HomeMy WebLinkAboutP_CIVIL_180830_v1EXISTING BUILDING
66,786 SF
SL
EXISTING
BUILDING
1,680 SF
FF
CL
CONSTRUCTION ENTRANCE
REMOVE ASPHALT
PAVEMENT
PROTECT
EXISTING
LAWN
IPREMOVE CONCRETE
PAVEMENT
IP
EXISTING CATCH BASIN
COORDINATE PAVEMENT REMOVAL
LIMITS WITH FOUNDATION PLAN.
REMOVE PAVEMENT AS NECESSARY.Sheet No.Designed by:Drawn by:Checked by:Sheet Title:Revisions:Issue Set & Date:Client:Job No.of Sheets123Project Title:535 DOCK ST, SUITE 211, TACOMA, WA 98402TEL: 253.284.9680 FAX:253.284.9681WWW.TAHOMADESIGNGROUP.COMTAHOMADESIGN GROUPNorthwest Gourmet Foods - Freezer Addition
600 SW 7th St, Renton, WA 98057
Northwest Gourmet FoodsFreezer AdditionNorthwest Gourmet Foods600 SW 7th St, Renton, WA 98057Mike Gilroy (425) 793-5001Issue For ClientReview9/4/20182160966.10TESC ANDDEMOLITION PLANTDWTDWSTKC1.02215 North 30th Street, Suite 300 Tacoma, WA 98403
253.383.2422TEL 253.383.2572FAX www.ahbl.comWEB
TACOMA SEATTLE SPOKANE TRI-CITIES
CONSTRUCTION SEQUENCE
1.HOLD THE PRE-CONSTRUCTION MEETING WITH THE CITY OF RENTON. IDENTIFY REQUIRED
INSPECTIONS.
2.POST SIGN WITH NAME AND PHONE NUMBER OF ESC SUPERVISOR (MAY BE CONSOLIDATED WITH THE
REQUIRED NOTICE OF CONSTRUCTION SIGN).
3.FLAG OR FENCE CLEARING AND CONSTRUCTION LIMITS.
4.INSTALL INLET SEDIMENT PROTECTION AS SHOWN ON PLANS.
5.UTILIZE THE EXISTING EAST DRIVEWAY FOR STABILIZED CONSTRUCTION ACCESS. SWEEP ENTRANCE
DAILY.
6.INSTALL FILTER FABRIC FENCE AS SHOWN ON PLANS.
7.SAWCUT AND REMOVE EXISTING ASPHALT PAVEMENT AS SHOWN ON PLANS.
8.CONSTRUCT BUILDING ADDITION AND CONCRETE PAD FOR COMPRESSOR PER ARCHITECTURAL PLANS.
9.MAINTAIN EROSION CONTROL MEASURES IN ACCORDANCE WITH CITY OF RENTON STANDARDS AND
MANUFACTURER'S RECOMMENDATIONS.
10.RELOCATE EROSION CONTROL MEASURES OR INSTALL NEW MEASURES SO THAT, AS SITE CONDITIONS
CHANGE, THE EROSION AND SEDIMENT CONTROL IS ALWAYS IN ACCORDANCE WITH THE CITY OF
RENTON EROSION AND SEDIMENT CONTROL STANDARDS.
11.COVER ALL AREAS THAT WILL BE UNWORKED FOR MORE THAN SEVEN DAYS DURING THE DRY SEASON
OR TWO DAYS DURING THE WET SEASON WITH STRAW, WOOD FIBER MULCH, COMPOST, PLASTIC
SHEETING, OR EQUIVALENT.
12.STABILIZE ALL AREAS WITHIN SEVEN DAYS OF REACHING FINAL GRADE.
13.SEED, SOD, STABILIZE, OR COVER ANY AREAS TO REMAIN UNWORKED FOR MORE THAN 30 DAYS.
14.UPON COMPLETION OF THE PROJECT, STABILIZE ALL DISTURBED AREAS AND REMOVE BMPS, IF
APPROPRIATE, UPON APPROVAL OF THE OWNER, ENGINEER, AND CITY OF RENTON INSPECTOR.
1.PROVIDE TEMPORARY EROSION CONTROL MEASURES AS SHOWN ON PLANS. CONTRACTOR IS RESPONSIBLE FOR
MAINTAINING AND ADJUSTING EROSION CONTROL FACILITIES AS SITE CONDITIONS CHANGE. REFER TO THE
T.E.S.C. NOTES AND DETAILS ON SHEET C1.1.
2.CONTRACTOR SHALL DESIGNATE A WASHINGTON STATE CERTIFIED EROSION AND SEDIMENT CONTROL LEAD
(CESCL) WHO WILL BE ON-SITE OR ON CALL AT ALL TIMES. THE EROSION CONTROL LEAD SHALL HAVE THE
AUTHORITY TO IMPLEMENT THE STORMWATER POLLUTION PREVENTION PLAN BASED ON SITE CONDITIONS
WITHIN THEIR SCOPE. IF THE METHODS INDICATED FOR EROSION AND SEDIMENT CONTROL ARE NOT ADEQUATE,
THE CESCL SHALL IMPLEMENT ADDITIONAL METHODS AS REQUIRED.
3.CONTRACTOR SHALL IMPLEMENT AND CHANGE EROSION CONTROL MEASURES AS NECESSITATED BY
CONSTRUCTION ACTIVITIES.
4.CONTRACTOR SHALL MAINTAIN BMP C150: MATERIALS ON HAND, ON-SITE IN AN AREA EASILY ACCESSIBLE.
5.CONTRACTOR TO FOLLOW BMP C153: MATERIAL DELIVERY, STORAGE AND CONTAINMENT IN THE STORAGE OF
HAZARDOUS MATERIALS ONSITE.
TESC NOTES
1.DEMOLITION: IT IS THE INTENT UNDER THE WORK OF THIS CONTRACT TO INCLUDE, BUT NOT LIMITED TO, THE
DEMOLITION OF ALL EXISTING PAVING, AND OTHER EXISTING SITE IMPROVEMENTS INCLUDING THE
UNDERGROUND COMPONENTS AS CLARIFIED BY THIS DRAWING. IT IS THE CONTRACTOR'S RESPONSIBILITY TO
FULLY REVIEW THE SITE CONDITIONS AND TO CORRELATE THESE OBSERVATIONS WITH THE PROJECT WORK
AND INCLUDE ALL NECESSARY DEMOLITION, WHETHER SHOWN OR NOT, AND INCLUDE ALL SUCH COSTS IN THE
SCOPE OF WORK.
2.CLEARING: IT IS THE INTENT UNDER THE WORK OF THIS CONTRACT TO CONDUCT ALL CLEARING NECESSARY TO
BE ABLE TO COMPLETE ALL THE WORK OF THIS PROJECT.
3.CONTRACTOR SHALL LEGALLY DISPOSE ALL DEMOLISHED AND REMOVED MATERIALS OFF THE OWNER'S
PROPERTY UNLESS INDICATED OTHERWISE.
4.IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO COMPLETELY COORDINATE UTILITY DEMOLITION WITH NEW
CONSTRUCTION. CONTRACTOR SHALL ENSURE THAT ADEQUATE FIRE PROTECTION IN ACCORDANCE WITH THE
FIRE MARSHAL'S REQUIREMENTS IS PROVIDED FOR EXISTING BUILDINGS.
5.ALL WORK SHALL BE CONTAINED WITHIN THE CONSTRUCTION LIMITS SHOWN ON THIS DRAWING. NO ADJOINING
AREAS SHALL BE DISTURBED BY CONSTRUCTION ACTIVITIES.
6.CONTRACTOR TO PROVIDE ADEQUATE MEASURES TO MINIMIZE THE AMOUNT OF SEDIMENT TRANSPORTED
ONTO PAVED ROADS FROM MOTOR VEHICLES LEAVING THE PROJECT SITE. DEPOSITED SEDIMENT SHALL BE
CLEANED EVERY DAY BY SHOVELING OR SWEEPING. WATER CLEANING SHALL ONLY BE DONE AFTER THE AREA
HAS BEEN SHOVELED OUT OR SWEPT.
7.CONTRACTOR TO PROTECT EXISTING UTILITIES UNLESS OTHERWISE NOTED.
DEMOLITION NOTES
FILTER FABRIC FENCE
CLEARING LIMITS
FF
CL
INLET SEDIMENT PROTECTION
ASPHALT PAVEMENT REMOVAL
CONCRETE PAVEMENT REMOVAL
TESC & DEMOLITION LEGEND
SAWCUT LINESL
IP
1
C1.1
2
C1.1GRAPHIC SCALE
0 30 60
1" = 30 FEET
15
N
PROTECT EXISTING
CATCH BASIN
SW 7TH STREET 09/05/2018RECEIVED
11/14/2018 jtaylor
PLANNING DIVISION
EXISTING BUILDING
66,786 SF
BUILDING
ADDITION
6,386 SF
EXISTING
BUILDING
1,680 SF
CHAIN LINK FENCE
REFER TO ARCHITECTURAL
STAIR
REFER TO ARCHITECTURAL
FREEZER COMPRESSOR ON 30' x 10'
CONCRETE PAD. REFER TO
MECHANICAL AND ARCHITECTURAL.
ROOF DOWNSPOUT
PROVIDE SPLASH BLOCK
TO EXISTING PAVEMENT
ROOF DOWNSPOUT
PROVIDE SPLASH BLOCK
TO EXISTING PAVEMENT
MATCH EXISTING
PAVEMENT ELEVATION
EXISTING CATCH BASIN
EXISTING CATCH BASIN
Sheet No.Designed by:Drawn by:Checked by:Sheet Title:Revisions:Issue Set & Date:Client:Job No.of Sheets123Project Title:535 DOCK ST, SUITE 211, TACOMA, WA 98402TEL: 253.284.9680 FAX:253.284.9681WWW.TAHOMADESIGNGROUP.COMTAHOMADESIGN GROUPNorthwest Gourmet Foods - Freezer Addition
600 SW 7th St, Renton, WA 98057
Northwest Gourmet FoodsFreezer AdditionNorthwest Gourmet Foods600 SW 7th St, Renton, WA 98057Mike Gilroy (425) 793-5001Issue For ClientReview9/4/20182160966.10DRAINAGE ANDSURFACING PLANTDWTDWSTKC1.12215 North 30th Street, Suite 300 Tacoma, WA 98403
253.383.2422TEL 253.383.2572FAX www.ahbl.comWEB
TACOMA SEATTLE SPOKANE TRI-CITIES
GRAPHIC SCALE
0 30 60
1" = 30 FEET
15
N
ASPHALT PAVEMENT
CONCRETE PAVEMENT
(PER STRUCTURAL)
SURFACING LEGEND
3
C1.1
SW 7TH STREET
REFER TO ARCHITECTURAL PLANS FOR HORIZONTAL CONTROL INFORMATION.
STORMWATER RUNOFF FROM THE BUILDING ROOF WILL SPLASH BLOCK ONTO
PAVEMENT AND DRAIN TO EXISTING CATCH BASINS. STORMWATER RUNOFF
FROM THE COMPRESSOR PAD AND GRAVEL WILL SHEET FLOW TO THE
EXISTING LAWN AREA, USING BASIC DISPERSION.
NOTE
PROVIDE GRAVEL
SURFACING INSIDE
CHAIN LINK FENCE
MATCH EXISTING
FINISH FLOOR
AREA DISTURBED:7,632 SF
REPLACED IMPERVIOUS SURFACE:6,386 SF (BUILDING)
334 SF (PAVEMENT)
NEW IMPERVIOUS SURFACE:300 SF (COMPRESSOR PAD)
612 SF (GRAVEL)
PROJECT STATISTICS
09/05/2018
Sheet No.Designed by:Drawn by:Checked by:Sheet Title:Revisions:Issue Set & Date:Client:Job No.of Sheets123Project Title:535 DOCK ST, SUITE 211, TACOMA, WA 98402TEL: 253.284.9680 FAX:253.284.9681WWW.TAHOMADESIGNGROUP.COMTAHOMADESIGN GROUPNorthwest Gourmet Foods - Freezer Addition
600 SW 7th St, Renton, WA 98057
Northwest Gourmet FoodsFreezer AdditionNorthwest Gourmet Foods600 SW 7th St, Renton, WA 98057Mike Gilroy (425) 793-5001Issue For ClientReview9/4/20182160966.10NOTES AND DETAILSTDWTDWSTKC1.22215 North 30th Street, Suite 300 Tacoma, WA 98403
253.383.2422TEL 253.383.2572FAX www.ahbl.comWEB
TACOMA SEATTLE SPOKANE TRI-CITIES
PROVIDE
HERBICIDE
TREATMENT
NOTE :
1.ALL DEPTHS SHOWN ARE COMPACTED DEPTHS.
2.PREPARE SUBGRADE PER GEOTECHNICAL
RECOMMMENDATIONS.
COMPACTED
SUBGRADE TO 95%
30" MINIMUM
CRUSHED SURFACING
TOP COURSE PER
WSDOT STANDARD
SPECIFICATION 9-03.9(3)
HMA CLASS 1/2", PG 64-22
PER WSDOT STANDARD
SPECIFICATION 5-04
6"
3"
1 NOT TO SCALE
FILTER FABRIC FENCE 2 NOT TO SCALE
INLET SEDIMENT PROTECTION 3 NOT TO SCALE
ASPHALT PAVEMENT SECTION 09/05/2018