Loading...
HomeMy WebLinkAboutECF_Justification_SEPA_181102_v1 535 DOCK STREET P: 253-284-9680 tahomadesigngroup.com SUITE 211 F: 253-284-9681 TACOMA, WA 98402 JUSTIFICATION FOR SEPA ADDENDUM TO: Mr. Jeffrey Taylor FROM: James K. Carleton, AIA DATE: November 2, 2018 PROJECT: Northwest Gourmet Freezer Addition OUR FILE NO.: 2160966.00, .30 SUBJECT: Justification for SEAP Addendum Northwest Gourmet operates a food processing company at 600 W 7th Street in Renton. This letter provides justification for the City of Renton to issue a SEPA Addendum for the proposed building addition at the Northwest Gourmet site. The proposal is located in the Industrial Medium (IM) zone and is within the Employment Area Valley (EAV) district. On June 12, 2013 the City of Renton issued a SEPA Determination of Nonsignificance for the installation of five tanks (and one future tank for a total of six tanks) with a maximum capacity of 30,881 gallons each for the storage of products similar to vegetable oil. The tanks would be installed on the west side of the existing 66,786 SF industrial building. A four-foot wall would be installed around the tanks as a safety precaution. Other exterior improvements included accessible ramps, a new forklift access at the loading dock and larger loading dock and forklift doors. No mitigation measures were imposed. Northwest Gourmet is currently seeking to add a 6,386 square foot freezer addition to the existing building in place of the existing paved loading dock area on the eastside of the building. Environmental details include: · The impervious coverage on the site will remain unchanged. · The proposal will convert a pollution generating surface to one that discharges clean roof stormwater. Storm drainage will continue to discharge to the storm drain system on site, which collects all water and conveys to the City’s regional stormwater system located in SW 7th Street. Stormwater runoff from the building addition roof will discharge onto splash blocks and will be collected by the existing private storm drainage system. The proposed 300 square-foot compressor pad to the south of the building addition will utilize basic dispersion, using sheet flor or a splash block to discharge to the existing lawn area to the south. · Three autumn blaze maple trees will be added to the existing planter strip along the frontage. · There will be no storage, use, or production of any toxic or hazardous chemicals. · Following construction, there will not be an increase in noise generated at the site. · No structures will be demolished. · There are no critical areas on-site. · There is not an anticipated increase to the existing employee count of 41. · The building height will be the same as the existing structure, approximately 33 feet. · No additional parking is required or proposed. · No new vehicular trips are anticipated and no changes to the existing access are proposed. WAC 197-11-706 defines a SEPA Addendum as “an environmental document used to provide additional information or analysis that does not substantially change the analysis of significant impacts and alternatives in the existing environmental document. The term does not include supplemental EISs. An RECEIVED 11/14/2018 jtaylor PLANNING DIVISION Justification for SEPA Addendum Page 2 of 2 Northwest Gourmet Freezer Addition 2160966.00, .30 addendum may be used at any time during the SEPA process.” The Northwest Gourmet building addition proposal does not substantially change the analysis of significant impacts and alternatives in the SEPA DNS issued June 12, 2013. Therefore, we believe a SEPA Addendum is appropriate. Please feel free to contact me with any questions or concerns. Thank You, James K. Carleton, AIA Vice President Tahoma Design Group JKC c: Lisa Klein, Associate Principal Planning, AHBL Philip Dale Couture, AIA, Tahoma Design Group Document1