Loading...
HomeMy WebLinkAboutRS_Civil_Drainage_Report_170629_v3 Montano Residence (Unit 3785) NE 12th Street, Renton WA 98059 Job (#) Drainage Report for Small Lot Residence Prepared for Chateau Meridian Development P.O. Box 6490 Kent, WA 98032 Prepared by O’Bunco Engineering International Inc. 1042 W James Street. Suite 103 Kent, WA 98032 June 2017 May 2017 L-i Montano Re/N.E. 12TH ST. PRELI. TIR TABLE OF CONTENTS P.E. Stamp Page .......................................................................................................................... 1  1.0 Project Overview ............................................................................................................... 2  2.0 Preliminary Conditions & Requirements Summary ........................................................... 3  3.0 Off-Site Analysis ................................................................................................................ 4  4.0 Conveyance System Design and Analysis ........................................................................ 4  5.0 Erosion / Sedimentation Control Design ........................................................................... 5  6.0 Financial Guarantees and Liability ................................................................................. 6  7.0 Maintenance and Operations ............................................................................................ 6  8.0 Revised Flow Control Requirements Summary/Storm Drainage Calculations .................. 6  APPENDIX A: 1. Topographic Map 2. Site Drainage Plans C1, C2, C3 & Figure 3 APPENDIX B: Maps & Drawings 1. Flow Control (Reference 11-A) 2. Groundwater Protection Areas (Reference 11-B) 3. Soil Survey (Reference 11-C) May 2017 Page.1 Montano Re/N.E. 12TH ST. PRELI. TIR P.E. Stamp Page O’Bunco Engineering Inc The staff of O’Bunco Engineering under the supervision and direction of undersigned professional engineer have prepared this report whose stamp and signature appears hereon. Samuel Obunike, P.E. Principal May 2017 Page.2 Montano Re/N.E. 12TH ST. PRELI. TIR 1.0 Project Overview Project Profile:  Property address & legal description is: Quarter Section 3, Township 23 N, Range 5 E W.M.; King County WA  Soil type: According to the King County soils map, the site is underlain with Alderwood Soils: Alderwood gravelly Sandy Loam (AgD), hydrologic soils group C.  Approximately 0.105 acres is developed with SW, DW surface & roof top  Approximately 0.115 acres is developed with grass cover  No Wetland was encountered  Proposed improvement: Residential one lot & Landscaping Site Description: The site is located at 5200 block of NE 12th Street in Renton, Washington (Vicinity Map Figure 1). The site consists of one rectangular tax parcel (No. 323059154) with a total area of 9,440 square feet. The site slopes gently toward the northeast at magnitudes ranging from 2.5 to 9.1 percent. The overall topographic relief across the property is approximately 14 feet. The property is vegetated with sparse evergreen and deciduous trees and grasses. The site is bordered to the east and west by single family residences, to the south by NE 12th St. SOIL CONDITIONS: Soil Type: AgD Slope: 15% to 30% Erosion Potential: Low Erosive Velocity: Low May 2017 Page.3 Montano Re/N.E. 12TH ST. PRELI. TIR PROPOSED PROJECT: The approximately 0.217 acres’ site including 1 existing paved driveway and vegetated with sparse evergreen and deciduous trees and grasses to be constructed of one new single-family residences on the existing parcel. 2.0 Preliminary Conditions & Requirements Summary The following is a summary list of the core requirements and special requirements according to City of Renton (COR) modified King County SWDM 2016 and brief description how the requirements are addressed: Core Requirement #1 (Discharge at the Natural Location): This project will preserve existing drainage paths. The project also proposes to restore the natural drainage paths for the frontage street and infiltrate roof/lot drain onsite (see site drainage plans C1, C2, C3 & Figure 3). Core Requirement #2 (Offsite Analysis): The existing drainage conditions were evaluated and runoff from the existing impervious surface do not have offsite impact but contained with the site. Core Requirement #3 (Flow Control): Flow control considerations was bases on final Geotech report. Full dispersion-N/G (no good) because the property does not have 100 ft of flow path available; The proposed new impervious surfaces (roof, and drive/walkway) will be mitigated using full infiltration. As a result, no additional flow control is required. Core Requirement #4 (Conveyance System): Not applicable (N/A). Core Requirement #5 (Erosion and Sediment Control): The proposed erosion control erosion and sediment plan will consist of filter fabric fences to be placed along the north, east margin of the site. Contractor will comply the COR/Ecology necessary permit during construction. Core Requirement #6 (Maintenance and Operations): The proposed storm drainage system will be owned, operated and maintained by the owner. See exhibit B for maintenance & operation manual. May 2017 Page.4 Montano Re/N.E. 12TH ST. PRELI. TIR Core Requirement #7 (Financial Guarantees and Liability): Financial Guarantees and Liability not applicable (N/A). Core Requirement #8 (Water Quality): The COR 2016 drainage manual requires water treatment for project that add 5,000 square ft or more of new pollution generating impervious surface (PGIS). The proposed developed (PGIS) will add 750 sq. ft of NEW PGIS. Based upon the threshold, water quality is not required per the manual. 3.0 Off-Site Analysis Upstream: The proposed project does not have off-site runoff entering the site. The frontage property has extruded asphalt curb which drains to downstream catch basin “B” (See attached topographic survey map) Downstream: We do not observe any areas that indicated flooding or any undue wash-off of soils during our site visit on march 5th 2017 (from one quarter of a mile downstream). Sheet flow from the site drains north to northeast parcels # 0323059054 which is heavily wooded brushy area and with Honey Creek flowing northwest from this parcel, cross Hoquiam avenue and enters May Creek approximately 2 miles from the site which discharges to Lake WA. 4.0 Conveyance System Design and Analysis No storm drainage conveyance system is proposed for the project and such the onsite conveyance system not applicable (N/A). May 2017 Page.5 Montano Re/N.E. 12TH ST. PRELI. TIR 5.0 Erosion / Sedimentation Control Design All temporary erosion and sediment control requirements have been designed in accordance with Core Requirement #5 of the 2016 COR SWDM section 1.2.5 Erosion and Sediment Control. These standards prevent or reduce pollution of stormwater runoff caused by construction activities. The Temporary Erosion and Sediment Control Plan has been designed to minimize the amount of sediment laden runoff that leaves the project site, protecting downstream properties from construction and grading activities. Since project does not meet 1 or more acre land disturbance, CSWPP is not required. Temporary erosion and sediment control plans has been prepared and attached in appendix. The following is a narrative describing proposed TESC measures: Clearing Limits: Clearing limits is shown clearly on TESC plans with details sufficient to install and maintain during construction. Cover Measures: The type and location of temporary cover measures to be used onsite is shown on the TESC plans. Perimeter Protection: Silt fencing location and details for installation is shown on TESC plans. Traffic Area Stabilization: Construction entrance locations is shown on the TESC plans. Dust control measures shall also be addressed on the plans. Sediment Retention: Silt fencing and catch basin inserts shall be used primarily to trap sediments. Also, stabilization of the site will help prevent sediments from migrating. Wet Season Requirements: A list of applicable wet season requirements shall be shown on the TESC plans. From October 1st through April 30th, no soils shall be exposed for more than two consecutive working days. Also, exposed soils shall be covered. May 2017 Page.6 Montano Re/N.E. 12TH ST. PRELI. TIR 6.0 Financial Guarantees and Liability Per RMC 4.6.030 Drainage Standard Section L, the flow control BMPs (Downspout Infiltration) for the single family residential building, Finan cial Guarantees and Liability not applicable (N/A). Declaration of Covenant will be filed for this site for the owner to operate and maintain and is provided in Exhibit A of this report. 7.0 Maintenance and Operations The maintenance & operations for the proposed dry well and infiltration trench have been provided in Exhibit B under Declaration of covenant. 8.0 Revised Flow Control Requirements Summary/Storm Drainage Calculations Flow Control (Core Requirement No. 3) The proposed development qualifies for exemption as follows: Since the proposed new project met the basic exemption of section 1.2.3, new plus replaced impervious is 4,028 sq. ft / or less than 5,000 sq. ft and less than 0.75 ac (actual pervious added is 5,372 sq. ft) of new pervious surface. In addition, the property is located within the city of Renton Flow Control Duration Standard (Matching Forested Site Conditions). The proposed new impervious surfaces will be mitigated using full infiltration (BMP’s to include drywell for driveway stormwater May 2017 Page.7 Montano Re/N.E. 12TH ST. PRELI. TIR management and infiltration trench for roof drain stormwater management designed to the “40/20 rule” section 1.2.3. Therefore, no additional flow control is required. Please see below flow control and water quality facility analysis and design concept- Based upon the 2017 City of Renton Drainage Manual, the following steps are required to determine the mitigation of storm water runoff of the development: Full Dispersion-N/G (no good)-the property does not have 100 feet of flow path available on each new lot; Full Infiltration- acceptable- The soils on the property are fine to medium sands and should provide adequate depth for full infiltration. The proposal is to mitigate all new impervious surfaces for the 1 single lot improvement. Design: Exiting Impervious surface on property- Ex. Asphalt Driveway- 750 sq. ft Ex. Concrete Path- 30 sq. ft Total existing 780 sq. ft Proposed lot impervious surface 2,918 sq. feet of roof area and patio; 1,110 sq. ft. (P.G.I.S) of asphalt/concrete driveway & 60 sq. ft. of path (Total = 1,170 sq. ft) Total impervious proposed 4,028 sq. ft Mitigation using full infiltration per very conservative calculation (see attached) & section C.2.2 or 5.2. 10 *20 infiltration trench & 1 drywell were prosed for roof drain & driveway to mitigate the propped impervious surfaces. May 2017 Page.8 Montano Re/N.E. 12TH ST. PRELI. TIR Developed Impervious- Un-mitigated New impervious 0 sq. ft Existing Impervious 780 sq. ft Total developed 4,028 sq. ft The difference between the existing and developed impervious surfaces is 3,248 sq. ft or less than 5,000 sq. feet. Therefore, storm water detention is not required per the manual. Proposed BMPs The proposed Infiltration Trench for roof mitigation located at the back of the property and infiltration drywell for driveway & walkway surface runoff containment, located at the front of the property, is underground stormwater detention facility which utilizes percolation into the ground as at least part of it outlet. The selected BMPs has numerous environmental benefits to include to reduce the peak rate of runoff leaving the site and also recharge groundwater into the ground. Sizing Infiltration Trench & Drywell Trench (22’x10’x4’ deep bed of ½” clean crushed stone with synthetic filter fabric completely around the stone-dimensions)-, because of limited space, 2 rows trenches with combinations of two 12 feet long 24” diameter perforated pipes with two 6 foot long manifolds and stone materials to add storage capacities are used to reduce trench footprints (C1). Drywell, -because of limited space, 1 drywell with combinations of bottomless concrete tank and surrounded with stone materials are used to reduce trench footprint and add capacity (C1). Appendix A Montano Residence 1. Topo Map 2. Site Drainage Plans C1, C2 , C3 & Figure 3 Appendix B:Maps & Drawings Montano Residence 1. Flow Control 2. Groundwater Protection Area 3. Soil Survey LakeDesire ShadyLake (MudLake) PantherLake LakeYoungs LakeWashington Bl a c kRi ver Gr eenRiv e r C edarRi verUV900 UV167 UV515 UV169 UV900 UV169 UV167BN IncBN IncBBNNIInnccSSEE RReennttoonn IIssss aa qquuaahh RR dd RReennttoonn MMaappllee VVaalllleeyyRRdd MMaapplleeVVaalllleeyyHHwwyy 110088tthhAAvveeSSEESSWW SSuunnsseettBBllvv dd RRaaiinnii eerrAAvveeNNNE 3rd S t NE 3rd S t SW 43rd StSW 43rd St SS EE CCaarrrrRR dd NE 4th StNE 4th St SSEE RReennttoonn MMaappllee VVaalllleeyy RRddLLooggaannAAvveeNN SR 515SR 515PPaarrkkAAvveeNNOOaakkeessddaalleeAAvveeSSWWSSuunnsseettBBllvvddNN EE DDuuvvaallllAAvveeNNEEI-405 FWYI-405 FWY II--440055FFWWYYSR 167SR 1671144 00tthh WWaayy SS EENNEE 2277tthh SStt 115566tthhAAvveeSSEEUUnniioonnAAvveeNNEE111166tthhAAvveeSSEESW 7th StSW 7th St N 8th StN 8th St PP uuggeettDDrrSSEE RR ee nnttoonnAAvvee SS SSWW 2277tthh SStt BBeennssoonnRRddSSWWiilllliiaammssAAvveeSSMMoonnrrooeeAAvveeNNEESE 128th StSE 128th St II nntt eerr uurr bbaannAA vvee SS HHooqquuiiaammAAvveeNNEE8844tthhAAvveeSSSSEEPPeett rr oovvii tt sskkyyRRddEEVVaalllleeyyHHwwyySE 192nd StSE 192nd St SE 60th StSE 60th St TTaallbboottRRddSSRRee nn tt oo nn AAvveeSS116644tthhAAvveeSSEESE 208th StSE 208th St SE 72nd StSE 72nd St RR aaiinniieerr AA vvee SS 111166tthhAAvveeSSEES 128th StS 128th St NNeewwccaassttllee WWaayy SS 221122tthh SStt SS 118800tthh SStt CCooaall CCrreeeekkPPkkwwyySSEESW 41st StSW 41st St 114400tthhAAvveeSSEE112288tthhAAvveeSSEE6688tthhAAvveeSSSSEE 116688tthh SStt NE 12th StNE 12th St BBeeaaccoonn AA vv ee SS FFoorreesstt DDrr SSEE SSEE 116644tthh SStt 114488tthhAAvveeSSEESSEE MMaayy VVaalllleeyy RRdd SS EE JJ oo nn ee ss RR dd SS EE 22 00 44 tthh WW aayySW 34th StSW 34th St SE 144th StSE 144th St 114488tthhAAvveeSSEE115544tthhPPllSSEELL aa kk ee WWaa sshhii nnggtt oonnBBll vvddNNEEddmmoonnddssAAvveeNNEEAAbbeerrddeeeennAAvveeNNEEEEMM eerrcceerrWWaayyWWeessttVVaalllleeyyHHwwyyEast Valley RdEast Valley Rd,§-405 ,§-405 ,§-405 µ0 1 2 Miles Flow Control Application Map Reference 11-A Date: 01/09/2014 Flow Control Standards Peak Rate Flow Control Standard (Existing Site Conditions) Flow Control Duration Standard (Existing Site Conditions) Flow Control Duration Standard (Forested Conditions) Flood Problem Flow Unincorporated King County Flow Control Standards Renton City Limits Potential Annexation Area !!! ! ! !!!!! ! ! !! ! ! !! ! !! PW-12 PW-11PW-17 PW-4 PW-9 PW-8 RW-3 RW-2 EW-3 PW-5A PW-12 PW-10 ,§-405 ,§-405 115544tthhPPllSSEESW 34th StSW 34th St East Valley RdEast Valley Rd114488tthhAAvveeSSEE140th Ave SE140th Ave SE164th Ave SE164th Ave SETalbot Rd STalbot Rd SN 30th StN 30th St 68th Ave S68th Ave SRa i n i e r A v e S Ra i n i e r A v e S SE 192nd StSE 192nd St SE May V a l l e y R d SE May V a l l e y R d E Valley HwyE Valley HwySE P e t r o v i t s k y R d SE P e t r o v i t s k y R d Forest D r S E Forest D r S E S 128th StS 128th St 112th Ave SE112th Ave SE84th Ave S84th Ave SSE 168th StSE 168th St S 55th StS 55th St N 10th StN 10th St NE 2nd StNE 2nd St SW 41st StSW 41st St 116th Ave SE116th Ave SE140th Ave SE140th Ave SESE 192nd StSE 192nd St 148th Ave SE148th Ave SE114400tthhAA vv ee SS EE SW 27th StSW 27th St Benson Rd SBenson Rd SHouser Way NHouser Way NLind Ave SWLind Ave SWN 8th StN 8th St PP uu gg ee ttDDrrSSEERReennttoonnAAvv ee SS SW 7th StSW 7th St I-405 FWYI-405 FWYRainier Ave NRainier Ave NNNEEPPaa rr kk DDrr NE 4th StNE 4th St SW 43rd StSW 43rd St SE Carr RdSE Carr Rd NE 3rd S t NE 3rd S tLogan Ave NLogan Ave NDuvall Ave NEDuvall Ave NEI-405 FWYI-405 FWYI-405 FWYI-405 FWYI-405 FW Y I-405 FW Y I-405 FWYI-405 FWYNE 4th StNE 4th StI-405 FWYI-405 FWYII--440055FFWWYYI-405 FWYI-405 FWYI-405 FWYI-405 FWY I-405 FWYI-405 FWYI-405 FWYI-405 FWY NE 4th StNE 4th St BN IncBN IncBN IncBN Inc BN IncBN Inc BN IncBN IncBN I n cBN I n c BN IncBN IncBN I n cBN I n c BN IncBN Inc BB NN IInnccBN I n cBN I n c BN IncBN IncBN In c BN In c BN IncBN IncCedar River Green River Black River May Creek Duwamish Waterway Springbrook Creek Lake Washington Lake Youngs Panther Lake Lake Boren Reference 11-B Wellfield Capture Zones One Year Capture Zone Five Year Capture Zone Ten Year Capture Zone Cedar Valley Sole SourceAquifer Project Review Area Streamflow Source Area Cedar Valley Sole Source Aquifer Aquifer Protection Area Zones Zone 1 Zone 1 Modified Zone 2 Network Structure !Production Well !Springbrook Springs Renton City Limits Potential Annexation Area Groundwater Protection Areas Date: 01/09/2014 µ0 1 2 Miles BeD BeD BeC AkF AmC KpD AmB AmB AgC AgC AgC KpB AgC AkF BeD AgC KpD AgCKpBKpBAgD EvC Bh BeC AgB KpB AgD UrEwC EvB AmC Or AgC BeC BeD BeD BeC AgC KpD BeC KpCKpB Sk AmC BeC UrBeCUr AgD KpB UrAgC EvC KpC AgC OvD SkAgB AgB AgD EvC W OvD OvD No AgC AgD EvC RdC Sk KpB No AgCRdEAgCEvC BeC InC Bh BeDRdC AkF AgD BeD BhSm AgC RdE AgC AgDEvC Sh Sh PITS PyAgC AgD AgC EvC PITS EvB BeC OvC PITS EvB AgCInA AgD AgD Ur Bh AgC RdCEvCEvD AmB AmC AgD BeD EvC AkF AgD AgC Sm AgD AmC EvB AgD Sm AgC EwC PITSPu Bh Bh AgC KpD Tu AgC EvC EvC Ur RdC KpB RdCRdE W AgD AgD No AgB AgC No An AkF EvBInD AgD EvDInC SkBeC PITS Ur WBeC W BeD An EvC BeC Pc EvC Rh AmC BeCBeD BeD Ur BeC Ur W W Rh EvC AkF PITS AgD AmCPITS Wo Py Tu BeD EvB Py AmC Py An InC Ng AgC AgC W EvB AgD AgCWo Ur W Ur RdC Ur Ur EvC Rh Pc PyPy AgD AmC AgD MaRh Pc BeD PyNgAmCNg BeC AgC Rh AgD Py Ma PyRh RhRhPu Pu Ur Pu PITS BeD Rh EvC Py Wo Wo AgC Ma AgD AgB So Ng AgD Tu Py AgC AgC AgC AgC Ng Ur AgD Sk AmB AgB AgD PuUr Py Sk Ur No AgB MaBeC W AkFBeDPu Py NoNo AmC AgC EvC Ma Sk EvC AgB Py InC SkAmCAmC AgC AgB SkAgBPITS AgC No Pu AmB EvC PITS AmB AgB AkF AkF Ng AgD AgD AgB EvBAmBAmCAmCWo Ng PITS Nk AgD SkNk SkAgB Ur AgD Wo AmC No AgD NoUr AgB Ur Br Py Os So EvB Ur Nk Wo AmB WPcOsRe UrAmB Sk W AmC Tu No Pu AgD AmBAkFAgCNo UrPk AgB AgC Ur AmB NoAmC NoAmC AmB PITS UrSkAgCAgB AgC Re AgB W InC No AgC Wo EvC NoAmC Wo AgB AgB Ur Ng SkAmB ReOs AgCNo AgD No Ur No InC AgD EvC Tu AmB EvB AgD Pu InC EvCAmC NoEvC Ur EvB AkFBr Os AgD AmC AgB AgD AmBOs Os NoAmC Pk AkF No AmC EvC NoNo AgDBr AgBAgC AgBAmC Re Re KpBAmBNoPyPySkNgAgBEvC EvC Sk NoEvBNo Pu BrPuOsOsWo AmC PantherLake LakeYoungs LakeWashington B l ack Ri verGr e enR iverCeda rRiverDuwamish Wat erwa yUV167 UV900 UV515 UV169 UV900 UV167BN IncBN IncBBNNIInnccSSEE RReennttoonn IIss ss aa qq uuaahhRRdd S 2nd StS 2nd St RReennttoonn MMaappllee VVaalllleeyyRRdd MMaapplleeVVaalllleeyyHHwwyy 110088tthhAAvveeSSEEMMaaiinnAAvveeSSMMaa rrttiinn LL KKiinnggJJrrWWaayySS SSWW SSuunnsseett BBllvv dd RRaaiinnii eerrAAvveeNNNE 3rd S t NE 3rd S t II--440055FFWWYYSW 43rd StSW 43rd St SSEE CCaarrrrRR dd NE 4th StNE 4th St SS GG rr aa dd yy WW aa yy SSEE RReennttoonn MMaappllee VVaalllleeyy RRddLLooggaannAAvveeNN SR 515SR 515PPaarrkkAAvveeNNBBeennssoonnDDrrSSSSuunnsseettBBllvvddNN OOaakkeessddaalleeAAvveeSSWWSSuunnsseettBBllvvddNN EE DDuuvvaallllAAvveeNNEESR 167SR 16711 4400tthh WWaayySSEEWWaa tt ee rrss AA vv ee SS NNEE 2277tthh SStt HH oouusseerrWWaayyNN115566tthhAAvveeSSEEUUnniioonnAAvveeNNEE111166tthhAAvveeSSEESW 7th StSW 7th St PPuuggeettDDrrSSEERR ee nnttoonnAAvvee SS GGaarrddeennAAvveeNNSSWW 2277tthh SStt BBeennssoonnRRddSSWWiilllliiaammssAAvveeSSMMoonnrrooeeAAvveeNNEEII nntt eerr uurr bbaannAAvveeSS HHooqquuiiaammAAvveeNNEE8844tthhAAvveeSSSSEEPPeettrroovviittsskkyyRRdd SSoouutthhcceenn tt ee rr BB llvvdd EEVVaalllleeyyHHwwyySShhaattttuucckkAAvveeSSRR aaiinniieerr AAvvee SS TTaallbboottRRddSSRRee nn tt oo nn AAvv ee SS116644tthhAAvveeSSEESE 208th StSE 208th St SSWWLLaannggssttoonnRRdd SE 72nd StSE 72nd St SE 128th StSE 128th St 112244tthhAAvveeSSEES 128th StS 128th St NNeewwccaassttllee WWaayy SS 221122tthh SStt SS 118800tthh SStt CCooaallCCrr eeeekkPPkkwwyySSEESW 41st StSW 41st St N 30th StN 30th St Tay lo r P l NWTay lo r P l NW114400tthhAAvveeSSEE112288tthhAAvveeSSEE111166tthhAAvveeSSEE6688tthhAAvveeSSSSEE 116688tthh SStt NE 12th StNE 12th St BB ee aa cc oo nn AAvv ee SSFFoorreesstt DDrr SSEE UUnniioonnAAvveeSSEESE 164th StSE 164th St NNiilleeAAvveeNNEE114488tthhAAvveeSSEESSEE MMaayy VVaalllleeyy RRdd SS EE 22 00 44 tthh WW aayySW 34th StSW 34th St SS EE JJ oo nnee ss RR dd SE 144th StSE 144th StEEMMeerrcceerrWWaayy 114488tthhAAvveeSSEEWWMMeerrcceerrWWaayy115544tthhPPllSSEEEEddmmoonnddssAAvveeNNEEAAbbeerrddeeeennAAvveeNNEEWWeessttVVaalllleeyyHHwwyyEast Valley RdEast Valley Rd,§-405 ,§-405 Reference 11-C Renton City Limits Potential Annexation Area Groundwater Protection Area Boundary Aquifer Protection Area Zone 1 Aquifer Protection Area Zone 1 Modified Soil Type AgB AgC AgD AkF AmB AmC An BeC BeD Bh Br EvB EvC EvD EwC InA InC InD KpB KpC KpD Ma Ng Nk No Or Os OvC OvD PITS Pc Pk Pu Py RdC RdE Re Rh Sh Sk Sm So Tu Ur W Wo Date: 01/09/2014 0 1 2 MilesµSoil Survey