HomeMy WebLinkAboutCOW Handouturo C
w r -
'5
`� d3
41
20 • ■ la
r. g •lzr.y,��f � =fin b6d2
as
`k.- 33 . Br:.. - 1 ■
Pi2g1 Ht4 a x _
3ess
— — I
•11 2.1 Z3 13
—
•3S 36 w
3/
25
vi }
.'Rtitafta 3o
S`
•1
13
y
I -
1
r
it
23 •
�T Ir a
s
i 1
2.2
a
� t N
t
Maintenance and Preservation
Corridor Projects
Traffk Operations and Safety
Non -Motorized Projects
OTIP Number
City-wide projects are not mapped.
2019-2020 Street candidates are shown for Street Overlay )TIP No. 1)
INDEX OF PROJECTS
tip
mlMTwe
nP
l-Tft
P
rofM Tlrk
t
eet Ovedav
is
w.yx erae<Rew6
91
wa.n. Blw x/swen pml Aaess Imgovemenls
Mal RenaMRtatim Progam
I6
wH Ave NE RoetlwaY pnProrcmmis
31
InA W Rwdw.y Widening
d1
1�
ton Avenue 5 Resunc�mg
11
uan WaV N BridR Repair
33
Pgan Ave NorM Improvemen
2.2
W 13rd 51 Res—ing
lg
ke W.—gm 1 P LraN
31
aPle Valley Highway &mien
3
alkway Progam
19
E1=1 a.(SR lmgovements
35
sterRwtlSW/6BM Arcs knprovemenh
1
dw.y Safety and Gwrdrail %ogam
1a
ark Ave Nerin Ertemion
E3rd Sb /NE - Street C-1—nngwemmla
s
rs<Ctiw mretYaknntixty vmgram
ves/N r,.ddm kn nh Pn.aee
37ve
xE %age Repiir
39erArc
NCorrider Nngo hPnauS
r-0Kr—Omcn Program
13
1160, Ave SE Imprprcmmb
39
on Bus Rapid Tranad IgRTI hngavemenx
g
nMNgent TranSpMadon Systems lnsl Pragram
11
w 2nd Sbeel Conversion Project
mn Masten —it Pbn
9
id<w.a Renatnir.twn.na Red,r< me
e.lag<ReP.ir
idge lmpermae RePalr Prag.m
mn%o t
11
hW]M Sgirce[Corridor Rngovemtcnh
Implem<
z1
rriRwdimgmrcmentsArc
13
uM Gr.Ey Wry MWH-Modal improvemenn
li
qnl Derclopmenta%e-Resign Program
Ig
ser W.YNw-Moroneed Nnprevemenh
Ig
uth Lake Washm,g 1—. Slop
13
nerblGNubBm Program
19
er Way NarM Widening and Realignmml
15
set Area Gr,m 1—.
11
%fIX Me Artr Prepam
30
akerm Sourd ILI5l Troll
W—glreet/5—den aoukvard Connection
41 .Ito Rows/I37-M Im
2019/2020 Proposed Budget
City of Renton, Washington
SUMMARY BY COUNCIL PRIORITY
Life to Date
Thru 2018
Proposed
P r o j e c t e d
Project
Total
Fro%ects
PrZ
2019
2020
2021
2022
2023
2024
Street Overlay
1
M
3,525
1,090
1,170
2,070
2,170
2,260
2,360
14,645
Arterial Rehabilitation Program
2
M
-
-
-
-
1,540
1,610
1,680
4,830
Arterial Rehabilitation Program - Renton Ave Resurfacing
2.1
M
550
-
Arterial Rehabilitation - SW 43rd St Pavement Preservation
2.2
M
-
-
220
-
1,820
-
-
-
-
550
Walkway Program
3
M
83
200
250
250
250
-
250
-
250
2,040
1,533
Roadway Safety and Guardrail Program
4
M
30
25
25
30
30
35
35
210
Intersection Safety & Mobility Program
5
C
200
250
200
350
350
350
350
2,050
Traffic Safety Program
6
M
297
150
150
150
150
150
150
1,197
Traffic Operation Devices Program
7
M
279
120
120
120
120
120
120
999
Intelligent Transportation Systems (ITS) Program
8
M
70
60
60
60
60
60
60
430
Sidewalk Rehabilitation and Replacement Program
9
M
922
100
110
110
110
110
110
1,572
Bridge Inspection & Repair Program
10
M
225
90
50
100
100
100
100
765
Barrier Free Transition Plan Implementation
11
M
60
60
80
80
80
80
80
520
Project Development & Pre -Design Program
12
M
210
150
150
150
ISO
150
150
1,110
Arterial Circulation Program
13
M
200
145
ISO
150
150
ISO
150
1,095
1% For The Arts Program
14
D
44
15
15
15
15
15
15
134
Bronson Way N Bridge Repair
15
M
70
420
2,510
-
-
-
3,000
Duvall Ave NE - NE 7th St to Sunset Blvd NE
16
M
4,992
1,512
-
-
6,504
Houser Way N Bridge Repair
17
M
70
470
2,532
223
3,295
Lake Washington Loop Trail
18
D
2,138
340
1,425
-
1,200
950
3,250
9,303
NE Sunset Boulevard (SR 900) Corridor Improvements
19
M
1,692
459
2,750
7,550
6,850
6,450
6,250
32,001
Park Avenue North Extension
20
D
1,050
5,825
625
-
-
-
-
7,500
Rainier Ave S/N Phase 4 -S 3rd Street to NW 3rd PI
21
D
2,049
1,500
1,951
8,800
5,750
250
-
20,300
Renton Connector
22
C
-
-
-
279
621
3,963
8,850
13,713
116th Ave SE Improvements
23
C
875
-
1,600
3,700
2,600
2,200
10,975
South 2nd Street Conversion Project
24
D
-
200
1,350
7,800
7,800
-
17,150
Williams Ave N Bridge Repair
25
M
70
470
2,640
-
-
-
3,180
Williams Ave S and Wells Ave S Conversion Project
26
C
3,642
1,934
6,348
11,924
Carr Road Improvements
27
D
784
50
-
-
_
834
Houser Way S/N Non -Motorized Improvements
28
D
-
-
385
836
966
2,187
Houser Way North - North 8th Street to Lake Washington Blvd
29
D
-
-
1,065
1,560
2,340
4,965
Lake to Sound (L2S) Trail
30
D
910
2,800
-
-
-
3,710
Lake Washington Blvd N - Park Ave N to Gene Coulon Memorial Park
31
D
443
2,000
-
-
-
2,443
Lind Ave SW - SW 16th St to SW 43rd St
32
D
-
-
400
1,650
2,350
4,400
Logan Ave North Improvements
33
D
7,353
-
1,240
10,000
18,593
Maple Valley Highway Barriers
34
D
-
299
2,839
-
-
3,138
Monster Road SW/68th Ave S Roadway Improvements
35
D
-
-
-
50
8,000
8,050
36. NE 3rd_4th
36
D
3,719
20
20
750
4,190
5,180
3,200
17,079
Nile Ave NE Bridge Repair
37
C
-
50
200
-
-
-
250
Rainier Ave N Corridor Improvements (Phase 5)
38
D
-
-
100
2,000
2,100
Renton Bus Rapid Transit (BRT) Improvements
39
D
-
3,195
9,053
9,053
21,301
Transit Master Plan
40
P
300
200
-
-
S00
South 3rd Street Conversion Project
41
C
4,000
6,500
10,700
-
21,200
7th Street Corridor Improvements - Naches Ave S to Talbot Road S
42
D
1,659
200
1,600
10,364
3,609
17,432
South Grady Way - Talbot Rd South to Rainier Ave South
43
C
S50
1,760
1,690
-
4,000
South Lake Washington Transit Stop
44
D
4,350
-
-
-
4,350
Sunset Area Green Connections
45 1
D
3,600 1
10,700 1
71900
22,200
Total
37,661
80 20,5
23,801
06 35,91
56,930 1
80,576 1
75,578
331,257
Lffe to Data
Thru 2018
Proposed
P r o; J e c t 'e d
Project
Total
Resources:
2019
2020
2021
2022
2023
2024
General Fund Sources
5,023
1,813
2,227
2,285
2,475
1,820
1,880
17,523
Restricted Taxes
1,543
700
710
720
730
740
750
5,893
Mitigation Fees
4,01S
699
1,540
760
800
250
-
8,064
Bond Proceeds
-
7,S00
7,500
Grants/Contributions Awarded
22,914
10,495
12,357
8,000
-
S3,766
Grants/Contributions Anticipated
300
(300)
6,222
2,100
4,455
12,777
Fund Balance
3,866
523
120
100
1 -
4,609
Total Resources
37,6611
21,4301
23,1761
13,9651
8,4601
2,8101
2,630
110,132
Balance Available/(Unfunded Needs) 625 (625) (21,941) (48,470) (77,766) (72,948) (221,125)
* NOTE: A - Acquisition, C- Cross Category, D - Development, M - Maintenance, P - Planning
** Projects under construction and/or with a phase under construction
0
City of Renton 12019 - 2024 TRANSPORTATION IMPROVEMENT PROGRAM (D
SUMMARY OF PROJECTS AND PRIORITIZATION
The prioritization of the TIP is influenced by the interconnection and/or interdependence among TIP projects
and with projects by other City departments and by other jurisdictions as well as the timing of those
transportation projects. Equally important to the prioritization below is the likelihood, the time frame, and
the amount of outside funding that will be obtainable to finance transportation projects.
The prioritization lists below are sorted by the category type of the projects.
Priority TIP No. Project Title Community Planning Area
Maintenance and Preservation of the Existing Infrastructure
1
1
Street Overlay
Citywide
2
2
Arterial Rehabilitation Program
Citywide
3
2.1
Renton Avenue S Resurfacing,
City Center
S 130th St to Taylor Ave NW
4
2.2
SW 43rd St Resurfacing,
Valley
SR 167 to west City Limits
5
15
Bronson Way N Bridge Repair,
City Center
across Cedar River
6
17
Houser Way N Bridge Repair,
City Center
across Cedar River
7
25
Williams Ave N Bridge Repair,
City Center
across Cedar River
8
9
Sidewalk Rehabilitation and Replacement Program
Citywide
9
37
Nile Ave NE Bridge Repair,
East Plateau
across May Creek
10
10
Bridge Inspection & Repair Program
Citywide
11
4
Roadway Safety and Guardrail Program
Citywide
15
V City of Renton 12019 - 2024 TRANSPORTATION IMPROVEMENT PROGRAM
Priority TIP No. Project Title community Planning Area
Corridor
' 1
26
Williams Ave S and Wells Ave S Conversion Project,
City Center
5 Grady Way to N 1st St
2
20
Park Ave North Extension,
City Center
Logan Ave N to Southport
3
21
Rainier Ave S/N Corridor Improvements Phase 4,
City Center
5 3rd St to NW 3rd PI
4
16
Duvall Ave NE Roadway Improvements,
Highlands & E. Plateau
NE 7th St to Sunset Blvd NE
5
24
South 2nd Street Conversion Project,
City Center
Rainier Ave 5 to Main St
19
NE Sunset Boulevard (SR 900) Corridor Improvements
Highlands
6
1-405 to east City Limits
7
23
116th Ave SE Improvements,
Benson
Puget Drive SE to the south City Limits
8
41
South 3rd Street Conversion Project,
City Center
Rainier Ave S to Main St
9
22
Renton Connector,
City Center
5 2nd St to S 5th St
10
44
South Lake Washington Transit Stop,
City Center
vicinity of Southport Dr N and Garden Ave N
11
27
Carr Road improvements,
Talbot & Benson
Lind Ave SW to 116th Ave SE
12
39
Renton Bus Rapid Transit (BRT) Improvements,
City Center
S Renton Village PI extension to S Grady Way
13
42
South 7th Street Corridor Improvements,
City Center
Rainier Ave South to Talbot Road South
31
Lake Washington Blvd N/ Southport Access Improvements,
City Center
14
Park Ave N to Gene Coulon Park
15
43
South Grady Way Multi -Modal Improvements,
City Center
Talbot Rd South to Rainier Ave South
16
38
Rainier Ave N Corridor Improvements Phase 5,
City Center
NW 3rd PI to City Limits
17
29
Houser Way North Widening and Realignment,
City Center
N Sth St to Lake Washington Blvd
18
33
Logan Ave North Improvements,
City Center
S 2nd St to Park Ave N
19
36
NE 3rd Street / NE 4th Street Corridor Improvements,
Highlands & E. Plateau
Sunset Blvd N to the east City Limits
20
32
Lind Ave SW Roadway Widening,
Valley
SW 16th St to SW 43rd St
Monster Road SW/68th Ave S Roadway Improvements,
Valley
21
35
Monster Rd Bridge and City Limits
22
46
SW 27th Street/Strander Boulevard Connection
Valley
16
El
City of Renton 12019 - 2024 TRANSPORTATION IMPROVEMENT PROGRAM (D
Priority TIP No. Project Title Community Planning Area-
Onerations and Safety
1
5
Intersection Safety & Mobility Program
Citywide
2
6
Traffic Safety Program
Citywide
3
8
Intelligent Transportation Systems (ITS) Program
Citywide
4
7
Traffic Operation Devices Program
Citywide
5
34
Maple Valley Highway Barriers,
Cedar River
west edge of Riverview Park
6
47
Talbot Road S / S 177th St Signalization and Roadway Improvements,
Talbot
adjacent to Valley Medical Center
Non -Motorized Proiects
1
18
Lake Washington Loop Trail,
City Center
south perimeter of the Renton Airport
2
30
Lake to Sound (L2S) Trail,
Valley & City Center
East-West Trail connecting Lake Washington to Puget Sound
3
28
Houser Way S/N Non -Motorized Improvements,
City Center
Mill Ave S to Bronson Way S
4
11
Barrier -Free Transition Plan Implementation
Citywide
5
3
Walkway Program
Citywide
6
45
Sunset Area Green Connections,
Highlands
vicnity of Sunset Area Revitilzotion Area
Other Proerams
1
13
Arterial Circulation Program
Citywide
2
12
Project Development & Pre -Design Program
Citywide
3
40
Transit Master Plan
Citywide
4
14
1% for the Arts Program
N/A
17