementation. This program will also provide coordination with the I-405 project team, to assure it provides the maximum benefits and minimum problems for Renton's transportation system. Rationale AGENDA ITEM #2. a) 2019/2020 Proposed Budget City of Renton, Washington TIP Number:14 Project Title: Project Category: Development Status:Extension of Previously Approved Project Appropriated To-Date 2019 2020 2021 2022 2023 2024 Total Project Expenditures Expenditures Planning/Design 44 15 15 15 15 15 15 134 Project Management - - - - - - - - Major Maintenance - - - - - - - - Land Acquisitions - - - - - - - - Construction - - - - - - - - Total Expenditures 44 15 15 15 15 15 15 134 Appropriated To-Date 2019 2020 2021 2022 2023 2024 Total Project Resources Resources General Fund Sources 44 15 15 15 15 15 15 134 Restricted Taxes - - - - - - - - Mitigation Fees - - - - - - - - Bond Proceeds - - - - - - - - Grants/Contributions Awarded - - - - - - - - Grants/Contributions Anticipated - - - - - - - - Fund Balance - - - - - - - - Total Resources 44 15 15 15 15 15 15 134 *Restricted Taxes include REET, Fuel, Utility, and KC Levy funds This program transfers funds to Fund 125, which is being managed by the Department of Community and Economic Development. TRANSPORTATION CAPITAL INVESTMENT PROGRAM 2019 through 2024 (in thousands of dollars) 1% For The Arts Program Description and Scope Funding is tied to the calculated share of eligible types of transportation projects and transportation funding subject to the City's 1% for the Arts Program. All gateway project proposals under this program are subject to approval of the Arts Commission. Rationale AGENDA ITEM #2. a) 2019/2020 Proposed Budget City of Renton, Washington TIP Number:15 Project Title: Project Category: Maintenance and Preservation Status:New Request Appropriated To-Date 2019 2020 2021 2022 2023 2024 Total Project Expenditures Expenditures Planning/Design 70 420 130 - - - - 620 Project Management - - - - - - - - Major Maintenance - - - - - - - - Land Acquisitions - - - - - - - - Construction - - 2,380 - - - - 2,380 Total Expenditures 70 420 2,510 - - - - 3,000 Appropriated To-Date 2019 2020 2021 2022 2023 2024 Total Project Resources Resources General Fund Sources - - - - - - - - Restricted Taxes - - - - - - - - Mitigation Fees - - - - - - - - Bond Proceeds - - - - - - - - Grants/Contributions Awarded 70 420 2,510 - - - - 3,000 Grants/Contributions Anticipated - - - - - - - - Fund Balance - - - - - - - - Total Resources 70 420 2,510 - - - - 3,000 *Restricted Taxes include REET, Fuel, Utility, and KC Levy funds The main span is carried by steel girders. The girders are coated with paint to protect the steel from corrosion. Corrosion causes section loss which results in a reduced load carrying capacity of the girders. The existing paint is failing. The bridge is located in a zone of moderate to high liquefaction susceptibility during seismic events and therefore this project is focused on public safety. TRANSPORTATION CAPITAL INVESTMENT PROGRAM 2019 through 2024 (in thousands of dollars) Bronson Way N Bridge Repair Description and Scope The Bronson Way Bridge was built by WSDOT in 1939. Ownership was transferred to the City in January 2018 as part of the SR-900 turnback agreement. It is a three span bridge that crosses over the Cedar River. The project will remove the existing paint from the steel girders, repair corrosion damage and apply a new protective paint system. The project will also perform a seismic analysis and retrofit along with other improvements. Rationale AGENDA ITEM #2. a) 2019/2020 Proposed Budget City of Renton, Washington TIP Number:16 Project Title: Project Category: Maintenance and Preservation Status:Extension of Previously Approved Project Appropriated To-Date 2019 2020 2021 2022 2023 2024 Total Project Expenditures Expenditures Planning/Design 689 355 - - - - - 1,044 Project Management - - - - - - - - Major Maintenance - - - - - - - - Land Acquisitions - - - - - - - - Construction 4,303 1,157 - - - - - 5,460 Total Expenditures 4,992 1,512 - - - - - 6,504 Appropriated To-Date 2019 2020 2021 2022 2023 2024 Total Project Resources Resources General Fund Sources 60 30 - - - - - 90 Restricted Taxes - - - - - - - - Mitigation Fees 750 322 - - - - - 1,072 Bond Proceeds - - - - - - - - Grants/Contributions Awarded 3,643 1,049 - - - - - 4,692 Grants/Contributions Anticipated - - - - - - - - Fund Balance 538 111 - - - - - 649 Total Resources 4,991 1,512 - - - - - 6,503 *Restricted Taxes include REET, Fuel, Utility, and KC Levy funds Complete roadway improvements, bicycle lanes and sidewalks on Duvall Ave NE, from NE 7th St to Sunset Blvd NE. Condition of the existing roadway pavement requires road reconstruction in segments of the roadway. Project will enhance safety for pedestrians, bicyclists and vehicular along this corridor. TRANSPORTATION CAPITAL INVESTMENT PROGRAM 2019 through 2024 (in thousands of dollars) Duvall Ave NE - NE 7th St to Sunset Blvd NE Description and Scope Reconstruction/resurfacing of roadway, including new pavement, curb, gutter, sidewalk, street lights, storm drainage, channelization and bike lanes from NE 7th St to Sunset Blvd NE. Rationale AGENDA ITEM #2. a) 2019/2020 Proposed Budget City of Renton, Washington TIP Number:17 Project Title: Project Category: Maintenance and Preservation Status:New Request Appropriated To-Date 2019 2020 2021 2022 2023 2024 Total Project Expenditures Expenditures Planning/Design 70 420 130 - - - - 620 Project Management - - - - - - - - Major Maintenance - - - - - - - - Land Acquisitions - 50 - - - - - 50 Construction - - 2,402 223 - - - 2,625 Total Expenditures 70 470 2,532 223 - - - 3,295 Appropriated To-Date 2019 2020 2021 2022 2023 2024 Total Project Resources Resources General Fund Sources - - - - - - - - Restricted Taxes - - - - - - - - Mitigation Fees - - - - - - - - Bond Proceeds - - - - - - - - Grants/Contributions Awarded 61 407 2,532 - - - - 3,000 Grants/Contributions Anticipated - - - - - - - - Fund Balance 9 63 - - - - - 72 Total Resources 70 470 2,532 - - - - 3,072 *Restricted Taxes include REET, Fuel, Utility, and KC Levy funds The main span is carried by steel girders. The girders are coated with paint to protect the steel from corrosion. Corrosion causes section loss which results in a reduced load carrying capacity of the girders. The existing paint is failing. The bridge is located in a zone of moderate to high liquefaction susceptibility during seismic events. The bridge rail has been damaged. Addressing all these concerns in the interest of public safety. TRANSPORTATION CAPITAL INVESTMENT PROGRAM 2019 through 2024 (in thousands of dollars) Houser Way N Bridge Repair Description and Scope The Houser Way Bridge was built by the City of Renton in 1960. It is a three span bridge that crosses over the Cedar River. The project will remove the existing paint from the steel girders, repair corrosion damage and apply a new protective paint system. The project will also perform a seismic analysis and retrofit and replace/upgrade the bridge rails along with other improvements. Rationale AGENDA ITEM #2. a) 2019/2020 Proposed Budget City of Renton, Washington TIP Number:18 Project Title: Project Category: Development Status:Extension of Previously Approved Project Appropriated To-Date 2019 2020 2021 2022 2023 2024 Total Project Expenditures Expenditures Planning/Design 911 - - - 1,200 150 - 2,261 Project Management - - - - - - - - Major Maintenance - - - - - - - - Land Acquisitions 670 - - - - - - 670 Construction 557 340 1,425 - - 800 3,250 6,372 Total Expenditures 2,138 340 1,425 - 1,200 950 3,250 9,303 Appropriated To-Date 2019 2020 2021 2022 2023 2024 Total Project Resources Resources General Fund Sources 50 - 75 - - - - 125 Restricted Taxes - - - - - - - - Mitigation Fees - - 307 - - - - 307 Bond Proceeds - - - - - - - - Grants/Contributions Awarded 2,088 340 1,043 - - - - 3,471 Grants/Contributions Anticipated - - - - - - - - Fund Balance - - - - - - - - Total Resources 2,138 340 1,425 - - - - 3,903 *Restricted Taxes include REET, Fuel, Utility, and KC Levy funds The project will separate pedestrians and bicyclists from the vehicular traffic, enhancing safety and encouraging residents to use active transportation modes. TRANSPORTATION CAPITAL INVESTMENT PROGRAM 2019 through 2024 (in thousands of dollars) Lake Washington Loop Trail Description and Scope The project will construct approximately 1.3 miles of pedestrian and bicycle facilities to complete a gap in the Lake Washington trail system. Improvements include a 12-foot wide combined pedestrian/bicycle path, a landscaped buffer separating the path from the travelled roadway, pedestrian level lighting. For the segment located along Airport Way, the facilities will include a bike track and sidewalk, which will involve removing one westbound lane of traffic on Airport Way. Rationale AGENDA ITEM #2. a) 2019/2020 Proposed Budget City of Renton, Washington TIP Number:19 Project Title: Project Category: Maintenance and Preservation Status:Previously Approved Appropriated To- Date 2019 2020 2021 2022 2023 2024 Total Project Expenditures Expenditures Planning/Design 1,692 209 - 1,000 600 200 - 3,701 Project Management - - - - - - - - Major Maintenance - - - - - - - - Land Acquisitions - 250 2,750 300 - - - 3,300 Construction - - - 6,250 6,250 6,250 6,250 25,000 Total Expenditures 1,692 459 2,750 7,550 6,850 6,450 6,250 32,001 Appropriated To- Date 2019 2020 2021 2022 2023 2024 Total Project Resources Resources General Fund Sources 280 33 - - - - - 313 Restricted Taxes 200 - - - - - - 200 Mitigation Fees - - - - - - - - Bond Proceeds - - - - - - - - Grants/Contributions Awarded 888 426 - - - - - 1,314 Grants/Contributions Anticipated - - 2,750 - - - - 2,750 Fund Balance 324 - - - - - - 324 Total Resources 1,692 459 2,750 - - - - 4,901 *Restricted Taxes include REET, Fuel, Utility, and KC Levy funds This corridor has strong potential for non-motorized and transit usage. The Sunset area is experiencing residential and retail growth. The Sunset Area Planned Action EIS prepared in 2011 delineated transportation needs along Sunset Blvd from N Park Dr to Monroe Ave NE (estimated at $33M) to help improve public safety and quality of life. TRANSPORTATION CAPITAL INVESTMENT PROGRAM 2019 through 2024 (in thousands of dollars) NE Sunset Boulevard (SR 900) Corridor Improvements Description and Scope This project will seek to address pedestrian, transit and bicycle needs. This corridor needs a series of key improvements to improve traffic operations such as channelization, traffic signal modifications, signal treatments, possible queue jumps, access management through installation of medians. The corridor limits are from I-405 on the west and to the east City limits. Rationale AGENDA ITEM #2. a) 2019/2020 Proposed Budget City of Renton, Washington TIP Number:20 Project Title: Project Category: Development Status:Previously Approved Appropriated To-Date 2019 2020 2021 2022 2023 2024 Total Project Expenditures Expenditures Planning/Design 750 250 - - - - - 1,000 Project Management - - - - - - - - Major Maintenance - - - - - - - - Land Acquisitions 300 1,200 - - - - - 1,500 Construction - 4,375 625 - - - - 5,000 Total Expenditures 1,050 5,825 625 - - - - 7,500 Appropriated To-Date 2019 2020 2021 2022 2023 2024 Total Project Resources Resources General Fund Sources - - - - - - - - Restricted Taxes - - - - - - - - Mitigation Fees 750 (750) - - - - - - Bond Proceeds - 7,500 - - - - - 7,500 Grants/Contributions Awarded - - - - - - - - Grants/Contributions Anticipated 300 (300) - - - - - - Fund Balance - - - - - - - - Total Resources 1,050 6,450 - - - - - 7,500 *Restricted Taxes include REET, Fuel, Utility, and KC Levy funds With the additional development growth in the North Renton area, which includes The Landing and the Southport residential/hotel/office development, this project will construct improvements to improve accessibility to help drive economic development in the area. TRANSPORTATION CAPITAL INVESTMENT PROGRAM 2019 through 2024 (in thousands of dollars) Park Avenue North Extension Description and Scope The project will extend Park Ave N to the north of Logan Ave N, to provide access to Southport, PSE property and The Boeing Company. Improvements include bicycle and pedestrian facilities, illumination, landscaping. Rationale AGENDA ITEM #2. a) 2019/2020 Proposed Budget City of Renton, Washington TIP Number:21 Project Title: Project Category: Development Status:Extension of Previously Approved Project Appropriated To-Date 2019 2020 2021 2022 2023 2024 Total Project Expenditures Expenditures Planning/Design 2,049 500 451 - - - - 3,000 Project Management - - - - - - - - Major Maintenance - - - - - - - - Land Acquisitions - 1,000 1,500 1,000 - - - 3,500 Construction - - - 7,800 5,750 250 - 13,800 Total Expenditures 2,049 1,500 1,951 8,800 5,750 250 - 20,300 Appropriated To-Date 2019 2020 2021 2022 2023 2024 Total Project Resources Resources General Fund Sources 160 - - 100 495 - - 755 Restricted Taxes - - - - - - - - Mitigation Fees - 307 593 700 800 250 - 2,650 Bond Proceeds - - - - - - - - Grants/Contributions Awarded 1,750 1,192 1,358 5,800 - - - 10,100 Grants/Contributions Anticipated - - - 2,100 4,455 - - 6,555 Fund Balance 140 - - 100 - - - 240 Total Resources 2,050 1,499 1,951 8,800 5,750 250 - 20,300 *Restricted Taxes include REET, Fuel, Utility, and KC Levy funds Rainier Ave is a critical corridor in central Renton with existing operational problems and in need of infrastructure enhancements to provide greater ease of non-motorized and transit-based travel. It also provides improved access to the Renton Airport and Boeing's Renton Plant. Improvements will enhance traffic flow and reduce accidents, increasing public safety. TRANSPORTATION CAPITAL INVESTMENT PROGRAM 2019 through 2024 (in thousands of dollars) Rainier Ave S/N Phase 4 - S 3rd Street to NW 3rd Pl Description and Scope This is Phase 4 of the Rainier Ave Corridor Improvements, and will extend the improvements from S 3rd St to NW 3rd Pl. Project elements include sidewalk widening with streetscaping, adding pedestrian-scale illumination, adding a pedestrian actuated traffic signal, upgrading existing traffic signals, transit facility improvements, planted buffer strips and landscaped medians. Also includes a ped/bike path on the east side of Rainier Ave N, between Airport Way and NW 3rd Pl. Rationale AGENDA ITEM #2. a) 2019/2020 Proposed Budget City of Renton, Washington TIP Number:22 Project Title: Project Category: Cross-Category Status:New Request Appropriated To-Date 2019 2020 2021 2022 2023 2024 Total Project Expenditures Expenditures Planning/Design - - - 279 621 600 - 1,500 Project Management - - - - - - - - Major Maintenance - - - - - - - - Land Acquisitions - - - - - - - - Construction - - - - - 3,363 8,850 12,213 Total Expenditures - - - 279 621 3,963 8,850 13,713 Appropriated To-Date 2019 2020 2021 2022 2023 2024 Total Project Resources Resources General Fund Sources - - - - - - - - Restricted Taxes - - - - - - - - Mitigation Fees - - - - - - - - Bond Proceeds - - - - - - - - Grants/Contributions Awarded - - - - - - - - Grants/Contributions Anticipated - - - - - - - - Fund Balance - - - - - - - - Total Resources - - - - - - - - *Restricted Taxes include REET, Fuel, Utility, and KC Levy funds As a key element of the Downtown Civic Core Vision and Action Plan, The Renton Connector is a new urban trail, or "greenway", that creates a signature Civic Core and Downtown green spine and regional trail connection between the Cedar River Trail, Lake to Sound Trail, Lake Washington Loop Trail, and the Eastside Rail Corridor for pedestrians and cyclists between the Cedar River, City Hall and the South Renton Transit Center to the South improving the overall quality of life for the city's residents. TRANSPORTATION CAPITAL INVESTMENT PROGRAM 2019 through 2024 (in thousands of dollars) Renton Connector Description and Scope The Renton Connector project will install a continuous non-motorized facility along Burnett Ave S. between S. 2nd St and S. 5th St via separated walkways, protected bicycle lanes (cycle track), and a multi-use path. This project will also include reduced travel lanes, landscaped medians, and reconfigured public parking areas in order to provide opportunities to incorporate art, play spaces, and resting areas along the connector. Intersection improvements will include traffic signalization improvements and curb ramp upgrades to ADA standards. Rationale AGENDA ITEM #2. a) 2019/2020 Proposed Budget City of Renton, Washington TIP Number:23 Project Title: Project Category: Cross-Category Status:Previously Approved Appropriated To-Date 2019 2020 2021 2022 2023 2024 Total Project Expenditures Expenditures Planning/Design 113 - - 600 600 - - 1,313 Project Management - - - - - - - - Major Maintenance - - - - - - - - Land Acquisitions - - - 1,000 1,800 - - 2,800 Construction 762 - - - 1,300 2,600 2,200 6,862 Total Expenditures 875 - - 1,600 3,700 2,600 2,200 10,975 Appropriated To-Date 2019 2020 2021 2022 2023 2024 Total Project Resources Resources General Fund Sources 222 - - - - - - 222 Restricted Taxes - - - - - - - - Mitigation Fees - - - - - - - - Bond Proceeds - - - - - - - - Grants/Contributions Awarded 654 - - - - - - 654 Grants/Contributions Anticipated - - - - - - - - Fund Balance - - - - - - - - Total Resources 876 - - - - - - 876 *Restricted Taxes include REET, Fuel, Utility, and KC Levy funds 116th Ave SE is classified as a minor arterial. Non-continuous segments of sidewalk exist along the roadway. Improvements will enhance vehicular, bicycle and pedestrian safety along this important north-south transportation corridor. TRANSPORTATION CAPITAL INVESTMENT PROGRAM 2019 through 2024 (in thousands of dollars) 116th Ave SE Improvements Description and Scope Widen roadway to provide a 3-lane roadway with bike lanes along 116th Ave SE and Edmonds Way SE, including new pavement, curb, gutter, sidewalk, street lights, traffic signals, storm drainage, channelization and landscaping from Puget Drive SE to the southern City limits. Benson Hill Community Plan recommended improvements for a first phase, based on the neighborhood needs. The priority, cost and schedule for the phased improvements will be determined based on available funding. Rationale AGENDA ITEM #2. a) 2019/2020 Proposed Budget City of Renton, Washington TIP Number:24 Project Title: Project Category: Development Status:New Request Appropriated To-Date 2019 2020 2021 2022 2023 2024 Total Project Expenditures Expenditures Planning/Design - - 200 1,350 - - - 1,550 Project Management - - - - - - - - Major Maintenance - - - - - - - - Land Acquisitions - - - - - - - - Construction - - - - 7,800 7,800 - 15,600 Total Expenditures - - 200 1,350 7,800 7,800 - 17,150 Appropriated To-Date 2019 2020 2021 2022 2023 2024 Total Project Resources Resources General Fund Sources - - 100 150 215 - - 465 Restricted Taxes - - - - - - - - Mitigation Fees - - - - - - - - Bond Proceeds - - - - - - - - Grants/Contributions Awarded - - - 1,200 - - - 1,200 Grants/Contributions Anticipated - - - - - - - - Fund Balance - - 100 - - - - 100 Total Resources - - 200 1,350 215 - - 1,765 *Restricted Taxes include REET, Fuel, Utility, and KC Levy funds This project is one of the strategies identified in the City Center Community Plan as well as the Downtown Civic Core Action Plan. The project enhances downtown Renton as a destination area, while improving circulation and enhancing pedestrian safety and environment. The intersection of S 2nd St and Burnett is key connection to The Renton Connector Project (TIP No. 22) TRANSPORTATION CAPITAL INVESTMENT PROGRAM 2019 through 2024 (in thousands of dollars) South 2nd Street Conversion Project Description and Scope The South 2nd Street Conversion Project will be improving multimodal mobility in around the downtown core by converting an existing 4–lane one-way roadway to a roadway with one through-lane in each direction between Main Ave South and Rainier Ave South. This project also includes pedestrian and bicycle facilities, traffic operations improvements, and transit upgrades that will provide better traffic operation and circulation for all modes of transportation. The improvements include a westbound bypass transit lane from just west of Logan Ave S to just east of Lake Avenue. Transit facility upgrades include new RapidRide stops and a transit queue jump at the new traffic signal at the Shattuck intersection. Rationale AGENDA ITEM #2. a) 2019/2020 Proposed Budget City of Renton, Washington TIP Number:25 Project Title: Project Category: Maintenance and Preservation Status:Previously Approved Appropriated To-Date 2019 2020 2021 2022 2023 2024 Total Project Expenditures Expenditures Planning/Design 70 420 100 - - - - 590 Project Management - - - - - - - - Major Maintenance - - - - - - - - Land Acquisitions - 50 - - - - - 50 Construction - - 2,540 - - - - 2,540 Total Expenditures 70 470 2,640 - - - - 3,180 Appropriated To-Date 2019 2020 2021 2022 2023 2024 Total Project Resources Resources General Fund Sources 9 - 122 - - - - 131 Restricted Taxes - - - - - - - - Mitigation Fees - - - - - - - - Bond Proceeds - - - - - - - - Grants/Contributions Awarded 61 407 2,518 - - - - 2,986 Grants/Contributions Anticipated - - - - - - - - Fund Balance - 63 - - - - - 63 Total Resources 70 470 2,640 - - - - 3,180 *Restricted Taxes include REET, Fuel, Utility, and KC Levy funds The main span is carried by steel girders. The girders are coated with paint to protect the steel from corrosion. Corrosion causes section loss which results in a reduced load carrying capacity of the girders. The existing paint is failing. The bridge is located in a zone of moderate to high liquefaction susceptibility during seismic events. TRANSPORTATION CAPITAL INVESTMENT PROGRAM 2019 through 2024 (in thousands of dollars) Williams Ave N Bridge Repair Description and Scope The Williams Ave Bridge was built by the City of Renton in 1954. It is a three span bridge that crosses over the Cedar River. The project will remove the existing paint from the steel girders, repair corrosion damage and apply a new protective paint system. The project will also perform a seismic analysis and retrofit along with other improvements to improve public safety. Rationale AGENDA ITEM #2. a) 2019/2020 Proposed Budget City of Renton, Washington TIP Number:26 Project Title: Project Category: Cross-Category Status:Extension of Previously Approved Project Appropriated To-Date 2019 2020 2021 2022 2023 2024 Total Project Expenditures Expenditures Planning/Design 1,147 - - - - - - 1,147 Project Management - - - - - - - - Major Maintenance - - - - - - - - Land Acquisitions 130 - - - - - - 130 Construction 2,365 1,934 6,348 - - - - 10,647 Total Expenditures 3,642 1,934 6,348 - - - - 11,924 Appropriated To-Date 2019 2020 2021 2022 2023 2024 Total Project Resources Resources General Fund Sources 319 30 180 - - - - 529 Restricted Taxes 10 - - - - - - 10 Mitigation Fees 408 450 300 - - - - 1,158 Bond Proceeds - - - - - - - - Grants/Contributions Awarded 2,365 1,454 2,396 - - - - 6,215 Grants/Contributions Anticipated - - 3,472 - - - - 3,472 Fund Balance 540 - - - - - - 540 Total Resources 3,642 1,934 6,348 - - - - 11,924 *Restricted Taxes include REET, Fuel, Utility, and KC Levy funds This project is one of the strategies identified in the City Center Community Plan. The project enhances downtown Renton as a destination area, while improving circulation, reducing traffic speeds and enhancing pedestrian safety. A feasibility study, including a Downtown Circulation Traffic Analysis for the conversion to two-way operations was completed. TRANSPORTATION CAPITAL INVESTMENT PROGRAM 2019 through 2024 (in thousands of dollars) Williams Ave S and Wells Ave S Conversion Project Description and Scope The project provides pedestrian and bicyclists facilities and enhancements, traffic operation and circulation improvements in Downtown. The improvements include adding signalized raised intersections with bulb outs, lighting, street furniture, streetscape, bike racks, signage and converting Williams Ave S and Wells Ave S to two-way traffic operations. Rationale AGENDA ITEM #2. a) 2019/2020 Proposed Budget City of Renton, Washington TIP Number:27 Project Title: Project Category: Development Status:Previously Approved Appropriated To-Date 2019 2020 2021 2022 2023 2024 Total Project Expenditures Expenditures Planning/Design 784 50 - - - - - 834 Project Management - - - - - - - - Major Maintenance - - - - - - - - Land Acquisitions - - - - - - - - Construction - - - - - - - - Total Expenditures 784 50 - - - - - 834 Appropriated To-Date 2019 2020 2021 2022 2023 2024 Total Project Resources Resources General Fund Sources - - - - - - - - Restricted Taxes - - - - - - - - Mitigation Fees 46 50 - - - - - 96 Bond Proceeds - - - - - - - - Grants/Contributions Awarded 660 - - - - - - 660 Grants/Contributions Anticipated - - - - - - - - Fund Balance 78 - - - - - - 78 Total Resources 784 50 - - - - - 834 *Restricted Taxes include REET, Fuel, Utility, and KC Levy funds Carr Road is classified as a principal arterial. It has four lanes of traffic with left-turn lanes at intersections. Improvements are necessary to enhance vehicle traffic capacity and safety for vehicles, bicycles, and pedestrians on this major east-west transportation corridor. TRANSPORTATION CAPITAL INVESTMENT PROGRAM 2019 through 2024 (in thousands of dollars) Carr Road Improvements Description and Scope A corridor study prepared by King County in 2003 identified the need for roadway improvements from Lind Ave SW and SW 43rd St intersection and extend east crossing SR 167 and ending at 116th Ave SE. Potential improvements vary from roadway realignment/widening at several locations to address geometric deficiencies, widening to 5-lane roadway (2 lanes westbound, 3 lanes eastbound), including bicycle lanes on new alignment. The total project cost is estimated as $80M. Rationale AGENDA ITEM #2. a) 2019/2020 Proposed Budget City of Renton, Washington TIP Number:28 Project Title: Project Category: Development Status:New Request Appropriated To-Date 2019 2020 2021 2022 2023 2024 Total Project Expenditures Expenditures Planning/Design - - - - 220 - - 220 Project Management - - - - - - - - Major Maintenance - - - - - - - - Land Acquisitions - - - - 165 - - 165 Construction - - - - - 836 966 1,802 Total Expenditures - - - - 385 836 966 2,187 Appropriated To-Date 2019 2020 2021 2022 2023 2024 Total Project Resources Resources General Fund Sources - - - - - - - - Restricted Taxes - - - - - - - - Mitigation Fees - - - - - - - - Bond Proceeds - - - - - - - - Grants/Contributions Awarded - - - - - - - - Grants/Contributions Anticipated - - - - - - - - Fund Balance - - - - - - - - Total Resources - - - - - - - - *Restricted Taxes include REET, Fuel, Utility, and KC Levy funds The feedback during the public engagement process for the Trails and Bicycle Master Plan update identified Houser Way as the route for the Eastside Rail Corridor alignment. With the development of the Civic Core Plan, development this section of the bicycle network creates an important connection point for bicycle traffic between the north and south portions of the City's urban growth center. Creating a bike facility down to Mill Ave S creates a connection to the Cedar River Trail. The crossing at Cedar River Park Drive is a connection point for people connecting from Liberty Park to the Renton Community Center and will greatly improve public safety. TRANSPORTATION CAPITAL INVESTMENT PROGRAM 2019 through 2024 (in thousands of dollars) Houser Way S/N Non-Motorized Improvements Description and Scope This project would install a separated bike facility on the north side of Houser Way S/N, between Mill Ave S. and Bronson Way N. Intersection crossings would be improved at Cedar River Park Drive and Mill Ave S. The project will include planing and pavement overlay, channelization, and intersection crossing improvements. For feasibility and constructability issues, the roadway and pedestrian bridge sections would not be part of this project. Rationale AGENDA ITEM #2. a) 2019/2020 Proposed Budget City of Renton, Washington TIP Number:29 Project Title:Houser Way North - North 8th Street to Lake Washington Blvd Project Category: Development Status:New Request Appropriated To-Date 2019 2020 2021 2022 2023 2024 Total Project Expenditures Expenditures Planning/Design 0 - - - 900 - - 900 Project Management 0 - - - - - - - Major Maintenance 0 - - - - - - - Land Acquisitions 0 - - - 165 - - 165 Construction - - - - - 1,560 2,340 3,900 Total Expenditures - - - - 1,065 1,560 2,340 4,965 Appropriated To-Date 2019 2020 2021 2022 2023 2024 Total Project Resources Resources General Fund Sources - - - - - - - - Restricted Taxes - - - - - - - - Mitigation Fees - - - - - - - - Bond Proceeds - - - - - - - - Grants/Contributions Awarded - - - - - - - - Grants/Contributions Anticipated - - - - - - - - Fund Balance - - - - - - - - Total Resources - - - - - - - - *Restricted Taxes include REET, Fuel, Utility, and KC Levy funds The City of Renton travel demand model predicts traffic volumes increasing significantly in the North Renton Area in the near future. One of the recommendations to improve northbound access to Lake Washington Blvd is to convert Houser Way N to a two- way operations, between N 8th St and Lake Washington Blvd to keep up with mobility demand to for economic development. TRANSPORTATION CAPITAL INVESTMENT PROGRAM 2019 through 2024 (in thousands of dollars) Description and Scope This project will widen and realign the existing one lane roadway to a two-lane roadway and includes intersection improvements to convert Houser Way N to a two-way operation. Includes new roadway, curbs, pedestrian-bicycle path, drainage, signals, lighting, signing and channelization. Rationale AGENDA ITEM #2. a) 2019/2020 Proposed Budget City of Renton, Washington TIP Number:30 Project Title: Project Category: Development Status:Previously Approved Appropriated To-Date 2019 2020 2021 2022 2023 2024 Total Project Expenditures Expenditures Planning/Design 800 - - - - - - 800 Project Management 0 - - - - - - - Major Maintenance 0 - - - - - - - Land Acquisitions 110 - - - - - - 110 Construction - 2,800 - - - - - 2,800 Total Expenditures 910 2,800 - - - - - 3,710 Appropriated To-Date 2019 2020 2021 2022 2023 2024 Total Project Resources Resources General Fund Sources - - - - - - - - Restricted Taxes - - - - - - - - Mitigation Fees - - - - - - - - Bond Proceeds - - - - - - - - Grants/Contributions Awarded 910 2,800 - - - - - 3,710 Grants/Contributions Anticipated - - - - - - - - Fund Balance - - - - - - - - Total Resources 910 2,800 - - - - - 3,710 *Restricted Taxes include REET, Fuel, Utility, and KC Levy funds Phase A will connect Fort Dent (Tukwila) to the larger system of regional trails in South King County, including the Green River Trail, the Interurban Trail and the Cedar River Trail. Phase A will provide a 12-foot wide asphalt paved multi-use trail, with 2-foot gravel shoulders. In the Downtown Civic Core Plan, the L2S Trail connects to the Eastside Rail Corridor (ERC) and the Renton Connector (TIP #22). This trail plant will improve the quality of life for residents. TRANSPORTATION CAPITAL INVESTMENT PROGRAM 2019 through 2024 (in thousands of dollars) Lake to Sound (L2S) Trail Description and Scope The Lake to Sound (L2S) Trail is a joint partnership between the cities of Renton, SeaTac, Tukwila, Burien and Des Moines, in coordination with King County. The 17-mile L2S Trail will provide an east-west connection between the shoreline of Lake Washington (Renton) and the shoreline of Puget Sound (Des Moines). Phase A goes from Naches Ave SW (Renton) to Fort Dent Park (Tukwila). The length between Naches Ave SW and Mill Ave S are future phases. Rationale AGENDA ITEM #2. a) 2019/2020 Proposed Budget City of Renton, Washington TIP Number:31 Project Title:Lake Washington Blvd N - Park Ave N to Gene Coulon Memorial Park Project Category: Development Status:New Request Appropriated To-Date 2019 2020 2021 2022 2023 2024 Total Project Expenditures Expenditures Planning/Design 43 - - - - - - 43 Project Management - - - - - - - - Major Maintenance - - - - - - - - Land Acquisitions - - - - - - - - Construction 400 2,000 - - - - - 2,400 Total Expenditures 443 2,000 - - - - - 2,443 Appropriated To-Date 2019 2020 2021 2022 2023 2024 Total Project Resources Resources General Fund Sources 3 - - - - - - 3 Restricted Taxes 3 - - - - - - 3 Mitigation Fees 258 - - - - - - 258 Bond Proceeds - - - - - - - Grants/Contributions Awarded 170 2,000 - - - - - 2,170 Grants/Contributions Anticipated - - - - - - - - Fund Balance 9 - - - - - - 9 Total Resources 443 2,000 - - - - - 2,443 *Restricted Taxes include REET, Fuel, Utility, and KC Levy funds This project will serve the development and access needs to Coulon Park and the Southport Development. Agreement with developer to credit traffic mitigation towards the costs of certain improvements. TRANSPORTATION CAPITAL INVESTMENT PROGRAM 2019 through 2024 (in thousands of dollars) Description and Scope This project includes road widening, traffic signals, railroad crossings, drainage, curb, gutter, sidewalks and bicycle lanes. Developer to design and construct improvements, and get credit toward mitigation contribution. The developer is completing the project in 3 phases. Rationale AGENDA ITEM #2. a) 2019/2020 Proposed Budget City of Renton, Washington TIP Number:32 Project Title: Project Category: Development Status:New Request Appropriated To-Date 2019 2020 2021 2022 2023 2024 Total Project Expenditures Expenditures Planning/Design - - - - 400 250 - 650 Project Management - - - - - - - - Major Maintenance - - - - - - - - Land Acquisitions - - - - - - - - Construction - - - - - 1,400 2,350 3,750 Total Expenditures - - - - 400 1,650 2,350 4,400 Appropriated To-Date 2019 2020 2021 2022 2023 2024 Total Project Resources Resources General Fund Sources - - - - - - - - Restricted Taxes - - - - - - - - Mitigation Fees - - - - - - - - Bond Proceeds - - - - - - - - Grants/Contributions Awarded - - - - - - - - Grants/Contributions Anticipated - - - - - - - - Fund Balance - - - - - - - - Total Resources - - - - - - - - *Restricted Taxes include REET, Fuel, Utility, and KC Levy funds Increasing traffic demands in the Valley due in part to development will create the need to increase the capacity of this major north/south arterial. A potential project is a signal installation at the intersection at Lind Ave SW and SW 34th St (currently unsignalized) to improve mobility. Additionally, improvements may result from future WSDOT I-405 plans which include an interchange at Lind Ave SW (currently unfunded). TRANSPORTATION CAPITAL INVESTMENT PROGRAM 2019 through 2024 (in thousands of dollars) Lind Ave SW - SW 16th St to SW 43rd St Description and Scope Widen existing roadway to five lanes where required. Includes new roadway, curbs, sidewalks, drainage, signals, lighting, signing and channelization. Rationale AGENDA ITEM #2. a) 2019/2020 Proposed Budget City of Renton, Washington TIP Number:33 Project Title: Project Category: Development Status:Extension of Previously Approved Project Appropriated To- Date 2019 2020 2021 2022 2023 2024 Total Project Expenditures Expenditures Planning/Design 1045 - - - - 1,240 1,000 3,285 Project Management 0 - - - - - - - Major Maintenance 0 - - - - - - - Land Acquisitions 33 - - - - - 9,000 9,033 Construction 6,275 - - - - - - 6,275 Total Expenditures 7,353 - - - - 1,240 10,000 18,593 Appropriated To- Date 2019 2020 2021 2022 2023 2024 Total Project Resources Resources General Fund Sources 107 - - - - - - 107 Restricted Taxes - - - - - - - - Mitigation Fees 200 - - - - - - 200 Bond Proceeds - - - - - - - - Grants/Contributions Awarded 6,987 - - - - - - 6,987 Grants/Contributions Anticipated - - - - - - - - Fund Balance 59 - - - - - - 59 Total Resources 7,353 - - - - - - 7,353 *Restricted Taxes include REET, Fuel, Utility, and KC Levy funds The increase in traffic and the new RapidRide transit have warranted widening to add a northbound lane. Included with the improvements are urban roadway amenities to implement "Complete Streets" practice per City code. This improvement will increase mobility and safety in the area. TRANSPORTATION CAPITAL INVESTMENT PROGRAM 2019 through 2024 (in thousands of dollars) Logan Ave North Improvements Description and Scope Phase 1 (Cedar River Bridge to N 6th St) is complete. Phase 2 (N 6th St to Park Ave N) will add a NB lane, new curb, gutter, sidewalks (on the east side), landscaped buffer, and a pedestrian/bicycle trail (west side), streetlights, pedestrian scale illumination, crosswalks, channelization. Rationale AGENDA ITEM #2. a) 2019/2020 Proposed Budget City of Renton, Washington TIP Number:34 Project Title: Project Category: Development Status:New Request Appropriated To-Date 2019 2020 2021 2022 2023 2024 Total Project Expenditures Expenditures Planning/Design - - - 274 249 - - 523 Project Management - - - - - - - - Major Maintenance - - - - - - - - Land Acquisitions - - - 25 131 - - 156 Construction - - - - 2,459 - - 2,459 Total Expenditures - - - 299 2,839 - - 3,138 Appropriated To-Date 2019 2020 2021 2022 2023 2024 Total Project Resources Resources General Fund Sources - - - - - - - - Restricted Taxes - - - - - - - - Mitigation Fees - - - - - - - - Bond Proceeds - - - - - - - - Grants/Contributions Awarded - - - - - - - - Grants/Contributions Anticipated - - - - - - - - Fund Balance - - - - - - - - Total Resources - - - - - - - - *Restricted Taxes include REET, Fuel, Utility, and KC Levy funds Maple Valley Highway (SR 169) is a principal arterial carrying 44,000 vehicles per day. This project will improve safety for traffic on Maple Valley Highway (SR 169) at this location, which has been the site to numerous collision impacts. TRANSPORTATION CAPITAL INVESTMENT PROGRAM 2019 through 2024 (in thousands of dollars) Maple Valley Highway Barriers Description and Scope This project includes two barriers: One is to install a concrete median barrier between east and westbound travel lanes of the SR 169 S-Curve between the Riviera Apartments and S. 5th Street including associated roadway widening to add the barrier. Rationale AGENDA ITEM #2. a) 2019/2020 Proposed Budget City of Renton, Washington TIP Number:35 Project Title:Monster Road SW/68th Ave S Roadway Improvements Project Category: Development Status:New Request Appropriated To-Date 2019 2020 2021 2022 2023 2024 Total Project Expenditures Expenditures Planning/Design - - - - - 50 5,000 5,050 Project Management - - - - - - - - Major Maintenance - - - - - - - - Land Acquisitions - - - - - - 3,000 3,000 Construction - - - - - - - - Total Expenditures - - - - - 50 8,000 8,050 Appropriated To-Date 2019 2020 2021 2022 2023 2024 Total Project Resources Resources General Fund Sources - - - - - - - - Restricted Taxes - - - - - - - - Mitigation Fees - - - - - - - - Bond Proceeds - - - - - - - - Grants/Contributions Awarded - - - - - - - - Grants/Contributions Anticipated - - - - - - - - Fund Balance - - - - - - - - Total Resources - - - - - - - - *Restricted Taxes include REET, Fuel, Utility, and KC Levy funds Will serve growing north-south traffic demand. A preliminary design study was completed in 1999. The project cost is estimated at $32M, with the City's share estimated at $13M and King Co. at $19M. TRANSPORTATION CAPITAL INVESTMENT PROGRAM 2019 through 2024 (in thousands of dollars) Description and Scope Widen existing roadway to four lanes plus two-way-left-turn-lane where needed and bike lanes. Realign Beacon Coal Mine Road approach to intersection with the Oakesdale Ave SW roadway. Includes new roadway, curbs, sidewalk, drainage, street lighting, traffic signals, channelization, retaining walls and widening the existing bridge. Rationale AGENDA ITEM #2. a) 2019/2020 Proposed Budget City of Renton, Washington TIP Number:36 Project Title: Project Category: Development Status:Extension of Previously Approved Project Appropriated To-Date 2019 2020 2021 2022 2023 2024 Total Project Expenditures Expenditures Planning/Design 995 20 20 750 750 - - 2,535 Project Management - - - - - - - - Major Maintenance - - - - - - - - Land Acquisitions 84 - - - 600 - - 684 Construction 2,640 - - - 2,840 5,180 3,200 13,860 Total Expenditures 3,719 20 20 750 4,190 5,180 3,200 17,079 Appropriated To-Date 2019 2020 2021 2022 2023 2024 Total Project Resources Resources General Fund Sources 825 20 20 - - - - 865 Restricted Taxes - - - - - - - - Mitigation Fees 374 - - - - - - 374 Bond Proceeds - - - - - - - - Grants/Contributions Awarded 1,496 - - - - - - 1,496 Grants/Contributions Anticipated - - - - - - - - Fund Balance 1,024 - - - - - - 1,024 Total Resources 3,719 20 20 - - - - 3,759 *Restricted Taxes include REET, Fuel, Utility, and KC Levy funds This corridor has a strong potential for transit usage and is experiencing rapid residential and retail growth. The NE 3rd/4th Corridor Study was adopted in May 2005. The study refined the corridor transportation needs and costs, including pedestrian, transit, bicycle improvements, as well as streetscape enhancement improving safety and quality of life. TRANSPORTATION CAPITAL INVESTMENT PROGRAM 2019 through 2024 (in thousands of dollars) 36. NE 3rd_4th Description and Scope This project involves a series of improvements in this corridor to improve traffic operations such as rechannelization and traffic signal modifications, possible transit priority signal treatments and queue jumps. This project will seek to meet pedestrian, transit and bicycle needs. Phase 1 constructed a new signal and other improvements at NE 4th St and Whitman Ave NE. Rationale AGENDA ITEM #2. a) 2019/2020 Proposed Budget City of Renton, Washington TIP Number:37 Project Title: Project Category: Cross-Category Status:New Request Appropriated To-Date 2019 2020 2021 2022 2023 2024 Total Project Expenditures Expenditures Planning/Design 0 - 50 200 - - - 250 Project Management 0 - - - - - - - Major Maintenance 0 - - - - - - - Land Acquisitions 0 - - - - - - - Construction - - - - - - - - Total Expenditures - - 50 200 - - - 250 Appropriated To-Date 2019 2020 2021 2022 2023 2024 Total Project Resources Resources General Fund Sources - - 50 - - - - 50 Restricted Taxes - - - - - - - - Mitigation Fees - - - - - - - - Bond Proceeds - - - - - - - - Grants/Contributions Awarded - - - - - - - - Grants/Contributions Anticipated - - - - - - - - Fund Balance - - - - - - - - Total Resources - - 50 - - - - 50 *Restricted Taxes include REET, Fuel, Utility, and KC Levy funds The bridge is 17 years beyond its original design lift of 50 years. It will very likely need to be replaced or significantly retrofitted within the next 10 years. The main span is comprised of precast concrete girders. The girders are supported on treated timber piles with a timber caps. Some of the timber piles are showing signs of deterioration. This project addresses the public safety needs of users of this bridge. TRANSPORTATION CAPITAL INVESTMENT PROGRAM 2019 through 2024 (in thousands of dollars) Nile Ave NE Bridge Repair Description and Scope The Nile Ave NE Bridge was built by King County in 1951. Ownership was transferred to the City in 2009 as part of the MacKay Annexation (Ord #5456). It is a single span bridge that crosses over May Creek. The initial phase of this project will evaluate replacement options with a type, size and location (TS&L) study. Rationale AGENDA ITEM #2. a) 2019/2020 Proposed Budget City of Renton, Washington TIP Number:38 Project Title:Rainier Ave N Corridor Improvements (Phase 5) Project Category: Development Status:New Request Appropriated To-Date 2019 2020 2021 2022 2023 2024 Total Project Expenditures Expenditures Planning/Design - - - - - 100 2,000 2,100 Project Management - - - - - - - - Major Maintenance - - - - - - - - Land Acquisitions - - - - - - - - Construction - - - - - - - - Total Expenditures - - - - - 100 2,000 2,100 Appropriated To-Date 2019 2020 2021 2022 2023 2024 Total Project Resources Resources General Fund Sources - - - - - - - - Restricted Taxes - - - - - - - - Mitigation Fees - - - - - - - - Bond Proceeds - - - - - - - - Grants/Contributions Awarded - - - - - - - - Grants/Contributions Anticipated - - - - - - - - Fund Balance - - - - - - - - Total Resources - - - - - - - - *Restricted Taxes include REET, Fuel, Utility, and KC Levy funds Rainier Ave is a critical corridor in Renton with existing operational problems and in need of infrastructure enhancements to provide greater ease for non-motorized and transit-based travel. TRANSPORTATION CAPITAL INVESTMENT PROGRAM 2019 through 2024 (in thousands of dollars) Description and Scope This is Phase 5 of the Rainier Ave Corridor Improvements, and will extend the improvements from NW 3rd Pl to north City limits. Project elements include widening of sidewalks with streetscaping, adding pedestrian-scale illumination and planted buffer strips. The street may be narrowed from 5 to 3 lanes where feasible. On the east side of Rainier Ave the new multi-use trail will be installed (Lake Washington Loop Trail), (as shown on TIP #18). Rationale AGENDA ITEM #2. a) 2019/2020 Proposed Budget City of Renton, Washington TIP Number:39 Project Title: Project Category: Development Status:New Request Appropriated To-Date 2019 2020 2021 2022 2023 2024 Total Project Expenditures Expenditures Planning/Design - - - - - - - - Project Management - - - - 3,195 9,053 9,053 21,301 Major Maintenance - - - - - - - - Land Acquisitions - - - - - - - - Construction - - - - - - - - Total Expenditures - - - - 3,195 9,053 9,053 21,301 Appropriated To-Date 2019 2020 2021 2022 2023 2024 Total Project Resources Resources General Fund Sources - - - - - - - - Restricted Taxes - - - - - - - - Mitigation Fees - - - - - - - - Bond Proceeds - - - - - - - - Grants/Contributions Awarded - - - - - - - - Grants/Contributions Anticipated - - - - - - - - Fund Balance - - - - - - - - Total Resources - - - - - - - - *Restricted Taxes include REET, Fuel, Utility, and KC Levy funds With current traffic conditions and configurations, improvements will be needed to ensure speed and reliability of the BRT system into and out of the South Renton Transit Center. This transit hub is currently and will remain and key connection point for transit users for both Metro and Sound Transit. Proximity to the Sounder Station and future increase of parking availability also plays a key role in improvement accessibility needs. Having easy access to public transportation focuses on improving the quality of life of residents. TRANSPORTATION CAPITAL INVESTMENT PROGRAM 2019 through 2024 (in thousands of dollars) Renton Bus Rapid Transit (BRT) Improvements Description and Scope New transit access road improvements from I405 exit 3 (Talbot Rd) to South Renton Transit Center. Includes reconfiguration of Grady Way, Lake Ave S and S Renton Village Place to accommodate transit. Rationale AGENDA ITEM #2. a) 2019/2020 Proposed Budget City of Renton, Washington TIP Number:40 Project Title: Project Category: Planning Status:New Request Appropriated To-Date 2019 2020 2021 2022 2023 2024 Total Project Expenditures Expenditures Planning/Design - - - 300 200 - - 500 Project Management - - - - - - - - Major Maintenance - - - - - - - - Land Acquisitions - - - - - - - - Construction - - - - - - - - Total Expenditures - - - 300 200 - - 500 Appropriated To-Date 2019 2020 2021 2022 2023 2024 Total Project Resources Resources General Fund Sources - - - - - - - - Restricted Taxes - - - - - - - - Mitigation Fees - - - - - - - - Bond Proceeds - - - - - - - - Grants/Contributions Awarded - - - - - - - - Grants/Contributions Anticipated - - - - - - - - Fund Balance - - - - - - - - Total Resources - - - - - - - - *Restricted Taxes include REET, Fuel, Utility, and KC Levy funds The current regional vision allows cities and other urban service providers to prioritize maximizing the use of existing infrastructure, making more efficient and less costly investments in new infrastructure, and minimizing the environmental impact of urban growth. This prioritization made transportation a key role in the region by creating improved accessibility and mobility for walking, biking, and transit. Regional growth centers are envisioned as major focal points of higher density population and employment, served with efficient multimodal transportation infrastructure and services. Linking these centers with a highly efficient transportation system allows the region to take actions to reduce the rate of growth in vehicle miles traveled, especially by providing and expanding transportation choices. TRANSPORTATION CAPITAL INVESTMENT PROGRAM 2019 through 2024 (in thousands of dollars) Transit Master Plan Description and Scope The Transit Master Plan provides the city with a means to influence decisions made by regional transit authorities. It also provides a basis on which to begin advancing proposed capital projects for further study, design and prioritization, and position them to be strong competitors for grant funding. The plan establishes scalable short- and long-term strategies, and identifies projects that will foster a high-quality transit system to meet Renton’s needs. Rationale AGENDA ITEM #2. a) 2019/2020 Proposed Budget City of Renton, Washington TIP Number:41 Project Title: Project Category: Cross-Category Status:New Request Appropriated To-Date 2019 2020 2021 2022 2023 2024 Total Project Expenditures Expenditures Planning/Design - - - 4,000 - - - 4,000 Project Management - - - - - - - - Major Maintenance - - - - - - - - Land Acquisitions - - - - - - - - Construction - - - - 6,500 10,700 - 17,200 Total Expenditures - - - 4,000 6,500 10,700 - 21,200 Appropriated To-Date 2019 2020 2021 2022 2023 2024 Total Project Resources Resources General Fund Sources - - - - - - - - Restricted Taxes - - - - - - - - Mitigation Fees - - - - - - - - Bond Proceeds - - - - - - - - Grants/Contributions Awarded - - - - - - - - Grants/Contributions Anticipated - - - - - - - - Fund Balance - - - - - - - - Total Resources - - - - - - - - *Restricted Taxes include REET, Fuel, Utility, and KC Levy funds This project is one of the strategies identified in the City Center Community Plan. The project enhances downtown Renton as a destination area for economic development, while improving circulation, reducing traffic speeds and enhancing pedestrian safety. A feasibility study, including a Downtown Circulation Traffic Analysis for the conversion to two-way operations was completed. TRANSPORTATION CAPITAL INVESTMENT PROGRAM 2019 through 2024 (in thousands of dollars) South 3rd Street Conversion Project Description and Scope The project provides pedestrian and bicyclists facilities and enhancements, traffic operation and circulation improvements in Downtown. The improvements include adding raised intersections with bulb outs, parklets, pedestrian plaza, lighting, street furniture, streetscape, bicycle blvd, bike racks, signage, wayfinding and converting S 3rd St to two-way operations. Rationale AGENDA ITEM #2. a) 2019/2020 Proposed Budget City of Renton, Washington TIP Number:42 Project Title:7th Street Corridor Improvements - Naches Ave S to Talbot Road S Project Category: Development Status:Extension of Previously Approved Project Appropriated To-Date 2019 2020 2021 2022 2023 2024 Total Project Expenditures Expenditures Planning/Design 344 - - 200 800 1,000 - 2,344 Project Management - - - - - - - - Major Maintenance - - - - - - - - Land Acquisitions 25 - - - 800 900 - 1,725 Construction 1,290 - - - - 8,464 3,609 13,363 Total Expenditures 1,659 - - 200 1,600 10,364 3,609 17,432 Appropriated To-Date 2019 2020 2021 2022 2023 2024 Total Project Resources Resources General Fund Sources 52 - - - - - - 52 Restricted Taxes - - - - - - - - Mitigation Fees 424 - - - - - - 424 Bond Proceeds - - - - - - - - Grants/Contributions Awarded 1,111 - - - - - - 1,111 Grants/Contributions Anticipated - - - - - - - - Fund Balance 72 - - - - - - 72 Total Resources 1,659 - - - - - - 1,659 *Restricted Taxes include REET, Fuel, Utility, and KC Levy funds This segment of the S 7th St corridor connects Talbot Rd S (SR 515) with Rainier Ave S (SR 167). This segment of S 7th St is part of a designated east-west ped/bike route through the City's commercial core and an important link between regional trails. The South Renton Neighborhood Study has identified South 7th St as needing streetscape improvements. The Trails and Bicycle Master Plan Update identified SW 7th St/S 7th St as a good alternate/parallel route as the L2S Trail (TIP #30) is developed. With the expansion of the South Renton Transit Center and Bus Rapid Transit (BRT) implementation, S 7th St is important non-motorized link to downtown core. TRANSPORTATION CAPITAL INVESTMENT PROGRAM 2019 through 2024 (in thousands of dollars) Description and Scope Widening the existing roadway to 3 lanes (2 lanes EB and 1 lane WB) and a separated multi-use trail. Includes new curb, gutter, wider sidewalks, street lighting, landscaping, channelization and upgrades to traffic signals. The S 7th St Project - Traffic Analysis Report provided alternatives for corridor improvement options. This project also includes a sidepath on SW 7th St between Rainier Ave S and Naches Ave S. Rationale AGENDA ITEM #2. a) 2019/2020 Proposed Budget City of Renton, Washington TIP Number:43 Project Title:South Grady Way - Talbot Rd South to Rainier Ave South Project Category: Cross-Category Status:New Request Appropriated To-Date 2019 2020 2021 2022 2023 2024 Total Project Expenditures Expenditures Planning/Design - - - 550 200 - - 750 Project Management - - - - - - - - Major Maintenance - - - - - - - - Land Acquisitions - - - - - - - - Construction - - - - 1,560 1,690 - 3,250 Total Expenditures - - - 550 1,760 1,690 - 4,000 Appropriated To-Date 2019 2020 2021 2022 2023 2024 Total Project Resources Resources General Fund Sources - - - - - - - - Restricted Taxes - - - - - - - - Mitigation Fees - - - - - - - - Bond Proceeds - - - - - - - - Grants/Contributions Awarded - - - - - - - - Grants/Contributions Anticipated - - - - - - - - Fund Balance - - - - - - - - Total Resources - - - - - - - - *Restricted Taxes include REET, Fuel, Utility, and KC Levy funds The project will remove the islands at the intersections of S Grady Way with Lake Ave S and Shattuck Ave S, to allow for a continuous eastbound lane from Rainier Ave S to Talbot Rd S. Included are modifications to the traffic signal, new pedestrian crossings and channelization. The improvements will add much needed capacity to the S Grady Way corridor and improve public safety. TRANSPORTATION CAPITAL INVESTMENT PROGRAM 2019 through 2024 (in thousands of dollars) Description and Scope This project will perform a comprehensive analysis of multi-modal transportation improvements, including review of potential transit improvements along Grady Way, such as Business Access and Transit (BAT) lanes and Traffic Signal Priority (TSP). Rationale AGENDA ITEM #2. a) 2019/2020 Proposed Budget City of Renton, Washington TIP Number:44 Project Title: Project Category: Development Status:New Request Appropriated To-Date 2019 2020 2021 2022 2023 2024 Total Project Expenditures Expenditures Planning/Design - - - 600 - - - 600 Project Management - - - - - - - - Major Maintenance - - - - - - - - Land Acquisitions - - - - - - - - Construction - - - 3,750 - - - 3,750 Total Expenditures - - - 4,350 - - - 4,350 Appropriated To-Date 2019 2020 2021 2022 2023 2024 Total Project Resources Resources General Fund Sources - - - - - - - - Restricted Taxes - - - - - - - - Mitigation Fees - - - - - - - - Bond Proceeds - - - - - - - - Grants/Contributions Awarded - - - - - - - - Grants/Contributions Anticipated - - - - - - - - Fund Balance - - - - - - - - Total Resources - - - - - - - - *Restricted Taxes include REET, Fuel, Utility, and KC Levy funds The project is proposed to meet recent travel demand growth in the area and as a part of the connectivity of the regional transit system. This transit hub will provide service to a 17.5 acre mixed use site consisting of 730,000 sq.ft. of office space, 43,000 sq.ft. of meeting space, 30,000 sq.ft. of retail, 383 apartment units and a 347 unit hotel. Other new development in the area includes two hotels. In addition, a large manufacturing company's employees will benefit from the transit hub's location as well as visitors to The Landing and the 57 acre Gene Coulon Park. TRANSPORTATION CAPITAL INVESTMENT PROGRAM 2019 through 2024 (in thousands of dollars) South Lake Washington Transit Stop Description and Scope This project will implement a Bus Transit Station at Park Ave. N and Garden Ave N. The project includes a new transit stop, with passenger amenities such as shelters, lighting, benches, litter receptacles, bicycle racks and lockers. Rationale AGENDA ITEM #2. a) 2019/2020 Proposed Budget City of Renton, Washington TIP Number:45 Project Title: Project Category: Development Status:New Request Appropriated To- Date 2019 2020 2021 2022 2023 2024 Total Project Expenditures Expenditures Planning/Design - - - - 2,600 - - 2,600 Project Management - - - - - - - - Major Maintenance - - - - - - - - Land Acquisitions - - - - 1,000 - - 1,000 Construction - - - - - 10,700 7,900 18,600 Total Expenditures - - - - 3,600 10,700 7,900 22,200 Appropriated To- Date 2019 2020 2021 2022 2023 2024 Total Project Resources Resources General Fund Sources - - - - - - - - Restricted Taxes - - - - - - - - Mitigation Fees - - - - - - - - Bond Proceeds - - - - - - - - Grants/Contributions Awarded - - - - - - - - Grants/Contributions Anticipated - - - - - - - - Fund Balance - - - - - - - - Total Resources - - - - - - - - *Restricted Taxes include REET, Fuel, Utility, and KC Levy funds Improvements to these streets are key to support the redevelopment of the Sunset Area Community in the Highlands area, bounded by NE 21st St on the north, Edmonds Ave NE on the west, NE 7th St on the south, and Monroe Ave NE on the east. The City in partnership with the Renton Housing Authority aspires to redevelop the Sunset Terrace public housing community and encourage private development in the Planned Action Study area over a 20-year period. TRANSPORTATION CAPITAL INVESTMENT PROGRAM 2019 through 2024 (in thousands of dollars) Sunset Area Green Connections Description and Scope This project will construct multi-modal improvements identified in the Sunset Area Community Planned Action Study. Roadways will be widened/extended/realigned to provide for future traffic flows. Several residential streets will be developed as "green connections" improving pedestrian mobility and enhance the neighborhood. Roadways included are NE 10th St, NE Sunset Lane, Harrington Ave NE, NE 12th St, Edmonds Ave NE, Jefferson Ave NE, Kirkland Ave NE and Glennwood Ave NE. Rationale AGENDA ITEM #2. a) 2019/2020 Proposed Budget City of Renton, Washington Life to Date Project Projects Priority Type*Thru 2018 2019 2020 2021 2022 2023 2024 Total Airport Office Renovation 1 M 3,014 - - - - - - 3,014 Major Facility Maintenance 2 M 1,735 175 175 225 225 - - 2,535 Maintenance Dredging and Shoreline Mitigation 3 M 1,755 - - - 650 - - 2,405 Taxiway Alpha Rehabilitation 4 D 6 - - - 1,700 5,650 - 7,356 Pavement Management Program 5 M 327 150 150 250 250 - - 1,127 Airport North Entrance & Parking Lot Rehab 6 M - - - 250 260 - - 510 Surface Water System Rehabilitation 7 M 280 - - 100 450 150 - 980 Seaplane Launch Ramp Replacement 8 D - - - 167 750 - - 917 Runway Safety Area 9 C - 600 - - - - - 600 Airport Maintenance Facility 10 M - - - - 150 - - 150 Snow Removal Equipment 11 M - - 200 - - - - 200 Total 7,117 925 525 992 4,435 5,800 - 19,794 Life to Date Project Resources:Thru 2018 2019 2020 2021 2022 2023 2024 Total General Fund Sources - - - - - - - - Restricted Taxes - - - - - - - - Mitigation Fees - - - - - - - - Bond Proceeds - - - - - - - - Grants/Contributions Awarded 556 - - 150 675 - - 1,381 Grants/Contributions Anticipated - - - - - 5,650 - 5,650 Fund Balance 6,561 925 525 842 3,760 150 - 12,763 Total Resources 7,117 925 525 992 4,435 5,800 - 19,794 Balance Available / (Unfunded Needs)- - - - - - - - * NOTE: A - Acquisition, C- Cross Category, D - Development, M - Maintenance, P - Planning, R - Regulatory ** Projects under construction and/or with a phase under construction Proposed P r o j e c t e d AIRPORT CAPITAL INVESTMENT PROGRAM 2019 through 2024 (in thousands of dollars) Proposed P r o j e c t e d S U M M A R Y B Y C O U N C I L P R I O R I T Y AGENDA ITEM #2. a) 2019/2020 Proposed Budget City of Renton, Washington Priority Number:1 Project Title: Project Category: Maintenance and Preservation Status:Previosuly Approved Appropriated To-Date 2019 2020 2021 2022 2023 2024 Total Project Expenditures Planning/Consultants 235 - - - - - - 235 Project Management - - - - - - - - Major Maintenance - - - - - - - - Land Acquisitions - - - - - - - - Construction 2,779 - - - - - - 2,779 Total Expenditures 3,014 - - - - - - 3,014 Appropriated To-Date 2019 2020 2021 2022 2023 2024 Total Project Resources General Fund Sources - - - - - - - - Restricted Taxes - - - - - - - - Mitigation Fees - - - - - - - - Bond Proceeds - - - - - - - - Grants/Contributions Awarded - - - - - - - - Grants/Contributions Anticipated - - - - - - - - Fund Balance 3,014 - - - - - - 3,014 Total Resources 3,014 - - - - - - 3,014 *Restricted Taxes include REET, Fuel, Utility, and KC Levy funds Having a modernized office will improve efficiency and reflect positively on customers coming in to visit the offices. Overall, this project should have a positive impact on the reputation of the airport as a whole, helping build eminence for the city. AIPORT CAPITAL INVESTMENT PROGRAM 2019 through 2024 (in thousands of dollars) Airport Office Renovation Description and Scope The Airport Administrative Office is located in the Control Tower building. The Tower was originally built in 1961. The overall project has two components. The first component is to seismically upgrade the entire structure. This upgrade will likely include an exterior steel frame bracing wrapping the building's exterior. The second component of the project is to remodel and add square footage to the bottom floor of the Tower where the administrative offices are located. The building was originaly built to only house Air Traffic Control staff, and in 1989, the Airport Administration Office was established on the ground floor housing 1.5 FTE City employees. Additional airport staff have been added since then, for a current total of 4 FTEs, with an additional 1 FTE coming on board in 2017. The Airport office is not air-tight and regularly allows jet fumes to permeate the offices.The building electrical panels need to be updated, and the water pipes in the building are a concern. The building does not meet ADA standards. All of these issues will be addressed in the 100% design and construction. Rationale AGENDA ITEM #2. a) 2019/2020 Proposed Budget City of Renton, Washington Priority Number:2 Project Title: Project Category: Maintenance and Preservation Status:Previously Approved Appropriated To-Date 2019 2020 2021 2022 2023 2024 Total Project Expenditures Planning/Consultants - - - - - - - - Project Management - - - - - - - - Major Maintenance 1,735 175 175 225 225 - - 2,535 Land Acquisitions - - - - - - - - Construction - - - - - - - - Total Expenditures 1,735 175 175 225 225 - - 2,535 Appropriated To-Date 2019 2020 2021 2022 2023 2024 Total Project Resources General Fund Sources - - - - - - - - Restricted Taxes - - - - - - - - Mitigation Fees - - - - - - - - Bond Proceeds - - - - - - - - Grants/Contributions Awarded - - - - - - - - Grants/Contributions Anticipated - - - - - - - - Fund Balance 1,735 175 175 225 225 - - 2,535 Total Resources 1,735 175 175 225 225 - - 2,535 *Restricted Taxes include REET, Fuel, Utility, and KC Levy funds Maintaining the airport facility as a whole is imperative to the overall customer serivce and operations of the airport and reflects positively on the city as a whole. AIPORT CAPITAL INVESTMENT PROGRAM 2019 through 2024 (in thousands of dollars) Major Facility Maintenance Description and Scope Ongoing program to maintain and repair airport-owned structures and facilities. Includes snow plowing exercises, major building repairs - new hangar doors, hangar roofs, hvac systems, electrical upgrades, and pavement repair. The City continues to add old existing structures to its ownership. Some of these buildings need major, unscheduled repairs to maintain the investment in the facility. The budget for the Fire/Water System and the Airside/Landside Separation projects has been rolled over to the Major Facility Maintenance project. Rationale AGENDA ITEM #2. a) 2019/2020 Proposed Budget City of Renton, Washington Priority Number:3 Project Title: Project Category: Maintenance and Preservation Status:Previously Approved Appropriated To-Date 2019 2020 2021 2022 2023 2024 Total Project Expenditures Planning/Consultants - - - - - - - - Project Management - - - - - - - - Major Maintenance - - - - - - - - Land Acquisitions - - - - - - - - Construction 1,755 - - - 650 - - 2,405 Total Expenditures 1,755 - - - 650 - - 2,405 Appropriated To-Date 2019 2020 2021 2022 2023 2024 Total Project Resources General Fund Sources - - - - - - - - Restricted Taxes - - - - - - - - Mitigation Fees - - - - - - - - Bond Proceeds - - - - - - - - Grants/Contributions Awarded 556 - - - - - - 556 Grants/Contributions Anticipated - - - - - - - - Fund Balance 1,199 - - - 650 - - 1,849 Total Resources 1,755 - - - 650 - - 2,405 *Restricted Taxes include REET, Fuel, Utility, and KC Levy funds This project is necessary for preservation of that natural areas surrounding the end of the airport by Lake Washington and the Cedar River. Preservation of these areas is important for both environmental and safety purposes. AIPORT CAPITAL INVESTMENT PROGRAM 2019 through 2024 (in thousands of dollars) Maintenance Dredging and Shoreline Mitigatio Description and Scope Over the next two budget cycles the objective is to set aside necessary funding for the completion of the next maintenance dredging around the docks and launch ramp at the Seaplane Base. The next dredge is anticipated to be needed in 2022, with extensive permitting beginning in 2020. Annual inspections of the sediment levels will be conducted to review the status of sediment build-up. Rationale AGENDA ITEM #2. a) 2019/2020 Proposed Budget City of Renton, Washington Priority Number:5 Project Title: Project Category: Development Status:Previously Approved Appropriated To-Date 2019 2020 2021 2022 2023 2024 Total Project Expenditures Planning/Consultants 6 - - - 1,700 - - 1,706 Project Management - - - - - - - - Major Maintenance - - - - - - - - Land Acquisitions - - - - - - - - Construction - - - - - 5,650 - 5,650 Total Expenditures 6 - - - 1,700 5,650 - 7,356 Appropriated To-Date 2019 2020 2021 2022 2023 2024 Total Project Resources General Fund Sources - - - - - - - - Restricted Taxes - - - - - - - - Mitigation Fees - - - - - - - - Bond Proceeds - - - - - - - - Grants/Contributions Awarded - - - - - - - - Grants/Contributions Anticipated - - - - - 5,650 - 5,650 Fund Balance 6 - - - 1,700 - - 1,706 Total Resources 6 - - - 1,700 5,650 - 7,356 *Restricted Taxes include REET, Fuel, Utility, and KC Levy funds The rehabilitiation of taxiway alpha will allow the airport to meet the growing demands from its various customers. This major reconstruction would be a big boost to the airport's notoriety and the reputation of the city as well. AIPORT CAPITAL INVESTMENT PROGRAM 2019 through 2024 (in thousands of dollars) Taxiway Alpha Rehabilitation Description and Scope From 2017 thru 2019, this program will fund a major reconstruction and rehabilitation of Taxiway Alpha. Taxiway Alpha is the major parallel taxiway that supports all GA aircraft operations on the west side of the airfield and also is used by Boeing 737 jets under tow. The existing pavement is showing stress, cracking, and rutting. The project will likely include areas of total reconstruction and other areas of pavement repairs. The project will also seek to upgrade Airport lighting to LED, infield drainage along Taxiway Alpha, painting, and other taxiway system upgrades. Rationale AGENDA ITEM #2. a) 2019/2020 Proposed Budget City of Renton, Washington Priority Number:5 Project Title: Project Category: Maintenance and Preservation Status:Previously Approved Appropriated To-Date 2019 2020 2021 2022 2023 2024 Total Project Expenditures Planning/Consultants - - - - - - - - Project Management - - - - - - - - Major Maintenance - - - - - - - - Land Acquisitions - - - - - - - - Construction 327 150 150 250 250 - - 1,127 Total Expenditures 327 150 150 250 250 - - 1,127 Appropriated To-Date 2019 2020 2021 2022 2023 2024 Total Project Resources General Fund Sources - - - - - - - - Restricted Taxes - - - - - - - - Mitigation Fees - - - - - - - - Bond Proceeds - - - - - - - - Grants/Contributions Awarded - - - - - - - - Grants/Contributions Anticipated - - - - - - - - Fund Balance 327 150 150 250 250 - - 1,127 Total Resources 327 150 150 250 250 - - 1,127 *Restricted Taxes include REET, Fuel, Utility, and KC Levy funds Pavement management is key to establishing a safe and aesthetic operating area that will continue to provide a place for current and new customers to enjoy the airport. AIPORT CAPITAL INVESTMENT PROGRAM 2019 through 2024 (in thousands of dollars) Pavement Management Program Description and Scope This project covers a variety of pavement repairs using the 2007 Airport Pavement Management Plan as a scheduling guideline. The Airport's taxiways and ramp areas are in need of rehabilitation in places due to cracked and crumbling pavement. Annual repairs ensure the integrity of the surface areas used by Boeing jets and general aviation aircraft and help to prevent foreign object damage from crumbling pavement. The Airport CIP budget 6 -year plan funds this program as high-priority areas are identified. Rationale AGENDA ITEM #2. a) 2019/2020 Proposed Budget City of Renton, Washington Priority Number:6 Project Title: Project Category: Maintenance and Preservation Status:Previously Approved Appropriated To-Date 2019 2020 2021 2022 2023 2024 Total Project Expenditures Planning/Consultants - - - 250 260 - - 510 Project Management - - - - - - - - Major Maintenance - - - - - - - - Land Acquisitions - - - - - - - - Construction - - - - - - - - Total Expenditures - - - 250 260 - - 510 Appropriated To-Date 2019 2020 2021 2022 2023 2024 Total Project Resources General Fund Sources - - - - - - - - Restricted Taxes - - - - - - - - Mitigation Fees - - - - - - - - Bond Proceeds - - - - - - - - Grants/Contributions Awarded - - - - - - - - Grants/Contributions Anticipated - - - - - - - - Fund Balance - - - 250 260 - - 510 Total Resources - - - 250 260 - - 510 *Restricted Taxes include REET, Fuel, Utility, and KC Levy funds This project addresses major safety and security concerns to the overall operations of the airport. AIPORT CAPITAL INVESTMENT PROGRAM 2019 through 2024 (in thousands of dollars) Airport North Entrance & Parking Lot Rehab Description and Scope The north entrance to the Airport is located off of Rainier Avenue North at the NW corner of the Airport. Recently, Airport staff have removed rotting wood signage and structures from this entrance and have placed temporary signage. This project will reshape and upgrade this entrance to mirror the recent upgrades at the Airport's main entrance off Shattuck Avenue. New concrete walls, signage, lighting, and landscaping are all anticipated as part of this upgrade. In addition, Airport staff will seek to add parking along the west side of west perimeter road in the vicinity as general parking for the Airport's tenants. Rationale AGENDA ITEM #2. a) 2019/2020 Proposed Budget City of Renton, Washington Priority Number:7 Project Title: Project Category: Maintenance and Preservation Status:Previously Approved Appropriated To-Date 2019 2020 2021 2022 2023 2024 Total Project Expenditures Planning/Consultants - - - - - - - - Project Management - - - - - - - - Major Maintenance 280 - - 100 450 150 - 980 Land Acquisitions - - - - - - - - Construction - - - - - - - - Total Expenditures 280 - - 100 450 150 - 980 Appropriated To-Date 2019 2020 2021 2022 2023 2024 Total Project Resources General Fund Sources - - - - - - - - Restricted Taxes - - - - - - - - Mitigation Fees - - - - - - - - Bond Proceeds - - - - - - - - Grants/Contributions Awarded - - - - - - - - Grants/Contributions Anticipated - - - - - - - - Fund Balance 280 - - 100 450 150 - 980 Total Resources 280 - - 100 450 150 - 980 *Restricted Taxes include REET, Fuel, Utility, and KC Levy funds The storm water systems at the airport need to be operating at full capacity to ensure the continued operations of the facility. AIPORT CAPITAL INVESTMENT PROGRAM 2019 through 2024 (in thousands of dollars) Surface Water System Rehabilitation Description and Scope The majority of the Airport's drainage system, installed in the 1950's, has exceeded its design life, and is failing in some locations. This project will replace components of the drainage system on the Airport. Rationale AGENDA ITEM #2. a) 2019/2020 Proposed Budget City of Renton, Washington Priority Number:8 Project Title:Seaplane Launch Ramp Replacement Project Category: Development Status:Previously Approved Appropriated To-Date 2019 2020 2021 2022 2023 2024 Total Project Expenditures Planning/Consultants - - - 167 750 - - 917 Project Management - - - - - - - - Major Maintenance - - - - - - - - Land Acquisitions - - - - - - - - Construction - - - - - - - - Total Expenditures - - - 167 750 - - 917 Appropriated To-Date 2019 2020 2021 2022 2023 2024 Total Project Resources General Fund Sources - - - - - - - - Restricted Taxes - - - - - - - - Mitigation Fees - - - - - - - - Bond Proceeds - - - - - - - - Grants/Contributions Awarded - - - 150 675 - - 825 Grants/Contributions Anticipated - - - - - - - - Fund Balance - - - 17 75 - - 92 Total Resources - - - 167 750 - - 917 *Restricted Taxes include REET, Fuel, Utility, and KC Levy funds This project addresses the growing demand of seaplane usage at the airport. The project would help make seaplane operation safer at the airport and likely draw in new customers to use the facility. AIPORT CAPITAL INVESTMENT PROGRAM 2019 through 2024 (in thousands of dollars) Description and Scope The Seaplane Base Launch Ramp consists of a concrete approach ramp and wood plank ramp, pilings, and bulkhead that are in need of replacement. The area along the bulkhead and around the pilings has been eroded over time due to wave action from Lake Washington. Part of this project will be to widen the 1950's era launch ramp to accommodate newer seaplanes that are having difficulty using the narrow ramp. Rationale AGENDA ITEM #2. a) 2019/2020 Proposed Budget City of Renton, Washington Priority Number:9 Project Title: Project Category: Cross-Category Status:New Request Appropriated To-Date 2019 2020 2021 2022 2023 2024 Total Project Expenditures Planning/Consultants - - - - - - - - Project Management - - - - - - - - Major Maintenance - 600 - - - - - 600 Land Acquisitions - - - - - - - - Construction - - - - - - - - Total Expenditures - 600 - - - - - 600 Appropriated To-Date 2019 2020 2021 2022 2023 2024 Total Project Resources General Fund Sources - - - - - - - - Restricted Taxes - - - - - - - - Mitigation Fees - - - - - - - - Bond Proceeds - - - - - - - - Grants/Contributions Awarded - - - - - - - - Grants/Contributions Anticipated - - - - - - - - Fund Balance - 600 - - - - - 600 Total Resources - 600 - - - - - 600 *Restricted Taxes include REET, Fuel, Utility, and KC Levy funds This project is address major safety concerns for airport operations. AIPORT CAPITAL INVESTMENT PROGRAM 2019 through 2024 (in thousands of dollars) Runway Safety Area Description and Scope Evaluation of the Runway Safety Areas surrounding Runway 16/34. A Runway Safety Area is a defined surface surrounding the runway prepared or suitable for reducing the risk of damage to aircraft in the event of an undershoot, overshoot, or excursion from the runway. The current safety area dimensions for Runway 16/34 are 75’ on either side of the Runway centerline, and 300’ beyond each threshold end. Runway Safety Area dimensions are established in FAA Advisory Circular 150/5300-13 – Airport Design, and are a function of the volume and type of aircraft that frequently use the Runway. As the mix of aircraft using a particular Runway change over time, the safety area, among other aspects of the movement areas, should be reevaluated. This capital line item will help fund that evaluation. Rationale AGENDA ITEM #2. a) 2019/2020 Proposed Budget City of Renton, Washington Priority Number:10 Project Title: Project Category: Maintenance and Preservation Status:New Request Appropriated To-Date 2019 2020 2021 2022 2023 2024 Total Project Expenditures Planning/Consultants - - - - 150 - - 150 Project Management - - - - - - - - Major Maintenance - - - - - - - - Land Acquisitions - - - - - - - - Construction - - - - - - - - Total Expenditures - - - - 150 - - 150 Appropriated To-Date 2019 2020 2021 2022 2023 2024 Total Project Resources General Fund Sources - - - - - - - - Restricted Taxes - - - - - - - - Mitigation Fees - - - - - - - - Bond Proceeds - - - - - - - - Grants/Contributions Awarded - - - - - - - - Grants/Contributions Anticipated - - - - - - - - Fund Balance - - - - 150 - - 150 Total Resources - - - - 150 - - 150 *Restricted Taxes include REET, Fuel, Utility, and KC Levy funds This project is needed in order to provide staff with the facility they need to be able to perform their duties safely and efficiently, ultimately improving the overall customer experience of the airport's clientele. AIPORT CAPITAL INVESTMENT PROGRAM 2019 through 2024 (in thousands of dollars) Airport Maintenance Facility Description and Scope The Airport Maintenance crew has grown significantly in both staff size and in equipment inventory. This level of service ensures the adequate operational standards of the Airport are being met. Currently, equipment is stored in a number of areas on the Airport, causing inefficiency in work production. In 2016, with aviation-use ramp space at a premium, it is desirable for the Airport to relocate the maintenance shop to a place that is more suited to equipment handling and to free up the 790 parcel for use by an aviation-related operator. This project is intended to develop a suitable site for the new maintenance shop that is large enough to house the existing 2 FTEs and 6 PTEs, breakroom, workshop, and equipment storage. Rationale AGENDA ITEM #2. a) 2019/2020 Proposed Budget City of Renton, Washington Priority Number:11 Project Title: Project Category: Maintenance and Preservation Status:Extension of Previously Approved Project Appropriated To-Date 2019 2020 2021 2022 2023 2024 Total Project Expenditures Planning/Consultants - - - - - - - - Project Management - - - - - - - - Major Maintenance - - 200 - - - - 200 Land Acquisitions - - - - - - - - Construction - - - - - - - - Total Expenditures - - 200 - - - - 200 Appropriated To-Date 2019 2020 2021 2022 2023 2024 Total Project Resources General Fund Sources - - - - - - - - Restricted Taxes - - - - - - - - Mitigation Fees - - - - - - - - Bond Proceeds - - - - - - - - Grants/Contributions Awarded - - - - - - - - Grants/Contributions Anticipated - - - - - - - - Fund Balance - - 200 - - - - 200 Total Resources - - 200 - - - - 200 *Restricted Taxes include REET, Fuel, Utility, and KC Levy funds The snow removal equipment is necessary to keep airport operations safe and functioning during winter months. Keeping service levels high at all times ensures greater customer satisfaction and increases the reputation of the airport and the city. AIPORT CAPITAL INVESTMENT PROGRAM 2019 through 2024 (in thousands of dollars) Snow Removal Equipment Description and Scope The Airport needs to maintain airfield snow and ice removal equipment to ensure that aircraft can operate safely to and from the airport unrestricted during winter months. The current rotary snow sweeper equipment was purchased used in 2014 and has become unreliable. The airport needs to replace this equipment with a new serviceable equipment. Rationale AGENDA ITEM #2. a) 2019/2020 Adopted Budget City of Renton, Washington Life to Date Project Projects Priority Type*Thru 2018 2019 2020 2021 2022 2023 2024 Total Maintenance Building 1 M - - - - - - 300 300 Irrigation Mainline Replacement 2 M - - - - - 1,000 - 1,000 Driving Range Turf Replacement 3 M - - - 800 - - - 800 Golf Course Major Maintenance 4 M 164 72 76 335 130 48 80 905 Total 164 72 76 1,135 130 1,048 380 3,005 Life to Date Project Resources:Thru 2018 2019 2020 2021 2022 2023 2024 Total General Fund Sources - - - - - - - - Restricted Taxes - - - - - - - - Mitigation Fees - - - - - - - - Bond Proceeds - - - - - - - - Grants/Contributions Awarded - - - - - - - - Grants/Contributions Anticipated - - - - - - - - Fund Balance 164 72 76 1,135 130 1,048 380 3,005 Total Resources 164 72 76 1,135 130 1,048 380 3,005 Balance Available / (Unfunded Needs)- - - - - - - - * NOTE: A - Acquisition, C- Cross Category, D - Development, M - Maintenance, P - Planning ** Projects under construction and/or with a phase under construction Proposed P r o j e c t e d GOLF COURSE CAPITAL INVESTMENT PROGRAM S U M M A R Y B Y C O U N C I L P R I O R I T Y 2019 through 2024 (in thousands of dollars) Proposed P r o j e c t e d AGENDA ITEM #2. a) 2019/2020 Proposed Budget City of Renton, Washington Project Number:1 Project Title: Project Category: Cross-Category Status:New Request Appropriated To-Date 2019 2020 2021 2022 2023 2024 Total Project Expenditures Expenditures - - - - - - - Planning/Design - - - - - - - - Project Management - - - - - - - - Major Maintenance - - - - - - 300 300 Land Acquisitions - - - - - - - - Construction - - - - - - - - Total Expenditures - - - - - - 300 300 Appropriated To-Date 2019 2020 2021 2022 2023 2024 Total Project Resources Resources - - - - - - - General Fund Sources - - - - - - - - Restricted Taxes - - - - - - - - Mitigation Fees - - - - - - - - Bond Proceeds - - - - - - - - Grants/Contributions Awarded - - - - - - - - Grants/Contributions Anticipated - - - - - - - - Fund Balance - - - - - - 300 300 Total Resources - - - - - - 300 300 *Restricted Taxes include REET, Fuel, Utility, and KC Levy funds By keeping the golf course appearance and quality in a well-maintained state helps build eminence for the city as a sign of a high quality of life for its residents and outside visitors. GOLF COURSE CAPITAL INVESTMENT PROGRAM 2019 through 2024 (in thousands of dollars) Maintenance Building Description and Scope Design and construct a new maintenance building and pumphouse including detention requirements that will replace the existing structure. The current building will require extensive renovations to function effectively and will be cost prohibitive. The new facility will provide an acceptable work environment for staff, provide a secure storage area for equipment, meet all environmental requirements for wash rack areas, and the storage of fuel and pesticides. The pump house will supply water to the west portion of the golf course per the adopted Master Plan. This is the last step in completely reworking the original irrigation system and fully automating the new system as per its design. This will allow for a shorter window of watering, resulting in less impact to golfers and the maintenance staff. Rationale AGENDA ITEM #2. a) 2019/2020 Proposed Budget City of Renton, Washington Project Number:2 Project Title:Irrigation Mainline Replacement Project Category: Cross-Category Status:New Request Appropriated To-Date 2019 2020 2021 2022 2023 2024 Total Project Expenditures Expenditures - - - - - - - Planning/Design - - - - - - - - Project Management - - - - - - - - Major Maintenance - - - - - 1,000 - 1,000 Land Acquisitions - - - - - - - - Construction - - - - - - - - Total Expenditures - - - - - 1,000 - 1,000 Appropriated To-Date 2019 2020 2021 2022 2023 2024 Total Project Resources Resources - - - - - - - General Fund Sources - - - - - - - - Restricted Taxes - - - - - - - - Mitigation Fees - - - - - - - - Bond Proceeds - - - - - - - - Grants/Contributions Awarded - - - - - - - - Grants/Contributions Anticipated - - - - - - - - Fund Balance - - - - - 1,000 - 1,000 Total Resources - - - - - 1,000 - 1,000 *Restricted Taxes include REET, Fuel, Utility, and KC Levy funds This project is necessary to keep the golf course irrigated and operating to keep up the quality of life standard the golf course helps set in the City. GOLF COURSE CAPITAL INVESTMENT PROGRAM 2019 through 2024 (in thousands of dollars) Description and Scope Replace/repair the golf course irrigation mainline to ensure efficient irrigating and health of turf. The mainline is an 8" - 200 psi/PVC pipe that ranges from 11 - 20 years old. The normal life expectancy of this pipe under this use is 20 - 25 years. This project was initially introduced into the CIP in 2007. Rationale AGENDA ITEM #2. a) 2019/2020 Proposed Budget City of Renton, Washington Project Number:3 Project Title:Driving Range Turf Replacement Project Category: Maintenance and Preservation Status:Previously Approved Appropriated To-Date 2019 2020 2021 2022 2023 2024 Total Project Expenditures Expenditures - - - - - - - Planning/Design - - - - - - - - Project Management - - - - - - - - Major Maintenance - - - 800 - - - 800 Land Acquisitions - - - - - - - - Construction - - - - - - - - Total Expenditures - - - 800 - - - 800 Appropriated To-Date 2019 2020 2021 2022 2023 2024 Total Project Resources Resources - - - - - - - General Fund Sources - - - - - - - - Restricted Taxes - - - - - - - - Mitigation Fees - - - - - - - - Bond Proceeds - - - - - - - - Grants/Contributions Awarded - - - - - - - - Grants/Contributions Anticipated - - - - - - - - Fund Balance - - - 800 - - - 800 Total Resources - - - 800 - - - 800 *Restricted Taxes include REET, Fuel, Utility, and KC Levy funds The driving range draws in a large volume of customers annually and upkeeping its condition is important to keep quality and reputation levels high for the community. GOLF COURSE CAPITAL INVESTMENT PROGRAM 2019 through 2024 (in thousands of dollars) Description and Scope Replace/repair the golf course driving range artificial turf to prevent undue wear on golf balls . The turf was installed in 2000 and the normal life expectancy of artificial turf is 10-12 years. This project was initially introduced into the CIP in 2016. Rationale AGENDA ITEM #2. a) 2019/2020 Proposed Budget City of Renton, Washington Project Number:4 Project Title:Golf Course Major Maintenance Project Category: Maintenance and Preservation Status:Extension of Previously Approved Request Appropriated To-Date 2019 2020 2021 2022 2023 2024 Total Project Expenditures Expenditures - - - - - - - Planning/Design - - - - - - - - Project Management - - - - - - - - Major Maintenance 164 72 76 335 130 48 80 905 Land Acquisitions - - - - - - - - Construction - - - - - - - - Total Expenditures 164 72 76 335 130 48 80 905 Appropriated To-Date 2019 2020 2021 2022 2023 2024 Total Project Resources Resources - - - - - - - General Fund Sources - - - - - - - - Restricted Taxes - - - - - - - - Mitigation Fees - - - - - - - - Bond Proceeds - - - - - - - - Grants/Contributions Awarded - - - - - - - - Grants/Contributions Anticipated - - - - - - - - Fund Balance 164 72 76 335 130 48 80 905 Total Resources 164 72 76 335 130 48 80 905 *Restricted Taxes include REET, Fuel, Utility, and KC Levy funds By keeping the golf course appearance and quality in a well-maintained state helps build eminence for the city as a sign of a high quality of life for its residents and outside visitors. GOLF COURSE CAPITAL INVESTMENT PROGRAM 2019 through 2024 (in thousands of dollars) Description and Scope The Maplewood Golf Course has the following activities that would be considered major maintenance, necessary to maintain the golf course, driving range, and building facilities. They do not add to the infrastructure, but ensure continued life and usability of the entire facility. Note that numbers listed in parenthesis on page 13 are the initial dates that projects were introduced into the Major Maintenance portion of the CIP. Rationale AGENDA ITEM #2. a) 2019/2020 Proposed Budget City of Renton, Washington Life to Date Project Projects Priority Type*Thru 2018 2019 2020 2021 2022 2023 2024 Total Emergency Response Projects 1 M 141 100 100 100 100 100 100 741 Kennydale 320-Reservoir 2 D 10,023 500 - - - - - 10,523 Highlands 435-Zone Reservoirs 3 D 15,786 2,400 2,300 - - - - 20,486 Water Main Replacement 4 M 5,408 1,500 1,500 1,500 1,500 1,500 1,500 14,408 Downtown Water Main Improvements 5 M 742 2,000 1,500 1,500 1,500 1,500 1,500 10,242 Telemetry Improvements 6 M 785 250 250 200 200 200 200 2,085 Water System Security 7 M 121 50 50 50 50 50 50 421 Emergency Power to Water Facilities 8 M 685 500 300 300 300 300 300 2,685 WSDOT I-405 Water Relocations 9 M 212 200 100 100 100 100 100 912 Water System Plan Update 10 R 863 100 50 50 50 50 50 1,213 Water Pump Station Rehabilitation 11 M 208 500 400 400 400 400 400 2,708 PRV's Replacement 12 M 223 300 300 300 300 300 300 2,023 Reservoir Recoating 13 M 244 200 200 200 200 200 200 1,444 Highlands Water Main Improvements 14 M 467 300 300 300 300 300 300 2,267 Automatic Meter Reading Conversion 15 M 3,396 50 50 50 50 50 50 3,696 Maplewood Filter Media Replacement 16 M 54 50 50 50 50 50 50 354 Aquifer Monitoring and Management 17 R 91 30 30 30 30 30 30 271 Water Main Oversizing 18 D 121 100 100 100 100 100 100 721 Rainier Ave S Phase 2 Water Main Improvements 19 M 553 - 300 300 - - - 1,153 Total 40,123 9,130 7,880 5,530 5,230 5,230 5,230 78,353 Life to Date Project Resources:Thru 2018 2019 2020 2021 2022 2023 2024 Total General Fund Sources - - - - - - - - Restricted Taxes - - - - - - - - Mitigation Fees - - - - - - - - Bond Proceeds - - - - - - - - Grants/Contributions Awarded - - - - - - - - Grants/Contributions Anticipated - - - - - - - - Fund Balance 40,123 9,130 7,880 5,530 5,230 5,230 5,230 78,353 Total Resources 40,123 9,130 7,880 5,530 5,230 5,230 5,230 78,353 Balance Available / (Unfunded Needs)- - - - - - - - * NOTE: A - Acquisition, C- Cross Category, D - Development, M - Maintenance, P - Planning, R - Regulatory ** Projects under construction and/or with a phase under construction WATER UTILITY CAPITAL INVESTMENT PROGRAM S U M M A R Y B Y C O U N C I L P R I O R I T Y Proposed P r o j e c t e d 2019 through 2024 (in thousands of dollars) Proposed P r o j e c t e d AGENDA ITEM #2. a) 2019/2020 Proposed Budget City of Renton, Washington Priority Number:1 Project Title: Project Category: Maintenance and Preservation Status:Previously Approved Appropriated To-Date 2019 2020 2021 2022 2023 2024 Total Project Expenditures Expenditures Planning/Consultants - - - - - - - - Project Management - - - - - - - - Major Maintenance 141 100 100 100 100 100 100 741 Land Acquisitions - - - - - - - - Construction - - - - - - - - Total Expenditures 141 100 100 100 100 100 100 741 Appropriated To-Date 2019 2020 2021 2022 2023 2024 Total Project Resources Resources General Fund Sources - - - - - - - - Restricted Taxes - - - - - - - - Mitigation Fees - - - - - - - - Bond Proceeds - - - - - - - - Grants/Contributions Awarded - - - - - - - - Grants/Contributions Anticipated - - - - - - - - Fund Balance 141 100 100 100 100 100 100 741 Total Resources 141 100 100 100 100 100 100 741 *Restricted Taxes include REET, Fuel, Utility, and KC Levy funds This program provides funding for the Water Utility to take corrective actions regarding unplanned and minor failures of the water system. These projects will be identified as the need arises. The projects selected will be in support of the city’s goals of promoting public safety and quality of life. WATER UTILITY CAPITAL INVESTMENT PROGRAM 2019 through 2024 (in thousands of dollars) Emergency Response Projects Description and Scope This program provides a reserve fund for the Water utility to respond to emergency events that cause damages or failures of water system infrastructure that are not anticipated as part of the budget process. Unplanned projects or actions resulting from emergencies and unforeseen conditions includes pipe failures, structural damages to water facilities and equipment and water contamination incidents. Rationale AGENDA ITEM #2. a) 2019/2020 Proposed Budget City of Renton, Washington Priority Number:2 Project Title: Project Category: Development Status:Previously Approved Appropriated To-Date 2019 2020 2021 2022 2023 2024 Total Project Expenditures Expenditures Planning/Consultants 1,278 100 - - - - - 1,378 Project Management 145 100 - - - - - 245 Major Maintenance - - - - - - - - Land Acquisitions - - - - - - - - Construction 8,600 300 - - - - - 8,900 Total Expenditures 10,023 500 - - - - - 10,523 Appropriated To-Date 2019 2020 2021 2022 2023 2024 Total Project Resources Resources General Fund Sources - - - - - - - - Restricted Taxes - - - - - - - - Mitigation Fees - - - - - - - - Bond Proceeds - - - - - - - - Grants/Contributions Awarded - - - - - - - - Grants/Contributions Anticipated - - - - - - - - Fund Balance 10,023 500 - - - - - 10,523 Total Resources 10,023 500 - - - - - 10,523 *Restricted Taxes include REET, Fuel, Utility, and KC Levy funds The need for the Kennydale reservoir was identified in both the 2006 and 2012 Water Comprehensive Plans to provide sufficent water storage to accomodate current and future growth in population, development and redevelopment projects in the Kennydale area. This project is in coordination with the city's goals of economic development, public safety and quality of life. WATER UTILITY CAPITAL INVESTMENT PROGRAM 2019 through 2024 (in thousands of dollars) Kennydale 320-Reservoir Description and Scope This project consists of the design and construction of a new 1.3 million-gallon reservoir to be located on City-owned property next to the new Kennydale Fire Station 15. The reservoir will provide operational flexibility of the water system and supply redundancy and reliability. The project also includes the construction of transmission mains and the extension of the City's fiber optic communication network to serve the new fire station and water reservoir. Rationale AGENDA ITEM #2. a) 2019/2020 Proposed Budget City of Renton, Washington Priority Number:3 Project Title: Project Category: Development Status:Previously Approved Appropriated To-Date 2019 2020 2021 2022 2023 2024 Total Project Expenditures Expenditures Planning/Consultants 1,125 500 500 - - - - 2,125 Project Management 134 100 100 - - - - 334 Major Maintenance - - - - - - - - Land Acquisitions - - - - - - - - Construction 14,527 1,800 1,700 - - - - 18,027 Total Expenditures 15,786 2,400 2,300 - - - - 20,486 Appropriated To-Date 2019 2020 2021 2022 2023 2024 Total Project Resources Resources General Fund Sources - - - - - - - - Restricted Taxes - - - - - - - - Mitigation Fees - - - - - - - - Bond Proceeds - - - - - - - - Grants/Contributions Awarded - - - - - - - - Grants/Contributions Anticipated - - - - - - - - Fund Balance 15,786 2,400 2,300 - - - - 20,486 Total Resources 15,786 2,400 2,300 - - - - 20,486 *Restricted Taxes include REET, Fuel, Utility, and KC Levy funds The new and seismic-resilient reservoir will increase water storage capacity for fire protection and for domestic uses and will provide additional capacity to meet water demand from growth in population and in development projects in the Highlands. This project supports the city's goals of promoting public safety and quality of life. WATER UTILITY CAPITAL INVESTMENT PROGRAM 2019 through 2024 (in thousands of dollars) Highlands 435-Zone Reservoirs Description and Scope The existing reservoir has developed leaks and is susceptible to damages during an earthquake event. This project consists of the design and construction of a new 6.3 million-gallon reservoir to replace an existing 60 year old tank. A new pump station with an onsite emergency power generator will also be constructed to replace the old pump station. The improvements include the replacement of approximately one mile of 24-inch and 12-inch diameter transmission water mains in NE 12th Street. Rationale AGENDA ITEM #2. a) 2019/2020 Proposed Budget City of Renton, Washington Priority Number:4 Project Title: Project Category: Maintenance and Preservation Status:Previously Approved Appropriated To-Date 2019 2020 2021 2022 2023 2024 Total Project Expenditures Expenditures Planning/Consultants - - - - - - - - Project Management - - - - - - - - Major Maintenance 5,408 1,500 1,500 1,500 1,500 1,500 1,500 14,408 Land Acquisitions - - - - - - - - Construction - - - - - - - - Total Expenditures 5,408 1,500 1,500 1,500 1,500 1,500 1,500 14,408 Appropriated To-Date 2019 2020 2021 2022 2023 2024 Total Project Resources Resources General Fund Sources - - - - - - - - Restricted Taxes - - - - - - - - Mitigation Fees - - - - - - - - Bond Proceeds - - - - - - - - Grants/Contributions Awarded - - - - - - - - Grants/Contributions Anticipated - - - - - - - - Fund Balance 5,408 1,500 1,500 1,500 1,500 1,500 1,500 14,408 Total Resources 5,408 1,500 1,500 1,500 1,500 1,500 1,500 14,408 *Restricted Taxes include REET, Fuel, Utility, and KC Levy funds This program maintains the target service levels and meets regulatory requirements for water quality and for fire protection. This project supports the city's goals of promoting public safety and quality of life. WATER UTILITY CAPITAL INVESTMENT PROGRAM 2019 through 2024 (in thousands of dollars) Water Main Replacement Description and Scope This program consists of the replacement of aging and undersized cast-iron, steel, and asbestos cement water mains throughout the water distribution system with a targeted replacement rate of 4,000 feet per year. The prioritization and selection of pipes are based on several factors including degree of fire flow deficiency; frequency of leaks and breaks; remaining useful life of the pipes; and coordination with other construction projects such as scheduled street overlays. This program reduces the likelihood of system failures, unplanned service interruptions and claims for damages against the City. Rationale AGENDA ITEM #2. a) 2019/2020 Proposed Budget City of Renton, Washington Priority Number:5 Project Title: Project Category: Maintenance and Preservation Status:Previously Approved Appropriated To-Date 2019 2020 2021 2022 2023 2024 Total Project Expenditures Expenditures Planning/Consultants - - - - - - - - Project Management - - - - - - - - Major Maintenance - - - - - - - - Land Acquisitions - - - - - - - - Construction 742 2,000 1,500 1,500 1,500 1,500 1,500 10,242 Total Expenditures 742 2,000 1,500 1,500 1,500 1,500 1,500 10,242 Appropriated To-Date 2019 2020 2021 2022 2023 2024 Total Project Resources Resources General Fund Sources - - - - - - - - Restricted Taxes - - - - - - - - Mitigation Fees - - - - - - - - Bond Proceeds - - - - - - - - Grants/Contributions Awarded - - - - - - - - Grants/Contributions Anticipated - - - - - - - - Fund Balance 742 2,000 1,500 1,500 1,500 1,500 1,500 10,242 Total Resources 742 2,000 1,500 1,500 1,500 1,500 1,500 10,242 *Restricted Taxes include REET, Fuel, Utility, and KC Levy funds This program reduces the likelihood of system failures, unplanned service interruptions and claims for damages against the City. This project was identified as a city priority to assist in revitalizing the downtown area. This project is in coordination with the city's goals of economic development, public safety and quality of life. WATER UTILITY CAPITAL INVESTMENT PROGRAM 2019 through 2024 (in thousands of dollars) Downtown Water Main Improvements Description and Scope This program consists of the replacement of old and undersized water mains in downtown Renton with larger water mains to provide fire flow capacity for development and redevelopment projects in the downtown area. The prioritization and selection of pipes are based on several factors including degree of fire flow deficiency; frequency of leaks and breaks; remaining useful life of the pipes; and coordination with other construction projects such as scheduled street overlays. This program reduces the likelihood of system failures, unplanned service interruptions and claims for damages against the City. Rationale AGENDA ITEM #2. a) 2019/2020 Proposed Budget City of Renton, Washington Priority Number:6 Project Title: Project Category: Maintenance and Preservation Status:Previously Approved Appropriated To-Date 2019 2020 2021 2022 2023 2024 Total Project Expenditures Expenditures Planning/Consultants - - - - - - - - Project Management - - - - - - - - Major Maintenance 785 250 250 200 200 200 200 2,085 Land Acquisitions - - - - - - - - Construction - - - - - - - - Total Expenditures 785 250 250 200 200 200 200 2,085 Appropriated To-Date 2019 2020 2021 2022 2023 2024 Total Project Resources Resources General Fund Sources - - - - - - - - Restricted Taxes - - - - - - - - Mitigation Fees - - - - - - - - Bond Proceeds - - - - - - - - Grants/Contributions Awarded - - - - - - - - Grants/Contributions Anticipated - - - - - - - - Fund Balance 785 250 250 200 200 200 200 2,085 Total Resources 785 250 250 200 200 200 200 2,085 *Restricted Taxes include REET, Fuel, Utility, and KC Levy funds Upgrades to the telemetry equipment, hardware and software are needed to operate and maintain the water system and to prevent failures or interruption of communication between all water facilites and the master telemetry system. This project supports the city's goals of promoting public safety and quality of life. WATER UTILITY CAPITAL INVESTMENT PROGRAM 2019 through 2024 (in thousands of dollars) Telemetry Improvements Description and Scope This project consists of the systematic replacement and upgrades of the telemetry system needed to operate the City's water system. The project includes the design, reconfiguration, programming, installation of hardware and software and functional testing of the telemetry system at various water facilities and at the City's operation and maintenance headquarters. The project also includes the installation of conduits and fiber optic cables for communication between the remote telemetry units at all water facilities with the City's master telemetry unit. Rationale AGENDA ITEM #2. a) 2019/2020 Proposed Budget City of Renton, Washington Priority Number:7 Project Title: Project Category: Maintenance and Preservation Status:Previously Approved Appropriated To-Date 2019 2020 2021 2022 2023 2024 Total Project Expenditures Expenditures Planning/Consultants - - - - - - - - Project Management - - - - - - - - Major Maintenance 121 50 50 50 50 50 50 421 Land Acquisitions - - - - - - - - Construction - - - - - - - - Total Expenditures 121 50 50 50 50 50 50 421 Appropriated To-Date 2019 2020 2021 2022 2023 2024 Total Project Resources Resources General Fund Sources - - - - - - - - Restricted Taxes - - - - - - - - Mitigation Fees - - - - - - - - Bond Proceeds - - - - - - - - Grants/Contributions Awarded - - - - - - - - Grants/Contributions Anticipated - - - - - - - - Fund Balance 121 50 50 50 50 50 50 421 Total Resources 121 50 50 50 50 50 50 421 *Restricted Taxes include REET, Fuel, Utility, and KC Levy funds This program provides safety measures to prevent security breaches that can damage water facilities or compromise the operation of the water system. This project supports the city's goals of promoting public safety and quality of life. WATER UTILITY CAPITAL INVESTMENT PROGRAM 2019 through 2024 (in thousands of dollars) Water System Security Description and Scope This project consists of the planning, design and installation of security improvements on existing water facilities based on the findings and recommendations of the security vulnerability assessment of the City's water system. Rationale AGENDA ITEM #2. a) 2019/2020 Proposed Budget City of Renton, Washington Priority Number:8 Project Title: Project Category: Maintenance and Preservation Status:Previously Approved Appropriated To-Date 2019 2020 2021 2022 2023 2024 Total Project Expenditures Expenditures Planning/Consultants - - - - - - - - Project Management - - - - - - - - Major Maintenance 685 500 300 300 300 300 300 2,685 Land Acquisitions - - - - - - - - Construction - - - - - - - - Total Expenditures 685 500 300 300 300 300 300 2,685 Appropriated To-Date 2019 2020 2021 2022 2023 2024 Total Project Resources Resources General Fund Sources - - - - - - - - Restricted Taxes - - - - - - - - Mitigation Fees - - - - - - - - Bond Proceeds - - - - - - - - Grants/Contributions Awarded - - - - - - - - Grants/Contributions Anticipated - - - - - - - - Fund Balance 685 500 300 300 300 300 300 2,685 Total Resources 685 500 300 300 300 300 300 2,685 *Restricted Taxes include REET, Fuel, Utility, and KC Levy funds Emergency generators are needed to provide power supply to operate the city's water facilities during periods of commercial power outage and in emergency events. This project supports the city's goals of promoting public safety and quality of life. WATER UTILITY CAPITAL INVESTMENT PROGRAM 2019 through 2024 (in thousands of dollars) Emergency Power to Water Facilities Description and Scope This project consists of the design, purchase and installation of on-site emergency power generators to the city's water pump stations, well pumps and water treatment facilities. Rationale AGENDA ITEM #2. a) 2019/2020 Proposed Budget City of Renton, Washington Priority Number:9 Project Title:WSDOT I-405 Water Relocations Project Category: Maintenance and Preservation Status:Previously Approved Appropriated To-Date 2019 2020 2021 2022 2023 2024 Total Project Expenditures Expenditures Planning/Consultants - - - - - - - - Project Management - - - - - - - - Major Maintenance 212 200 100 100 100 100 100 912 Land Acquisitions - - - - - - - - Construction - - - - - - - - Total Expenditures 212 200 100 100 100 100 100 912 Appropriated To-Date 2019 2020 2021 2022 2023 2024 Total Project Resources Resources General Fund Sources - - - - - - - - Restricted Taxes - - - - - - - - Mitigation Fees - - - - - - - - Bond Proceeds - - - - - - - - Grants/Contributions Awarded - - - - - - - - Grants/Contributions Anticipated - - - - - - - - Fund Balance 212 200 100 100 100 100 100 912 Total Resources 212 200 100 100 100 100 100 912 *Restricted Taxes include REET, Fuel, Utility, and KC Levy funds The City of Renton is legally obligated under franchise permits from the state to relocate its water mains to accommodate the state's project. This project supports the city's goals of promoting public safety and quality of life. WATER UTILITY CAPITAL INVESTMENT PROGRAM 2019 through 2024 (in thousands of dollars) Description and Scope This program consists of the relocation of existing city water mains within the state's right-of-way to accommodate WSDOT's I-405 Renton to Bellevue corridor widening and express toll lanes project. Rationale AGENDA ITEM #2. a) 2019/2020 Proposed Budget City of Renton, Washington Priority Number:10 Project Title: Project Category: Regulatory Status:Previously Approved Appropriated To-Date 2019 2020 2021 2022 2023 2024 Total Project Expenditures Expenditures Planning/Consultants 863 100 50 50 50 50 50 1,213 Project Management - - - - - - - - Major Maintenance - - - - - - - - Land Acquisitions - - - - - - - - Construction - - - - - - - - Total Expenditures 863 100 50 50 50 50 50 1,213 Appropriated To-Date 2019 2020 2021 2022 2023 2024 Total Project Resources Resources General Fund Sources - - - - - - - - Restricted Taxes - - - - - - - - Mitigation Fees - - - - - - - - Bond Proceeds - - - - - - - - Grants/Contributions Awarded - - - - - - - - Grants/Contributions Anticipated - - - - - - - - Fund Balance 863 100 50 50 50 50 50 1,213 Total Resources 863 100 50 50 50 50 50 1,213 *Restricted Taxes include REET, Fuel, Utility, and KC Levy funds This update is a regulatory requirement. This plan supports the city's goals of promoting public safety and quality of life. WATER UTILITY CAPITAL INVESTMENT PROGRAM 2019 through 2024 (in thousands of dollars) Water System Plan Update Description and Scope This project consists of the update of the Water System Comprehensive Plan in accordance to the Department of Health’s requirements. The purpose of the water system plan is to present recommended facility improvements and policy criteria to be used to maintain and operate a potable municipal water supply system that is adequate, safe and reliable. The next update of the 10-year water system plan is due by September 2019. Rationale AGENDA ITEM #2. a) 2019/2020 Proposed Budget City of Renton, Washington Priority Number:11 Project Title: Project Category: Maintenance and Preservation Status:Previously Approved Appropriated To-Date 2019 2020 2021 2022 2023 2024 Total Project Expenditures Expenditures Planning/Consultants - - - - - - - - Project Management - - - - - - - - Major Maintenance 208 500 400 400 400 400 400 2,708 Land Acquisitions - - - - - - - - Construction - - - - - - - - Total Expenditures 208 500 400 400 400 400 400 2,708 Appropriated To-Date 2019 2020 2021 2022 2023 2024 Total Project Resources Resources General Fund Sources - - - - - - - - Restricted Taxes - - - - - - - - Mitigation Fees - - - - - - - - Bond Proceeds - - - - - - - - Grants/Contributions Awarded - - - - - - - - Grants/Contributions Anticipated - - - - - - - - Fund Balance 208 500 400 400 400 400 400 2,708 Total Resources 208 500 400 400 400 400 400 2,708 *Restricted Taxes include REET, Fuel, Utility, and KC Levy funds This program reduces the likelihood of failures of water pump stations and unplanned service interruptions for fire protection and for domestic uses. This project supports the city's goals of promoting public safety and quality of life. WATER UTILITY CAPITAL INVESTMENT PROGRAM 2019 through 2024 (in thousands of dollars) Water Pump Station Rehabilitation Description and Scope This program consists of the design and construction for the rehabilitation of the City’s twelve water pump stations to extend the useful life of the stations. The rehabilitation work includes replacing mechanical and electrical equipment and resolving building structural deficiencies and life/safety issues as needed. Rationale AGENDA ITEM #2. a) 2019/2020 Proposed Budget City of Renton, Washington Priority Number:12 Project Title: Project Category: Maintenance and Preservation Status:Previously Approved Appropriated To-Date 2019 2020 2021 2022 2023 2024 Total Project Expenditures Expenditures Planning/Consultants - - - - - - - - Project Management - - - - - - - - Major Maintenance 223 300 300 300 300 300 300 2,023 Land Acquisitions - - - - - - - - Construction - - - - - - - - Total Expenditures 223 300 300 300 300 300 300 2,023 Appropriated To-Date 2019 2020 2021 2022 2023 2024 Total Project Resources Resources General Fund Sources - - - - - - - - Restricted Taxes - - - - - - - - Mitigation Fees - - - - - - - - Bond Proceeds - - - - - - - - Grants/Contributions Awarded - - - - - - - - Grants/Contributions Anticipated - - - - - - - - Fund Balance 223 300 300 300 300 300 300 2,023 Total Resources 223 300 300 300 300 300 300 2,023 *Restricted Taxes include REET, Fuel, Utility, and KC Levy funds This program reduces the likelihood of water system failures, unplanned service interruptions and damage claims to the City of Renton. The selected PRV's will be chosen based on the prioritized need. This project supports the city’s goals of promoting public safety and quality of life. WATER UTILITY CAPITAL INVESTMENT PROGRAM 2019 through 2024 (in thousands of dollars) PRV's Replacement Description and Scope This program consists of the rehabilitation and replacement of old pressure reducing valves (PRV's) throughout the water distribution system. Safety improvements, PRV meters, and telemetry improvements are included as part of the PRV's rehabilitation. The timely repair and replacement of old water system assets reduces operation and maintenance costs and extends the useful life of the assets. Rationale AGENDA ITEM #2. a) 2019/2020 Proposed Budget City of Renton, Washington Priority Number:13 Project Title: Project Category: Maintenance and Preservation Status:Previously Approved Appropriated To-Date 2019 2020 2021 2022 2023 2024 Total Project Expenditures Expenditures Planning/Consultants - - - - - - - - Project Management - - - - - - - - Major Maintenance 244 200 200 200 200 200 200 1,444 Land Acquisitions - - - - - - - - Construction - - - - - - - - Total Expenditures 244 200 200 200 200 200 200 1,444 Appropriated To-Date 2019 2020 2021 2022 2023 2024 Total Project Resources Resources General Fund Sources - - - - - - - - Restricted Taxes - - - - - - - - Mitigation Fees - - - - - - - - Bond Proceeds - - - - - - - - Grants/Contributions Awarded - - - - - - - - Grants/Contributions Anticipated - - - - - - - - Fund Balance 244 200 200 200 200 200 200 1,444 Total Resources 244 200 200 200 200 200 200 1,444 *Restricted Taxes include REET, Fuel, Utility, and KC Levy funds This program extends the useful life of existing water reservoirs, reduces maintenance cost and meets the target service level. This project supports the city's goals of promoting public safety and quality of life. WATER UTILITY CAPITAL INVESTMENT PROGRAM 2019 through 2024 (in thousands of dollars) Reservoir Recoating Description and Scope This program consists of the design and construction for the recoating of the interior and exterior surfaces of the existing steel water reservoirs for protection from corrosion and to extend the useful life of the structures. The project also includes the design and installation of seismic upgrade and retrofit, safety features and security upgrades. Rationale AGENDA ITEM #2. a) 2019/2020 Proposed Budget City of Renton, Washington Priority Number:14 Project Title: Project Category: Maintenance and Preservation Status:Previously Approved Appropriated To-Date 2019 2020 2021 2022 2023 2024 Total Project Expenditures Expenditures Planning/Consultants - - - - - - - - Project Management - - - - - - - - Major Maintenance 467 300 300 300 300 300 300 2,267 Land Acquisitions - - - - - - - - Construction - - - - - - - - Total Expenditures 467 300 300 300 300 300 300 2,267 Appropriated To-Date 2019 2020 2021 2022 2023 2024 Total Project Resources Resources General Fund Sources - - - - - - - - Restricted Taxes - - - - - - - - Mitigation Fees - - - - - - - - Bond Proceeds - - - - - - - - Grants/Contributions Awarded - - - - - - - - Grants/Contributions Anticipated - - - - - - - - Fund Balance 467 300 300 300 300 300 300 2,267 Total Resources 467 300 300 300 300 300 300 2,267 *Restricted Taxes include REET, Fuel, Utility, and KC Levy funds This project was identified as a city priority to assist in revitalizing the Highlands area. This project is in coordination with the city's goals of economic development, public safety and quality of life. WATER UTILITY CAPITAL INVESTMENT PROGRAM 2019 through 2024 (in thousands of dollars) Highlands Water Main Improvements Description and Scope This program consists of the design and construction of the replacement of old and undersized water mains in the Renton Highlands with larger water mains to provide fire flow capacity for development and redevelopment projects in the Highlands area. This program reduces the likelihood of system failures, unplanned service interruptions, and claims for damages against the City of Renton. Rationale AGENDA ITEM #2. a) 2019/2020 Proposed Budget City of Renton, Washington Priority Number:15 Project Title: Project Category: Maintenance and Preservation Status:Previously Approved Appropriated To-Date 2019 2020 2021 2022 2023 2024 Total Project Expenditures Expenditures Planning/Consultants - - - - - - - - Project Management - - - - - - - - Major Maintenance 3,396 50 50 50 50 50 50 3,696 Land Acquisitions - - - - - - - - Construction - - - - - - - - Total Expenditures 3,396 50 50 50 50 50 50 3,696 Appropriated To-Date 2019 2020 2021 2022 2023 2024 Total Project Resources Resources General Fund Sources - - - - - - - - Restricted Taxes - - - - - - - - Mitigation Fees - - - - - - - - Bond Proceeds - - - - - - - - Grants/Contributions Awarded - - - - - - - - Grants/Contributions Anticipated - - - - - - - - Fund Balance 3,396 50 50 50 50 50 50 3,696 Total Resources 3,396 50 50 50 50 50 50 3,696 *Restricted Taxes include REET, Fuel, Utility, and KC Levy funds Due to the aging computer server the AMI system needs to be replaced. This project supports the city's goals of promoting public safety and quality of life. WATER UTILITY CAPITAL INVESTMENT PROGRAM 2019 through 2024 (in thousands of dollars) Automatic Meter Reading Conversion Description and Scope This program consists of the replacement of the existing computer server, software and hardware for the operation the Advanced Metering Infrastructure (AMI) system that is used to read the existing 18,000 City water meters. The existing server for the AMI runs on a system that is no longer supported by Microsoft. The Advanced Metering Infrastructure system improves meter reading efficiency, captures water usage data, enhances water conservation activities including leak detection, and provides timely, accurate billing and water usage information to our customers. Rationale AGENDA ITEM #2. a) 2019/2020 Proposed Budget City of Renton, Washington Priority Number:16 Project Title: Project Category: Maintenance and Preservation Status:Previously Approved Appropriated To-Date 2019 2020 2021 2022 2023 2024 Total Project Expenditures Expenditures Planning/Consultants - - - - - - - - Project Management - - - - - - - - Major Maintenance 54 50 50 50 50 50 50 354 Land Acquisitions - - - - - - - - Construction - - - - - - - - Total Expenditures 54 50 50 50 50 50 50 354 Appropriated To-Date 2019 2020 2021 2022 2023 2024 Total Project Resources Resources General Fund Sources - - - - - - - - Restricted Taxes - - - - - - - - Mitigation Fees - - - - - - - - Bond Proceeds - - - - - - - - Grants/Contributions Awarded - - - - - - - - Grants/Contributions Anticipated - - - - - - - - Fund Balance 54 50 50 50 50 50 50 354 Total Resources 54 50 50 50 50 50 50 354 *Restricted Taxes include REET, Fuel, Utility, and KC Levy funds The replacement of the filter media used for water treatment is needed to maintain and provide drinking water quality that meets regulatory requirements. This project supports the city's goals of promoting public safety and quality of life. WATER UTILITY CAPITAL INVESTMENT PROGRAM 2019 through 2024 (in thousands of dollars) Maplewood Filter Media Replacement Description and Scope This program consists of the scheduled replacement of the two filter media, greensand and granular activated carbon media, used at the city's Maplewood Water Treatment Facility. The filter media needs to be replaced about every seven years. Rationale AGENDA ITEM #2. a) 2019/2020 Proposed Budget City of Renton, Washington Priority Number:17 Project Title: Project Category: Regulatory Status:Extension of Previously Approved Project Appropriated To-Date 2019 2020 2021 2022 2023 2024 Total Project Expenditures Expenditures Planning/Consultants - - - - - - - - Project Management - - - - - - - - Major Maintenance 91 30 30 30 30 30 30 271 Land Acquisitions - - - - - - - - Construction - - - - - - - - Total Expenditures 91 30 30 30 30 30 30 271 Appropriated To-Date 2019 2020 2021 2022 2023 2024 Total Project Resources Resources General Fund Sources - - - - - - - - Restricted Taxes - - - - - - - - Mitigation Fees - - - - - - - - Bond Proceeds - - - - - - - - Grants/Contributions Awarded - - - - - - - - Grants/Contributions Anticipated - - - - - - - - Fund Balance 91 30 30 30 30 30 30 271 Total Resources 91 30 30 30 30 30 30 271 *Restricted Taxes include REET, Fuel, Utility, and KC Levy funds This program meets the regulatory requirements for water monitoring wells to maintain the city's drinking water quality. This project supports the city's goals of promoting public safety and quality of life. WATER UTILITY CAPITAL INVESTMENT PROGRAM 2019 through 2024 (in thousands of dollars) Aquifer Monitoring and Management Description and Scope This program consists of the repair and improvements to the City's water monitoring wells that are used for early detection of contaminants entering the groundwater supply before they reach the production wells. This program reduces the risk of potential contamination of the City's drinking water supply wells from unauthorized releases of hazardous chemicals or from accidental chemical spills that can impact the drinking water quality of the city's water supply wells. The project includes the installation of submersible pumps in the monitoring wells for collection of water samples. Rationale AGENDA ITEM #2. a) 2019/2020 Proposed Budget City of Renton, Washington Priority Number:18 Project Title: Project Category: Development Status:Previously Approved Appropriated To-Date 2019 2020 2021 2022 2023 2024 Total Project Expenditures Expenditures Planning/Consultants - - - - - - - - Project Management - - - - - - - - Major Maintenance - - - - - - - - Land Acquisitions - - - - - - - - Construction 121 100 100 100 100 100 100 721 Total Expenditures 121 100 100 100 100 100 100 721 Appropriated To-Date 2019 2020 2021 2022 2023 2024 Total Project Resources Resources General Fund Sources - - - - - - - - Restricted Taxes - - - - - - - - Mitigation Fees - - - - - - - - Bond Proceeds - - - - - - - - Grants/Contributions Awarded - - - - - - - - Grants/Contributions Anticipated - - - - - - - - Fund Balance 121 100 100 100 100 100 100 721 Total Resources 121 100 100 100 100 100 100 721 *Restricted Taxes include REET, Fuel, Utility, and KC Levy funds This program provides equitable cost compensation to private developers who are required by the Water Utility to upsize new water main extensions to meet the city's long-term planning needs. This project is in coordination with the city's goals of economic development, public safety and quality of life. WATER UTILITY CAPITAL INVESTMENT PROGRAM 2019 through 2024 (in thousands of dollars) Water Main Oversizing Description and Scope This program consists of the city's cost-sharing and/or reimbursement to private developers for the installation of larger size water mains than what would normally be required to serve the properties being developed. The Water Utility requires the oversizing of the water mains in designated mixed-used, commercial and industrial areas, to meet the requirements of the city's Comprehensive Land Use Plan and Water System Plan. Rationale AGENDA ITEM #2. a) 2019/2020 Proposed Budget City of Renton, Washington Priority Number:19 Project Title:Rainier Ave S Phase 2 Water Main Improvements Project Category: Maintenance and Preservation Status:Extension of Previously Approved Project Appropriated To-Date 2019 2020 2021 2022 2023 2024 Total Project Expenditures Expenditures Planning/Consultants - - - - - - - - Project Management - - - - - - - - Major Maintenance 553 - 300 300 - - - 1,153 Land Acquisitions - - - - - - - - Construction - - - - - - - - Total Expenditures 553 - 300 300 - - - 1,153 Appropriated To-Date 2019 2020 2021 2022 2023 2024 Total Project Resources Resources General Fund Sources - - - - - - - - Restricted Taxes - - - - - - - - Mitigation Fees - - - - - - - - Bond Proceeds - - - - - - - - Grants/Contributions Awarded - - - - - - - - Grants/Contributions Anticipated - - - - - - - - Fund Balance 553 - 300 300 - - - 1,153 Total Resources 553 - 300 300 - - - 1,153 *Restricted Taxes include REET, Fuel, Utility, and KC Levy funds This project was identified as a city priority to assist in revitalizing the Rainier Avenue corridor. This project is in coordination with the city's goals of economic development, public safety and quality of life. WATER UTILITY CAPITAL INVESTMENT PROGRAM 2019 through 2024 (in thousands of dollars) Description and Scope This project consists of the relocation and replacement of existing water mains in Rainier Avenue South with new and larger size water mains as part of the city's transportation improvements and widening of the Phase 2 of Rainier Avenue South corridor. The project will increase the water system capacity for fire protection for existing properties and for future development and redevelopment projects along the Rainier Avenue corridor. This program reduces the likelihood of system failures, unplanned service interruptions and claims for damages against the City of Renton. Rationale AGENDA ITEM #2. a) 2019/2020 Proposed Budget City of Renton, Washington Life to Date Project Projects Priority Type*Thru 2018 2019 2020 2021 2022 2023 2024 Total Kennydale Lakeline Sewer Upgrade 1 M - 1,700 1,700 - - - - 3,400 Downtown Sewer Replacement/Rehabilitation 2 C 3,000 2,000 - - - - - 5,000 Lift Station Rehabilitation 3 M 968 900 900 - - - - 2,768 Forcemain Rehab/Replacement 4 M 1,478 400 400 - - - - 2,278 2019 Sanitary Sewer Main Repl / Rehab 5 M - 1,500 - - - - - 1,500 2020 Sanitary Sewer Main Repl / Rehab 6 M - - 1,500 - - - - 1,500 Miscellaneous/ Emergency Projects 7 M 756 200 200 200 200 200 200 1,956 Wastewater Operations Master Plan 8 R - 300 - - - - - 300 Sewer Capacity Improvements 2021 - 2024 9 D - - - 2,000 2,000 2,000 2,000 8,000 2021 Sanitary Sewer Main Repl / Rehab 10 M - - - 2,000 - - - 2,000 2022 Sanitary Sewer Main Repl/Rehab 11 M - - - - 2,000 - - 2,000 2023 Sanitary Sewer Main Repl / Rehab 12 M - - - - - 2,000 - 2,000 2024 Sanitary Sewer Main Repl / Rehab 13 M - - - - - - 2,000 2,000 Sanitary Sewer Hydraulic Model 14 M - - - 300 300 - - 600 Telemetry Upgrade 15 M - - - - - 300 - 300 Long Range Wastewater Management Plan 16 R 384 - - - - - 300 684 Total 6,586 7,000 4,700 4,500 4,500 4,500 4,500 36,286 Life to Date Project Resources:Thru 2018 2019 2020 2021 2022 2023 2024 Total General Fund Sources - - - - - - - - Restricted Taxes - - - - - - - - Mitigation Fees - - - - - - - - Bond Proceeds - - - - - - - - Grants/Contributions Awarded - - - - - - - - Grants/Contributions Anticipated - - - - - - - - Fund Balance 6,586 7,000 4,700 4,500 4,500 4,500 4,500 36,286 Total Resources 6,586 7,000 4,700 4,500 4,500 4,500 4,500 36,286 Balance Available / (Unfunded Needs)- - - - - - - - * NOTE: A - Acquisition, C- Cross Category, D - Development, M - Maintenance, P - Planning, R - Regulatory ** Projects under construction and/or with a phase under construction WASTEWATER UTILITY CAPITAL INVESTMENT PROGRAM S U M M A R Y B Y C O U N C I L P R I O R I T Y Proposed P r o j e c t e d 2019 through 2024 (in thousands of dollars) Proposed P r o j e c t e d AGENDA ITEM #2. a) 2019/2020 Proposed Budget City of Renton, Washington Priority Number:1 Project Title: Project Category: Maintenance and Preservation Status:Previosuly Approved Appropriated To-Date 2019 2020 2021 2022 2023 2024 Total Project Expenditures Expenditures Planning/Consultants - - - - - - - - Project Management - - - - - - - - Major Maintenance - 1,700 1,700 - - - - 3,400 Land Acquisitions - - - - - - - - Construction - - - - - - - - Total Expenditures - 1,700 1,700 - - - - 3,400 Appropriated To-Date 2019 2020 2021 2022 2023 2024 Total Project Resources Resources General Fund Sources - - - - - - - - Restricted Taxes - - - - - - - - Mitigation Fees - - - - - - - - Bond Proceeds - - - - - - - - Grants/Contributions Awarded - - - - - - - - Grants/Contributions Anticipated - - - - - - - - Fund Balance - 1,700 1,700 - - - - 3,400 Total Resources - 1,700 1,700 - - - - 3,400 *Restricted Taxes include REET, Fuel, Utility, and KC Levy funds Due to the aging Kennydale Lakeline Sewer System the sewer needs to be upgraded. This project supports the city's goals of promoting public safety and quality of life. WASTEWATER UTILITY CAPITAL INVESTMENT PROGRAM 2019 through 2024 (in thousands of dollars) Kennydale Lakeline Sewer Upgrade Description and Scope The Kennydale Lakeline Sewer consists of over 5,200 linear feet of 8-inch sewer main, 31 laterals, a flush station at its south end, and Lake Washington No. 2 Lift Station at its north end. Project work anticipated will be repairs/rehabilitation of the sewer main and laterals and full replacement of the flush station and lift station. In 2018 analysis of the Lakeline was completed including a full cleaning of the the sewer main. Rationale AGENDA ITEM #2. a) 2019/2020 Proposed Budget City of Renton, Washington Priority Number:2 Project Title: Project Category: Cross-Category Status:Previously Approved Appropriated To-Date 2019 2020 2021 2022 2023 2024 Total Project Expenditures Expenditures Planning/Consultants - - - - - - - - Project Management - - - - - - - - Major Maintenance 3,000 2,000 - - - - - 5,000 Land Acquisitions - - - - - - - - Construction - - - - - - - - Total Expenditures 3,000 2,000 - - - - - 5,000 Appropriated To-Date 2019 2020 2021 2022 2023 2024 Total Project Resources Resources General Fund Sources - - - - - - - - Restricted Taxes - - - - - - - - Mitigation Fees - - - - - - - - Bond Proceeds - - - - - - - - Grants/Contributions Awarded - - - - - - - - Grants/Contributions Anticipated - - - - - - - - Fund Balance 3,000 2,000 - - - - - 5,000 Total Resources 3,000 2,000 - - - - - 5,000 *Restricted Taxes include REET, Fuel, Utility, and KC Levy funds This project was identified as a city priority to assist in revitalizing the downtown area. This project is in coordination with the city's goals of economic development, public safety and quality of life. WASTEWATER UTILITY CAPITAL INVESTMENT PROGRAM 2019 through 2024 (in thousands of dollars) Downtown Sewer Replacement/Rehabilitatio Description and Scope Replace and rehabilitate the existing sanitary sewer mains in the Downtown Area associated with the proposed one-way to two- way conversion of S. 2nd Street and S. Third Street. The project consists of the installation or rehabilitation of approximately 7,300 linear feet of 8-inch to 15-inch sewer main. The project will give the Wastewater Utility the opportunity to correct capacity issues and portions of our system with inadequate slopes and sags. Design is proposed to occur in 2018/19, with construction to be completed in 2019/20. Rationale AGENDA ITEM #2. a) 2019/2020 Proposed Budget City of Renton, Washington Priority Number:3 Project Title: Project Category: Maintenance and Preservation Status:Previously Approved Appropriated To-Date 2019 2020 2021 2022 2023 2024 Total Project Expenditures Expenditures Planning/Consultants - - - - - - - - Project Management - - - - - - - - Major Maintenance 968 900 900 - - - - 2,768 Land Acquisitions - - - - - - - - Construction - - - - - - - - Total Expenditures 968 900 900 - - - - 2,768 Appropriated To-Date 2019 2020 2021 2022 2023 2024 Total Project Resources Resources General Fund Sources - - - - - - - - Restricted Taxes - - - - - - - - Mitigation Fees - - - - - - - - Bond Proceeds - - - - - - - - Grants/Contributions Awarded - - - - - - - - Grants/Contributions Anticipated - - - - - - - - Fund Balance 968 900 900 - - - - 2,768 Total Resources 968 900 900 - - - - 2,768 *Restricted Taxes include REET, Fuel, Utility, and KC Levy funds The individual lift stations will be chosen based on the prioritized need to rehabilitate the lift stations. This project supports the city’s goals of promoting public safety and quality of life. WASTEWATER UTILITY CAPITAL INVESTMENT PROGRAM 2019 through 2024 (in thousands of dollars) Lift Station Rehabilitation Description and Scope The Wastewater Utility operates 22 lift stations throughout the City. Over the past 25-years we will have replaced, rehabilitated, or eliminated all of our previous 25 lift stations. At this point, we can now go into a maintenance/rehabilitation phase for each of the stations. In 2016, we completed the process of evaluating the needs for each station. In 2017 we began the rehabilitation of stations. The second phase stations will be completed in 2019/20. Rationale AGENDA ITEM #2. a) 2019/2020 Proposed Budget City of Renton, Washington Priority Number:4 Project Title: Project Category: Maintenance and Preservation Status:Previously Approved Appropriated To-Date 2019 2020 2021 2022 2023 2024 Total Project Expenditures Expenditures Planning/Consultants - - - - - - - - Project Management - - - - - - - - Major Maintenance 1,478 400 400 - - - - 2,278 Land Acquisitions - - - - - - - - Construction - - - - - - - - Total Expenditures 1,478 400 400 - - - - 2,278 Appropriated To-Date 2019 2020 2021 2022 2023 2024 Total Project Resources Resources General Fund Sources - - - - - - - - Restricted Taxes - - - - - - - - Mitigation Fees - - - - - - - - Bond Proceeds - - - - - - - - Grants/Contributions Awarded - - - - - - - - Grants/Contributions Anticipated - - - - - - - - Fund Balance 1,478 400 400 - - - - 2,278 Total Resources 1,478 400 400 - - - - 2,278 *Restricted Taxes include REET, Fuel, Utility, and KC Levy funds This program will replace/rehabilitate the forcemains identified in 2016, starting with those in the highest need first. This project supports the city's goals of promoting public safety and quality of life. WASTEWATER UTILITY CAPITAL INVESTMENT PROGRAM 2019 through 2024 (in thousands of dollars) Forcemain Rehab/Replacement Description and Scope The Wastewater Utility operates 22 sewage lift stations that each have their own forcemain that delivers the flows to the gravity system. While many of the lift stations have been either rehabilitated or replaced, their forcemains often times were not. In 2016 we completed our force main evalauation that prioritized the forcemains. We started to replace and rehabilitate the forcemains indentified in the study in 2016. We expect to be completed with this project in 2020. Rationale AGENDA ITEM #2. a) 2019/2020 Proposed Budget City of Renton, Washington Priority Number:5 Project Title: Project Category: Maintenance and Preservation Status:Previously Approved Appropriated To-Date 2019 2020 2021 2022 2023 2024 Total Project Expenditures Expenditures Planning/Consultants - - - - - - - - Project Management - - - - - - - - Major Maintenance - 1,500 - - - - - 1,500 Land Acquisitions - - - - - - - - Construction - - - - - - - - Total Expenditures - 1,500 - - - - - 1,500 Appropriated To-Date 2019 2020 2021 2022 2023 2024 Total Project Resources Resources General Fund Sources - - - - - - - - Restricted Taxes - - - - - - - - Mitigation Fees - - - - - - - - Bond Proceeds - - - - - - - - Grants/Contributions Awarded - - - - - - - - Grants/Contributions Anticipated - - - - - - - - Fund Balance - 1,500 - - - - - 1,500 Total Resources - 1,500 - - - - - 1,500 *Restricted Taxes include REET, Fuel, Utility, and KC Levy funds The individual projects will be identified based on the need to either repair, rehabilitate or replace the sewer mains. The projects selected will be in support of the city’s goals of promoting public safety and quality of life. WASTEWATER UTILITY CAPITAL INVESTMENT PROGRAM 2019 through 2024 (in thousands of dollars) 2019 Sanitary Sewer Main Repl / Rehab Description and Scope This is an annual program the Wastewater Utility will perform to identify and through either repair, rehabilitation, or replacement those portions of our sewer pipe system that needs to be brought up to current standards. The program will be city-wide and may consist of individual projects. Design and construction are anticipated to be completed in 2019. Rationale AGENDA ITEM #2. a) 2019/2020 Proposed Budget City of Renton, Washington Priority Number:6 Project Title: Project Category: Maintenance and Preservation Status:Previously Approved Appropriated To-Date 2019 2020 2021 2022 2023 2024 Total Project Expenditures Expenditures Planning/Consultants - - - - - - - - Project Management - - - - - - - - Major Maintenance - - 1,500 - - - - 1,500 Land Acquisitions - - - - - - - - Construction - - - - - - - - Total Expenditures - - 1,500 - - - - 1,500 Appropriated To-Date 2019 2020 2021 2022 2023 2024 Total Project Resources Resources General Fund Sources - - - - - - - - Restricted Taxes - - - - - - - - Mitigation Fees - - - - - - - - Bond Proceeds - - - - - - - - Grants/Contributions Awarded - - - - - - - - Grants/Contributions Anticipated - - - - - - - - Fund Balance - - 1,500 - - - - 1,500 Total Resources - - 1,500 - - - - 1,500 *Restricted Taxes include REET, Fuel, Utility, and KC Levy funds The individual projects will be identified based on the need to either repair, rehabilitate or replace the sewer mains. The projects selected will be in support of the city’s goals of promoting public safety and quality of life. WASTEWATER UTILITY CAPITAL INVESTMENT PROGRAM 2019 through 2024 (in thousands of dollars) 2020 Sanitary Sewer Main Repl / Rehab Description and Scope This is an annual program the Wastewater Utility will perform to identify and through either repair, rehabilitation, or replacement those portions of our sewer pipe system that needs to be brought up to current standards. The program will be city-wide and may consist of individual projects. Design and construction are anticipated to be completed in 2020. Rationale AGENDA ITEM #2. a) 2019/2020 Proposed Budget City of Renton, Washington Priority Number:7 Project Title: Project Category: Maintenance and Preservation Status:Previously Approved Appropriated To-Date 2019 2020 2021 2022 2023 2024 Total Project Expenditures Expenditures Planning/Consultants - - - - - - - - Project Management - - - - - - - - Major Maintenance 756 200 200 200 200 200 200 1,956 Land Acquisitions - - - - - - - - Construction - - - - - - - - Total Expenditures 756 200 200 200 200 200 200 1,956 Appropriated To-Date 2019 2020 2021 2022 2023 2024 Total Project Resources Resources General Fund Sources - - - - - - - - Restricted Taxes - - - - - - - - Mitigation Fees - - - - - - - - Bond Proceeds - - - - - - - - Grants/Contributions Awarded - - - - - - - - Grants/Contributions Anticipated - - - - - - - - Fund Balance 756 200 200 200 200 200 200 1,956 Total Resources 756 200 200 200 200 200 200 1,956 *Restricted Taxes include REET, Fuel, Utility, and KC Levy funds These miscellaneous and emergency projects will be identified as the need arises. The projects selected will be in support of the city’s goals of promoting public safety and quality of life. WASTEWATER UTILITY CAPITAL INVESTMENT PROGRAM 2019 through 2024 (in thousands of dollars) Miscellaneous/ Emergency Projects Description and Scope Funds to allow the Wastewater Utility the ability to address small or emergency projects that are not anticipated as part of the budget process. Rationale AGENDA ITEM #2. a) 2019/2020 Proposed Budget City of Renton, Washington Priority Number:8 Project Title: Project Category: Regulatory Status:Previously Approved Appropriated To-Date 2019 2020 2021 2022 2023 2024 Total Project Expenditures Expenditures Planning/Consultants - - - - - - - - Project Management - - - - - - - - Major Maintenance - 300 - - - - - 300 Land Acquisitions - - - - - - - - Construction - - - - - - - - Total Expenditures - 300 - - - - - 300 Appropriated To-Date 2019 2020 2021 2022 2023 2024 Total Project Resources Resources General Fund Sources - - - - - - - - Restricted Taxes - - - - - - - - Mitigation Fees - - - - - - - - Bond Proceeds - - - - - - - - Grants/Contributions Awarded - - - - - - - - Grants/Contributions Anticipated - - - - - - - - Fund Balance - 300 - - - - - 300 Total Resources - 300 - - - - - 300 *Restricted Taxes include REET, Fuel, Utility, and KC Levy funds This plan supports the city's goals of promoting public safety and quality of life. WASTEWATER UTILITY CAPITAL INVESTMENT PROGRAM 2019 through 2024 (in thousands of dollars) Wastewater Operations Master Plan Description and Scope Continue the development of the Wastewater Operations Master Plan to enable continued improvement for both engineering and maintenance of our system. This phase will increase our ability to identify and address "hot spot" areas in our system to better prevent the potential for sanitary sewer overflows. Wastewater already has a list of these “hot spots” that we address, the updated process will allow us to automate how we monitor each location. Rationale AGENDA ITEM #2. a) 2019/2020 Proposed Budget City of Renton, Washington Priority Number:9 Project Title:Sewer Capacity Improvements 2021 - 2024 Project Category: Development Status:New Request Appropriated To-Date 2019 2020 2021 2022 2023 2024 Total Project Expenditures Expenditures Planning/Consultants - - - - - - - - Project Management - - - - - - - - Major Maintenance - - - 2,000 2,000 2,000 2,000 8,000 Land Acquisitions - - - - - - - - Construction - - - - - - - - Total Expenditures - - - 2,000 2,000 2,000 2,000 8,000 Appropriated To-Date 2019 2020 2021 2022 2023 2024 Total Project Resources Resources General Fund Sources - - - - - - - - Restricted Taxes - - - - - - - - Mitigation Fees - - - - - - - - Bond Proceeds - - - - - - - - Grants/Contributions Awarded - - - - - - - - Grants/Contributions Anticipated - - - - - - - - Fund Balance - - - 2,000 2,000 2,000 2,000 8,000 Total Resources - - - 2,000 2,000 2,000 2,000 8,000 *Restricted Taxes include REET, Fuel, Utility, and KC Levy funds The individual projects will be identified based on the need to increase capacity identified in the Wastewater Management Plan Update project. The projects selected will be in support of the city’s goals of promoting public safety and quality of life. WASTEWATER UTILITY CAPITAL INVESTMENT PROGRAM 2019 through 2024 (in thousands of dollars) Description and Scope System improvements identified, as part of the Wastewater Management Plan Update project, to have capacity restraints that can result in sanitary sewer overflows due to lack of capacity will be prioritized for replacement over this four year period. Analysis and priority of projects are currently being developed as part of the 2018/19 Wastewater Management Plan Update. Rationale AGENDA ITEM #2. a) 2019/2020 Proposed Budget City of Renton, Washington Priority Number:10 Project Title: Project Category: Maintenance and Preservation Status:New Request Appropriated To-Date 2019 2020 2021 2022 2023 2024 Total Project Expenditures Expenditures Planning/Consultants - - - - - - - - Project Management - - - - - - - - Major Maintenance - - - 2,000 - - - 2,000 Land Acquisitions - - - - - - - - Construction - - - - - - - - Total Expenditures - - - 2,000 - - - 2,000 Appropriated To-Date 2019 2020 2021 2022 2023 2024 Total Project Resources Resources General Fund Sources - - - - - - - - Restricted Taxes - - - - - - - - Mitigation Fees - - - - - - - - Bond Proceeds - - - - - - - - Grants/Contributions Awarded - - - - - - - - Grants/Contributions Anticipated - - - - - - - - Fund Balance - - - 2,000 - - - 2,000 Total Resources - - - 2,000 - - - 2,000 *Restricted Taxes include REET, Fuel, Utility, and KC Levy funds The individual projects will be identified based on the need to either repair, rehabilitate or replace the sewer mains. The projects selected will be in support of the city’s goals of promoting public safety and quality of life. WASTEWATER UTILITY CAPITAL INVESTMENT PROGRAM 2019 through 2024 (in thousands of dollars) 2021 Sanitary Sewer Main Repl / Rehab Description and Scope This is an annual program the Wastewater Utility will perform to identify and through either repair, rehabilitation, or replacement those portions of our sewer pipe system that needs to be brought up to current standards. The program will be city-wide and may consist of individual projects. Design and construction are anticipated to be completed in 2021. Rationale AGENDA ITEM #2. a) 2019/2020 Proposed Budget City of Renton, Washington Priority Number:11 Project Title: Project Category: Maintenance and Preservation Status:New Request Appropriated To-Date 2019 2020 2021 2022 2023 2024 Total Project Expenditures Expenditures Planning/Consultants - - - - - - - - Project Management - - - - - - - - Major Maintenance - - - - 2,000 - - 2,000 Land Acquisitions - - - - - - - - Construction - - - - - - - - Total Expenditures - - - - 2,000 - - 2,000 Appropriated To-Date 2019 2020 2021 2022 2023 2024 Total Project Resources Resources General Fund Sources - - - - - - - - Restricted Taxes - - - - - - - - Mitigation Fees - - - - - - - - Bond Proceeds - - - - - - - - Grants/Contributions Awarded - - - - - - - - Grants/Contributions Anticipated - - - - - - - - Fund Balance - - - - 2,000 - - 2,000 Total Resources - - - - 2,000 - - 2,000 *Restricted Taxes include REET, Fuel, Utility, and KC Levy funds The individual projects will be identified based on the need to either repair, rehabilitate or replace the sewer mains. The projects selected will be in support of the city’s goals of promoting public safety and quality of life. WASTEWATER UTILITY CAPITAL INVESTMENT PROGRAM 2019 through 2024 (in thousands of dollars) 2022 Sanitary Sewer Main Repl/Rehab Description and Scope This is an annual program the Wastewater Utility will perform to identify and through either repair, rehabilitation, or replacements those portions of our system that needs to be brought up to current standards. The program will be city-wide and may consist of individual projects. Design and construction are anticipated to be completed in 2022. Rationale AGENDA ITEM #2. a) 2019/2020 Proposed Budget City of Renton, Washington Priority Number:12 Project Title: Project Category: Maintenance and Preservation Status:New Request Appropriated To-Date 2019 2020 2021 2022 2023 2024 Total Project Expenditures Expenditures Planning/Consultants - - - - - - - - Project Management - - - - - - - - Major Maintenance - - - - - 2,000 - 2,000 Land Acquisitions - - - - - - - - Construction - - - - - - - - Total Expenditures - - - - - 2,000 - 2,000 Appropriated To-Date 2019 2020 2021 2022 2023 2024 Total Project Resources Resources General Fund Sources - - - - - - - - Restricted Taxes - - - - - - - - Mitigation Fees - - - - - - - - Bond Proceeds - - - - - - - - Grants/Contributions Awarded - - - - - - - - Grants/Contributions Anticipated - - - - - - - - Fund Balance - - - - - 2,000 - 2,000 Total Resources - - - - - 2,000 - 2,000 *Restricted Taxes include REET, Fuel, Utility, and KC Levy funds The individual projects will be identified based on the need to either repair, rehabilitate or replace the sewer mains. The projects selected will be in support of the city’s goals of promoting public safety and quality of life. WASTEWATER UTILITY CAPITAL INVESTMENT PROGRAM 2019 through 2024 (in thousands of dollars) 2023 Sanitary Sewer Main Repl / Rehab Description and Scope This is an annual program the Wastewater Utility will perform to identify and through either repair, rehabilitation, or replacement those portions of our sewer pipe system that needs to be brought up to current standards. The program will be city-wide and may consist of individual projects. Design and construction are anticipated to be completed in 2023. Rationale AGENDA ITEM #2. a) 2019/2020 Proposed Budget City of Renton, Washington Priority Number:13 Project Title: Project Category: Maintenance and Preservation Status:New Request Appropriated To-Date 2019 2020 2021 2022 2023 2024 Total Project Expenditures Expenditures Planning/Consultants - - - - - - - - Project Management - - - - - - - - Major Maintenance - - - - - - 2,000 2,000 Land Acquisitions - - - - - - - - Construction - - - - - - - - Total Expenditures - - - - - - 2,000 2,000 Appropriated To-Date 2019 2020 2021 2022 2023 2024 Total Project Resources Resources General Fund Sources - - - - - - - - Restricted Taxes - - - - - - - - Mitigation Fees - - - - - - - - Bond Proceeds - - - - - - - - Grants/Contributions Awarded - - - - - - - - Grants/Contributions Anticipated - - - - - - - - Fund Balance - - - - - - 2,000 2,000 Total Resources - - - - - - 2,000 2,000 *Restricted Taxes include REET, Fuel, Utility, and KC Levy funds The individual projects will be identified based on the need to either repair, rehabilitate or replace the sewer mains. The projects selected will be in support of the city’s goals of promoting public safety and quality of life. WASTEWATER UTILITY CAPITAL INVESTMENT PROGRAM 2019 through 2024 (in thousands of dollars) 2024 Sanitary Sewer Main Repl / Rehab Description and Scope This is an annual program the Wastewater Utility will perform to identify and through either repair, rehabilitation, or replacement those portions of our sewer pipe system that needs to be brought up to current standards. The program will be city-wide and may consist of individual projects. Design and construction are anticipated to be completed in 2024. Rationale AGENDA ITEM #2. a) 2019/2020 Proposed Budget City of Renton, Washington Priority Number:14 Project Title: Project Category: Maintenance and Preservation Status:Previously Approved Appropriated To-Date 2019 2020 2021 2022 2023 2024 Total Project Expenditures Expenditures Planning/Consultants - - - - - - - - Project Management - - - - - - - - Major Maintenance - - - 300 300 - - 600 Land Acquisitions - - - - - - - - Construction - - - - - - - - Total Expenditures - - - 300 300 - - 600 Appropriated To-Date 2019 2020 2021 2022 2023 2024 Total Project Resources Resources General Fund Sources - - - - - - - - Restricted Taxes - - - - - - - - Mitigation Fees - - - - - - - - Bond Proceeds - - - - - - - - Grants/Contributions Awarded - - - - - - - - Grants/Contributions Anticipated - - - - - - - - Fund Balance - - - 300 300 - - 600 Total Resources - - - 300 300 - - 600 *Restricted Taxes include REET, Fuel, Utility, and KC Levy funds This model update supports the city's goals of promoting public safety and quality of life. WASTEWATER UTILITY CAPITAL INVESTMENT PROGRAM 2019 through 2024 (in thousands of dollars) Sanitary Sewer Hydraulic Model Description and Scope The existing model utilizes flow data from 2010/11. King County, as part of their flow monitoring program will re-monitor key flow locations to update the flows in the system in 2020. We will incorporate the new King County information in our update of our hydraulic model. Rationale AGENDA ITEM #2. a) 2019/2020 Proposed Budget City of Renton, Washington Priority Number:15 Project Title: Project Category: Maintenance and Preservation Status:Previously Approved Appropriated To-Date 2019 2020 2021 2022 2023 2024 Total Project Expenditures Expenditures Planning/Consultants - - - - - - - - Project Management - - - - - - - - Major Maintenance - - - - - 300 - 300 Land Acquisitions - - - - - - - - Construction - - - - - - - - Total Expenditures - - - - - 300 - 300 Appropriated To-Date 2019 2020 2021 2022 2023 2024 Total Project Resources Resources General Fund Sources - - - - - - - - Restricted Taxes - - - - - - - - Mitigation Fees - - - - - - - - Bond Proceeds - - - - - - - - Grants/Contributions Awarded - - - - - - - - Grants/Contributions Anticipated - - - - - - - - Fund Balance - - - - - 300 - 300 Total Resources - - - - - 300 - 300 *Restricted Taxes include REET, Fuel, Utility, and KC Levy funds This program provides us with funding to update our telemetry when the technology becomes outdated. This project supports the city's goals of promoting public safety and quality of life. WASTEWATER UTILITY CAPITAL INVESTMENT PROGRAM 2019 through 2024 (in thousands of dollars) Telemetry Upgrade Description and Scope The Wastewater Utility owns and operates 22 sewage lift stations. Each of these stations communicates through a radio controlled telemetry system that consists of a master unit at the City Shops site and individual units at each station. The telemetry allows us to track operations at each station, modify parameters as needed, and provides a means to be contacted for emergency alarms. Anticipated work includes communication efficiency and redundancy. Individual telemetry units are anticipated to be replaced as part of Lift Station Rehabilitation project. Rationale AGENDA ITEM #2. a) 2019/2020 Proposed Budget City of Renton, Washington Priority Number:16 Project Title: Project Category: Regulatory Status:Previously Approved Appropriated To-Date 2019 2020 2021 2022 2023 2024 Total Project Expenditures Expenditures Planning/Consultants - - - - - - - - Project Management - - - - - - - - Major Maintenance 384 - - - - - 300 684 Land Acquisitions - - - - - - - - Construction - - - - - - - - Total Expenditures 384 - - - - - 300 684 Appropriated To-Date 2019 2020 2021 2022 2023 2024 Total Project Resources Resources General Fund Sources - - - - - - - - Restricted Taxes - - - - - - - - Mitigation Fees - - - - - - - - Bond Proceeds - - - - - - - - Grants/Contributions Awarded - - - - - - - - Grants/Contributions Anticipated - - - - - - - - Fund Balance 384 - - - - - 300 684 Total Resources 384 - - - - - 300 684 *Restricted Taxes include REET, Fuel, Utility, and KC Levy funds This plan needs to be updated, per state law, and King County requirements every six years. This plan update supports the city's goals of promoting public safety and quality of life. WASTEWATER UTILITY CAPITAL INVESTMENT PROGRAM 2019 through 2024 (in thousands of dollars) Long Range Wastewater Management Plan Description and Scope The Long Range Wastewater Management Plan is currently scheduled to be updated in 2018/19. This plan evaluates, over a twenty year period, the operational and capital needs and processes for the Wastewater Utility. It provides a road map for needed services and improvements to ensure that we meet all of our internal commitments and regulatory requirements. The plan update is expected to be performed in 2024 to allow for adoption in 2025. Rationale AGENDA ITEM #2. a) 2019/2020 Proposed Budget City of Renton, Washington Life to Date Project Projects Priority Type*Thru 2018 2019 2020 2021 2022 2023 2024 Total Cedar River Gravel Removal (Maintenance Dredge) Project 1 M 13,259 164 - - - - - 13,423 Cedar River 205 Project Levee Recertification Project 2 R 800 750 3,000 1,250 - - - 5,800 Madsen Creek Improvement Project 3 M 519 275 625 500 - - - 1,919 Renton Hill Storm System Improvement Project 4 D 1,975 275 - - - - - 2,250 Jefferson Ave NE Green Connections Project 5 D 2,075 625 - - - - - 2,700 SE 172nd St and 125th Ave N Storm System Improvement Project 6 D 250 30 - 900 - - - 1,180 Heather Downs Detention Pond Retrofit 7 M 293 38 500 - - - - 831 Small Drainage Projects Program 8 M 1,828 510 500 500 500 500 500 4,838 Surface Water Utility GIS 9 R 756 100 100 100 100 100 100 1,356 Maplewood Creek Sedimentation Facility Maintenance 10 M 510 85 85 85 85 85 90 1,025 Madsen Creek Sedimentation Cleaning 11 M 347 73 65 65 65 65 75 755 Springbrook Creek Wetland and Habitat Mitigation Bank 12 D 677 100 100 - - - - 877 Rainier Ave and Oakesdale Ave Pump Station Upgrades 13 M 124 200 - - - - - 324 Stormwater Facility Fencing Project 14 M 600 100 100 100 100 100 100 1,200 Miscellaneous/Emergency Storm Projects 15 M 230 50 50 50 50 50 60 540 Talbot Hill Area Mosquito Abatement Program 16 R 441 75 75 75 75 75 75 891 Hardie Ave SW-SW 7th St Storm System Improvements 17 D 6,922 - - 400 2,000 200 - 9,522 NE Sunset Blvd & Union Ave NE Storm System Improvements 18 D - - - 275 200 1,610 - 2,085 Monroe Ave NE & NE 2nd St Infiltration System Improvements 19 D - - - - 125 315 1,450 1,890 SW 43rd Street/Lind Ave SW Storm System Improvements 20 D - - - - - 300 500 800 East Valley Road Storm System Improvements 21 D - - - - - - 400 400 Surface Water Utility System Plan 22 R 446 - - - - - 100 546 Ginger Creek/Cascade Park Basin Plan 23 D - - - - - - 350 350 Total 32,052 3,450 5,200 4,300 3,300 3,400 3,800 55,502 Life to Date Project Resources:Thru 2018 2019 2020 2021 2022 2023 2024 Total General Fund Sources - - - - - - - - Restricted Taxes - - - - - - - - Mitigation Fees - - - - - - - - Bond Proceeds - - - - - - - - Grants/Contributions Awarded 17,209 164 - - - - - 17,373 Grants/Contributions Anticipated - 750 3,000 1,250 - - - 5,000 Fund Balance 14,843 2,536 2,200 3,050 3,300 3,400 3,800 33,129 Total Resources 32,052 3,450 5,200 4,300 3,300 3,400 3,800 55,502 Balance Available / (Unfunded Needs)- - - - - - - - * NOTE: A - Acquisition, C- Cross Category, D - Development, M - Maintenance, P - Planning, R - Regulatory ** Projects under construction and/or with a phase under construction SURFACE WATER UTILITY CAPITAL INVESTMENT PROGRAM S U M M A R Y B Y C O U N C I L P R I O R I T Y Proposed P r o j e c t e d 2019 through 2024 (in thousands of dollars) Proposed P r o j e c t e d AGENDA ITEM #2. a) 2019/2020 Proposed Budget City of Renton, Washington Priority Number:1 Project Title:Cedar River Gravel Removal (Maintenance Dredge) Project Project Category: Maintenance and Preservation Status:Previously Approved Appropriated To-Date 2019 2020 2021 2022 2023 2024 Total Project Expenditures Expenditures Planning/Consultants - - - - - - - - Project Management - - - - - - - - Major Maintenance - - - - - - - - Land Acquisitions - - - - - - - - Construction 13,259 164 - - - - - 13,423 Total Expenditures 13,259 164 - - - - - 13,423 Appropriated To-Date 2019 2020 2021 2022 2023 2024 Total Project Resources Resources General Fund Sources - - - - - - - - Restricted Taxes - - - - - - - - Mitigation Fees - - - - - - - - Bond Proceeds - - - - - - - - Grants/Contributions Awarded 13,259 164 - - - - - 13,423 Grants/Contributions Anticipated - - - - - - - - Fund Balance - - - - - - - - Total Resources 13,259 164 - - - - - 13,423 *Restricted Taxes include REET, Fuel, Utility, and KC Levy funds This will provide funding for completing construction and mitigation work associated with the project and performing long-term monitoring, maintenance and reporting as required by the project permits. This project supports the city's goals of economic development, public safety and quality of life. SURFACE WATER UTILITY CAPITAL INVESTMENT PROGRAM 2019 through 2024 (in thousands of dollars) Description and Scope In 1998, the U.S. Army Corps of Engineers and the City of Renton constructed the Lower Cedar River Section 205 Flood Hazard Reduction project. The project included the construction of levees and floodwalls along the lower 1.23 mile of the Cedar River, along with dredging and the need to do future periodic maintenance dredging of the Cedar River to provide flood protection for the 100- year flood event. The Cedar River Gravel Removal project is needed to remove gravel from the lower 1.23 miles of the Cedar River, which has accumulated since 1998. The maintenance dredging is a requirement of the Project Cooperation Agreement with the U.S. Army Corps of Engineers. The project is being funded by the King County Flood Control District with the city acting as the project manager. The project will ensure that the Renton Municipal Airport, the Boeing 737 Renton Plant, and other commercial and residential properties in the area will continue to have reduced flood risks. The project design, permitting and construction was completed in 2016. Rationale AGENDA ITEM #2. a) 2019/2020 Proposed Budget City of Renton, Washington Priority Number:2 Project Title:Cedar River 205 Project Levee Recertification Project Project Category: Regulatory Status:Previously Approved Appropriated To-Date 2019 2020 2021 2022 2023 2024 Total Project Expenditures Expenditures Planning/Consultants 800 600 100 25 - - - 1,525 Project Management - 150 100 125 - - - 375 Major Maintenance - - - - - - - - Land Acquisitions - - - - - - - - Construction - - 2,800 1,100 - - - 3,900 Total Expenditures 800 750 3,000 1,250 - - - 5,800 Appropriated To-Date 2019 2020 2021 2022 2023 2024 Total Project Resources Resources General Fund Sources - - - - - - - - Restricted Taxes - - - - - - - - Mitigation Fees - - - - - - - - Bond Proceeds - - - - - - - - Grants/Contributions Awarded 800 - - - - - - 800 Grants/Contributions Anticipated - 750 3,000 1,250 - - - 5,000 Fund Balance - - - - - - - - Total Resources 800 750 3,000 1,250 - - - 5,800 *Restricted Taxes include REET, Fuel, Utility, and KC Levy funds The city has to prepare the re-certification information for approval by FEMA in order to have the levees and floodwall re-certified and accredited by FEMA. This project is in coordination with the city's goals of economic development, public safety and quality of life. SURFACE WATER UTILITY CAPITAL INVESTMENT PROGRAM 2019 through 2024 (in thousands of dollars) Description and Scope The U.S. Army Corps of Engineers originally certified the levees and floodwalls that were constructed as part of the Lower Cedar River Flood Hazard Reduction project in 1998. The U.S. Army Corps of Engineers has since determined that their certification is no longer valid and that the city of Renton would need to re-certify the levees and floodwalls, if they are to be accredited by FEMA as providing 100-year flood protection for floodplain mapping purposes. If the levees are not re-certified and accredited by FEMA, the property behind the levees would have to be remapped to show they are in a floodplain. Phase 1 of the project was completed in 2016. Phase 2 of the project to complete the re-certification documentation will be completed in 2018. Phase 3 of the project will start in 2019. Rationale AGENDA ITEM #2. a) 2019/2020 Proposed Budget City of Renton, Washington Priority Number:3 Project Title: Project Category: Maintenance and Preservation Status:Previously Approved Appropriated To-Date 2019 2020 2021 2022 2023 2024 Total Project Expenditures Expenditures Planning/Consultants 466 225 - - - - - 691 Project Management 53 50 125 100 - - - 328 Major Maintenance - - - - - - - - Land Acquisitions - - - - - - - - Construction - - 500 400 - - - 900 Total Expenditures 519 275 625 500 - - - 1,919 Appropriated To-Date 2019 2020 2021 2022 2023 2024 Total Project Resources Resources General Fund Sources - - - - - - - - Restricted Taxes - - - - - - - - Mitigation Fees - - - - - - - - Bond Proceeds - - - - - - - - Grants/Contributions Awarded 472 - - - - - - 472 Grants/Contributions Anticipated - - - - - - - - Fund Balance 47 275 625 500 - - - 1,447 Total Resources 519 275 625 500 - - - 1,919 *Restricted Taxes include REET, Fuel, Utility, and KC Levy funds This project will analyze the basin hydrology and channel hydraulics to identify improvements that need to be made to the existing system or other channel improvement alignments to reduce risk of flooding and minimize environmental impacts of the improvements. This project supports the city's goal of promoting public safety. SURFACE WATER UTILITY CAPITAL INVESTMENT PROGRAM 2019 through 2024 (in thousands of dollars) Madsen Creek Improvement Project Description and Scope This project will address flooding problems associated with Madsen Creek, where it enters the Cedar River. Flooding has occurred along SR-169 near Wonderland Estates Manufactured Home Park, along 149th Avenue SE and in Ron Regis Park. The King County Flood Control District awarded the city a $472,000 flood reduction grant for Phase 1 of the project in December 2017, which included hydrologic and hydraulic analysis, surveying, environmental analysis and preliminary design to solve the flooding problems. Future project phases will include selection of the improvements to be made, design, permitting and implementation of the improvements. Rationale AGENDA ITEM #2. a) 2019/2020 Proposed Budget City of Renton, Washington Priority Number:4 Project Title: Project Category: Development Status:Previously Approved Appropriated To-Date 2019 2020 2021 2022 2023 2024 Total Project Expenditures Expenditures Planning/Consultants - - - - - - - - Project Management - 25 - - - - - 25 Major Maintenance 1,975 250 - - - - - 2,225 Land Acquisitions - - - - - - - - Construction - - - - - - - - Total Expenditures 1,975 275 - - - - - 2,250 Appropriated To-Date 2019 2020 2021 2022 2023 2024 Total Project Resources Resources General Fund Sources - - - - - - - - Restricted Taxes - - - - - - - - Mitigation Fees - - - - - - - - Bond Proceeds - - - - - - - - Grants/Contributions Awarded - - - - - - - - Grants/Contributions Anticipated - - - - - - - - Fund Balance 1,975 275 - - - - - 2,250 Total Resources 1,975 275 - - - - - 2,250 *Restricted Taxes include REET, Fuel, Utility, and KC Levy funds This project supports the city's goals of promoting public safety and quality of life. SURFACE WATER UTILITY CAPITAL INVESTMENT PROGRAM 2019 through 2024 (in thousands of dollars) Renton Hill Storm System Improvement Project Description and Scope The project includes replacing existing storm systems and installing new storm systems in the Renton Hill area to replace aging infrastructure and improve drainage. The project will be designed and constructed in coordination with the city's Water Utility and Wastewater Utility where they are also planning to make utility improvements. Project construction started in January of 2018 and will continue through 2019. Rationale AGENDA ITEM #2. a) 2019/2020 Proposed Budget City of Renton, Washington Priority Number:5 Project Title: Project Category: Development Status:Previously Approved Appropriated To-Date 2019 2020 2021 2022 2023 2024 Total Project Expenditures Expenditures Planning/Consultants 355 35 - - - - - 390 Project Management 112 55 - - - - - 167 Major Maintenance - - - - - - - - Land Acquisitions - - - - - - - - Construction 1,608 535 - - - - - 2,143 Total Expenditures 2,075 625 - - - - - 2,700 Appropriated To-Date 2019 2020 2021 2022 2023 2024 Total Project Resources Resources General Fund Sources - - - - - - - - Restricted Taxes - - - - - - - - Mitigation Fees - - - - - - - - Bond Proceeds - - - - - - - - Grants/Contributions Awarded 2,075 - - - - - - 2,075 Grants/Contributions Anticipated - - - - - - - - Fund Balance - 625 - - - - - 625 Total Resources 2,075 625 - - - - - 2,700 *Restricted Taxes include REET, Fuel, Utility, and KC Levy funds This project was identified in the Sunset Area Surface Water Master Plan that was developed and approved as part of the Sunset Community Investment Strategy and Planned Action EIS. This project supports the city's goals of economic development, public safety and quality of life. SURFACE WATER UTILITY CAPITAL INVESTMENT PROGRAM 2019 through 2024 (in thousands of dollars) Jefferson Ave NE Green Connections Project Description and Scope This project will design flow reduction and stormwater quality treatment facilities for approximately 1,300 linear feet of roadway to include bioretention facilities, a storm conveyance system and permeable concrete sidewalks on Jefferson Avenue NE (between NE 16th Street and NE 12th Street) in the Sunset Area community along the existing roadway where most feasible. The project is partially funded by an Ecology Stormwater Financial Assistance Program grant of $2,075,095 that was awarded in 2018. Project design and permitting is anticipated to be completed in 2019 with construction in 2020. Rationale AGENDA ITEM #2. a) 2019/2020 Proposed Budget City of Renton, Washington Priority Number:6 Project Title:SE 172nd St and 125th Ave N Storm System Improvement Project Project Category: Development Status:Previously Approved Appropriated To-Date 2019 2020 2021 2022 2023 2024 Total Project Expenditures Expenditures Planning/Consultants 225 - - - - - - 225 Project Management 25 30 - - - - - 55 Major Maintenance - - - - - - - - Land Acquisitions - - - - - - - - Construction - - - 900 - - - 900 Total Expenditures 250 30 - 900 - - - 1,180 Appropriated To-Date 2019 2020 2021 2022 2023 2024 Total Project Resources Resources General Fund Sources - - - - - - - - Restricted Taxes - - - - - - - - Mitigation Fees - - - - - - - - Bond Proceeds - - - - - - - - Grants/Contributions Awarded 250 - - - - - - 250 Grants/Contributions Anticipated - - - - - - - - Fund Balance - 30 - 900 - - - 930 Total Resources 250 30 - 900 - - - 1,180 *Restricted Taxes include REET, Fuel, Utility, and KC Levy funds The project will address a street flooding problem and improve storm system conveyance capacity of existing drainage systems along 125th Avenue SE and SE 172nd Street. This project supports the city's goals of economic development, public safety and quality of life. SURFACE WATER UTILITY CAPITAL INVESTMENT PROGRAM 2019 through 2024 (in thousands of dollars) Description and Scope The project includes the design and permitting of storm system improvements that include green stormwater infrastructure improvements of bioretention facilities and pervious sidewalks to provide water quality treatment for the street stormwater runoff and flow reduction. The project is funded by a $250,000 Ecology Stormwater Financial Assistance Program grant that was awarded in 2018. The project design will start in 2019 and be completed in 2020. Construction is planned to start in 2021. Rationale AGENDA ITEM #2. a) 2019/2020 Proposed Budget City of Renton, Washington Priority Number:7 Project Title: Project Category: Maintenance and Preservation Status:Previously Approved Appropriated To-Date 2019 2020 2021 2022 2023 2024 Total Project Expenditures Expenditures Planning/Consultants 120 - - - - - - 120 Project Management 45 38 - - - - - 83 Major Maintenance - - - - - - - - Land Acquisitions - - - - - - - - Construction 128 - 500 - - - - 628 Total Expenditures 293 38 500 - - - - 831 Appropriated To-Date 2019 2020 2021 2022 2023 2024 Total Project Resources Resources General Fund Sources - - - - - - - - Restricted Taxes - - - - - - - - Mitigation Fees - - - - - - - - Bond Proceeds - - - - - - - - Grants/Contributions Awarded 163 - - - - - - 163 Grants/Contributions Anticipated - - - - - - - - Fund Balance 130 38 500 - - - - 668 Total Resources 293 38 500 - - - - 831 *Restricted Taxes include REET, Fuel, Utility, and KC Levy funds The improved facility will remove stormwater runoff pollutants to improve water quality in the Maplewood Creek Subbasin and the Cedar River. This project supports the city's goals of promoting public safety and quality of life. SURFACE WATER UTILITY CAPITAL INVESTMENT PROGRAM 2019 through 2024 (in thousands of dollars) Heather Downs Detention Pond Retrofit Description and Scope The project will retrofit a city-owned detention facility in the Heather Downs residential development to be a combined detention and wet pond stormwater facility. This stormwater facility will provide flow control and additional basic water quality treatment to remove pollutants from streets and other pollution generating surfaces within a 30-acre drainage basin. The existing detention pond is located at the intersection of Union Avenue SE and SE 4th Street and is in the Maplewood Creek subbasin to the Cedar River. The project is partially funded by an Ecology Stormwater Financial Assistance Program grant ($93,000) that was awarded in 2018 and a King County Waterworks Grant that was awarded in 2017 ($70,000). Project planning and design will be completed in 2019 with construction planned for 2020. Rationale AGENDA ITEM #2. a) 2019/2020 Proposed Budget City of Renton, Washington Priority Number:8 Project Title: Project Category: Maintenance and Preservation Status:Previously Approved Appropriated To-Date 2019 2020 2021 2022 2023 2024 Total Project Expenditures Expenditures Planning/Consultants - - - - - - - - Project Management - 50 50 50 50 50 50 300 Major Maintenance - - - - - - - - Land Acquisitions - - - - - - - - Construction 1,828 460 450 450 450 450 450 4,538 Total Expenditures 1,828 510 500 500 500 500 500 4,838 Appropriated To-Date 2019 2020 2021 2022 2023 2024 Total Project Resources Resources General Fund Sources - - - - - - - - Restricted Taxes - - - - - - - - Mitigation Fees - - - - - - - - Bond Proceeds - - - - - - - - Grants/Contributions Awarded - - - - - - - - Grants/Contributions Anticipated - - - - - - - - Fund Balance 1,828 510 500 500 500 500 500 4,838 Total Resources 1,828 510 500 500 500 500 500 4,838 *Restricted Taxes include REET, Fuel, Utility, and KC Levy funds To provide funding for small drainage projects that will replace failing corrugated metal pipes and other storm systems, as needed. The projects selected will be in support of the city’s goal of promoting public safety. SURFACE WATER UTILITY CAPITAL INVESTMENT PROGRAM 2019 through 2024 (in thousands of dollars) Small Drainage Projects Program Description and Scope This project consists of designing and constructing solutions to local flooding problems, minor storm system maintenance, and replacements that are relatively simple to construct by the city’s maintenance crews or contractors. The Surface Water Utility identifies these projects on an annual basis through problem identification, citizen complaints, and input from the maintenance section. The Lake Youngs Court Small Drainage project has already been identified as one of the projects for this program. The funding for the project design and construction of the Lake Youngs Court Small Drainage project is included in this program. Rationale AGENDA ITEM #2. a) 2019/2020 Proposed Budget City of Renton, Washington Priority Number:9 Project Title:Surface Water Utility GIS Project Category: Regulatory Status:Previously Approved Appropriated To-Date 2019 2020 2021 2022 2023 2024 Total Project Expenditures Expenditures Planning/Consultants - - - - - - - - Project Management 756 100 100 100 100 100 100 1,356 Major Maintenance - - - - - - - - Land Acquisitions - - - - - - - - Construction - - - - - - - - Total Expenditures 756 100 100 100 100 100 100 1,356 Appropriated To-Date 2019 2020 2021 2022 2023 2024 Total Project Resources Resources General Fund Sources - - - - - - - - Restricted Taxes - - - - - - - - Mitigation Fees - - - - - - - - Bond Proceeds - - - - - - - - Grants/Contributions Awarded - - - - - - - - Grants/Contributions Anticipated - - - - - - - - Fund Balance 756 100 100 100 100 100 100 1,356 Total Resources 756 100 100 100 100 100 100 1,356 *Restricted Taxes include REET, Fuel, Utility, and KC Levy funds This annual program provides funding to maintain an accurate inventory of the city’s storm systems for use by the Surface Water Utility for maintenance, planning and engineering functions, other City departments, and the public. This program meets regulatory requirements and supports the city’s goals of economic development and public safety. SURFACE WATER UTILITY CAPITAL INVESTMENT PROGRAM 2019 through 2024 (in thousands of dollars) Description and Scope This annual program is to update our storm system inventory maps and database with new storm system infrastructure that is constructed or added by private development projects, public projects, and annexations. The information is integrated into the city’s Geographic Information System (GIS). The GIS data is used to track maintenance and inspection of public and private stormwater management systems and facilities for operation and maintenance purposes. The data is also used to update long-range asset management programs. The updating and adding newly constructed storm systems to the Surface Water Utility GIS is a requirement of the NPDES Phase II Municipal Stormwater permit. Rationale AGENDA ITEM #2. a) 2019/2020 Proposed Budget City of Renton, Washington Priority Number:10 Project Title:Maplewood Creek Sedimentation Facility Maintenance Project Category: Maintenance and Preservation Status:Previously Approved Appropriated To-Date 2019 2020 2021 2022 2023 2024 Total Project Expenditures Expenditures Planning/Consultants - - - - - - - - Project Management - 10 10 10 10 10 10 60 Major Maintenance 510 75 75 75 75 75 80 965 Land Acquisitions - - - - - - - - Construction - - - - - - - - Total Expenditures 510 85 85 85 85 85 90 1,025 Appropriated To-Date 2019 2020 2021 2022 2023 2024 Total Project Resources Resources General Fund Sources - - - - - - - - Restricted Taxes - - - - - - - - Mitigation Fees - - - - - - - - Bond Proceeds - - - - - - - - Grants/Contributions Awarded - - - - - - - - Grants/Contributions Anticipated - - - - - - - - Fund Balance 510 85 85 85 85 85 90 1,025 Total Resources 510 85 85 85 85 85 90 1,025 *Restricted Taxes include REET, Fuel, Utility, and KC Levy funds The sediment will be removed from the facility in the summer of 2019 and annually thereafter, as needed. This project supports the city's goals of promoting public safety and quality of life. SURFACE WATER UTILITY CAPITAL INVESTMENT PROGRAM 2019 through 2024 (in thousands of dollars) Description and Scope The Maplewood Creek Sedimentation Facility is located on the Maplewood Golf Course and traps sediment that is transported downstream by Maplewood Creek. The facility prevents the sediment from being deposited on the golf course during large storms and reduces flooding of the golf course and SR-169. The funding is programmed for project management, permitting, and construction to routinely remove the accumulated sediment from the facility. The facility was constructed in 1996 in conjunction with a fish passage channel across the Maplewood Golf Course to the Cedar River. A fish ladder was constructed as part of the facility to allow upstream fish passage. The accumulated sediment in the facility needs to be removed every year, depending upon flood events and how fast sediment accumulates in the facility. Rationale AGENDA ITEM #2. a) 2019/2020 Proposed Budget City of Renton, Washington Priority Number:11 Project Title: Project Category: Maintenance and Preservation Status:Previously Approved Appropriated To-Date 2019 2020 2021 2022 2023 2024 Total Project Expenditures Expenditures Planning/Consultants - - - - - - - - Project Management - 13 10 10 10 10 10 63 Major Maintenance 347 60 55 55 55 55 65 692 Land Acquisitions - - - - - - - - Construction - - - - - - - - Total Expenditures 347 73 65 65 65 65 75 755 Appropriated To-Date 2019 2020 2021 2022 2023 2024 Total Project Resources Resources General Fund Sources - - - - - - - - Restricted Taxes - - - - - - - - Mitigation Fees - - - - - - - - Bond Proceeds - - - - - - - - Grants/Contributions Awarded - - - - - - - - Grants/Contributions Anticipated - - - - - - - - Fund Balance 347 73 65 65 65 65 75 755 Total Resources 347 73 65 65 65 65 75 755 *Restricted Taxes include REET, Fuel, Utility, and KC Levy funds The maintenance of the facility is planned to be completed in August or September in 2019 and annually thereafter, as needed. This project supports the city's goals of promoting public safety and quality of life. SURFACE WATER UTILITY CAPITAL INVESTMENT PROGRAM 2019 through 2024 (in thousands of dollars) Madsen Creek Sedimentation Cleaning Description and Scope The Madsen Creek Sedimentation Facility was originally constructed by King County to control sediment resulting from erosion of steep slopes in the Madsen Creek ravine due to increased upstream stormwater runoff from new development projects. The facility is located on the New Life Church property that was annexed into the city as part of the New Life-Aqua Barn annexation (A-07-001) in June of 2008. Approximately 800 cubic yards of sediment has to be removed from the facility annually to control the sediment that is being deposited from the upstream area into the facility in order to maintain its proper operation. Rationale AGENDA ITEM #2. a) 2019/2020 Proposed Budget City of Renton, Washington Priority Number:12 Project Title: Project Category: Development Status:Previously Approved Appropriated To-Date 2019 2020 2021 2022 2023 2024 Total Project Expenditures Expenditures Planning/Consultants - - - - - - - - Project Management - 20 20 - - - - 40 Major Maintenance 677 80 80 - - - - 837 Land Acquisitions - - - - - - - - Construction - - - - - - - - Total Expenditures 677 100 100 - - - - 877 Appropriated To-Date 2019 2020 2021 2022 2023 2024 Total Project Resources Resources General Fund Sources - - - - - - - - Restricted Taxes - - - - - - - - Mitigation Fees - - - - - - - - Bond Proceeds - - - - - - - - Grants/Contributions Awarded - - - - - - - - Grants/Contributions Anticipated - - - - - - - - Fund Balance 677 100 100 - - - - 877 Total Resources 677 100 100 - - - - 877 *Restricted Taxes include REET, Fuel, Utility, and KC Levy funds This provides funding for the city's share of plant establishment and monitoring costs necessary to meet performance standards to allow the release of mitigation credits. This project supports the city's goals of economic development and quality of life. SURFACE WATER UTILITY CAPITAL INVESTMENT PROGRAM 2019 through 2024 (in thousands of dollars) Springbrook Creek Wetland and Habitat Mitigat Description and Scope The project consisted of developing a wetland mitigation bank, in partnership with WSDOT, on approximately 130 total acres in the valley adjacent to Springbrook Creek. The wetland mitigation bank is an alternative to onsite mitigation for private and public projects (City of Renton or WSDOT) with wetland impacts that require mitigation per city code to achieve a no-net loss of wetland functions and values. The project also improved flood storage capacity along Springbrook Creek, improved water quality, fish and wildlife habitat, and provided economic benefits by allowing private development to fill low quality wetlands on their property in exchange for purchasing credits from the wetland bank. The private developers are then able to develop more area, which creates higher valued developments, increases property values, and creates more jobs, thereby increasing the city's general fund revenues. The project construction was completed in 2009 with a following 10-year monitoring period to verify whether performance standards have been met to allow for the release of wetland mitigation credits that can be used by the City, WSDOT, and private developments. A total of 40.75 credits have been released out of the total of 45 credits that could be released if all performance standards have been met in the 10-year performance and monitoring period. The city’s portion of wetland credits in the wetland bank is 19.12 credits. Rationale AGENDA ITEM #2. a) 2019/2020 Proposed Budget City of Renton, Washington Priority Number:13 Project Title: Project Category: Maintenance and Preservation Status:Previously Approved Appropriated To-Date 2019 2020 2021 2022 2023 2024 Total Project Expenditures Expenditures Planning/Consultants - 10 - - - - - 10 Project Management 124 10 - - - - - 134 Major Maintenance - - - - - - - - Land Acquisitions - - - - - - - - Construction - 180 - - - - - 180 Total Expenditures 124 200 - - - - - 324 Appropriated To-Date 2019 2020 2021 2022 2023 2024 Total Project Resources Resources General Fund Sources - - - - - - - - Restricted Taxes - - - - - - - - Mitigation Fees - - - - - - - - Bond Proceeds - - - - - - - - Grants/Contributions Awarded - - - - - - - - Grants/Contributions Anticipated - - - - - - - - Fund Balance 124 200 - - - - - 324 Total Resources 124 200 - - - - - 324 *Restricted Taxes include REET, Fuel, Utility, and KC Levy funds This program provides us with funding to update our telemetry when the technology becomes outdated. This project supports the city's goals of promoting public safety and quality of life. SURFACE WATER UTILITY CAPITAL INVESTMENT PROGRAM 2019 through 2024 (in thousands of dollars) Rainier Ave and Oakesdale Ave Pump Station U Description and Scope Both pump stations need to have their remote telemetry units replaced (RTUs). The existing RTUs made by Rugid are aging and the company is downsizing and is offering very limited customer support. The Wastewater Utility is gradually replacing its Rugid RTU panels with Allen-Bradley RTU panels at all its pump stations because Allen-Bradley is a large company with an extensive support network. In order to have equipment commonality among the city's pumps stations, the Surface Water Utility will need to upgrade to Allen-Bradley RTU panels. The upgrade includes RTU panel replacement and software. Telemetry panel design and construction was completed in 2018, with installation to be completed in 2019. Rationale AGENDA ITEM #2. a) 2019/2020 Proposed Budget City of Renton, Washington Priority Number:14 Project Title: Project Category: Maintenance and Preservation Status:Previously Approved Appropriated To-Date 2019 2020 2021 2022 2023 2024 Total Project Expenditures Expenditures Planning/Consultants - - - - - - - - Project Management 10 10 10 10 10 10 10 70 Major Maintenance - - - - - - - - Land Acquisitions - - - - - - - - Construction 590 90 90 90 90 90 90 1,130 Total Expenditures 600 100 100 100 100 100 100 1,200 Appropriated To-Date 2019 2020 2021 2022 2023 2024 Total Project Resources Resources General Fund Sources - - - - - - - - Restricted Taxes - - - - - - - - Mitigation Fees - - - - - - - - Bond Proceeds - - - - - - - - Grants/Contributions Awarded - - - - - - - - Grants/Contributions Anticipated - - - - - - - - Fund Balance 600 100 100 100 100 100 100 1,200 Total Resources 600 100 100 100 100 100 100 1,200 *Restricted Taxes include REET, Fuel, Utility, and KC Levy funds This project will provide funding to install fences over time on stormwater facilities to protect residents and to limit liability associated with these facilities being unfenced. This project supports the city's goal of promoting public safety. SURFACE WATER UTILITY CAPITAL INVESTMENT PROGRAM 2019 through 2024 (in thousands of dollars) Stormwater Facility Fencing Project Description and Scope This project consists of constructing fences around existing stormwater detention/retention and water quality treatment facilities that the Surface Water Utility owns and maintains. Stormwater facilities that were constructed with side slopes that were not steep (3:1 or flatter side slopes), were not required to have fences by previous surface water design standards. The city's surface water design standards have been updated to require all future constructed stormwater facilities to be fenced. Many of the stormwater facilities that are not fenced were constructed in unincorporated King County and were previously owned and maintained by the county. When the city annexed these areas, the Surface Water Utility assumed ownership and maintenance of the facilities. A total of 17 stormwater facilities have been fenced since the start of this project. There are currently 28 stormwater facilities that still need fencing. This number may increase due to annexations and as the Utility takes over maintenance of stormwater facilities from Homeowners Associations as part of the stormwater facility transfer program. Rationale AGENDA ITEM #2. a) 2019/2020 Proposed Budget City of Renton, Washington Priority Number:15 Project Title: Project Category: Maintenance and Preservation Status:Previously Approved Appropriated To-Date 2019 2020 2021 2022 2023 2024 Total Project Expenditures Expenditures Planning/Consultants - - - - - - - - Project Management - - - - - - - - Major Maintenance - - - - - - - - Land Acquisitions - - - - - - - - Construction 230 50 50 50 50 50 60 540 Total Expenditures 230 50 50 50 50 50 60 540 Appropriated To-Date 2019 2020 2021 2022 2023 2024 Total Project Resources Resources General Fund Sources - - - - - - - - Restricted Taxes - - - - - - - - Mitigation Fees - - - - - - - - Bond Proceeds - - - - - - - - Grants/Contributions Awarded - - - - - - - - Grants/Contributions Anticipated - - - - - - - - Fund Balance 230 50 50 50 50 50 60 540 Total Resources 230 50 50 50 50 50 60 540 *Restricted Taxes include REET, Fuel, Utility, and KC Levy funds These funds are used for unplanned projects in response to system failures that need immediate repair or other unplanned storm system improvements, as needed. The projects selected will be in support of the city's goal of promoting public safety. SURFACE WATER UTILITY CAPITAL INVESTMENT PROGRAM 2019 through 2024 (in thousands of dollars) Miscellaneous/Emergency Storm Projects Description and Scope This fund is for unplanned or miscellaneous storm system improvements needed to keep the existing system functional or in response to an opportunity to fix identified system deficiencies in coordination with another project. The funding is also available to respond to system failures (structure failure, pipeline failure, pump station failure) or other emergency response needs during storm events. Rationale AGENDA ITEM #2. a) 2019/2020 Proposed Budget City of Renton, Washington Priority Number:16 Project Title:Talbot Hill Area Mosquito Abatement Program Project Category: Regulatory Status:Previously Approved Appropriated To-Date 2019 2020 2021 2022 2023 2024 Total Project Expenditures Expenditures Planning/Consultants 441 65 65 65 65 65 65 831 Project Management - 10 10 10 10 10 10 60 Major Maintenance - - - - - - - - Land Acquisitions - - - - - - - - Construction - - - - - - - - Total Expenditures 441 75 75 75 75 75 75 891 Appropriated To-Date 2019 2020 2021 2022 2023 2024 Total Project Resources Resources General Fund Sources - - - - - - - - Restricted Taxes - - - - - - - - Mitigation Fees - - - - - - - - Bond Proceeds - - - - - - - - Grants/Contributions Awarded - - - - - - - - Grants/Contributions Anticipated - - - - - - - - Fund Balance 441 75 75 75 75 75 75 891 Total Resources 441 75 75 75 75 75 75 891 *Restricted Taxes include REET, Fuel, Utility, and KC Levy funds This program provides funding for mosquito abatement in the Talbot Hill area and helps to protect the city against a West Nile Virus outbreak. This program meets regulatory requirements and supports the city's goal of promoting public safety. SURFACE WATER UTILITY CAPITAL INVESTMENT PROGRAM 2019 through 2024 (in thousands of dollars) Description and Scope The program consists of annually treating upland areas around the Panther Creek Wetlands to control mosquitoes from the wetlands in response to citizen complaints in the Talbot Hill area. This program also funds the annual treatment of city-owned stormwater water quality/flow control facilities in response to the West Nile Virus. This also provides additional funding in the event of a West Nile Virus outbreak occurs and more treatments are advised by the Department of Health. Rationale AGENDA ITEM #2. a) 2019/2020 Proposed Budget City of Renton, Washington Priority Number:17 Project Title:Hardie Ave SW-SW 7th St Storm System Improvements Project Category: Development Status:Previously Approved Appropriated To-Date 2019 2020 2021 2022 2023 2024 Total Project Expenditures Expenditures Planning/Consultants - - - 350 100 - - 450 Project Management - - - 50 50 - - 100 Major Maintenance - - - - - - - - Land Acquisitions - - - - - - - - Construction 6,922 - - - 1,850 200 - 8,972 Total Expenditures 6,922 - - 400 2,000 200 - 9,522 Appropriated To-Date 2019 2020 2021 2022 2023 2024 Total Project Resources Resources General Fund Sources - - - - - - - - Restricted Taxes - - - - - - - - Mitigation Fees - - - - - - - - Bond Proceeds - - - - - - - - Grants/Contributions Awarded 190 - - - - - - 190 Grants/Contributions Anticipated - - - - - - - - Fund Balance 6,732 - - 400 2,000 200 - 9,332 Total Resources 6,922 - - 400 2,000 200 - 9,522 *Restricted Taxes include REET, Fuel, Utility, and KC Levy funds This project supports the city's goals of economic development, public safety and quality of life. SURFACE WATER UTILITY CAPITAL INVESTMENT PROGRAM 2019 through 2024 (in thousands of dollars) Description and Scope The planning, design and permitting of the first two phases of the project, which included installing approximately 3,600 linear feet of new 60-inch storm system in SW 7th Street between Lind Avenue NE and Naches Avenue SW has been completed. The third phase of the project includes the replacement of approximately 700 linear feet of 36 inch to 48-inch storm system, between Hardie Avenue SW to SW 7th Street, with a new 60-inch storm system. Phase 3 project design will start in 2021 with construction planned for 2022. Rationale AGENDA ITEM #2. a) 2019/2020 Proposed Budget City of Renton, Washington Priority Number:18 Project Title:NE Sunset Blvd & Union Ave NE Storm System Improvements Project Category: Development Status:Previously Approved Appropriated To-Date 2019 2020 2021 2022 2023 2024 Total Project Expenditures Expenditures Planning/Consultants - - - 225 150 50 - 425 Project Management - - - 50 50 50 - 150 Major Maintenance - - - - - - - - Land Acquisitions - - - - - - - - Construction - - - - - 1,510 - 1,510 Total Expenditures - - - 275 200 1,610 - 2,085 Appropriated To-Date 2019 2020 2021 2022 2023 2024 Total Project Resources Resources General Fund Sources - - - - - - - - Restricted Taxes - - - - - - - - Mitigation Fees - - - - - - - - Bond Proceeds - - - - - - - - Grants/Contributions Awarded - - - - - - - - Grants/Contributions Anticipated - - - - - - - - Fund Balance - - - 275 200 1,610 - 2,085 Total Resources - - - 275 200 1,610 - 2,085 *Restricted Taxes include REET, Fuel, Utility, and KC Levy funds The project will help protect businesses, residential areas and important transportation corridors (SR-900) from flooding. This project is in coordination with the city's goals of economic development and promoting public safety. SURFACE WATER UTILITY CAPITAL INVESTMENT PROGRAM 2019 through 2024 (in thousands of dollars) Description and Scope Sections of Honey Creek between Union Avenue NE and Duvall Avenue NE contains an old, closed pipe system that has insufficient capacity and is located in parking lots, under buildings, and across public right-of-ways. Land use changes in the upstream basin area have increased surface water runoff and could cause flooding due to the lack of capacity in the piped sections. Due to the age of the piped section, the structural condition of the storm system is unknown. This project will consist of developing an accurate base map of the storm system location; inspecting its structural condition; developing a basin hydrologic and hydraulic model to perform capacity analysis of the existing system; and developing conceptual design solutions. The selected conceptual design solution will be used for the final design, permitting, and construction of the storm system improvements. The improved conveyance system will have sufficient capacity to convey future land use condition runoff, meet city capacity design standards to help prevent flooding and the structural failure of the storm system. Rationale AGENDA ITEM #2. a) 2019/2020 Proposed Budget City of Renton, Washington Priority Number:19 Project Title:Monroe Ave NE & NE 2nd St Infiltration System Improvements Project Category: Development Status:Previously Approved Appropriated To-Date 2019 2020 2021 2022 2023 2024 Total Project Expenditures Expenditures Planning/Consultants - - - - 100 270 - 370 Project Management - - - - 25 45 - 70 Major Maintenance - - - - - - - - Land Acquisitions - - - - - - - - Construction - - - - - - 1,450 1,450 Total Expenditures - - - - 125 315 1,450 1,890 Appropriated To-Date 2019 2020 2021 2022 2023 2024 Total Project Resources Resources General Fund Sources - - - - - - - - Restricted Taxes - - - - - - - - Mitigation Fees - - - - - - - - Bond Proceeds - - - - - - - - Grants/Contributions Awarded - - - - - - - - Grants/Contributions Anticipated - - - - - - - - Fund Balance - - - - 125 315 1,450 1,890 Total Resources - - - - 125 315 1,450 1,890 *Restricted Taxes include REET, Fuel, Utility, and KC Levy funds The project will help protect businesses and residential areas from flooding with a more permanent solution than a temporary easement granted to the city from a business owner. This project supports the city's goal of promoting public safety. SURFACE WATER UTILITY CAPITAL INVESTMENT PROGRAM 2019 through 2024 (in thousands of dollars) Description and Scope The project includes the design and construction of an additional infiltration system to increase the size of an existing infiltration system near the city's Maintenance Shops. The existing infiltration system in Monroe Avenue NE and N 2nd Street has insufficient capacity for the increased runoff due to the changing land use for the 200-acre basin that it serves. The existing infiltration system surcharges, which has caused street flooding and private property damage during large storm events. To prevent flooding, the city has a temporary easement, approved in 2018, to discharge stormwater during extreme events into the Segale Upper Balch Pit. Rationale AGENDA ITEM #2. a) 2019/2020 Proposed Budget City of Renton, Washington Priority Number:20 Project Title:SW 43rd Street/Lind Ave SW Storm System Improvements Project Category: Development Status:Previously Approved Appropriated To-Date 2019 2020 2021 2022 2023 2024 Total Project Expenditures Expenditures Planning/Consultants - - - - - 250 450 700 Project Management - - - - - 50 50 100 Major Maintenance - - - - - - - - Land Acquisitions - - - - - - - - Construction - - - - - - - - Total Expenditures - - - - - 300 500 800 Appropriated To-Date 2019 2020 2021 2022 2023 2024 Total Project Resources Resources General Fund Sources - - - - - - - - Restricted Taxes - - - - - - - - Mitigation Fees - - - - - - - - Bond Proceeds - - - - - - - - Grants/Contributions Awarded - - - - - - - - Grants/Contributions Anticipated - - - - - - - - Fund Balance - - - - - 300 500 800 Total Resources - - - - - 300 500 800 *Restricted Taxes include REET, Fuel, Utility, and KC Levy funds This project is in coordination with the city's goals of economic development, public safety and quality of life. SURFACE WATER UTILITY CAPITAL INVESTMENT PROGRAM 2019 through 2024 (in thousands of dollars) Description and Scope The project includes constructing approximately 3,500 feet of a new 84-inch diameter storm system along Lind Avenue SW, from SW 43rd Street to SW 39th Street, and then along SW 39th Street from Lind Avenue to a new outfall into Springbrook Creek. The estimated total project cost is $4 million. Project design and permitting is programmed to start in 2023 with construction planned for 2025. Rationale AGENDA ITEM #2. a) 2019/2020 Proposed Budget City of Renton, Washington Priority Number:21 Project Title: Project Category: Development Status:Previously Approved Appropriated To-Date 2019 2020 2021 2022 2023 2024 Total Project Expenditures Expenditures Planning/Consultants - - - - - - 350 350 Project Management - - - - - - 50 50 Major Maintenance - - - - - - - - Land Acquisitions - - - - - - - - Construction - - - - - - - - Total Expenditures - - - - - - 400 400 Appropriated To-Date 2019 2020 2021 2022 2023 2024 Total Project Resources Resources General Fund Sources - - - - - - - - Restricted Taxes - - - - - - - - Mitigation Fees - - - - - - - - Bond Proceeds - - - - - - - - Grants/Contributions Awarded - - - - - - - - Grants/Contributions Anticipated - - - - - - - - Fund Balance - - - - - - 400 400 Total Resources - - - - - - 400 400 *Restricted Taxes include REET, Fuel, Utility, and KC Levy funds This project is in coordination with the city's goals of economic development and promoting public safety. SURFACE WATER UTILITY CAPITAL INVESTMENT PROGRAM 2019 through 2024 (in thousands of dollars) East Valley Road Storm System Improvements Description and Scope The project includes replacing the existing storm system along the East Valley Road between SW 29th Street and SW 23rd Street with a new 48-inch storm system. The new storm system will discharge into the SW 23rd Street channel, which flows to Springbrook Creek. The project schedule and improvements may change depending upon the schedule and scope of improvements planned by WSDOT as part of the I-405/SR-167 project. Rationale AGENDA ITEM #2. a) 2019/2020 Proposed Budget City of Renton, Washington Priority Number:22 Project Title: Project Category: Regulatory Status:Previously Approved Appropriated To-Date 2019 2020 2021 2022 2023 2024 Total Project Expenditures Expenditures Planning/Consultants - - - - - - - - Project Management 446 - - - - - 100 546 Major Maintenance - - - - - - - - Land Acquisitions - - - - - - - - Construction - - - - - - - - Total Expenditures 446 - - - - - 100 546 Appropriated To-Date 2019 2020 2021 2022 2023 2024 Total Project Resources Resources General Fund Sources - - - - - - - - Restricted Taxes - - - - - - - - Mitigation Fees - - - - - - - - Bond Proceeds - - - - - - - - Grants/Contributions Awarded - - - - - - - - Grants/Contributions Anticipated - - - - - - - - Fund Balance 446 - - - - - 100 546 Total Resources 446 - - - - - 100 546 *Restricted Taxes include REET, Fuel, Utility, and KC Levy funds This plan update is a regulatory requirement. This plan supports the city's goals of promoting public safety and quality of life. SURFACE WATER UTILITY CAPITAL INVESTMENT PROGRAM 2019 through 2024 (in thousands of dollars) Surface Water Utility System Plan Description and Scope The Surface Water Utility System Master Plan is a comprehensive management plan of the city’s natural and constructed surface water systems. The plan identifies current and future resource requirements, policies, regulatory requirements, and design criteria associated with the management of surface water runoff within the city. The plan defines maintenance and operational programs along with future capital investment programs needed to solve flooding, water quality, and fish habitat problems in response to existing problems, future growth, and regulatory requirements related to the NPDES Phase II Permit and the Endangered Species Act. A draft Surface Water Utility System Master Plan is being prepared for review and approval by Renton City Council in 2019. Funding programmed for 2024 is to update this plan. Rationale AGENDA ITEM #2. a) 2019/2020 Proposed Budget City of Renton, Washington Priority Number:23 Project Title:Ginger Creek/Cascade Park Basin Plan Project Category: Development Status:Previously Approved Appropriated To-Date 2019 2020 2021 2022 2023 2024 Total Project Expenditures Expenditures Planning/Consultants - - - - - - 250 250 Project Management - - - - - - 100 100 Major Maintenance - - - - - - - - Land Acquisitions - - - - - - - - Construction - - - - - - - - Total Expenditures - - - - - - 350 350 Appropriated To-Date 2019 2020 2021 2022 2023 2024 Total Project Resources Resources General Fund Sources - - - - - - - - Restricted Taxes - - - - - - - - Mitigation Fees - - - - - - - - Bond Proceeds - - - - - - - - Grants/Contributions Awarded - - - - - - - - Grants/Contributions Anticipated - - - - - - - - Fund Balance - - - - - - 350 350 Total Resources - - - - - - 350 350 *Restricted Taxes include REET, Fuel, Utility, and KC Levy funds This provides funding for a study to determine the primary cause of the problem, evaluate alternative solutions and develop a design of the preferred solution. This project supports the city's goal of promoting public safety. SURFACE WATER UTILITY CAPITAL INVESTMENT PROGRAM 2019 through 2024 (in thousands of dollars) Description and Scope Cascade Park drains north through a neighborhood via an old concrete pipe and open channels. The runoff eventually reaches the Cedar River Pipeline ROW, via an old steel pipe, and is routed under the Tiffany Park area. The existing pipe system has surcharged during moderate events flooding Cascade Park. Based on a cursory site visit, it appears that sediment buildup in the open channel section between SE 160th Street and the Cedar River Pipeline ROW, along with insufficient capacity of the existing storm system pipe, flat gradient and poor structural pipe conditions are contributing to the backwater conditions resulting in flooding in the park that could cause flooding in the neighborhood to the south. Rationale AGENDA ITEM #2. a) 2019/2020 Proposed Budget City of Renton, Washington Dept Assigned Equipment Number Make Model Description Original Cost Year Purchased Life 2019 Replacement Cost 2020 Replacement Cost CED Inspection/Permits B130 CHEV TRAILBLAZER Utility Vehicle small 22,321 2008 8 37,000 CED Inspection/Permits B136A CHEV TRAILBLAZER Utility Vehicle small 22,186 2008 8 37,000 CS Admin B089 GMCX SAFARI Van Passenger 20,338 1999 8 30,000 CS Admin B120 FORD SUPREME 14 pass bus with lift 50,054 2006 8 70,000 CS Admin B121 FORD SUPREME 14 pass bus with lift 50,054 2006 8 70,000 CS Facilities C211 GMCX SONOMA Pickup compact 15,212 2002 8 33,000 CS Parks D107 CHEV 3500 DUMP Stakebed dump 31,536 2003 10 50,000 CS Parks P079 SPLT SPRAY TANK Spray Tank 1,088 1995 8 3,500 CS Parks P084 SPLT SPRAY TANK Spray Tank 1,039 1995 8 3,500 CS Parks P105 JNDR GATOR Gator 6X4 7,765 1999 5 10,000 CS Parks P112 FRYS TRAILER 40 ton Trailer 3,547 2000 15 7,000 CS Parks P117 BROY 5054X2 Rototiller 5,731 1999 10 10,000 CS Parks P118 BROY 5054X2 Rototiller 2,394 1999 10 10,000 CS Parks P119 BROY 5054X2 Rototiller 6,172 1999 10 10,000 CS Parks P122 JNDR LOADER TILLER Tractor 27,047 2002 10 35,000 CS Parks P125 TORO SANDPRO Rotary Mower 13,577 2003 5 30,000 CS Parks P127 FRYS TRAILER Arc Welder 3,152 2003 15 7,000 CS Parks P129 TORO 4000 Rotary Mower 46,546 2004 5 75,000 CS Parks P131 JNDR 1445 Rotary Mower 19,061 2004 5 30,000 CS Parks P132 SMCO SWEEPSTAR Sweeper, Leaf, Towed 24,995 2004 10 40,000 CS Parks P138 SMCO SWEEPSTAR Sweeper, Leaf, Towed 27,296 2004 10 40,000 Police Admin A449A TOYO CAMRY Gas/Elect Hybrid 30,002 2008 6 56,000 Police Admin A458 DMCH AVENGER Standard 22,715 2008 4 56,000 Police Admin A459 TOYO CAMRY Gas/Elect Hybrid 27,463 2009 4 56,000 Police Admin B145A FORD ESCAPE Gas/Elect Hybrid 27,513 2008 8 40,000 Police Animal Control C260 FORD F250 Pickup 28,164 2012 8 150,000 Police Investigations A457 DMCH AVENGER Standard 22,715 2008 4 48,000 Police Investigations B114 FORD ESCAPE Utility Vehicle small 24,538 2005 8 40,000 Police Investigations B138A FORD ESCAPE Utility Vehicle small 20,296 2008 8 55,000 Police Patrol B164 FORD INTERCEPTOR Utility Vehicle small 35,118 2013 4 70,000 Police Patrol B166 FORD INTERCEPTOR Utility Vehicle small 35,537 2013 4 70,000 Police Patrol B167 FORD INTERCEPTOR Utility Vehicle small 35,537 2013 4 70,000 Police Patrol B168 FORD INTERCEPTOR Police pursuit 36,337 2013 4 70,000 Police Patrol NEW NEW NEW Police pursuit - 8 1,650,000 Police Spec Ops A440 TOYO PRIUS Gas/Elect Hybrid 22,396 2005 4 70,000 Police Traffic B118 FORD EXPLORER Utility Vehicle small 22,728 2006 8 70,000 PW Airport C233 FORD F150 Pickup 1/2 ton 25,917 2006 8 35,000 PW Airport C234 FORD F150 Pickup 1/2 ton 18,165 2007 8 35,000 PW Street Maint D079 FORD DUMP Dumptruck 60,220 1995 8 120,000 PW Street Maint D085 FORD F450 1 Ton Truck 30,370 1997 15 60,000 PW Street Maint D096 FREIGHT FLD120SD Dumptruck 10yd 128,206 2001 15 120,000 PW Street Maint E109 INGERSOL DD34HF Vibrator 46,761 2005 10 90,000 PW Street Maint E119A NEW HOLL TV145 Mower 137,353 2008 5 200,000 PW Surface Water Maint C217 FORD F250 Pickup 24,946 2002 8 60,000 PW Surface Water Maint E120A CTPL 314CLCR Backhoe 183,944 2008 5 280,000 PW Surface Water Maint E132 ALAMO TRAXX Mower 94,429 2014 5 100,000 PW Surface Water Maint S221 KUT KWK SSM38-72D Rotary Mower 51,891 2011 5 100,000 PW Trans System Maint C248 FORD F250 Pickup 24,930 2008 10 40,000 PW Trans System Maint C252 FORD F350 1 Ton Pickup 22,045 2008 10 40,000 PW Trans System Maint D117 INTE 4300 Bucket truck 212,277 2008 10 250,000 PW Trans System Maint E110 GMCX TRUCK Stakebed dump 140,647 2006 10 200,000 PW Trans System Maint S057 UTIL POLE Trl Trailer Stake 370 1968 15 25,000 PW Wastewater Maint D108 FORD F550 Stakebed dump 34,290 2004 10 60,000 PW Wastewater Maint E127 INTE VACTOR Vactor 369,600 2012 5 440,000 PW Wastewater Maint S153 TKLT TRAILER 40 ton Trailer 2,164 1992 15 25,000 PW Wastewater Maint S157 AREN WC60H Cement Mixer 3,267 1993 10 10,000 PW Water Engineering A391 FORD TAURUS Standard Wagon 17,070 1999 10 30,000 PW Water Maint B097 WORK GRUMMAN Step Van 33,727 2001 8 60,000 PW Water Maint D100 FORD F550 Stakebed dump 39,428 2000 10 60,000 PW Water Maint S191 DEERE 345 Rotary Mower 6,892 2002 5 PW Water Maint S218 DEERE X720 Mower 9,652 2011 5 20,000 Total:3,865,000$ 1,804,000$ Fund 501 - Equipment Rental Fund 2019-2020 Vehicle Acquisitions/Replacements Capital Investment Program - Internal Service Funds AGENDA ITEM #2. a) Renton City Council August 6, 2018 AGENDA ITEM #2. b) Agenda •Budget Calendar •Capital Improvement Program Discussion –General Government CIP (Parks & Facilities) –Transportation CIP •Next Steps Page 2 AGENDA ITEM #2. b) 2019-2020 Budget Schedule Council Engagement Page 3 Committee of the Whole o Council CIP / Budget Status Update Committee of the Whole o Mayor's Budget Message and Proposed Budget Committee of the Whole o Budget Overview o Department Presentations o Council deliberation o Department Presentations o Council deliberation o Consider draft committee report Regular Council Meeting o Public Hearing #2 o Public Hearing #3 o Adopt committee report o 1st reading of budget-related legislation Regular Council Meeting o 2nd reading and enactment of all budget-related legislation October 8, 2018 October 15, 2018 August 6, 2018 October 1, 2018 November 19, 2018 Committee of the Whole Committee of the Whole October 22, 2018 November 5, 2018 Regular Council Meeting AGENDA ITEM #2. b) Budget Development Next Steps •Mayor presents budget message and preliminary budget to Committee of the Whole (October 1) •Budget overview, department presentations & Council deliberation (October) •Budget-related legislation (November) Page 4 AGENDA ITEM #2. b) Upcoming Public Outreach •Public Hearing on October 22 •Public Hearing on November 5 •Public comments at each Council meeting •Email Finance at finance@rentonwa.gov Page 5 AGENDA ITEM #2. b) Capital Improvement Program •General Government CIP –Kelly Beymer, Community Services Administrator •Transportation CIP –Gregg Zimmerman, Public Works Administrator Page 6 AGENDA ITEM #2. b) Parks •17 prioritized projects for 2019 –2020 •$3.85 million requested for 2019 –includes REET, Mitigation funds, and grants •$2.6 million requested for 2020 –includes REET and Mitigation funds •All project prioritization based on Safety, ADA Upgrades, and one project addressing the downtown revitalization •Following slides are a sample of projects General Government CIP AGENDA ITEM #2. b) Philip Arnold Park Improvements ADA Upgrades from Lower Parking Lot Replace 15+ Year Old Play Equipment AGENDA ITEM #2. b) Parking Lot Repairs Renton Senior Activity Center Coulon Parking Lot AGENDA ITEM #2. b) Coulon Swim Beach Repairs AGENDA ITEM #2. b) Sunset Park Phase II Construction – Open 2020!AGENDA ITEM #2. b) Facilities •Six projects for 2019 –2020 •Approximately $2 million requested for each 2019 & 2020 –REET funds •Project prioritization based on system or component life expectancy from Facility Condition Assessment •Following slides are project samples General Government CIP AGENDA ITEM #2. b) City Hall Elevator Modernization AGENDA ITEM #2. b) 2019 -City Hall Mammoth Replacement AGENDA ITEM #2. b) 2019 -City Hall Cooling Tower Replacement AGENDA ITEM #2. b) 2020 -Renton Community Center 14 Air Handler Units and Boiler Replacement AGENDA ITEM #2. b) 2020 -Renton Community Center Chiller Replacement AGENDA ITEM #2. b) Transportation Improvement Program Six-Year Transportation Improvement Plan (“TIP”) •Updated and adopted annually in July/August •Updated as needed with quarterly budget adjustments Scheduled for the August 6 Council meeting agenda for referral to the August 20 Transportation (Aviation) Committee Public hearing scheduled during the August 20 Council meeting Scheduled for adoption August/September 2018 2AGENDA ITEM #2. b) 3 Transportation Improvement Program Map AGENDA ITEM #2. b) Draft Transportation Improvement Program EXPENDITURES AND REVENUES FOR BUDGET YEARS 2019 AND 2020 2019 2020 Expenditures $ 20.8M $ 23.8M Revenues*$ 21.4M $ 23.2M** *Revenues include vehicle fuel tax, business license fees, business and occupation tax, grants, mitigation (impact) fees and other funding sources **Includes $6.2 undetermined funds 9AGENDA ITEM #2. b) Draft Transportation Improvement Program Proposed High Priority Projects: 1.Williams Avenue South and Wells Avenue South Conversion Project •South Grady Way to North 1st Street (TIP No. 26) 2.Park Avenue North Extension •Logan Avenue North to Southport (TIP No. 20) 3.Rainier Avenue South/North Corridor Improvements Phase 4 •South 3rd Street to NW 3rd Place (TIP No. 21) 4.Duvall Avenue NE Roadway Improvements •NE 7th Street to Sunset Blvd NE (TIP No. 16) 10AGENDA ITEM #2. b) Draft Transportation Improvement Program Park Avenue North Extension •Logan Avenue North to Southport (TIP No. 20) 11AGENDA ITEM #2. b) Draft Transportation Improvement Program Williams Avenue South and Wells Avenue South Conversion Project •South Grady Way to North 1st Street (TIP No. 26) 12AGENDA ITEM #2. b) Draft Transportation Improvement Program Lake Washington Loop Trail •Perimeter of the Renton Airport (TIP No. 18) 13AGENDA ITEM #2. b) Questions? Page 25 AGENDA ITEM #2. b)