Loading...
HomeMy WebLinkAboutCM_Construction Mitigation Description.pdfConstruction Mitigation Description I-Kuan-Tao Cultural Center Addition 711 Monroe Ave NE Renton 08-25-2018 Proposed construction dates 01/01/2019 to 12/31/2019 Hours and days of operations 7am to 5pm (Mon to Fri) / 8am to 5pm (Sat) Proposed hauling / transportation route I-405  NE Sunset Blvd NE  NE 10th St.  Monroe Ave NE Measures of construction There is large space between the building and the street providing construction vehicle parking and staging. Existing concrete driveway will be used for construction entrance. Portable toilet will be placed away from sidewalk and adjacent properties. Silt fence will be installed to limit disturbance area. Volume of radio play will be controlled to avoid bothering the neighborhood. Traffic control plans Not required.